Lining trolley and method for small-clearance triple-arch special-shaped section tunnel

By designing a small clearance triple arch special-shaped section tunnel lining trolley, using the frame, inner formwork and side formwork to form a Y-shaped cavity, combined with a pouring device and a feeding device, the problem of special-shaped section lining in triple arch construction was solved and achieved Convenient secondary lining and optimized construction process.

CN114991816BActive Publication Date: 2024-10-18中铁广州工程局集团第三工程有限公司 +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202210539658.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-05-18
Publication Date
2024-10-18
Estimated Expiration
2042-05-18

AI Technical Summary

Technical Problem

In the construction of triple-arch tunnels, the small clear distance causes the arc-shaped contours of the tunnel vaults to overlap, causing the secondary lining structures of the side tunnels and the central guide tunnels constructed in succession to partially overlap each other. Traditional lining trolleys cannot complete the secondary lining of special-shaped sections. .

Method used

A small clear distance triple arch special-shaped section tunnel lining trolley is designed. It uses a frame, inner formwork, side formwork and connecting mechanism to realize the shaping of the special-shaped section through the cavity forming a Y-shaped cross-section profile, and through the pouring device and the inlet The material device optimizes the concrete pouring process, reducing manpower requirements and concrete waste.

Benefits of technology

It achieves convenient secondary lining of special-shaped sections and optimizes the demoulding process, reducing construction difficulty and safety risks, while improving the integrity and accuracy of triple arch construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114991816B_ABST
    Figure CN114991816B_ABST
Patent Text Reader

Abstract

The present application relates to a trolley and method for lining a small-clearance triple-arch tunnel with a special-shaped section, which includes a frame for walking and supporting and a plurality of inner templates arranged on the top and side of the frame, the side of the frame is provided with a side template for forming a secondary lining structure in an adjacent guide tunnel, the side template is located on the side of the inner template away from the frame, a cavity with a Y-shaped cross-sectional profile is formed between the side template and the inner template, the side template is connected to the inner template through a plurality of connecting mechanisms, the connecting mechanism includes a connecting rod, a sleeve sleeved on the connecting rod, and a support pipe penetrated and threadedly connected to the inner template, one end of the connecting rod is inserted and threadedly connected to the side template, the other end of the connecting rod is inserted into the inner template and abuts against the support pipe, and the two ends of the sleeve abut against the inner template and the side template respectively. The present application can relatively conveniently complete the secondary lining construction of a tunnel with a special-shaped section.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the field of tunnel lining technology, and in particular to a lining trolley and method for a three-arch irregular cross-section tunnel with small clearance. Background Technology

[0002] A triple-arch tunnel is a tunnel structure consisting of three parallel tunnels whose arched outlines intersect at the top. It is commonly found in urban rail transit construction. Different construction methods are used in the construction of triple-arch tunnels due to the varying net distances between the centers of the three tunnels; the main methods are the double-sidewall pilot tunnel method and the bench method.

[0003] In existing technology, the construction of triple arches primarily involves the following steps. The first involves constructing the central pilot tunnel first, completing the primary and secondary linings for the central pilot tunnel. Two side tunnels are then excavated simultaneously with the secondary lining of the central pilot tunnel. The side tunnels are excavated using a top-to-bottom construction method, with a temporary invert installed between the upper and lower sections. The second method involves constructing the side tunnels on either side of the central pilot tunnel first. After the primary and secondary linings are completed on the side tunnels, the central pilot tunnel is excavated, and the primary and secondary linings of the central pilot tunnel are then completed.

[0004] However, in the actual construction process, when the net distance between the three tunnels in the triple arch is relatively small, resulting in a relatively large overlap of the arc-shaped profiles of the arch tops of the three tunnels, the secondary lining structures of the side tunnels and the middle guide tunnel constructed successively will partially overlap with each other. At this time, the structure of the secondary lining constructed first will be quite different from the traditional arc-shaped section, resulting in the secondary lining structure having an irregular section. The traditional lining trolley is unable to complete the secondary lining of the irregular section. Summary of the Invention

[0005] In order to complete the secondary lining of irregular cross sections, this application provides a lining trolley and method for a three-arch irregular cross section tunnel with small clearance.

[0006] Firstly, this application provides a lining trolley for a three-arch irregular cross-section tunnel with small clearance, adopting the following technical solution:

[0007] A small-clearance triple-arch special-section tunnel lining trolley comprises a frame for walking and supporting and a plurality of inner templates arranged on the top and sides of the frame; the side of the frame is provided with a side template for forming a secondary lining structure in an adjacent guide tunnel; the side template is located on the side of the inner template away from the frame; a cavity with a Y-shaped cross-sectional profile is formed between the side template and the inner template; the side template is connected to the inner template through a plurality of connecting mechanisms; the connecting mechanism comprises a connecting rod, a sleeve outermostly fitted on the connecting rod, and a support tube passed through and threadedly connected to the inner template; one end of the connecting rod is inserted and threadedly connected to the side template; the other end of the connecting rod is inserted into the inner template and abuts the support tube; the two ends of the sleeve abut the inner template and the side template respectively.

[0008] By adopting the above technical solution, when pouring the irregular cross-section secondary lining of the triple arch, a cavity with a Y-shaped cross-section profile can be formed between the side template and the inner template to shape the irregular cross-section. Since the frame needs to continue moving forward after the secondary lining is poured, it is only necessary to rotate the support pipe first, and then rotate the connecting rod, so that multiple connecting rods are detached from the connected side templates. Then, the connecting rods can be pulled out relative to the sleeve. During the pouring process, the sleeve can isolate the connecting rods from the concrete, reducing the possibility that the connecting rods cannot be pulled out due to the solidification of the concrete. This achieves a relatively convenient completion of the irregular cross-section secondary lining while optimizing the convenience of demolding and dismantling.

[0009] Optionally, the side template includes an upper template and a lower template arranged sequentially from top to bottom around the frame, and the end of the connecting rod away from the inner template is inserted and threadedly connected to the upper template or the lower template. The frame is equipped with a pouring device for sequentially pouring the cavity and the outer side of the inner template in layers.

