A beam-slab type wind power on-site expansion foundation and its construction method
By setting up beam-plate expansion structures and double-layer steel plates on the basis of wind power, combined with circumferential prestressed steel strands, the problem of small capacity and service life of the wind farm is solved, the original site expansion and reinforcement is realized, the construction period and cost are reduced, and the efficiency is improved Stability and capacity of wind turbine tower foundations.
Patent Information
- Application Number
- CN202211072442.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-09-02
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2042-09-02
AI Technical Summary
The wind turbine farms built in the early stage have small capacity and need to be expanded and renovated, or the wind turbines of the completed wind farm have reached the designed service life and need to be replaced, resulting in long construction period and high cost.
The beam-plate type wind power in-site expansion foundation is used, including setting up cast-in-place expansion columns, prefabricated expansion ring beams and prefabricated expansion rib beams outside the original foundation columns, combined with a double-layer steel plate structure and circumferential prestressed steel strands, to achieve the original site expansion and expansion through specific steps. Reinforce to improve the stability and capacity of the foundation.
It achieves the expansion and reinforcement of the original site while reducing the construction period and cost, improving the stability and service life of the wind power tower foundation, being suitable for the installation of wind power towers of different diameters, and enhancing the capacity and safety of the wind turbine foundation.
Smart Images

Figure CN115341595B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of wind power foundation structure design and construction, and relates to a beam-slab type wind power original site expansion foundation and a construction method thereof. Background Art
[0002] Wind energy is an inexhaustible renewable clean energy. Wind power generation is one of the most promising sustainable projects in the world. To ensure the sustainable development of wind power generation, the wind turbine foundation used to install and fix the wind turbine tower is the key. However, land resources are limited. New wind farms on land or at sea also face problems such as land resource shortage and complex geological conditions. The capacity of wind turbine power plants built earlier is small and needs to be expanded and renovated. Or the wind turbines of the built wind farms have reached their designed service life and need to be replaced. In this case, the original wind farm can be expanded and reinforced on the original site, which can make full and effective use of the original foundation and reduce the construction period and construction cost.
[0003] Therefore, under the circumstance that the use of existing wind power generation equipment is restricted, it is very necessary to construct an extended foundation on the existing wind turbine foundation, and it is urgent to develop an extended foundation structure suitable for existing wind turbines and its supporting construction method. Summary of the invention
[0004] In view of this, the present invention provides a beam-slab wind power on-site expansion foundation and a construction method thereof in order to solve the problem that the capacity of wind turbine power farms built in the early stage is small and the wind farm needs to be expanded and renovated, or the wind turbines of the built wind farm have reached their designed service life and need to be replaced. The method realizes the expansion and reinforcement and renovation of the original wind farm on the original site, which can fully and effectively utilize the original foundation and reduce the construction period and construction cost.
[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a beam-slab type wind turbine on-site expansion foundation, comprising a cast-in-place expansion column sleeved outside the original foundation column, a prefabricated expansion ring beam, and a plurality of prefabricated expansion rib beams circumferentially arranged between the expansion column and the prefabricated expansion ring beam, the prefabricated expansion rib beams are alternately arranged between the original foundation rib beams, and a double-layer steel plate structure is arranged on the expansion column for facilitating the increase in height and capacity of the original wind turbine foundation, the double-layer steel plate structure comprises an upper steel plate, a lower steel plate, and a plurality of stiffening ribs circumferentially arranged between the upper steel plate and the lower steel plate, and the upper steel plate is connected to a new tower after the expansion.
[0006] Furthermore, through holes are opened in the middle of the upper steel plate and the lower steel plate, and a first vertical hole is opened on the upper steel plate around the through hole to facilitate fixed connection with the prestressed anchor bolts on the original foundation piles. A second vertical hole is opened on the outer circumference of the upper steel plate, and the new tower is installed on the second vertical hole. A through hole corresponding to the second vertical hole is opened on the bottom of the new tower, and a third vertical hole compatible with the extended column is opened on the outer circumference of the lower steel plate.
