A method of upward layered filling mining with long anchor cable pre-protection on thick and broken ore bodies
Through the long anchor cable pre-protected top layered filling mining method, combined with the step-by-step mining of the ore house and ore pillars, the high cost and low efficiency problems in the mining of thick and broken ore bodies have been solved, and the stope production efficiency and safety and reduce ore loss.
Patent Information
- Application Number
- CN202210846915.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-07-04
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2042-07-04
AI Technical Summary
Thick and broken ore bodies have problems such as high cost, low efficiency and serious ore loss during the mining process. In particular, the management and support of the roof are difficult, resulting in safety hazards and low production efficiency.
The long anchor cable pre-protection roof upward layered filling mining method is used to combine the long anchor cable pre-support with upward layered filling. Through the step-by-step mining of the ore room and ore pillars, the long anchor cable's large anchoring depth and anchorage are used. It has great advantages, improves stope production efficiency and construction safety, and adapts to changes in ore body morphology through layered mining.
The production efficiency and construction safety of the stope are improved, and the loss of ore is reduced. By adjusting the length of the long anchor cable and the concentration of the filling material, the filling cost is reduced, and the filling quality and ore body mining efficiency are improved.
Smart Images

Figure CN115217474B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of mining engineering, in particular to a method for mining thick and broken ore bodies with long anchor cables for top upward layered filling. Background Art
[0002] Thick, broken and other ore bodies with extremely complex rock mechanical properties are prone to damage and instability after being disturbed by excavation, posing great safety hazards and posing a huge threat to safe construction.
[0003] The mining of thick and broken ore bodies is a difficult problem in the mining industry. It is difficult to achieve safe and efficient mining of ore bodies due to factors such as ore body occurrence conditions, rock drilling, mining, and support. The main reasons for the difficulty in mining thick and broken ore bodies are as follows: (1) The ore body has a gentle inclination and a small bottom plate slope. The ore that has collapsed in the lower plate cannot be completely released by its own weight. It is also inconvenient for trackless equipment such as scrapers to enter and exit. When the mine is unloaded, some ore is forced to be left in the mine, resulting in serious ore losses. (2) Difficulties in roof management and maintenance. When the surrounding rock of the roof of a gently inclined thick ore body is broken, the mine roof needs to be supported to ensure the safety of the mining workers. However, due to the thickness of the ore body, existing equipment is difficult to perform support work. (3) Difficulties in the layout of mining and cutting projects. When mining the ore body, if the vein mining method is adopted, although the amount of waste rock is small and the cost is controlled to a certain extent, it is difficult to achieve trackless operation in the mine, the production capacity is small, and the labor intensity of workers is high. When the off-vein mining method is adopted, the production capacity is large and the efficiency is high, but the mining workload is large and the cost of ore body mining is high. The room-and-pillar method and the open-field method are the main methods, but they have problems such as backward production equipment, low production efficiency, and high loss and dilution, which restrict the safe and efficient mining of mines.
[0004] To this end, the present invention provides a thick and large broken ore body long anchor cable pre-protection top layered filling mining method, which aims to solve the problems of high recovery cost, low efficiency, high loss and depletion rate of thick and large broken ore bodies in the prior art. Summary of the invention
[0005] The technical problem to be solved by the present invention is to provide a method for upward layered filling mining with long anchor cable pre-support on thick and broken ore bodies, which combines the long anchor cable pre-support with the upward layered filling mining method, and mine rooms and pillars are mined in steps, giving full play to the advantages of long anchor cable support such as large anchoring depth, large anchoring force, and high bearing capacity, thereby improving the production efficiency and construction safety of the mining site.
