A method for treating deep porous water-bearing strata at a vertical shaft working face
Through the segmented grouting method combined with single-liquid cement slurry and chemical slurry, the dual-machine double-hole grouting technology with high pressure and high flow rate was solved, and the problems of grouting difficulties and poor water blocking effect in pore water-containing formation management were achieved, achieving high efficiency The water blocking effect and process optimization have significantly improved the management effect of the shaft working face.
Patent Information
- Application Number
- CN202210649706.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-06-09
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2042-06-09
AI Technical Summary
When dealing with deep pore aquatic formations on the working surface of the shaft, the grouting process is backward, the slurry injection is difficult, the water blocking effect is poor, the process conversion is frequent, and the construction period is long. In particular, the granular materials are difficult to enter the pore water formation with small pore sizes, resulting in The governance effect is not good.
The segmented grouting method is adopted, combining single-liquid cement slurry and chemical slurry. Through high-pressure and high-flow dual-machine double-hole grouting technology, the single-liquid cement slurry is first injected into small cracks, and then the modified urinary aldehyde resin slurry is used to perform pore water. For the water blocking of the formation, the mix ratio and control valve are adjusted through the ground grouting machine to achieve quantitative and uniform hole division grouting, and then the formation grouting is carried out after the slurry flocculation and stone body strength is ensured.
It improves the water blockage rate of pore aquatic formations, shortens the grouting period, reduces process conversion, and significantly improves the treatment effect. The grouting section is tall, there are few process conversions, and has high application value.
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of mine water prevention and control, and in particular to a method for treating deep porous water-bearing strata on a vertical shaft working face. Background Art
[0002] With the rapid development of mining construction technology and the large-scale development of coal resources in western my country, in the construction of vertical shafts, we often encounter stratum fissure water, pore water, karst water, structural water, etc. These stratum water sources are often abundant and the amount of water gushing is large. If not handled properly, it may cause flooding and casualties, and seriously restrict the construction period of mines.
[0003] The vertical shaft mainly passes through porous water-bearing soft rock formations of the Tertiary, Cretaceous, and Jurassic periods, with effective porosity generally between 5-30%, and the most common being 10-25%. It has strong water-rich and good water-conducting capacity. The fissure rate of formation fissure water is generally between 3-10%, and the fissure opening is relatively large. In the process of vertical shaft construction using the common method, the method of pre-grouting of the working face is generally used to treat the aquifer. The pre-grouting method has rich experience and good treatment effects for formations with fissure water, karst water, and tectonic water, but there is still a lack of treatment methods and experience for porous water formations. Since the commonly used grouting materials are cement slurry and clay slurry, both of which are granular materials, and the pore size of porous aquifers is small, it is difficult for granular materials to enter the pores, so the grouting and water blocking effect is poor; the fissure opening of fissure water and tectonic water is relatively large, and granular materials can enter the fissures well and fill them densely, so the grouting and water blocking effect is good. At present, the technology for treating water-bearing strata in interstitial spaces at the working surface of vertical shafts has some outstanding problems, such as backward grouting technology, difficulty in slurry injection, poor grouting water blocking effect, small and high grouting section, frequent process conversion and long grouting period.
[0004] Therefore, a method for treating deep porous water-bearing strata at the shaft working face is proposed. Summary of the invention
[0005] The purpose of the present invention is to provide a method for treating deep porous water-bearing strata at a vertical shaft working face, so as to solve the problems raised in the above-mentioned background technology.
[0006] To achieve the above object, the present invention provides the following technical solution: a method for treating deep porous water-bearing strata at a vertical shaft working face, the method comprising the following steps:
[0007] S1. Grouting design: The grouting section height can be determined based on the well inspection data, combined with factors such as the thickness and number of aquifers. It is generally 30m / section to 50m / section. The height of a single section should not be greater than 100m. The segmented grouting method can be used to achieve a single large-section high treatment of multiple aquifers. The number of grouting holes should be determined based on the grouting slurry diffusion radius and curtain thickness. Generally, the effective slurry diffusion radius is 8m to 12m, and the number of boreholes is generally 6 to 8. The grouting pressure design of the working face should be calculated at 2 to 4 times the hydrostatic pressure. The grouting materials are single-liquid cement slurry and chemical slurry. The grouting volume is calculated according to the fracture rate and porosity respectively.
