A method for rapid micro-pipe jacking construction of urban main roads

By quickly ejecting the prefabricated pipe section by sinking the steel casing of the rocking pipe machine and the micro-pipe machine, combining guidance and lubrication technology, the problems of ground settlement and low construction efficiency in existing pipe heading construction are solved, and the micro-channel of urban main roads are realized Fast and precise construction results for pipe tops.

CN115012977BActive Publication Date: 2024-11-22CCTEB INFRASTRUCTURE CONSTR CO LTD +1
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202210722409.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-06-24
Publication Date
2024-11-22
Estimated Expiration
2042-06-24

AI Technical Summary

Technical Problem

The existing pipe top construction methods cannot effectively control the settlement of urban roads, have poor construction accuracy, large area, low efficiency and long cycle.

Method used

Using a rocking pipe machine to sink steel casing to quickly construct the working well and receiving well of the pipe header, and using a micro pipe header to quickly eject and install prefabricated pipe sections with high precision. Combined with a photographic electronic theodolite and a high-pressure injection grouting hole device, the guidance and Lubricate, reduce propulsion resistance.

Benefits of technology

It has achieved rapid construction of micro-top pipes on urban main roads, controlled ground settlement, shortened construction cycle, improved construction efficiency, reduced footprint and reduced costs, and is suitable for a variety of formation conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115012977B_ABST
    Figure CN115012977B_ABST
Patent Text Reader

Abstract

The invention discloses a method for rapid micro-pipe jacking construction of urban trunk roads, comprising the following steps: cutting and breaking the urban road structural layer, sinking the steel casing to the designed elevation in sections by using a vertical pipe shaking machine, and pouring bottom cushion concrete; installing a photographic electronic theodolite and a pipe jacking device in a starting well, and driving a guide rod drill with an LED target into the soil body by using a jacking device; after the guide rod reaches the receiving well, connecting the outer pipe of the mud discharge pipe and the mud discharge spiral rod with a reducer to continue jacking; after the mud discharge spiral rod reaches the receiving well, connecting an enlarged cutting machine head or a shield machine to the last mud discharge pipe section of the starting well, the cutting machine head or the shield machine cutter head cuts the front soil into the soil bin, and at the same time rotates to drive the mud discharge spiral rod to rotate and discharge soil; connecting a glass fiber reinforced plastic pipe jacking machine to the rear, and jacking the prefabricated pipe sections forward in sequence by using a jacking device; hoisting the pipe jacking equipment, installing a prefabricated inspection well, backfilling the well side wall with medium and coarse sand, pulling out the steel casing male ring, and restoring the road surface.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of pipe jacking construction, and in particular relates to a method for rapid micro-pipe jacking construction of urban trunk roads. Background Art

[0002] At present, slurry balance pipe jacking and earth pressure balance pipe jacking are generally used in pipe jacking construction. The above two construction methods cannot effectively control the ground subsidence of urban roads. In addition, the construction occupies a large area, has poor construction accuracy, low efficiency and a relatively long cycle. Therefore, it is necessary to design a method for rapid construction of micro-pipe jacking on urban main roads to achieve a construction method that can quickly construct and reasonably control ground subsidence. Summary of the invention

[0003] In order to overcome the above technical problems in the prior art, the present invention provides a method for rapid micro-pipe jacking construction for urban main roads, which quickly constructs the working well and receiving well of the pipe jacking machine by sinking a steel casing through a pipe shaking machine, and uses a micro-pipe jacking machine to quickly jack and install prefabricated pipe sections with high precision, thereby solving the above technical problems.

[0004] A method for rapid micro-pipe jacking construction of urban main roads, the construction method comprising the following construction steps:

[0005] S1: Close and fence off the single-lane work area, divert traffic, remove the road structure layer within the working well and receiving well, use a vertical pit pipe shaker to sink the steel casing to the designed elevation, use a long-arm excavator to dig out the soil during the process, and finally pour the bottom concrete;

[0006] S2: In the starting well, the channel steel base is welded to the steel casing, and a 50cm space is reserved between the bottom of the channel steel and the floor as a space for storing groundwater and a small amount of sediment. The pipe jacking machine is hoisted into the well, and a photographic electronic theodolite and a display are installed. The back wall of the pipe jacking machine adopts a tooling-type arc-shaped backrest steel plate that is closely attached to the steel casing. A hole is opened on the inner wall of the steel casing in the jacking direction, and the drill bit with an LED target guide rod is pushed into the soil of the opened working hole with a jacking device. The subsequent guide rod is connected to the front guide pipe through a thread and pushed into the soil in turn until the guide drill bit at the other end is pushed out from the receiving well.