[0006] The method comprises the following steps:
[0007] S1: Ore block division: The stope is arranged vertically to the ore body, and several ore blocks are arranged in the stope. The ore blocks are divided into ore rooms and ore pillars. The ore blocks are arranged in a cycle of ore room-ore pillar-ore pillar-ore room. The ore body is divided into middle sections in the vertical direction. The stope height is the middle section height, and the middle section is divided into layers;
[0008] S2: Mining project: Arrange the middle transport tunnel and the segmented transport tunnel in the footwall of the ore body, and dig the mining field connecting road from the middle transport tunnel and each segmented transport tunnel to reach the ore body; arrange pedestrian ventilation skylights, chute shafts, return air shafts, sedimentation tanks, etc. to form a ventilation and chute breaking system;
[0009] S3: First step of mining: The ore rooms are mined in the method of every other two, and the ore body is mined layer by layer from bottom to top; drilling and blasting are carried out using rock drilling rigs and air-leg rock drills; the collapsed ore is loaded into trucks by scrapers, and the trucks transport the ore to the chute;
[0010] S4: Filling: calibrate the closure position of the plate wall (including the second and third plate walls), the installation position of the filling pipe, the false bottom line, and the construction position of the shell anchor; construct an artificial false top, first lay a plastic sheet on the bottom plate, then lay a steel mesh, construct the shell anchor at the boundary of the ore body, and weld the steel bars to the shell anchor. After the false bottom is filled, the remaining filling height can reduce the filling material concentration according to the actual situation, and leave a distance of empty top;
[0011] S5: Second step mining: mining the bottom layer of the second pillar in the chamber-pillar-pillar-chamber structure, and after mining, vertically construct long anchor cables to support the roof and upper layers, and the long anchor cable support layer of the pillar is used as the next step mining site. After the long anchor cable support is completed, the chamber and the remaining layers of the first pillar in the chamber-pillar-pillar-chamber structure are mined according to S3~S4 steps;
[0012] S6: The third step of mining: mining the remaining long anchor cable support layers of the second pillar in the mine room-mine pillar-mine pillar-mine room structure according to steps S3 to S4;
[0013] S7: Repeat S3 to S6 to complete the mining operation of each middle section of the ore body.
[0014] Among them, the layer height in S1 is 3~8 m, and the width of the mine room and pillar is 5~10 m.
[0015] In the first step of S3, the number of layers to be mined in the mining chamber layer by layer shall not exceed 5; in order to reduce the disturbance to the bottom filling body during blasting, a safety distance of 0.5 m is set between the bottom hole and the lower filling body.
[0016] In S4, the steel mesh is laid with the main reinforcement at the bottom and the secondary reinforcement at the top. The lap length of the main reinforcement and the secondary reinforcement is not less than 300 mm, the welding length is not less than 100 mm, and the main reinforcement on the continuous side of the ore body is supported by 1.0 m. The shell expansion anchors at the boundary of the ore body are constructed with a depth of 1.0~2.0 m, a spacing of 1.0~2.0 m, and a height of 1.0~2.0 m from the bottom plate. The welding length of the steel bars and the shell expansion anchors is not less than 100 mm, and the distance from the empty top is 0.5~1.0 m.
[0017] The main reinforcement of the above-mentioned steel mesh is perpendicular to the direction of the approach, and the secondary reinforcement is along the direction of the approach.
[0018] The construction steps of S5 medium and long anchor cable support are as follows:
[0019] S51: Determine parameters: determine the diameter, length, breaking force, support mesh and other parameters of the long anchor cable, and determine the grouting slurry ratio and bonding strength;
[0020] S52: Knock on the side and check the top: Before construction, check the construction site, check the top plate and the floating stones on both sides in time, and carry out temporary support with pit wood and anchor rods before anchor cable support according to the stability of the mining site;
[0021] S53: Drilling: The drilling is done with a down-the-hole drill. Before drilling, the mine surveying technician uses a total station to accurately locate the drilling position (the drilling position is located at the pre-construction position of the roof anchor cable, that is, the surrounding rock crushing area). The down-the-hole drill should prevent the drilling hole from tilting during the drilling process. In order to ensure the smooth installation of the long anchor cable, the drilling depth is greater than the design depth, and the drilling diameter is greater than the anchor cable diameter.
[0022] S54: Install anchor cables: Use a high-pressure air duct to blow out the gravel in the borehole before installing the anchor cables. The operator will send the anchor cable tied to the exhaust pipe into the borehole. The exhaust pipe is used to exhaust the air in the hole during grouting. The anchor cable must be sent to the bottom of the hole. After the above work is completed, use a sealing wooden plug to seal the hole.