[0008] S2. Construction of concrete stop pads; the concrete stop pads should be poured together with the well wall;
[0009] S3, set up the drilling platform and bury the water-stop casing;
[0010] S4, reinforcement of grouting cap: reinforcement by grouting drilling with the same grouting material;
[0011] S5, grouting drilling construction: use a drilling rig to drill holes;
[0012] S6. Perform grouting with single-liquid cement slurry. First, use single-liquid cement slurry to grout and plug water in the strata above the small cracks, and meet the single-liquid cement slurry grouting completion standard;
[0013] S7, chemical slurry grouting; using modified urea-formaldehyde resin slurry, according to the ratio of liquid A and liquid B, firstly, two three-cylinder grouting machines are modified, one of which absorbs liquid B and installs a control valve to adjust the amount of liquid absorbed, and the other two cylinders absorb liquid A; secondly, according to the ratio, trial mixing is carried out through the ground grouting machine, the grouting machine is adjusted to the maximum flow rate and high-pressure grouting is adopted at the same time, and the liquid B control valve is adjusted to meet the slurry flocculation time and stone body strength, and then the formation grouting is carried out; thirdly, double-machine and double-hole grouting is adopted, and the chemical slurry is quantitatively injected in batches and holes; according to the designed grouting amount, each hole is quantitatively and evenly distributed, and a single hole is pressed three times, and the time interval for waiting for solidification is 8h. The initial injection amount is half of the total amount of the single hole, and the grouting is continuous without interruption in the middle. The amount of the second and third hole sweeping is half of the remaining amount, and the re-injection improves the formation water blocking rate;
[0014] S8, repeat the above procedure, and extend the grouting downward section by section, so as to achieve the construction of one working face to treat multiple aquifer sections;
[0015] S9. Water sealing effect inspection: The amount of chemical slurry injected should meet the design requirements; the number of drilling holes for construction inspection should be no less than 3, and the water inflow of a single hole should be less than 1.5m 3 / h, it is believed that this grouting has achieved the water sealing effect.
[0016] Preferably, in step S2, the thickness of the concrete stop pad is preferably 1.5 m to 3 m.
[0017] Preferably: in step S3, the length of the water-stopping sleeve shall not be less than 20 m, and the water-stopping sleeve shall be subjected to a pressure test, and the test pressure shall not be less than 1.2 times the grouting pressure.
[0018] Preferably: in step S4, the thickness of the grouting rock cap shall not be less than 20 m, and the reinforcement pressure shall not be less than 1.2 times of the grouting pressure.
[0019] Preferably, in step S5, during the grouting drilling construction, in the rock formation with a water pressure greater than 3 MPa, the lead distance between the water exploration and drainage drilling and the grouting drilling in the rock formation shall not be less than 25 m, and the water inflow of the drilling hole shall reach 10 m 3 / h, drilling should be stopped.
[0020] Preferably, in step S7, the main components of liquid A are urea-formaldehyde resin, dinitropropene amide, and propene amide; the main components of liquid B are ammonium persulfate, oxalic acid, and water; liquid A is provided by the manufacturer, and liquid B is prepared on site (water: oxalic acid: ammonium persulfate = 100: 1.5: 0.015; i.e. 1m 3 Liquid B = 1000Kg water: 15Kg oxalic acid: 0.15Kg ammonium persulfate).
[0021] Preferably: in step S7, the ratio of liquid A to liquid B is 10:3, the flocculation time of the slurry of this formula is 40 minutes, and the stone strength is 7 MPa.
[0022] Compared with the prior art, the beneficial effects of the present invention are: this method is the only method for treating porous water-bearing strata, with good treatment effect, high water blocking rate, short grouting period, large grouting section, less process conversion, and high application and promotion value. DETAILED DESCRIPTION
[0023] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the embodiments of the present invention.
[0024] This method uses granular (single-liquid cement slurry) materials + non-granular (chemical slurry) materials, uses a grouting station arranged on the ground, connects the high-pressure grouting pipeline laid in the wellbore and the high-pressure valve of the working face with the stop grouting casing, and uses a high-pressure, high-flow double grouting machine to inject the slurry into the injected formation in sections and multiple times, thereby achieving large-section high-pressure treatment of fractures and porous water-bearing formations on the working face. In terms of treatment sequence, the treatment of formation fissure water should be carried out first, and then the treatment of formation pore water, that is, the granular (single-liquid cement slurry) material should be injected first, and then the non-granular (chemical slurry) material should be injected.
