Equipment selection method for CCHP system considering comprehensive demand response under time-of-use electricity price
By building the algorithm model and genetic algorithm optimization of the CCHP system, combined with time-sharing electricity price data, the equipment capacity and operating mode are optimized, and the problem of equipment selection and operation strategy of the three-cool and hot power supply system under time-sharing electricity price is solved, and the equipment selection and operation strategy of the three-cool and hot power supply system is achieved lower annual cost and more efficient energy utilization.
Patent Information
- Application Number
- CN202210456979.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-04-27
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2042-04-27
AI Technical Summary
In the environment of time-sharing electricity price, it is difficult for the existing technology to effectively optimize the equipment selection and operation strategies of the hot and hot power triple supply system, resulting in difficulty in achieving energy utilization efficiency and cost control.
By constructing an algorithm model of the CCHP system, combining genetic algorithms, the equipment capacity and operating mode are optimized, and the conventional electric-controlled heat operation mode, waste heat economic utilization mode, prime mover shutdown mode during valley power, and waste heat economic utilization mode during valley power. Time-sharing electricity price data is used to optimize the target of minimizing annual net costs.
It achieves lower annual costs and more efficient energy utilization in a time-sharing electricity price environment, improves the authenticity and response flexibility of optimization results, and is in line with future development trends.
Smart Images

Figure CN115018251B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of type selection optimization of CCHP systems, and in particular to an equipment type selection optimization method of a CCHP system considering comprehensive demand response and time-of-use electricity prices. Background Art
[0002] Combined cooling, heating and power (CCHP) system has the advantages of high primary energy utilization and low environmental pollution, and has become one of the hot topics in recent years. CCHP system can generate electricity and heat energy at the same time, and the energy utilization rate can reach 75%-80%, which is equivalent to consuming only 3 / 4 of the energy of traditional heat and power supply. Typical CCHP system includes (1) generator set, such as gas turbine, internal combustion engine, fuel cell, etc.; (2) heating equipment, such as waste heat boiler, gas boiler, etc.; (3) refrigeration equipment, such as lithium bromide absorption refrigerator, electric refrigerator, etc.
[0003] The complexity of the cooling, heating and power system has caused the environmental and economic performance of the system to be significantly affected by the selection of the prime mover, the capacity of other equipment in the system and the system operation strategy. When optimizing the selection of the cooling, heating and power trigeneration system, it is necessary to establish a physical simulation model for each device in the system to simulate the operating characteristics of each device under different operating conditions. The comprehensive demand response makes full use of the energy complementarity of the cooling, heating and power trigeneration system, allowing energy users to switch the types of energy they consume more flexibly, and the flexibility of the system is further improved. With the increase in the proportion of renewable energy in the power grid, time-of-use electricity prices have gradually emerged. Time-of-use electricity prices refer to dividing 24 hours a day into several time periods according to the system operation status, and charging electricity fees for each time period according to the average marginal cost of system operation. Time-of-use electricity prices have the function of stimulating and encouraging power users to shift peaks and fill valleys and optimize electricity consumption. Under the condition of time-of-use electricity prices, how to choose the operation strategy of the cooling, heating and power system and optimize the system equipment is a question worth thinking about. Summary of the invention
[0004] The purpose of the present invention is to overcome the defects in the prior art and provide a method for selecting equipment for a CCHP system taking into account comprehensive demand response under a time-of-use electricity price.
[0005] The specific technical solutions adopted by the present invention are as follows:
[0006] The present invention provides a method for selecting equipment for a CCHP system considering comprehensive demand response under a time-of-use electricity price, which is as follows:
[0007] S1: According to the actual thermal process, the algorithm model of each device in the CCHP system is constructed respectively; according to all the algorithm models, the energy supply model under the target demand response implementation strategy is constructed; the target demand response implementation strategy includes the conventional electricity-to-heat operation mode, the electricity-to-heat operation mode with economic utilization of waste heat, the electricity-to-heat operation mode with the prime mover shut down during the valley power period, and the electricity-to-heat operation mode with economic utilization of waste heat during the valley power period when the prime mover is shut down;
[0008] The CCHP system includes a prime mover, a waste heat boiler, an absorption refrigerator, a gas boiler, an electric refrigerator and an energy storage system; the electric energy generated by the prime mover is transmitted to an external power grid for supplying power to users through electric wires; the heat energy generated by the prime mover is transmitted to the waste heat boiler and the absorption refrigerator respectively through a first pipeline; the heat generated by the waste heat boiler is transmitted to a heating pipeline for supplying heat to users; the cold energy generated by the absorption refrigerator is transmitted to a cooling pipeline for supplying cooling to users; part of the heat energy generated by the gas boiler is transmitted to the absorption refrigerator through a second pipeline, and part is directly transmitted to the heating pipeline; an electric refrigerator is connected to the power grid, and the cold energy generated by the electric refrigerator is transmitted to the cooling pipeline through a third pipeline; the energy storage system includes an electric storage device connected to the electric wires, a cold storage device connected to the cooling pipeline, and a heat storage device connected to the heating pipeline;
[0009] S2: According to the actual energy load data, obtain the user's annual heat load demand data, annual electricity load demand data and annual cooling load demand data;
[0010] S3: According to the energy supply model under the target demand response implementation strategy, based on the annual heat load demand data, annual electricity load demand data, annual cooling load demand data and all-day time-of-use electricity price data, with the goal of minimizing the annual net cost C, the optimal capacity of all equipment in the CCHP system is obtained through a genetic algorithm, and the actual selection of each equipment is determined according to the optimal capacity.
[0011] Preferably, the prime mover is a gas turbine or an internal combustion engine.
[0012] Preferably, the heat energy generated by the prime mover includes flue gas and jacket water, the flue gas is transported to the waste heat boiler and the absorption chiller respectively, and the jacket water is transported to the absorption chiller.
[0013] Preferably, the conventional electric heating operation mode is as follows:
[0014] S11: judging whether the total power supply of the CHP system can meet the user's power load demand, the CHP system including a prime mover and a waste heat boiler; if the total power supply of the CHP system can meet the user's power load demand, the CHP system is used to supply power to the user, and then step S12 is performed; if the total power supply of the CHP system cannot meet the user's power load demand, the CHP system is first operated in a maximum power generation mode, and the power grid is used to supplement the power supply to the user, and then step S12 is performed;
[0015] S12: Determine whether the CHP system can meet the user's heat demand, wherein the user's heat demand includes the user's cooling load demand and heating load demand; if the total heating capacity of the CHP system can meet the user's heat demand, the CHP system is used to provide heat to the user, and the excess cooling and cooling capacity is stored; if the total heating capacity of the CHP system cannot meet the user's heat demand, not only the CHP system is used to provide heat to the user, but also a gas boiler and / or an electric refrigerator is used to provide heating and cooling to the user.
