A kind of grass and greening flower pot structure and construction method thereof
By using technical means such as a waterproof layer, a hollow honeycomb water collection layer, a filter layer and a middle layer of planting soil in the flowerpot structure of shrubs and greening, the problems of low survival rate and high maintenance cost of shrubs and greening are solved, and the greening effect is achieved improvement and cost reduction.
Patent Information
- Application Number
- CN202210789563.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-07-06
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2042-07-06
AI Technical Summary
In fields such as municipal administration, railway stations, and logistics parks, low survival rates and seasonal withering of shrubs and grasses lead to problems such as poor greening effects, frequent annual repairs, heavy maintenance workload, and high costs.
It adopts a shrub and green flower pot structure, including a waterproof layer, a hollow honeycomb water collection layer, a filter layer, a middle layer of planting soil, a pebble transition layer and a fancy grid plate laid in sequence from bottom to top, connected by supports. The pot-side cofferdam and permeable supports form a stable flowerpot-style shrub and grass greening structure, ensuring soil breathability and moisture retention, collecting rainwater and irrigation water in a timely manner, and reducing water loss.
It improves the greening survival rate, reduces repair and maintenance costs, ensures the sustainability and aesthetics of the greening effect, and solves the problems of low survival rate, poor effect, annual repairs and high cost.
Smart Images

Figure CN114982519B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of shrub and greening, and in particular relates to a shrub and greening flowerpot structure and a construction method thereof. Background Art
[0002] At present, greening is becoming more and more common in my country's municipal administration, railway stations, logistics parks and other fields, especially herbaceous planting. However, with the influence of factors such as differences in geographical regions, changes in seasons (especially in the north), and climate change, the survival rate of shrubs and grasses is low, and seasonal withering occurs, resulting in poor greening effects, annual restoration, heavy maintenance workload, and serious cost expenditure. Summary of the invention
[0003] In order to solve the technical problems of low greening survival rate, poor greening effect, annual restoration, large maintenance workload and serious cost expenditure, the present invention provides a grass and greening flowerpot structure and a construction method thereof, which is suitable for the greening of fields in the fields of municipal administration, railway stations, logistics parks, etc., and aims to protect the entire growth process of greening and to achieve beautification effect in the early stage of seedling formation and seasonal withering period; ensure the air permeability and moisture retention of the soil, greatly improve the greening survival rate, and can timely collect rainwater and irrigation water, reduce water loss, and reduce repair and maintenance costs.
[0004] In order to achieve the above object, the technical solution adopted by the present invention is as follows:
[0005] In a first aspect, the present invention provides a shrub and greening flower pot structure, comprising a waterproof layer, a hollow honeycomb water collection layer, a filter layer, a planting soil middle layer, a pebble transition layer, and a fancy grille plate, which are laid in sequence from bottom to top;
[0006] The fancy grille plate is an assembleable grille plate;
[0007] The pebble transition layer is formed by evenly dispersing pebbles;
[0008] The middle layer of the planting soil is an organic soil layer;
[0009] The filter layer includes sand and gravel and a permeable geotextile, wherein the permeable geotextile is spread in the sand and gravel, and the particle size of the sand and gravel decreases from bottom to top;
[0010] The hollow honeycomb water collection layer is paved with a number of hollow honeycomb bricks;
[0011] The waterproof layer is a waterproof composite geomembrane;
[0012] The basin edge cofferdam composed of a plurality of supporting members is laid on the outside of the fancy grid plate, the pebble transition layer, the planting soil middle layer, and the filter layer, and the basin edge cofferdam is set on the upper surface edge of the hollow honeycomb water collection layer;
[0013] The permeable retaining wall made of crushed stones is arranged on the outer side of the hollow honeycomb water collection layer, the waterproof layer and the lower part of the basin edge cofferdam, and drainage is carried out through the pores between the crushed stones.
[0014] Preferably, the fancy grille plate is assembled from a number of basic fancy grille plates, and the shape of the basic fancy grille plates may be square, triangular or fan-shaped; the fancy grille plates are made of fiberglass.
[0015] Preferably, gaps are left between the pebbles in the pebble transition layer, and the thickness of the pebble transition layer does not exceed 10 centimeters.
[0016] Preferably, the permeable geotextile is laid between the drainage body and the anti-filter body formed by the sand and gravel, the drainage body is located below the permeable geotextile, and the anti-filter body is located above the permeable geotextile.
