A method for controlling the coning or ridge advancement of bottom water in oil wells

By injecting gas and silicate aqueous solution to form artificial chemical partitions, the problem of bottom water coning or ridge in high-temperature oil reservoirs is solved, and the oil well recovery efficiency and gel stability are improved.

CN115163027BActive Publication Date: 2024-10-29CHINA PETROLEUM & CHEMICAL CORP +1

Patent Information

Application Number
CN202110361692.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-04-02
Publication Date
2024-10-29
Estimated Expiration
2041-04-02

AI Technical Summary

Technical Problem

Existing technology is difficult to effectively control bottom water coning or ridge in high-temperature oil reservoirs, resulting in increased oil well water production and reduced recovery rates, and traditional chemical gels are not effective under high-temperature conditions.

Method used

By injecting gas, spacer fluid and silicate aqueous solution into the oil well, an artificial chemical barrier is formed to lower the height of the water cone or water ridge, and form a stable solid-phase silicate gel at high temperature to prevent bottom water coning or ridge. Enter.

Benefits of technology

It effectively reduces the bottom water coning or ridge intrusion, improves the oil production efficiency of the oil well, and the gel formed has strong stability at high temperatures and is not affected by the salinity of the external water body.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115163027B_ABST
    Figure CN115163027B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of oilfield development, and discloses a method for controlling the coning or ridge of water at the bottom of an oil well. The method comprises determining the position, height and volume of the water cone or water ridge and the distribution of the remaining oil in the oil well according to data, determining the control construction position, the volume and area of ​​the artificial chemical partition to be established, and whether it is necessary to fill the hole; injecting gas used to reduce the height of the water cone or water ridge into the oil well, and then injecting the first isolation fluid; injecting primary CO2, a second isolation fluid, a silicate aqueous solution, a third isolation fluid, secondary CO2 and a well-killing fluid into the oil well to carry out a well-blocking treatment, and forming the artificial chemical partition at the top of the water cone or water ridge at the oil-water interface of the oil well. The present invention injects a chemical agent into the production well to move the bottom water interface downward, and at the same time forms a chemical partition, so that the bottom water no longer ridges or cones.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of oilfield development, in particular to the field of improving oil recovery such as petroleum engineering and oil well water plugging, and relates to a method for controlling the coning or ridge advancement of bottom water in an oil well. Background Art

[0002] Bottom water reservoirs account for a large proportion of my country's oil reservoirs, and the reserves are quite rich. In addition to a large number of natural bottom water reservoirs, as oil fields enter the second and third exploitation, the development characteristics of more oil fields are constantly tending towards bottom water reservoirs. Bottom water reservoirs have the characteristic that the entire oil-bearing area is in contact with bottom water. This is not only the advantage of bottom water reservoirs over other oil reservoirs in terms of development, but also the difficulty in the development of bottom water reservoirs. Specifically, on the one hand, the large contact area between the oil reservoir and the bottom water greatly enhances the ability of bottom water to invade the oil reservoir, and the formation energy consumed by crude oil extraction can be replenished from the bottom water in time. The development of most bottom water reservoirs shows the characteristics of sufficient energy; but on the other hand, the existence of bottom water brings serious water production problems to oil well production. In its production process, it often shows the characteristics of early water breakthrough, short water-free oil production period, rapid increase in water content after water breakthrough, and even violent flooding, which leads to a decrease in the recovery rate of the oil reservoir and an increase in the risk of oil field exploitation.

[0003] Before the development of bottom water reservoirs, the bottom water is located at the bottom of the oil layer (see Appendix Figure 1 ), after the reservoir is developed, a hemispherical potential distribution will be generated in the reservoir. The deformation of the oil-water interface in the vertical direction is consistent with the deformation of the water drive front in the horizontal direction. Both are derived from the potential gathered at the bottom of the well. The influence of the vertical potential gradient will cause the oil-water interface to deform, so that the potential gradient reaches an extreme value along the well axis. At this time, the oil-water interface is trumpet-shaped, which is the bottom water cone (see attached Figure 2 ). Bottom water coning is the most common and core problem in the development of bottom water reservoirs. As crude oil is continuously produced, bottom water cones upward to form a water cone. For the development of bottom water reservoirs, once the bottom water cones to the bottom of the well, the oil well usually shows a rapid increase in water content, resulting in a significant reduction in oil production. In severe cases, it may even cause the well to be flooded and forced to shut down, greatly affecting the recovery rate of the reservoir. Once the water cone is formed, it is particularly difficult to eliminate or suppress it.

