A temperature-pressure controllable paste slurry rheological property testing device and method

By designing a temperature-pressure controllable paste slurry rheology performance test device, the accuracy of paste slurry rheology performance testing in plateau, tropical, extreme cold and other environments is solved, and the temperature and pressure are achieved. The control and adjustable ensures accurate measurement of the rheology performance of paste slurry and supports the application of paste filling technology in special environments.

CN115032116BActive Publication Date: 2024-12-06UNIV OF SCI & TECH BEIJING
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210497902.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-05-06
Publication Date
2024-12-06
Estimated Expiration
2042-05-06

AI Technical Summary

Technical Problem

The existing paste slurry rheology performance testing device is difficult to accurately test the rheology performance of paste slurry under special temperature-pressure environments such as plateau, tropical, and extreme cold. Especially under temperature-transformation conditions, resulting in test data. Inaccurate, limiting the application of paste filling technology.

Method used

A temperature-pressure controllable paste slurry rheology performance testing device is designed, including paste rheology performance testing system, temperature control system, air pressure control system and data integration control system, using intelligent control platform and embedded The liquid level sensor and pressure gauge ensure rheology experiments are carried out under constant temperature and pressure.

Benefits of technology

It realizes controllable and adjustable temperature and pressure, and quantitatively monitors key parameters such as viscosity and stress of paste slurry, and provides support for paste slurry performance in special environments such as plateau, tropical, and extreme cold, which improves the test accuracy and reliability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115032116B_ABST
    Figure CN115032116B_ABST
Patent Text Reader

Abstract

The present invention provides a temperature-pressure controllable paste slurry rheological property testing device and method, belonging to the technical field of metal ore paste filling. The device includes an airtight pad, an airtight nut, an airtight bolt, a pressure gauge, an air injection valve, an exhaust valve, a slurry rheometer, a sealing cover, an intelligent control platform, a connecting rotating shaft, a temperature-controlled overflow liquid tank, a tank top overflow port, a shell, an insulation layer, a water bath layer, an embedded liquid level sensor, a paste slurry tank, a tank bottom liquid injection port, a temperature-controlled liquid storage tank, a temperature sensor, a sealing layer, a pressure nitrogen bottle and a gas-liquid pump. The paste slurry tank is a cylindrical hollow trough body with a sealing cover on the top; the pressure gauge, the air injection valve and the exhaust valve are arranged on the upper part of the sealing cover; the embedded liquid level sensor is embedded in the inner wall of the paste slurry tank; the intelligent control platform is used to realize the quantitative and intelligent monitoring of the rheological parameters of the paste slurry under controllable and adjustable temperature and pressure, which provides a reference for the transportation of paste slurry under complex variable temperature-pressure conditions.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of metal ore paste filling, and in particular to a device and method for testing the rheological properties of paste slurry with controllable temperature and pressure. Background Art

[0002] The paste filling mining technology for metal mines can make full use of solid wastes from mines such as tailings, slag and waste rock, eliminate the major hazards of surface tailings ponds and underground goafs, and effectively achieve the goal of "one waste to cure two hazards". At present, paste filling technology has been widely used in China, the United States, Canada, Australia and other countries. Mines mined by filling method are distributed in different regions such as plateaus, tropical, temperate, arid and water-deficient regions. It has become the only way for the efficient and green development of metal mines in the future.

[0003] The rheological properties of paste slurry are important indicators that restrict paste filling technology, especially the underground transportation and filling and top-forming processes of paste materials. However, due to the different geographical environments of mines, the temperature, air pressure and other environments of the filling slurry transportation area are different; in particular, when metal mines enter deep mining, the deep ground stress of the stratum and the ambient temperature of the filling mining area have increased significantly, which has significant differences in the transportation of paste slurry, especially the rheological properties of paste slurry. Existing related invention patents and research mainly focus on the following aspects: 1) Rheological properties of paste slurry under different slurry rheometer parameters, such as: blade size, number of blades, blade speed and rotation mode; 2) Rheological properties of paste slurry under different paste material conditions, such as: ash-sand ratio, material type, particle size grading, filling admixtures, etc.; 3) Rheological properties of paste slurry under different initial slurry conditions, such as: slurry temperature, curing time, etc.