[0017] Preferably, the support member includes a base plate and a vertical plate, the lower end of the vertical plate is connected to the upper surface of the base plate, the cross-section of the support member is an inverted T-shape, and an L-shaped platform is provided on one side of the upper part of the vertical plate; the filter layer, the middle layer of planting soil, the pebble transition layer, and the fancy grille plate are arranged on the inner side of the support member in sequence from bottom to top, wherein the edge of the fancy grille plate is erected on the L-shaped platform; the support member is a reinforced concrete structure.
[0018] Preferably, the support members are divided into corner support members and middle support members, the basin edge cofferdam is composed of the corner support members and the middle support members, four corner support members are respectively located at the four corners of the basin edge cofferdam, two adjacent corner support members are connected by the middle support member, and the bottom plate thickness, vertical plate height, and setting height of the L-shaped platform of the corner support members and the middle support members are all consistent;
[0019] The corner support member is a right-angle support member or a rounded-angle support member; the bottom plate, vertical plate and L-shaped platform of the right-angle support member are all provided with matching right-angle corners; the bottom plate, vertical plate and L-shaped platform of the rounded-angle support member are all provided with matching curvatures.
[0020] Preferably, the hollow honeycomb brick is a hollow cube structure, and circular holes are evenly distributed on the other five surfaces except the bottom surface; the circular holes on every two opposite sides of the hollow honeycomb brick are arranged uniformly; the material of the hollow honeycomb brick is plain concrete or reinforced concrete.
[0021] Preferably, the top surface of the hollow honeycomb brick is provided with multiple rows of circular holes, and each of the four sides is provided with a row of circular holes, the circular holes arranged on each side have the same height and the same spacing between the circular holes; the diameter of the circular holes should be compatible with the structure of the hollow honeycomb brick to ensure the stability of the hollow honeycomb brick.
[0022] Preferably, the thickness of the middle layer of the planting soil is determined according to the root development of the greening planted; the waterproof layer is specifically composed of two cloths and one film, wherein the thickness of the film is 0.30 to 2.00 mm.
[0023] In a second aspect, the present invention further provides a construction method of a grass and greening flowerpot structure, the method comprising the following steps:
[0024] Step S1, completing the construction preparation work, which includes the delivery of materials from the factory and the site clearing work;
[0025] Step S2, excavating the foundation pit, specifically excavating the foundation pit along the excavation line to the designed height, and providing temporary support for the foundation pit;
[0026] Step S3, complete the laying of the following structural layers in sequence from bottom to top, as follows:
[0027] ① Laying waterproof layer;
[0028] First, use sand or clay to level the base surface, then lay two cloths and one membrane, with the two ends of the two cloths and one membrane buried in the soil in a corrugated shape, and finally lay a transition layer of fine sand or clay on the laid two cloths and one membrane;
[0029] ② Laying a hollow honeycomb water collection layer;
[0030] The top surface of the hollow honeycomb bricks faces upwards, and the circular holes on the sides of the adjacent hollow honeycomb bricks are neatly laid on the transition layer in a one-to-one correspondence manner. The edge of the hollow honeycomb water collection layer is consistent with the edge of the transition layer of the waterproof layer. The top surface of each hollow honeycomb brick is located in the same horizontal plane, and the adjacent hollow honeycomb bricks are attached to each other.
[0031] ③ Lay the basin edge cofferdam and permeable retaining wall;
[0032] The corner support members are positioned and arranged on the upper surface of the hollow honeycomb water collection layer, and then the middle support members are laid out in sequence along the edge of the upper surface of the hollow honeycomb water collection layer, and the corner support members and the middle support members are connected by cement mortar;
[0033] Remove temporary support for the foundation pit, fill the outer side of the hollow honeycomb water collection layer, waterproof layer and the lower part of the basin cofferdam with graded crushed stone, and complete the laying of permeable support;
[0034] After the basin cofferdam and permeable support are laid, the outer surface of the permeable support and basin cofferdam is smoothed or reinforced by spraying cement mortar;
[0035] ④ Laying the filter layer;
[0036] Above the hollow honeycomb water collection layer, a drainage body made of sand and gravel, a permeable geotextile, and an anti-filter body made of sand and gravel are laid from bottom to top on the inner side of the basin cofferdam to ensure that each layer is flat and compact;
[0037] ⑤ Lay the middle layer of planting soil;
[0038] On the inner side of the basin cofferdam, a middle layer of planting soil is laid above the filter layer, wherein the middle layer of planting soil includes a main layer of soil and a surface layer of soil (32). First, the main layer of soil that is not compacted is laid, and then grass seeds are sown. Then, 1 / 2 of the surface layer of soil (32) is covered. Then, water is sprayed on the laid surface layer of soil, and finally, the remaining surface layer of soil is covered to a preset position.