[0016] Preferably, the electric-heat-constant operation mode of the waste heat economic utilization is as follows:
[0017] S21: judging whether the total power supply of the CHP system can meet the user's power load demand, the CHP system includes a prime mover and a waste heat boiler. If the total power supply of the CHP system can meet the user's power load demand, the CHP system is used to supply power to the user, and then step S22 is performed; if the total power supply of the CHP system cannot meet the user's power load demand, the CHP system is first operated in a maximum power generation mode, and the power grid is used to supplement the power supply to the user, and then step S22 is performed;
[0018] S22: Calculate the priority cooling cost according to formula (5), and calculate the priority heating cost according to formula (6); if the priority cooling cost is greater than the priority heating cost, the heat recovered from the prime mover is first supplied to the absorption chiller, and then directly supplies heat to the user after the user's cooling demand is met, and then proceeds to step S23; if the priority cooling cost is less than the priority heating cost, the heat recovered from the prime mover is first supplied to the user directly for heating, and then supplies heat to the absorption chiller after the user's cooling demand is met, and then proceeds to step S23;
[0019] The calculation of the priority cooling cost is as follows:
[0020] C cold(t) =∑ i=1 (F gas.cold.i(t) ×P gas +F e.cold.i(t) ×P e(t) ) (5)
[0021] The calculation of the priority heating cost is as follows:
[0022] Cheat(t) =∑ i=1 (F gas.heat.i(t) ×P gas +F e.heat.i(t) ×P e(t) ) (6)
[0023] Where: P e(t) is the electricity price at that time, in RMB / kWh; P gas is the natural gas price, unit: RMB / kWh; when the operation mode of electric heating is adopted for waste heat economic utilization, C t Use the second half of the formula to calculate; where C cold(t) is the cost of priority cooling at time t, in RMB; C heat(t) is the cost of priority heating at time t, in RMB; F gas.cold·i(t) is the natural gas consumption of device i in the CCHP system at time t under the condition of priority cooling, in kWh; F e.cold·i(t) is the purchased power consumption of device i in the CCHP system at time t under the condition of priority cooling, in kWh; F gas.heat·i(t) is the natural gas consumption of equipment i in the CCHP system at time t under the condition of priority heating, in kWh; F e.hrat·i(t) is the purchased power consumption of device i in the CCHP system at time t under the condition of priority heating, in kWh;
[0024] S23: Determine whether the CHP system can meet the user's heat demand, wherein the user's heat demand includes the user's cooling load demand and heating load demand; if the total heating capacity of the CHP system can meet the user's heat demand, the CHP system is used to heat the user, and the excess cooling and cooling capacity is stored; if the total heating capacity of the CHP system cannot meet the user's heat demand, not only the CHP system is used to heat the user, but also a gas boiler and / or an electric refrigerator is used to heat and cool the user.
[0025] Preferably, during the valley power period, the prime mover is shut down and the electric-heat operation mode is as follows:
[0026] S31: Determine whether the electricity price is at a low point; if it is, determine whether the power storage equipment, heat storage and standby equipment, and cold storage equipment can meet user needs respectively. If they cannot meet user needs, supplement the power storage equipment, heat storage and standby equipment, and cold storage equipment with corresponding electricity, heat, and cold from the power grid, gas boiler, and electric refrigerator respectively; if it is not at a low point, proceed to step S32.
[0027] S32: judging whether the total power supply of the CHP system can meet the user's power load demand, the CHP system includes a prime mover and a waste heat boiler. If the total power supply of the CHP system can meet the user's power load demand, the CHP system is used to supply power to the user, and then step S33 is performed; if the total power supply of the CHP system cannot meet the user's power load demand, the CHP system is first operated in a maximum power generation mode, and the power grid is used to supplement the power supply to the user, and then step S33 is performed;
[0028] S33: Determine whether the CHP system can meet the user's heat demand, wherein the user's heat demand includes the user's cooling load demand and heating load demand; if the total heating capacity of the CHP system can meet the user's heat demand, the CHP system is used to provide heat to the user, and the excess cooling and cooling capacity is stored; if the total heating capacity of the CHP system cannot meet the user's heat demand, not only the CHP system is used to provide heat to the user, but also a gas boiler and / or an electric refrigerator is used to provide heating and cooling to the user.
[0029] As a preferred embodiment, the specific heat-to-electricity mode for economically utilizing waste heat during the valley power period when the prime mover is shut down is as follows:
[0030] S41: Determine whether the electricity price is at a low point; if it is at a low point, determine whether the power storage equipment, heat storage and standby equipment, and cold storage equipment can meet the user's needs respectively. If they cannot meet the user's needs, the power storage equipment, heat storage and standby equipment, and cold storage equipment are supplemented with corresponding electricity, heat, and cold from the power grid, gas boiler, and electric refrigerator respectively; if it is not at a low point, proceed to step S42;
[0031] S42: judging whether the total power supply of the CHP system can meet the user's power load demand, the CHP system includes a prime mover, a waste heat boiler and an energy storage system. If the total power supply of the CHP system can meet the user's power load demand, the CHP system is used to supply power to the user, and then step S43 is performed; if the total power supply of the CHP system cannot meet the user's power load demand, the CHP system is first operated in a maximum power generation mode, and the power grid is used to supplement the power supply to the user, and then step S43 is performed;
[0032] S43: Calculate the priority cooling cost according to formula (5), and calculate the priority heating cost according to formula (6); if the priority cooling cost is greater than the priority heating cost, the heat recovered from the prime mover is first supplied to the absorption chiller, and then directly supplies heat to the user after the user's cooling demand is met, and then proceeds to step S44; if the priority cooling cost is less than the priority heating cost, the heat recovered from the prime mover is first supplied to the user directly for heating, and then supplies heat to the absorption chiller after the user's cooling demand is met, and then proceeds to step S44;
[0033] The calculation of the priority cooling cost is as follows:
[0034] C cold(t) =∑ i=1 (F gas.cold.i(t) ×P gas +F e.cold.i(t) ×P e(t) ) (5)
[0035] The calculation of the priority heating cost is as follows:
[0036] C heat(t) =∑ i=1 (F gas.heat.i(t) ×P gas +F e.heat.i(t) ×P e(t) ) (6)
[0037] Where: P e(t) is the electricity price at that time, in RMB / kWh; P gas is the natural gas price, unit: RMB / kWh; when the operation mode of electric heating is adopted for waste heat economic utilization, C t Use the second half of the formula to calculate; where C cold(t) is the cost of priority cooling at time t, in RMB; C heat(t) is the cost of priority heating at time t, in RMB; F gas.cold·i(t) is the natural gas consumption of device i in the CCHP system at time t under the condition of priority cooling, in kWh; F e.cold·i(t) is the purchased power consumption of device i in the CCHP system at time t under the condition of priority cooling, in kWh; F gas.heat·i(t) is the natural gas consumption of equipment i in the CCHP system at time t under the condition of priority heating, in kWh; F e.hrat·i(t) is the purchased power consumption of device i in the CCHP system at time t under the condition of priority heating, in kWh;
[0038] S44: Determine whether the CHP system can meet the user's heat demand, wherein the user's heat demand includes the user's cooling load demand and heating load demand; if the total heating capacity of the CHP system can meet the user's heat demand, the CHP system is used to heat the user, and the excess cooling and cooling capacity is stored; if the total heating capacity of the CHP system cannot meet the user's heat demand, not only the CHP system is used to heat the user, but also a gas boiler and / or an electric refrigerator is used to heat and cool the user.