[0004] The research on the development of bottom water reservoirs and bottom water coning has a long history. As early as 1935, Muskat and Wyckoff first proposed the bottom water coning theory based on the assumption that there is a gravity balance on the oil-water interface and the influence of bottom water coning on the oil phase pressure is ignored. They used the graphical method to solve the total pressure drop in the gravity balance equation, and derived the critical production formula based on the pressure drop, and established the basic theory of bottom water coning. In 1964, Chierici et al. used the method of potential simulation to intuitively and vividly describe the water cone morphology of vertical wells in homogeneous bottom water reservoirs. In 1962, Karp et al. proposed the baffle water control theory. They established a set of laboratory equipment and experimentally studied the influence of baffle shape, position and baffle permeability on water cone.

[0005] In 1963, Smith and Pirson proposed a method of injecting crude oil into the production well section to suppress water cone. Through experiments, they found that injecting a high viscosity fluid into the well can reduce the water-oil ratio and suppress the bottom water cone. In 1974, Hoyt proposed a method of injecting fluid into the oil layer to alleviate the bottom water cone. The external fluid enters the formation through the oil pipe and forms a partition at the formation to suppress the bottom water cone. In 1991, Kisman et al. studied two methods to alleviate the bottom water cone. One is to inject gas into the oil layer through the production wellbore; the other is to inject hydrophilic substances and gas into the oil layer at the same time to achieve the effect of suppressing water cone. In 1996, Tang Xiaofen et al. proposed to use the characteristics of polyacrylamide gel to form obstacles in the formation to prevent the bottom water from cone too fast. In the actual application process, the plugging agent solution is injected into the target formation through the production wellbore. After a period of time, the plugging agent solution will generate a high molecular copolymer with a network structure. The polymer has an impermeable property and forms a plugging layer in the formation, thereby suppressing water cone. In 2004, Liu Li et al. conducted indoor experiments and studied the water cone of bottom water reservoirs with baffles based on the water cone model of bottom water reservoirs. The experiment can intuitively understand the role of baffles in alleviating water cones. And studied the effect of different interlayers on the inhibition of water cones. In 2006, Dai Caili et al. proposed to suppress the bottom water cone by building artificial baffles for the water cone of thin bottom water reservoirs. This method requires that a suitable plugging agent be injected into the formation through the production well, and then interact with the working fluid and the formation fluid to finally form an artificial barrier, thereby achieving the purpose of alleviating water cones. In 2011, Yang Kefeng et al. proposed a fracturing artificial baffle model. That is, after hydraulic fracturing forms a crack, gel is injected into the crack, and the chemical gel in the crack and the gel lost in the formation through the upper and lower walls of the crack are mixed to form a chemical gel baffle of a certain strength. This method can effectively control the cone of bottom water. In 2012, Li Zhaomin et al. proposed to apply gel foam to the profile control and water plugging of bottom water drive reservoirs. This technology has been applied in many oil fields at home and abroad, and has effectively alleviated the rapid coning of bottom water and improved the recovery rate of bottom water reservoirs. USP3687198 discloses injecting high-density miscible liquid (such as CO2) near the oil-water interface to form a miscible zone between oil and water. This miscible zone can prevent the formation of water cones.

[0006] There are two main types of control methods for bottom water coning: (1) Methods for controlling bottom water coning in oil wells: including dual-pipe simultaneous production to suppress water coning, drainage oil production, coning control and downhole oil-water separation, double-layer completion water production to eliminate coning, horizontal well control of bottom water coning, artificial interlayer suppression of bottom water coning, chemical water plugging to control bottom water coning (inorganic weighting fluid to control oil well bottom water coning technology, inorganic solid-phase chemical plugging technology, polyacrylamide gel bottom water plugging technology), and gas injection to suppress water coning. (2) Methods for controlling bottom water coning in water injection wells: including polymer and oil-water emulsion injection to suppress coning, and water injection to control bottom water coning.

