A foundation pit blasting excavation method and system

By establishing a foundation pit blasting model and calculating vibration velocity attenuation data, a reasonable excavation method is determined, and the environmental impact of traditional blasting methods in urban subways and city foundation pit construction is solved, and the blasting excavation effect and construction environment are improved.

CN114969949BActive Publication Date: 2024-11-15JIANGXI ZHONGHENG UNDERGROUND SPACE TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210727187.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-06-24
Publication Date
2024-11-15
Estimated Expiration
2042-06-24

AI Technical Summary

Technical Problem

In the construction of urban subways and foundation pits in the city, the traditional blasting method causes surrounding rock disturbance, excessive underexcavation and harmful gas pollution, affecting the construction environment and the environment of surrounding buildings.

Method used

By obtaining foundation pit information and analyzing data, establishing a foundation pit blasting model, deducing blasting vibration velocity and ground stress parameters, obtaining multiple measurement points, calculating vibration velocity attenuation data, determining reasonable excavation methods, and optimizing blasting parameters to reduce construction Environmental impact.

Benefits of technology

It improves the blasting and excavation effect of foundation pits, improves the construction environment, reduces the impact on surrounding buildings, and ensures the safety and efficiency of construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114969949B_ABST
    Figure CN114969949B_ABST
Patent Text Reader

Abstract

The present application relates to the field of blasting technology, and in particular to a foundation pit blasting excavation method and system, the method comprising: obtaining foundation pit information and corresponding analysis data; establishing a foundation pit blasting model according to the foundation pit information, and obtaining target analysis data according to the foundation pit blasting model and the analysis data; obtaining boundary conditions of the foundation pit blasting model, and obtaining blasting vibration velocity in combination with the target analysis data; obtaining ground stress parameters according to the target analysis data, and obtaining multiple measuring points according to the ground stress parameters; obtaining vibration velocity attenuation data according to the blasting vibration velocity and the multiple measuring points; determining the excavation method according to the vibration velocity attenuation data. The foundation pit blasting excavation method and system provided in the present application have the advantages of improving the foundation pit blasting excavation effect and further improving the construction environment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of blasting technology, and in particular to a foundation pit blasting excavation method and system. Background Art

[0002] Foundation pit excavation includes the excavation of contact network support pits, rigid column foundation pits, and wire pits. According to the excavation method, it can be divided into manual excavation and mechanical excavation. The excavation method of foundation pits varies depending on the soil type of the foundation pit. When encountering hard rock or semi-hard rock foundation pits, blasting is usually used for excavation.

[0003] At present, blasting construction has been widely used in underground, mining and tunnel construction. However, for the construction of urban subways and urban foundation pits, due to the presence of many buildings (structures) around the foundation pits, traditional blasting methods will cause problems such as surrounding rock disturbance, over-excavation and under-excavation, and harmful gas pollution, which has a great impact on the construction environment and the environment of surrounding buildings (structures). Summary of the invention

[0004] In order to enhance the effect of foundation pit blasting excavation and further improve the construction environment, the present application provides a foundation pit blasting excavation method and system.

[0005] In a first aspect, the present application provides a foundation pit blasting excavation method, which adopts the following technical solution:

[0006] Obtain foundation pit information and corresponding analysis data;

[0007] Establishing a foundation pit blasting model according to the foundation pit information, and acquiring target analysis data according to the foundation pit blasting model and the analysis data;

[0008] Obtaining the boundary conditions of the foundation pit blasting model, and obtaining the blasting vibration velocity in combination with the target analysis data;

[0009] Acquire geostress parameters according to the target analysis data, and acquire multiple measuring points according to the geostress parameters;

[0010] Acquiring vibration velocity attenuation data according to the blasting vibration velocity and the plurality of measuring points;

[0011] The excavation method is determined according to the vibration velocity attenuation data.

[0012] By adopting the above technical scheme, the corresponding target analysis data is obtained according to the foundation pit blasting model, and the boundary conditions of the foundation pit blasting model are obtained. The blasting vibration velocity is derived by combining the target analysis data and the boundary conditions of the foundation pit blasting model. Further, multiple measuring points of the blasting vibration velocity of the foundation pit blasting model are set according to the ground stress parameters in the target analysis data. Then, the vibration velocity attenuation data is obtained according to the blasting vibration velocity of multiple measuring points. The excavation method that meets the actual construction is determined based on the vibration velocity attenuation data, thereby improving the foundation pit blasting excavation effect and further improving the construction environment.

[0013] Optionally, the target analysis data includes a simplified blast load, and the step of obtaining the boundary conditions of the foundation pit blasting model and obtaining the blasting vibration velocity in combination with the target analysis data includes the following steps:

[0014] Determining a boundary surface according to the foundation pit blasting model;

[0015] Acquire a target blasting model according to the boundary condition corresponding to the boundary surface;

[0016] The blasting vibration velocity is obtained according to the target blasting model and the simplified blasting load, wherein the simplified blasting load includes a simplified blasting load model:

[0017] P(t)=P0ξ(e -at -e -bt ),

[0018] in: t0=ln(b / a) / (ba), P(t) is the explosion load-time function, P0 is the peak value of the explosion load, t0 is the time when the explosion load reaches the peak value, and b / a is the explosion load attenuation index.