[0039] Preferably, the minimized annual net cost C is calculated by formulas (1) to (7), which are specifically as follows:
[0040] C=C in +C op -I gr (1)
[0041]
[0042] C op =∑ t=1 C t (3)
[0043] C t ={F gas(t) ×P gas +F e(t) ×P e(t)}Pmin{C cold ,C heat} (4)
[0044] C cold(t) =∑ i=1 (F gas.cold.i(t) ×P gas +F e.cold.i(t) ×P e(t) ) (5)
[0045] C heat(t) =∑ i=1 (F gas.heat.i(t) ×P gas +F e.heat.i(t) ×P e(t) ) (6)
[0046] I gr =F gr(t) ×P e' (7)
[0047] Where C is the annual cost, in RMB; C in is the converted investment cost of each device in CCHP system, unit: RMB; C op is the annual operating cost of the CCHP system, in RMB; I gr is the income of the surplus power of CCHP system, in RMB; q is the interest rate; n is the life of CCHP system, in years; C i is the unit price of equipment i, in RMB / kW. Equipment i includes prime mover, waste heat boiler, absorption chiller, gas boiler, electric chiller and energy storage system; R i is the rated power of equipment i, in kW; C t is the cost at time t, in RMB. When it does not consider the economic utilization of preheating, it is calculated using the first half of the formula: F e(t) is the power purchased by CCHP system at time t, in kWh; F gas(t) is the natural gas purchased by CCHP system at time t, in kWh; P e(t) is the electricity price at that time, in RMB / kWh; P gasis the natural gas price, unit: RMB / kWh; when the operation mode of electric heating is adopted for waste heat economic utilization, C t Use the second half of the formula to calculate; where C cold(t) is the cost of priority cooling at time t, in RMB; C heat(t) is the cost of priority heating at time t, in RMB; F gas.cold·i(t) is the natural gas consumption of device i in the CCHP system at time t under the condition of priority cooling, in kWh; F e.cold·i(t) is the purchased power consumption of device i in the CCHP system at time t under the condition of priority cooling, in kWh; F gas.heat·i(t) is the natural gas consumption of equipment i in the CCHP system at time t under the condition of priority heating, in kWh; F e.hrat·i(t) is the purchased power consumption of equipment i in the CCHP system at time t under the condition of priority heating, in kWh; F gr(t) is the amount of surplus power on-grid of CCHP system at time t, in kWh; P e‘ It is the on-grid electricity price, unit is RMB / kWh.
[0048] Preferably, the optimization factors of the genetic algorithm include prime mover capacity, waste heat boiler capacity, absorption chiller capacity, gas boiler capacity, heat pump capacity, cold storage equipment capacity, electricity storage equipment capacity, heat storage equipment capacity and comprehensive demand response implementation strategy.
[0049] Compared with the prior art, the present invention has the following beneficial effects:
[0050] The present invention constructs an equipment selection optimization method for a CCHP system based on comprehensive demand response under time-of-use electricity prices, uses a new operating mode to deal with time-of-use electricity prices, and substitutes it into the model for optimization and solution, and determines the comprehensive demand response strategy and equipment selection according to the optimization results. Compared with the time-of-use electricity price response strategy in the prior art, the present invention incorporates the time-of-use electricity price into the CCHP optimization process, and the operating conditions are more in line with the actual situation and future development trends, thereby improving the authenticity of the optimization results; in addition, the present invention proposes a new comprehensive demand response strategy based on the economic utilization of waste heat to deal with the optimization of time-of-use electricity prices, which responds to time-of-use electricity prices more effectively, and thereby obtains an optimization result with a lower annual cost that is closer to the actual situation. BRIEF DESCRIPTION OF THE DRAWINGS
[0051] Figure 1 It is the structural diagram of CCHP system;
[0052] Figure 2 The operation flow chart of the CCHP system in the conventional electric heating mode (CCHP-FEL mode);
[0053] Figure 3 The operation flow chart of CCHP system in the electricity-to-heat mode (WHU-FEL mode) with economical utilization of waste heat;
[0054] Figure 4 It is the operation flow chart of CCHP system in the power-to-heat operation mode (PSV-FEL mode) with the prime mover shut down during valley power period;
[0055] Figure 5 This is the operation flow chart of the CCHP system in the power-to-heat mode (PSV-WHU) with economical utilization of waste heat during the off-peak period when the prime mover is shut down;
[0056] Figure 6 The selection optimization results of the CCHP system using the optimization method of the present invention (i.e., using a new comprehensive response strategy that responds to time-of-use electricity prices);
[0057] Figure 7 The economic index results of the CCHP system are respectively for the conventional electricity-to-heat operation mode and the CCHP system after the variables are optimized by the optimization method of the present invention. DETAILED DESCRIPTION
[0058] The present invention is further described and illustrated below in conjunction with the accompanying drawings and specific embodiments. The technical features of each embodiment of the present invention can be combined accordingly without conflicting with each other.
[0059] like Figure 1 As shown, a CCHP system based on a prime mover provided by the present invention mainly includes the following equipment: a prime mover (PM), a waste heat boiler (WHB), an absorption chiller (AC), a gas boiler (GB), an electric chiller (EC) and an energy storage system (SS). The connection mode and structure of each device are described in detail below.
[0060] The prime mover can be a gas turbine (GT) or an internal combustion engine (ICE), and the prime mover generates heat or electricity by consuming natural gas. The electricity generated by the prime mover is transmitted through wires to an external power grid for powering users, providing electrical load for the system. The system can also meet the system's electricity demand by purchasing electricity from the power grid, and when the system's power production capacity is in surplus, the remaining electricity can be incorporated into the power grid. The heat energy generated by the prime mover is transmitted to the waste heat boiler and the absorption chiller through the first pipeline. Taking the internal combustion engine as an example, the heat energy generated by the internal combustion engine includes flue gas and jacket water. Among them, since the heat energy of the flue gas is relatively high, it is respectively transmitted to the waste heat boiler for heating and the absorption chiller for cooling; since the heat energy of the jacket water is relatively low, it is only transmitted to the absorption chiller for cooling.
[0061] The waste heat boiler generates heat by utilizing hot flue gas to provide heat load for the system, and the generated heat is transported to the heating pipeline for heating users. The absorption chiller generates cold energy by utilizing heat energy such as hot flue gas or jacket water to provide cold load, and the generated cold energy is transported to the cooling pipeline for cooling users. Therefore, in the CCHP mode of the present invention, since "cold" is driven by the prime mover, gas boiler or electric chiller to provide heat energy to drive the absorption chiller, "cold" also refers to "heat" in a broad sense.
[0062] The gas boiler consumes natural gas to meet the heat demand of the system and provides the heat energy required for the cooling load of the absorption chiller. That is to say, part of the heat energy generated by the gas boiler is transported to the absorption chiller through the second pipeline, and the other part is directly transported to the heating pipeline. The electric chiller is connected to the power grid, and the cold energy generated by the electric chiller is transported to the cooling pipeline through the third pipeline, providing cooling load for the system and meeting part of the heat demand of the system.
[0063] The energy storage system (SS) includes electric storage equipment, cold storage equipment and heat storage equipment, among which the electric storage equipment is connected to the power grid's wires and can store electric energy; the cold storage equipment is connected to the cooling pipeline and is used to store cold energy; the heat storage equipment is connected to the heating pipeline and is used to store heat energy.
[0064] In actual application, the system can also add solar power generation devices and wind power generation devices connected to the power grid as needed to provide power load for the system and meet part of the system's power demand, thereby reducing the amount of electricity purchased by the system from the power grid and the cost of purchasing electricity.
[0065] The present invention uses the CCHP system to provide a comprehensive response strategy that uses a new response time-of-use electricity price. This method is not like the conventional prior art of determining heat by electricity, but adopts a more effective operation mode to select equipment and obtain a more economical optimization result:
[0066] S1: Based on the above CCHP system, the algorithm model of each device in the CCHP system is constructed according to the actual thermal process. That is to say, the algorithm model of the prime mover, waste heat boiler, absorption chiller, gas boiler and electric chiller is first constructed. The algorithm model of each device mainly includes:
[0067] 1. The prime mover is described by taking an internal combustion engine as an example, as follows:
[0068] The natural gas consumption of internal combustion engines is expressed as:
[0069]
[0070] Where G is the amount of natural gas consumed by the internal combustion engine, unit: m 3 ; P is the power generation of the internal combustion engine, unit kW; η eis the electrical efficiency of the internal combustion engine; CV is the calorific value of natural gas, in kWh / m 3 .