[0007] Chemical water plugging is a simple and easy method to control the bottom water coning. For example, the chemical gel movable elastic baffle plugs the bottom water. The process principle is to inject a certain amount of chemical agent into the lower part of the oil layer by filling holes near the oil-water interface in the oil-water transition zone. The chemical agent seeps radially in the filling hole section and forms a high-viscosity, movable baffle at a certain radius around the wellbore. Make full use of the flow rate of the bottom water pressure head to drive oil, expand the radius of the water cone, thereby eliminating or controlling the water cone, changing the seepage direction of the bottom water and the bottom injected water, increasing the water drive swept volume, and controlling the water content rising speed of the oil well to achieve the purpose of reducing water and increasing oil. The Linpan Oil Production Plant of Shengli Oilfield has implemented 5 wells, all of which were successful. In response to the bottom water coning problem that occurs during the production of vertical wells, the use of chemical methods to treat it has achieved good results. However, as the temperature of the developed oil reservoir becomes higher and higher and the conditions become more and more harsh, it is becoming more and more difficult to control the water cone with the previous chemical gel. Solid particles such as ultrafine cement are affected by the solidification reaction in porous media, and the application effect is difficult to achieve the expected effect. At present, most oil fields have entered the middle and late stages of development, and the water drive efficiency is low, especially for reservoirs with sufficient bottom water energy. Once the bottom water cones in, the water content will increase sharply at best, and the production will be stopped due to water flooding at worst. Therefore, it is very necessary to propose a method of bottom water cone or ridge intrusion suitable for high-temperature reservoirs. Summary of the invention

[0008] The purpose of the present invention is to address the deficiencies of the prior art and to propose a method for controlling the coning or ridge advancement of bottom water in oil wells. The method of the present invention is a method for controlling the ridge advancement or coning of bottom water in production wells during the development of bottom water reservoirs. By injecting chemicals into the production wells, the bottom water interface is moved downward, and a chemical partition is formed at the bottom water interface, so that the bottom water is controlled below the production layer, so that the bottom water no longer ridges (horizontal wells) or cones (vertical wells), thereby controlling the water content of the produced liquid and achieving the purpose of improving oil recovery efficiency.

[0009] In order to achieve the above object, the present invention provides a method for controlling the coning or ridge advancement of bottom water in an oil well, the method comprising the following steps:

[0010] S1: Determine the location, height and volume of the water cone or water ridge and the distribution of the remaining oil in the oil well based on the data, determine the location of the treatment construction, the volume and area of ​​the artificial chemical partition to be established, and whether the hole needs to be repaired;

[0011] S2: injecting gas into the oil well to reduce the height of the water cone or water ridge, and then injecting a first spacer fluid;

[0012] S3: injecting primary CO2, second spacer fluid, silicate aqueous solution, third spacer fluid, secondary CO2 and well killing fluid into the oil well treated in step S2 in sequence to carry out well blocking treatment, and forming the artificial chemical partition at the top of the water cone or water ridge at the oil-water interface of the oil well.

[0013] The technical solution of the present invention has the following beneficial effects:

[0014] (1) The present invention reduces the height of the water cone by carrying out a series of measures such as injecting gas to compress the water cone or water ridge, injecting isolation fluid, injecting chemical plugging agents, and blocking the well in the oil well where bottom water cone intrusion (vertical well) or ridge intrusion (horizontal well) occurs. The injected silicate aqueous solution forms a solid-phase silicate gel under the action of the two injections of CO2, and an artificial chemical partition is established at the oil-water interface near the wellbore, thereby inhibiting or slowing down the bottom water cone intrusion or ridge intrusion in the subsequent production process.

[0015] (2) After the silicate aqueous solution of the present invention forms a solid phase silicate gel, it can be stable for more than 6 months at 100°C, and the formed gel is not affected by the mineralization of the external water body. Even if the mineralization of the external water body reaches 20×10 4 mg / L (calcium and magnesium ion concentration 10000 mg / L), the formed gel does not undergo syneresis shrinkage.

[0016] Other features and advantages of the present invention will be described in detail in the following detailed description. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The above and other objects, features and advantages of the present invention will become more apparent through a more detailed description of exemplary embodiments of the present invention with reference to the accompanying drawings.

[0018] Figure 1 The diagram shows the oil and water distribution diagram of the vertical wells before the development of the existing bottom water reservoir.

[0019] Figure 2 A schematic diagram showing bottom water coning occurring in a vertical well during the development of an existing bottom water reservoir is shown.

[0020] Figure 3 A schematic diagram showing the present invention of injecting gas (N2 in the figure) into the oil well to reduce the height of the water cone.

[0021] Figure 4 A schematic diagram showing the primary injection of CO2 into an oil well according to the present invention is shown.

[0022] Figure 5 A schematic diagram showing the method of injecting a silicate aqueous solution into an oil well according to the present invention is shown.

[0023] Figure 6 A schematic diagram showing the secondary CO2 injection into an oil well according to the present invention.

[0024] Figure 7 A schematic diagram of forming an artificial chemical partition according to the present invention is shown. DETAILED DESCRIPTION

[0025] The preferred embodiments of the present invention will be described in more detail below. Although the preferred embodiments of the present invention are described below, it should be understood that the present invention can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided to make the present invention more thorough and complete, and to fully convey the scope of the present invention to those skilled in the art.