[0004] Combined with the existing research, there are three research difficulties and deficiencies: 1) There are many innovative methods for testing Newtonian and non-Newtonian rheological properties, but there are fewer methods for paste slurries prepared from mining solid waste, especially the rheological experimental equipment and methods for simulating paste slurry under different environmental temperature-pressure conditions are even more lacking; 2) Existing research mostly focuses on initial conditions such as initial temperature and initial pressure, that is, the paste slurry is cured at a certain temperature, and then taken out and placed in a paste slurry rheometer under normal temperature and pressure environment to test the rheological properties of the paste slurry. Due to the continuous change of slurry temperature, the key parameters such as slurry viscosity, stress, and strain change significantly, resulting in inaccurate rheological test data, which fails to effectively reflect the rheological properties of paste slurry under constant temperature and pressure conditions; 3) Existing paste slurry rheological properties tests are mostly static, and rarely involve dynamic variable pressure and variable temperature environments. In particular, there is little research on the rheological properties of paste slurry under negative pressure and low temperature conditions, which restricts the promotion and application of paste filling technology in high-altitude and cold areas such as the Qinghai-Tibet Plateau.

[0005] In general, the existing research devices and methods for the rheological properties of paste slurries are mainly aimed at standard conditions of normal temperature and pressure, which can hardly effectively meet the special temperature-pressure mining conditions such as plateau, tropical, and extreme cold. For the test research on the rheological properties of paste slurries under variable temperature and pressure conditions, there are still major defects in the experimental devices and methods, and relevant innovative devices or methods are urgently needed. Summary of the invention

[0006] The technical problem to be solved by the present invention is to provide a temperature-pressure controllable paste slurry rheological property testing device and method, which provides a reference for the study of the rheological properties of paste slurry in areas with relatively complex isothermal-pressure environments on the plateau.

[0007] The device includes a paste rheological property testing system, a temperature control system, an air pressure control system and a data integration control system; wherein the paste rheological property testing system includes a slurry rheometer, a connecting rotating shaft, a shell, a paste slurry tank and a gas-liquid pump; the temperature control system includes a temperature-controlled overflow liquid tank, a tank top overflow port, a heat insulation layer, a water bath layer, a tank bottom liquid injection port, a temperature-controlled liquid storage tank and a temperature sensor; the air pressure control system includes an airtight pad, an airtight nut, an airtight bolt, an air injection valve, an exhaust valve, a sealing cover, a sealing layer and a pressure nitrogen bottle; the data integration control system includes an intelligent management and control platform, an embedded liquid level sensor and a pressure gauge;

[0008] The paste slurry tank is a cylindrical hollow tank. The paste slurry tank is placed in the shell. A heat insulation layer is arranged close to the inner wall of the shell. A water bath layer is arranged between the heat insulation layer and the paste slurry tank. A temperature sensor is arranged in the water bath layer. The embedded liquid level sensor is embedded in the tube wall of the paste slurry tank. A sealing cover is arranged on the top of the shell. A sealing layer is arranged between the shell and the sealing cover, and they are fixed by airtight nuts and airtight bolts. The air injection valve, exhaust valve, and paddle rheometer are all installed on the upper part of the sealing cover. The lower ends of the air valve and the exhaust valve are connected to the paste slurry tank for regulating the pressure in the tank. The lower end of the paddle rheometer is a three-propeller paddle, which extends into the paste slurry tank to perform rheological tests on the paste slurry. The air injection valve is connected to the pressure nitrogen bottle through an air-liquid pump. A tank bottom filling port is provided at the lower part of the shell, and a tank top overflow port is provided at the upper part. The tank top overflow port is connected to a temperature-controlled overflow liquid tank, and the tank bottom filling port is connected to a temperature-controlled liquid storage tank. The liquid in the temperature-controlled overflow liquid tank is transported to the temperature-controlled liquid storage tank by the air-liquid pump.