[0010] By adopting the above technical solution, the upper and lower templates are distributed vertically to form a Y-shaped contour cavity. Since the net distance between the three arches is relatively small, the distance between the secondary lining and the primary lining at the junction of two adjacent tunnels is relatively large in order to facilitate construction. If all concrete is poured at this time, it will lead to internal stress and waste of concrete. However, the secondary lining structure formed by the upper and lower templates will have a certain gap with the primary lining structure. At this time, only sand or soil needs to be backfilled, which can effectively reduce the internal stress of the secondary lining structure with irregular cross-section.

[0011] Optionally, the pouring device includes multiple pouring pipes mounted on the frame and at least one pouring seat. The pouring seat is fixedly connected to the frame. The multiple pouring pipes are divided into multiple groups, and the multiple groups of pouring pipes are vertically distributed. The multiple pouring pipes in the same group are located on both sides of the length direction of the frame. One end of the pouring pipe passes through and is fixedly connected to the pouring seat. The other end of the pouring pipe passes through the inner template. The end of some of the pouring pipes away from the pouring seat is connected to the high end of the cavity away from the frame. The frame is provided with a feeding device for sequentially pouring concrete into the multiple groups of pouring pipes.

[0012] By adopting the above technical solution, since the cross-sectional profile of the cavity is Y-shaped, it is easy for cavities to appear during concrete pouring. At this time, by pouring the concrete in layers from bottom to top through multiple pouring pipes, the bottom of the cavity and the top of the side away from the frame can be poured in layers, which can effectively reduce the possibility of cavities after pouring. In addition, during the pouring process, the pouring seat can position the inlet end of the pouring pipe to facilitate the pouring of concrete with the feeding device.

[0013] Optionally, the feeding device includes a feed pipe for inputting concrete and a discharge pipe for outputting concrete. The frame is slidably connected to a feeding assembly for sequentially inserting the discharge end of the discharge pipe into the feed ends of multiple pouring pipes. The feeding assembly is provided with two connecting pipe fittings with retractable and swingable discharge ends. The feed pipe is connected to the feed end of the feeding assembly through one of the connecting pipe fittings, and the discharge pipe is connected to the discharge end of the feeding assembly through the other connecting pipe fitting.

[0014] By adopting the above technical solution, during concrete pouring, concrete is introduced through the inlet pipe, and then the sliding of the inlet assembly ensures that the outlet pipes are aligned with different pouring pipes at different positions. The inlet pipe then passes through two connecting pipes and the inlet assembly to introduce concrete into the outlet pipe, and finally connects the concrete into the pouring pipe. Compared to directly connecting the concrete to the pouring pipe through separate pipes, this method effectively reduces the manpower required and the intensity of labor. Furthermore, compared to directly controlling the flow of concrete with valves, it effectively reduces the possibility of concrete remaining in the pipes due to valves, facilitating subsequent cleaning.

[0015] Optionally, the connecting pipe includes two connecting pipes, one end of which is bent at 90° towards each other and rotatably connected coaxially, and the other ends of which are also bent at 90° towards each other. The ends of the two connecting pipes that are far apart are rotatably connected to and connected to the discharge end of the discharge pipe and the discharge end of the feeding assembly, or the ends of the two connecting pipes that are far apart are rotatably connected to and connected to the feed end of the feed pipe and the feed assembly. The feeding assembly is provided with a plug-in connector that allows the discharge pipe to be inserted and connected to the casting pipe.

[0016] By adopting the above technical solution, when the feed seat slides, the relative rotation of the two connecting pipes can adapt to the change in the position of the feed seat. At the same time, compared with the method of direct conveying through a hose, the two connecting pipes and the feed seat can form a relatively stable triangular structure, thereby reducing the possibility of pipeline swaying during concrete conveying.

[0017] Optionally, the connector includes a connector seat disposed on the feeding assembly and an expansion joint disposed on the connector seat. The expansion joint's expansion end is connected to the discharge pipe, and the expansion direction of the expansion joint's expansion end is parallel to the opening direction of the feeding end of the casting pipe.

[0018] By adopting the above technical solution, when it is necessary to connect the discharge pipe to the inlet of the casting pipe, the feeding component only needs to slide to the corresponding position and align the discharge pipe with the corresponding casting pipe. Then, the discharge pipe can be extended by controlling the expansion joint, so that the discharge pipe can be inserted into the casting pipe at the corresponding position.

[0019] Optionally, the feeding assembly includes a feeding seat and a transition pipe parallel to the casting seat. The transition pipe passes through and is rotatably connected to the feeding seat, and both ends of the transition pipe are rotatably connected to and communicate with two connecting pipes. The feeding seat is slidably connected to the frame along the length of the frame.

[0020] By adopting the above technical solution, when it is necessary to align the discharge pipe with the casting pipe, simply rotate the transition pipe to drive the connecting pipe fittings connected to the discharge pipe to rotate.

[0021] Optionally, the inlet end of the casting pipe is provided with a fastening and sealing element for cooperating with the outlet pipe. The fastening and sealing element includes a fastening connecting pipe fixedly connected to the inlet end of the casting pipe and a plug pipe for inserting into the inlet end of the fastening connecting pipe. The plug pipe is fixedly connected to and communicates with the outlet end of the outlet pipe. The inner wall of the fastening connecting pipe has a tapered tube structure and is open at the large end.

[0022] By adopting the above technical solution, as the discharge pipe moves toward the pouring pipe, the insertion pipe abuts against the inner wall of the fastening connection pipe, which can reduce concrete leakage during the pouring process.

[0023] Secondly, this application provides a method for lining a three-arch tunnel with a small clearance and irregular cross-section, adopting the following technical solution:

[0024] A method for lining a three-arch tunnel with a small clearance profile includes the following steps: S1, Side excavation: First, excavate the side tunnels on the left and right sides of the central pilot tunnel, and sequentially spray concrete, install wire mesh, erect steel frames and pre-set anchor bolts on the inner walls of the side tunnels. Finally, complete the initial lining of the side walls on the opposite side of the two side tunnels with sprayed concrete, and form a middle partition wall on the inner walls of the two formed side tunnels facing each other; S2, Initial lining of the side tunnels: Excavate the side tunnels on the opposite side of the two middle partition walls to form a complete side tunnel structure, and then repeat step S1 to complete the initial lining of the side tunnels; S3, Secondary lining of the side tunnels: Remove the middle partition wall, and then construct the secondary lining of the side tunnels based on the structure of the initial lining. S4. Excavation of the central tunnel: The central tunnel is excavated between the two side tunnels, and shotcrete is applied, wire mesh is hung, steel frames and pre-set anchor rods are erected on the inner wall of the central tunnel, and finally the initial lining of the central tunnel is completed with shotcrete, and the structure of the initial lining of the central tunnel intersects with the initial lining of the two side tunnels; S5. Secondary lining of the central tunnel: The part of the initial lining of the two side tunnels located inside the central tunnel is removed, and then the secondary lining of the invert arch at the top of the central tunnel is completed based on the secondary lining invert arch.

