A dual-gradient drilling and completion integrated operation system and method for complex oil reservoir formations
Through the dual-gradient drilling system and pressure-managed cementing technology, the problems of easy leakage, high-pressure formations and high-hydrogen sulfide-containing formations in the existing drilling technology have been solved, bottom hole pressure control and cementing quality improvement have been achieved, and drilling costs have been significantly reduced. and risks.
Patent Information
- Application Number
- CN202210806296.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-07-08
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2042-07-08
AI Technical Summary
The existing drilling technology cannot effectively solve the problems of leak-prone, high-pressure formations and high hydrogen sulfide-containing formations, resulting in increased drilling costs and risks, and it is unable to effectively adjust bottom hole pressure and cementing quality.
A dual-gradient drilling system is used to form hydrostatic columns with different densities through double-layer drill pipes and low-density medium pumping systems to regulate bottom-hole pressure. The cement slurry injection pressure is precisely controlled through the pressure control system to ensure bottom-hole stability.
It achieves effective drilling and cementing of leak-prone formations and high-pressure formations, reduces the risk of drilling fluid loss, improves wellbore cleaning efficiency and cementing success rate, and shortens the well construction cycle.
Smart Images

Figure CN115110893B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of land complex oil reservoir exploitation, and in particular to a dual-gradient drilling and completion integrated operation system and method for complex oil reservoir strata. Background Art
[0002] my country's land has large areas of complex oil and gas reservoirs with low porosity, low permeability, and low abundance. At the same time, with the continuous deepening of oil and gas exploration and development, more and more situations such as easy leakage, high-pressure formations, and hydrogen sulfide-containing formations are encountered during the drilling process, which greatly increases the drilling cost and risks during the drilling process. Conventional drilling methods cannot effectively solve the above problems. The double-layer pipe double-gradient drilling technology, due to its special bottom hole pressure monitoring and adjustment method, is an effective means to solve the drilling problems in the above oil and gas exploration process, increase the wellbore drilling speed, shorten the well construction period, and protect the oil and gas layers. It has huge advantages that other drilling technologies cannot match.
[0003] At present, conventional drilling technology cannot solve the problem of vicious leakage of drilling fluid in leaky formations and achieve efficient cementing after plugging, which is mainly reflected in the following aspects:
[0004] (1) Conventional drilling technology does not have the ability to control bottom hole pressure, resulting in the inability to adjust bottom hole pressure when drilling into leaky formations or high-pressure formations, which ultimately leads to vicious leakage of drilling fluid or bottom hole overflow and well kick.
[0005] (2) During the implementation of conventional drilling technology, the drilling fluid returns through the annulus between the well wall and the drill pipe, and returns to the mud pool through the vibrating screen. This type of drilling fluid circulation method will cause the hydrogen sulfide carried by the drilling fluid to greatly increase the risk of drilling when drilling into high-sulfur formations.
[0006] (3) In conventional drilling technology, the cuttings at the bottom of the well are returned to the wellhead by means of liquid lifting through the annulus between the drill pipe and the well wall. The efficiency of cuttings transportation is low, the speed of bottom hole cleaning is slow, and it is more likely to cause the well wall to collapse, which in turn leads to a slowdown in drilling speed and an increase in well construction costs.
[0007] (4) During the drilling and completion process of shale gas production, after the conventional drilling process is completed, the conventional cementing process cannot control the pressure of the injected cement slurry, resulting in secondary fracturing of the leaky formation, and the cementing success rate is greatly reduced. Summary of the invention
[0008] In order to solve the above problems, the present invention provides an integrated operation system and method for dual-gradient drilling and completion in complex oil reservoir formations. The present invention is provided with a double-layer drill pipe, a low-density medium pumping system, and a hydraulic lift pump. The isolation fluid is used to form two sections of low-density medium static liquid columns and drilling fluid static liquid columns with different densities and heights in the wellbore. The power of the hydraulic lift pump is changed by changing the flow rate of the high-pressure mud pump to achieve a change in the height of the drilling fluid static liquid column, thereby achieving regulation of the bottom hole pressure. At the same time, the low-density medium injection amount can be obtained through a low-density medium metering tank, and the bottom hole pressure can be accurately calculated. At the same time, the circulation process of the cuttings generated by drilling can reach a fully closed state, which solves the problem that the bottom hole pressure cannot be adjusted and monitored in conventional drilling processes. , the problem of low safety in drilling in high-sulfur formations; the present invention adopts a double-layer drill pipe drilling method, and the bottom hole cuttings are transported upward through the inner tube of the double-layer tube. The cuttings transportation speed is faster, and the wellbore cleaning efficiency is higher, which can greatly shorten the well construction period, and solves the problem of low drilling cuttings transportation efficiency in conventional drilling processes. The present invention is provided with a pressure control system, which accurately controls the injection pressure and flow rate during the injection of cementing cement slurry by arranging a hydraulic calculation and optimization control system and a cementing mud pool, and adjusts the wellbore back pressure at the same time, thereby controlling the bottom hole cementing cement slurry pressure, so that the cement slurry pressure is between the formation pressure and the fracture pressure, which solves the problem that the conventional cementing process cannot control the pressure of the injected cement slurry, the cementing success rate is low, and the cementing quality is poor.