[0009] Among them, airtight gaskets are arranged between the airtight nut and the sealing cover, and between the airtight nut and the shell.

[0010] A pressure gauge is installed on the lower pipeline of the gas injection valve; the intelligent management and control platform controls the slurry rheometer, embedded liquid level sensor, pressure gauge, and temperature sensor to monitor viscosity, temperature, and stress parameters, and transmits valve start and stop control instructions to the gas injection valve, exhaust valve, and gas-liquid pump.

[0011] The temperature sensor, paddle rheometer, sealing layer, paste slurry tank and embedded liquid level sensor are all made of temperature-resistant, pressure-resistant and wear-resistant materials.

[0012] The pressure gauge and intelligent management and control platform monitor the gas injection and pressurization and exhaust and pressure relief processes in the paste slurry tank; the temperature sensor and intelligent management and control platform monitor the heating and cooling processes of the paste slurry tank to ensure constant temperature and pressure conditions when conducting rheological experiments on paste slurry using a slurry rheometer.

[0013] The shell and the sealing cover are provided with a connecting rotating shaft at one side edge.

[0014] The device uses an intelligent management and control platform and an embedded liquid level sensor to ensure that the paste slurry level is always lower than the exhaust port connected to the air injection valve and the exhaust valve under the sealing cover, so as to avoid affecting the air injection operation of the air injection valve and the exhaust operation of the exhaust valve.

[0015] The method of using the device comprises the following steps:

[0016] S1: Device test phase: Deionized water is injected into the paste slurry tank. Under standard conditions of normal temperature and pressure, the intelligent control platform, pressure gauge, embedded liquid level sensor, temperature sensor, and slurry rheometer are calibrated and tested to ensure that the air tightness and temperature control of the device are good. Then, the paste slurry tank is emptied for rheological experiments.

[0017] S2: Rheological experiment preparation stage: the paste slurry prepared according to the requirements is injected into the paste slurry tank, and the liquid level of the paste slurry in the paste slurry tank is determined by using the built-in liquid level sensor and the intelligent control platform; the sealing cover is rotated by using the connecting rotating shaft to effectively close the sealing layer and the shell;

[0018] S3: Airtightness and pressure change stage: Under the monitoring of the intelligent management and control platform and the pressure gauge, screw the airtight gasket, airtight bolt, airtight nut, and air injection valve in sequence to perform airtightness operations; according to the air pressure requirements of the experimental environment, use a pressure nitrogen bottle and an air-liquid pump to inject nitrogen into the paste slurry tank to increase the pressure in the tank, or use an exhaust valve and an air-liquid pump to discharge part of the gas in the paste slurry tank to reduce the pressure in the tank;

[0019] S4: Temperature adjustment and control stage: deionized water is injected into the temperature-controlled liquid storage tank, the water temperature is raised to the temperature required by the experiment, and the constant temperature deionized water is injected into the water bath layer through the liquid injection port at the bottom of the tank using a gas-liquid pump. When the constant temperature deionized water fills the water bath layer from bottom to top, it flows into the temperature-controlled overflow liquid tank from the overflow port on the top of the tank. The ambient temperature is monitored using a temperature sensor and an intelligent control platform, and the thermal insulation layer is used to improve the stability during the rheological experiment;

[0020] S5: Rheological experiment stage: start the slurry rheometer to conduct rheological experiment on paste slurry;

[0021] S6: The final stage of the experiment: First, turn off the slurry rheometer, adjust the temperature of the liquid in the temperature-controlled liquid storage tank to the ambient temperature, and cool the paste slurry tank to the ambient temperature; secondly, start the exhaust valve or the air injection valve according to the ambient pressure difference, and use the pressure gauge and the intelligent management and control platform to monitor the pressure relief and pressurization process. When the pressure inside the paste slurry tank is balanced with the external pressure, use the connecting rotating shaft as the axis to screw open the airtight gasket, airtight nut and airtight bolt, and clean the paste slurry tank in preparation for subsequent experiments.