[0025] Pore size and crack analysis: There are various pores in rocks, which can be divided into macropores, mesopores and micropores according to their size; macropores refer to pores with a diameter greater than 50nm, mesopores refer to pores with a diameter greater than 2nm and less than 50nm, and micropores refer to pores with a diameter less than 2nm. Cracks can be divided into large cracks (width>100μm), medium cracks (10μm~100μm), small cracks (1μm~10μm) and microcracks (<1μm) according to their opening size; in fact, there is no difference between microcracks and intergranular pores.
[0026] Analysis of commonly used materials for grouting: Grouting materials are divided into granular materials and non-granular (chemical slurry) materials according to their types. Commonly used granular materials are mainly cement and clay. The particle size of cement materials, such as 1250 mesh ultrafine cement, has an average particle size of 11um (11000nm), such as 7000 mesh ultrafine cement, has an average particle size of 1.25um (1250nm). The particle size of clay materials, mud bentonite 75um (200 mesh) wet sieve analysis residue <3%. Non-granular (chemical slurry) materials mainly use modified urea-formaldehyde resin and Marisan.
[0027] Relationship between grouting materials and formation fissures and pores: According to the results of previous research, the pore diameter d must be more than 3 times the slurry particle diameter D before it can be injected; the particle size of commonly used cement in China is 0.085mm, and cement can only be injected into 0.255mm pores. If you want to inject cement into smaller pores, the most direct way is to make the cement particles smaller and use ultrafine cement; taking 7000 mesh ultrafine cement as an example, its average particle size is 1.25um (1250nm), and cement can only be injected into 3.75um (3750nm) pores, while the large pore diameter in the pore refers to the pores larger than 50nm, and the difference between the two is large, so ultrafine cement cannot be used to treat porous water formations. For formation fissure water, granular materials are only injectable to formations above small fissures, but micro-fracture aquifers are not injectable. Non-granular (chemical slurry) materials have good injectability for formation fissure water, pore water, karst water, tectonic water, etc., that is, chemical slurry can reach where water passes; in addition, since the strength of chemical slurry after solidification is relatively low (generally around 7MPa), for deep wells with high water pressure, other types of water except formation pore water and micro-fracture water are easily squeezed out by the solidified chemical slurry due to the pressure release effect after formation excavation, thus forming a water passage. However, the water plugging effect of formation pore water and micro-fracture water after solidification with chemical slurry is significantly different, because the pores of sandstone are small, and under a certain porosity, the pore wall area is large, and the consolidation force generated by the chemical slurry and the pore wall after solidification becomes larger, which can withstand the high water pressure of the formation. Therefore, granular materials should be used for the treatment of formation fissure water, karst water, tectonic water, etc.; non-granular (chemical slurry) materials should be used for formation pore water and micro-fracture water.
[0028] Example 1
[0029] The method of the present invention was applied to a deep vertical shaft project in a coal mine. The net diameter of the main shaft was φ7.0m, the shaft depth was 950m, the freezing depth was 590m, and the bedrock section was constructed using the common method. The main aquifer in the bedrock section was the sandstone fissure pore water aquifer of the Upper Shihezi Formation of the Permian System, with a burial depth of 742.71 to 867.37m. According to the information provided, the total water inflow of the shaft was expected to be about 100m 3 / h.
[0030] S1. Grouting engineering design: The grouting section is 100m high, with a starting and ending depth of 782m to 882m (of which the thickness of the fractured pore water aquifer is 75m and the thickness of the pore water stratum is 33.8m). It is divided into two sections. The first section is from 782m to 826m deep and 44m thick. The second section is from 826m to 882m and 56m thick. The lead distance of the water exploration borehole is 25m, the thickness of the concrete grouting pad is 2m, the thickness of the grouting rock cap is 22m, and the length of the orifice pipe is 20m. There are 6 grouting holes and 3 inspection holes. The final grouting pressure is 24MPa (single-liquid cement slurry). The chemical slurry is 648m 3 (The slurry in the first and second sections is 360m 3 、288m 3 ).