[0009] The technical solution adopted by the patent of the present invention to solve its technical problems is: a dual-gradient drilling and completion integrated operation system for complex oil reservoir formations, which is composed of a ground system and a downhole tool combination, wherein the ground system is composed of a derrick, a top drive, a double-layer pipe adapter, a blowout preventer, a cementing mud pool, a plugging agent tank, a pressure control system, a mud circulation system, and a low-density medium circulation system; wherein the well control system is composed of a wellhead blowout preventer and a rotary control head; the pressure control system is composed of valve I, valve II, an adjustable linear throttle valve, a pressure gauge, a flow meter, and a hydraulic parameter calculation and optimization control system; wherein the hydraulic parameter calculation and optimization control system can collect feedback signals from the adjustable linear throttle valve, the pressure gauge, and the flow meter, and at the same time, the adjustable linear throttle valve can receive feedback signals from the hydraulic parameter calculation and optimization control system, thereby realizing the adjustment of the opening of the adjustable linear throttle valve; the mud circulation system is composed of a closed vibrating screen, a mud pool, a valve IV, and a high-pressure mud pump group connected in sequence through pipelines; the low-density medium circulation system is composed of an isolation fluid, a valve III , auxiliary pump group, and low-density medium metering tank; the downhole drilling tool assembly consists of a double-layer drill pipe, a bridge channel, a hydraulic lift pump, a battery short-circuit, a well inclination probe, a stabilizer, a pulse generator assembly, a while-drilling plugging short-circuit, a double-layer pipe drill string blowout preventer, a suction short-circuit, a turbodrill, a working fluid control unit, a paranoid mechanism execution unit, and a drill bit. The hydraulic lift pump consists of a turbine motor, a bridge channel II, and a turbine pump; the bridge channel II is installed at the bottom of the double-layer adapter, and the lower end of the bridge channel II is connected to the double-layer drill pipe. The turbine motor, bridge channel II and turbine pump are installed in sequence at the lower part of the rod through threaded connection, wherein bridge channel II is installed between the turbine motor and the turbine pump through threaded connection, the battery short circuit, well inclination probe pipe, centralizer and pulse generator assembly are connected and installed in sequence at the lower end of the turbine pump to form a while-drilling measurement system, the while-drilling plugging short circuit and suction short circuit are installed in sequence at the lower part of the pulse generator assembly, the turbodrill tool, working fluid control unit, bias mechanism execution unit and drill bit are connected and installed in sequence at the lower part of the suction short circuit to form a rotary steering system.
[0010] The dual-gradient drilling and completion integrated operation system for complex oil reservoir formations is characterized in that the drilling-while-plugging short-circuit is provided with an injection channel that passes through the annulus of the inner and outer pipes of the double-layer pipe, and the opening and closing of the drilling-while-plugging short-circuit is controlled by a pulse signal emitted by a pulse generator assembly.
[0011] The dual-gradient drilling and completion integrated operation system for complex oil reservoir formations is characterized in that it includes the following steps:
[0012] SⅠ. The drilling process specifically includes the following steps:
[0013] S101, using conventional drilling methods to conduct the first drilling, drilling to a predetermined depth, inserting surface casing, and then performing the first cementing according to conventional processes;
[0014] S102, installing a wellhead blowout preventer, wherein the low-density medium metering tank is connected to the wellhead blowout preventer through a hose, and the low-density medium and the isolation fluid can enter the well through the wellhead blowout preventer;
[0015] S103, controlled pressure drilling: the lower part of the top drive is connected to the double-layer pipe adapter, and the lower end of the double-layer pipe adapter is connected to the assembled downhole tool assembly. The downhole tool assembly passes through the conventional blowout preventer group and goes into the wellbore. Close valve II and valve III, and open valve I. Turn on the high-pressure mud pump group, and the drilling fluid enters the inner pipe of the double-layer pipe adapter from the mud pool through the top drive. The pressurized drilling fluid passes through the bridge channel I and then transfers from the inner pipe of the double-layer adapter to the double-layer pipe annulus. The drilling fluid in the annulus flows downward to the turbine motor. Driven by the drilling fluid, the turbine motor starts to rotate. The drilling fluid passes through the bridge channel II and then enters the inner channel of the turbine pump from the double-layer pipe annulus. Thereafter, the drilling fluid passes through the battery short circuit, the well inclination probe, the inner channel of the centralizer, the pulse generator assembly, the inner channel of the while-drilling plugging short circuit, and the turbine drilling starts to rotate and output torque under the action of the pressurized drilling fluid. The working fluid control unit and the paranoid mechanism execution unit start to work, and the drilling fluid passes through the drill bit end to reach the bottom of the well.