[0023] S55: Grouting: Add cement, fine sand and water according to the designed ratio into the mixing bucket and mix evenly. Connect the grouting pipe to the grouting machine and use clean water to test the machine before grouting. Since the grouting time is relatively long, in order to prevent the grouting material from settling, stir the grouting material during the grouting process until the grouting material flows out of the exhaust pipe. Rinse the grouting machine with clean water after the grouting is completed. After the maintenance is completed, cut off the exposed grouting pipe and install the pad and anchor.
[0024] Among them, the diameter of S51 medium-long anchor cable is 15-30 mm, and the breaking force is 120-450 kN. A single anchor cable is welded into a long anchor cable, and the length of the welding point is not less than 0.5 m.
[0025] Based on field experience, the bonding strength of the grouting material (28 days) is not less than 5.0 MPa. If the upper plate triangular area is large, in order to avoid unnecessary waste, the length of the long anchor cable is gradually reduced within the triangular area, and the length of the long anchor cable passing through the upper plate crushing is not less than 3.0 m.
[0026] The sealing plug in S54 has long anchor hole, exhaust pipe hole and grouting pipe hole. The exhaust pipe adopts Φ5~10 mm polyvinyl chloride pipe, and the exhaust pipe extends 300~500 mm outside the exhaust pipe hole.
[0027] In S55, the grouting pipe extends into the grouting pipe hole by 300-500 mm, and the length of the sealing wooden plug is 250-300 mm;
[0028] The curing time of grouting material in S55 shall not be less than 72 h.
[0029] The beneficial effects of the above technical solution of the present invention are as follows:
[0030] (1) The method of the present invention has high construction safety. The long anchor cable support has the characteristics of large anchoring depth, large anchoring force, and high bearing capacity. It can also apply prestress to play the role of actively supporting the surrounding rock. The stability of the mine roof is improved, thereby expanding the specifications of the mine access and improving the mine production efficiency. (2) Layered mining can better adapt to changes in the ore body shape. In addition, the length of the long anchor cable can also be adjusted according to the actual situation of the mine, which has strong flexibility. (3) By arranging horizontal and vertical steel meshes and shell anchors, the integrity of the false roof structure is strengthened, so that the cement content in the filling slurry can be reduced. The reduction in cement content can greatly reduce the filling cost, and the improvement of filling quality is conducive to the recovery of the ore body and the bottom pillar, reducing the loss of ore depletion. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 It is a schematic diagram of the process of the long anchor cable pre-protection top upward layered filling mining method of thick and broken ore body of the present invention;
[0032] Figure 2 It is a front view of the long anchor cable pre-protection top upward layered filling mining method of thick and broken ore body of the present invention;
[0033] Figure 3 for Figure 2 BB cross-section diagram;
[0034] Figure 4 for Figure 2 CC profile of ;
[0035] Figure 5 This is a schematic diagram of long anchor cable support construction;
[0036] Figure 6 This is a cross-sectional view of a sealing cork.
[0037] Among them: 1-middle transport tunnel; 2-mining connecting road; 3-filling body; 4-ore; 5-long anchor cable; 6-ore body; 7-segmented transport tunnel; 8-chute; 9-mixing barrel; 10-grouting machine; 11-grouting pipe; 12-exhaust pipe; 13-sealing wooden plug; 14-grouting material; 15-grouting pipe hole; 16-exhaust pipe hole; 17-long anchor cable hole. DETAILED DESCRIPTION
[0038] In order to make the technical problems, technical solutions and advantages to be solved by the present invention more clear, a detailed description will be given below with reference to the accompanying drawings and specific embodiments.
[0039] The invention provides a method for mining thick and broken ore bodies by using long anchor cables to pre-protect the top and then fill the top in layers.
