A method and device for planning incremental distribution network considering tram load
Through the construction of a distributed shortest path consensus algorithm and a typical scenario set, the problem of computational efficiency and solution accuracy in incremental distribution network planning is solved, and fast and accurate grid path planning is achieved, which is suitable for large-scale electric vehicle charging station access. distribution network expansion.
Patent Information
- Application Number
- CN202210681890.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-06-16
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2042-06-16
AI Technical Summary
Existing incremental distribution network planning methods cannot meet the computational efficiency and solution accuracy requirements when large-scale electric vehicle charging stations are connected. Traditional methods are difficult to generate feasible solutions close to the global optimal, resulting in inaccurate grid path selection.
The distributed shortest path consensus algorithm is used to solve the incremental distribution network grid planning model. By extracting typical operating daily loads and charging loads from power load monitoring data, a typical scenario set is constructed, and under power flow, circuit and structural constraints With the objective of minimizing the annualized cost function, the planned path is output.
It achieves fast and accurate incremental distribution network grid planning, overcomes the computational complexity and solution uncertainty of traditional methods when connecting large-scale electric vehicle charging stations, and is suitable for the incremental expansion of large-scale distribution networks. .
Smart Images

Figure CN114997686B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power grid planning, and in particular to a method and device for planning an incremental distribution network framework taking into account tram loads. Background Art
[0002] In the past decade, with the development of technology in the field of electric vehicles (EVs), the number of EVs has maintained a rapid growth trend. As of March 2021, China's new energy vehicle ownership reached 5.51 million, of which 4.49 million were pure electric vehicles, accounting for 81.53% of the total number of new energy vehicles. The number of charging piles is about 1.758 million, but the actual number of public charging piles is only 837,000. As the main infrastructure for EV charging, the number of EV charging stations (EVCS) is far from the target. It is expected that the number of EVs and EVCS will continue to rise rapidly in the future. The sharp increase in the demand for EVCS construction has put forward new requirements for distribution network operators. Due to the access of large-scale EVCS, the traditional demand profile of the distribution network has been changed, showing new volatility and intermittency, which not only brings huge challenges to the safe and reliable operation of the power grid, but also brings new uncertainties to the power grid. Distribution network operators need to plan incremental distribution networks under the premise of considering economic efficiency and operational reliability to ensure that EVCS and distribution network facilities are highly integrated. Therefore, incremental distribution network planning (DNEP) that takes into account both construction cost and EVCS access is an urgent problem to be solved in the current research field.
[0003] In the planning of incremental distribution network, implicit enumeration, Monte Carlo method and heuristic algorithm are generally used for solution. Among them, implicit enumeration method cannot meet the efficiency requirements when the problem scale is large; Monte Carlo method and heuristic algorithm cannot guarantee the stable generation of feasible solutions close to the global optimum in practical applications. In summary, the existing path selection methods cannot adapt to the actual needs of planning incremental distribution networks when large-scale EVCS are connected, and the selected power grid paths are not accurate enough. Summary of the invention
[0004] The embodiment of the present invention provides a method and device for planning an incremental distribution network framework taking into account tram loads, and uses a distributed algorithm to solve an established incremental distribution network framework planning model, with fast calculation speed and accurate solution.
[0005] To achieve the above-mentioned purpose, a first aspect of an embodiment of the present application provides a method for planning an incremental distribution network considering tram load, comprising:
[0006] extracting a plurality of typical operating days, a typical operating day load corresponding to each typical operating day, and an occurrence probability corresponding to each typical operating day from power load monitoring data of a local node set of an incremental distribution network;
[0007] Obtaining the electric vehicle charging load of each node in the local node set on each typical operation day from the electric vehicle load data;
[0008] The typical operating day load corresponding to each typical operating day and the electric vehicle charging load are added together to obtain the incremental typical operating day load corresponding to each typical operating day; the collection of incremental typical operating day loads corresponding to all typical operating days constitutes a typical scenario set;
[0009] According to the typical scenario set and the corresponding occurrence probability of each typical operation day, an incremental distribution network framework planning model is constructed with the goal of minimizing the annualized cost function under power flow constraints, circuit parameter constraints and structural constraints;
[0010] The incremental distribution network framework planning model is solved based on a distributed shortest path consensus algorithm to obtain an output planning path set.
[0011] In a possible implementation manner of the first aspect, a method for determining the typical operating day and the corresponding occurrence probability is:
[0012] Initialize the cluster center, and continuously update the cluster center until the cluster center meets the upper error limit requirement of cluster convergence; after clustering, each category of the cluster center corresponds to a typical operating day, and the frequency of occurrence of each category corresponds to the probability of occurrence of the typical operating day.