[0025] By adopting the above technical solutions, the central isolation wall can effectively support the initial lining of the side tunnels, thereby optimizing the stability of the initial lining of the side tunnels. At the same time, through the construction of the secondary lining of the side tunnels, the pouring of the secondary lining of the invert arch of the central guide tunnel can be carried out, which can more accurately position the central guide tunnel. During the construction of the central guide tunnel, there is no need to set up additional formwork for the side structure of the central guide tunnel, thereby reducing the construction difficulty of the secondary lining of the central guide tunnel. Thus, in the process of completing the triple arch lining, the effect of excavation-side tunnel initial lining-side tunnel secondary lining-central guide tunnel excavation-central guide tunnel secondary lining is achieved, optimizing the safety of the triple arch construction.

[0026] Optionally, in step S2, the side edges of the upper and lower templates are abutted against the inner wall of the side tunnel primary lining to form a cavity for casting the side tunnel secondary lining. Then, the lower side edge of the side tunnel secondary lining and the secondary lining invert are cast sequentially from bottom to top using a casting device, and finally the casting of the side tunnel secondary lining invert is completed.

[0027] By adopting the above technical solution, a secondary lining structure with a three-arch irregular cross section can be formed.

[0028] In summary, this application includes at least one of the following beneficial technical effects:

[0029] 1. When pouring the secondary lining of a triple-arched irregular section, a Y-shaped cavity can be formed between the upper, lower, and inner formwork to shape the irregular section. Since the frame needs to continue moving forward after the secondary lining is poured, simply rotate the support pipe first, then rotate the connecting rods, causing each connecting rod to detach from its connected side formwork. The connecting rods can then be pulled out relative to the sleeve. During pouring, the sleeve isolates the connecting rods from the concrete, reducing the possibility of the connecting rods becoming impossible to remove due to concrete hardening. This achieves a relatively convenient completion of the irregular section secondary lining while optimizing the ease of demolding and dismantling. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 It is a structural diagram of an embodiment of the present application.

[0031] Figure 2 It is a schematic cross-sectional structural diagram of an embodiment of the present application.

[0032] Figure 3 This is a cross-sectional structural schematic diagram of the connecting mechanism in the embodiments of this application.

[0033] Figure 4 This is a structural schematic diagram of the casting device and the feeding device in the embodiments of this application.

[0034] Figure 5 yes Figure 2 Schematic diagram of the enlarged structure of part A.

[0035] Figure 6 It is a structural schematic diagram of the feeding device in the embodiment of the present application.

[0036] Figure 7 yes Figure 2 A magnified structural diagram of part B.

[0037] Figure 8 It is a schematic diagram of the partial cross-sectional structure of the fastening seal and the sealing assembly in the embodiment of the present application.

[0038] Figure 9 It is a schematic diagram of the tunnel structure of step S1 of the lining method in an embodiment of the present application.

[0039] Figure 10 It is a schematic diagram of the tunnel structure of step S2 of the lining method in an embodiment of the present application.

[0040] Figure 11 It is a schematic diagram of the tunnel structure of step S3 of the lining method in an embodiment of the present application.

[0041] Figure 12 It is a schematic diagram of the tunnel structure of step S4 of the lining method in an embodiment of the present application.

[0042] Figure 13 It is a schematic diagram of the tunnel structure of step S5 of the lining method in an embodiment of the present application.

[0043] Explanation of reference numerals in the attached drawings: 1. Frame; 1a. Side tunnel initial lining; 1b. Central partition wall; 1c. Side tunnel secondary lining; 1d. Secondary lining invert; 11. Frame body; 111. Installation cavity; 12. Hydraulic cylinder; 13. Roller; 2. Inner formwork; 2b. Central guide tunnel initial lining; 21. Pouring port; 211. Pouring cover plate; 212. Pouring support; 22. Control component; 221. Telescopic component; 222. Control rod; 3. Side formwork; 31. Upper formwork; 311. Upper pouring pipe; 32. Lower formwork; 4. Connecting mechanism; 41. Connecting rod; 411. Auxiliary hole; 42. Sleeve; 43. Support pipe; 5. Pouring device; 51. Pouring pipe; 52. Pouring seat; 53. Fastening and sealing component; 531. 532. Fastening connecting pipe; 533. Insert pipe; 54. Spreading annular groove; 55. Sealing assembly; 541. Sealing ring; 542. Fixing ring; 543. Fixing rod; 55. Spreading component; 551. Spreading pipe; 552. Spreading spring; 553. Spreading ring; 554. Pressure sensor; 6. Feeding device; 61. Feeding pipe; 62. Discharge pipe; 63. Feeding assembly; 631. Feeding seat; 632. Transition pipe; 633. Transition connecting pipe; 64. Connecting pipe fitting; 641. Connecting pipe; 65. Insert fitting; 651. Insert fitting seat; 652. Expansion joint; 66. Feeding drive component; 661. Feeding drive motor; 662. Feeding drive worm; 663. Feeding drive worm wheel. DETAILED DESCRIPTION

[0044] The following is combined with Figure 1-13 This application is described in further detail.

[0045] The embodiment of the present application discloses a small-clearance triple-arch special-shaped cross-section tunnel lining trolley. Figure 1 and Figure 2 The lining trolley includes a frame 1 for traveling and supporting and a plurality of inner templates 2. The plurality of inner templates 2 are arranged on the side and top of the frame 1 around the center of the frame 1 for secondary lining. The frame 1 includes a frame body 11 and a plurality of hydraulic cylinders 12. The inner template 2 on the top of the frame body 11 is connected to the frame body 11 by vertical lifting of the hydraulic cylinders 12. The inner template 2 located on the side of the frame body 11 is hinged to the frame body 11, and the telescopic end of the hydraulic cylinder 12 located on the side of the frame body 11 is hinged to the inner template 2 on the side of the frame body 11 to facilitate demoulding. Among them, a plurality of rollers 13 for transportation are rotatably provided at the bottom of the frame body 11.