[0039] ⑥ Laying a pebble transition layer;
[0040] On the inner side of the cofferdam at the edge of the basin, pebbles are evenly spread on the surface soil;
[0041] ⑦ Laying fancy grille plates;
[0042] According to the required size and pattern, several basic fancy grille plates are assembled into a whole fancy grille plate, and its edges are placed on the L-shaped platform of the middle support and the corner support, so that the fancy grille plate is placed inside the cofferdam of the basin edge and laid above the pebble transition layer to complete the overall laying;
[0043] Step S4, complete the backfilling and compaction of the soil around the cofferdam, water and irrigate, and evacuate the site.
[0044] Preferably, before laying the filter layer, the positions of the filter layer, the planting soil middle layer and the pebble transition layer are marked on the inner side of the basin cofferdam.
[0045] The present invention has the following beneficial effects:
[0046] (1) The present invention provides a grass and greening flower pot integral structure, which is composed of a fancy grille plate, a pebble transition layer, a planting soil middle layer, a gravel filter layer, a hollow honeycomb water collection layer, a waterproof layer, a basin edge cofferdam, and a permeable support. The structure is stable, breathable, and has strong moisture retention. It is both beautiful and environmentally friendly. The fancy grille plate can protect the entire process of greening growth and play a beautifying effect in the early seedling stage and seasonal withering period. The lower hollow honeycomb water collection layer not only ensures the air permeability and moisture retention of the soil, greatly improves the survival rate of greening, but also can timely collect rainwater and irrigation water, reduce water loss, and reduce repair and maintenance costs. At the same time, the holes set on the side of the hollow honeycomb water collection layer can form a water control device with the permeable support to timely discharge the excess water accumulated in heavy rain or continuous precipitation weather to avoid drought and waterlogging. Ultimately, many problems such as low greening survival rate, poor greening effect, annual restoration, large maintenance workload, and serious cost expenditure are solved.
[0047] (2) The method for constructing a grass and greening flower pot-like integral structure provided by the present invention is a specific construction method designed according to the grass and greening flower pot-like integral structure. Its main structural materials are prefabricated in the factory and assembled on site, which greatly saves construction time and cost. The construction sequence is from bottom to top, which fully meets the structural stability. BRIEF DESCRIPTION OF THE DRAWINGS
[0048] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for describing the embodiments are briefly introduced below. Obviously, the drawings described below are only some embodiments of the embodiments of the present invention.
[0049] Figure 1 This is a structural schematic diagram of a flowerpot structure for grassing and greening according to an embodiment of the present invention;
[0050] Figure 2 for Figure 1 A magnified view of part A;
[0051] Figure 3 is a three-dimensional diagram of a right-angle support member in an embodiment of the present invention;
[0052] Figure 4 is a three-dimensional diagram of a rounded support member in an embodiment of the present invention;
[0053] Figure 5 is a three-dimensional diagram of an intermediate support member in an embodiment of the present invention;
[0054] Figure 6 is a three-dimensional diagram of a hollow honeycomb brick in an embodiment of the present invention;
[0055] Figure 7 It is a front perspective view of a hollow honeycomb brick in an embodiment of the present invention;
[0056] Figure 8 is a top perspective view of a hollow honeycomb brick in an embodiment of the present invention;
[0057] Fig. 9 It is a schematic plan view of a square basic fancy grille plate in an embodiment of the present invention;
[0058] Fig.10 It is a plane schematic diagram of a triangular basic fancy grille plate in an embodiment of the present invention;
[0059] Fig.11 It is a schematic plan view of a fan-shaped basic fancy grille plate in an embodiment of the present invention;
[0060] Fig.12 The top view of the flower pot structure for greening grass in the embodiment of the present invention Figure 1 ;
[0061] Fig.13The top view of the flower pot structure for greening grass in the embodiment of the present invention Figure 2 .