[0013] In a possible implementation of the first aspect, obtaining the electric vehicle charging load of each node in the local node set on each typical operating day from the electric vehicle load data specifically includes:
[0014] The load curves of all single charges of each node in each typical operation day are obtained from the tram load data;
[0015] All single-charge load curves are added together to obtain the electric vehicle charging load of each node on each typical operating day.
[0016] In a possible implementation of the first aspect, obtaining the load curves of all single charges of each node on each typical operating day from the tram load data specifically includes:
[0017] A model for the duration of the electric vehicle load charging is established based on the difference between the percentage of the remaining electric power of the electric vehicle load and the percentage of the initial electric power of the electric vehicle load, the battery capacity of the electric vehicle, the normal charging power and the charging efficiency; the percentage of the remaining electric power of the electric vehicle load is a linear function of the charging electricity price and the percentage of the maximum electric power of the electric vehicle;
[0018] By combining the electric vehicle load charging duration model and the normal charging power, the load curves of all single charges of each node on each typical operating day are obtained.
[0019] In a possible implementation of the first aspect, establishing the electric vehicle load charging duration model specifically includes:
[0020] The difference between the remaining power percentage of the electric vehicle load and the initial power percentage of the electric vehicle load and the product value of the battery capacity of the electric vehicle are divided by the product value of the normal charging power and the charging efficiency to obtain the electric vehicle load charging duration model.
[0021] In a possible implementation manner of the first aspect, the power flow constraint includes active power constraints of each node and active power constraints of each node of each node;
[0022] The circuit parameter constraints include a maximum current carrying capacity constraint of the cable and a maximum voltage limit constraint;
[0023] The structural constraints include a constraint on the maximum number of outgoing lines at a power point.
[0024] In a possible implementation manner of the first aspect, the annualized cost function is a sum function of unit annual construction cost and total operating expenditure.
[0025] In a possible implementation manner of the first aspect, solving the incremental distribution network framework planning model based on a distributed shortest path consensus algorithm to obtain an output planning path set specifically includes:
[0026] The incremental distribution network framework planning model is converted into a topology diagram; in the topology diagram, the annualized cost function is regarded as a master node, and the power flow constraints, circuit parameter constraints and structural constraints are regarded as slave nodes;
[0027] The branch with the smallest current path weight of each node is calculated, and the global optimal path from each node to the specified node is obtained by exchanging information between nodes and updating the branch selected by each node through multiple iterations.
[0028] In a possible implementation manner of the first aspect, exchanging information between nodes and iteratively updating a branch selected by each node specifically includes:
[0029] The branches selected by the nodes are iterated according to the accumulated path weight values, and each node is iterated repeatedly until the node state value is the same as the previous node state value; the parent node of each node in each iteration is represented by the adjacent node calculated in the iteration to achieve the best state value.
[0030] A second aspect of an embodiment of the present application provides an incremental distribution network framework planning device considering tram load, comprising:
[0031] A typical day extraction module is used to extract a plurality of typical operating days, a typical operating day load corresponding to each typical operating day, and an occurrence probability corresponding to each typical operating day from the power load monitoring data of the local node set of the incremental distribution network;
[0032] A charging load extraction module, used to obtain the electric vehicle charging load of each node in the local node set on each typical operation day from the electric vehicle load data;
[0033] A typical scenario set establishment module is used to obtain an incremental typical operating day load corresponding to each typical operating day by adding the typical operating day load corresponding to each typical operating day and the electric vehicle charging load; the collection of incremental typical operating day loads corresponding to all typical operating days constitutes a typical scenario set;
[0034] A planning model building module is used to build an incremental distribution network framework planning model with the goal of minimizing the annualized cost function value under power flow constraints, circuit parameter constraints and structural constraints based on the typical scenario set and the corresponding occurrence probability of each typical operation day;
[0035] The path output module is used to solve the incremental distribution network framework planning model based on the distributed shortest path consensus algorithm to obtain an output planning path set.
[0036] Compared with the prior art, the incremental distribution network framework planning method and device considering the tram load provided by the embodiment of the present invention first extracts the load of a typical operating day from the power load monitoring data of the local node set of the incremental distribution network, and models the EVCS of the target planning grid area, obtains the electric vehicle charging load under the typical operating day, and adds it to the load of the typical operating day to form a typical scenario set. Each typical day is obtained by clustering, and the daily loads with similar power characteristics are classified into one category to reduce the calculation complexity of the planning and improve the solution efficiency. The relevant parameters of the typical scenario set are input into the incremental distribution network framework planning model. Under the conditions of power flow constraints, circuit parameter constraints and structural constraints, the model is solved by a distributed shortest path consensus algorithm with the goal of minimizing the value of the annualized cost function until the selected grid fully meets the constraints, and finally outputs the planning path set, which overcomes the disadvantage that the traditional distributed algorithm is difficult to consider the operation constraints when applied to the power system, and is suitable for the incremental expansion of large-scale distribution networks.