[0046] The side of the frame 11 is provided with a side formwork 3 for forming the secondary lining structure in the adjacent pilot tunnel. The side formwork 3 is located between the side tunnel and the middle pilot tunnel, and is located on the side of the inner formwork 2 away from the frame 11. The side formwork 3 includes an upper formwork 31 and a lower formwork 32 arranged around the frame 11. The upper formwork 31 and the lower formwork 32 are arranged in sequence from top to bottom.

[0047] Reference Figure 1 and Figure 2 The upper template 31 has a ladder plate extending upward from the frame 11 to the top of the frame 11. The plate of the upper template 31 on the side away from the frame 11 is first bent horizontally and then bent upward to form a U-shaped cross-section. The lower template 32 is an arc-shaped plate structure with its opening facing away from the frame 11. The lower template 32 is located below the plate of the upper template 31 on the side away from the frame 11, so that a cavity for secondary lining is formed between the upper template 31, the lower template 32, and the inner template 2 located on the side of the frame 11 facing the lower template 32. The cross-sectional profile of the cavity is Y-shaped.

[0048] Reference Figure 2 and Figure 3 Furthermore, the upper template 31 and the lower template 32 are respectively connected to the inner template 2 through a plurality of different connecting mechanisms 4. The connecting mechanism 4 includes a connecting rod 41, a sleeve 42 outermost to the connecting rod 41, and a support tube 43 passing through and threadedly connected to the inner template 2.

[0049] One end of the connecting rod 41 is inserted and threadedly connected to the upper template 31 or the lower template 32, and the other end of the connecting rod 41 is inserted into the inner template 2 and abuts against the support tube 43. The connecting rod 41 is rotatably connected to the support tube 43, and an auxiliary hole 411 for assisting rotation is provided at the end of the connecting rod 41. One end of the sleeve 42 abuts against the upper template 31 or the lower template 32, and the other end of the sleeve 42 abuts against the side of the inner template 2 away from the frame 11, so as to support the upper template 31 or the lower template 32, and limit the sleeve 42, the upper template 31 and the lower template 32 through the connecting rod 41. The support tube 43 is inserted and threadedly connected to the inner template 2 to support the connecting rod 41.

[0050] During secondary lining, the secondary lining of both the side tunnels and the two sides of the secondary lining of the central guide tunnel can be completed simultaneously simply by pouring concrete into the cavity. Compared to completing the secondary lining of the two side tunnels and the central guide tunnel separately using three trolleys, using the secondary lining of the side tunnels as the foundation for the secondary lining of the central guide tunnel effectively increases the integrity of the secondary lining of the triple arch. Furthermore, the secondary lining of the side tunnels can be used to position the excavation and secondary lining of the central guide tunnel, increasing the accuracy of the triple arch construction. In addition, since the upper formwork 31 and the lower formwork 32 are connected to the inner formwork 2 by different connecting rods 41, after the secondary lining of the side tunnels is completed… Simply rotate the support pipe 43 to detach it from the inner template 2, and then rotate the connecting rod 41 to slide it out of the sleeve 42, so that the connecting rod 41 is detached from the upper template 31 or the lower template 32. This allows the upper template 31 and the lower template 32 to detach from the frame 11, thus completing the demolding without affecting the overall movement of the frame 1. At the same time, after the connecting rod 41 is detached, the sleeve 42 is sealed with sealant. This achieves the purpose of secondary lining for tunnels with irregular cross sections. When lining normal tunnel cross sections, simply detach the connecting rod 41 from the inner template 2 and then seal the support pipe 43.

[0051] Reference Figure 4 The frame 11 is provided with a pouring device 5 for pouring the cavity and the outside of the inner formwork 2 in layers. The pouring order is to pour the bottom of the cavity first, and then pour the cavity from the top of the cavity away from the side of the frame 11, thereby reducing the possibility of the secondary lining structure having a cavity or an irregular cross-section due to the inability of concrete to fully fill the top of the cavity.

[0052] Specifically, the casting device 5 includes multiple casting pipes 51 and two casting seats 52 disposed on the frame 11. The top of the frame 11 is formed with an installation cavity 111 for placing the casting device 5, and the installation cavity 111 extends horizontally along the length of the frame 11. The casting seats 52 extend along the length of the frame 11 and are horizontally disposed. The two casting seats 52 are respectively fixedly connected to the cavity walls on both sides of the installation cavity 111 along the length direction.

[0053] Reference Figure 2 and Figure 4 , multiple pouring pipes 51 are divided into two groups, and the pouring pipes 51 of the two groups are respectively located on the side away from the two pouring seats 52, one end of the multiple pouring pipes 51 in the same group is passed through and fixedly connected to the pouring pipe 51 on the same side of the frame 11, and the other end parts of the multiple pouring pipes 51 in the same group are evenly arrayed on the inner formwork 2 on the same side of the frame 11. The end of the multiple pouring pipes 51 in the same group away from the frame 11 is L1, and L1 is connected to the top of the end of the upper formwork 31 away from the frame 11.

[0054] Specifically, the upper mold plate 31 is fixedly connected to an upper pouring pipe 311. One end of the upper pouring pipe 311 is fixed to and communicates with the top of the upper mold plate 31 on the side away from the frame 11, while the other end of the upper pouring pipe 311 is fixed to and penetrates the outer wall of the upper mold plate 31 on the side facing the frame 11. A pouring pipe 51 connected to the upper mold plate 31 penetrates and slidably connects to the upper pouring pipe 311. The upper pouring pipe 51 connected to the upper mold plate 31 is also covered with a sleeve 42 to facilitate the pouring pipe 51 to extend to the top of the mold cavity.

[0055] Reference Figure 4 and Figure 5 The inner formwork 2 has multiple pouring ports 21, which are divided into multiple groups and arranged vertically. The multiple pouring ports 21 in the same group are distributed along the length of the frame 11 in the inner formwork 2. The ends of multiple pouring pipes 51 away from the pouring seat 52 are respectively set with multiple pouring ports 21, and the pouring ports 21 are equipped with control components 22 for controlling the pouring pipes 51 to extend out of the pouring port 21 for pouring.