[0022] The beneficial effects of the above technical solution of the present invention are as follows:

[0023] In the above scheme, the overall quantitative and intelligent monitoring of the rheological properties of paste slurry under controllable and adjustable temperature and pressure conditions is realized, and key parameters such as temperature, stress, and slurry viscosity are obtained, providing important equipment and method support for conducting paste slurry performance tests under special temperature and pressure conditions such as plateaus, tropical areas, and extreme cold, and providing a good reference for the efficient preparation of paste slurry under special temperature-pressure conditions. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a schematic structural diagram of a temperature-pressure controllable paste slurry rheological property testing device of the present invention;

[0025] Figure 2 It is a schematic diagram of the three-dimensional structure of the temperature-pressure controllable paste slurry rheological properties testing device of the present invention.

[0026] Among them: 1-airtight gasket; 2-airtight nut; 3-airtight bolt; 4-pressure gauge; 5-gas injection valve; 6-exhaust valve; 7-paddle rheometer; 8-sealing cover; 9-intelligent management and control platform; 10-connecting rotating shaft; 11-temperature-controlled overflow liquid tank; 12-tank top overflow port; 13-shell; 14-insulation layer; 15-water bath layer; 16-embedded liquid level sensor; 17-paste slurry tank; 18-tank bottom liquid injection port; 19-temperature-controlled liquid storage tank; 20-temperature sensor; 21-sealing layer; 22-pressure nitrogen bottle; 23-gas-liquid pump. DETAILED DESCRIPTION

[0027] In order to make the technical problems, technical solutions and advantages to be solved by the present invention more clear, a detailed description will be given below with reference to the accompanying drawings and specific embodiments.

[0028] The invention provides a temperature-pressure controllable paste slurry rheological property testing device and method.

[0029] like Figure 1 and Figure 2As shown, the device includes a paste rheological property testing system, a temperature control system, an air pressure control system and a data integration control system; wherein the paste rheological property testing system includes a slurry rheometer 7, a connecting rotating shaft 10, a shell 13, a paste slurry tank 17 and a gas-liquid pump 23; the temperature control system includes a temperature-controlled overflow liquid tank 11, a tank top overflow port 12, an insulation layer 14, a water bath layer 15, a tank bottom liquid injection port 18, a temperature-controlled liquid storage tank 19 and a temperature sensor 20; the air pressure control system includes an airtight pad 1, an airtight nut 2, an airtight bolt 3, an air injection valve 5, an exhaust valve 6, a sealing cover 8, a sealing layer 21 and a pressure nitrogen bottle 22; the data integration control system includes an intelligent management and control platform 9, an embedded liquid level sensor 16 and a pressure gauge 4;

[0030] The paste slurry tank 17 is a cylindrical hollow tank. The paste slurry tank 17 is placed in the shell 13. A heat insulation layer 14 is arranged close to the inner wall of the shell 13. A water bath layer 15 is arranged between the heat insulation layer 14 and the paste slurry tank 17. A temperature sensor 20 is arranged in the water bath layer 15. An embedded liquid level sensor 16 is embedded in the tube wall of the paste slurry tank 17. A sealing cover 8 is arranged on the top of the shell 13. A sealing layer 21 is arranged between the shell 13 and the sealing cover 8, and is fixed by an airtight nut 2 and an airtight bolt 3. The air injection valve 5, the exhaust valve 6, and the paddle rheometer 7 are all arranged on the sealing cover 8. At the upper part, the lower ends of the gas injection valve 5 and the gas exhaust valve 6 are connected to the paste slurry tank 17 for regulating the pressure in the tank. The lower end of the paddle rheometer 7 is a three-propeller paddle, which extends into the paste slurry tank 17 to perform rheological tests on the paste slurry. The gas injection valve 5 is connected to the pressure nitrogen bottle 22 through the gas-liquid pump 23. The lower part of the shell 13 is provided with a tank bottom liquid injection port 18, and the upper part is provided with a tank top overflow port 12. The tank top overflow port 12 is connected to the temperature-controlled overflow liquid tank 11, and the tank bottom liquid injection port 18 is connected to the temperature-controlled liquid storage tank 19. The liquid in the temperature-controlled overflow liquid tank 11 is transported to the temperature-controlled liquid storage tank 19 by the gas-liquid pump.