[0007] Furthermore, the upper steel plate is fixedly connected to the bottom of the new tower by bolts, and the lower steel plate is fixedly connected to the extended platform column by bolts welded to the lower steel bars.
[0008] Furthermore, the second vertical holes in the outer circumferential direction of the upper steel plate are arranged in double rows.
[0009] Furthermore, an annular extended bottom plate is cast at the lower part of the prefabricated extended ring beam, and the extended bottom plate extends to the end of the prefabricated extended rib beam, and the extended bottom plate and the original foundation bottom plate are in the same horizontal plane.
[0010] Furthermore, a plurality of circumferential prestressed steel strands are arranged outside the extension column to perform circumferential reinforcement on the extension column, and two free ends of the prestressed steel strands are fixed by anchor heads with conical holes at the ends.
[0011] A construction method for a beam-slab type wind power on-site expansion foundation comprises the following steps:
[0012] S1. Cast the extended bottom plate according to the size of the prefabricated extended rib beam;
[0013] S2, positioning and assembling the prefabricated extended rib beams between adjacent original basic rib beams;
[0014] S3, positioning and assembling the prefabricated extended ring beams between adjacent prefabricated extended rib beams;
[0015] S4. Longitudinal embedded steel bars are evenly distributed along the height of the end side of the prefabricated extended rib beam close to the extended column. The longitudinal embedded steel bars are overlapped with the steel bars in the extended column overlapped at the upper part on site to form a whole and then cast. Radial embedded steel bars are also evenly distributed in the horizontal direction of the extended column. The radial embedded steel bars are welded to the internal steel bars of the original foundation column.
[0016] S5. Install the double-layer steel plate structure on the table formed by the original foundation column and the extended column, fix the upper steel plate in the double-layer steel plate structure with the original foundation column through the original foundation prestressed anchor bolts, and fix the upper steel plate with the bottom of the new tower and the lower steel plate with the extended column through bolt fasteners;
[0017] S6, pouring new concrete columns;
[0018] S7. Wrap multiple annular prestressed steel strands around the cast-in-place expansion column and fix the ends with anchor heads.
[0019] Furthermore, the specific steps in step S2 are: placing the groove opened at the bottom of the prefabricated extended rib beam on the original foundation ring beam between the corresponding original foundation rib beams, the prefabricated extended rib beam at the groove does not need to be connected to the original foundation ring beam, and a through hole is opened on the prefabricated extended rib beam to facilitate the connection with the original foundation bottom plate after passing the embedded steel bars, and the embedded steel bars pass through the bottom of the original foundation bottom plate and then pour the grouting material.
[0020] Furthermore, the specific steps in step S3 are: the prefabricated extended ring beam is welded with the ring beam connecting steel bars at both ends of the prefabricated extended rib beam through the end embedded steel bars at both ends, the connecting grooves at both ends of the prefabricated extended ring beam are poured and filled to improve the connection stability between the prefabricated extended rib beam and the prefabricated extended ring beam, and a through opening is opened on the prefabricated extended ring beam to facilitate the connection with the extended base plate after passing through the embedded steel bars, and the grouting material is poured after the embedded steel bars pass through the bottom extended base plate.
[0021] Furthermore, the specific steps in step S5 are: the upper steel plate is mounted on the prestressed anchor bolts of the original foundation piles through the first vertical hole and then fixed by bolt fasteners to achieve a fixed connection between the upper steel plate and the original foundation column; suitable bolt fasteners are inserted into the second vertical holes on the outer circumference of the upper steel plate, and fixed at the top of the new tower and the bottom of the upper steel plate by bolt fasteners to achieve a fixed connection between the new tower and the upper steel plate; suitable bolt fasteners are inserted into the third vertical holes on the outer circumference of the lower steel plate to achieve a fixed connection between the lower steel plate and the extended column in the double-layer steel plate structure.