[0056] Specifically, the upper edge of the pouring port 21 is rotatably connected to a pouring cover plate 211 that is turned outward, and the lower edge of the pouring port 21 is fixedly connected to a pouring bracket 212 for installing the control assembly 22. The control assembly 22 includes a telescopic member 221 and a control rod 222 hinged to the telescopic end of the telescopic member 221. The telescopic direction of the telescopic end of the telescopic member 221 is horizontally arranged and passes through the pouring port 21. The end of the pouring pipe 51 away from the pouring seat 52 is fixedly connected to the telescopic end of the telescopic member 221, and the end of the control rod 222 away from the telescopic member 221 is hinged to the pouring cover plate 211. Among them, the rotation planes of the control rod 222 and the pouring cover plate 211 are both vertically arranged and perpendicular to the length direction of the frame 11. The end of the control rod 222 away from the telescopic member 221 is located on the side of the pouring pipe 51 away from the center of the frame 11. The telescopic member 221 is a hydraulic cylinder or an electric push cylinder, preferably a hydraulic cylinder.

[0057] In use, the telescopic component 221 controls the extension of the telescopic end, causing the end of the pouring pipe 51 away from the pouring seat 52 to extend out of the pouring port 21. During this process, the control rod 222 pushes the pouring cover plate 211 to flip outward, allowing concrete to be poured through the pouring pipe 51. Simultaneously, when the current pouring port 21 is completed, the telescopic component 221 retracts, causing the pouring pipe 51 to retract to the inside of the pouring port 21. Then, the pouring cover plate 211, under the action of the telescopic component 221, covers the outer edge of the pouring port 21, reducing the possibility of leakage of subsequent poured concrete. This achieves layered pouring from bottom to top while effectively avoiding the impact of layered pouring on concrete curing. In addition, since pouring is carried out through multiple pouring ports 21, the possibility of concrete getting stuck due to flow along the inner formwork 2 is effectively reduced, thereby further reducing the possibility of voids in the secondary lining, adapting to the pouring of irregular cross-sections.

[0058] Reference Figure 4 and Figure 6 Furthermore, since concrete needs to be poured into the inlets of multiple pouring pipes 51 separately during pouring, it is relatively inconvenient. In order to facilitate the pouring of concrete into the inlets of multiple pouring pipes 51, a feeding device 6 is provided in the installation cavity 111.

[0059] The feeding device 6 includes a feeding pipe 61 and a discharge pipe 62 for discharging concrete. The feeding pipe 61 is vertically arranged and passes through the frame 11 to feed concrete from outside the frame 11 into the installation cavity 111. The discharge port of the feeding pipe 61 is connected to the inlet of the discharge pipe 62 through the feeding assembly 63. The discharge pipe 62 is parallel to the opening direction of the inlets of the plurality of pouring pipes 51, and the discharge pipe 62 is slidably arranged relative to the feeding assembly 63 along its length.

[0060] Of course, in other embodiments, the pouring device 5 and the feeding device 6 may also include multiple pouring pipes 51 and a pouring device for pouring concrete into the pouring pipes 51. The pouring device consists of a main pouring pipe and multiple valves. The multiple valves are respectively and correspondingly set at the inlet of the pouring pipe 51. The main pouring pipe has multiple outlets and one inlet. The multiple outlets of the main pouring pipe are respectively and correspondingly connected to the inlet of the multiple valves. The inlet of the main pouring pipe is used to introduce concrete, and the flow direction of the concrete is controlled by opening and closing the valves.

[0061] Reference Figure 4 and Figure 6 Specifically, the feeding assembly 63 includes a feeding seat 631 disposed in the mounting cavity 111 and a transition tube 632 parallel to the casting seat 52. The transition tube 632 passes through and is rotatably connected to the feeding seat 631. The feeding seat 631 is slidably connected to the cavity wall of the mounting cavity 111 by at least two linear motors or slide rails, and the transition tube 632 is parallel to the casting seat 52.

[0062] One end of the transition pipe 632 is provided with a connecting pipe fitting 64 for connecting to the discharge pipe 62, and the other end of the transition pipe 632 is rotatably connected to and connected to a transition connecting pipe 633. The transition pipe 632 is provided with another connecting pipe fitting 64 through the transition connecting pipe 633 for connecting to the feed pipe 61.

[0063] Reference Figure 4 and Figure 6 The transition connecting pipe 633 is fixedly connected to the feed seat 631. The connecting pipe fitting 64 includes two connecting pipes 641, the central axes of the two connecting pipes 641 are located in different horizontal planes, and one end of the two connecting pipes 641 is bent at 90° towards each other and rotated to connect, and the two connecting pipes 641 of the same connecting pipe fitting 64 are interconnected.

[0064] The two connecting tubes 641 are similarly bent 90 degrees at their ends, facing away from each other, to form a vertical orientation. One end of one connecting tube 641 is pivotally connected to and communicates with the discharge tube 62 or the inlet tube 61. The other end of the connecting tube 641, facing toward the inlet seat 631, is pivotally connected to and communicates with the transition connecting tube 633 or the transition tube 632. The rotation planes of the two connecting tubes 641 are horizontal, while the rotation plane of the transition tube 632 is vertical. A feed drive 66 is located within the inlet seat 631 to drive the transition tube 632 to rotate.

[0065] When pouring concrete, it is only necessary to slide the feed seat 631 so that the discharge pipe 62 can be aligned with the feed ports of different casting pipes 51 respectively, and during the sliding process of the feed seat 631, the two connecting pipes 641 can be rotated relative to each other to adapt to the position change of the feed seat 631 relative to the discharge pipe 62 and the feed pipe 61 when sliding, while reducing the impact on concrete transportation, and only need to pump concrete into the feed pipe 61 to transport the concrete to different positions; in addition, during construction, when the feed seat 631 slides to the position corresponding to the casting pipe 51, it is only necessary to connect the discharge pipe 62 to the corresponding casting pipe 51 to realize the concrete pouring in layers from bottom to top.

[0066] Furthermore, after concrete pouring on one side is complete, the angle of the outlet of the discharge pipe 62 can be adjusted by simply rotating the transition pipe 632 via the feed drive 66 to connect to different pouring pipes 51. Furthermore, compared to directly using valves to control the flow direction of concrete, the pouring device 5 and feed device 6 in this embodiment can effectively reduce the amount of concrete remaining in the pouring pipe 51 and other pipes due to concrete blockage. Furthermore, during subsequent cleaning, it is only necessary to flush multiple pipes one by one, eliminating the need for excessive control valves.