[0019] By adopting the above technical solution, the accuracy of obtaining the blasting vibration velocity in the foundation pit blasting model based on the blasting load-time function is improved.

[0020] Optionally, the boundary surface includes an air-facing surface and a non-air-facing surface, the boundary conditions include a free boundary and a transmission boundary, and obtaining the target blasting model according to the boundary conditions corresponding to the boundary surface includes the following steps:

[0021] Applying the free boundary to the free surface to obtain free boundary conditions;

[0022] Applying the transmission boundary to the non-air-facing surface to obtain a non-air-facing boundary condition;

[0023] The target blasting model is obtained according to the air-facing boundary condition and the non-air-facing boundary condition.

[0024] By adopting the above technical solution, the accuracy of analyzing and obtaining blasting vibration velocity is improved.

[0025] Optionally, the target analysis data includes rock sample data, and obtaining geostress parameters according to the target analysis data, and obtaining multiple measuring points according to the geostress parameters includes the following steps:

[0026] Obtaining ground stress parameters according to the rock sample data;

[0027] According to preset rules and the geostress parameters, a plurality of measuring points are obtained.

[0028] By adopting the above technical solution, the standardization of detecting blasting vibration speed is improved.

[0029] Optionally, obtaining vibration velocity attenuation data according to the blasting vibration velocity and the plurality of measuring points comprises the following steps:

[0030] According to the plurality of measuring points, obtaining corresponding explosion center distances;

[0031] The vibration velocity attenuation data is acquired according to the blasting vibration velocity and the explosion center distance.

[0032] By adopting the above technical solution, the accuracy of obtaining vibration velocity attenuation data is improved.

[0033] Optionally, the step of obtaining the vibration velocity attenuation data according to the blasting vibration velocity and the blast center distance comprises the following steps:

[0034] According to the blasting vibration velocity attenuation data, a fitting formula is obtained, and the fitting formula includes:

[0035]

[0036]

[0037] Among them, y(x) is the vibration velocity-explosion center distance function, A1, A2, t1 and t2 are curve fitting coefficients.

[0038] By adopting the above technical solution and according to the fitting formula, the analysis effect of the vibration velocity attenuation data is further improved.

[0039] Optionally, determining the excavation method according to the vibration velocity attenuation data comprises the following steps:

[0040] Matching a preset excavation method according to the vibration velocity attenuation data, wherein the preset excavation method includes a common blasting excavation method, a concentrated energy blasting excavation method, and a static excavation method;

[0041] Select one of the preset excavation methods as a current comparison sample;

[0042] Determining whether the current comparison sample meets the preset safety standard;

[0043] If the current comparison sample meets the preset safety standard, selecting the current comparison sample as the determined excavation method;

[0044] If the current comparison sample does not meet the preset safety standard, another excavation method is selected as the current comparison sample, and the above judgment process is looped until the determined excavation method is obtained.

[0045] By adopting the above technical solution, a reasonable and efficient excavation method can be selected according to the actual foundation pit construction conditions.

[0046] Optionally, after determining the excavation method according to the vibration velocity attenuation data, the following steps are further included:

[0047] According to the excavation method, obtaining corresponding blasting parameters;

[0048] According to the blasting parameters, a damage cloud map is obtained;

[0049] The construction parameters are obtained according to the damage cloud map.

[0050] By adopting the above technical solution, the blasting parameters are further optimized, and the combination of vibration velocity attenuation data and damage cloud map can provide a better reference for blasting.

[0051] In the second aspect, the present application also provides a foundation pit blasting excavation system, which adopts the following technical solution:

[0052] A foundation pit blasting excavation system, comprising:

[0053] An acquisition module is used to obtain foundation pit information and corresponding analysis data;

[0054] An establishment module is used to establish a foundation pit blasting model according to the foundation pit information, and to obtain target analysis data according to the foundation pit blasting model and the analysis data;

[0055] A setting module is used to obtain the boundary conditions of the foundation pit blasting model and obtain the blasting vibration speed in combination with the target analysis data;

[0056] An analysis module, used to obtain ground stress parameters according to the target analysis data, and to obtain multiple measuring points according to the ground stress parameters, and also used to obtain vibration velocity attenuation data according to the blasting vibration velocity and the multiple measuring points;

[0057] A determination module is used to determine an excavation method according to the vibration velocity attenuation data.

[0058] By adopting the above technical scheme, the foundation pit information and the corresponding analysis data are obtained according to the acquisition module, and the acquisition module sends the acquired foundation pit information and analysis data to the establishment module. The establishment module establishes the corresponding foundation pit blasting model according to the foundation pit information, and obtains the corresponding target analysis data according to the analysis data. The establishment module sends the established foundation pit blasting model and the target analysis data to the setting module. The setting module obtains the boundary conditions of the foundation pit blasting model, and derives the blasting vibration speed in combination with the target analysis data and the boundary conditions of the foundation pit blasting model. The setting module sends the acquired blasting vibration speed to the analysis module. The analysis module further sets multiple measuring points of the blasting vibration speed of the foundation pit blasting model according to the ground stress parameters in the target analysis data, and then obtains the vibration speed attenuation data according to the blasting vibration speed of the multiple measuring points. The analysis module sends the vibration speed attenuation data to the determination module. The determination module determines the excavation method that meets the actual construction according to the vibration speed attenuation data, thereby improving the foundation pit blasting excavation effect and further improving the construction environment.