[0037] In addition, in the process of modeling the EVCS in the target planning grid area, a tram load charging duration model was established, taking into account the uncertainty of various random factors such as EV charging time and EV charging load size. Then, an optimization method based on multiple scenario sets was used in the incremental distribution network grid planning model to deal with system uncertainty, thereby optimizing the distribution network operation and route planning under different EV load scenarios. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] Figure 1 It is a flow chart of a method for planning an incremental distribution network considering tram loads provided by an embodiment of the present invention;
[0039] Figure 2 It is a schematic diagram of an incremental distribution network framework planning device taking into account tram load according to an embodiment of the present invention. DETAILED DESCRIPTION
[0040] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0041] See also Figure 1 An embodiment of the present invention provides a method for planning an incremental distribution network considering tram load, comprising:
[0042] S10. Extract multiple typical operating days, the typical operating day load corresponding to each typical operating day, and the occurrence probability corresponding to each typical operating day from the power load monitoring data of the local node set of the incremental distribution network.
[0043] S11. Obtaining the electric vehicle charging load of each node in the local node set on each typical operating day from the electric vehicle load data.
[0044] S12. Add the typical operating day load corresponding to each typical operating day and the electric vehicle charging load to obtain the incremental typical operating day load corresponding to each typical operating day; the collection of the incremental typical operating day loads corresponding to all typical operating days constitutes a typical scenario set.
[0045] S13. Based on the typical scenario set and the corresponding occurrence probability of each typical operation day, an incremental distribution network framework planning model is constructed with the goal of minimizing the annualized cost function under power flow constraints, circuit parameter constraints and structural constraints.
[0046] S14. Solve the incremental distribution network framework planning model based on a distributed shortest path consensus algorithm to obtain an output planning path set.
[0047] Incremental distribution network planning is a path selection problem involving a large number of 0-1 variables and nonlinear constraints, and the solution is relatively complex. Therefore, seeking efficient and accurate solution algorithms has always been the focus of research in this field.
[0048] At present, there is no efficient and accurate solution to the 0-1 programming problem. Small-scale 0-1 programming problems usually use the exhaustive method to traverse all possible combinations of decision variables and find the optimal solution to the objective function. When the scale of the problem continues to increase, the size of the combination set increases exponentially, and the original method is no longer applicable. A new method, implicit enumeration, has emerged. This method improves the exhaustive method by screening conditions, continuously deleting solution sets that are worse than the current solution, and taking the better solution as the new optimal solution, and then constructing new screening conditions with the new optimal solution. This method can be repeated to find the optimal solution relatively quickly, but it cannot meet the efficiency requirements when the problem scale is large. Another idea to improve the exhaustive method is random search, among which the more typical one is the Monte Carlo method. This method obtains better solutions by randomly taking values of decision variables in large quantities and comparing their objective function values. Finally, an approximate result is calculated on random sampling, so the global optimality of the solution cannot be guaranteed. Heuristic algorithm is another idea to solve the 0-1 planning problem. This algorithm identifies heuristic information according to the special structure of the specific problem, and constructs a heuristic optimization process to efficiently find the approximate optimal solution. However, its approximate optimal solution is usually a local optimal solution, so it is necessary to use other methods to evaluate the quality of its solution. In practical applications, it cannot guarantee the stable generation of feasible solutions close to the global optimal. When studying the path selection problem, the shortest path algorithm has the advantage of accurate calculation results. This algorithm has many improved algorithms and heuristic algorithms. These algorithms have different efficiencies and applicable networks. Among them, the traditional Dijkstra algorithm starts from the starting point and expands the calculation layer by layer in all directions around it. After calculating a large number of nodes, it reaches the target point. The solution speed is slow and the efficiency is low. When applied to large-scale distribution network planning, there will be a problem of excessive calculation burden. Therefore, the incremental distribution network grid planning method based on the distributed Bias Min-Consensus algorithm proposed in this embodiment is adapted to the actual needs of planning incremental distribution networks when large-scale EVCS is connected in the future.
[0049] Since the incremental distribution network grid planning model is a multi-scenario model, it is necessary to first obtain the scenario parameters required by the incremental distribution network grid planning model. Therefore, in S10-S12, on the basis of the typical day load, the EV load corresponding to the typical day is added to form a typical scenario set S. The typical scenario set S and the corresponding parameters are the scenario parameters required by the incremental distribution network grid planning model. In the planning process, the uncertainty of future load demand can be described by a set of scenarios. Before conducting grid planning, the load of a typical operating day is extracted based on historical data, and the EVCS in the planning area is modeled to obtain the EVCS load distribution, and then the distribution network grid is planned based on the Bias Min-consensus algorithm.