[0016] S104, when the drilling fluid in the wellbore reaches a preset height, the auxiliary pump group injects a quantitative isolation fluid into the wellbore through the wellhead blowout preventer group channel. The isolation fluid is located on the upper part of the drilling fluid and is immiscible with the drilling fluid. At the same time, a low-density medium is injected into the wellbore through the wellhead blowout preventer group channel, and the pumping flow rate is recorded. The low-density medium is located on the upper end of the isolation fluid and is immiscible with the isolation fluid. It is ensured that the pressure at each location in the wellbore is between the formation pressure and the fracture pressure at the corresponding formation depth, and the drilling fluid circulation is established to start the drilling process;
[0017] S105, Drilling in leaky formations: When the surface monitor detects an abnormal drop in the liquid level in the wellbore, it indicates that the drilling has reached a leaky formation. At this time, the pulse generator assembly is controlled by the ground control system to send a pulse signal, and the drilling plugging short circuit closes the axial channel after receiving the signal, so that the fluid cannot flow out to the drill bit end;
[0018] S106, close valve IV, open valve V, reduce the pumping flow of the high-pressure mud pump group to below the starting flow of the hydraulic lift pump, pump the plugging agent into the well, the plugging agent flows through the upper downhole drilling tool assembly to the while-drilling plugging short-circuit, and is ejected from the while-drilling plugging short-circuit injection channel into the formation fractures to plug the leak; the plugging agent injection is completed;
[0019] S107, open valve IV, close valve V, and at the same time, after the plugging while drilling short circuit receives the pulse signal, the axial channel is opened and the injection channel is closed, the drilling fluid can flow to the drill bit end, and the drill bit end continues to drill, gradually increasing the pumping flow of the high-pressure mud pump and the power of the hydraulic lift pump. The drilling fluid returned from the bottom of the well is greater than the drilling fluid pumped into the bottom of the well, and the height of the static liquid column of the drilling fluid in the wellbore decreases. As the relatively high-density drilling fluid is discharged, the pressure in the wellbore gradually decreases to the formation pressure, and the drilling fluid is no longer lost, and normal drilling can be resumed;
[0020] S108, High-pressure formation drilling: When the surface monitoring detects abnormal rise of the liquid level in the wellbore, it indicates that well invasion or overflow has occurred. At this time, the flow rate of the high-pressure mud pump group is reduced, the power of the hydraulic lift pump is reduced, the flow rate of the pumped drilling fluid is greater than the flow rate of the returned drilling fluid, and the height of the static liquid column of the drilling fluid in the wellbore increases. At the same time, the opening of the linear throttle valve is reduced through hydraulic parameter calculation and optimization control system to increase the wellbore back pressure. The pressure in the wellbore gradually increases to the formation pressure. The formation fluid no longer immerses in the wellbore, and normal drilling can be resumed;
[0021] SⅡ, the controlled pressure cementing process, specifically includes the following steps:
[0022] S201, the drilling stage is completed, the double-layer drill pipe is taken out and the downhole drilling tool assembly is carried out, the cementing casing is lowered, and valves IV, V and III are closed at the same time, and valves II and VI are opened;
[0023] S202, start the high-pressure mud pump group to inject cement slurry from the cementing mud pool into the casing through the top drive, and the bottom hole drilling fluid begins to return from the casing and the wellbore annulus, and flows into the closed vibrating screen through the wellhead blowout preventer group, valve II, and adjustable linear throttle valve for post-processing. During the cement slurry injection process, the pressure gauge signal, flow meter signal, and adjustable linear throttle valve opening are fed back to the hydraulic parameter calculation and optimization control system;
[0024] S203, the hydraulic parameter calculation and optimization control system regulates the opening of the adjustable linear throttle valve to control the back pressure in the wellbore, and at the same time changes the power of the high-pressure pump group to change the cement slurry injection rate and injection volume to control the cement slurry pressure in the wellbore, so as to ensure that the cement slurry pressure at each location in the wellbore is between the formation pressure and the fracture pressure at the corresponding formation depth; the low-density medium, isolation fluid and drilling fluid replaced in the slurry replacement process pass through the wellhead blowout preventer, valve II, adjustable linear throttle valve, flow meter, vibrating screen, and enter the mud pool for post-processing;
[0025] After S204 and controlled pressure cementing, S103, S104 and SⅡ are repeated to start the next stage of drilling process.