[0022] The beneficial effects of the present invention are:
[0023] 1. The beam-slab type wind turbine original site expansion foundation disclosed in the present invention has an extended column which is convenient for expanding the original foundation column, supporting the expanded wind turbine tower, and enhancing the stability of the original foundation column; the prefabricated extended rib beams outside the extended column are alternately arranged between the original foundation rib beams, thereby improving the installation stability of the extended column on the basis of rationally utilizing the original foundation rib beams; the prefabricated extended ring beams are positioned and assembled between adjacent prefabricated extended rib beams, so that the expanded new foundation bottom plate formed after the expansion of the original foundation bottom plate and the prefabricated extended ring beam form a whole, thereby increasing their service life and reducing the construction workload, effectively solving the problem that the capacity of the wind turbine power plant built in the early stage is small and the wind turbine power plant needs to be expanded and renovated, or the wind turbines in the built wind farm have reached the designed service life and need to be replaced.
[0024] 2. The beam-slab type wind turbine original site expansion foundation disclosed in the present invention has a double-layer steel plate structure on the expansion column. A plurality of stiffening ribs are arranged between the upper steel plate and the lower steel plate in the double-layer steel plate structure. The height of the stiffening ribs can be adjusted according to the expansion height of the wind turbine tower foundation after the expansion, and different forms of stiffening ribs can be selected. The through holes in the middle of the upper steel plate and the lower steel plate facilitate grouting into the through holes after the double-layer steel plate structure is assembled on the original foundation column, so as to connect the double-layer steel plate structure and the original foundation column into an integral structure. The first vertical hole on the upper steel plate around the through hole helps to fix the connection with the prestressed anchor bolts on the original foundation pile. The upper steel plate is fixed by bolt fasteners after being mounted on the prestressed anchor bolts of the original foundation pile. The double rows of second vertical holes on the outer circumference of the upper steel plate correspond to the through holes at the bottom of the new tower. Appropriate bolt fasteners are inserted into the through holes and the corresponding second vertical holes for fixing. The bottom of the new tower and the bottom of the upper steel plate are fixed by bolt fasteners to achieve a fixed connection between the new tower and the upper steel plate. Appropriate welded bolts are inserted into the third vertical holes on the outer circumference of the lower steel plate to achieve a fixed connection between the double-layer steel plate structure and the extended column. The double-layer steel plate structure not only achieves the adjustment of the height of the wind turbine tower foundation after expansion, but also achieves the radial adjustment of the wind turbine tower foundation after expansion. It is suitable for assembling wind turbine towers of different diameters, and realizes capacity expansion without changing the position of the wind turbine foundation.
[0025] 3. The beam-slab type wind turbine original site expansion foundation disclosed in the present invention has an annular prestressed steel strand arranged outside the expansion column, which can reinforce the expansion column in an annular direction, and can quickly and conveniently reinforce the expansion column, thereby improving the safety of the wind turbine tower foundation after expansion.
[0026] Other advantages, objectives and features of the present invention will be described in the following description to some extent, and to some extent, will be obvious to those skilled in the art based on the following examination and study, or can be taught from the practice of the present invention. The objectives and other advantages of the present invention can be realized and obtained through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] In order to make the purpose, technical solutions and advantages of the present invention more clear, the present invention will be described in detail below in conjunction with the accompanying drawings, wherein:
[0028] Figure 1 This is a structural schematic diagram of the beam-slab type wind power original site expansion foundation of the present invention;
[0029] Figure 2 This is a front view of the original site expansion foundation of the beam-slab type wind power plant of the present invention;
[0030] Figure 3 It is a cross-sectional view of the original site expansion foundation of the beam-slab type wind power plant of the present invention;
[0031] Figure 4 For the present invention Figure 3 A partial enlarged view of the middle part;
[0032] Figure 5 It is a structural schematic diagram of a double-layer steel plate structure in the beam-slab type wind power on-site expansion foundation of the present invention;
[0033] Figure 6 For the present invention Figure 3 Schematic diagram of the structure of the new tower installed on the middle double-layer steel plate structure;
[0034] Figure 7 This is a structural diagram of an existing wind turbine tower foundation;
[0035] Figure 8 For the present invention Figure 3 Structural schematic diagram of the prefabricated extended rib beam;
[0036] Fig. 9 For the present invention Figure 3 Structural schematic diagram of the prefabricated extended ring beam.