[0059] Optionally, the determining module includes:

[0060] A selection unit, used for selecting one of the preset excavation methods as a current comparison sample;

[0061] A judgment unit is used to judge whether the current comparison sample meets the preset safety standard. If the current comparison sample meets the preset safety standard, the current comparison sample is selected as the determined excavation method. If the current comparison sample does not meet the preset safety standard, another excavation method is selected as the current comparison sample, and the above judgment process is repeated until the determined excavation method is obtained.

[0062] By adopting the above technical solution, it is easy to determine a safe and effective excavation method according to the actual construction environment.

[0063] In summary, this application includes the following beneficial technical effects:

[0064] According to the foundation pit blasting model, the corresponding target analysis data is obtained, and the boundary conditions of the foundation pit blasting model are obtained. The blasting vibration velocity is derived by combining the target analysis data and the boundary conditions of the foundation pit blasting model. Further, according to the ground stress parameters in the target analysis data, multiple measuring points of the blasting vibration velocity of the foundation pit blasting model are set, and then the vibration velocity attenuation data is obtained according to the blasting vibration velocity of multiple measuring points. The excavation method that meets the actual construction is determined based on the vibration velocity attenuation data, thereby improving the foundation pit blasting excavation effect and further improving the construction environment. BRIEF DESCRIPTION OF THE DRAWINGS

[0065] Figure 1 It is a schematic diagram of the overall process of a foundation pit blasting excavation method of the present application.

[0066] Figure 2 It is a flow chart of steps S201 to S203 in a foundation pit blasting excavation method of the present application.

[0067] Figure 3 It is a time history curve diagram of explosion load in a foundation pit blasting excavation method of the present application.

[0068] Figure 4 It is a flow chart of steps S301 to S303 in a foundation pit blasting excavation method of the present application.

[0069] Figure 5 It is a flow chart of steps S401 to S402 in a foundation pit blasting excavation method of the present application.

[0070] Figure 6 It is a flow chart of steps S501 to S502 in a foundation pit blasting excavation method of the present application.

[0071] Figure 7 It is a flow chart of steps S501 to S601 in a foundation pit blasting excavation method of the present application.

[0072] Figure 8 It is a flow chart of steps S701 to S705 in a foundation pit blasting excavation method of the present application.

[0073] Fig. 9 It is a top view of the location of measurement points selected in a foundation pit blasting excavation method of the present application.

[0074] Fig.10 It is a side view of the location of measuring point selection in a foundation pit blasting excavation method of the present application.

[0075] Fig.11 It is a flow chart of steps S801 to S803 in a foundation pit blasting excavation method of the present application.

[0076] Fig.12 It is a schematic diagram of the overall module of a foundation pit blasting excavation system of the present application.

[0077] Description of reference numerals:

[0078] 1. Acquisition module; 2. Establishment module; 3. Setting module; 4. Analysis module; 5. Determination module; 51. Selection unit; 52. Judgment unit. DETAILED DESCRIPTION

[0079] The following is combined with Figure 1-12 This application is described in further detail.

[0080] The present application embodiment discloses a foundation pit blasting excavation method, referring to Figure 1 , including the following steps:

[0081] S101, obtaining foundation pit information and corresponding analysis data;

[0082] S102, establishing a foundation pit blasting model according to the foundation pit information, and acquiring target analysis data according to the foundation pit blasting model and the analysis data;

[0083] S103, obtaining boundary conditions of the foundation pit blasting model, and obtaining blasting vibration velocity in combination with target analysis data;

[0084] S104, obtaining ground stress parameters according to the target analysis data, and obtaining multiple measuring points according to the ground stress parameters;

[0085] S105, obtaining vibration velocity attenuation data according to the blasting vibration velocity and multiple measuring points;

[0086] S106. Determine the excavation method according to the vibration velocity attenuation data.

[0087] In the present embodiment, the foundation pit blasting excavation method is determined by numerical formulation. Considering the limited computing power of computers, the foundation pit blasting model is not established completely according to the actual foundation pit size information, but a part of it is selected. The foundation pit blasting model is selected according to the location of the buildings (structures) around the foundation pit. In order to facilitate the comparison of blasting vibration velocity and damage effect, the present embodiment uses the common three-dimensional model and the energy-gathering three-dimensional model of the foundation pit blasting model established in the software ANSYS, and the two models are meshed respectively. After the target analysis options are set, the target analysis data is imported into LSDYNA for calculation to obtain the corresponding blasting vibration velocity. ANSYS is used to establish the geometric model, and LS-DYNA is used for the numerical calculation and post-processing of the model, and analyzes highly nonlinear complex mechanical problems such as explosion and impact, collision, and metal cutting.

[0088] The traditional blasting model of foundation pit and the focused blasting model were established in the software ANSYS. Under the high strain rate condition caused by the explosive impact load, the accuracy of the tetrahedron unit is less than that of the hexahedron unit. Therefore, the traditional blasting model of foundation pit and the focused blasting model both use 8-node hexahedron units. The two models are meshed separately. The meshing principle is that the mesh size is smaller near the blasthole, and the mesh size increases with the increase of the distance from the blasthole.