[0062] Description of reference numerals:
[0063] 1. Fancy grille plate; 11. Square basic fancy grille plate; 12. Triangular basic fancy grille plate; 13. Fan-shaped basic fancy grille plate; 2. Pebble transition layer; 3. Middle layer of planting soil; 31. Main layer of soil; 32. Surface soil; 4. Sand and gravel filter layer; 41. Drainage body; 42. Permeable geotextile; 43. Anti-filter body; 5. Hollow honeycomb water collection layer; 51. Hollow honeycomb brick; 511. Circular holes; 512. Hollow space; 6. Waterproof layer, 7. Basin cofferdam; 71. Right-angle support; 72. Middle support; 73. Rounded support; 701. Bottom plate; 702. Vertical plate; 703. L-shaped platform; 8. Permeable support; 9. Excavation line; 10. Backfill soil. DETAILED DESCRIPTION
[0064] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention is described in detail below with reference to the accompanying drawings and specific embodiments.
[0065] This embodiment provides a grass and greening flower pot structure, such as Figures 1 to 13 As shown, it includes a waterproof layer 6, a hollow honeycomb water collection layer 5, a filter layer 4, a planting soil middle layer 3, a pebble transition layer 2, and a fancy grille plate 1 which are laid in sequence from bottom to top.
[0066] The fancy grille plate 1 is an assembleable grille plate made of glass fiber reinforced plastic, which is beautiful and environmentally friendly. The fancy grille plate 1 is assembled from a number of basic fancy grille plates. The shape of the basic fancy grille plate can be square, triangular or fan-shaped (the arc spacing and the minimum fan-shaped unit arc value can be adjusted according to the required hollow area), and can be arbitrarily colored and spliced into different patterns; the square basic fancy grille plate 11 is as follows Fig. 9 As shown, the triangular basic fancy grille plate 12 is as shown in Fig.10 As shown, the fan-shaped basic fancy grille plate 13 is as shown in Fig.11 shown.
[0067] The pebble transition layer 2 is formed by evenly dispersed pebbles, which decompose the stress and reduce soil scouring and water evaporation; there are gaps between the pebbles in the pebble transition layer 2, and the thickness of the pebble transition layer 2 does not exceed 10 centimeters.
[0068] The middle layer 3 of the planting soil is an organic soil layer, which is the nutrient layer for the growth and development of the greening grass. The thickness of the soil layer is determined according to the root development of the greening plant, and 30 centimeters is generally used; the structure of the middle layer 3 of the planting soil includes a main layer of soil 31 and a topsoil 32. First, the main layer of soil 31 that is not compacted is laid, and then grass seeds are sown. Then, 1 / 2 of the topsoil 32 is covered, and then a small amount of water is sprayed on the covered topsoil 32. Finally, the remaining 1 / 2 of the topsoil 32 is covered to the preset position.
[0069] The filter layer 4 includes sand and gravel and a permeable geotextile 42. The permeable geotextile 42 is laid flat in the sand and gravel, and the particle size of the sand and gravel decreases from bottom to top. Specifically, the permeable geotextile 42 is laid flat between the drainage body 41 and the filter body 42 formed by the sand and gravel. The drainage body 41 formed by the sand and gravel is located below the permeable geotextile 42, and the filter body 43 formed by the sand and gravel is located above the permeable geotextile 42. The function of the filter layer 4 is to retain soil and water.
[0070] The hollow honeycomb water collection layer 5 is paved with a number of hollow honeycomb bricks 51, and is used to collect filtered water that has seeped through the filter layer 4; the hollow honeycomb bricks 51 are made of plain concrete or reinforced concrete; the hollow honeycomb bricks 51 are hollow cubic structures with hollow spaces 512, and except for the bottom surface, the other five surfaces are evenly provided with circular holes 511, and the circular holes 511 on every two opposite sides of the hollow honeycomb bricks 51 are arranged in the same manner. In this embodiment, the top surface of the hollow honeycomb bricks 51 is provided with multiple rows of circular holes 511, and each of the four side surfaces is provided with a row of circular holes 511, and the circular holes 511 arranged on each side have the same height and the circular holes 511 have the same spacing, such as Figures 6 to 8 As shown, the diameter of the circular hole 511 must be compatible with the structure of the hollow honeycomb brick 51 to ensure the stability of the hollow honeycomb brick 51.