[0037] Figure numerals: foundation column 1, foundation ring beam 2, foundation rib beam 3, foundation base plate 4, foundation ring 5, bolt 6, extended column 7, prefabricated extended ring beam 8, connecting groove 81, end embedded steel bars 82, prefabricated extended rib beam 9, slot 91, radial embedded steel bars 92, longitudinal embedded steel bars 93, ring beam connecting steel bars 94, extended base plate 10, prestressed steel strand 11, upper steel plate 12, lower steel plate 13, stiffening rib 14, first vertical hole 15, second vertical hole 16, third vertical hole 17, new tower 18. DETAILED DESCRIPTION
[0038] The following describes the embodiments of the present invention by specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention. It should be noted that the illustrations provided in the following embodiments only illustrate the basic concept of the present invention in a schematic manner, and the following embodiments and features in the embodiments can be combined with each other without conflict.
[0039] Among them, the drawings are only used for illustrative explanations, and they only represent schematic diagrams rather than actual pictures, and should not be understood as limitations on the present invention. In order to better illustrate the embodiments of the present invention, some parts of the drawings may be omitted, enlarged or reduced, and do not represent the size of actual products. For those skilled in the art, it is understandable that some well-known structures and their descriptions in the drawings may be omitted.
[0040] The same or similar numbers in the drawings of the embodiments of the present invention correspond to the same or similar parts; in the description of the present invention, it should be understood that if the terms "upper", "lower", "left", "right", "front", "rear", etc. indicate the orientation or position relationship, they are based on the orientation or position relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation. Therefore, the terms describing the position relationship in the drawings are only used for illustrative purposes and cannot be understood as limiting the present invention. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.
[0041] like Figure 7 The existing wind turbine tower foundation shown includes a cast-in-place foundation column 1 for connecting the wind turbine tower, a foundation ring beam 2, and a plurality of foundation rib beams 3 circumferentially arranged between the foundation column 1 and the foundation ring beam 2. A foundation base plate 4 is cast inside the foundation ring beam 2 at the bottom of the foundation column 1. The foundation column 1 is arranged in the center of the foundation base plate 4. The top and bottom of the foundation column 1 are both foundation rings 5 or anchor cage rings of the original foundation, and prestressed anchor bolts are evenly distributed between the upper and lower foundation rings 5 or anchor cage rings.
[0042] like Figures 1 to 6 and Figures 8-9 The beam-slab type wind power original site expansion foundation shown in the figure includes a prefabricated expansion column 7, a prefabricated expansion ring beam 8, and a plurality of prefabricated expansion rib beams 9 circumferentially arranged between the expansion column 7 and the prefabricated expansion ring beam 8, the prefabricated expansion rib beams 9 are alternately arranged between the original foundation rib beams 3, and a circular expansion bottom plate 10 is cast at the lower part of the prefabricated expansion ring beam 8, and the expansion bottom plate extends to the end of the prefabricated expansion rib beam 9, and the expansion bottom plate 10 is in the same horizontal plane as the original foundation bottom plate 4. The prefabricated expansion rib beam 9 is a prefabricated rib beam, and the end side close to the expansion column 7 is uniformly distributed with longitudinal embedded steel bars 93 along the height, and the longitudinal embedded steel bars 93 are overlapped with the steel bars in the expansion column 7 overlapped at the upper part of the site to form a whole and then cast.
[0043] That is, after the longitudinal embedded steel bars 93 of the prefabricated extended rib beam 9 and the longitudinal steel bars of the original basic rib beam 3 are chiseled out and exposed, they are extended by welding steel bars, and then welded with bolts passing through the third vertical holes 17 on the periphery of the lower steel plate 13 of the double-layer steel plate structure to form a whole, and then the cast-in-place extended column 7 is cast. The surface of the original basic column 1 should be appropriately chiseled along the height. The chiseling at the bottom is used to expose the steel bars for welding, and the chiseling at the top allows the original basic column to form an uneven surface so that the bonding force between the new cast-in-place extended column 7 and the original basic column 1 is stronger.