[0007] S3: Connect the conical reducer to the tail of the guide rod in the working well, connect the conical reducer to the mud discharge pipe, connect the spiral excavation rod in the mud discharge pipe, use the jacking device to push the mud discharge pipe with the conical reducer into the soil along with the guide rod, remove the guide rods in sections at the receiving well and hoist them out until all the guide rods are pushed into the receiving well, and hoist all the guide rods that have entered the receiving well out of the receiving well;

[0008] S4: After the conical enlarged head of the first section of the mud discharge spiral pipe follows the guide rod into the receiving well, the steel casing at the tunnel gate is cut, and the tunnel gate sealing device is installed. Then, a jacking machine head with a high-pressure jet grouting hole device is pushed into the hole following the mud discharge spiral pipe at the end by using the jacking device. The rotation of the cutter head of the jacking machine head drives all the mud discharge spiral rods in front of the tunnel face to rotate. The cutter head cuts the soil, and the cut soil enters the soil pressure bin in front of the tunnel face of the jacking machine head. The soil in the soil pressure bin is discharged to the receiving well through the mud discharge spiral rod and the mud discharge pipe, and the receiving well is hoisted out of the well by a small bucket car;

[0009] S5: Install the glass fiber reinforced plastic jacking pipe section behind the jacking machine head in the working well, and use the jacking device to push all the pipe sections into the soil in sequence following the jacking machine head. Remove the jacked guide rods, mud discharge spiral pipes and jacking machine heads in sections at the front receiving well. After each resin concrete pipe section is installed, extend and connect the high-pressure water hose and power supply cable until all the pipe sections are finally pushed in.

[0010] S6: After the pipe segment is jacked in, remove the pipe jacking equipment, waterproof the hole where the steel casing and the pipe segment are connected, install the prefabricated inspection shaft, backfill the space between the outside of the shaft and the steel casing with medium-coarse sand, cut and remove the male ring of the steel casing, then install the manhole cover, restore the road structure layer according to the original road design, and finally remove the fence and resume traffic.

[0011] In the above-mentioned method for rapid micro-pipe jacking construction on urban main roads, the vertical pipe shaking machine is a retractable structure, which can be retracted to a narrower size during transportation to the site to facilitate loading and transportation.

[0012] The above-mentioned method for rapid micro-pipe jacking construction of urban main roads, the walls of the working well and the receiving well are steel casings, which are made of Q235B steel plates with a wall thickness of 20mm. The standard steel casing section height is 2m, the blade foot section steel casing height is 1m, and the blade foot section steel casing contacting the soil side needs to be processed into a serrated shape with a serration depth of about 100mm-200mm to reduce the resistance of the steel casing during the sinking process of the well shaking. A vertical pipe shaking machine is used to complete the segmented sinking of the steel casing. After each section of the steel casing sinks into place, it is unearthed by a long-arm excavator. After the construction is completed, the public ring of the jacking pipe above 50cm is cut and pulled out for reuse.

[0013] The above-mentioned method for rapid micro-pipe jacking construction on urban main roads comprises the following steps: the channel steel base is composed of three sections of channel steel welded in parallel on the side wall of the steel casing; a steel plate is laid on the channel steel as an operating platform; a 500mm space is reserved between the steel plate and the concrete bottom plate as a space for storing groundwater and a small amount of sediment; the propulsion platform of the pipe jacking machine is fixed to the operating platform by a plurality of adjustable bolts to ensure that no deviation occurs during the jacking process.

[0014] The above-mentioned method for rapid micro-pipe jacking construction on urban main roads, the photographic electronic theodolite is arranged behind the pipe jacking machine, and the photographic electronic theodolite and the industrial display are connected by a special VGA video line, and the LED target light source with its own power supply is installed in the wedge-shaped guide rod. Before jacking, the photographic electronic theodolite's photographic function and laser pointing are turned on, and the industrial display and the LED target light source are turned on. The display image is adjusted to a suitable size by adjusting the photographic electronic theodolite, and the crosshairs in the display are clear. For the convenience of observation, the image can be adjusted to about 1 / 2 of the display screen size at a close distance, and the image can be adjusted to the maximum to fill the entire display screen at a long distance. The photographic electronic theodolite is adjusted to adjust the vertical stop micromotion and the horizontal stop micromotion of the electronic theodolite, so that the electronic theodolite pointing laser beam coincides with the "horizontal contour lead", and the electronic theodolite pointing laser beam should be vertically incident on the center of the LED target. Later, as the excavation distance increases, the photographic electronic theodolite is adjusted at any time to make the LED target image clear.