[0050] Exemplarily, the method for determining the typical operating day and the corresponding probability of occurrence is:
[0051] Initialize the cluster center, and continuously update the cluster center until the cluster center meets the upper error limit requirement of cluster convergence; after clustering, each category of the cluster center corresponds to a typical operating day, and the frequency of occurrence of each category corresponds to the probability of occurrence of the typical operating day.
[0052] The typical day can be obtained from the 365-day conventional power load monitoring data of the local node set N, with a measurement interval of 1 hour, that is, T = {1, 2, ..., 24}. CL,n (t,d)(where P CL represents the active power of conventional load, n represents the nth node, t represents time t, and d represents the dth day) is formed into vectors by day, standardized and normalized, and the processed data set is recorded as R = {r1, r2, ..., r k ,...r Td}, where r k Represents the load data of the kth day. For the extraction of typical operating day loads, an improved K-medoids clustering algorithm can be used. Through clustering, daily loads with similar power characteristics are classified into one category, and typical daily loads are extracted to reduce the calculation complexity of the planning and improve the solution efficiency.
[0053] Load curve r on day k k and the load curve r on day x x The similarity between k ,r x ) is expressed as the inner product of two vectors:
[0054] se(r k ,r x )=r k ·r x (1)
[0055] A typical operating day should contain at least two categories: sunny and rainy. Considering that this clustering method can automatically classify according to data characteristics, the number of initial class centers is set to 2, and the following formula is used to select the initial class center:
[0056]
[0057] Use formula (3) to initialize the category, where G i Represents a class with center r C,i Class:
[0058]
[0059] After updating the class center according to formula (4), determine whether standard (5) is met. If not, update the classification using formula (3) and iterate repeatedly until standard (5) is met:
[0060]
[0061]
[0062] Among them, σ1 is the upper limit of the error of clustering iteration, r C,i- ,r C,i+ They are the class centers before and after the update respectively.
[0063] Then, determine whether the clustering meets the category convergence requirements according to the following formula:
[0064]
[0065] Among them, σ2 determines the upper limit of the error of clustering convergence.
[0066] If it does not meet the requirements, add a new class center:
[0067]
[0068] After clustering, the set of cluster centers is represented by R C =[r C,1 ,r C,2 ,...,r C,m ], where m represents the number of cluster centers after clustering, and the proportion of the number of load curves contained in each category to all load curves participating in the clustering are c1, c2, …, c m The same type of daily load curve can be represented by the cluster center of each type of load. Therefore, the number of typical operating days obtained based on the conventional load is also m. The serial numbers of the operating days corresponding to these cluster centers are s1, s2, s3, ... s m The numbered sets of typical operating days are formed. All load data on these days constitute a typical day load. The proportion of each typical operating day is c1, c2,…,c m On the basis of the typical day, add the EV load P corresponding to the typical day EV,n (t,s i ), constitutes a typical scene set S. Scene s i For {P L,n (t,s i )=P CL,n (t,s i )+P EV,n (t,s i )|t∈T,n∈N}, typical scenario s i The probability of occurrence p(si )=c i For example, the daily load curves of 365 days are clustered, and three cluster centers are obtained after clustering, namely: C,1 =r3,r C,2 =r 125 ,r C,3 =r 300 , the number of daily load curves in each category is 50, 150, and 165 respectively, so the typical operation day sequence number set is {3, 125, 300}, and the typical scenario is {P L,n (t,3)=P CL,n (t,3)+P EV,n (t,3)|t∈T,n∈N}, {P L,n (t,125)=P CL,n (t,125)+P EV,n (t,125)|t∈T,n∈N},{P L,n (t,300)=P CL,n (t,300)+P EV,n (t,300)|t∈T,n∈N}, the probability of each scene appearing is: 50 / 365, 150 / 365, 165 / 365.
[0069] Exemplarily, obtaining the electric vehicle charging load of each node in the local node set on each typical operation day from the electric vehicle load data specifically includes:
[0070] The load curves of all single charges at each node on each typical operating day are obtained from the tram load data.
[0071] All single-charge load curves are added together to obtain the electric vehicle charging load of each node on each typical operating day.
[0072] Exemplarily, the step of obtaining the load curves of all single charges of each node on each typical operation day from the electric vehicle load data specifically includes:
[0073] A model for the duration of the electric vehicle load charging is established based on the difference between the percentage of the remaining electric power of the electric vehicle load and the percentage of the initial electric power of the electric vehicle load, the battery capacity of the electric vehicle, the normal charging power and the charging efficiency; the percentage of the remaining electric power of the electric vehicle load is a linear function of the charging electricity price and the percentage of the maximum electric power of the electric vehicle;
[0074] By combining the electric vehicle load charging duration model and the normal charging power, the load curves of all single charges of each node on each typical operating day are obtained.