[0067] Of course, in other embodiments, the connecting pipe 64 can also be a flexible hose. Compared with the connecting pipe 64 in this embodiment, the flexible hose needs to pump concrete at a certain pressure, which may cause the hose to swing during the pumping process. However, the connecting pipe 64 in this embodiment can form a relatively stable triangular structure with the feed seat 631 through two rigid connecting pipes 641, so that the possibility of pipe swinging during concrete pumping will not occur, thus optimizing the stability of concrete conveying.

[0068] Reference Figure 4 and Figure 6 The feeding drive component 66 includes a feeding drive motor 661, a feeding drive worm 662, and a feeding drive worm wheel 663. The feeding drive worm 662 is coaxially and fixedly connected to the feeding drive motor 661, and the feeding drive worm 662 meshes with the feeding drive worm wheel 663. The transition tube 632 is coaxially inserted and fixedly connected to the feeding drive worm wheel 663 to realize the rotation of the transition tube 632 and the rotation locking at any angle.

[0069] Reference Figure 4 and Figure 6 Furthermore, since the discharge pipe 62 can swing relative to the inlet seat 631, and it is necessary to connect the discharge pipe 62 to the pouring pipe 51 during concrete pouring, the inlet seat 631 is provided with a connector 65 for inserting the discharge pipe 62 and connecting it to the pouring pipe 51. The connector 65 includes a connector 651 and an expansion joint 652. The connector 651 is fixedly connected to the transition pipe 632, and the expansion joint 652 is fixedly connected to the connector 651. The telescopic end of the expansion joint 652 is fixedly connected to the discharge pipe 62, and the discharge pipe 62 is connected to the telescopic end of the expansion joint 652. The telescopic direction of the telescopic end of the expansion joint 652 is perpendicular to the transition pipe 632. The expansion joint 652 is a hydraulic cylinder or an electric cylinder, preferably an electric cylinder.

[0070] When in use, if it is necessary to connect the discharge pipe 62 to the pouring pipe 51, simply rotate the transition pipe 632 so that the discharge pipe 62 and the plug-in seat 651 face the corresponding pouring pipe 51, and then extend the telescopic end of the expansion joint 652 so that the discharge pipe 62 is connected to the pouring pipe 51.

[0071] Reference Figure 6 and Figure 7 Furthermore, since the connection between the discharge pipe 62 and the pouring pipe 51 is temporary, a fastening seal 53 is provided on the opening edge of the pouring pipe 51 to seal the connection between the two when the discharge pipe 62 is connected to the pouring pipe 51, thereby reducing the possibility of concrete leakage.

[0072] The fastening seal 53 includes a fastening connecting pipe 531 and a insertion pipe 532. The fastening connecting pipe 531 is coaxially and fixedly connected to the edge of the inlet opening of the casting pipe 51, and the inner wall of the fastening connecting pipe 531 has a tapered tube structure. The large end of the fastening connecting pipe 531 is positioned facing the opening of the insertion pipe 532. The insertion pipe 532 is coaxially and fixedly connected to the edge of the outlet opening of the discharge pipe 62.

[0073] Reference Figure 7 and Figure 8 A sealing assembly 54 is provided at the opening edge of the plug-in tube 532 to further seal between the plug-in tube 532 and the fastening connection tube 531 .

[0074] The sealing assembly 54 includes a sealing ring 541 that is positioned over the outer wall of the plug-in tube 532, a retaining ring 542 embedded within the sealing ring 541, and a plurality of retaining rods 543 arranged around the central axis of the retaining ring 542. The sealing ring 541 and the retaining ring 542 are arranged on the same central axis. The retaining rods 543 extend radially along the retaining ring 542 and penetrate the sealing ring 541. The ends of the retaining rods 543 are respectively fixedly connected to the retaining ring 542 and the outer wall of the plug-in tube 532, thereby securing the sealing ring 541 to the plug-in tube 532. The sealing ring 541 is made of an elastic material, such as a rubber ring; its cross-section is U-shaped, with the opening of the cross-section of the sealing ring 541 facing the feed seat 631.

[0075] Reference Figure 7 and Figure 8 The inner side of the sealing ring 541 is provided with an expansion member 55 for expanding the sealing ring 541 during insertion. Specifically, the expansion member 55 comprises an expansion tube 551 and an expansion spring 552. Both the expansion tube 551 and the expansion spring 552 are externally mounted on the insertion tube 532. The outer wall of the insertion tube 532 is provided with an expansion ring groove 533. The expansion ring 553 is fixedly connected to the opening edge of the expansion tube 551 facing the sealing ring 541, which is used to expand the sealing ring 541 and abut against the insertion tube 532 and the inner wall of the fastening connection tube 531. The opening edge of the expansion tube 551 facing away from the sealing ring 541 is bent inward and clamped in the expansion ring groove 533, allowing the expansion tube 551 to slide and connect to the insertion tube 532.

[0076] The spreading spring 552 is located within the spreading annular groove 533, with one end abutting against the bent portion of the spreading tube 551 and the other end abutting against the inner wall of the spreading annular groove 533 on the side away from the feed seat 631, so that the spreading tube 551 maintains a tendency to slide towards the feed seat 631. The outer diameter of the sealing ring 541 is smaller than the diameter of the large end opening edge of the fastening connecting tube 531, and the outer diameter of the sealing ring 541 is larger than the diameter of the small end opening edge of the fastening connecting tube 531. The inner cavity formed by the opening of the cross-section U of the sealing ring 541 is located on the sliding path of the spreading tube 551, and the telescopic end of the telescopic device 652 is fixedly connected to the discharge tube 62 through the spreading tube 551 and the insertion tube 532, that is, the telescopic end of the telescopic device 652 is fixedly connected to the spreading tube 551.

[0077] During the process of inserting the plug-in tube 532 into the fastening connecting tube 531, the sealing ring 541 and the plug-in tube 532 will be gradually inserted into the fastening connecting tube 531, and in this process, the sealing ring 541 will abut against the inner wall of the fastening connecting tube 531, and at the same time, the expansion ring 553 will expand the inner and outer walls of the sealing ring 541 and abut against the inner wall of the fastening connecting tube 531 and the outer wall of the plug-in tube 532 to complete the sealing when pouring concrete.