[0071] 2. As the main heat generating equipment in the CCHP system, the heat generating model of the waste heat boiler is:
[0072] H out,boiler =H in,boiler ×η boiler (12)
[0073] In the formula, H out,boiler is the heat output of the waste heat boiler, in kW; H in,boiler is the heat entering the waste heat boiler, unit kW; η boiler is the thermal efficiency of the waste heat boiler.
[0074] 3. The absorption chiller is the main cooling equipment in the trigeneration system. The flue gas with higher temperature enters the chiller for double-effect refrigeration cycle, and the jacket water with lower temperature enters the chiller for single-effect refrigeration cycle. The mathematical model of the chiller can be expressed as follows:
[0075] C out,abc =Q ex ×COP double +Q jw ×COP single (13)
[0076] In the formula, C out,abc is the cooling capacity of the refrigerator, in kW; Q ex is the flue gas heat entering the refrigerator, in kW; COP double is the double-effect refrigeration efficiency of the refrigerator; Q jw COP is the heat of the jacket water entering the refrigerator, in kW; single is the single-effect refrigeration efficiency of the refrigerator.
[0077] 4. Gas boilers are used as supplementary heating equipment in the trigeneration system to supplement when the waste heat boiler is insufficient in heat production and heat storage. The model is as follows:
[0078] H out,gas_boiler =H in,gas_boiler ×η gas_boiler (15)
[0079] In the formula, H out,gas_boiler is the heat output of the gas boiler, in kW; H in,gas-boiler is the heat entering the gas boiler, in kW; η gas_boiler is the thermal efficiency of gas boiler.
[0080] 5. The electric refrigerator is used as a supplementary cooling device for the system. It provides cooling when the refrigerator and cold storage are insufficient. The model is as follows:
[0081] C hp =E in,hp ×COP hp (16)
[0082] In the formula, C hp E is the cooling capacity of the electric refrigerator, in kW; in,hp The power entering the electric refrigerator, in kW; COP hp is the cooling efficiency of the electric refrigerator.
[0083] 6. The Campus Metabolism website platform of Arizona State University obtained the hourly load data of 16 buildings in the Tempo campus that have electricity demand, heating demand and cooling demand throughout the year; the electricity prices are all from the "Electricity Price List for Commercial and Industrial Users of State Grid Zhejiang Electric Power Co., Ltd.
[0084] According to the algorithm models of all equipment, the energy supply model under the target demand response implementation strategy is constructed. The target demand response implementation strategy includes the conventional power-to-heat operation mode (CCHP-FEL), the power-to-heat operation mode with economic utilization of waste heat (WHU-FEL), the power-to-heat operation mode with the prime mover shut down during valley power periods (PSV-FEL), and the power-to-heat operation mode with economic utilization of waste heat during valley power periods (PSV-WHU).
[0085] like Figure 2 As shown in the figure, the conventional electricity-based heat operation mode (CCHP-FEL) refers to the mode in which the CCHP system operates by first meeting the user's electricity load demand and then meeting the user's heat demand. The user's heat demand includes the user's cooling load demand and heating load demand. The details are as follows:
[0086] S11: judging whether the total power supply of the CHP system can meet the user's power load demand, the CHP system including a prime mover and a waste heat boiler; if the total power supply of the CHP system can meet the user's power load demand, the CHP system is used to supply power to the user, and then step S12 is performed; if the total power supply of the CHP system cannot meet the user's power load demand, the CHP system is first operated in a maximum power generation mode, and the power grid is used to supplement the power supply to the user, and then step S12 is performed;
[0087] S12: Determine whether the CHP system can meet the user's heat demand, wherein the user's heat demand includes the user's cooling load demand and heating load demand; if the total heating capacity of the CHP system can meet the user's heat demand, the CHP system is used to provide heat to the user, and the excess cooling and cooling capacity is stored; if the total heating capacity of the CHP system cannot meet the user's heat demand, not only the CHP system is used to provide heat to the user, but also a gas boiler and / or an electric refrigerator is used to provide heating and cooling to the user.
[0088] like Figure 3 As shown in the figure, the waste heat economic utilization electricity-to-heat operation mode (WHU-FEL) is that the CCHP system compares the cooling and heating costs of users first, and then prioritizes the use of waste heat to meet higher cost needs. The details are as follows:
[0089] S21: judging whether the total power supply of the CHP system can meet the user's power load demand, the CHP system includes a prime mover and a waste heat boiler. If the total power supply of the CHP system can meet the user's power load demand, the CHP system is used to supply power to the user, and then step S22 is performed; if the total power supply of the CHP system cannot meet the user's power load demand, the CHP system is first operated in a maximum power generation mode, and the power grid is used to supplement the power supply to the user, and then step S22 is performed;
[0090] S22: Calculate the priority cooling cost according to formula (5), and calculate the priority heating cost according to formula (6); if the priority cooling cost is greater than the priority heating cost, the heat recovered from the prime mover is first supplied to the absorption chiller, and then directly supplies heat to the user after the user's cooling demand is met, and then proceeds to step S23; if the priority cooling cost is less than the priority heating cost, the heat recovered from the prime mover is first supplied to the user directly for heating, and then supplies heat to the absorption chiller after the user's cooling demand is met, and then proceeds to step S23;
[0091] The calculation of the priority cooling cost is as follows:
[0092] C cold(t) =∑ i=1 (F gas.cold.i(t) ×P gas +F e.cold.i(t) ×P e(t) ) (5)
[0093] The calculation of the priority heating cost is as follows:
[0094] C heat(t) =∑ i=1 (F gas.heat.i(t) ×P gas +F e.heat.i(t) ×P e(t) ) (6)
[0095] Where: P e(t) is the electricity price at that time, in RMB / kWh; P gas is the natural gas price, unit: RMB / kWh; when the operation mode of electric heating is adopted for waste heat economic utilization, C t Use the second half of the formula to calculate; where C cold(t) is the cost of priority cooling at time t, in RMB; C heat(t) is the cost of priority heating at time t, in RMB; Fgas.cold·i(t) is the natural gas consumption of device i in the CCHP system at time t under the condition of priority cooling, in kWh; F e.cold·i(t) is the purchased power consumption of device i in the CCHP system at time t under the condition of priority cooling, in kWh; F gas.heat·i(t) is the natural gas consumption of equipment i in the CCHP system at time t under the condition of priority heating, in kWh; F e.hrat·i(t) is the purchased power consumption of device i in the CCHP system at time t under the condition of priority heating, in kWh;
[0096] S23: Determine whether the CHP system can meet the user's heat demand, wherein the user's heat demand includes the user's cooling load demand and heating load demand; if the total heating capacity of the CHP system can meet the user's heat demand, the CHP system is used to heat the user, and the excess cooling and cooling capacity is stored; if the total heating capacity of the CHP system cannot meet the user's heat demand, not only the CHP system is used to heat the user, but also a gas boiler and / or an electric refrigerator is used to heat and cool the user.
[0097] like Figure 4 As shown in the figure, the PSV-FEL mode is a CCHP system that shuts down the prime mover during the valley period and uses energy storage and power grid purchases. The rest of the time is still in the power-to-heat mode. The details are as follows:
[0098] S31: Determine whether the electricity price is at a low point; if it is, determine whether the power storage equipment, heat storage and standby equipment, and cold storage equipment can meet user needs respectively. If they cannot meet user needs, supplement the power storage equipment, heat storage and standby equipment, and cold storage equipment with corresponding electricity, heat, and cold from the power grid, gas boiler, and electric refrigerator respectively; if it is not at a low point, proceed to step S32.