[0075] Assume that the EV owner expects the remaining charge percentage (SOC) of the EV under scenario s, SOC DES (s), following the linear charging price model. The upper and lower limits of the expected SOC are SOC max and SOC min The charging price λ(s) in scenario s is in units of $ / kWh, and its value is affected by the current market price λ max and λ min limit:
[0076] λ min ≤λ(s)≤λ max (8)
[0077] A linear model is used to reflect the relationship between charging price and user's expected SOC:
[0078] SOC DES (s) = SOC max -α·λ(s)(9)
[0079] The slope is α=(SOCmax-SOCmin) / (λmax-λmin).
[0080] Specifically, in scenario s, when the charging price is set to λ max When SOC DES (s) down to minimum SOC min On the other hand, when the charging price is set to λ min When SOC DES (s) reaches the maximum SOC max .
[0081] In addition, assuming that the initial SOC before charging in scenario s, SOC INI (s) follows a standard normal distribution and assumes that the arrival time t of the electric vehicle in scenario s a (s) follows a mixed normal distribution.
[0082] The corresponding probability density function is expressed as follows:
[0083]
[0084]
[0085] In the formula, μ INI ,σ INI ,μ 1ta ,σ 1ta ,μ 2ta ,σ 2ta ,The values of a1 and a2 are determined based on the historical EV load data, and the values of different ,vehicles are different, for example, the data values of buses and ,private cars are different.
[0086] Then, the EV charging duration T a (s) can be modeled as a function given by the following formula:
[0087]
[0088] Among them, Ta(s) is the charging time, ECAP is the battery capacity of the electric vehicle, PCHA is the normal charging power in kW, and η is the charging efficiency. According to the above formula, the load curve of a single charge under scenario s can be obtained:
[0089]
[0090] According to the local EV development report, the EV quantity forecast data can be obtained to determine the EV charging times of node n under scenario s. EV The corresponding addition can be obtained as follows: EV charging load {P EV,n (t,s)|t∈T,n∈N}, which is used to generate a set of typical scenes in .
[0091] Exemplarily, the establishing of the electric vehicle load charging duration model specifically includes:
[0092] The difference between the remaining power percentage of the electric vehicle load and the initial power percentage of the electric vehicle load and the product value of the battery capacity of the electric vehicle are divided by the product value of the normal charging power and the charging efficiency to obtain the electric vehicle load charging duration model.
[0093] Exemplarily, the power flow constraints include active power constraints of each node and active power constraints of each node of each node;
[0094] The circuit parameter constraints include a maximum current carrying capacity constraint of the cable and a maximum voltage limit constraint;
[0095] The structural constraints include a constraint on the maximum number of outgoing lines at a power point.
[0096] Exemplarily, the annualized cost function is a sum function of unit annual construction cost and total operating expenditure.
[0097] The goal of establishing an incremental distribution network planning model is to plan the network structure in a way that minimizes the annualized capital expenditure and total operating expenditure under all possible circumstances. The annualized cost c can be expressed as:
[0098]
[0099] Among them, c CPis to convert the one-time line construction cost in the planning period into the unit annual construction cost value, Y is the planning period, κ is the rate of return on investment, C CP is the line construction unit price, l nn’ is the line length, x nn’ is a binary decision variable for whether to build the line, L nn' Refers to branch nn', L CA Is the line set to be planned:
[0100]
[0101] Total operating expensesc OP It can be calculated as:
[0102] c OP =c E +c M +c PN (16)
[0103]
[0104]
[0105] Among them, c E is the annual power loss cost caused by line transmission loss, and the calculation formula is given by formula (18), p(s) is the probability of occurrence of scenario s, T d is the total number of days in a single planning year, is the network loss on line nn'. M is the cost of grid maintenance per year, C M To maintain the unit price, L is the set of lines. PN is a penalty function for any violation of the constraints.
[0106] On the basis of the optimization goal, it is necessary to consider the operation constraints, equations (19) to (23). In addition, it is also necessary to consider the constraints of the urban pipe network topology (24):
[0107]
[0108] Where P n (t,s) is the active power flowing into node n, P L,n (t,s) is the active load consumed by node n, P nn’ (t,s) is the active power flowing to the downstream node n' of node n;
[0109]
[0110] Where P n’(t,s) is the active power flowing into node n', and the other symbols have the same meanings as above;
[0111]
[0112] In the formula, cosθ is the power factor of the network, ρ is the resistivity, Vn is the voltage value at node n, and the other symbols have the same meanings as above;
[0113]
[0114] In the formula, It is the square value of the maximum current carrying capacity of the cable, which is obtained by consulting the national standard according to the cable model used. The meanings of other symbols are the same as above;
[0115]
[0116] In the formula, is the maximum voltage limit, which can be obtained by referring to the national standard voltage limit, V N is the rated voltage, and the meanings of other symbols are the same as above;
[0117] 0≤m b ≤m blim (twenty four)
[0118] In the formula, m b is the number of outgoing wires from the power supply point, m blim It is the maximum number of outgoing wires, which is determined by referring to the national standard based on the transformer capacity.