[0071] The waterproof layer 6 is a waterproof composite geomembrane, specifically two fabrics and one membrane, which has waterproof and structural stability functions. The material of the membrane can be polyvinyl chloride (PVC) or polyethylene (PE), and the thickness of the membrane is 0.30-2.00 mm.
[0072] The basin edge cofferdam 7 composed of several supporting members is laid on the outside of the fancy grid plate 1, the pebble transition layer 2, the planting soil middle layer 3, and the filter layer 4; the basin edge cofferdam 7 is set on the upper surface edge of the hollow honeycomb water collection layer 5. The basin edge cofferdam 7 plays a role in stabilizing the structure.
[0073] The support member includes a bottom plate 701 and a vertical plate 702. The lower end of the vertical plate 702 is connected to the upper surface of the bottom plate 701. The cross-section of the support member is inverted T-shape (i.e., "⊥" shape). An L-shaped platform 703 is provided on one side of the upper part of the vertical plate 702. The filter layer 4, the planting soil middle layer 3, the pebble transition layer 2, and the fancy grille plate 1 are arranged on the inner side of the support member from bottom to top, wherein the edge of the fancy grille plate 1 is erected on the L-shaped platform 703. The support member is a reinforced concrete structure.
[0074] The support members are divided into corner support members and middle support members 72. The basin cofferdam 7 is composed of four corner support members and four middle support members 72 connected by cement mortar joints. The four corner support members are respectively located at the four corners of the basin cofferdam 7. Two adjacent corner support members are supported and connected by the middle basin edge 72. The thickness of the bottom plate 701 of the corner support members and the middle support members 72, the height of the vertical plate 702, and the setting height of the L-shaped platform 703 are all consistent.
[0075] The corner support member is a right-angle support member 71 or a rounded corner support member 73. The bottom plate 701, the vertical plate 702, and the L-shaped platform 703 of the right-angle support member 71 are all provided with matching right-angle corners, such as Figure 3 The bottom plate 701, the vertical plate 702, and the L-shaped platform 703 of the rounded support member 73 all have matching curvatures, such as Figure 4 As shown; intermediate support member 72, such as Figure 5 shown.
[0076] The permeable support 8 is a stable support structure made of large-diameter crushed stones, which plays a role in drainage support and can drain water through the pores between the crushed stones. The permeable support 8 is arranged on the outer side of the hollow honeycomb water collection layer 5, the waterproof layer 6 and the lower part of the basin edge cofferdam 7 to form an integral basin edge. In this embodiment, the upper surface of the permeable support 8 is on the same horizontal plane as the upper surface of the bottom plate 701 of the middle support member 72 and the corner support member.
[0077] The top view of the grass and greening flower pot structure with four right angles at the basin edge cofferdam 7 is as follows: Fig.12 As shown, the top view of the shrub and greening flower pot structure with four rounded corners of the basin edge cofferdam 7 is as follows: Fig.13 shown.
[0078] The present embodiment provides a grass and greening flowerpot structure, which is a flowerpot-type grass and greening structure composed of a fancy grille plate 1, a pebble transition layer 2, a planting soil middle layer 3, a filter layer 4, a hollow honeycomb water-collecting layer 5, a waterproof layer 6, a basin edge cofferdam 7, and a permeable support 8. The structure has strong stability, air permeability, and moisture retention, and is both beautiful and environmentally friendly. The fancy grille plate can protect the entire growth process of greening, and has a beautification effect in the early seedling stage and seasonal withering period; the lower hollow honeycomb water-collecting layer 5 not only ensures the air permeability and moisture retention of the soil, greatly improves the survival rate of greening, but also can timely collect rainwater and irrigation water, reduce water loss, and reduce repair and maintenance costs. At the same time, the circular holes 511 arranged on the side of the hollow honeycomb water-collecting layer 5 can form a water control device with the permeable support 8 to timely discharge excess water accumulated in heavy rain or continuous precipitation weather to avoid drought and waterlogging. Ultimately, many problems such as low greening survival rate, poor greening effect, annual restoration, heavy maintenance workload and serious cost expenditure will be solved.
[0079] This embodiment also provides a construction method for a grass and greening flowerpot structure. Figures 1 to 13 As shown, the method comprises the following steps:
[0080] Step S1, completing construction preparation work, which includes material delivery and site clearing.