[0031] In the actual design, the temperature-controlled liquid storage tank 19 obtains the solution of the experimental temperature. Driven by the gas-liquid pump 23, the solution flows into the temperature-controlled liquid storage tank 19 and the liquid filling port 18 at the bottom of the tank and flows out from the overflow port 12 at the top of the tank until the water bath layer 15 is filled with constant temperature liquid. The outside of the water bath layer 15 is a heat-insulating layer 14 to ensure a constant temperature environment for the paste rheology experiment.

[0032] An airtight gasket 1 is arranged between the airtight nut 2 and the sealing cover 8 , and between the airtight nut 2 and the housing 13 .

[0033] A pressure gauge 4 is provided on the lower pipeline of the gas injection valve 5; the intelligent management and control platform 9 regulates the slurry rheometer 7, the embedded liquid level sensor 16, the pressure gauge 4, and the temperature sensor 20 to monitor the viscosity, temperature and stress parameters, and transmits the valve start and stop control instructions to the gas injection valve 5, the exhaust valve 6 and the gas-liquid pump 23.

[0034] The temperature sensor 20, the paddle rheometer 7, the sealing layer 21, the paste slurry tank 17 and the embedded liquid level sensor 16 are all made of temperature-resistant, pressure-resistant and wear-resistant materials.

[0035] The pressure gauge 4 and the intelligent management and control platform 9 monitor the gas injection pressurization and exhaust pressure relief process in the paste slurry tank 17; the temperature sensor 20 and the intelligent management and control platform 9 monitor the heating and cooling process of the paste slurry tank 17 to ensure a constant temperature and pressure state when using the slurry rheometer 7 to conduct rheological experiments on the paste slurry.

[0036] The housing 13 and the sealing cover 8 are provided with a connecting rotating shaft 10 at one side edge.

[0037] The device utilizes an intelligent control platform 9 and an embedded liquid level sensor 16 to ensure that the liquid level of the paste slurry is always lower than the exhaust port connected to the gas injection valve 5 and the exhaust valve 6 below the sealing cover 8, so as to avoid affecting the gas injection operation of the gas injection valve 5 and the exhaust operation of the exhaust valve 6.

[0038] The actual test process of the device is carried out according to the following steps:

[0039] S1: Device test run phase: Deionized water is injected into the paste slurry tank 17, and the intelligent control platform 9, the pressure gauge 4, the embedded liquid level sensor 16, the temperature sensor 20, and the slurry rheometer 7 are calibrated and tested under standard conditions of normal temperature and pressure to ensure that the air tightness and temperature control of the device are good, and then the paste slurry tank 17 is emptied for rheological experiments;

[0040] S2: Rheological experiment preparation stage: the paste slurry prepared according to the requirements is injected into the paste slurry tank 17, and the liquid level of the paste slurry in the paste slurry tank 17 is determined by using the embedded liquid level sensor 16 and the intelligent control platform 9; the sealing cover 8 is rotated by connecting the rotating shaft 10 to effectively close the sealing layer 21 and the shell 13;

[0041] S3: Airtightness and pressure change stage: Under the monitoring of the intelligent control platform 9 and the pressure gauge 4, the airtight gasket 1, the airtight bolt 3, the airtight nut 2, and the air injection valve 5 are screwed in sequence to perform airtightness operations; according to the air pressure requirements of the experimental environment, nitrogen is injected into the paste slurry tank 17 using the pressure nitrogen bottle 22 and the gas-liquid pump 23 to increase the pressure in the tank, or the exhaust valve 6 and the gas-liquid pump are used to discharge part of the gas in the paste slurry tank 17 to reduce the pressure in the tank;