[0119] Equations (14) to (24) constitute a complete incremental distribution network planning model. Since both the constraints and the objective function contain a large number of binary variables and continuous variables, and the incremental distribution network planning model can be expressed by a topological graph, it can be solved accurately and quickly using the Bias Min-consensus algorithm.
[0120] Exemplarily, solving the incremental distribution network framework planning model based on the distributed shortest path consensus algorithm to obtain an output planning path set specifically includes:
[0121] The incremental distribution network framework planning model is converted into a topology diagram; in the topology diagram, the annualized cost function is regarded as a master node, and the power flow constraints, circuit parameter constraints and structural constraints are regarded as slave nodes;
[0122] Calculate the branch with the smallest current path weight of each node, and update the branch selected by each node through information exchange between nodes and multiple iterations to obtain the global optimal path from each node to the specified node.
[0123] The Discrete Biased Min-Consensus (DBMC) algorithm is a distributed shortest path consensus algorithm based on graph theory. Its main feature is that all nodes in the network synchronously calculate the branch with the smallest current path weight, and update the selected branches through information exchange between nodes and multiple iterations to obtain the global optimal path from each node to the specified node.
[0124] Nodes are divided into master nodes (S leader ) and slave nodes (S follower ) Two categories: The optimal branch selected by the master node is not affected by other nodes during the iteration and information exchange process, so they are static, while the optimal branch selected by the slave node is affected by the optimal branch selected by its adjacent node. After comprehensive consideration, the branch with the smallest cumulative path weight to the specified node is selected, so they are dynamic.
[0125] Exemplarily, the branch selected by each node is updated through information exchange between nodes and multiple iterations, specifically including:
[0126] The branches selected by the nodes are iterated according to the accumulated path weight values, and each node is iterated repeatedly until the node state value is the same as the previous node state value; the parent node of each node in each iteration is represented by the adjacent node calculated in the iteration to achieve the best state value.
[0127] The DBMC algorithm finds the shortest path by updating the rules. The update rules are as follows:
[0128]
[0129]
[0130] Where, d n (k) represents the state value of node n in the kth iteration, N n represents the set of adjacent nodes of node n, c nn’ It represents the path weight of the branch nn' connecting n and the adjacent node n'. The calculation formula of the path weight of the branch nn' is as follows:
[0131]
[0132] Among them, c PNnn’ is the penalty term, and the other symbols have the same meanings as above.
[0133] The parent node f of node n in the kth iteration n (k) The neighboring node that makes the state value optimal is represented by the neighboring node calculated in the iteration. The update rule of the parent node is as follows:
[0134]
[0135] In the steady state (k = ∞), the value of the state variable d will converge to:
[0136]
[0137] During the iteration, when the d of all nodes in the kth iteration n (k) and d of the previous iteration n (k+1) are exactly the same, it can be considered that the iteration has converged. At this time, the branch L connecting the parent and child nodes is calculated based on the parent node results of each node. nn' The corresponding binary variable x nn' Assign 1 and output the decision results of each branch X={x nn'}, a radial distribution network is obtained from the decision result. According to equations (19)-(21), the flow of the distribution network under the heaviest load scenario in the scenario set established in steps (1) and (2) is calculated. According to equations (22)-(24), it is determined whether the current and voltage meet the constraints. If the constraints exceed the limit, the penalty item c of the branch nn' that exceeds the limit is set. PNnn’ Set to infinity to indicate that this branch cannot meet the constraint requirements and is no longer selected. Then restart the shortest path calculation and iterate the optimization again until the selected grid fully meets the constraints and output the planned path set.
[0138] Compared with the prior art, the incremental distribution network framework planning method considering the tram load provided by the embodiment of the present invention first extracts the load of a typical operating day from the power load monitoring data of the local node set of the incremental distribution network, and models the EVCS of the target planning grid area, obtains the electric vehicle charging load under the typical operating day, and adds it to the load of the typical operating day to form a typical scenario set. Each typical day is obtained by clustering, and the daily loads with similar power characteristics are classified into one category to reduce the calculation complexity of the planning and improve the solution efficiency. The relevant parameters of the typical scenario set are input into the incremental distribution network framework planning model. Under the conditions of flow constraints, circuit parameter constraints and structural constraints, the model is solved by a distributed shortest path consensus algorithm with the goal of minimizing the value of the annualized cost function until the selected grid fully meets the constraints, and finally outputs the planning path set, which overcomes the disadvantage that the traditional distributed algorithm is difficult to consider the operation constraints when applied to the power system, and is suitable for the incremental expansion of large-scale distribution networks.
