A construction method for large cantilever flange of steel box girder for ultra-wide cable-stayed bridge
By adopting a simplified loading base and telescopic construction platform structure in the construction of ultra-wide cable-stayed bridge steel box girder, combined with the support design of electromagnets and hydraulic cylinders, the problems of complexity and low efficiency of the existing construction platform are solved and achieved More efficient and more stable construction results.
Patent Information
- Application Number
- CN202210433396.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-04-24
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2042-04-24
Smart Images

Figure CN114908681B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of bridge construction, and in particular to a construction method for a large cantilever flange of a steel box girder of an ultra-wide cable-stayed bridge. Background Art
[0002] With the rapid expansion of urban population and the popularization of automobile industry, the original municipal roads can no longer meet the growing driving demand. Due to the limitation of limited urban space, large-span and ultra-wide municipal bridges are gradually favored by design institutes. However, the increase of bridge width also leads to problems such as lateral displacement of bridges, internal stress of steel box girder welding, deformation of large cantilever of steel box girder, etc. Therefore, it is necessary to improve the welding construction technology; the existing large cantilever of steel box girder adopts segmented processing, and each segment is pre-assembled in the steel structure factory, and then hoisted and temporarily fixed after being transported to the site, and welded on a self-made cantilever construction platform; the existing cantilever construction platform is a hanging basket-shaped structure with complex structure, limited installation and use conditions, large space occupation, and inflexible, and it is troublesome to disassemble, which brings certain adverse effects during use. Therefore, we propose a construction method for the flange of large cantilever of steel box girder of ultra-wide cable-stayed bridge. Summary of the invention
[0003] The main purpose of the present invention is to provide a large cantilever flange construction method for an ultra-wide cable-stayed bridge steel box girder, which can effectively solve the problems in the background technology.
[0004] To achieve the above object, the technical solution adopted by the present invention is:
[0005] A construction method for a large cantilever flange of a steel box girder of an ultra-wide cable-stayed bridge, comprising a loading seat, with a plurality of groups of lifting foot supports symmetrically arranged on both sides of the loading seat, the upper end of the loading seat comprising a branch assembly and a pump station acting on the branch assembly, the outermost shell of the branch assembly is hinged with diagonal supports on both sides, a telescopic construction platform and a top platform are installed on the innermost shell of the branch assembly, the top platform is located above the telescopic construction platform, and a giant clamping groove is formed between the two, the ends of the telescopic construction platform and the top platform are connected by a ladder, the lower half of the top platform is provided with an electromagnet, a plurality of groups of fastening cylinders are symmetrically arranged at the sides of the upper end surface of the telescopic construction platform, and the rod ends of the fastening cylinders are connected with a compression spring and a compression block;
[0006] The telescopic construction platform is provided with a slide groove inside for the telescopic platform to move, and a plurality of racks are symmetrically provided on both sides of the telescopic platform. The first rotating shaft, the second rotating shaft and the third rotating shaft are respectively installed on the outer sides of the slide groove. Large gears are sleeved on the first rotating shaft, the second rotating shaft and the third rotating shaft. The large gears on the first rotating shaft and the second rotating shaft are respectively meshed with the racks on both sides of the telescopic platform. The telescopic construction platform is divided into two groups, the left and right groups. The front end surface of one group is evenly provided with a plurality of slots, and the front end surface of the other group is provided with dowels extending into the slots;
[0007] Two groups of movable hydraulic cylinders are symmetrically installed at the bottom of the telescopic construction platform. The movable hydraulic cylinders are respectively arranged on two groups of connecting seats. The two groups of movable hydraulic cylinders are connected for transmission by a coupling. A hydraulic rod is arranged in the movable hydraulic cylinder. A clamping block is welded at the bottom end of the hydraulic rod. The clamping block acts in the arc-shaped clamping groove at the end of the loading seat.
[0008] Preferably, universal wheels are installed at the four corners of the lower end of the loading seat, and the branch combination includes several groups of lifting branches.