[0015] The above-mentioned method for rapid micro-pipe jacking construction on urban main roads, during the process of jacking the pilot pipe and pipes, in order to prevent serious water leakage at the entrance and exit of the pipe, causing uneven settlement of the road surface, a tunnel door sealing device is installed on the steel casing before the jacking machine is jacked in, so as to control the loss of water, sand and other soil in the well.

[0016] The above-mentioned method for rapid micro-pipe jacking construction on urban main roads, the jacking machine head is a replaceable machine head, and the options include a simple machine head, an enlarged cutting machine head and an extrusion cutting shield machine head. The simple machine head is selected for DN400 and soft soil, the enlarged cutting machine head and the extrusion cutting shield machine head can be selected for DN600 pipe diameter, and the DN800 pipe diameter is the maximum jacking diameter currently achieved by the micro-pipe jacking, and the extrusion cutting shield machine head should be selected. The simple machine head and the enlarged cutting machine head are provided with three high-pressure grouting holes on the side, and a high-pressure grouting hole is provided on the top of the extrusion cutting shield machine head. Through the high-pressure grouting pipeline connected at the back, the grouting hole meets the requirements. When the construction jacking distance is long and the sand content of the soil layer is large, during the pipeline advancement process, the sand layer adheres to the outer wall of the pipeline, causing the "pipe holding" phenomenon, and the advancement resistance will become larger.

[0017] The above-mentioned method for rapid construction of micro-pipe jacking on urban main roads, the glass fiber reinforced plastic jacking pipe adopts an F-type socket joint, the lining material between the pipe sections is multi-layer plywood, the steel sleeve and the steel ring are made of 304 stainless steel, two wedge-shaped rubber rings are arranged at the socket, and the material is chloroprene rubber. The expansion rubber should be pasted simultaneously when installing the multi-layer plywood liner, and it should be flush with the inner wall of the pipe after being jacked in and pressed.

[0018] In general, the above technical solutions conceived by the present invention can achieve the following beneficial effects compared with the prior art:

[0019] 1. The invention discloses a method for rapid micro-pipe jacking construction on urban trunk roads. The pipe-shaking machine device has a small size and can be used for construction on a 3-meter-wide road. It only needs to occupy one lane. The steel casing is sunk in sections of 2 meters each. The casings are connected by welding. The shaking pipe sinks the steel casing quickly. The male ring can be recycled after the inspection well is completed, which saves costs.

[0020] 2. The micro-pipe jacking machine used in the present invention has an integrated design. The pushing device is small in size and light in weight. The equipment is easy to operate and has high construction efficiency. The working well size is only φ2590mm and φ3290mm. The back wall is an arc-shaped steel plate, which is closely attached to the inner wall of the steel casing. The back structure can provide sufficient support strength and can withstand the maximum reaction force of the jack during the jacking process. With the fixed setting of the machine base, the equipment is kept stable during the entire jacking process, and the jacking center line is always kept on the same horizontal line;

[0021] 3. The invention is applicable to a wide range of strata, including hard soil layers, sand layers, and gravel layers with a diameter of less than 50 mm under urban main roads, and the construction method of the invention can be used;

[0022] 4. A high-pressure grouting hole is set at the head of the pipe jacking machine. When the construction jacking distance is long and the soil layer contains a large amount of sand, the sand layer adheres to the outer wall of the pipe during the advancement of the pipe, causing the "pipe holding" phenomenon, and the advancement resistance will become larger. Special mud can be injected into the head through the high-pressure jet grouting hole to lubricate the outer wall of the pipe, prevent the sand layer from adhering, reduce the resistance of the pipe in the sand layer, and reduce the thrust. When encountering a larger soil layer or an old city miscellaneous fill layer dominated by gravel, the jacking force of the jack is increased, and the high-pressure pump can be turned on to flush and improve the soil in front of the cutter disc through the grouting hole nozzle;