[0139] In addition, in the process of modeling the EVCS in the target planning grid area, a tram load charging duration model was established, taking into account the uncertainty of various random factors such as EV charging time and EV charging load size. Then, an optimization method based on multiple scenario sets was used in the incremental distribution network grid planning model to deal with system uncertainty, thereby optimizing the distribution network operation and route planning under different EV load scenarios.
[0140] See also Figure 2 An embodiment of the present application provides an incremental distribution network framework planning device taking into account tram load, including: a typical day extraction module 20, a charging load extraction module 21, a typical scenario set establishment module 22, a planning model establishment module 23 and a path output module 24.
[0141] The typical day extraction module 20 is used to extract multiple typical operating days, the typical operating day load corresponding to each typical operating day, and the occurrence probability corresponding to each typical operating day from the power load monitoring data of the local node set of the incremental distribution network.
[0142] The charging load extraction module 21 is used to obtain the electric vehicle charging load of each node in the local node set on each typical operating day from the electric vehicle load data.
[0143] The typical scenario set establishment module 22 is used to add the typical operating day load corresponding to each typical operating day and the electric vehicle charging load to obtain the incremental typical operating day load corresponding to each typical operating day; the collection of incremental typical operating day loads corresponding to all typical operating days constitutes a typical scenario set.
[0144] The planning model building module 23 is used to build an incremental distribution network framework planning model with the goal of minimizing the annualized cost function under power flow constraints, circuit parameter constraints and structural constraints based on the typical scenario set and the corresponding occurrence probability of each typical operation day.
[0145] The path output module 24 is used to solve the incremental distribution network framework planning model based on a distributed shortest path consensus algorithm to obtain an output planning path set.
[0146] Compared with the prior art, the incremental distribution network grid planning device considering the tram load provided by the embodiment of the present invention first extracts the load of a typical operating day from the power load monitoring data of the local node set of the incremental distribution network, and models the EVCS of the target planning grid area, obtains the electric vehicle charging load under the typical operating day, and adds it to the load of the typical operating day to form a typical scenario set. Each typical day is obtained by clustering, and the daily loads with similar power characteristics are classified into one category to reduce the calculation complexity of the planning and improve the solution efficiency. The relevant parameters of the typical scenario set are input into the incremental distribution network grid planning model. Under the conditions of flow constraints, circuit parameter constraints and structural constraints, the model is solved by a distributed shortest path consensus algorithm with the goal of minimizing the value of the annualized cost function until the selected grid fully meets the constraints, and finally outputs the planning path set, which overcomes the disadvantage that the traditional distributed algorithm is difficult to consider the operation constraints when applied to the power system, and is suitable for the incremental expansion of large-scale distribution networks.
[0147] In addition, in the process of modeling the EVCS in the target planning grid area, a tram load charging duration model was established, taking into account the uncertainty of various random factors such as EV charging time and EV charging load size. Then, an optimization method based on multiple scenario sets was used in the incremental distribution network grid planning model to deal with system uncertainty, thereby optimizing the distribution network operation and route planning under different EV load scenarios.
[0148] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working process of the device described above can refer to the corresponding process in the aforementioned method embodiment, and will not be described again here.
[0149] The above is a preferred embodiment of the present invention. It should be pointed out that a person skilled in the art can make several improvements and modifications without departing from the principle of the present invention. These improvements and modifications are also considered to be within the scope of protection of the present invention.
