A fast construction method for hollow anchor reinforcement in tunnels

By simplifying the construction steps of hollow anchor reinforcement, including drilling holes, grouting and sealing, the problems of long construction time and low efficiency in the existing technology are solved, and efficient hollow anchor reinforcement is achieved to achieve high fullness and density. requirements, saving materials and costs.

CN114876540BActive Publication Date: 2024-10-18CHINA RAILWAY TUNNEL GROUP CO LTD +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202210459644.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-04-28
Publication Date
2024-10-18
Estimated Expiration
2042-04-28

AI Technical Summary

Technical Problem

The existing hollow anchor reinforcement construction process is complicated, resulting in long construction time, low efficiency, and increased construction costs.

Method used

A quick construction method for hollow anchors is designed, which includes drilling anchor holes at the stakeout point, measuring the volume difference, inserting the grouting pipe and injecting slurry, checking the fullness, inserting the hollow anchors and sealing the holes, which simplifies the construction steps. .

Benefits of technology

It significantly shortens the construction time, improves the construction efficiency, reaches 84% ​​fullness and 70% density requirements, and saves materials and costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114876540B_ABST
    Figure CN114876540B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for fast construction of hollow anchor reinforcement suitable for tunnels, so as to solve the technical problems of long construction time and low efficiency of existing hollow anchor reinforcement. The main steps of the method include: drilling holes, removing slag and cleaning holes; measuring the volume difference ΔV between the anchor hole volume V1 and the hollow anchor rod volume V2; injecting ΔV volume of slurry into the anchor hole, and before the grouting of the anchor hole is completed, the hollow anchor rod body corresponding to the anchor hole is filled with slurry; inserting the hollow anchor to the bottom of the corresponding anchor hole; checking whether the slurry position in the anchor hole is full; closing the anchor hole. The method for fast construction of hollow anchor reinforcement disclosed by the present invention saves the reinforcement construction process of the hollow anchor, greatly reduces the reinforcement construction time of the hollow anchor, further optimizes the hollow anchor material, saves construction costs, is convenient and fast, has strong operability, and can meet the requirements of corresponding technical specifications.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of tunnel reinforcement, and in particular to a quick construction method for hollow anchor reinforcement of tunnels. Background Art

[0002] As a kind of fixing parts, anchor rods have been widely used in reinforcement projects such as tunnel support, rock and soil slope support, foundation pit support and dam support. They mainly overcome the deficiency that the tensile capacity of rock and soil is far lower than its compressive capacity through the longitudinal tension of the anchor rod body.

[0003] The construction process of hollow anchor reinforcement currently used in tunnel projects is relatively complicated, including: anchor hole arrangement, anchor hole drilling, rod body installation, slurry stopper and exhaust pipe installation, slurry mixing, grouting machine inspection and grouting, anchor grouting fullness inspection (slurry is discharged from the exhaust hole, that is, the grouting is full), sealing, and installation of pads and bolts.

[0004] In TB / T 3209-2008, "Technical Conditions for Hollow Anchors", the 4.1.1 Product Use Clauses states: When ordinary hollow anchors are used in side walls or downward-inclined anchor holes, the exhaust grouting process of grouting at the bottom of the anchor hole and exhaust at the anchor hole mouth should be adopted. The mortar in the anchor hole is filled from the inside to the outside, and the hollow anchor body also serves as the grouting pipe. When used in arches or upward-inclined anchor holes with an elevation angle greater than 30 degrees, the exhaust grouting process of grouting at the anchor hole mouth and exhaust at the bottom of the anchor hole should be adopted. The mortar in the anchor hole is filled from the outside to the inside, and the mortar is injected into the anchor hole from the grouting pipe. The hollow inner control of the hollow anchor body is used as an exhaust grouting pipe, and the air in the anchor hole is discharged from the hollow inner hole of the hollow anchor body. After the grouting is completed, the plug should be installed immediately. Clause 4.2.1.3 states: When grouting the combined hollow anchor rod, the mortar enters the anchor hole from the grout outlet on the connecting sleeve through the hollow inner hole of the hollow anchor rod body. The mortar in the anchor hole is filled from the outside to the inside, and the air in the anchor hole is discharged from the exhaust pipe. After the grouting is completed, the plug should be installed immediately.