[0023] 5. The present invention adopts advanced photographic theodolite + laser guide drill for guidance. The horizontal straightness of the entire jacking process is ±30mm. The pipe section adopts glass fiber reinforced plastic jacking pipe, which is light in weight, large in rigidity, and stronger in corrosion resistance than concrete structure. The pipe sections are connected by socket type, the joints have good waterproof effect, and the formed pipes meet gravity drainage. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] The specific embodiments of the present invention are further described in detail below with reference to the accompanying drawings, wherein:

[0025] Figure 1 It is a schematic diagram of the sinking process of the steel casing according to the present invention;

[0026] Figure 2 It is a schematic diagram of the placement of the pipe jacking equipment in the construction method of the present invention;

[0027] Figure 3 It is a schematic diagram of positioning and guiding of a photographic electronic theodolite in the construction method described in the present invention;

[0028] Figure 4 It is a schematic diagram of the construction process of step S3 of the present invention;

[0029] Figure 5 It is a schematic diagram of the construction process of step S4 of the present invention;

[0030] Figure 6 It is a schematic diagram of the construction process of step S5 of the present invention;

[0031] In the figure: 1-display, 2-photographic electronic theodolite, 3-guide rod, 4-wedge-shaped guide drill bit, 41-power supply, 42-LED target light source, 5-pushing device, 6-arc-shaped rear backrest, 7-small gantry crane, 8-steel casing, 9-conical enlarged head, 10-channel steel base, 11-concrete bottom cushion, 12-mud discharge pipe, 13-mud discharge spiral rod, 14-jacking machine head, 15-high-pressure jet grouting hole, 16-glass fiber reinforced plastic jacking pipe. DETAILED DESCRIPTION

[0032] The present invention provides a method for rapid micro-pipe jacking construction of urban main roads, the method comprising the following construction steps:

[0033] Step 1: Close and fence the single-lane work area, divert traffic, remove the road structure layer within the working well and receiving well, use a vertical pipe shaker to sink the steel casing 8 to the designed elevation, and use a long-arm excavator to dig out the soil and pour the bottom concrete. Figure 1 Shown is a construction schematic diagram of the steel casing 8 sinking process;

[0034] Step 2: In the starting well, weld the channel steel base 10 to the steel casing 8, and reserve a 500mm space between the channel steel base 10 and the floor as a space for storing groundwater and a small amount of sediment. Hoist the pipe jacking machine down the well, install the photographic electronic theodolite 2 and the display 1, and the back wall of the pipe jacking machine adopts a tooling-type arc-shaped backrest 6 steel plate that is closely attached to the steel casing 8. A hole is opened on the inner wall of the steel casing 8 in the jacking direction, and the drill bit with the LED target guide rod 3 is pushed into the soil of the opened working hole with a jacking device 5. The subsequent guide rod 3 is connected to the front guide pipe through a thread and pushed into the soil in turn until the wedge-shaped guide drill bit 4 at the other end is pushed out from the receiving well, as shown in FIG. Figure 2 and Figure 3 As shown, it is a construction schematic diagram of the positioning of the jacking equipment and the positioning and guiding of the photographic electronic theodolite 2;

[0035] Step 3: Connect the conical reducer to the tail of the guide rod 3 in the working well, connect the conical reducer to the mud discharge pipe 12, connect the mud discharge spiral rod 13 in the mud discharge pipe 12, use the jacking device 5 to push the mud discharge pipe 12 with the conical reducer into the soil along with the guide rod 3, remove the guide rod 3 in sections at the receiving well and lift them out until all the guide rods 3 are pushed into the receiving well, and lift all the guide rods 3 that have entered the receiving well out of the receiving well. The construction process of this step is as follows: Figure 4 As shown;

[0036] Step 4: After the conical enlarged head 9 of the first section of the mud discharge pipe 12 follows the guide rod 3 into the receiving well, the steel casing 8 at the tunnel portal is cut, and the tunnel portal sealing device is installed. Then, the jacking device 5 is used to push the jacking head 14 with the high-pressure jet grouting hole 15 device into the hole following the mud discharge spiral rod 13 at the end. The rotation of the cutter head 14 drives all the mud discharge spiral rods 13 in front of the face to rotate, and the cutter head cuts the soil. The cut soil enters the soil pressure bin in front of the face of the jacking head 14. The soil in the soil pressure bin is discharged to the receiving well through the mud discharge spiral rod 13 and the mud discharge pipe 12. The receiving well is hoisted out of the well by a small gantry crane 7. The construction process of this step is as follows: Figure 5 As shown;