[0099] S32: judging whether the total power supply of the CHP system can meet the user's power load demand, the CHP system includes a prime mover and a waste heat boiler. If the total power supply of the CHP system can meet the user's power load demand, the CHP system is used to supply power to the user, and then step S33 is performed; if the total power supply of the CHP system cannot meet the user's power load demand, the CHP system is first operated in a maximum power generation mode, and the power grid is used to supplement the power supply to the user, and then step S33 is performed;
[0100] S33: Determine whether the CHP system can meet the user's heat demand, wherein the user's heat demand includes the user's cooling load demand and heating load demand; if the total heating capacity of the CHP system can meet the user's heat demand, the CHP system is used to provide heat to the user, and the excess cooling and cooling capacity is stored; if the total heating capacity of the CHP system cannot meet the user's heat demand, not only the CHP system is used to provide heat to the user, but also a gas boiler and / or an electric refrigerator is used to provide heating and cooling to the user.
[0101] like Figure 5 As shown in the figure, the power-to-heat mode (PSV-WHU) for economical utilization of waste heat during valley power periods and the prime mover is shut down during the rest of the time is the CCHP system that shuts down the prime mover during the valley power period, mainly using energy storage and purchasing electricity from the grid; the rest of the time is still the power-to-heat mode. The details are as follows:
[0102] S41: Determine whether the electricity price is at a low point; if it is at a low point, determine whether the power storage equipment, heat storage and standby equipment, and cold storage equipment can meet the user's needs respectively. If they cannot meet the user's needs, the power storage equipment, heat storage and standby equipment, and cold storage equipment are supplemented with corresponding electricity, heat, and cold from the power grid, gas boiler, and electric refrigerator respectively; if it is not at a low point, proceed to step S42;
[0103] S42: judging whether the total power supply of the CHP system can meet the user's power load demand, the CHP system includes a prime mover and a waste heat boiler. If the total power supply of the CHP system can meet the user's power load demand, the CHP system is used to supply power to the user, and then step S43 is performed; if the total power supply of the CHP system cannot meet the user's power load demand, the CHP system is first operated in a maximum power generation mode, and the power grid is used to supplement the power supply to the user, and then step S43 is performed;
[0104] S43: Calculate the priority cooling cost according to formula (5), and calculate the priority heating cost according to formula (6); if the priority cooling cost is greater than the priority heating cost, the heat recovered from the prime mover is first supplied to the absorption chiller, and then directly supplies heat to the user after the user's cooling demand is met, and then proceeds to step S44; if the priority cooling cost is less than the priority heating cost, the heat recovered from the prime mover is first supplied to the user directly for heating, and then supplies heat to the absorption chiller after the user's cooling demand is met, and then proceeds to step S44;
[0105] The calculation of the priority cooling cost is as follows:
[0106] C cold(t) =∑ i=1 (F gas.cold.i(t) ×P gas +F e.cold.i(t) ×P e ) (5)
[0107] The calculation of the priority heating cost is as follows:
[0108] C heat(t) =∑ i=1 (F gas.heat.i(t) ×P gas +F e.heat.i(t) ×P e ) (6)
[0109] Where: P e(t) is the electricity price at that time, in RMB / kWh; P gas is the natural gas price, unit: RMB / kWh; when the operation mode of electric heating is adopted for waste heat economic utilization, C t Use the second half of the formula to calculate; where C cold(t) is the cost of priority cooling at time t, in RMB; C heat(t( is the cost of priority heating at time t, in RMB; F gas.cold·i(t) is the natural gas consumption of device i in the CCHP system at time t under the condition of priority cooling, in kWh; F e.cold·i(t) is the purchased power consumption of device i in the CCHP system at time t under the condition of priority cooling, in kWh; F gas.heat·i(t) is the natural gas consumption of equipment i in the CCHP system at time t under the condition of priority heating, in kWh; F e.hrat·i(t) is the purchased power consumption of device i in the CCHP system at time t under the condition of priority heating, in kWh;
[0110] S44: Determine whether the CHP system can meet the user's heat demand, wherein the user's heat demand includes the user's cooling load demand and heating load demand; if the total heating capacity of the CHP system can meet the user's heat demand, the CHP system is used to heat the user, and the excess cooling and cooling capacity is stored; if the total heating capacity of the CHP system cannot meet the user's heat demand, not only the CHP system is used to heat the user, but also a gas boiler and / or an electric refrigerator is used to heat and cool the user.
[0111] S3: According to the energy supply model under the target demand response implementation strategy, based on the annual heat load demand data, annual electricity load demand data, annual cooling load demand data and all-day time-of-use electricity price data, with the goal of minimizing the annual net cost C, the optimal capacity of all equipment in the CCHP system is obtained through a genetic algorithm, and the actual selection of each equipment is determined according to the optimal capacity;
[0112] Among them, the minimized annual net cost C is calculated by formulas (1) to (7), and formulas (1) to (7) are as follows:
[0113] C=C in +C op -I gr (1)
[0114]
[0115] C op =∑ t=1 C t (3)
[0116] C t ={F gas(t) ×P gas +F e(t) ×P e(t)}Pmin{C cold ,C heat} (4)
[0117] C cold(t) =∑ i=1 (F gas.cold.i(t) ×P gas +F e.cold.i(t) ×P e(t) ) (5)
[0118] C heat(t) =∑ i=1 (F gas.heat.i(t) ×P gas +F e.heat.i(t) ×P e(t) ) (6)
[0119] I gr =F gr(t) ×P e' (7)
[0120] Where, C is the annual cost, unit yuan; C in is the converted investment cost of each device in CCHP system, unit: RMB; C op is the annual operating cost of the CCHP system, in RMB; I gr is the income of the surplus power of CCHP system, in RMB; q is the interest rate; n is the life of CCHP system, in years; C i is the unit price of equipment i, in RMB / kW. Equipment i includes prime mover, waste heat boiler, absorption chiller, gas boiler, electric chiller and energy storage system; R i is the rated power of equipment i, in kW; C t is the cost at time t, in RMB. When it does not consider the economic utilization of preheating, it is calculated using the first half of the formula: F e(t) is the power purchased by CCHP system at time t, in kWh; F gas(t) is the natural gas purchased by CCHP system at time t, in kWh; P e(t) is the electricity price at that time, in RMB / kWh; P gasis the natural gas price, unit: RMB / kWh; when the operation mode of electric heating is adopted for waste heat economic utilization, C t Use the second half of the formula to calculate; where C cold(t) is the cost of priority cooling at time t, in RMB; C heat(t) is the cost of priority heating at time t, in RMB; F gas.cold·i(t) is the natural gas consumption of device i in the CCHP system at time t under the condition of priority cooling, in kWh; F e.cold·i(t) is the purchased power consumption of device i in the CCHP system at time t under the condition of priority cooling, in kWh; F gas.heat·i(t) is the natural gas consumption of equipment i in the CCHP system at time t under the condition of priority heating, in kWh; F e.hrat·i(t) is the purchased power consumption of equipment i in the CCHP system at time t under the condition of priority heating, in kWh; F gr(t) is the amount of surplus power on-grid of CCHP system at time t, in kWh; P e‘ It is the on-grid electricity price, unit is RMB / kWh.