[0026] Beneficial effects:
[0027] The beneficial effects of the present invention are:
[0028] 1. Two static liquid columns with different heights, a low-density medium static liquid column and a drilling fluid static liquid column, are formed between the drill pipe and the well wall. When drilling into leaky formations or high-pressure formations, the drilling fluid injection flow of the high-pressure mud pump can be adjusted to change the power of the underwater lift pump, thereby adjusting the height of the static liquid column of the drilling fluid column. By reducing the height of the static liquid column of the drilling fluid and simultaneously opening the short-circuit while drilling to inject the plugging agent, the bottom hole pressure can be reduced to solve the vicious leakage of the drilling fluid. By increasing the height of the static liquid column of the drilling fluid, the bottom hole pressure can be increased to solve the well kick and overflow problems caused by the high-pressure formation pressure.
[0029] 2. The cuttings at the bottom of the well are transported through the inner tube of the double-layer drill pipe without passing through the annulus between the drill pipe and the well wall. At the same time, under the action of the hydraulic lift pump, the cuttings in the double-layer pipe move faster, the bottom of the well cleaning efficiency is improved, the drilling cycle is shortened, and the drilling cost is greatly saved.
[0030] 3. Two static liquid columns with different heights, the low-density medium static liquid column and the drilling fluid static liquid column, are formed between the drill pipe and the well wall. The height of the low-density medium static liquid column can be directly obtained through the low-density medium metering tank, and then the accurate value of the bottom hole pressure can be obtained, so as to realize accurate monitoring of the bottom hole pressure and ensure the safety of drilling.
[0031] 4. After plugging or drilling is completed, cement slurry can be injected for pressure-controlled cementing. Through hydraulic parameter calculation and optimization control system, as well as adjustable linear throttle valve, the bottom hole pressure and wellhead back pressure can be adjusted to achieve efficient and safe cementing.
[0032] 5. Equipped with measurement while drilling tools and rotary steering tools, it can realize the drilling of horizontal wells during the exploration of complex oil and gas reservoirs.
[0033] 6. The equipment and systems required for managed pressure drilling and managed pressure cementing are highly integrated. The integrated operation of efficient and safe drilling and cementing can be completed using relatively simple devices and system components, and the efficiency of well construction is effectively improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0035] Figure 2 For the present invention Figure I A magnified view of the overall structure;
[0036] Figure 3 This is a schematic diagram of the process of plugging leaks in the leaky layer of the present invention;
[0037] Figure 4 This is a schematic diagram of the structure of the controlled pressure cementing process of the present invention;
[0038] Figure 5 It is a schematic diagram of the drilling process of the present invention;
[0039] Figure 6 This is a schematic diagram of the process flow of the controlled pressure cementing process of the present invention;
[0040] In the figure: 1-valve II, 2-pressure gauge, 3-valve III, 4-auxiliary pump group, 5-low-density medium metering tank, 6-hydraulic parameter calculation and optimization control system, 7-valve I, 8-adjustable linear throttle valve, 9-flow meter, 10-enclosed vibrating screen, 11-mud pool, 12-plugging agent tank, 13-valve VI, 14-cementing cement slurry mixing tank, 15-valve V, 16-valve IV, 17-high-pressure mud pump group, 18-derrick, 19-top drive , 20-double-layer pipe adapter, 21-bridge channel I, 22-double-layer drill pipe, 23-wellhead blowout preventer, 24-isolation fluid, 25-turbine motor, 26-bridge channel II, 27-turbine pump, 28-battery short circuit, 29-well inclination probe pipe, 30-centralizer, 31-pulse generator assembly, 32-while-drilling plugging short circuit, 33-suction short circuit, 34-turbodrill, 35-working fluid control unit, 36-biased mechanism execution unit, 37-drill bit. DETAILED DESCRIPTION
[0041] The present invention is further described below in conjunction with the accompanying drawings, and the protection scope of the present invention is not limited to the following description:
[0042] like Figure 1-Figure 4As shown; a complex reservoir formation dual gradient drilling and completion integrated operation system and method, which includes valve II 1, pressure gauge 2, valve III 3, auxiliary pump group 4, low-density medium metering tank 5, hydraulic parameter calculation and optimization control system 6, valve I 7, adjustable linear throttle valve 8, flow meter 9, closed vibrating screen 10, mud pool 11, plugging agent tank 12, valve VI 13, cementing cement slurry mixing tank 14, valve V 15, valve IV 16, high-pressure mud pump group 17, derrick 18, top drive 19, double-layer pipe adapter 20, bridge channel I 21, double-layer drill pipe 2 2. Wellhead BOP 23, spacer fluid 24, turbine motor 25, bridge channel II 26, turbine pump 27, battery short circuit 28, well inclination probe 29, stabilizer 30, pulse generator assembly 31, while drilling plugging short circuit 32, suction short circuit 33, turbodrill 34, working fluid control unit 35, paranoid mechanism execution unit 36, drill bit 37; the ground system consists