[0081] Step S2, excavating the foundation pit, specifically excavating the foundation pit along the excavation line 9 to the designed height, and providing temporary support for the foundation pit.
[0082] Step S3, complete the laying of the following structural layers in sequence from bottom to top, as follows:
[0083] ① Lay waterproof layer 6.
[0084] First, use sand or clay to level the base surface (maintain the designed height value), and then lay two cloths and one membrane. Do not lay them too tight. The two ends of the two cloths and one membrane should be buried in the soil in a corrugated shape. Finally, lay a transition layer of about 10 cm with fine sand or clay on the laid two cloths and one membrane.
[0085] ② Lay a hollow honeycomb water-collecting layer 5.
[0086] First, confirm the upper and lower sides of the hollow honeycomb bricks, with the top surface of the hollow honeycomb bricks 51 facing upwards, and lay them neatly on the transition layer in a one-to-one correspondence manner with the circular holes 511 on the sides of adjacent hollow honeycomb bricks 51. The edge of the hollow honeycomb water-collecting layer 5 is consistent with the edge of the transition layer of the waterproof layer 6, and the top surfaces of each hollow honeycomb brick 51 are located in the same horizontal plane, and adjacent hollow honeycomb bricks 51 are attached to each other.
[0087] ③ Lay the basin edge cofferdam 7 and permeable retaining 8.
[0088] Distinguish between the top and bottom, inside and outside, draw a line for leveling, determine the position of the corner support members on the upper surface of the hollow honeycomb water-collecting layer 5 and arrange them, then lay the middle support members 72 along the edge of the upper surface of the hollow honeycomb water-collecting layer 5 in sequence, and connect the corner support members and the middle support members 72 with cement mortar.
[0089] The temporary support of the foundation pit is removed, and graded gravel is promptly filled on the outer side of the hollow honeycomb water collection layer 5, the waterproof layer 6 and the lower part of the basin edge cofferdam 7 to complete the laying of the permeable support 8. In this embodiment, the upper surface of the permeable support 8 is on the same horizontal plane as the upper surface of the bottom plate 701 of the middle support member 72 and the corner support member.
[0090] After the basin edge cofferdam 7 and the permeable support 8 are laid, the outer surface of the permeable support 8 and the basin edge cofferdam 7 is smoothed or sprayed with cement mortar for reinforcement.
[0091] ④ Lay the filter layer 4.
[0092] Above the hollow honeycomb water-collecting layer 5, a drainage body 41 made of sand and gravel, a permeable geotextile 42, and an anti-filter body 43 made of sand and gravel are laid in sequence from bottom to top on the inner side of the basin edge cofferdam 7 to ensure that each layer is flat and compact.
[0093] ⑤ Lay the middle layer of planting soil 3.
[0094] On the inner side of the basin cofferdam 7, the planting soil middle layer 3 structure includes a main layer of soil 31 and a topsoil 32. First, the main layer of soil 31 that is not compacted is laid, and then grass seeds are sown. Then, 1 / 2 of the topsoil 32 is covered, and then a small amount of water is sprayed on the laid topsoil 32. Finally, the remaining topsoil 32 is covered to the preset position.
[0095] ⑥ Lay pebble transition layer 2.
[0096] On the inner side of the basin cofferdam 7, pebbles are evenly dispersed and laid on the topsoil 32, as close as possible to the preset height. The pebble transition layer 2 plays a role in decomposing the stress and reducing soil scouring and water evaporation.
[0097] ⑦ Lay the fancy grille board 1.
[0098] A whole fancy grating plate 1 is assembled by assembling several basic fancy grating plates according to the required size and pattern style. The edge of the fancy grating plate 1 is placed on the L-shaped platform 703 of the middle support 72 and the corner support, so that the fancy grating plate 1 is laid on the inner side of the basin cofferdam 7 and above the pebble transition layer 2 to complete the overall laying.
[0099] Step S4, complete the backfilling and compaction of the backfill soil 10 around the basin cofferdam 7, water and irrigate, and evacuate the site.
[0100] Furthermore, before laying the filter layer 4, the positions of the filter layer 4, the planting soil middle layer 3, and the pebble transition layer 2 are marked on the inner side of the basin edge cofferdam 7.