[0005] The complicated construction process seriously restricts the efficiency of hollow anchor reinforcement construction, increases the construction period, and also virtually increases the construction cost. Therefore, a fast and convenient hollow anchor reinforcement construction method is urgently needed.

[0006] The information disclosed in this background technology section is only intended to deepen the understanding of the overall background technology of the present invention, and should not be regarded as acknowledging or suggesting in any form that the information constitutes the prior art known to those skilled in the art. Summary of the invention

[0007] The purpose of the present invention is to provide a fast construction method for hollow anchor reinforcement of tunnels, so as to solve the technical problems of long construction time and low efficiency of existing hollow anchor construction.

[0008] In order to solve the above technical problems, the present invention adopts the following technical solutions:

[0009] A method for rapid construction of hollow anchor rods is designed, comprising the following steps:

[0010] (1) Drilling an anchor hole corresponding to the hollow anchor at the stakeout point, and removing slag and cleaning the anchor hole;

[0011] (2) Calculate the volume difference ΔV between the anchor hole volume V1 and the hollow anchor body volume V2;

[0012] (3) inserting the grouting pipe into the bottom of the anchor hole, starting the grouting machine to inject ΔV volume of grout into the anchor hole, and before the grouting of the anchor hole is completed, the hollow anchor rod body corresponding to the anchor hole is filled with grout;

[0013] (4) Insert the hollow anchor filled with grout into the bottom of the corresponding anchor hole;

[0014] (5) Check whether the grout in the anchor hole overflows to the corresponding position of the rock surface at the hole mouth and is full. Otherwise, inject grout into the hole until it is full.

[0015] (6) At the opening of the anchor hole, a gasket is fastened with a nut and sleeved on the corresponding position of the hollow anchor body close to the rock surface to squeeze the grout stop plug and thus close the anchor hole.

[0016] Furthermore, in the step (1), the layout points are measured and laid out according to technical instructions before the anchor bolt construction.

[0017] Furthermore, in step (1), the hollow anchor rod comprises: a hollow rod body, a grout stopper, a gasket, and a nut; the hollow rod body is provided with a thread corresponding to the nut; the grout stopper and the gasket have through holes corresponding to the hollow rod body in the center; the grout stopper, the gasket, and the nut are sequentially arranged on the hollow rod body.

[0018] Furthermore, in step (1), the anchor hole depth is such that the length of the corresponding hollow anchor rod body in the hole that leaks out of the rock surface at the hole opening is less than the designed initial shotcrete thickness.

[0019] Furthermore, in step (3), the slurry is mixed according to the design requirements and the mortar mix ratio reported by the laboratory before grouting to ensure the slump of the slurry and make the bonding force between the slurry and the cave wall greater than its own gravity.

[0020] Furthermore, in step (3), the hole diameter of the grouting pipe is smaller than the hole diameter of the anchor hole, so that the grouting pipe inserted into the bottom of the anchor hole before grouting can be gradually pushed out of the hole under the reaction force of the slurry during grouting.

[0021] Furthermore, in the step (3), the grouting pipe is provided with a mark at the corresponding position where the plane of the rock surface at the hole mouth intersects with the grouting pipe when the grouting amount in the anchor hole reaches the measurement requirement.

[0022] Furthermore, in the step (3), when the grouting pipe is grouting into the hollow anchor rod body, the grouting pipe is fixed to a threaded connecting sleeve matching the anchor rod thread and used for connecting the anchor rod body by a buckle.

[0023] Furthermore, in step (3), the time interval between the completion time of grouting of the hollow anchor rod body and the completion time of grouting of the anchor hole is no more than 2 hours.

[0024] Compared with the prior art, the main beneficial technical effects of the present invention are:

[0025] 1. The hollow anchor reinforcement rapid construction method disclosed in the present invention overcomes the existing technical prejudice. It is not difficult to find from relevant industry standards such as TB / T 3209-2008, "Technical Conditions for Hollow Anchors" that the hollow anchor construction method adopts the exhaust grouting process, and the hollow anchor must be inserted into the anchor hole first, and then grouting is performed through the hollow anchor. The present invention breaks the limitation of this rule. The hollow anchor reinforcement project constructed by the method disclosed in the present invention has a fullness of 84%, which meets the requirements of Class II anchors specified in the DLT5424-2009 specification and the anchor density of not less than 70% in the SL377-2007 specification.