[0078] Simultaneously, when it is necessary to replace the pouring pipe 51, the expansion joint 652 only needs to retract. At this time, it will directly drive the expansion pipe 551 to slide relative to the sealing ring 541 toward the feed seat 631. Due to friction and the tapered structure of the inner wall of the fastening connecting pipe 531, the sealing ring 541 will remain fixed relative to the fastening connecting pipe 531 until the expansion ring 553 slides relative to the sealing ring 541. After the inner and outer walls of the sealing ring 541 retract, and the expansion pipe 551 abuts against the inner wall of the expansion ring groove 533, the insertion pipe 532 will then be driven to disengage from the fastening connecting pipe 531. This effectively reduces the influence of friction on the sealing ring 541 during the insertion of the insertion pipe 532 into the fastening connecting pipe 531, thereby reducing the possibility of a decrease in the sealing effect of the sealing ring 541 due to frequent insertion and maintenance, and simultaneously maintaining a relatively good sealing effect, thus effectively reducing the possibility of a decrease in the sealing effect due to a decrease in the elasticity of the sealing ring 541.

[0079] Reference Figure 8 In addition, a number of pressure sensors 554 arranged around the central axis are provided in the expansion ring 553 to monitor and detect the pressure of the expansion ring 553 to expand the sealing ring 541 and press it onto the fastening connection pipe 531. This can ensure that the sealing degree and effect can be maintained relatively accurately each time the plug-in pipe 532 is plugged into the fastening connection pipe 531 based on the pressure comparison when the sealing effect is achieved.

[0080] The present application also discloses a method for lining a tunnel with a small clearance and a triple-arch shape. The lining method includes the following steps:

[0081] Reference Figure 9 S1. Excavation of side tunnels: First, excavate the side tunnels on the left and right sides of the central pilot tunnel, and then spray concrete, hang mesh, set up steel frames and preset anchor rods on the inner walls of the side tunnels. Finally, spray concrete again to complete the primary lining of the side walls of the two side tunnels on the far side, and form the middle isolation wall 1b on the inner walls of the two formed side tunnels on the opposite sides; to reduce the possibility of collapse during side tunnel excavation.

[0082] Reference Figure 10 , S2, side tunnel primary lining: excavate side tunnels on the opposite sides of the two middle partition walls and form a complete side tunnel structure, and then repeat step S1 to complete the side tunnel primary lining 1a.

[0083] Reference Figure 11 and Figure 12 S3, Secondary Lining of Side Tunnels: Remove the central isolation wall 1b, and then construct the secondary lining 1c of the side tunnel based on the structure of the initial lining 1a of the side tunnel. Construct secondary lining inverts 1d on the opposite sides of the two side tunnels. The upper parts of the two secondary lining inverts 1d are set facing each other to serve as the foundation for the secondary lining construction of the central tunnel. Backfill soil or gravel on top of the secondary lining inverts 1d. Simultaneous construction of the secondary lining inverts 1d with the secondary lining 1c of the side tunnels allows the inverts 1d to position the central tunnel while also serving as the foundation for the secondary lining of the central tunnel, facilitating construction, when the outlines of the central tunnel and the side tunnels intersect.

[0084] Reference Figure 12 and Figure 13 S4. Excavation of the middle pilot tunnel: excavate the middle pilot tunnel between the two side tunnels, spray concrete, hang mesh, set up steel frames and preset anchor rods on the inner wall of the middle pilot tunnel, and finally complete the primary lining 2b of the middle pilot tunnel by spraying concrete again. The structure of the primary lining 2b of the middle pilot tunnel intersects with the primary linings 1a of the two side tunnels.

[0085] Reference Figure 13 S5, secondary lining of the middle pilot tunnel: remove the part of the primary lining 1a of the two side tunnels located in the middle pilot tunnel, and then complete the secondary lining 2c of the inverted arch at the top of the middle pilot tunnel based on the secondary lining 1d.

[0086] Of course, in other embodiments, step S2 can also involve abutting the side edges of the upper template 31 and the lower template 32 against the inner wall of the side tunnel lining 1a, so as to form a cavity for pouring the side tunnel secondary lining 1c and the secondary lining invert 1d in conjunction with the inner template 2, the side tunnel lining 1a, the upper template 31, and the lower template 32. Furthermore, rubber sealing strips are provided on the edges of the upper template 31 and the lower template 32 abutting against the side tunnel lining 1a, for sealing and adapting to the waterproof membrane inside the side tunnel lining, reducing the impact on the waterproof membrane inside the side tunnel lining. Finally, the pouring device 5 is used to pour the lower side edge of the side tunnel secondary lining 1c and the invert 1d sequentially from bottom to top, finally completing the pouring of the side tunnel secondary lining 1c invert.

[0087] The above are all preferred embodiments of the present application, and are not intended to limit the scope of protection of the present application. Therefore, any equivalent changes made based on the structure, shape, and principle of the present application should be included in the scope of protection of the present application.

Claims

1. A small-clearance triple-arch special-section tunnel lining trolley, comprising a frame (1) for traveling and supporting, and a plurality of inner templates (2) arranged on the top and side of the frame (1), Features: The side of the frame (1) is provided with a side template (3) for forming a secondary lining structure in an adjacent guide hole. The side template (3) is located on a side of the inner template (2) away from the frame (1). A cavity with a Y-shaped cross-sectional profile is formed between the side template (3) and the inner template (2). The side template (3) is connected to the inner template (2) via a plurality of connecting mechanisms (4). The connecting mechanisms (4) include a connecting rod (41), a sleeve (42) sleeved on the connecting rod (41), and a support tube (43) penetrated and threadedly connected to the inner template (2). One end of the connecting rod (41) is inserted and threadedly connected to the inner template (2). The side template (3) is connected to the side template (3), the other end of the connecting rod (41) is inserted into the inner template (2) and abuts against the support pipe (43), and the two ends of the sleeve (42) are respectively abutted against the inner template (2) and the side template (3); the side template (3) comprises an upper template (31) and a lower template (32) which are arranged in sequence from top to bottom around the frame (1), one end of the connecting rod (41) away from the inner template (2) is inserted and threadedly connected to the upper template (31) or the lower template (32), and the frame (1) is provided with a casting device (5) for casting the outer side of the cavity and the inner template (2) in layers in sequence.