[0040] The method comprises the following steps:
[0041] The steps include:
[0042] S1: Ore block division: The stope is arranged perpendicular to the ore body, and the ore blocks are arranged in the stope. The ore blocks are divided into chambers and pillars (generally, the chambers and pillars are given in combination with the specific mining method, ore-extraction method, ore depletion index and safety index of the mine. Since the structural parameters of the chambers and pillars in this mining method are the same, in order to facilitate the distinction, the first ore block arranged perpendicular to the ore body direction from the lower plate to the upper plate is the chamber, and then the pillars are arranged, and the two are arranged alternately). The ore block is arranged in a cycle of chamber-pillar-pillar-chamber, and the ore body is divided into the middle section in the vertical direction. The stope height is the middle section height, and the middle section is divided into layers (generally each middle section is divided into 10 layers);
[0043] S2: Mining project: Arrange the middle transport tunnel and the segmented transport tunnel in the footwall of the ore body (each segmented transport tunnel mainly serves as a connection, one end is used to connect the middle transport tunnel, and the other end is connected to the stope connection road, through which the collapsed ore is transported from the stope to the middle transport tunnel. The segmented transport tunnel is generally arranged perpendicular to the middle transport tunnel. The distance between the two segmented transport tunnels depends on the grade of the ore body, but the cross-sectional specifications of the middle transport tunnel and the segmented transport tunnel are the same), and dig the stope connection road from the middle transport tunnel and each segmented transport tunnel to reach the ore body; arrange pedestrian ventilation skylights, chute shafts, return air shafts, and sedimentation tanks to form a ventilation and chute breaking system;
[0044] S3: First step of mining: mining the mine room by mining every other two, such as Figure 1 As shown, firstly, the 1# and 4# mining rooms are mined, and the ore bodies are mined layer by layer from bottom to top; drilling and blasting are carried out by using rock drilling trolleys and air-leg rock drills; the collapsed ore is loaded into trucks by scrapers, and the trucks transport the ore to chute 8;
[0045] S4: Filling: calibrate the closure position of the plate wall, the position of the filling pipe, the false bottom line, and the construction position of the shell anchor; construct an artificial false top, first lay a plastic sheet on the bottom plate, then lay a steel mesh, construct the shell anchor at the boundary of the ore body, weld the steel bars and the shell anchor, and after the false bottom is filled, leave a distance of empty top in the remaining filling height;
[0046] Among them, the plate wall closure position is arranged at one end of the mine contact road, that is, the bottom entrance of the goaf; the filling pipe is mounted on the filling pipe bracket, and is specifically fixed at a height of 1.3m on one side of the filling return air channel; the false bottom line is a straight line calibrated according to the filling height required to be reached when the filling false bottom is finally formed. In this method, the filling false bottom is 1m, that is, the false top line is calibrated at 1m away from the bottom of the mine in the mine; the shell anchor is constructed at the boundary of the ore body, with a spacing of 1m, a depth of 1m, and a height of 1m from the bottom plate;
[0047] S5: Second step of mining: mining the bottom layer of the second pillar in the chamber-pillar-pillar-chamber structure (i.e. Figure 1 After mining, long anchor cables are constructed vertically upward to support the roof and upper layers, and the long anchor cable support layer of the pillar is used as the next step of mining. After the long anchor cable support is completed, the remaining layers of the first pillar in the mining room and the mining room-pillar-pillar-mining room structure (i.e. Figure 1 The remaining layers of the 1# and 4# chambers and the 2# pillar);
[0048] S6: The third step of mining: mining the second pillar in the chamber-pillar-pillar-chamber structure (i.e. Figure 1 Middle 3# pillar) Remaining long anchor cable support layering;
[0049] S7: Repeat S3 to S6 to complete the mining operation of each middle section of the ore body.
[0050] This will be described below with reference to specific embodiments.