[0026] 2. The hollow anchor reinforcement rapid construction method disclosed in the present invention saves construction procedures, greatly reduces the construction time of the hollow anchor, is convenient and fast, and has strong operability. For example, the prior art takes 55 minutes to install a qualified Φ25, 4.5m long hollow anchor; the hollow anchor reinforcement rapid construction method of the present invention takes 27 minutes; compared with the prior art, each hollow anchor will save 28 minutes, greatly improving the hollow anchor reinforcement construction efficiency.

[0027] 3. The hollow anchor rod reinforcement rapid construction method disclosed in the present invention further optimizes the hollow anchor rod material by saving construction procedures. Compared with the prior art, the reinforcement rapid construction method of the present invention eliminates the exhaust pipe required to match the hollow anchor rod in the prior art, thereby saving construction costs to a certain extent. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 This is a schematic diagram of the hollow anchor rod structure in Example 1.

[0029] Figure 2 Schematic diagram of the cross-sectional structure of the hollow anchor rod in Example 1.

[0030] Figure 3This is a schematic diagram of the connection between the grouting pipe and the hollow anchor rod in Example 1.

[0031] Figure 4 This is a schematic diagram of the anchor hole grouting construction in Example 1.

[0032] Figure 5 This is the waveform of the anchor rod fullness in Example 1.

[0033] In the above figures, 1 is the rod body, 2 is the stop plug, 3 is the gasket, 4 is the nut, 5 is the rubber grouting pipe, 6 is the buckle, 7 is the threaded connecting sleeve, 8 is the working platform, 9 is the rock mass, 10 is the anchor hole, and 11 is the grouting machine. DETAILED DESCRIPTION

[0034] The specific implementation modes of the present invention are described below in conjunction with the accompanying drawings and examples. However, the following examples are only used to illustrate the present invention in detail and do not limit the scope of the present invention in any way.

[0035] In the description of the technical solution of the present invention, it is necessary to understand that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", etc. indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the present invention.

[0036] Unless otherwise specified, the components, structures and other devices involved in the following embodiments are conventional commercially available products.

[0037] Example 1: A method for rapid construction of hollow anchor rods. In the construction of hollow anchor rods in a tunnel of a certain section, see Figure 1-Figure 2 , setting a Φ25, 4.5m long hollow anchor rod, including the following steps:

[0038] Step 1: Before construction, use a total station to measure and stake out the anchor holes planned in the technical briefing, clean the surrounding rock surface, and start mixing the corresponding proportion of slurry. According to relevant technical requirements, drill a Φ42, 4.5m long anchor hole at the stakeout point. After the hole is formed, use an elbow steel pipe to pass high-pressure air to remove slag and clean the anchor hole. This step takes 7 minutes in total.

[0039] Step 2: See Figure 3 , screw the threaded connection sleeve that matches the hollow anchor rod body to the rod head, use the buckle to fasten the rubber grouting pipe to the threaded connection sleeve, start the grouting machine to fill the 4.5m long hollow anchor rod body with grouting, and after the grouting is completed, install a plug at the grouting port of the rod body to prevent the grouting from leaking out. Calculate the anchor hole volume V1=πR 2 L = 3.14 × (0.042 / 2)2 ×4.5=0.006231m 3 、Volume of hollow anchor rod V2==πr 2 L = 3.14 × (0.025 / 2) 2 ×4.5=0.002208m 3 Calculate the volume difference between the two, ΔV = 0.004023 m 3 , the volume of the hollow anchor rod is calculated to be 35.4% of the volume of the anchor hole, and the distance between the liquid level and the hole mouth after grouting is calculated to be L=ΔV / πR 2 =0.004023 / 3.14×(0.042 / 2) 2 =2.96m, use a thin tie to mark the corresponding position from the rubber grouting pipe outlet to the grouting pipe 2.96m. This step takes 10 minutes in total.

[0040] Step 3: See Figure 4 , insert the grouting pipe into the bottom of the anchor hole, start the grouting machine, and the grouting pipe is gradually pushed out of the hole under the reaction force of the slurry. When the tie mark on the grouting pipe reaches the rock surface position at the hole mouth, turn off the grouting machine to complete the grouting of the anchor hole. This step takes a total of 3 minutes.

[0041] Step 4: Insert the hollow anchor filled with grout to the bottom of the corresponding anchor hole. This step takes less than 1 minute.