of derrick 18, top drive 19, double-layer pipe adapter 20, wellhead BOP 23, cementing cement slurry mixing tank 14, plugging agent tank 12, pressure control system, mud circulation system, low-density medium circulation system The pressure control system is composed of valve I7, valve II1, adjustable linear throttle valve 8, pressure gauge 2, flow meter 9, hydraulic parameter calculation and optimization control system 6; wherein the hydraulic parameter calculation and optimization control system 6 can collect feedback signals from the adjustable linear throttle valve 8, pressure gauge 2, flow meter 9, and the adjustable linear throttle valve 8 can receive feedback signals from the hydraulic parameter calculation and optimization control system 6, thereby realizing the adjustment of the opening of the adjustable linear throttle valve 8; the mud circulation system is composed of a closed vibrating screen 10, a mud pool 11, valve IV16, The high-pressure mud pump group 17 is composed of the low-density medium circulation system, which is composed of the isolation fluid 24, the valve III 3, the auxiliary pump group 4, and the low-density medium metering tank 5; the downhole drilling tool assembly is composed of the double-layer drill pipe 22, the bridge channel I 21, the hydraulic lift pump, the battery short circuit 28, the well inclination probe 29, the centralizer 30, the pulse generator assembly 31, the while-drilling plugging short circuit 32, the suction short circuit 33, the turbodrill 34, the working fluid control unit 35, the paranoid mechanism execution unit 36, and the drill bit 37, wherein the hydraulic lift pump is composed of the turbine motor 25, the bridge channel II 26, and the turbo pump 27;The bridge channel I 21 is installed at the bottom of the double-layer adapter 20, the lower end of the bridge channel I 21 is connected to the double-layer drill pipe 22, the lower part of the double-layer drill pipe 22 is sequentially installed with a turbine motor 25, a bridge channel II 26, and a turbine pump 27 through threaded connection, wherein the bridge channel II 26 is installed between the turbine motor 25 and the turbine pump 27 through threaded connection, the battery short circuit 28, the well inclination probe 29, the centralizer 30, and the pulse generator assembly 31 are sequentially connected and installed at the lower end of the turbine pump 27 to form a measurement while drilling system, the plugging while drilling short circuit 32 and the suction short circuit 33 are sequentially installed at the lower part of the pulse generator assembly 31, and the turbodrill 34, the working fluid control unit 35, the paranoid mechanism execution unit 36, and the drill bit 37 are sequentially connected and installed at the lower part of the suction short circuit 33 to form a rotary steering system. ;
[0043] The working process of the present invention is as follows:
[0044] SⅠ. The drilling and plugging process specifically includes the following steps:
[0045] S1. Use conventional drilling methods to conduct the first drilling, drill to a predetermined depth, lower the surface casing, and then perform the first cementing according to conventional processes;
[0046] S2, installing the wellhead blowout preventer 23, wherein the low-density medium metering tank 5 is connected to the wellhead blowout preventer through a hose, and the low-density medium and the isolation fluid 24 can be pumped into the well through the wellhead blowout preventer 23;
[0047] S3, controlled pressure drilling: the lower part of the top drive 19 is connected to the double-layer pipe adapter 20, and the lower end of the double-layer pipe adapter 20 is connected to the assembled downhole tool assembly. The downhole tool assembly passes through the wellhead blowout preventer and goes into the wellbore. Close valve II1, valve III3, and open valve I7; open the high-pressure mud pump group 17, and the drilling fluid enters the inner pipe of the double-layer pipe adapter 20 from the mud pool 11 through the top drive 19. The pressurized drilling fluid passes through the bridge channel I 21 and then is transferred from the inner pipe of the double-layer adapter 20 to the double-layer pipe annulus. The drilling fluid in the annulus flows downward to the turbine motor 25. Driven by the drilling fluid, the turbine motor 25 starts to rotate. The drilling fluid passes through the bridge channel II 26 and then enters the inner channel of the turbine pump 27 from the double-layer pipe annulus. Thereafter, the drilling fluid passes through the battery short-circuit 28, the well inclination probe 29, the inner channel of the centralizer 30, the pulse generator assembly 31, and the drilling plugging short-circuit 32 inner channel, under the action of pressurized drilling fluid, the turbine drill 34 starts to rotate and output torque, the well inclination probe 29 collects wellbore structure data, the working fluid control unit 35 and the paranoid mechanism execution unit 36 start to work under the action of drilling fluid, wherein the paranoid mechanism execution unit 36 adjusts the drilling direction of the drill bit 37, and the drilling fluid reaches the bottom of the well through the end of the drill bit 37. When the drilling fluid in the wellbore reaches the preset height, the auxiliary pump group 4 injects a quantitative isolation fluid 24 into the wellbore through the wellhead blowout preventer 23 channel. The isolation fluid 24 is located on the upper part of the drilling fluid and does not mix with the drilling fluid. At the same time, a low-density medium is injected into the wellbore through the wellhead blowout preventer 23 channel, and the pumping flow rate is recorded. The low-density medium is located on the upper end of the isolation fluid 24 and does not mix with the isolation fluid 24, ensuring that the pressure at each location in the wellbore is between the formation pressure and the fracture pressure at the corresponding formation depth, establishing a drilling fluid circulation, and starting the drilling process;