[0026] The present invention provides a method for controlling the coning or ridge advancement of bottom water in an oil well, the method comprising the following steps:

[0027] S1: Determine the location, height and volume of the water cone or water ridge and the distribution of the remaining oil in the oil well based on the data, determine the location of the treatment construction, the volume and area of ​​the artificial chemical partition to be established, and whether the hole needs to be repaired;

[0028] S2: injecting gas into the oil well to reduce the height of the water cone or water ridge, and then injecting a first spacer fluid;

[0029] S3: Inject CO2 into the oil wells treated in step S2 (see attached Figure 4 ), the second spacer liquid, the silicate aqueous solution (see attached Figure 5 )、third isolation fluid、secondary CO2 (see attached Figure 6 ) and well killing fluid, to carry out well blocking treatment, to form the artificial chemical partition (see attached) at the top of the water cone or water ridge at the oil-water interface of the oil well Figure 7 ).

[0030] In step S1 of the present invention, whether the perforation needs to be supplemented is determined based on whether the production layer is returned and whether the original production layer is polluted. If it is determined that the previous layer needs to be produced based on the results of reservoir analysis and bottom water treatment, the layer needs to be perforated; if the original production layer is polluted after the bottom water treatment measures, resulting in poor communication between the reservoir and the wellbore, then supplementary perforation measures need to be taken in the original production layer.

[0031] The temperature of the oil well of the present invention is not limited and can exceed 90° C. For high-temperature oil reservoirs, the action time of traditional organic polymer gels is greatly shortened and the effective period is reduced, so the present invention selects inorganic gels, namely silicate aqueous solutions.

[0032] According to the present invention, preferably, in step S1, the data include reservoir physical property data, geological data, production performance data, logging data and fluid production profile data; the production performance data include bottom hole pressure, production pressure difference, rock fracture pressure and wellhead pressure limit.

[0033] In step S2, gas is injected into the oil well where bottom water coning or ridge advancement has occurred in the target reservoir to pressurize the water cone or water ridge. This has two functions: on the one hand, the density difference between gas and water is used to form a gas cap at the top of the water cone, thereby pressing down the water cone or water ridge (see attached). Figure 3 , only for the case where bottom water coning occurs); on the other hand, the elastic energy of the gas can be used for production in the later stage, killing two birds with one stone. According to the present invention, preferably, the gas used is high-pressure nitrogen or high-pressure air, preferably high-pressure nitrogen, which will not cause corrosion and other problems. Under the action of the injection of high-pressure gas, the height of the water cone will be suppressed to a certain extent and reduced, but the high-pressure gas can only temporarily reduce the height of the water cone. If the well is opened for production, it will return to its original state or even become worse after a period of time. Therefore, it is necessary to carry out the next step of establishing an artificial chemical partition to separate the water layer from the oil layer near the wellbore. In theory, the larger the area of ​​the artificial chemical partition, the more conducive it is to control the bottom water coning. However, due to factors such as the seepage of porous media, the cost of chemicals, and the difficulty of construction, it is impossible to establish an infinitely large chemical partition, and we can only find a balance between the effect and cost of controlling the water cone.

[0034] Before establishing the artificial chemical partition, the first spacer liquid is injected to prevent the gas injected in the early stage to reduce the height of the water cone or water ridge from affecting the quality of the artificial chemical partition. According to the present invention, preferably, in step S2, the first spacer liquid is a partially hydrolyzed polyacrylamide aqueous solution, clean water, brine, C1-C4 alcohol, kerosene or formation reinjection water.

[0035] According to the present invention, preferably, the first spacer liquid is a partially hydrolyzed polyacrylamide aqueous solution, the concentration of the partially hydrolyzed polyacrylamide aqueous solution is 0.1%-0.8%, preferably 0.2%-0.6%, and considering the injectability and viscosity increasing properties, the molecular weight of the partially hydrolyzed polyacrylamide aqueous solution is 15 million-25 million, preferably 20 million-23 million;

[0036] In the present invention, according to the high temperature characteristics of the oil reservoir, CO2 is selected to initiate the gelation of the silicate aqueous solution. The gelation process adopts a double liquid method to inject CO2 and a silicate aqueous solution respectively. The gelation time is controlled by controlling the dosage of the second spacer liquid and the third spacer liquid. CO2 penetrates the second spacer liquid and the third spacer liquid, dissolves in the silicate aqueous solution, and reduces the pH value of the silicate aqueous solution, thereby inducing the silicate molecules to cross-link to form a solid gel. After the gel is formed, it can be stable for more than 6 months at 100°C, and the formed gel is not affected by the mineralization degree of the external water body. Even if the mineralization degree of the external water body reaches 20×10 4 mg / L (calcium and magnesium ion concentration 10000 mg / L), the formed gel does not undergo syneresis shrinkage.