[0089] The traditional blasting model includes rock and blastholes, and the focused blasting model includes rock, blastholes and copper slit focused tubes, and the focused tube unit is connected to the rock unit at a common node. The copper slit tube is a ring-shaped copper tube with a slit cross section, which plays a role in restraining the blast load. Rocks and copper slit tubes are part of the model in order to clearly distinguish the two models. Set the analysis options, solution time and time step control applicable to blasting. This embodiment uses the MAT11 material card parameters as the simulation parameters of the copper tube.

[0090] The target blasting construction analysis parameters such as the blasthole position, blasthole spacing, charge roll length and plugging length in the model are preliminarily formulated according to the actual situation of open-pit blasting, and the center line of the reinforced concrete bite pile coincides with the median vertical line of the blasthole connection line to simulate the situation where the reinforced concrete bite pile is most affected by blasting. The median vertical line along the blasthole connection line is to consider the position with the strongest blast load, so that the actual project can be most conservative during blasting excavation. The equal spacing between the measuring points is to better fit the vibration velocity in the post-processing process.

[0091] Step S103 In this embodiment, the boundary conditions of the foundation pit blasting model are set because it is considered that the explosion load transmitted to the model boundary will produce reflection or be affected by external loads, and in actual conditions, rocks have no boundaries, and the explosion load will continue to propagate in the rock until it disappears. Therefore, it is impossible to establish an infinitely large model to reflect the infinite propagation process of the explosion load during the simulation process. Therefore, it is necessary to add the boundary conditions of the foundation pit blasting model, so as to facilitate the subsequent acquisition and analysis of the corresponding blasting vibration velocity based on the foundation pit blasting model.

[0092] In step S104, in this embodiment, geostress is the stress existing in the earth's crust, that is, the force per unit area inside the medium caused by rock deformation. The geostress parameters are obtained based on the actual parameters of the foundation pit rock, and are roughly divided into the magnitude of the vertical principal stress, the magnitude of the maximum horizontal principal stress, the magnitude of the minimum horizontal principal stress, and the direction of the maximum horizontal principal stress.

[0093] Apply ground stress parameters to the entire foundation pit blasting model, solve the foundation pit blasting model, and obtain simulation results of multiple measuring points. The locations of multiple measuring points are determined based on the location with the minimum ground stress and the location that bears the most blast load, because the smaller the ground stress, the more difficult it is to bear the blast load. The measuring point location obtained in this way is the location that most needs to consider safety regulations, making the actual project more conservative during the blasting excavation process.

[0094] In the present embodiment, step S105 to step S106 are to sort out the data calculated by LS-DYNA, obtain the blasting vibration velocities of multiple measuring points, deduce the vibration velocity attenuation data of the foundation pit blasting model according to the blasting vibration velocities of multiple measuring points, and determine the excavation method of the foundation pit blasting according to the vibration velocity attenuation data.

[0095] In the foundation pit blasting excavation method provided in the present embodiment, the boundary conditions of the foundation pit blasting model are set, and the blasting vibration velocity is derived by combining the target analysis data and the boundary conditions of the foundation pit blasting model. Further, multiple measuring points of the blasting vibration velocity of the foundation pit blasting model are set according to the ground stress parameters in the target analysis data, and then the vibration velocity attenuation data is obtained according to the blasting vibration velocities of the multiple measuring points. The excavation method that meets the actual construction is determined based on the vibration velocity attenuation data, thereby improving the foundation pit blasting excavation effect and further improving the construction environment.

[0096] In one implementation of this embodiment, Figure 2 As shown, the target analysis data includes simplifying the blast load, obtaining the boundary conditions of the foundation pit blasting model, and combining the target analysis data to obtain the blasting vibration velocity includes the following steps:

[0097] S201, determining a boundary surface according to a foundation pit blasting model;

[0098] S202, obtaining a target blasting model according to boundary conditions corresponding to the boundary surface;

[0099] S203. Obtain blasting vibration velocity according to the target blasting model and the simplified blasting load.

[0100] The simplified explosion load includes the simplified explosion load model:

[0101] P(t)=P0ξ(e -at -e -bt ),

[0102] in: t0=ln(b / a) / (ba), P(t) is the explosion load-time function, P0 is the peak value of the explosion load, t0 is the time when the explosion load reaches the peak value, and b / a is the explosion load attenuation index.

[0103] In practical application, load refers to external forces and other factors that cause internal forces and deformations in structures or components. Explosion is a process of rapid energy release, in which chemical energy is mainly converted into kinetic energy and other forms of energy, which not only threatens people's lives, but also causes serious damage to buildings within the range of the shock wave.

[0104] The effect of explosion load on building structures is usually divided into three processes. First, the explosion shock wave produces an inward thrust on the vertical components of the structure's periphery close to the explosion source. Then the shock wave produces an upward thrust on horizontal components such as floor slabs and beams. Finally, the negative pressure generated inside the structure causes the peripheral components of the entire building to be subjected to inward pressure.