[0048] S4. Drilling in leaky formations: When the surface monitors that the liquid level in the wellbore drops abnormally, it indicates that a leaky formation has been drilled. At this time, the pulse generator assembly 31 is controlled by the ground control system to send a pulse signal. After receiving the signal, the drilling plugging short circuit 32 closes the axial channel, and the fluid cannot flow out to the drill bit end. The valve IV 16 is closed, the valve V 15 is opened, and the pumping flow of the high-pressure mud pump group 17 is reduced to below the starting flow of the hydraulic lift pump. The plugging agent is pumped into the well, and the plugging agent flows through the upper downhole drilling tool assembly to the drilling plugging short circuit 32, and is ejected from the injection channel of the drilling plugging short circuit 32 into the ground. After the injection of the plugging agent is completed, the valve IV16 is opened and the valve V15 is closed. At the same time, after the plugging short circuit 32 receives the pulse signal, the axial channel is opened and the injection channel is closed, and the drilling fluid can flow to the drill bit end. The drill bit end continues to drill, and the pumping flow of the high-pressure mud pump group 17 is gradually increased. The power of the hydraulic lift pump increases, the drilling fluid returned from the bottom of the well is greater than the drilling fluid pumped into the bottom of the well, and the height of the static liquid column of the drilling fluid in the wellbore decreases. As the higher density drilling fluid is discharged, the pressure in the wellbore gradually decreases to the formation pressure, the drilling fluid is no longer lost, and normal drilling can be resumed;
[0049] S5, high-pressure formation drilling: When the surface monitoring detects abnormal rise of the liquid level in the wellbore, it indicates that well invasion or overflow has occurred. At this time, the flow rate of the high-pressure mud pump group 17 is reduced, the power of the hydraulic lift pump is reduced, the flow rate of the drilling fluid pumped in is greater than the flow rate of the drilling fluid returned, and the height of the static liquid column of the drilling fluid in the wellbore increases. At the same time, the opening of the adjustable linear throttle valve 8 is reduced by the hydraulic parameter calculation and optimization control system 6 to increase the wellbore back pressure. The pressure in the wellbore gradually increases to the formation pressure, and the formation fluid no longer immerses in the wellbore, and normal drilling can be resumed;
[0050] SⅡ, the controlled pressure cementing process, specifically includes the following steps:
[0051] S6, the drilling stage is completed, the double-layer drill pipe 22 is taken out and the downhole drilling tool assembly is carried out, and the cementing casing is lowered, and valve IV16, valve V15, valve III3 are closed at the same time, and valve II1 and valve VI13 are opened;
[0052] S7, start the high-pressure mud pump group 17 to inject cement slurry from the cementing cement slurry mixing tank 14 into the casing through the top drive 19, and the bottom hole drilling fluid begins to return from the casing and the wellbore annulus, and flows into the closed vibrating screen 10 through the wellhead blowout preventer 23, valve II1, and adjustable linear throttle valve 8 for post-processing. During the cementing cement slurry injection process, the pressure gauge 2 signal, the flow meter 9 signal, and the opening of the adjustable linear throttle valve 8 are fed back to the hydraulic parameter calculation and optimization control system 6, and the hydraulic parameter calculation and optimization control system 6 controls the adjustable linear throttle valve 8 opening controls the back pressure in the wellbore, and at the same time changes the power of the high-pressure mud pump group 17 to change the cement slurry injection rate and injection volume to control the cement slurry pressure in the wellbore, ensuring that the cement slurry pressure at each location in the wellbore is between the formation pressure and the fracture pressure at the corresponding formation depth; the low-density medium, isolation fluid 24 and drilling fluid replaced in the slurry replacement process pass through the wellhead blowout preventer 23, valve II1, adjustable linear throttle valve 8, flow meter 9, vibrating screen 10, and enter the mud pool 11 for post-processing; S8, after pressure-controlled cementing, repeat S3 to start the next stage of drilling process.
[0053] Finally, it should be noted that the above embodiments are only used to illustrate rather than limit the technical solutions of the present invention. Although the present invention has been described in detail with reference to the above embodiments, those skilled in the art should understand that this patent can still be modified or replaced by equivalents. Any modification or partial replacement that does not depart from the spirit and scope of the present invention should be included in the scope of the claims of the present invention.