[0037] Step 5: Install the glass fiber reinforced plastic jacking pipe 16 pipe section behind the jacking machine head 14 in the working well, use the jacking device 5 to push all the pipe sections into the soil in sequence following the jacking machine head 14, and remove the jacked guide rod 3, mud discharge spiral rod 13 and jacking machine head 14 in sections at the front receiving well. Each time a resin concrete pipe section is installed, the high-pressure water hose and power supply cable are extended and connected until all the pipe sections are finally pushed in. The construction process of this step is as follows: Figure 6 As shown;

[0038] Step 6: After the pipe segment is jacked in, remove the jacking equipment, waterproof the hole where the steel casing 8 and the pipe segment are connected, install the prefabricated inspection shaft, backfill the space between the outside of the shaft and the steel casing 8 with medium-coarse sand, cut and remove the male ring of the steel casing 8, then install the manhole cover, restore the road structure layer according to the original road design, and finally remove the fence and resume traffic.

[0039] The walls of the working well and the receiving well are steel casing 8, which are made of Q235B steel plates with a wall thickness of 20mm. The standard steel casing 8 section height is 2m, the blade foot section steel casing 8 height is 1m, and the blade foot section steel casing 8 soil contact side needs to be processed into a serrated shape with a serration depth of 100-200mm to reduce the resistance of the steel casing 8 during the sinking process of the well shaking.

[0040] The back wall of the pipe jacking equipment is an arc-shaped steel plate, which is connected to the pipe jacking equipment as a whole by bolts and is closely attached to the inner wall of the steel casing 8.

[0041] The drill bit of the guide rod 3 is wedge-shaped, and the jacking elevation can be fine-tuned up and down and left and right by rotating the guide rod 3. An LED target light source 42 is installed in the drill bit. At the same time, the lifting platform of the photographic electronic theodolite 2 is installed on the concrete foundation at the bottom of the working pit. The photographic electronic theodolite is connected to 2 with an industrial display 1, and the imaging of the LED target light source 42 can be observed and adjusted through the display 1 to always be in the center of the screen.

[0042] In step 4, the jacking head 14 is a replaceable head. A simple head can be used for a DN400 pipe diameter, and the jacking method is non-soil discharge, compaction and hole expansion jacking, which is suitable for soft formations. An enlarged cutting head or an extrusion cutting shield head can be used for a DN600 pipe diameter, and the jacking method is soil discharge, extrusion and hole expansion jacking. An extrusion cutting shield head can be used for a DN800 pipe diameter, and the jacking method is soil discharge, extrusion and hole expansion jacking. The simple head, enlarged cutting head and shield machine are all equipped with high-pressure jet grouting holes 15.

[0043] The glass fiber reinforced plastic jacking pipe 16 adopts an F-type socket joint, the lining material between the pipe sections is multi-layer plywood, the steel sleeve and steel ring materials are 304 stainless steel, and two wedge-shaped rubber rings are arranged at the socket, and the material is neoprene.