[0121] If the system operates in the electric heating mode, the CHP system is first enabled to supply the system electricity demand. If the electricity demand to be met is less than the minimum output limit of the CCHP system, it will be supplied by the power grid; if the electricity demand to be met is not less than the output limit, it will operate according to the normal process. During the cooling season, the prime mover operates to meet the user's electricity demand. If the maximum power output of the prime mover is not enough to meet the user's electricity demand, it will be supplemented by the power grid; if the cooling capacity of the refrigerator is insufficient at this time, it will be supplemented by electric refrigerators and absorption refrigerators. During the heating season, the prime mover operates to meet the user's electricity demand, and the power grid will supplement it. If the heat output of the waste heat boiler is insufficient at this time, it will be supplemented by the gas boiler. The system heat load is met by the prime mover, waste heat boiler, gas boiler, absorption refrigerator and electric refrigerator. The total natural gas consumption of the system is the natural gas consumption of the prime mover and the gas boiler. The economic index C of the trigeneration of heat, cooling and electricity system under the CCHP-FEL mode is obtained. CCHP-FEL .
[0122] If the system operates in an electricity-to-heat mode with economical utilization of waste heat, the CHP system is first enabled to supply the system's electricity demand. If the electricity demand to be met is less than the minimum output limit of the CHP system, it will be supplied by the power grid; if the electricity demand to be met is not less than the output limit, it will operate according to the normal process. When supplying cooling and heating, the prime mover operates to meet the user's electricity demand, and then compares the cost of cooling and heating, and prioritizes the use of waste heat to meet the higher-cost cooling or heating demand. The remaining cooling and heating demand is provided by electric refrigerators and gas boilers. The system's thermal load is met by the prime mover, waste heat boiler, gas boiler, absorption refrigerator, electric refrigerator and energy storage system. The total natural gas consumption of the system is the natural gas consumption of the prime mover and the gas boiler, and the economic index C of the trigeneration of heat, cooling and electricity system under the WHU-FEL mode is obtained. WHU-FEL .
[0123] If the system operates in the electricity-to-heat mode with the prime mover shut down during valley power periods, first determine whether the electricity price is at a valley. If it is at a valley, determine whether the electricity storage, heat storage, and cold storage can meet the corresponding needs respectively. If they are insufficient, it is necessary to supplement the corresponding electricity, heat, and cold from the power grid, gas boiler, and electric refrigerator respectively. If the electricity price is not at a valley, then continue to operate in the electricity-to-heat mode. The system heat load is met by the prime mover, waste heat boiler, gas boiler, absorption refrigerator, electric refrigerator, and energy storage system. The total natural gas consumption of the system is the natural gas consumption of the prime mover and the gas boiler. The economic index C of the trigeneration of heat, cooling, and electricity system under the WHU-FEL mode is obtained. WHU-FEL .
[0124] If the system operates in the electricity-to-heat mode with the prime mover shut down during valley power periods, first determine whether the electricity price is at a valley. If it is at a valley, determine whether the electricity storage, heat storage, and cold storage can meet the corresponding needs respectively. If they are insufficient, it is necessary to supplement the corresponding electricity, heat, and cold from the power grid, gas boiler, and electric refrigerator respectively. If the electricity price is not at a valley, then continue to operate in the electricity-to-heat mode. The system heat load is met by the prime mover, waste heat boiler, gas boiler, absorption refrigerator, electric refrigerator, and energy storage system. The total natural gas consumption of the system is the natural gas consumption of the prime mover and the gas boiler. The economic index C of the trigeneration of heat, cooling, and electricity system under the WHU-FEL mode is obtained. PSV-FEL .
[0125] If the system operates in a mode of electricity-to-heat ratio with the prime mover shut down during off-peak hours and waste heat economically utilized during the rest of the time, first determine whether the electricity price is at a low point. If it is at a low electricity price, the system operates in a mode of electricity-to-heat ratio with the prime mover shut down during off-peak hours. If the electricity price is not at a low point, then the system operates in a mode of electricity-to-heat ratio with waste heat economically utilized. The system heat load is met by the prime mover, waste heat boiler, gas boiler, absorption chiller, electric chiller and energy storage system. The total natural gas consumption of the system is the natural gas consumption of the prime mover and gas boiler, and the economic index C of the trigeneration of heat, cooling and electricity system under the WHU-FEL mode is obtained. PSV-WHU .
[0126] In this embodiment, the above method is used to incorporate the operation mode into the genetic algorithm chromosome genome, and the equipment capacity and operation mode of the CCHP system are optimized and selected, so that the operation mode optimization result and equipment capacity corresponding to the lowest annual cost of the system can be obtained. Figure 6 As shown, the algorithm optimization result is that when the fixed CCHP system adopts the electricity-to-heat operation mode in which the prime mover is shut down during valley power periods and the waste heat is economically utilized in the rest of the time, the optimal equipment combination for the system economy is optimized as follows: gas turbine 12173kW, waste heat boiler 12876kW, absorption chiller 9065W, gas boiler 6074.9kW, electric chiller 60148.4W, heat storage 296kW, cold storage 111kW, and electricity storage 0kW.
[0127] In order to verify the selection optimization effect of the method of the present invention, the following selection optimization test was also carried out using the CCHP system of the present invention:
[0128] Experiment 1): Fix the chromosome factor-operating mode in the algorithm to the electric-heat operation mode, and optimize the equipment capacity of the CCHP system, such as Figure 2 That is to say, this experiment does not consider the choice of operation mode when optimizing the model, but optimizes the system under the premise of determining the electric-heat operation mode in advance. Figure 6 It can be seen that when the fixed CCHP system adopts the electricity-based heat mode, the optimal equipment combination for the best system economy is gas turbine 11877kW, waste heat boiler 12580kW, absorption chiller 8658kW, gas boiler 2767.5kW, electric chiller 51881.8kW, heat storage 185kW, cold storage 370kW, and electricity storage 37kW.
[0129] Experiment 2): The chromosome factor-operating mode in the algorithm is fixed to the electricity-to-heat operation mode for economic utilization of waste heat, and the equipment capacity of the CCHP system is optimized, such as Figure 3That is to say, this experiment does not consider the choice of operation mode when optimizing the selection, but optimizes the system on the premise of determining the operation mode of electricity-to-heat with waste heat economic utilization in advance. Figure 6 It can be seen that when the fixed CCHP system adopts the electricity-to-heat operation mode with economical utilization of waste heat, the optimal equipment combination for the best system economy is gas turbine 11914kW, waste heat boiler 12654kW, absorption chiller 8880W, gas boiler 4043.4kW, electric chiller 53275.3kW, heat storage 259kW, cold storage 74kW, and electricity storage 0kW.
[0130] Experiment 3): The chromosome factor-operating mode in the algorithm is fixed to the power-heat operation mode during valley power period when the prime mover is shut down, and the equipment capacity of the CCHP system is optimized, such as Figure 4 That is to say, this experiment does not consider the choice of operation mode during the selection and optimization, but optimizes the system by determining in advance that the prime mover is shut down during the off-peak period and the system is operated in the electric-heat mode. Figure 6 It can be seen that when the fixed CCHP system adopts the operation mode of stopping the prime mover during off-peak hours and using electricity to determine the heat, the optimal equipment combination for the best system economy is gas turbine 12136kW, waste heat boiler 12802kW, absorption chiller 8769W, gas boiler 6074.9kW, electric chiller 60148.4W, heat storage 222kW, cold storage 407kW, and electricity storage 37kW.