[0037] The primary CO2 (pre-CO2 slug) has two functions: on the one hand, it can further reduce the height of the water cone by utilizing the density difference between CO2 and water (see attached). Figure 4), and on the other hand, it is used to trigger the cross-linking of the chemical plugging agent injected later. The primary CO2 (pre-CO2 plug) should be as large as possible to press down the water cone or water ridge, laying a good foundation for the establishment of the subsequent artificial chemical baffle. Considering that CO2 is easily soluble in water, it will dissolve in the formation water in the formation, causing losses, and will also react with the reservoir rock and cause losses. Therefore, the amount of primary CO2 should be excessive. According to the present invention, preferably, the amount of the primary CO2 is generally 3-20 times the volume of the silicate aqueous solution, preferably 5-15 times.

[0038] The volume usage of the secondary CO2 is 3-20 times the volume usage of the silicate aqueous solution, and considering the loss of dissolved formation water and acid-rock reaction, it is preferably 5-15 times. The secondary CO2 reduces the water cone or water ridge on the one hand, and is used to induce the silicate aqueous solution to form an artificial chemical partition on the other hand.

[0039] The primary CO2 and the secondary CO2 are each independently liquid CO2, supercritical CO2 or gaseous CO2. Considering the actual conditions such as transportation and injection, liquid CO2 is preferred.

[0040] According to the present invention, preferably, in step S3,

[0041] The purpose of adding the second spacer fluid is to drive all the primary CO2 (pre-CO2 plug) from the wellbore to the oil reservoir. Therefore, the second spacer fluid should be easy for CO2 to pass through, have a neutral pH value, and not react with silicates and CO2. Therefore, clean water, brine, C1-C4 alcohol, kerosene or formation reinjection water can be selected, preferably clean water.

[0042] The purpose of adding the third spacer fluid is to drive all the silicate aqueous solution in the wellbore out of the wellbore and into the oil reservoir. Therefore, the third spacer fluid should be easy for CO2 to pass through, have a neutral pH value, and not react with silicates and CO2. Therefore, clean water, brine, C1-C4 alcohol, kerosene or formation reinjection water can be selected, preferably clean water.

[0043] The usage of the second spacer liquid and the third spacer liquid is determined according to the gel time of the silicate aqueous solution.

[0044] In the present invention, the C1-C4 alcohol includes methanol, ethanol, propanol, butanol, preferably ethanol.

[0045] According to the present invention, preferably, in step S3,

[0046] The silicate aqueous solution is a silicate aqueous solution formed by at least one of lithium silicate, sodium silicate and potassium silicate; in the present invention, the silicate aqueous solution is commonly known as water glass, which is respectively called lithium water glass, sodium water glass and potassium water glass according to different cations. The strength of the silicate gel formed by the three water glasses at the same dosage is different. Lithium silicate has the best effect, but it is the most expensive. Considering economic factors, sodium water glass is preferred. Water glass is a soluble alkali metal silicate material formed by combining alkali metal oxides and silicon dioxide. The molecular ratio (or molar ratio) of silicon oxide and alkali metal oxide in water glass is called water glass modulus. The larger the water glass modulus, the more difficult it is for solid water glass to dissolve in water. When the modulus is 1, it can be dissolved in water at room temperature. When the modulus increases, hot water is required to dissolve. When the modulus is greater than 3, steam above 4 atmospheres is required to dissolve. The larger the water glass modulus, the more silicon oxide content, and the greater the strength of the silicate gel formed. The modulus of the silicate aqueous solution is determined according to the bottom hole pressure and the production pressure difference, and is preferably 1-5, and more preferably 3-4. If the modulus of the silicate is too low, the strength of the formed silicate gel is weak, and if the modulus of the silicate is too high, there will be problems with solubility and injectability (i.e., the higher the modulus, the greater the viscosity).

[0047] The volumetric amount of the silicate aqueous solution is determined according to the volume and area of ​​the artificial chemical partition to be established.

[0048] The injection rate and the ultimate pump pressure of the silicate aqueous solution are determined according to the cross-linking reaction time, the bottom hole pressure, the rock fracture pressure and the wellhead limit pressure measured in indoor experiments.