[0009] Preferably, the above shows a single lifting platform structure. In order to match the width of the steel box girder of the super-wide cable-stayed bridge, a group of identical lifting platform structures will be symmetrically arranged on the other side of the steel box girder. The two are connected by slots and dowels. The giant clamping groove is for the steel box girder to extend into. When the electromagnet is energized, the top platform is adsorbed on the upper end surface of the steel box girder to achieve the purpose of fixation.
[0010] Preferably, the second rotating shaft and the third rotating shaft are located on the same side, the large gears thereon are meshed with each other, the first rotating shaft and the output end of the No. 1 motor are connected through a sprocket structure, the third rotating shaft and the output end of the No. 1 motor are connected through a sprocket structure, and the No. 1 motor is fixed to the bottom of the telescopic construction platform through a frame.
[0011] Preferably, the coupling shaft is connected to the reduction box of the second motor, and the movable hydraulic cylinder moves between a horizontal position and a vertical position driven by the coupling shaft, and is fixed to the bottom of the telescopic construction platform in a horizontal state.
[0012] The present invention provides a construction method for a large cantilever flange of a steel box girder of an ultra-wide cable-stayed bridge through improvement, which has the following significant improvements and advantages compared with the prior art:
[0013] (1) It replaces the traditional cantilever construction platform, has a simple structure, is easy to install and use, is reusable, has low cost, occupies a small space, and has a large range of activities for construction workers, thus improving the efficiency of welding construction.
[0014] (2) The top platform is designed with an electromagnet, several sets of retractable tightening cylinders, and a movable hydraulic cylinder with enhanced support. The three work together to greatly improve the fixity and stability of the entire platform.
[0015] (3) The same lifting platform structure is symmetrically set on both sides of the steel box girder. The two are moved horizontally through the telescopic table. The slots and dowel bars are connected. The two giant clamping grooves are merged to completely cover the steel box girder, forming a complete suspended working platform at the bottom of the steel box girder for construction workers to use, thereby making this method more complete and applicable.
[0016] (4) The entire construction method is simple in design, easy to operate, meets actual usage standards, reduces costs, improves work efficiency, and has better results than traditional methods. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the overall structure of a large cantilever flange construction method for a steel box girder of an ultra-wide cable-stayed bridge according to the present invention;
[0018] Figure 2 A detailed structural view of a telescopic construction platform for a large cantilever flange construction method of a steel box girder of an ultra-wide cable-stayed bridge according to the present invention;
[0019] Figure 3 This is a transmission structure diagram of a large cantilever flange construction method for a super-wide cable-stayed bridge steel box girder of the present invention;
[0020] Figure 4 The present invention is a specific structural diagram of a movable hydraulic cylinder used in a large cantilever flange construction method of a steel box girder of an ultra-wide cable-stayed bridge.
[0021] In the figure: 1. loading seat; 2. lifting foot support; 3. branch combination; 4. pump station; 5. raw material trough; 6. diagonal support; 7. top platform; 8. ladder; 9. electromagnet; 10. fastening cylinder; 11. clamping spring; 12. clamping block; 13. slide; 14. telescopic table; 15. rack; 16. first rotating shaft; 17. second rotating shaft; 18. large gear; 19. third rotating shaft; 20. frame; 21. No. 1 motor; 22. sprocket structure; 23. slot; 24. movable hydraulic cylinder; 25. connecting seat; 26. connecting shaft; 27. No. 2 motor; 28. hydraulic rod; 29. clamping block; 30. arc-shaped clamping slot. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0023] like Figure 1-4As shown, a method for constructing a large cantilever flange of a steel box girder of an ultra-wide cable-stayed bridge comprises a loading seat 1, and a plurality of lifting foot supports 2 are symmetrically arranged on both sides of the loading seat 1. The upper end of the loading seat 1 comprises a branch assembly 3 and a pump station 4 acting on the branch assembly 3. The outermost shell of the branch assembly 3 is hinged with diagonal supports 5 on both sides. A telescopic construction platform 6 and a top platform 7 are installed on the innermost shell of the branch assembly 3. The top platform 7 is located above the telescopic construction platform 6, and a giant clamping groove is formed between the two. The ends of the telescopic construction platform 6 and the top platform 7 are connected by a ladder 8. The lower half of the top platform 7 is provided with an electromagnet 9. A plurality of fastening cylinders 10 are symmetrically arranged on the sides of the upper end surface of the telescopic construction platform 6. The rod ends of the fastening cylinders 10 are connected with a compression spring 11 and a compression block 12.