[0101] The present embodiment provides a construction method for a shrub and greening flowerpot-type structure, which is a specific construction method set up according to the shrub and greening flowerpot-type overall structure. Its main structural materials are prefabricated in the factory and assembled on site, which greatly saves construction time and cost; the construction sequence is from bottom to top, which fully meets the structural stability.
[0102] The above embodiments of the present invention are described in detail through examples, but the contents described are only exemplary embodiments of the embodiments of the present invention and cannot be considered to limit the scope of implementation of the embodiments of the present invention. The protection scope of the embodiments of the present invention is defined by the claims. Anyone who utilizes the technical solutions described in the embodiments of the present invention, or who, inspired by the technical solutions of the embodiments of the present invention, designs similar technical solutions within the essence and protection scope of the embodiments of the present invention to achieve the above technical effects, or who makes equal changes and improvements to the scope of application, shall still fall within the scope of protection covered by the patent of the embodiments of the present invention.
Claims
1. A flowerpot structure for shrubs and greening, characterized in that: It comprises a waterproof layer (6), a hollow honeycomb water collection layer (5), a filter layer (4), a planting soil middle layer (3), a pebble transition layer (2), and a fancy grille plate (1) which are laid in sequence from bottom to top; wherein: The fancy grille plate (1) is an assembleable grille plate; The pebble transition layer (2) is formed by evenly dispersed pebbles; The middle layer (3) of the planting soil is an organic soil layer; The filter layer (4) comprises sand and gravel and a permeable geotextile (42), wherein the permeable geotextile (42) is spread in the sand and gravel, and the particle size of the sand and gravel decreases from bottom to top; The hollow honeycomb water collection layer (5) is formed by paving a plurality of hollow honeycomb bricks; The waterproof layer (6) is a waterproof composite geomembrane; A basin edge cofferdam (7) composed of a plurality of support members connected together is laid on the outside of the fancy grille plate (1), the pebble transition layer (2), the planting soil middle layer (3), and the filter layer (4), and the basin edge cofferdam (7) is arranged on the upper surface edge of the hollow honeycomb water collection layer (5); A permeable support (8) made of piled gravels is arranged outside the hollow honeycomb water collection layer (5), the waterproof layer (6) and the lower part of the basin edge cofferdam (7), and drainage is carried out through the pores between the gravels; The support member comprises a bottom plate (701) and a vertical plate (702), the lower end of the vertical plate (702) being connected to the upper surface of the bottom plate (701), the cross section of the support member being in an inverted T-shape, and an L-shaped platform (703) being provided on one side of the upper part of the vertical plate (702); the filter layer (4), the planting soil middle layer (3), the pebble transition layer (2), and the fancy grille plate (1) are sequentially arranged on the inner side of the support member from bottom to top, wherein the edge of the fancy grille plate (1) is placed on the L-shaped platform (703); the support member is a reinforced concrete structure; The support members are divided into corner support members and middle support members (72); the basin edge cofferdam (7) is composed of the corner support members and the middle support members (72) connected together; four corner support members are respectively located at four corners of the basin edge cofferdam (7); two adjacent corner support members are connected via the middle support member (72); the thickness of the bottom plate (701) of the corner support members and the middle support member (72), the height of the vertical plate (702), and the setting height of the L-shaped platform (703) are all consistent; The corner support member is a right-angle support member (71) or a rounded-angle support member (73); the bottom plate (701), the vertical plate (702), and the L-shaped platform (703) of the right-angle support member (71) are all provided with matching right-angle corners; the bottom plate (701), the vertical plate (702), and the L-shaped platform (703) of the rounded-angle support member (73) are all provided with matching curvatures; The hollow honeycomb brick (51) is a hollow cubic structure, and the other five surfaces except the bottom surface are uniformly provided with circular holes (511); the circular holes (511) on every two opposite sides of the hollow honeycomb brick (51) are uniformly arranged; the material of the hollow honeycomb brick (51) is plain concrete or reinforced concrete; The top surface of the hollow honeycomb brick (51) is provided with a plurality of rows of circular holes (511), and each of the four sides is provided with a row of circular holes (511), and the circular holes (511) arranged on each side have the same height and the same spacing