[0049] The concentration of the silicate aqueous solution is determined according to the strength of the water cone or water ridge, and is preferably 3%-10%, and more preferably 5%-8%.

[0050] In the present invention, the strength of the water cone or water ridge refers to the size of the water body, the time it takes to reach the bottom of the well, and the bottom flow pressure.

[0051] According to the present invention, preferably, in step S3, the well killing fluid drives all the secondary CO2 into the oil reservoir, and the well killing fluid is a high-concentration salt water. As a preferred embodiment, the well killing fluid is a sodium chloride aqueous solution with a concentration of more than 20%, so that the CO2 injected in the early stage can be dissolved in the well killing fluid as little as possible.

[0052] According to the present invention, preferably, in step S3, after the injection of the well-killing fluid is completed, the well is shut down and waited for solidification, and a well-blocking treatment is performed to promote the full penetration of CO2 into the silicate aqueous solution. Since the gel is formed in the porous medium of the reservoir, and although CO2 has strong solubility and permeability in water, its migration speed will be affected in the porous medium, the time required for the well-blocking treatment is 3-25 days, preferably 7-15 days. During the well-blocking treatment, CO2 is distributed above and below the injected silicate aqueous solution. These CO2 penetrates and passes through the second isolation fluid and the third isolation fluid (the second isolation fluid and the third isolation fluid have been continuously thinned in the process of continuous subsequent injection of silicate and CO2) and contacts with the silicate aqueous solution, and then dissolves in the silicate aqueous solution, reduces the pH value of the silicate aqueous solution, and triggers the silicate to undergo a cross-linking reaction to form silicate gel, thereby forming an artificial chemical partition at the top of the water cone or water ridge of the reservoir (see attached). Figure 7 ).

[0053] According to the present invention, preferably, the method further comprises measuring oil pressure during the well blocking treatment (analyzing the degree of artificial chemical baffle formation) and / or stopping production and water injection for all corresponding injection wells and surrounding production wells of the oil well.

[0054] In the present invention, during the construction process, in order to prevent the injected chemicals (primary CO2, second isolation fluid, silicate aqueous solution, third isolation fluid, secondary CO2 and well killing fluid) from diffusing along the dominant seepage channel and reducing the effect of the artificial chemical baffle, all corresponding injection wells and surrounding production wells of the oil well stop production and water injection to ensure that the implementation process of the method of the present invention is not interfered with by other wells.

[0055] The present invention is further illustrated by the following examples.

[0056] Example 1

[0057] This embodiment provides a method for controlling water coning at the bottom of an oil well, the method comprising the following steps:

[0058] S1: Determine the location, height and volume of the water cone and the distribution of remaining oil in the well based on the data, determine the location of the treatment construction, the volume and area of ​​the artificial chemical partition to be established, and whether the hole needs to be repaired;

[0059] The data include reservoir physical property data, geological data, production dynamic data, logging data and production fluid profile data; the production dynamic data include bottom hole pressure, production pressure difference, rock fracture pressure and wellhead pressure limit. In this embodiment, it is assumed that the reservoir thickness is 20m, the water layer thickness is 30m, the porosity is 30%, the well spacing is 200m, and the temperature of the oil well is 100℃.

[0060] S2: Inject 10×10 4 m3 (N) High pressure nitrogen, the water cone height will be suppressed to a certain extent and reduced (see attached Figure 3 ), then inject 10m 3 Clean water, so as to prevent the gas injected in the early stage to reduce the height of the water cone or water ridge from affecting the quality of the artificial chemical partition;

[0061] S3: According to the high temperature characteristics of the oil reservoir, CO2 is selected to initiate the gelation of silicate aqueous solution. The gelation process adopts a double liquid method to inject CO2 and silicate aqueous solution respectively. The gelation time is controlled by controlling the dosage of the second spacer liquid and the third spacer liquid. 500t of liquid CO2 (see attached) is injected into the oil well treated in step S2 in sequence. Figure 4 )、8m 3 Clean water, 300m 3 Sodium silicate aqueous solution (concentration 6%, modulus 3.3) (see attached Figure 5 )、8m 3 Clean water, 300t liquid CO2 (see attached Figure 6 ) and 20% concentration of 5m 3 The sodium chloride aqueous solution was used to seal the well for 12 days to form the artificial chemical partition at the top of the water cone at the oil-water interface of the oil well (see attached Figure 7 ). The injection rate and the ultimate pump pressure of the silicate aqueous solution are determined according to the cross-linking reaction time, the bottom hole pressure, the rock fracture pressure and the wellhead limit pressure measured in indoor experiments;

[0062] The method further includes measuring the oil pressure during the well blocking treatment and stopping production and water injection of all corresponding injection wells and surrounding production wells of the oil well.