[0024] The telescopic construction platform 6 is provided with a slide 13 inside for the telescopic platform 14 to move, and a plurality of racks 15 are symmetrically provided on both sides of the telescopic platform 14. The first rotating shaft 16, the second rotating shaft 17 and the third rotating shaft 19 are respectively installed on the outer side of the slide 13. The first rotating shaft 16, the second rotating shaft 17 and the third rotating shaft 19 are sleeved with a large gear 18. The large gears 18 on the first rotating shaft 16 and the second rotating shaft 17 are respectively meshed with the racks 15 on both sides of the telescopic platform 14 for horizontal movement of the telescopic platform 14. The construction length can be extended as needed. The telescopic construction platform 6 is divided into two groups, the left and right groups, and the front end surface of one group is evenly provided with a plurality of slots 23, and the front end surface of the other group is provided with dowels extending into the slots 23;
[0025] Two groups of movable hydraulic cylinders 24 are symmetrically installed at the bottom of the telescopic construction platform 6. The movable hydraulic cylinders 24 are respectively arranged on two groups of connecting seats 25. The two groups of movable hydraulic cylinders 24 are connected and driven by a connecting shaft 26. A hydraulic rod 28 is arranged in the movable hydraulic cylinder 24. A clamping block 29 is welded at the bottom end of the hydraulic rod 28. The clamping block 29 acts in the arc-shaped clamping groove 30 at the end of the loading seat 1.
[0026] Universal wheels are installed at the four corners of the lower end of the loading seat 1, and the branch combination 3 includes several groups of lifting branches; the above is a single lifting platform structure. In order to match the width of the steel box girder of the ultra-wide cable-stayed bridge, a group of identical lifting platform structures will be symmetrically arranged on the other side of the steel box girder. The two are connected by slots 23 and dowels. The giant clamping groove is for the steel box girder to extend into. When the electromagnet 9 is energized, the top platform 7 is adsorbed on the upper end surface of the steel box girder to achieve the purpose of fixing; the second rotating shaft 17 and the third rotating shaft 19 are located on the same side , the large gear 18 thereon is meshed with each other, the first rotating shaft 16 and the output end of the No. 1 motor 21 are connected through a sprocket structure 22, the third rotating shaft 19 and the output end of the No. 1 motor 21 are connected through a sprocket structure 22, and the No. 1 motor 21 is fixed to the bottom of the telescopic construction platform 6 through a frame 20; the connecting shaft 26 is connected to the reduction box of the No. 2 motor 27, and the movable hydraulic cylinder 24 moves between the horizontal position and the vertical position under the drive of the connecting shaft 26, and is fixed to the bottom of the telescopic construction platform 6 in the horizontal state.
[0027] It should be noted that the present invention is a method for constructing a large cantilever flange of a steel box girder for an ultra-wide cable-stayed bridge. When in use, the loading seat 1 is moved to the flat ground obliquely below the bridge at the position of segment hoisting, the pump station 4 is started, and each section of the branch combination 3 is raised to the parallel plane of the hoisting position, and then the loading seat 1 is moved inward so that the giant clamping groove wraps around the steel box girder until it reaches the side wing of the steel box girder, and the lifting foot support 2 is lowered to fix the loading seat 1. At this time, the electromagnet 9 of the top platform 7 is energized, and the top platform 7 is adsorbed on the upper end surface of the steel box girder to achieve the purpose of fixing. At the same time, a number of groups of fastening cylinders 10 work, and the rods of the cylinders drive The clamping block 12 is pressed against the lower end surface of the steel box girder to achieve the purpose of fixing, and then the connecting shaft 26 drives the two sets of movable hydraulic cylinders 24 to rotate in the direction of the arc-shaped slot 30, and releases the hydraulic rod until the block 29 moves in an arc and enters the arc-shaped slot 30, and is completely stuck, thereby achieving the purpose of strengthening the support; in order to match the width of the steel box girder of the ultra-wide cable-stayed bridge, a set of identical lifting platform structures will be symmetrically arranged on the other side of the steel box girder. The two are horizontally moved through the telescopic platform 14, and the slots 23 are connected with the dowel bars. The two giant clamping grooves are merged to completely cover the steel box girder, forming a complete suspended working platform at the bottom of the steel box girder for construction workers.