[0105] In the numerical calculation of explosion problems, the explosion load and exponential decay load can be calculated through the pressure-time curve acting on the borehole wall. In actual work, the time-history curve of the semi-theoretical and semi-empirical exponential decay pressure is more often used. t0 determines the rising section of the pressure-time curve, and b / a determines the falling section of the curve. As long as the explosion load peak value P0, the explosion load peak time t0 and the explosion load decay index b / a are obtained, the form of the pressure-time curve can be completely determined. In this embodiment, t0=100μs, P0=150Mpa. The explosion load pressure-time curve is also called the explosion load time-history curve, such as Figure 3 shown.

[0106] In one implementation of this embodiment, Figure 4 As shown, the boundary surface includes an air-facing surface and a non-air-facing surface, and the boundary conditions include a free boundary and a transmission boundary. According to the boundary conditions corresponding to the boundary surface, obtaining the target blasting model includes the following steps:

[0107] S301, applying a free boundary to the free surface to obtain free boundary conditions;

[0108] S302, applying a transmission boundary to a non-air-facing surface to obtain a non-air-facing boundary condition;

[0109] S303, obtaining a target blasting model according to the air boundary conditions and the non-air boundary conditions.

[0110] In actual application, the free surface refers to the top surface and slope surface of the foundation pit blasting model adjacent to the outside world, and the non-adjacent surface refers to the rock bordering reference surface set in the foundation pit blasting model. The free boundary means that this boundary is not affected by external loads. The transmission boundary is set because it takes into account that the explosion load will be reflected when it is transmitted to the model boundary. In actual conditions, rocks have no boundaries, and the explosion load will continue to propagate in the rock until it disappears. Therefore, it is necessary to set a transmission boundary at the boundary of the established model so that when the explosion load reaches the transmission boundary, the load will be transmitted instead of rebounding, thereby improving the accuracy of the analysis of the blasting vibration velocity.

[0111] In one implementation of this embodiment, Figure 5 As shown, the target analysis data includes rock sample data. According to the target analysis data, obtaining ground stress parameters, and obtaining multiple measuring points according to the ground stress parameters include the following steps:

[0112] S401, obtaining ground stress parameters according to rock sample data;

[0113] S402: Acquire multiple measuring points according to preset rules and geostress parameters.

[0114] In actual application, in order to make the simulation effect more accurate, the rock samples were taken from the foundation pit site, and the RHT model parameters of the MAT272 material rock were deduced and calibrated through experiments and calculations. The samples were processed into 100mm×50mm standard specimens (for uniaxial compression test) and 75mm×37.5mm standard specimens (for SHPB impact test) for testing.

[0115] The corresponding rock parameters are obtained according to the rock sample data. The traditional blasting model and the concentrated energy blasting model rock are both taken as examples of the granite RHT model. The density and initial porosity of rock can be obtained by weighing and saturated liquid method; the uniaxial compressive strength, elastic modulus, Poisson's ratio and wave velocity of rock are determined by uniaxial compression test and rock wave velocity test; the state equation parameters and Hugoniot polynomial coefficients are calculated by Rankine-Hugoniot equation and Mie-Gruneisen state equation; the SHPB impact test model is established in LS-DYNA, and the above-mentioned parameters are assigned to the MAT272 material card in LS-DYNA. The remaining unknown parameters temporarily refer to the relevant parameters of concrete materials, so as to carry out SHPB impact simulation test, and the simulated stress-strain curve is compared with the stress-strain curve measured by SHPB impact test, and the orthogonal test index points are determined in the strengthening stage and damage stage of the stress-strain curve. The remaining unknown parameters are used as test factors, and the orthogonal test level is 3 to carry out orthogonal test so that the simulated stress-strain curve and the measured stress-strain curve at different stages of the orthogonal test index points are constantly close to each other, so as to determine the remaining unknown parameters. At this point, all parameters of rock RHT model are determined.

[0116] By considering the influence of ground stress on blasting vibration, the locations of multiple measuring points affected by ground stress are determined according to all parameters of the rock RHT model, thereby improving the standardization of blasting vibration velocity detection.

[0117] In one implementation of this embodiment, Figure 6 As shown, according to the blasting vibration velocity and multiple measuring points, obtaining vibration velocity attenuation data includes the following steps:

[0118] S501, obtaining corresponding explosion center distances according to multiple measuring points;

[0119] S502: Obtain vibration velocity attenuation data according to the blasting vibration velocity and the distance from the blasting center.

[0120] In actual application, the explosion center distance refers to the distance from each measuring point to the explosion center. Considering the influence of the blast hole position on the blasting vibration, the measuring points are arranged along the median perpendicular line of the blast hole line, and the spacing between each measuring point is equal, so as to further obtain the vibration velocity attenuation data of the traditional blasting model and the concentrated charge blasting model. The arrangement along the median perpendicular line of the blast hole line is to take into account the position where the measuring point is most strongly subjected to the explosion load, so that the actual project can be most conservative during blasting excavation. The equal spacing between the measuring points is to better fit the vibration velocity in the later processing process, thereby improving the accuracy of obtaining the vibration velocity attenuation data.

[0121] In this embodiment, as the distance from the explosion center increases, the explosion energy will decay, and the vibration velocities of the measuring points in all directions in the traditional blasting model and the focused charge blasting model will decrease as the distance from the explosion center increases; at the same distance from the explosion center, the vibration velocity values ​​of the measuring points in all directions of the traditional blasting model are similar, and the measuring point velocity of the focused charge blasting model in the energy focusing direction is greater than that in other directions, and this difference will also increase as the distance from the explosion center increases; at the same distance from the explosion center, due to the energy focusing effect of the energy focusing tube in the focused charge blasting mold, except for the energy focusing direction, the vibration velocities of the measuring points in other directions of the focused charge blasting model are lower than those of the traditional blasting model, and this difference will also increase as the distance from the explosion center increases.