[0051] The specific mining process is carried out in the following steps:
[0052] S1: Ore block division: The stopes are arranged vertically along the ore body, each stope is 100 m long and the height is the middle section. Each stope is arranged with 20 ore blocks, which are divided into ore rooms and ore pillars. The width of the ore rooms and ore pillars is 5.0 m, the layer height is 3.8 m, the filling height is 3.3 m, and the top control height is 0.5 m;
[0053] S2: Mining project: Arrange the middle section transportation tunnel 1 in the footwall of the ore body (such as Figure 3 )、Sectional transport tunnel 7 (section 4.15m×3.55 m) (such as Figure 4 ), from the middle transport tunnel 1 and each segment transport tunnel 7, the stope connecting tunnel 2 (section 3.5 m×3.5 m) is excavated to reach the ore body 6; pedestrian ventilation skylight (section 1.5 m×1.5 m), chute 8 (Φ2.5 m), return air shaft (Φ1.5 m), sedimentation tank (section 3.5 m×3.5 m) and other systems are arranged to form a ventilation and chute system;
[0054] S3: First step of mining: Use the method of mining every other two to mine the 1# and 4# mines (such as Figure 1 ), the ore body is mined layer by layer from bottom to top; drilling trolley and air-leg rock drill are used to drill holes with a depth of 2.0 to 4.0 m and a diameter of 40 to 42 mm. The spacing between the slot holes is 0.45 m, the inclination angle of the blasthole is 68°, and the number of blastholes is 6. Figure 2 In order to reduce the disturbance of blasting to the bottom filling body 3, a safety distance of 0.5 m is set between the bottom hole and the lower filling body 3, the spacing between the bottom holes is 0.6 m, the distance between the auxiliary holes and the stope contour is 0.2 m, the spacing between the auxiliary holes is 0.6 m, the spacing between the auxiliary holes is 0.6-0.8 m, and the spacing between the arch holes is 0.5 m. The caved ore 4 is loaded into the pit by a shovel loader, and the ore 4 is transported to the middle chute 8 by a truck;
[0055] S4: Filling: After the stope is accepted, the technicians shall mark the closure position of the plate wall (including the second and third plate walls), the erection position of the filling pipe, the false bottom line, and the construction position of the shell anchor. To build an artificial false roof, first lay a plastic sheet on the bottom plate, and then use 12# steel bars to lay a steel mesh with a mesh size of 300 mm×300 mm, with the main bars (perpendicular to the approach direction) at the bottom and the secondary bars (along the approach direction) at the top. The lap length of the steel bars shall not be less than 300 mm, and the welding length shall not be less than 100 mm. The main bars on the 6 continuous sides of the ore body shall be supported on the side by 1.0m. Shell expansion anchors are constructed at the boundary of ore body 6. The shell expansion anchors are 1.0 m deep, 1.0 m apart, and 1.0 m high from the bottom plate. The welding length between the steel bar and the shell expansion anchor is not less than 100 mm. First, fill the false bottom of 1.0 m with filler body 3 at a ratio of 1:4, then fill 1.8 m with filler body 3 at a ratio of 1:20, and then fill 0.5 m with filler body 3 at a ratio of 1:10, leaving 0.5 m of top empty.
[0056] S5: The second step of mining: mining the bottom layer of the 3# pillar, after mining, constructing long anchor cable 5 vertically upward to support the roof and upper layers, and the long anchor cable 5 support layer of the 3# pillar is used as the next segmented one-step mining site. After the long anchor cable 5 support is completed, the remaining layers of 1#, 4# mine rooms and 2# pillar are mined according to S3~S4 steps;
[0057] like Figure 5 , the long anchor cable 5 support construction steps include:
[0058] S51: Determine the parameters: Use Φ22 mm spiral steel, the length of the long anchor cable 5 is 18 m, the support mesh is 2.0 m×1.5 m, the length of a single spiral steel is 5 m, and the spiral steel needs to be welded to reach a length of 18 m. Four spiral steels with a length of 5 m are welded to the steel structure, and the length of the weld is 0.5 m. Due to the large triangular area of the upper plate, in order to avoid unnecessary waste, the length of the long anchor cable 5 is gradually reduced within 28 m of the upper plate to ensure that it passes through the upper plate and is broken by 3 m. The bonding material of the grouting material 14 is 425# ordinary silicate cement, and the aggregate is fine sand. The ratio of cement to sand is 1:3, the ratio of cement to water is 1:2.5, and the bonding strength (28 d) is 5.3 MPa;
[0059] S52: Knock on the side and check the top: Before construction, check the construction site, check the top plate and the floating stones on both sides in time, and carry out temporary support of pit wood before the long anchor cable 5 support;
[0060] S53: Drilling: The drilling is done by a down-the-hole drill. Before drilling, the mine surveying technician uses a total station to accurately locate the drilling position. The down-the-hole drill should prevent the drilling hole from tilting during the drilling process. The drilling diameter is Φ50 mm. In order to ensure the smooth installation of the long anchor cable 5, the drilling depth should be slightly greater than the designed hole depth.