[0131] Experiment 4): The chromosome factor-operating mode in the algorithm is fixed to the power-to-heat operation mode in which the prime mover is shut down during the off-peak period and the waste heat is economically utilized during the rest of the time, and the equipment capacity of the CCHP system is optimized, such as Figure 5 That is to say, this experiment does not consider the choice of operation mode during the selection and optimization, but optimizes the system by determining in advance the operation mode of power-to-heat, which uses the waste heat economically during the off-peak period when the prime mover is shut down. Figure 6 It can be seen that when the fixed CCHP system adopts the electricity-to-heat operation mode in which the prime mover is shut down during off-peak hours and the waste heat is economically utilized during the rest of the time, the optimal equipment combination for the system economy is gas turbine 12173kW, waste heat boiler 12876kW, absorption chiller 9065W, gas boiler 6074.9kW, electric chiller 60148.4W, heat storage 296kW, cold storage 111kW, and electricity storage 0kW.
[0132] Figure 7The annual net cost data obtained in experiments 1) to 4) and in the embodiments of the present invention are shown. It can be seen from the figure that when the system supplies energy in the electric-heat operation mode by economically utilizing the waste heat during the off-peak period when the prime mover is shut down, the system cost is minimized, which is consistent with the results obtained by the method of the present invention. Therefore, the selection optimization method of the present invention effectively selects the operation mode of the CCHP system, optimizes the equipment capacity, and effectively selects the energy supply mode that maximizes the economic benefits of the system.
[0133] The above-described embodiment is only a preferred solution of the present invention, but it is not intended to limit the present invention. A person skilled in the relevant technical field may make various changes and modifications without departing from the spirit and scope of the present invention. Therefore, any technical solution obtained by equivalent replacement or equivalent transformation falls within the protection scope of the present invention.
Claims
1. A method for selecting equipment for a CCHP system considering comprehensive demand response under time-of-use electricity prices, characterized in that: The details are as follows: S1: According to the actual thermal process, the algorithm model of each device in the CCHP system is constructed respectively; according to all the algorithm models, the energy supply model under the target demand response implementation strategy is constructed; the target demand response implementation strategy includes the conventional electricity-to-heat operation mode, the electricity-to-heat operation mode with economic utilization of waste heat, the electricity-to-heat operation mode with the prime mover shut down during the valley power period, and the electricity-to-heat operation mode with economic utilization of waste heat during the valley power period when the prime mover is shut down; The CCHP system includes a prime mover, a waste heat boiler, an absorption refrigerator, a gas boiler, an electric refrigerator and an energy storage system; the electric energy generated by the prime mover is transmitted to an external power grid for supplying power to users through electric wires; the heat energy generated by the prime mover is transmitted to the waste heat boiler and the absorption refrigerator respectively through a first pipeline; the heat generated by the waste heat boiler is transmitted to a heating pipeline for supplying heat to users; The cooling energy generated by the absorption refrigerator is delivered to the cooling pipeline for providing cooling to users; the heat energy generated by the gas boiler is partially delivered to the absorption refrigerator through the second pipeline, and partially delivered directly to the heating pipeline; an electric refrigerator is connected to the power grid, and the cooling energy generated by the electric refrigerator is delivered to the cooling pipeline through the third pipeline; the energy storage system includes an electric storage device connected to the electric wire, a cold storage device connected to the cooling pipeline, and a heat storage device connected to the heating pipeline; S2: According to the actual energy load data, obtain the user's annual heat load demand data, annual electricity load demand data and annual cooling load demand data; S3: According to the energy supply model under the target demand response implementation strategy, based on the annual heat load demand data, annual electricity load demand data, annual cooling load demand data and all-day time-of-use electricity price data, with the goal of minimizing the annual net cost C, the optimal capacity of all equipment in the CCHP system is obtained through a genetic algorithm, and the actual selection of each equipment is determined according to the optimal capacity; The specific electricity-to-heat mode for economically utilizing waste heat during the off-peak period when the prime mover is shut down is as follows: S41: Determine whether the electricity price is at a low point; if it is at a low point, determine whether the power storage equipment, heat storage and standby equipment, and cold storage equipment can meet the user's needs respectively. If they cannot meet the user's needs, the power storage equipment, heat storage and standby equipment, and cold storage equipment are supplemented with corresponding electricity, heat, and cold from the power grid, gas boiler, and electric refrigerator respectively; if it is not at a low point, proceed to step S42; S42: judging whether the total power supply of the CHP system can meet the user's power load demand, the CHP system including a prime mover and a waste heat boiler, if the total power supply of the CHP system can meet the user's power load demand, the CHP system is used to supply power to the user, and then step S43 is performed; If the total power supply of the CHP system cannot meet the user's power load demand, the CHP system is first operated in the maximum power generation mode to supply power, and the power grid supplements the power supply to the user, and then step S43 is performed; S43: Calculate the priority cooling cost according to formula (5), and calculate the priority heating cost according to formula (6); if the priority cooling cost is greater than the priority heating cost, the heat recovered from the prime mover is first supplied to the absorption chiller, and then directly supplies heat to the user after the user's cooling demand is met, and then proceeds to step S44; if the priority cooling cost is less than the priority heating cost, the heat recovered from the prime mover is first supplied to the user directly for heating, and then supplies heat to the absorption chiller after the user's cooling demand is met, and then proceeds to step S44; The calculation of the priority cooling cost is as follows: C cold(t) =Σ i=1 (F gas.cold.i(t) ×P gas +F e.cold.i(t) ×P e(t) ) (5) The calculation of the priority heating cost is as follows: C heat(t) =Σ i=1 (F gas.heat.i(t) ×P gas +F e.heat.i(t) ×P e(t) ) (6) Where: P e(t) is the electricity price at that time, in RMB / kWh; P gas is the natural gas price, unit: RMB / kWh; when the operation mode of electric heating is adopted for waste heat economic utilization, C t Use the second half of the formula to calculate; where C cold(t) is the cost of priority cooling at time t, in RMB; C heat(t) is the cost of priority heating at time t, in RMB; F gas.cold.i(t) is the natural gas consumption of device i in the CCHP system at time t under the condition of priority cooling, in kWh; F e.cold.i(t) is the purchased power consumption of equipment i in the CCHP system at time t under the condition of priority cooling, in kWh; F gas.heat.i(t) is the natural gas consumption of equipment i in the CCHP system at time t under the condition of priority heating, in kWh; F e.hrat.i(t) is the purchased power consumption of device i in the CCHP system at time t under the condition of priority heating, in kWh; S44: Determine whether the CHP system can meet the user's heat demand, wherein the user's heat demand includes the user's cooling load demand and heating load demand; if the total heating capacity of the CHP system can meet the user's heat demand, the CHP system is used to heat the user, and the excess cooling and cooling capacity is stored; if the total heating capacity of the CHP system cannot meet the user's heat demand, not only the CHP system is used to heat the user, but also a gas boiler and / or an electric refrigerator is used to heat and cool the user.
2. The equipment selection method of the CCHP system according to claim 1, characterized in that: The prime mover is a gas turbine or an internal combustion engine.
3. The equipment selection method of the CCHP system according to claim 1, characterized in that: The heat energy generated by the prime mover includes flue gas and jacket water. The flue gas is transported to the waste heat boiler and the absorption refrigerator respectively, and the jacket water is transported to the absorption refrigerator.