[0044] It will be easily understood by those skilled in the art that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for rapid micro-pipe jacking construction of urban main roads, characterized in that: The method includes the following construction steps: S1: Close and fence off the single-lane work area, do a good job of traffic diversion, break the road structure layer within the working well and the receiving well, use a vertical pipe shaking machine to sink the steel casing (8) to the designed elevation, and at the same time use a long-arm excavator to dig out the soil, and pour the bottom sealing concrete. The walls of the working well and the receiving well are steel casings (8) made of Q235B steel plates with a wall thickness of 20 mm; S2: In the starting well, the channel steel base (10) is welded to the steel casing (8). A space of 500 mm is reserved between the channel steel base (10) and the floor as a space for storing groundwater and a small amount of sediment. The pipe jacking machine is hoisted down the well, and a photographic electronic theodolite (2) and a display (1) are installed. The back wall of the pipe jacking machine adopts a tooling-type curved backrest (6) steel plate that is closely attached to the steel casing (8). A hole is opened on the inner wall of the steel casing (8) in the jacking direction. The back wall of the pipe jacking equipment is a curved steel plate, which is connected to the pipe jacking equipment as a whole by bolts and closely attached to the inner wall of the steel casing (8). The drill bit with an LED target guide rod (3) is pushed with a jack. The device (5) is pushed into the soil of the opened working hole, and the subsequent guide rod (3) is connected to the front guide tube through a thread and pushed into the soil in sequence until the wedge-shaped guide drill bit (4) at the other end is pushed out from the receiving well. The drill bit of the guide rod (3) is wedge-shaped, and the jacking elevation is finely adjusted up and down and left and right by rotating the guide rod (3). An LED target light source (42) is installed in the drill bit. At the same time, the lifting platform of the photographic electronic theodolite (2) is installed on the concrete foundation at the bottom of the working well. The photographic electronic theodolite (2) is connected to a display (1). The LED target light source (42) is observed and adjusted through the display (1) so that the image is always at the center of the screen; S3: Connect a conical reducer to the tail of the guide rod (3) in the working well, connect a mud discharge pipe (12) behind the conical reducer, connect a mud discharge spiral rod (13) inside the mud discharge pipe (12), use a jacking device (5) to push the mud discharge pipe (12) equipped with the conical reducer into the soil along with the guide rod (3), remove the guide rods (3) in sections at the receiving well and hoist them out until all the guide rods (3) are pushed into the receiving well, and all the guide rods (3) that have entered the receiving well are hoisted out of the receiving well; S4: After the conical enlarged head (9) of the first section of the mud discharge pipe (12) follows the guide rod (3) into the receiving well, the steel casing (8) at the tunnel entrance is cut, and the tunnel entrance sealing device is installed. Then, a jacking machine head (14) with a high-pressure jet grouting hole (15) device is pushed into the hole following the mud discharge spiral rod (13) at the end by using the jacking device (5). The rotation of the cutter head of the jacking machine head (14) drives all the mud discharge spiral rods (13) in front of the tunnel face to rotate, and the cutter head cuts the soil. The cut soil enters the soil pressure bin in front of the tunnel face of the jacking machine head (14). The soil in the soil pressure bin passes through the The mud discharge screw rod (13) and the mud discharge pipe (12) are discharged to the receiving well, and the mud is hoisted out of the well by a small gantry crane (7) at the receiving well. The jacking head (14) is a replaceable head. The DN400 pipe diameter is a simple head, and the jacking method is non-soil discharge, compaction and hole expansion jacking, which is suitable for soft formations. The DN600 pipe diameter is an enlarged cutting head or an extrusion cutting shield head, and the jacking method is soil discharge, extrusion and hole expansion jacking. The DN800 pipe diameter is an extrusion cutting shield head, and the jacking method is soil discharge, extrusion and hole expansion jacking. The simple head, enlarged cutting head and shield machine are all equipped with high-pressure jet grouting holes (15); S5: Install the glass fiber reinforced plastic jacking pipe (16) pipe section behind the jacking machine head (14) in the working well, and use the jacking device (5) to push all the pipe sections into the soil body in sequence following the jacking machine head (14). Remove the jacked guide rod (3), mud discharge spiral rod (13) and jacking machine head (14) in sections at the front receiving well. After each resin concrete pipe section is installed, extend and connect the high-pressure water hose and power supply cable until all the pipe sections are pushed in. The glass fiber reinforced plastic jacking pipe (16) adopts an F-type socket joint. The lining material between the pipe sections is multi-layer plywood. The steel sleeve ring and the steel ring are made of 304 stainless steel. Two wedge-shaped rubber rings made of chloroprene rubber are set at the socket. S6: After the pipe segment is pushed in, the lifting and jacking equipment is removed, the hole where the steel casing (8) and the pipe segment are connected is waterproofed, the prefabricated inspection shaft is installed, the space between the outer side of the shaft and the steel casing (8) is backfilled with medium-coarse sand, the male ring of the steel casing (8) is cut and removed, and then the manhole cover is installed. The road structure layer is restored according to the original road design, and finally the enclosure is removed and traffic is restored.

Citation Information

Patent Citations

  • Small pipe diameter drainage pipeline pipe jacking machine tool and pipe jacking construction method

    CN106988751A

  • Rectangular pipe jacking construction method for outlet and inlet channel of subway station

    CN111075474A

  • Guiding type micro pipe jacking construction method

    CN113550758A

  • Underground pipe laying method by small diameter jacking method and underground boring machine

    JP1998231686A