[0122] In one implementation of this embodiment, Figure 7 As shown, according to the blasting vibration velocity and the distance from the blasting center, the following steps are included after obtaining the vibration velocity attenuation data:

[0123] S601. Obtain a fitting formula according to the vibration velocity attenuation data. The fitting formula includes:

[0124]

[0125]

[0126] Among them, y(x) is the vibration velocity-explosion center distance function, A1, A2, t1 and t2 are curve fitting coefficients.

[0127] In actual application, the relationship curve between the vibration velocity of the measuring point and the distance from the explosion center is nonlinearly fitted. The distance from the explosion center refers to the distance from each measuring point to the explosion center. The blasting effects of the three-dimensional traditional model and the three-dimensional concentrated energy model are compared, and the attenuation formula of the vibration velocity of the measuring point of the three-dimensional model is determined to further determine the blasting parameters such as the location, size, spacing and amount of the blasthole.

[0128] By comparing the blasting effects of the two models, it can be found that the three-dimensional traditional model has more rock damage. This is because the explosion stress wave is evenly transmitted around the blast hole without being constrained by the energy-gathering tube. First, a compressed crushing zone will be formed around the blast hole, and then a crack zone will be formed. In addition, since the slope and top surfaces are free surfaces, when the stress wave is transmitted to the free surface, a reverse stretching effect will be produced on the rock mass. Since the tensile strength of the rock mass is much smaller than the compressive strength, more damage will be produced on the slope surface. The three-dimensional energy-gathering model has much less rock damage. This is because the explosion stress wave will not be evenly transmitted around the blast hole when constrained by the energy-gathering tube, but will produce stress concentration in the x direction (energy-gathering direction). In addition, the expansion effect of high-temperature gas and the "air blade" effect during the explosion process cause more rock damage in the energy-gathering direction and less rock damage in other directions.

[0129] In one implementation of this embodiment, Figure 8 As shown, according to the vibration velocity attenuation data, determining the excavation method includes the following steps:

[0130] S701, matching a preset excavation method according to the vibration velocity attenuation data, where the preset excavation method includes a common blasting excavation method, a concentrated energy blasting excavation method, and a static excavation method;

[0131] S702, selecting one of the preset excavation methods as a current comparison sample;

[0132] S703, determining whether the current comparison sample meets the preset safety standard;

[0133] S704, if the current comparison sample meets the preset safety standard, select the current comparison sample as the determined excavation method;

[0134] S705. If the current comparison sample does not meet the preset safety standard, another excavation method is selected as the current comparison sample, and the above judgment process is repeated until a determined excavation method is obtained.

[0135] In actual application, the vibration velocity requirements of reinforced concrete interlocking piles are determined by consulting the blasting safety regulations, and the distance between the reinforced concrete interlocking piles and the explosion center is determined according to the actual situation of the foundation pit. When using the ordinary blasting excavation method, refer to the vibration velocity attenuation curve and fitting formula of the traditional blasting model. If the vibration velocity meets the requirements of the blasting safety regulations, the traditional blasting excavation method can be used. If the vibration velocity does not meet the requirements of the blasting safety regulations, use concentrated blasting; similarly, when using the concentrated blasting excavation method, refer to the vibration velocity attenuation curve and fitting formula of the concentrated blasting model. If the vibration velocity meets the requirements of the blasting safety regulations, concentrated blasting can be used. If the vibration velocity does not meet the requirements of the blasting safety regulations, use the static foundation pit excavation method.

[0136] According to the granite model blasting method and blasting parameters, it can be obtained that: if the affected structure is considered to be a concrete bite pile, by referring to the relevant specification "Safety Regulations for Blasting", it is known that the safe allowable blasting vibration speed limit for concrete bite piles is 7cm / s.

[0137] For this numerical simulation, through the vibration velocity attenuation process of the three-dimensional traditional model and the three-dimensional concentrated energy model measuring points, it can be obtained that the three-dimensional traditional model measuring point No. 14854 has a blast center distance of 800cm and a vibration velocity of 8cm / s, which is close to but does not meet the requirements of the "Safety Regulations for Blasting". For the sake of conservatism, if the blast center distance is greater than 800cm, the traditional blasting method can be used, and if the blast center distance is less than 800cm, the concentrated energy blasting method can be used. The three-dimensional concentrated energy model measuring point No. 317638 has a blast center distance of 400cm and a vibration velocity of 4cm / s, which meets the requirements of the "Safety Regulations for Blasting". Similarly, if the blast center distance is greater than 400cm, the concentrated energy blasting method can be used, and if the blast center distance is less than 400cm, the mechanical static excavation method is used to minimize the impact on the affected structures, so that a reasonable and efficient excavation method can be selected according to the actual foundation pit construction conditions.