Claims
1. A method for planning an incremental distribution network considering tram load, characterized in that: include: extracting a plurality of typical operating days, a typical operating day load corresponding to each typical operating day, and an occurrence probability corresponding to each typical operating day from power load monitoring data of a local node set of an incremental distribution network; Obtaining the electric vehicle charging load of each node in the local node set on each typical operation day from the tram load data, specifically including: obtaining the load curve of all single charges of each node on each typical operation day from the tram load data, specifically including: the difference between the tram load remaining power percentage and the tram load initial power percentage, the electric vehicle battery capacity, the normal charging power and the charging efficiency, and establishing a tram load charging duration model; the tram load remaining power percentage is a linear function of the charging electricity price and the tram maximum power percentage; the establishing of the tram load charging duration model specifically includes: dividing the product value of the difference between the tram load remaining power percentage and the tram load initial power percentage and the electric vehicle battery capacity by the product value of the normal charging power and the charging efficiency to obtain the tram load charging duration model; Combining the electric vehicle load charging duration model and the normal charging power, the load curves of all single charges of each node on each typical operation day are obtained; all single charging load curves are added together to obtain the electric vehicle charging load of each node on each typical operation day; The typical operating day load corresponding to each typical operating day and the electric vehicle charging load are added together to obtain an incremental typical operating day load corresponding to each typical operating day; The collection of incremental typical operating day loads corresponding to all typical operating days constitutes a typical scenario set; According to the typical scenario set and the corresponding occurrence probability of each typical operation day, an incremental distribution network framework planning model is constructed with the goal of minimizing the annualized cost function under power flow constraints, circuit parameter constraints and structural constraints; The incremental distribution network framework planning model is solved based on a distributed shortest path consensus algorithm to obtain an output planning path set, which specifically includes: converting the incremental distribution network framework planning model into a topology diagram; in the topology diagram, the annualized cost function is regarded as the main node, and the flow constraints, circuit parameter constraints and structural constraints are regarded as slave nodes; calculating the branch with the smallest current path weight value of each node, and updating the branch selected by each node through information exchange between nodes and multiple iterations to obtain the global optimal path from each node to the designated node; the branch selected by each node through information exchange between nodes and multiple iterations specifically includes: iterating the branch selected by the node according to the accumulated path weight value, and each node repeats the iteration until the node state value is the same as the previous node state value; the parent node of each node in each iteration is represented by the adjacent node calculated in the iteration to make the state value reach the best.
2. The incremental distribution network planning method considering tram load as claimed in claim 1 is characterized in that: The method for determining the typical operating day and the corresponding probability of occurrence is as follows: Initialize the cluster center, and continuously update the cluster center until the cluster center meets the upper error limit requirement of cluster convergence; after clustering, each category of the cluster center corresponds to a typical operating day, and the occurrence frequency of each category corresponds to the occurrence probability of the typical operating day.
3. The incremental distribution network planning method considering tram load as claimed in claim 1 is characterized in that: The power flow constraints include active power constraints of each node and active power constraints of each node of each node; The circuit parameter constraints include a maximum current carrying capacity constraint of the cable and a maximum voltage limit constraint; The structural constraints include a constraint on the maximum number of outgoing lines at a power point.
4. The incremental distribution network planning method considering tram load as claimed in claim 1 is characterized in that: The annualized cost function is a function of the sum of unit annual construction cost and total operating expenditure.
5. A device for planning an incremental distribution network considering tram load, characterized in that: include: A typical day extraction module is used to extract a plurality of typical operating days, a typical operating day load corresponding to each typical operating day, and an occurrence probability corresponding to each typical operating day from the power load monitoring data of the local node set of the incremental distribution network; The charging load extraction module is used to obtain the electric vehicle charging load of each node in the local node set on each typical operation day from the tram load data, specifically including: obtaining the load curve of all single charges of each node on each typical operation day from the tram load data, specifically including: the difference between the tram load remaining power percentage and the tram load initial power percentage, the electric vehicle battery capacity, the normal charging power and the charging efficiency, and establishing the tram load charging duration model; the tram load remaining power percentage is a linear function of the charging electricity price and the tram maximum power percentage; the establishment of the tram load charging duration model specifically includes: dividing the product value of the difference between the tram load remaining power percentage and the tram load initial power percentage and the electric vehicle battery capacity by the product value of the normal charging power and the charging efficiency to obtain the tram load charging duration model; Combining the electric vehicle load charging duration model and the normal charging power, the load curves of all single charges of each node on each typical operation day are obtained; all single charging load curves are added together to obtain the electric vehicle charging load of each node on each typical operation day; A typical scenario set establishment module, used for adding the typical operating day load corresponding to each typical operating day and the electric vehicle charging load to obtain an incremental typical operating day load corresponding to each typical operating day; The collection of incremental typical operating day loads corresponding to all typical operating days constitutes a typical scenario set; A planning model building module is used to build an incremental distribution network framework planning model with the goal of minimizing the annualized cost function value under power flow constraints, circuit parameter constraints and structural constraints based on the typical scenario set and the corresponding occurrence probability of each typical operation day; The path output module is used to solve the incremental distribution network framework planning model based on the distributed shortest path consensus algorithm to obtain an output planning path set, which specifically includes: converting the incremental distribution network framework planning model into a topology diagram; in the topology diagram, the annualized cost function is regarded as the main node, and the flow constraint, circuit parameter constraint and structural constraint are regarded as the slave node; calculating the branch with the smallest current path weight value of each node, and updating the branch selected by each node through information exchange between nodes and multiple iterations to obtain the global optimal path from each node to the designated node; the branch selected by each node through information exchange between nodes and multiple iterations specifically includes: iterating the branch selected by the node according to the accumulated path weight value, and each node repeats the iteration until the node state value is the same as the previous node state value; the parent node of each node in each iteration is represented by the adjacent node calculated in the iteration to make the state value reach the best.