[0042] S4: Temperature adjustment and control stage: deionized water is injected into the temperature control liquid storage tank 19, the water temperature is raised to the temperature required by the experiment, and the constant temperature deionized water is injected into the water bath layer 15 through the tank bottom injection port 18 by using a gas-liquid pump. When the constant temperature deionized water fills the water bath layer 15 from bottom to top, it flows into the temperature control overflow liquid tank 11 from the upper tank top overflow port 12. The ambient temperature is monitored by the temperature sensor 20 and the intelligent control platform 9, and the thermal insulation layer 14 is used to improve the stability during the rheological experiment;

[0043] S5: Rheological experiment stage: Start the paddle rheometer 7 to conduct rheological experiment on paste slurry; use the intelligent control platform 9 and the paddle rheometer 7 to obtain key rheological parameters such as viscosity and stress, and use the temperature sensor 20, the pressure gauge 4, and the embedded liquid level sensor 16 to monitor the ambient temperature, pressure, slurry level, etc.;

[0044] S6: The final stage of the experiment: First, turn off the slurry rheometer 7, adjust the liquid temperature in the temperature-controlled liquid storage tank 19 to the ambient temperature, and cool the paste slurry tank 17 to the ambient temperature; secondly, according to the ambient pressure difference, start the exhaust valve 6 or the air injection valve 5, and use the pressure gauge 4 and the intelligent management and control platform 9 to monitor the pressure relief and pressurization process. When the pressure inside the paste slurry tank 17 is balanced with the external pressure, use the connecting rotating shaft 10 as the axis to screw open the airtight gasket 1, the airtight nut 2 and the airtight bolt 3, and clean the paste slurry tank 17 in preparation for subsequent experiments.

[0045] The above is a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A temperature-pressure controllable paste slurry rheological property testing device, It is characterized in that It includes a paste rheological properties testing system, a temperature control system, an air pressure control system and a data integration control system; wherein the paste rheological properties testing system includes a slurry rheometer, a connecting rotating shaft, a shell, a paste slurry tank and a gas-liquid pump; the temperature control system includes a temperature-controlled overflow liquid tank, a tank top overflow port, a heat insulation layer, a water bath layer, a tank bottom liquid injection port, a temperature-controlled liquid storage tank and a temperature sensor; the air pressure control system includes an airtight pad, an airtight nut, an airtight bolt, an air injection valve, an exhaust valve, a sealing cover, a sealing layer and a pressure nitrogen cylinder; the data integration control system includes an intelligent management and control platform, an embedded liquid level sensor and a pressure gauge; The paste slurry tank is a cylindrical hollow tank. The paste slurry tank is placed in the shell. A heat insulation layer is arranged close to the inner wall of the shell. A water bath layer is arranged between the heat insulation layer and the paste slurry tank. A temperature sensor is arranged in the water bath layer. The embedded liquid level sensor is embedded in the tube wall of the paste slurry tank. A sealing cover is arranged on the top of the shell. A sealing layer is arranged between the shell and the sealing cover, and they are fixed by airtight nuts and airtight bolts. The air injection valve, exhaust valve, and paddle rheometer are all installed on the upper part of the sealing cover. The lower ends of the air valve and the exhaust valve are connected to the paste slurry tank for regulating the pressure in the tank. The lower end of the paddle rheometer is a three-paddle paddle that extends into the paste slurry tank to perform rheological tests on the paste slurry. The air injection valve is connected to the pressure nitrogen bottle through an air-liquid pump. The lower part of the shell is provided with a tank bottom injection port, and the upper part is provided with a tank top overflow port. The tank top overflow port is connected to a temperature-controlled overflow liquid tank, and the tank bottom injection port is connected to a temperature-controlled liquid storage tank. The liquid in the temperature-controlled overflow liquid tank is transported to the temperature-controlled liquid storage tank through the air-liquid pump. Airtight gaskets are arranged between the airtight nut and the sealing cover, and between the airtight nut and the housing; A pressure gauge is provided on the lower pipeline of the gas injection valve; the intelligent control platform controls the paddle rheometer, the embedded liquid level sensor, the pressure gauge, and the temperature sensor to monitor the viscosity, temperature, and stress parameters, and transmits the valve start and stop control instructions to the gas injection valve, the exhaust valve, and the gas-liquid pump; The pressure gauge and intelligent control platform monitor the gas injection and pressure increase and exhaust and pressure relief process in the paste slurry tank; the temperature sensor and intelligent control platform monitor the temperature increase and decrease process of the paste slurry tank to ensure the constant temperature and pressure state when the paste slurry rheology experiment is carried out using a slurry rheometer; The device uses an intelligent management and control platform and an embedded liquid level sensor to ensure that the paste slurry level is always lower than the exhaust port connected to the air injection valve and the exhaust valve under the sealing cover, so as to avoid affecting the air injection operation of the air injection valve and the exhaust operation of the exhaust valve.