[0028] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0029] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A construction method for a large cantilever flange of a steel box girder of an ultra-wide cable-stayed bridge, Features: The construction device comprises a loading seat (1), wherein a plurality of lifting foot supports (2) are symmetrically arranged on both sides of the loading seat (1), the upper end of the loading seat (1) comprises a branch assembly (3) and a pump station (4) acting on the branch assembly (3), the outermost shell of the branch assembly (3) is hinged with diagonal supports (5) on both sides, a telescopic construction platform (6) and a top platform (7) are installed on the innermost shell of the branch assembly (3), the top platform (7) is located above the telescopic construction platform (6), and a giant clamping groove is formed between the two, the ends of the telescopic construction platform (6) and the top platform (7) are connected by a ladder (8), the lower half of the top platform (7) is provided with an electromagnet (9), and a plurality of fastening cylinders (10) are symmetrically arranged on the side of the upper end surface of the telescopic construction platform (6), and the rod ends of the fastening cylinders (10) are connected to a compression spring (11) and a compression block (12); The telescopic construction platform (6) is provided with a slide groove (13) inside for the telescopic platform (14) to move, and a plurality of groups of racks (15) are symmetrically provided on both sides of the telescopic platform (14). A first rotating shaft (16), a second rotating shaft (17) and a third rotating shaft (19) are respectively installed on the outer side of the slide groove (13), and a large gear (18) is sleeved on the first rotating shaft (16), the second rotating shaft (17) and the third rotating shaft (19). The large gears (18) on the first rotating shaft (16) and the second rotating shaft (17) are respectively meshed with the racks (15) on both sides of the telescopic platform (14); The construction devices are provided in two pieces and are symmetrically arranged on both sides of the steel box girder of the ultra-wide cable-stayed bridge; a plurality of groups of slots (23) are evenly opened on the front end surface of the telescopic construction platform (6) of one of the construction devices, and dowel bars extending into the slots (23) are installed on the front end surface of the telescopic construction platform (6) of the other construction device; when in use, the two are connected via the slots (23) and the dowel bars to form a giant clamping groove for the steel box girder to extend into, and when the electromagnet (9) is energized, the top platform (7) is adsorbed on the upper end surface of the steel box girder to achieve the purpose of fixing; Two groups of movable hydraulic cylinders (24) are symmetrically mounted at the bottom of the telescopic construction platform (6). The movable hydraulic cylinders (24) are respectively arranged on two groups of connecting seats (25). The two groups of movable hydraulic cylinders (24) are connected for transmission by a connecting shaft (26). A hydraulic rod (28) is arranged in the movable hydraulic cylinder (24). A clamping block (29) is welded to the bottom end of the hydraulic rod (28). The clamping block (29) acts in an arc-shaped clamping groove (30) at the end of the loading seat (1). Universal wheels are installed at the four corners of the lower end of the loading seat (1), and the branch assembly (3) includes a plurality of groups of lifting branches.
2. A construction method for a large cantilever flange of a steel box girder for an ultra-wide cable-stayed bridge according to claim 1, Features: The second rotating shaft (17) and the third rotating shaft (19) are located on the same side, and the large gears (18) thereon are meshed with each other; the first rotating shaft (16) and the output end of the first motor (21) are connected via a sprocket structure (22); the third rotating shaft (19) and the output end of the first motor (21) are connected via a sprocket structure (22); and the first motor (21) is fixed to the bottom of the telescopic construction platform (6) via a frame (20).
3. A construction method for a large cantilever flange of a steel box girder for an ultra-wide cable-stayed bridge according to claim 2, Features: The connecting shaft (26) is connected to the reduction box of the second motor (27), and the movable hydraulic cylinder (24) moves between a horizontal position and a vertical position under the drive of the connecting shaft (26), and is fixed to the bottom of the telescopic construction platform (6) in a horizontal state.