[0031] S2. Use C50 grade concrete to cast a 2m thick grouting pad.
[0032] S3. Set up a double-layer drilling platform on the working face and use the overall descending metal formwork to symmetrically fix two ZDY1900S drilling rigs. Construct 6 Φ108×6mm seamless steel pipes for water-stop casings with a length of 20m and pre-buried and reinforced.
[0033] S4. Use the water-stop casing and the slurry of the same grouting material to grout the grouting rock cap with a thickness of 22m to meet the grouting pressure requirements.
[0034] S5. Two ZDY1900S drilling rigs with a drill bit diameter of φ75mm were used to construct water exploration holes and grouting holes at the same time. The two holes were staggered by 10m. The first section was used for water exploration and grouting operations from the well depth of 782m to 826m and the thickness of 44m. The maximum water inflow of a single water exploration hole was 101m 3 / h, using the calculation of a complete well from pressure-bearing to pressure-free, the estimated wellbore water inflow is 170m 3 / h. This is quite different from the hydrogeological data provided.
[0035] S6. Use two XPB-90E grouting machines on the ground to implement double-hole grouting at the same time. Use high pressure and large flow to force single-liquid cement slurry of different proportions into the injected formation, thereby sealing the formation fissure water; each hole is re-injected 3 to 5 times to meet the grouting completion standard.
[0036] After the completion of the first stage of single-liquid grouting, joint water measurement was carried out in 6 boreholes. The total water inflow of the boreholes was 36m3 / h. Analysis showed that the remaining water in the formation was mainly pore water, and the thickness of the pore aquifer was 18.7m.
[0037] S7. Chemical grouting was carried out on the first section of the stratum using modified urea-formaldehyde resin slurry. According to the ratio of liquid A to liquid B of 10:3, two three-cylinder grouting machines were first modified, one of which absorbed liquid B and installed a control valve to adjust the amount of liquid absorbed, while the other two absorbed liquid A; the second step was to conduct trial mixing through the ground grouting machine, adjust the grouting machine to the maximum flow rate, adjust the liquid B control valve, and then carry out stratum grouting after the slurry flocculation time and stone body strength were met; the third step was to use double machines and double holes for grouting, with the initial single hole grouting volume of 30m 3 / hole; secondary hole single hole grouting volume 15m 3 / hole; three-hole single hole grouting volume 15m 3 / hole, total 360m 3 ; The waiting time for solidification is 8h.
[0038] S8, then the second section from 826m to 882m thick 56m section water exploration and grouting operations were carried out, the maximum water inflow of a single water exploration hole was 79m 3 / h, using the calculation of a complete well from pressure-bearing to pressure-free, the estimated wellbore water inflow is 129m 3 / h. Adopt S6 construction technology to implement the treatment of formation fissure water.
[0039] After the second stage of single-liquid grouting was completed, joint water measurement was carried out in 6 boreholes. The total water inflow of the boreholes was 24m3 / h. Analysis showed that the remaining water in the formation was mainly pore water, and the thickness of the pore aquifer was 15.1m.
[0040] The S7 construction technology was used to carry out chemical grouting in the second section of porous water strata. Dual-machine and dual-hole grouting was used, and the initial single-hole grouting volume was 24m 3 / hole; secondary hole single hole grouting volume 12m 3 / hole; three-hole single hole grouting volume 12m 3 / hole, total 288m 3 ; The waiting time for solidification is 8h.
[0041] It took a total of 10 days to treat pore water in two grouting sections using chemical slurry.
[0042] S9. Effect inspection: The slurry injection volume meets the design requirements; 3 holes were drilled for construction inspection, and the water inflow of each hole was less than 1m 3 / h; after excavation, the total water leakage in the grouting section is 4m 3 / h, the grouting water blocking rate reached more than 98%. According to the observation of the rock blocks after blasting, the chemical slurry in the pores was densely filled (white solid) and there was no trace of cement slurry filling (black solid).