2. The small-clearance triple-arch special-section tunnel lining trolley according to claim 1, Features: The pouring device (5) comprises a plurality of pouring pipes (51) arranged on a frame (1) and at least one pouring seat (52); the pouring seat (52) is fixedly connected to the frame (1); the plurality of pouring pipes (51) are divided into a plurality of groups and the plurality of groups of pouring pipes (51) are vertically distributed; the plurality of pouring pipes (51) in the same group are respectively located on both sides of the length direction of the frame (1); one end of the pouring pipe (51) is passed through and fixedly connected to the pouring seat (52); the other end of the pouring pipe (51) is passed through the inner mold (2); and one end of a portion of the pouring pipe (51) away from the pouring seat (52) is connected to the high end of the mold cavity away from the frame (1); the frame (1) is provided with a feeding device (6) for pouring concrete into the plurality of groups of pouring pipes (51) in sequence.

3. The small-clearance triple-arch special-section tunnel lining trolley according to claim 2, Features: The feed device (6) comprises a feed pipe (61) for inputting concrete and a discharge pipe (62) for outputting concrete. The frame (1) is slidably connected to a feed assembly (63) for sequentially plugging the discharge end of the discharge pipe (62) into the feed ends of a plurality of casting pipes (51). The feed assembly (63) is provided with two connecting pipe pieces (64) whose discharge ends can be telescopically swung. The feed pipe (61) is connected to the feed end of the feed assembly (63) via one of the connecting pipe pieces (64), and the discharge pipe (62) is connected to the discharge end of the feed assembly (63) via the other connecting pipe piece (64).

4. The small-clearance triple-arch special-section tunnel lining trolley according to claim 3, Features: The pipe connecting member (64) comprises two connecting pipes (641), one end of the two connecting pipes (641) is bent towards each other at 90 degrees and is coaxially rotatably connected, the other end of the two connecting pipes (641) is also bent towards each other at 90 degrees, and the ends of the two connecting pipes (641) that are separated from each other are respectively rotatably connected to and connected to the discharge pipe (62) and the discharge end of the feed assembly (63), or the ends of the two connecting pipes (641) that are separated from each other are respectively rotatably connected to and connected to the feed pipe (61) and the feed end of the feed assembly (63), and the feed assembly (63) is provided with a plug-in member (65) that enables the discharge pipe (62) to be inserted and connected to the casting pipe (51).

5. The small-clearance triple-arch special-section tunnel lining trolley according to claim 4, Features: The plug-in connector (65) comprises a plug-in socket (651) arranged on the feed assembly (63) and a telescope (652) arranged on the plug-in socket (651); the telescopic end of the telescope (652) is connected to the discharge pipe (62), and the telescopic direction of the telescopic end of the telescope (652) is parallel to the opening direction of the feed end of the casting pipe (51).

6. The small-clearance triple-arch special-section tunnel lining trolley according to claim 3, Features: The feed assembly (63) comprises a feed seat (631) and a transition pipe (632) parallel to the casting seat (52); the transition pipe (632) is passed through and rotatably connected to the feed seat (631); and both ends of the transition pipe (632) are rotatably connected to and communicated with two connecting pipe pieces (64); the feed seat (631) is slidably connected to the frame (1) along the length direction of the frame (1).

7. The small-clearance triple-arch special-section tunnel lining trolley according to claim 6, Features: The feed end of the casting pipe (51) is provided with a fastening seal (53) for cooperating with the discharge pipe (62); the fastening seal (53) comprises a fastening connection pipe (531) fixedly connected to the feed end of the casting pipe (51) and a plug-in pipe (532) for plugging into the feed end of the fastening connection pipe (531); the plug-in pipe (532) is fixedly connected to and communicated with the discharge end of the discharge pipe (62); the inner wall of the fastening connection pipe (531) is in a conical tube structure and is open at the large end.

8. A lining method for a small-clearance triple-arch tunnel with a special-shaped section. Features: The application of the small-clearance triple-arch special-section tunnel lining trolley described in claim 1 comprises the following steps: S1, side tunnel excavation: first excavate the side tunnels on the left and right sides of the central guide tunnel, and spray concrete, hang meshes, erect steel frames and preset anchor rods on the inner walls of the side tunnels in sequence, and finally complete the initial lining of the two side tunnels on the side away from each other by re-spraying concrete, and form a middle partition wall (1b) on the inner walls of the two formed side tunnels on the opposite sides; S2, side tunnel initial lining: excavate side tunnels on the opposite sides of the two middle partition walls to form a complete side tunnel structure, and then repeat step S1 to complete the side tunnel initial lining (1a); S3, side tunnel secondary lining: remove the middle partition wall (1b), and then construct the side tunnel secondary lining (1c) based on the structure of the side tunnel primary lining (1a), and Secondary lining inverts (1d) are constructed on the opposite sides of the two side tunnels, and the upper parts of the two secondary lining inverts (1d) are arranged to face each other to serve as the foundation for the secondary lining construction of the middle guide tunnel, and soil or gravel is backfilled above the secondary lining inverts (1d); S4, excavation of the middle guide tunnel: the middle guide tunnel is excavated between the two side tunnels, and concrete is sprayed, mesh is hung, and steel frames and preset anchor rods are erected on the inner wall of the middle guide tunnel. Finally, the primary lining (2b) of the middle guide tunnel is completed by re-spraying concrete, and the structure of the primary lining (2b) of the middle guide tunnel intersects with the primary linings (1a) of the two side tunnels; S5, secondary lining of the middle guide tunnel: the parts of the structures of the primary linings (1a) of the two side tunnels located in the middle guide tunnel are removed, and then the secondary lining (2c) of the inverts at the top of the middle guide tunnel is completed based on the secondary lining inverts (1d); In step S2, the side edges of the upper template (31) and the lower template (32) are abutted against the inner wall of the primary lining (1a) of the side tunnel to form a cavity for casting the secondary lining of the side tunnel. Then, the lower side edge of the secondary lining (1c) of the side tunnel and the secondary lining invert (1d) are cast from bottom to top by the casting device (5), and finally the casting of the invert of the secondary lining (1c) of the side tunnel is completed.

Citation Information

Patent Citations

  • Three-arched tunnel construction method

    CN109488311A

  • Multifunctional secondary lining trolley construction equipment and method for long and wide tunnel

    CN111911194A