Claims
1. A dual-gradient drilling and completion integrated operation system for complex oil reservoir formations, the system comprising a ground system and a downhole tool assembly, wherein the ground system comprises a derrick (18), a top drive (19), a double-layer pipe adapter (20), a wellhead blowout preventer (23), a cementing slurry mixing tank (14), a plugging agent tank (12), a pressure control system, a mud circulation system, a pressure control system, and a low-density medium circulation system; the mud circulation system comprises a closed vibrating screen (10), a mud pool (11), a valve IV (16) connected in sequence through pipelines , a high-pressure mud pump group (17); a low-density medium circulation system is composed of an isolation fluid (24), a valve III (3), an auxiliary pump group (4), and a low-density medium metering tank (5); a downhole drilling tool assembly includes a double-layer drill pipe (22), a bridge channel I (21), a hydraulic lift pump, a battery short circuit (28), a well inclination probe (29), a centralizer (30), a pulse generator assembly (31), a while-drilling plugging short circuit (32), a suction short circuit (33), a turbodrill (34), a working fluid control unit (35), and a paranoid machine The invention relates to a hydraulic lifting pump comprising a turbine motor (25), a bridge channel II (26) and a turbine pump (27); the bridge channel I (21) is installed at the lower part of the double-layer adapter (20); the lower end of the bridge channel I (21) is connected to the double-layer drill pipe (22); the turbine motor (25), the bridge channel II (26) and the turbine pump (27) are installed in sequence at the lower part of the double-layer drill pipe (22) through threaded connection; the bridge channel II (26) is installed between the turbine motor (25) and the double-layer drill pipe (22) through threaded connection. The turbine pump (27), the battery short circuit (28), the well inclination probe (29), the centralizer (30), and the pulse generator assembly (31) are sequentially connected and installed at the lower end of the turbine pump (27) to form a measurement while drilling system. The leakage plugging while drilling short circuit (32) and the suction short circuit (33) are sequentially installed at the lower part of the pulse generator assembly (31). The turbine drill (34), the working fluid control unit (35), the paranoid mechanism execution unit (36), and the drill bit (37) are sequentially connected and installed at the lower part of the suction short circuit (33) to form a rotary steering system. It is characterized in that The pressure control system is composed of valve I (7), valve II (1), an adjustable linear throttle valve (8), a pressure gauge (2), a flow meter (9), and a hydraulic parameter calculation and optimization control system (6); wherein the hydraulic parameter calculation and optimization control system (6) can collect feedback signals from the adjustable linear throttle valve (8), the pressure gauge (2), and the flow meter (9), and the adjustable linear throttle valve (8) can receive feedback signals from the hydraulic parameter calculation and optimization control system (6), thereby adjusting the opening of the adjustable linear throttle valve (8). The complex reservoir formation dual gradient drilling and completion integrated operation system comprises the following implementation steps: SⅠ. Drilling and plugging process: S101, using a conventional drilling method to perform the first drilling, drilling to a predetermined depth, inserting a surface casing, and then performing the first cementing according to a conventional process; S102, installing a wellhead blowout preventer (23), wherein the low-density medium metering tank (5) is connected to the wellhead blowout preventer via a hose, and the low-density medium and the isolation fluid (24) can be pumped into the well via the wellhead blowout preventer (23); S103, controlled pressure drilling: The lower part of the top drive (19) is connected to the double-layer pipe adapter (20), and the lower end of the double-layer pipe adapter (20) is connected to the assembled downhole tool assembly. The downhole tool assembly passes through the wellhead blowout preventer (23) and goes into the wellbore. The valve II (1) and valve III (3) are closed, and the valve I (7) is opened. The high-pressure mud pump group (17) is turned on, and the drilling fluid enters the inner pipe of the double-layer pipe adapter (20) from the mud pool (11) through the top drive (19). The pressurized drilling fluid passes through the bridge channel I (21) and then is transferred from the inner pipe of the double-layer adapter (20) to the annulus of the double-layer pipe. The drilling fluid in the annulus flows downward to the The turbine motor (25) starts to rotate under the driving of the drilling fluid. The drilling fluid passes through the bridge channel II (26) and then enters the inner channel of the turbine pump (27) from the double-layer pipe annulus. Thereafter, the drilling fluid passes through the battery short circuit (28), the well inclination probe (29), the inner channel of the centralizer (30), the pulse generator assembly (31), and the inner channel of the while-drilling plugging short circuit (32). Under the action of the pressurized drilling fluid, the turbine drill (34) starts to rotate and output torque. The working fluid control unit (35) and the bias mechanism execution unit (36) start to work, and the drilling fluid passes through the drill bit (37) to reach the bottom of the well. S104, when the drilling fluid in the wellbore reaches a preset height, the auxiliary pump group (4) injects a quantitative isolation fluid (24) into the wellbore through the wellhead blowout preventer (23) channel, the isolation fluid (24) is located above the drilling fluid and is immiscible with the drilling