4. The equipment selection method of the CCHP system according to claim 1, characterized in that: The conventional electric heating operation mode is as follows: S11: judging whether the total power supply of the CHP system can meet the user's power load demand, the CHP system including a prime mover and a waste heat boiler; if the total power supply of the CHP system can meet the user's power load demand, the CHP system is used to supply power to the user, and then step S12 is performed; if the total power supply of the CHP system cannot meet the user's power load demand, the CHP system is first operated in a maximum power generation mode, and the power grid is used to supplement the power supply to the user, and then step S12 is performed; S12: Determine whether the CHP system can meet the user's heat demand, wherein the user's heat demand includes the user's cooling load demand and heating load demand; if the total heating capacity of the CHP system can meet the user's heat demand, the CHP system is used to provide heat to the user, and the excess cooling and cooling capacity is stored; if the total heating capacity of the CHP system cannot meet the user's heat demand, not only the CHP system is used to provide heat to the user, but also a gas boiler and / or an electric refrigerator is used to provide heating and cooling to the user.
5. The equipment selection method of the CCHP system according to claim 1, characterized in that: The specific operation mode of the waste heat economic utilization with electricity as heat is as follows: S21: judging whether the total power supply of the CHP system can meet the user's power load demand, the CHP system includes a prime mover and a waste heat boiler. If the total power supply of the CHP system can meet the user's power load demand, the CHP system is used to supply power to the user, and then step S22 is performed; if the total power supply of the CHP system cannot meet the user's power load demand, the CHP system is first operated in a maximum power generation mode, and the power grid is used to supplement the power supply to the user, and then step S22 is performed; S22: Calculate the priority cooling cost according to formula (5), and calculate the priority heating cost according to formula (6); if the priority cooling cost is greater than the priority heating cost, the heat recovered from the prime mover is first supplied to the absorption chiller, and then directly supplies heat to the user after the user's cooling demand is met, and then proceeds to step S23; if the priority cooling cost is less than the priority heating cost, the heat recovered from the prime mover is first supplied to the user directly for heating, and then supplies heat to the absorption chiller after the user's cooling demand is met, and then proceeds to step S23; The calculation of the priority cooling cost is as follows: C cold(t) =Σ i=1 (F gas.cold.i(t) ×P gas +F e.cold.i(t) ×P e(t) ) (5) The calculation of the priority heating cost is as follows: C heat(t) =Σ i=1 (F gas.heat.i(t) ×P gas +F e.heat.i(t) ×P e(t) ) (6) Where: P e(t) is the electricity price at that time, in RMB / kWh; P gas is the natural gas price, unit: RMB / kWh; when the operation mode of electric heating is adopted for waste heat economic utilization, C t Use the second half of the formula to calculate; where C cold(t) is the cost of priority cooling at time t, in RMB; C heat(t) is the cost of priority heating at time t, in RMB; F gas.cold.i(t) is the natural gas consumption of device i in the CCHP system at time t under the condition of priority cooling, in kWh; F e.cold.i(t) is the purchased power consumption of equipment i in the CCHP system at time t under the condition of priority cooling, in kWh; F gas.heat.i(t) is the natural gas consumption of equipment i in the CCHP system at time t under the condition of priority heating, in kWh; F e.hrat.i(t) is the purchased power consumption of device i in the CCHP system at time t under the condition of priority heating, in kWh; S23: Determine whether the CHP system can meet the user's heat demand, wherein the user's heat demand includes the user's cooling load demand and heating load demand; if the total heating capacity of the CHP system can meet the user's heat demand, the CHP system is used to heat the user, and the excess cooling and cooling capacity is stored; if the total heating capacity of the CHP system cannot meet the user's heat demand, not only the CHP system is used to heat the user, but also a gas boiler and / or an electric refrigerator is used to heat and cool the user.
6. The equipment selection method of the CCHP system according to claim 1, characterized in that: The specific operation mode of the prime mover stopping and operating with electricity and heat during the valley power period is as follows: S31: Determine whether the electricity price is at a low point; if it is at a low point, determine whether the power storage equipment, heat storage and standby equipment, and cold storage equipment can meet user needs respectively. If they cannot meet user needs, the power storage equipment, heat storage and standby equipment, and cold storage equipment are supplemented with corresponding electricity, heat, and cold from the power grid, gas boiler, and electric refrigerator respectively; if it is not at a low point, proceed to step S32; S32: judging whether the total power supply of the CHP system can meet the user's power load demand, the CHP system includes a prime mover and a waste heat boiler. If the total power supply of the CHP system can meet the user's power load demand, the CHP system is used to supply power to the user, and then step S33 is performed; if the total power supply of the CHP system cannot meet the user's power load demand, the CHP system is first operated in a maximum power generation mode, and the power grid is used to supplement the power supply to the user, and then step S33 is performed; S33: Determine whether the CHP system can meet the user's heat demand, wherein the user's heat demand includes the user's cooling load demand and heating load demand; if the total heating capacity of the CHP system can meet the user's heat demand, the CHP system is used to provide heat to the user, and the excess cooling and cooling capacity is stored; if the total heating capacity of the CHP system cannot meet the user's heat demand, not only the CHP system is used to provide heat to the user, but also a gas boiler and / or an electric refrigerator is used to provide heating and cooling to the user.
7. The equipment selection method of the CCHP system according to claim 1, characterized in that: The minimized annual net cost C is calculated by formulas (1) to (7), which are specifically as follows: C=C in +C op -I gr (1) C op =S t=1 C t (3) C t ={F gas(t) ×P gas +F e(t) ×P e(t) }Pmin{C cold ,C heat } (4) C cold(t) =Σ i=1 (F gas.cold.i(t) ×P gas +F e.cold.i(t) ×P e(t) ) (5) C heat(t) =Σ i=1 (F gas.heat.i(t) ×P gas +F e.heat.i(t) ×P e(t) ) (6) I gr =F gr(t) ×P e' (7) Where C is the annual cost, in RMB; C in is the converted investment cost of each device in CCHP system, unit: RMB; C op is the annual operating cost of the CCHP system, in RMB; I gr is the income of the surplus power of CCHP system, in RMB; q is the interest rate; n is the life of CCHP system, in years; C i is the unit price of equipment i, in RMB / kW. Equipment i includes prime mover, waste heat boiler, absorption chiller, gas boiler, electric chiller and energy storage system; R i is the rated power of equipment i, in kW; C t is the cost at time t, in RMB. When it does not consider the economic utilization of preheating, it is calculated using the first half of the formula: F e(t) is the power purchased by CCHP system at time t, in kWh; F gas(t) is the amount of natural gas purchased by the CCHP system at time t, in kWh; P e(t) is the electricity price at that time, in RMB / kWh; P gas is the natural gas price, unit: RMB / kWh; when the operation mode of electric heating is adopted for waste heat economic utilization, C t Use the second half of the formula to calculate; where C cold(t) is the cost of priority cooling at time t, in RMB; C heat(t) is the cost of priority heating at time t, in RMB; F gas.cold.i(t) is the natural gas consumption of device i in the CCHP system at time t under the condition of priority cooling, in kWh; F e.cold.i(t) is the purchased power consumption of equipment i in the CCHP system at time t under the condition of priority cooling, in kWh; F gas.heat.i(t) is the natural gas consumption of equipment i in the CCHP system at time t under the condition of priority heating, in kWh; F e.hrat.i(t) is the purchased power consumption of equipment i in the CCHP system at time t under the condition of priority heating, in kWh; F gr(t) is the amount of surplus power on-grid of CCHP system at time t, in kWh; P e‘ It is the on-grid electricity price, unit is RMB / kWh.
8. The equipment selection method of the CCHP system according to claim 1, characterized in that: The optimization factors of the genetic algorithm include prime mover capacity, waste heat boiler capacity, absorption chiller capacity, gas boiler capacity, heat pump capacity, cold storage equipment capacity, electricity storage equipment capacity, heat storage equipment capacity and comprehensive demand response implementation strategy.