[0043] Example 2
[0044] The method of the present invention is applied to a coal mine shaft project. The return air shaft has a net diameter of φ6.5m, a well depth of 545m, a freezing depth of 430m, and the bedrock section is constructed by ordinary method. The main aquifer of the bedrock section is the pore and fissure confined water aquifer of the "Qili Town Sandstone" clastic rock of the Middle Jurassic Zhiluo Formation, with a burial depth of 443-447m. According to the provided information, the hydrostatic pressure of the "Qili Town Sandstone" aquifer is 2.9MPa. It is estimated that the water inflow of this section of the aquifer is about 43m 3 / h.
[0045] S1. Grouting engineering design: grouting section height 30m, start and end depth 420m~450m; water exploration drilling hole advance distance 20m, concrete grouting pad thickness 2m, grouting rock cap thickness 20m, hole mouth pipe length 15m; 6 grouting holes, 3 inspection holes; grouting final pressure 12MPa (single liquid cement slurry); chemical slurry 132m 3 .
[0046] S2. Use C50 grade concrete to cast a 2m thick grouting pad.
[0047] S3. Set up a double-layer drilling platform on the working face and use the overall descending metal formwork to symmetrically fix two ZDY1900S drilling rigs. First, construct 6 Φ108×6mm seamless steel pipes for water-stop casings with a length of 15m and pre-buried and reinforced.
[0048] S4. Use the water-stop casing and the slurry of the same grouting material to grout the grouting rock cap with a thickness of 16m to meet the grouting pressure requirements.
[0049] S5. Two ZDY1900S drilling rigs with a drill bit diameter of φ75mm were used to construct water exploration holes and grouting holes at the same time. The two holes were staggered by 10m. The water exploration and grouting operations were carried out in the 30m thick section from 420m to 450m deep. The maximum water inflow of a single water exploration hole was 25m 3 / h, using the calculation of a complete well from pressure-bearing to pressure-free, the estimated wellbore water inflow is 78m 3 / h.
[0050] S6. Use two XPB-90E grouting machines on the ground to implement double-hole grouting at the same time. Use high pressure and large flow to force single-liquid cement slurry of different proportions into the injected formation, thereby sealing the formation fissure water; each hole is re-injected 3 to 5 times to meet the grouting completion standard.
[0051] After the single-liquid grouting was completed, the joint water measurement of 6 boreholes was carried out, and the total water inflow of the boreholes was 15m 3 / h. After analysis, the remaining water in the formation is mainly pore water, and the thickness of the pore aquifer is 4m.
[0052] S7. Chemical grouting is carried out on this porous water-bearing stratum using modified urea-formaldehyde resin slurry. According to the ratio of liquid A to liquid B of 10:3, firstly, two three-cylinder grouting machines are modified, one of which absorbs liquid B and installs a control valve to adjust the amount of liquid absorbed, and the other two cylinders absorb liquid A; secondly, trial mixing is carried out through the ground grouting machine, the grouting machine is adjusted to the maximum flow rate, and the liquid B control valve is adjusted to meet the slurry flocculation time and stone body strength, and then the formation grouting is carried out; thirdly, double-machine and double-hole grouting is adopted, and the grouting volume of the first hole is 11m 3 / hole; secondary hole single hole grouting volume 6m 3 / hole; three-hole single hole grouting volume 5m 3 / hole, total 132m 3 ; The waiting time for solidification is 8h.
[0053] It took a total of 4 days to treat pore water using chemical slurry.
[0054] S8. Effect inspection: The slurry injection volume meets the design requirements; 3 holes were drilled for construction inspection, and the water inflow of each hole was less than 1m 3 / h; after excavation, the total water leakage in the grouting section is 1m 3 / h, the grouting water blocking rate reached more than 98%. According to the observation of the rock blocks after blasting, the chemical slurry in the pores was densely filled (white solid) and there was no trace of cement slurry filling (black solid).