fluid, and at the same time, a low-density medium is injected into the wellbore through the wellhead blowout preventer (23) channel, and the pumping flow rate is recorded. The low-density medium is located above the isolation fluid (24) and is immiscible with the isolation fluid (24), ensuring that the pressure at each location in the wellbore is between the formation pressure and the fracture pressure at the corresponding formation depth, establishing a drilling fluid circulation, and starting the drilling process; S105, drilling in leaky formations: When the surface monitor detects an abnormal drop in the liquid level in the wellbore, it indicates that the drilling has reached a leaky formation. At this time, the pulse generator assembly (31) is controlled by the ground control system to send a pulse signal, and the drilling plugging short circuit (32) closes the axial channel after receiving the signal, so that the fluid cannot flow out to the drill bit end; S106, close valve IV (16), open valve V (15), reduce the pumping flow rate of the high-pressure mud pump group (17) to below the starting flow rate of the hydraulic lift pump, pump the plugging agent into the well, the plugging agent flows through the upper downhole drilling tool assembly to the while-drilling plugging short circuit (32), and is ejected from the injection channel of the while-drilling plugging short circuit (32) into the formation cracks to plug the leak; the plugging agent injection is completed; S107, open valve IV (16), close valve V (15), and at the same time, after receiving the pulse signal, the axial channel of the drilling plugging short circuit (32) is opened and the injection channel is closed, so that the drilling fluid can flow to the drill bit end, and the drill bit end continues to drill. The pumping flow of the high-pressure mud pump group (17) is gradually increased, and the power of the hydraulic lift pump is increased. The drilling fluid returned from the bottom of the well is greater than the drilling fluid pumped into the bottom of the well, and the height of the static liquid column of the drilling fluid in the wellbore decreases. As the relatively high-density drilling fluid is discharged, the pressure in the wellbore gradually decreases to the formation pressure, and the drilling fluid is no longer lost, and normal drilling can be resumed; S108, high-pressure formation drilling: When the surface monitoring detects that the liquid level in the wellbore rises abnormally, it indicates that well invasion or overflow has occurred. At this time, the flow rate of the high-pressure mud pump group (17) is reduced, the power of the hydraulic lift pump is reduced, the flow rate of the drilling fluid pumped in is greater than the flow rate of the drilling fluid returned, and the height of the static liquid column of the drilling fluid in the wellbore increases. At the same time, the opening of the adjustable linear throttle valve (8) is reduced through the hydraulic parameter calculation and optimization control system (6) to increase the wellbore back pressure. The pressure in the wellbore gradually increases to the formation pressure. The formation fluid no longer immerses in the wellbore, and normal drilling can be resumed; SⅡ, controlled pressure cementing process: S201, the drilling stage is completed, the double-layer drill pipe (22) is taken out and the downhole drilling tool assembly is carried out, the cementing casing is lowered, and valve IV (16), valve V (15), valve III (3) are closed at the same time, and valve II (1) and valve VI (13) are opened; S202, the high-pressure mud pump group (17) is turned on to inject cement slurry from the cementing cement slurry mixing tank (14) into the casing through the top drive (19), and the bottom hole drilling fluid begins to return from the casing and the wellbore annulus, and flows into the closed vibrating screen (10) through the wellhead blowout preventer (23), valve II (1), and adjustable linear throttle valve (8) for post-processing. During the cementing cement slurry injection process, the pressure gauge (2) signal, the flow meter (9) signal, and the opening of the adjustable linear throttle valve (8) are fed back to the hydraulic parameter calculation and optimization control system (6). S203, the hydraulic parameter calculation and optimization control system (6) controls the opening of the adjustable linear throttle valve (8) to control the back pressure in the wellbore, and at the same time changes the power of the high-pressure mud pump group (17) to change the cement slurry injection rate and injection amount to control the cement slurry pressure in the wellbore, so as to ensure that the cement slurry pressure at each location in the wellbore is between the formation pressure and the fracture pressure at the corresponding formation depth. The low-density medium, isolation fluid (24) and drilling fluid replaced in the slurry replacement process pass through the wellhead blowout preventer (23), valve II (1), adjustable linear throttle valve (8), flow meter (9), vibrating screen (10), and enter the mud pool (11) for post-processing; After S204 and controlled pressure cementing, S103, S104 and SⅡ are repeated to start the next stage of drilling process.
2. According to claim 1, a dual-gradient drilling and completion integrated operation system for complex oil reservoir formations, Features: The drilling plugging short-circuit (32) is provided with an injection channel penetrating the inner and outer annuli of the double-layer pipe.
Citation Information
Patent Citations
While-drilling bypass valve
CN105569609A
Switch mode drilling tool bypass valve
CN105569610A
Double-layer continuous pipe double-gradient drilling system
CN111021958A
Leakage-measuring and plugging method during drilling
CN111894560A
Multi-gradient pressure control drilling system
CN113250617A