between the circular holes (511); The construction method of the grass and greening flowerpot structure comprises the following steps: Step S1, completing the construction preparation work, which includes the delivery of materials from the factory and the site clearing work; Step S2, excavating the foundation pit, specifically excavating the foundation pit along the excavation line (9) to the designed height, and providing temporary support for the foundation pit; Step S3, complete the laying of the following structural layers in sequence from bottom to top, as follows: ① Laying a waterproof layer (6); First, use sand or clay to level the base surface, then lay two cloths and one membrane, with the two ends of the two cloths and one membrane buried in the soil in a corrugated shape, and finally lay a transition layer of fine sand or clay on the laid two cloths and one membrane; ② Laying a hollow honeycomb water collection layer (5); The top surfaces of the hollow honeycomb bricks (51) face upwards and are neatly laid on the transition layer in a one-to-one correspondence manner with the circular holes (511) on the sides of adjacent hollow honeycomb bricks (51). The edge of the hollow honeycomb water collection layer (5) is consistent with the edge of the transition layer of the waterproof layer (6). The top surfaces of the hollow honeycomb bricks (51) are located on the same horizontal plane, and adjacent hollow honeycomb bricks (51) are attached to each other. ③ Lay the basin edge cofferdam (7) and permeable retaining wall (8); The corner support members are positioned and arranged on the upper surface of the hollow honeycomb water-collecting layer (5), and then the intermediate support members (72) are laid in sequence along the edge of the upper surface of the hollow honeycomb water-collecting layer (5), and the corner support members and the intermediate support members (72) are connected by cement mortar; The temporary support of the foundation pit is removed, and graded crushed stones are filled on the outer side of the hollow honeycomb water collection layer (5), the waterproof layer (6) and the lower part of the basin edge cofferdam (7) to complete the laying of the permeable support (8); After the basin edge cofferdam (7) and the permeable support (8) are laid, the outer surface of the permeable support (8) and the basin edge cofferdam (7) is smoothed or sprayed with cement mortar for reinforcement; ④ Laying the filter layer (4); Above the hollow honeycomb water collection layer (5), a drainage body (41) made of sand and gravel, a permeable geotextile (42), and an anti-filter body (43) made of sand and gravel are laid in order from bottom to top on the inner side of the basin edge cofferdam (7), ensuring that each layer is flat and compact; ⑤ Laying the middle layer of planting soil (3); A planting soil middle layer (3) is laid on the inner side of the basin cofferdam (7) and above the filter layer (4), wherein the planting soil middle layer (3) comprises a main soil layer (31) and a surface soil layer (32), grass seeds are sown after the main soil layer (31) which is not compacted is laid, and then 1 / 2 of the surface soil (32) is covered, and then water is sprayed on the laid surface soil (32), and finally the remaining surface soil (32) is covered to a preset position; ⑥ Laying a pebble transition layer (2); On the inner side of the basin cofferdam (7), pebbles are evenly spread on the surface soil (32); ⑦ Laying the fancy grille plate (1); A whole fancy grille plate (1) is assembled by assembling a plurality of basic fancy grille plates according to the required size and pattern, and its edges are placed on the L-shaped platform (703) of the middle support member (72) and the corner support member, so that the fancy grille plate (1) is laid on the inner side of the basin edge cofferdam (7) and above the pebble transition layer (2), thus completing the overall laying; Step S4, complete the backfilling and compaction of the backfill soil (10) around the basin cofferdam (7), water and irrigate, and evacuate the site.
2. The shrub and greening flowerpot structure according to claim 1, characterized in that: The fancy grille plate (1) is assembled from a number of basic fancy grille plates, and the shape of the basic fancy grille plates can be square, triangular or fan-shaped; the material of the fancy grille plate (1) is glass fiber reinforced plastic.
3. The shrub and greening flowerpot structure according to claim 1, characterized in that: There are gaps between the pebbles in the pebble transition layer (2), and the thickness of the pebble transition layer (2) does not exceed 10 centimeters.
4. The shrub and greening flowerpot structure according to claim 1, characterized in that: The permeable geotextile (42) is laid flat between the drainage body (41) and the anti-filter body (43) formed by the sand and gravel, the drainage body (41) is located below the permeable geotextile (42), and the anti-filter body (43) is located above the permeable geotextile (42).
5. The shrub and greening flowerpot structure according to claim 1, characterized in that: Before laying the filter layer (4), the positions of the filter layer (4), the planting soil middle layer (3) and the pebble transition layer (2) are marked on the inner side of the basin edge cofferdam (7).