[0061] S54: Install anchor cables: Before installing the long anchor cables 5, a high-pressure air duct is used to blow out the gravel in the borehole. The operator sends the long anchor cables 5 into the borehole, and the long anchor cables 5 must be sent to the bottom of the hole. During installation, an exhaust pipe 12 must be tied to the long anchor cable 5. The function of the exhaust pipe 12 is to exhaust the air in the hole during grouting. The exhaust pipe 12 uses a Φ8 mm polyvinyl chloride (PVC) pipe, and the exhaust pipe 12 extends 300 mm outside the hole. In addition, a grouting pipe 11 (Φ25 mm) needs to be arranged at the grouting pipe hole 15, and the grouting pipe 12 extends 300 mm into the grouting pipe hole 15. After the above work is completed, a special sealing wooden plug 13 is used for sealing. To ensure the sealing effect, the sealing length is 280 mm; if Figure 6 The sealing wooden plug 13 is provided with a long anchor hole 17, an exhaust pipe hole 16, and a grouting pipe hole 15. The exhaust pipe is a Φ5-10 mm polyvinyl chloride pipe, and the exhaust pipe extends 300-500 mm outside the exhaust pipe hole;
[0062] S55: Grouting: Add cement, fine sand and water into the mixing barrel 9 according to the designed ratio. Before using the fine sand, large debris in the sand needs to be screened out to prevent clogging of the grouting pipe. Connect the grouting pipe 11 to the grouting machine 10. The grouting machine 10 uses the UB-3C grouting pump. Use clean water to test the machine before grouting. After confirmation, start grouting. Since the grouting time is relatively long, in order to prevent the grouting material 14 from settling, the grouting material 14 needs to be stirred during the grouting process until the grouting material 14 flows out of the exhaust pipe. After the grouting is completed, rinse the grouting machine 10 with clean water to prevent the residual grouting material 14 in the pump from hardening and clogging the grouting machine 10. After 72 hours, cut off the exposed grouting pipe 11 and install the pad and anchor;
[0063] S6: The third step of mining: mining the remaining long anchor cables 5 of the 3# pillar in accordance with S3~S4 steps to support the stratification; repeat S3~S6 to complete the mining operation of each middle section of the ore body 6.
[0064] The above is a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. A method of mining thick and broken ore body with long anchor cable pre-protection and upward layered filling, characterized in that: The steps include: S1: Ore block division: The stope is arranged vertically to the ore body, and the ore blocks are arranged in the stope. The ore blocks are divided into chambers and pillars. The ore blocks are arranged in a cycle of chamber-pillar-pillar-chamber. The ore body is divided into middle sections in the vertical direction. The stope height is the middle section height, and the middle section is divided into layers. S2: Mining project: Arrange the middle transport tunnel and the segmented transport tunnel in the footwall of the ore body, and dig the mining field connecting road from the middle transport tunnel and each segmented transport tunnel to reach the ore body; arrange the pedestrian ventilation skylight, chute, return air shaft, and sedimentation tank to form a ventilation and chute breaking system; S3: First step of mining: The ore rooms are mined in the method of every other two, and the ore body is mined layer by layer from bottom to top; drilling and blasting are carried out using rock drilling rigs and air-leg rock drills; the collapsed ore is loaded into trucks by scrapers, and the trucks transport the ore to the chute; S4: Filling: calibrate the closure position of the plate wall, the position of the filling pipe, the false bottom line, and the construction position of the shell anchor; construct an artificial false top, first lay a plastic sheet on the bottom plate, then lay a steel mesh, construct the shell anchor at the boundary of the ore body, weld the steel bars and the shell anchor, and after the false bottom is filled, leave a distance of empty top in the remaining filling height; S5: Second step mining: mining the bottom layer of the second pillar in the chamber-pillar-pillar-chamber structure, and after mining, vertically construct long anchor cables to support the roof and upper layers, and the long anchor cable support layer of the pillar is used as the next step mining site. After the long anchor cable support is completed, the chamber and the remaining layers of the first pillar in the chamber-pillar-pillar-chamber structure are mined according to S3~S4 steps; S6: The third step of mining: mining the remaining long anchor cable support layers of the second pillar in the mine room-mine pillar-mine pillar-mine room structure according to steps S3 to S4; S7: Repeat S3 to S6 to complete the mining operation of each middle section of the ore body; The layer height in S1 is 3~8 m, and the width of the mine room and the mine pillar is the same, both 5~10 m; In the first step of S3, the number of layers of the mining chamber layer by layer shall not exceed 5; in order to reduce the disturbance to the bottom filling body during blasting, a safety distance of 0.5 m is set between the bottom hole and the lower filling body; In the S4, the main reinforcement of the steel mesh is laid at the bottom and the secondary reinforcement is laid at the top. The lap length of the main reinforcement and the secondary reinforcement is not less than 300 mm, the welding length is not less than 100 mm, and the main reinforcement on the continuous side of the ore body is supported by 1.0 m. The shell expansion anchor rods constructed at the boundary of the ore body are 1.0~2.0 m deep, 1.0~2.0 m apart, and 1.0~2.0 m high from the bottom plate. The welding length of the steel bar and the shell expansion anchor rod is not less than 100 mm, and the empty top distance is 0.5~1.0 m.