[0042] Step 5: Check whether the grout in the anchor hole overflows to the corresponding position of the rock surface at the hole mouth and is full. Otherwise, inject grout into the hole until it is full. This step takes less than 1 minute.

[0043] Step 6: At the hole of the anchor, put the stop plug and the gasket on the hollow anchor body, fit the stop plug into the hole of the anchor, and then use bolts to tightly fit the gasket to the rock surface to close the anchor hole. This step takes 4 minutes in total.

[0044] The installation time of a hollow anchor rod in this embodiment is about 26 minutes. Figure 5 The waveforms detected by non-destructive testing instrument are symmetrical, and the fullness of the hollow anchor is calculated to be 84%, which meets the requirements of Grade II anchors specified in DLT5424-2009 and anchor grouting density of not less than 70% specified in SL377-2007.

[0045] The present invention has been described in detail above with reference to the accompanying drawings and embodiments. However, those skilled in the art will appreciate that, without departing from the concept of the present invention, the specific parameters in the above embodiments may be changed, or the relevant components, materials and method steps may be replaced by equivalents, thereby forming multiple specific embodiments, which are all within the common variation range of the present invention and will not be described in detail one by one here.

Claims

1. A method for rapid construction of hollow anchor reinforcement, characterized in that: The steps include: (1) Drilling an anchor hole corresponding to the hollow anchor at the stakeout point, and removing slag and cleaning the anchor hole; (2) Calculate the volume difference ΔV between the anchor hole volume V1 and the hollow anchor body volume V2; calculate the distance L between the liquid level in the anchor hole and the hole opening after grouting, and mark the corresponding position L on the grouting pipe from the grouting outlet; (3) Insert the grouting pipe into the bottom of the anchor hole, start the grouting machine to inject ΔV volume of grout into the anchor hole, and turn off the grouting machine when the mark on the grouting pipe reaches the rock surface position at the hole mouth. Before the grouting of the anchor hole is completed, fill the hollow anchor rod body corresponding to the anchor hole with grouting; (4) Insert the hollow anchor filled with grout into the bottom of the corresponding anchor hole; (5) Check whether the grout in the anchor hole overflows to the corresponding position of the rock surface at the hole mouth and is full. Otherwise, inject grout into the hole until it is full. (6) At the opening of the anchor hole, a gasket is fastened with a nut and sleeved on the corresponding position of the hollow anchor body close to the rock surface to squeeze the grout stop plug and thus close the anchor hole.

2. The hollow anchor reinforcement rapid construction method according to claim 1 is characterized in that: In the step (1), the layout points are measured and laid out according to the technical instructions before the anchor construction.

3. The hollow anchor reinforcement rapid construction method according to claim 1 is characterized in that: In step (1), the hollow anchor rod comprises: a hollow rod body, a grout stopper, a gasket, and a nut. The hollow rod body is provided with a thread corresponding to the nut. The grout stopper and the gasket have through holes corresponding to the hollow rod body at their centers. The grout stopper, the gasket, and the nut are sequentially arranged on the hollow rod body.

4. The hollow anchor reinforcement rapid construction method according to claim 1 is characterized in that: In the step (1), the anchor hole depth is such that the length of the corresponding hollow anchor rod body in the hole that leaks out of the rock surface at the hole opening is less than the designed initial shotcrete thickness.

5. The hollow anchor reinforcement rapid construction method according to claim 1 is characterized in that: In step (3), the slurry is mixed according to the design requirements and the mortar mix ratio reported by the laboratory before grouting to ensure the slump of the slurry and make the bonding force between the slurry and the cave wall greater than its own gravity.

6. The hollow anchor reinforcement rapid construction method according to claim 1 is characterized in that: In step (3), the grouting pipe has a smaller diameter than the anchor hole, so that the grouting pipe inserted into the bottom of the anchor hole before grouting can be gradually pushed out of the hole under the reaction force of the slurry during grouting.

7. The hollow anchor reinforcement rapid construction method according to claim 1 is characterized in that: In the step (3), when the grouting pipe is grouting into the hollow anchor rod body, the grouting pipe is fixed to a threaded connection sleeve matching the anchor rod thread and used for connecting the anchor rod body by a buckle.

8. The hollow anchor reinforcement rapid construction method according to claim 1, characterized in that: In the step (3), the time interval between the completion time of the grouting of the hollow anchor rod body and the completion time of the grouting of the anchor hole shall not exceed 2 hours.