[0055] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A method for treating deep porous water-bearing strata at a vertical shaft working face. It is characterized in that The treatment method comprises the following steps: S1. Grouting design: The grouting section height can be determined based on the well inspection data, combined with the thickness and number of aquifers, and is 30m / section to 50m / section. The height of a single section is not more than 100m. The segmented grouting method can be used to achieve a single large-section high treatment of multiple aquifers. The number of grouting holes should be determined based on the grouting slurry diffusion radius and curtain thickness. The effective slurry diffusion radius is 8m to 12m, and the number of boreholes is 6 to 8. The grouting pressure design of the working face is calculated as 2 to 4 times the hydrostatic pressure. The grouting materials are single-liquid cement slurry and chemical slurry. The grouting volume is calculated according to the fracture rate and porosity respectively. S2. Construction of concrete stop pads; the concrete stop pads should be poured together with the well wall; S3, set up the drilling platform and bury the water-stop casing; S4, reinforcement of grouting cap: reinforcement by grouting drilling with the same grouting material; S5, grouting drilling construction: use a drilling rig to drill holes; S6. Perform grouting with single-liquid cement slurry. First, use single-liquid cement slurry to grout and block water in the strata above the small cracks, and meet the single-liquid cement slurry grouting completion standard; S7, chemical slurry grouting; using modified urea-formaldehyde resin slurry, according to the ratio of liquid A and liquid B, firstly, two three-cylinder grouting machines are modified, one of which absorbs liquid B and installs a control valve to adjust the amount of liquid absorbed, and the other two cylinders absorb liquid A; secondly, according to the ratio, trial mixing is carried out through the ground grouting machine, the grouting machine is adjusted to the maximum flow rate and high-pressure grouting is adopted at the same time, and the liquid B control valve is adjusted to meet the slurry flocculation time and stone body strength, and then the formation grouting is carried out; thirdly, double-machine and double-hole grouting is adopted, and the chemical slurry is quantitatively injected in batches and holes; according to the designed grouting amount, each hole is quantitatively and evenly distributed, and a single hole is pressed three times, and the time interval for waiting for solidification is 8h. The initial injection amount is half of the total amount of the single hole, and the grouting is continuous without interruption in the middle. The amount of the second and third hole sweeping is half of the remaining amount, and the re-injection improves the formation water blocking rate; S8, repeat the above procedure, and extend the grouting downward section by section, so as to achieve the construction of one working face to treat multiple aquifer sections; S9. Water sealing effect inspection: The amount of chemical slurry injected should meet the design requirements; the number of drilling holes for construction inspection should be no less than 3, and the water inflow of a single hole should be less than 1.5m 3 / h, it is considered that this grouting has achieved the water sealing effect; The main components of liquid A are urea-formaldehyde resin, dinitropropene amide, and propene amide, and the main components of liquid B are ammonium persulfate, oxalic acid, and water; liquid A is provided by the manufacturer, and liquid B is prepared on site, water: oxalic acid: ammonium persulfate = 100: 1.5: 0.015; that is, 1m 3 Liquid B = 1000Kg water: 15Kg oxalic acid: 0.15Kg ammonium persulfate, Liquid A: Liquid B = 10:
3. The flocculation time of this formula slurry is 40min, and the stone strength is 7MPa.
2. A method for treating deep porous water-bearing strata at a vertical shaft working face according to claim 1, Features: In step S2, the thickness of the concrete stop pad is 1.5m to 3m.
3. A method for treating deep porous water-bearing strata at a vertical shaft working face according to claim 1, Features: In step S3, the length of the water-stopping sleeve shall not be less than 20 m, and the water-stopping sleeve shall be subjected to a pressure test, the test pressure of which shall not be less than 1.2 times the grouting pressure.
4. A method for treating deep porous water-bearing strata at a vertical shaft working face according to claim 1, Features: In step S4, the thickness of the grouting rock cap shall not be less than 20 m, and its reinforcement pressure shall not be less than 1.2 times of the grouting pressure.
5. A method for treating deep porous water-bearing strata at a vertical shaft working face according to claim 1, Features: In step S5, during the grouting drilling construction, in the rock layer with water pressure greater than 3MPa, the lead distance between the water exploration and drainage drilling and the grouting drilling in the rock layer shall not be less than 25m, and the water inflow of the drilling hole shall reach 10m 3 / h, drilling should be stopped.
Citation Information
Patent Citations
Construction strengthening method for soft geological layer in middle section of vertical shaft
CN104005768A
Vertical shaft working face ahead pre-grouting method
CN104453913A
Vertical shaft working face cement-water glass double-liquid and chemical slurry double-circle curtain combined grouting method
CN108119143A
Shaft constructing device
JP1997242460A
Cited By
Comprehensive treatment method for water disasters of medium-depth vertical shaft in water-rich rock stratum of metal mine
CN120312326A