2. The temperature-pressure controllable paste slurry rheological properties testing device according to claim 1, It is characterized in that The temperature sensor, the slurry rheometer, the sealing layer, the paste slurry tank and the embedded liquid level sensor are all made of temperature-resistant, pressure-resistant and wear-resistant materials.

3. The temperature-pressure controllable paste slurry rheological property testing device according to claim 1, It is characterized in that The shell and the sealing cover are provided with a connecting rotating shaft at one side edge.

4. A method for applying the temperature-pressure controllable paste slurry rheological properties testing device according to claim 1, It is characterized in that The steps include: S1: Device test phase: Deionized water is injected into the paste slurry tank. Under standard conditions of normal temperature and pressure, the intelligent control platform, pressure gauge, embedded liquid level sensor, temperature sensor, and slurry rheometer are calibrated and tested to ensure that the air tightness and temperature control of the device are good. Then, the paste slurry tank is emptied for rheological experiments. S2: Rheological experiment preparation stage: the paste slurry prepared according to the requirements is injected into the paste slurry tank, and the liquid level of the paste slurry in the paste slurry tank is determined by using the built-in liquid level sensor and the intelligent control platform; the sealing cover is rotated by using the connecting rotating shaft to effectively close the sealing layer and the shell; S3: Airtightness and pressure change stage: Under the monitoring of the intelligent management and control platform and the pressure gauge, the airtight gasket, airtight bolt, airtight nut and air injection valve are screwed in sequence to perform airtightness operations; According to the air pressure requirements of the experimental environment, use a pressure nitrogen bottle and a gas-liquid pump to inject nitrogen into the paste slurry tank to increase the pressure in the tank, or use an exhaust valve and a gas-liquid pump to discharge part of the gas in the paste slurry tank to reduce the pressure in the tank; S4: Temperature adjustment and control stage: deionized water is injected into the temperature-controlled liquid storage tank, the water temperature is raised to the temperature required by the experiment, and the constant temperature deionized water is injected into the water bath layer through the liquid injection port at the bottom of the tank using a gas-liquid pump. When the constant temperature deionized water fills the water bath layer from bottom to top, it flows into the temperature-controlled overflow liquid tank from the overflow port on the top of the tank. The ambient temperature is monitored using a temperature sensor and an intelligent control platform, and the thermal insulation layer is used to improve the stability during the rheological experiment; S5: Rheological experiment stage: start the slurry rheometer to conduct rheological experiment on paste slurry; S6: The final stage of the experiment: First, turn off the slurry rheometer, adjust the temperature of the liquid in the temperature-controlled liquid storage tank to the ambient temperature, and cool the paste slurry tank to the ambient temperature; secondly, start the exhaust valve or the air injection valve according to the ambient pressure difference, and use the pressure gauge and the intelligent management and control platform to monitor the pressure relief and pressurization process. When the pressure inside the paste slurry tank is balanced with the external pressure, use the connecting rotating shaft as the axis to screw open the airtight gasket, airtight nut and airtight bolt, and clean the paste slurry tank in preparation for subsequent experiments.