[0138] like Fig. 9 and Fig.10 As shown, P is the selection of the measuring point position, among which No. P14854 and No. P317638 are the measuring points farthest from the explosion center, O is the position of the blasthole, OL is the blasthole spacing, H is the excavation direction, D is the blocking part of the explosive, Z is the explosive part, and H is the excavation direction.

[0139] In one implementation of this embodiment, Fig.11 As shown, according to the vibration velocity attenuation data, after determining the excavation method, the following steps are also included:

[0140] S801. Obtain corresponding blasting parameters according to the excavation method;

[0141] S802, obtaining a damage cloud map according to blasting parameters;

[0142] S803. Obtain construction parameters according to the damage cloud map.

[0143] In actual application, after the excavation method is determined as above, the corresponding damage cloud map is obtained according to the blasting parameters in the excavation method, where the damage cloud map is used to optimize the blasting construction parameters. For example, if the rock damage reflected in the damage cloud map does not achieve the expected effect, the spacing between the blastholes or the distance from the blastholes to the open surface can be reduced. The blasting construction parameters such as blasthole arrangement, blasthole spacing, and explosive quantity can be further adjusted by observing the rock crushing.

[0144] If the foundation pit rock is considered to be sandstone, the traditional and energy-gathering 3D model establishment methods and vibration measurement point selection methods are the same as those for granite. It is only necessary to assign the sandstone RHT parameters to the rock part in LSDYNA. Since the strength of sandstone is lower than that of granite, the charge amount can be lower than the charge amount of the 3D model of granite during the numerical calculation process, and on this basis, continuous debugging is carried out to finally determine the blasting parameter information of sandstone.

[0145] The present application embodiment discloses a foundation pit blasting excavation system, referring to Fig.12 , including an acquisition module 1, an establishment module 2, a setting module 3, an analysis module 4 and a determination module 5, wherein the acquisition module 1 is used to acquire foundation pit information and corresponding analysis data; the establishment module 2 is used to establish a foundation pit blasting model according to the foundation pit information, and acquire target analysis data according to the foundation pit blasting model and the analysis data; the setting module 3 is used to acquire the boundary conditions of the foundation pit blasting model, and acquire the blasting vibration velocity in combination with the target analysis data; the analysis module 4 is used to acquire the ground stress parameters according to the target analysis data, and acquire multiple measuring points according to the ground stress parameters, and also to acquire the vibration velocity attenuation data according to the blasting vibration velocity and multiple measuring points; the determination module 5 is used to determine the excavation method according to the vibration velocity attenuation data.

[0146] The acquisition module 1 acquires the foundation pit information and sends it to the establishment module 2, so that the establishment module 2 establishes the corresponding foundation pit blasting model according to the foundation pit information, and the role of the foundation pit blasting model is to obtain the corresponding target analysis data. The setting module 3 obtains the boundary conditions of the foundation pit blasting model according to the foundation pit blasting model and the target analysis data sent by the establishment module 2, and derives the blasting vibration speed in combination with the target analysis data and the boundary conditions of the foundation pit blasting model. The setting module 3 sends the acquired blasting vibration speed to the analysis module 4. The analysis module 4 further sets multiple measuring points of the blasting vibration speed of the foundation pit blasting model according to the ground stress parameters in the target analysis data, and then obtains the vibration speed attenuation data according to the blasting vibration speed of the multiple measuring points. The analysis module 4 sends the vibration speed attenuation data to the determination module 5. The determination module 5 determines the excavation method that meets the actual construction based on the vibration speed attenuation data, thereby improving the foundation pit blasting excavation effect and further improving the construction environment.

[0147] Among them, in one implementation of this embodiment, if Fig.12As shown, the determination module 5 includes a selection unit 51 and a judgment unit 52. The selection unit 51 is used to select one of the preset excavation methods as the current comparison sample; the judgment unit 52 is used to judge whether the current comparison sample meets the preset safety standard. If the current comparison sample meets the preset safety standard, the current comparison sample is selected as the determined excavation method. If the current comparison sample does not meet the preset safety standard, another excavation method is selected as the current comparison sample, and the above judgment process is repeated until the determined excavation method is obtained, so as to facilitate the determination of a safe and effective excavation method according to the actual construction environment.

[0148] For any of the above-mentioned foundation pit blasting excavation systems, the operating principle can refer to the corresponding description of a foundation pit blasting excavation method, which can achieve the same technical effect as the corresponding method.

[0149] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A foundation pit blasting excavation method, characterized in that: The following steps are involved: Obtain foundation pit information and corresponding analysis data; Establishing a foundation pit blasting model according to the foundation pit information, and acquiring target analysis data according to the foundation pit blasting model and the analysis data; Obtaining the boundary conditions of the foundation pit blasting model, and obtaining the blasting vibration velocity in combination with the target analysis data; Acquire geostress parameters according to the target analysis data, and acquire multiple measuring points according to the geostress parameters; Acquiring vibration velocity attenuation data according to the blasting vibration velocity and the plurality of measuring points; determining an excavation method according to the vibration velocity attenuation data; Wherein, the target analysis data includes simplified blast load, and the step of obtaining the boundary conditions of the foundation pit blasting model and obtaining the blasting vibration velocity in combination with the target analysis data includes the following steps: Determining a boundary surface according to the foundation pit blasting model; Acquire a target blasting model according to the boundary condition corresponding to the boundary surface; The blasting vibration velocity is obtained according to the target blasting model and the simplified blasting load, wherein the simplified blasting load includes a simplified blasting load model: , in: , , P(t) is the explosion load-time function, P0 is the explosion load peak value, t0 is the time when the explosion load reaches the peak value, and b / a is the explosion load attenuation index; Wherein, the boundary surface includes an air-facing surface and a non-air-facing surface, the boundary conditions include a free boundary and a transmission boundary, and the step of obtaining the target blasting model according to the boundary conditions corresponding to the boundary surface includes the following steps: Applying the free boundary to the free surface to obtain free boundary conditions; Applying the transmission boundary to the non-air-facing surface to obtain a non-air-facing boundary condition; The target blasting model is obtained according to the air-facing boundary condition and the non-air-facing boundary condition.