[0063] The above treatment method effectively inhibits the coning of bottom water in the subsequent production process. After the silicate aqueous solution forms a solid phase silicate gel, it can be stable for more than 6 months at 100°C, and the formed gel is not affected by the mineralization of the external water body. Even if the mineralization of the external water body reaches 20×10 4 mg / L (calcium and magnesium ion concentration 10000 mg / L), the formed gel does not undergo syneresis shrinkage.

[0064] Example 2

[0065] This embodiment provides a method for controlling water coning at the bottom of an oil well. The difference between this method and the method in Embodiment 1 is that:

[0066] The temperature of the oil well is 90°C;

[0067] In step S2, 15×10 4 m 3 (N) High pressure nitrogen, then inject 10m 3 clean water;

[0068] In step S3, 600t of liquid CO2, 8m 3 Clear water, 400m 3 Sodium silicate aqueous solution (concentration 5.5%, modulus 3.3), 8m 3 Clean water, 400t of liquid CO2 and 5m 3 Sodium chloride aqueous solution was used to seal the well for 15 days.

[0069] The above treatment method effectively inhibits the coning of bottom water in the subsequent production process. After the silicate aqueous solution forms a solid phase silicate gel, it can be stable for more than 12 months at 90°C, and the formed gel is not affected by the mineralization of the external water body. Even if the mineralization of the external water body reaches 20×10 4 mg / L (calcium and magnesium ion concentration 10000 mg / L), the formed gel does not undergo syneresis shrinkage.

[0070] Example 3

[0071] This embodiment provides a method for controlling water coning at the bottom of an oil well. The difference between this method and the method in Embodiment 1 is that:

[0072] The temperature of the oil well is 80°C;

[0073] In step S2, 8×10 4 m 3 (N) High pressure nitrogen, then inject 10m 3 clean water;

[0074] In step S3, 300t of liquid CO2, 5m 3 Clean water, 200m 3 Sodium silicate aqueous solution (concentration 7%, modulus 3.3), 5m 3 Clean water, 200t of liquid CO2 and 5m 3 Sodium chloride aqueous solution was used to seal the well for 10 days.

[0075] The above treatment method effectively inhibits the coning of bottom water in the subsequent production process. After the silicate aqueous solution forms a solid phase silicate gel, it can be stable for more than 18 months at 80°C, and the formed gel is not affected by the mineralization of the external water body. Even if the mineralization of the external water body reaches 20×10 4 mg / L (calcium and magnesium ion concentration 10000 mg / L), the formed gel does not undergo syneresis shrinkage.

[0076] The embodiments of the present invention have been described above, and the above description is exemplary, not exhaustive, and is not limited to the disclosed embodiments. Many modifications and changes will be apparent to those skilled in the art without departing from the scope and spirit of the described embodiments.

Claims

1. A method for controlling the coning or ridge advancement of bottom water in an oil well, characterized in that: The method comprises the following steps: S1: Determine the location, height and volume of the water cone or water ridge and the distribution of the remaining oil in the oil well based on the data, determine the location of the treatment construction, the volume and area of ​​the artificial chemical partition to be established, and whether the hole needs to be repaired; S2: injecting gas into the oil well to reduce the height of the water cone or water ridge, and then injecting a first spacer fluid; S3: injecting primary CO2, a second spacer fluid, a silicate aqueous solution, a third spacer fluid, a secondary CO2 and a well-killing fluid into the oil well treated in step S2 in sequence to perform well blocking treatment, thereby forming the artificial chemical partition at the top of the water cone or water ridge at the oil-water interface of the oil well; The volume dosage of the primary CO2 is 3-20 times the volume dosage of the silicate aqueous solution; The second spacer fluid and the third spacer fluid are each independently clean water, brine, C1-C4 alcohol, kerosene or formation reinjection water; The modulus of the silicate aqueous solution is 3-4.

2. The method for controlling the coning or ridge advancement of bottom water in an oil well according to claim 1, wherein: In step S1, the data include reservoir physical property data, geological data, production performance data, logging data and production fluid profile data; the production performance data include bottom hole pressure, production pressure difference, rock fracture pressure and wellhead pressure limit.