2. The method of mining thick and broken ore body with long anchor cable pre-protection and upward layered filling according to claim 1 is characterized in that: The main reinforcement of the steel mesh is perpendicular to the direction of the approach, and the secondary reinforcement is along the direction of the approach.
3. The method of mining thick and broken ore body with long anchor cable pre-protection and upward layered filling according to claim 1 is characterized in that: The construction steps of the S5 medium-long anchor cable support are as follows: S51: Determine parameters: determine the diameter, length, breaking force, support mesh of the long anchor cable, and determine the grouting slurry ratio and bonding strength; S52: Knock on the side and check the top: Before construction, check the construction site, check the top plate and the floating stones on both sides in time, and carry out temporary support with pit wood and anchor rods before anchor cable support according to the stability of the mining site; S53: Drilling: The drilling is done by a down-the-hole drill. Before drilling, the mine surveying technicians use a total station to accurately locate the drilling position. During the drilling process, the down-the-hole drill should prevent the drilling hole from tilting. The drilling depth should be greater than the designed depth, and the drilling diameter should be greater than the anchor cable diameter. S54: Install anchor cables: Use a high-pressure air duct to blow out the gravel in the borehole before installing the anchor cables. The operator will send the anchor cable tied to the exhaust pipe into the borehole. The anchor cable must be sent to the bottom of the hole. After the above S51-S53 work is completed, use a sealing wooden plug to seal the hole. S55: Grouting: Add cement, fine sand and water according to the designed ratio into the mixing bucket and mix evenly. Connect the grouting pipe to the grouting machine. Use clean water to test the machine before grouting. During the grouting process, stir the grouting material until the grouting material flows out of the exhaust pipe. Rinse the grouting machine with clean water after the grouting is completed. After the maintenance is completed, cut off the exposed grouting pipe and install the pad and anchor.
4. The method for mining thick and broken ore bodies with long anchor cables for top upward stratified filling according to claim 3 is characterized in that: The diameter of the S51 medium-long anchor cable is 15 to 30 mm, and the breaking force is 120 to 450 kN. A single anchor cable is welded into a long anchor cable, and the length of the weld is not less than 0.5 m.
5. The method for mining thick and broken ore bodies with long anchor cables for top upward stratified filling according to claim 4 is characterized in that: The length of the long anchor cable passing through the upper plate crushing is not less than 3.0 m.
6. The method for mining thick and broken ore bodies with long anchor cables for top upward layered filling according to claim 3 is characterized in that: The sealing wooden plug in the S54 is provided with a long anchor hole, an exhaust pipe hole, and a grouting pipe hole. The exhaust pipe adopts a Φ5-10 mm polyvinyl chloride pipe, and the exhaust pipe extends 300-500 mm outside the exhaust pipe hole. The grouting pipe in S55 extends into the grouting pipe hole by 300-500 mm, and the length of the sealing wooden plug is 250-300 mm; The curing time of the grouting material in S55 is not less than 72 h.
Citation Information
Patent Citations
Sublevel shrinkage caving stage open stope afterwards filling mining method
CN101881169A
Upward drift filling method
CN102337892A
Cited By
Anchor cable supporting method for reinforcing specified position in rock mass
CN122148362A