2. A foundation pit blasting excavation method according to claim 1, characterized in that: The target analysis data includes rock sample data. The step of obtaining ground stress parameters according to the target analysis data and obtaining multiple measuring points according to the ground stress parameters includes the following steps: Obtaining ground stress parameters according to the rock sample data; According to preset rules and the geostress parameters, a plurality of measuring points are obtained.

3. A foundation pit blasting excavation method according to claim 2, characterized in that: The step of obtaining vibration velocity attenuation data according to the blasting vibration velocity and the plurality of measuring points comprises the following steps: According to the plurality of measuring points, obtaining corresponding explosion center distances; The vibration velocity attenuation data is acquired according to the blasting vibration velocity and the explosion center distance.

4. A foundation pit blasting excavation method according to claim 3, characterized in that: The step of obtaining the vibration velocity attenuation data according to the blasting vibration velocity and the blast center distance comprises the following steps: According to the blasting vibration velocity attenuation data, a fitting formula is obtained, and the fitting formula includes: , , Among them, y(x) is the vibration velocity-explosion center distance function, A1, A2, t1 and t2 are curve fitting coefficients.

5. The foundation pit blasting excavation method according to claim 1, characterized in that: Determining the excavation method according to the vibration velocity attenuation data comprises the following steps: Matching a preset excavation method according to the vibration velocity attenuation data, wherein the preset excavation method includes a common blasting excavation method, a concentrated energy blasting excavation method, and a static excavation method; Select one of the preset excavation methods as a current comparison sample; Determining whether the current comparison sample meets the preset safety standard; If the current comparison sample meets the preset safety standard, selecting the current comparison sample as the determined excavation method; If the current comparison sample does not meet the preset safety standard, another excavation method is selected as the current comparison sample, and the above judgment process is looped until the determined excavation method is obtained.

6. A foundation pit blasting excavation method according to claim 5, characterized in that: After determining the excavation method according to the vibration velocity attenuation data, the following steps are also included: According to the excavation method, obtaining corresponding blasting parameters; According to the blasting parameters, a damage cloud map is obtained; The construction parameters are obtained according to the damage cloud map.

7. A foundation pit blasting excavation system, characterized in that: include: An acquisition module (1) is used to acquire foundation pit information and corresponding analysis data; Establishing module (2), establishing a foundation pit blasting model according to the foundation pit information, and acquiring target analysis data according to the foundation pit blasting model and the analysis data; A setting module (3) is used to obtain the boundary conditions of the foundation pit blasting model and obtain the blasting vibration speed in combination with the target analysis data; An analysis module (4) is used to obtain ground stress parameters according to the target analysis data, and to obtain multiple measuring points according to the ground stress parameters, and is also used to obtain vibration velocity attenuation data according to the blasting vibration velocity and the multiple measuring points; A determination module (5) is used to determine an excavation method according to the vibration velocity attenuation data; Wherein, the target analysis data includes simplified blast load, and the step of obtaining the boundary conditions of the foundation pit blasting model and obtaining the blasting vibration velocity in combination with the target analysis data includes the following steps: Determining a boundary surface according to the foundation pit blasting model; Acquire a target blasting model according to the boundary condition corresponding to the boundary surface; The blasting vibration velocity is obtained according to the target blasting model and the simplified blasting load, wherein the simplified blasting load includes a simplified blasting load model: , in: , , P(t) is the explosion load-time function, P0 is the explosion load peak value, t0 is the time when the explosion load reaches the peak value, and b / a is the explosion load attenuation index; Wherein, the boundary surface includes an air-facing surface and a non-air-facing surface, the boundary conditions include a free boundary and a transmission boundary, and the step of obtaining the target blasting model according to the boundary conditions corresponding to the boundary surface includes the following steps: Applying the free boundary to the free surface to obtain free boundary conditions; Applying the transmission boundary to the non-air-facing surface to obtain a non-air-facing boundary condition; The target blasting model is obtained according to the air-facing boundary condition and the non-air-facing boundary condition.

8. A foundation pit blasting excavation system according to claim 7, characterized in that: The determination module (5) comprises: A selection unit (51) is used to select one of the preset excavation methods as a current comparison sample; A judgment unit (52) is used to judge whether the current comparison sample meets the preset safety standard. If the current comparison sample meets the preset safety standard, the current comparison sample is selected as the determined excavation method. If the current comparison sample does not meet the preset safety standard, another excavation method is selected as the current comparison sample, and the above judgment process is repeated until the determined excavation method is obtained.