3. The method for controlling the coning or ridge advancement of bottom water in an oil well according to claim 1, wherein: In step S2, The gas used to lower the height of the water cone or water ridge is high-pressure nitrogen or high-pressure air; The first spacer fluid is a partially hydrolyzed polyacrylamide aqueous solution, clean water, brine, C1-C4 alcohol, kerosene or formation reinjection water.

4. The method for controlling the coning or ridge advancement of bottom water in an oil well according to claim 3, wherein: The gas used to lower the height of the water cone or water ridge is high-pressure nitrogen.

5. The method for controlling the coning or ridge advancement of bottom water in an oil well according to claim 3, wherein: The first isolation liquid is a partially hydrolyzed polyacrylamide aqueous solution, the concentration of the partially hydrolyzed polyacrylamide aqueous solution is 0.1%-0.8%, and the molecular weight of the partially hydrolyzed polyacrylamide aqueous solution is 15 million-25 million.

6. The method for controlling the coning or ridge advancement of bottom water in an oil well according to claim 5, wherein: The concentration of the partially hydrolyzed polyacrylamide aqueous solution is 0.2%-0.6%.

7. The method for controlling the coning or ridge advancement of bottom water in an oil well according to claim 5, wherein: The molecular weight of the partially hydrolyzed polyacrylamide aqueous solution is 20 million to 23 million.

8. The method for controlling the coning or ridge advancement of bottom water in an oil well according to claim 1, wherein: In step S3, The volume dosage of the secondary CO2 is 3-20 times the volume dosage of the silicate aqueous solution; The primary CO2 and the secondary CO2 are each independently liquid CO2, supercritical CO2 or gaseous CO2.

9. The method for controlling the coning or ridge advancement of bottom water in an oil well according to claim 8, wherein: The volume dosage of the primary CO2 and the volume dosage of the secondary CO2 are each independently 5-15 times the volume dosage of the silicate aqueous solution.

10. The method for controlling the coning or ridge advancement of bottom water in an oil well according to claim 8, wherein: The primary CO2 and the secondary CO2 are each independently liquid CO2.

11. The method for controlling the coning or ridge advancement of bottom water in an oil well according to claim 1, wherein: In step S3, The second isolation liquid and the third isolation liquid are clean water; The usage of the second spacer liquid and the third spacer liquid is determined according to the gel time of the silicate aqueous solution.

12. The method for controlling the coning or ridge advancement of bottom water in an oil well according to claim 1, wherein: In step S3, The silicate aqueous solution is a silicate aqueous solution formed by at least one of lithium silicate, sodium silicate and potassium silicate; The modulus of the silicate aqueous solution is determined according to the bottom hole pressure and the production pressure difference; The volume usage of the silicate aqueous solution is determined according to the volume and area of ​​the artificial chemical partition to be established; The injection rate and the ultimate pump pressure of the silicate aqueous solution are determined according to the cross-linking reaction time, the bottom hole pressure, the rock fracture pressure and the wellhead limit pressure measured in indoor experiments; The concentration of the aqueous silicate solution is determined according to the intensity of the water cone or water ridge.

13. The method for controlling the coning or ridge advancement of bottom water in an oil well according to claim 12, wherein: The concentration of the silicate aqueous solution is 3%-10%.

14. The method for controlling the coning or ridge advancement of bottom water in an oil well according to claim 13, wherein: The concentration of the silicate aqueous solution is 5%-8%.

15. The method for controlling the coning or ridge advancement of bottom water in an oil well according to claim 1, wherein: In step S3, the well killing fluid is a sodium chloride aqueous solution with a concentration of more than 20%.

16. The method for controlling the coning or ridge advancement of bottom water in an oil well according to claim 1, wherein: In step S3, the time of the well blocking treatment is 3-25 days.

17. The method for controlling the coning or ridge advancement of bottom water in an oil well according to claim 16, wherein: The time for the well blocking treatment is 7-15 days.

18. The method for controlling the coning or ridge advancement of bottom water in an oil well according to any one of claims 1 to 17, wherein: The method further includes measuring the oil pressure during the well blocking treatment and / or stopping production and water injection of all corresponding injection wells and surrounding production wells of the oil well.

Citation Information

Patent Citations

  • High density miscible fluid injection with aquifer encroachment

    US3687198A

  • Profile modifying and water plugging agent as well as preparation method and application thereof

    CN106479466A

  • Water-controlling air-injecting and oil-extracting integrated production-increasing method

    CN106837268A

  • Compound for isolation of water-bearing beds

    RU2103498C1

  • Method for treating down-hole zone of producing well

    RU2105144C1

Cited By

  • On-site injection-production operation method for relieving water cone of gas storage containing bottom water

    CN120020339A