[0044] The extended column 7 is also evenly distributed with radial embedded steel bars 92 in the horizontal direction; the radial embedded steel bars 92 are welded to the internal steel bars of the original foundation column by chiseling the outer concrete of the original foundation column 1, and the longitudinal embedded steel bars are overlapped with the steel bars in the extended column 7 overlapped at the upper part on site to form a whole and then cast.
[0045] In order to achieve better bonding performance between the new and old upper columns (new extension column 7 and original base column 1), the side surface of the upper base column is also excavated, and then the new extension column outside is cast, and finally the new and old parts are bonded together by two prestressed steel strands 11. The number of steel strands is not fixed, and can be more or less, depending on the actual construction situation. After the casting is completed, the new and old parts of the upper column are bonded together by the prestressed steel strands 11.
[0046] A groove 91 is provided at the bottom of the prefabricated extended rib beam 9 at a position corresponding to the original foundation ring beam 2. The prefabricated extended rib beam 9 is placed on the original foundation ring beam 2 between the corresponding original foundation rib beams 3 through the groove 91 at the bottom. The prefabricated extended rib beam 9 at the groove 91 does not need to be connected to the original foundation ring beam 2. A through hole is provided on the prefabricated extended rib beam 9 to facilitate the connection with the original foundation bottom plate 4 after passing the embedded steel bars. The embedded steel bars pass through the bottom original foundation bottom plate 4 and then the grouting material is poured.
[0047] The ends of the prefabricated expanded rib beams 9 should also be reserved with ring beam connecting steel bars 94 for connecting with the external prefabricated expanded ring beams 8 .
[0048] The lower part of the expanded extended column 7 is connected to the upper part of the original basic rib beam 3 or the upper part of the prefabricated extended rib beam 9, and the upper part is connected to the steel bars by end welding, and the connected steel bars are welded to the bolt fasteners and then welded. After the bolt fasteners are connected to the lower steel plate, the extended column 7 is cast.
[0049] A plurality of circumferential prestressed steel strands 11 are arranged outside the extension column 7 to perform circumferential reinforcement on the extension column 7, which can quickly and conveniently reinforce the extension column 7 and improve the safety of the wind power tower foundation after expansion. The two free ends of the circumferential prestressed steel strands 11 can be fixed by anchor heads with tapered holes at the ends.
[0050] A double-layer steel plate structure is arranged on the extended column 7, and the double-layer steel plate structure includes an upper steel plate 12, a lower steel plate 13 and a plurality of stiffening ribs 14 circumferentially arranged between the upper steel plate 12 and the lower steel plate 13. The height of the stiffening ribs 14 can be adjusted according to the extended height of the wind turbine tower foundation after expansion, and different forms of stiffening ribs 14 can be selected.
[0051] Through holes are opened in the middle of the upper steel plate 12 and the lower steel plate 13, so that after the double-layer steel plate structure is assembled on the original foundation column 1, grouting is injected into the through holes to connect the double-layer steel plate structure and the original foundation column 1 into an integral structure.
[0052] The upper steel plate 12 on the side of the through hole is provided with a first vertical hole 15 for fixing and connecting with the prestressed anchor bolts on the original foundation pile. The upper steel plate 12 is fixed by bolt fasteners after being mounted on the prestressed anchor bolts of the original foundation pile. The upper steel plate 12 is provided with a double row of second vertical holes 16 on the outer circumference. The second vertical holes 16 are connected to the bottom of the expanded new tower 18. The bottom of the new tower 18 is provided with a through hole corresponding to the second vertical hole 16. Appropriate bolts 6 are inserted into the through hole and the corresponding second vertical hole 16. The bottom of the new tower 18 and the bottom of the upper steel plate 12 are fixed by bolt fasteners, so as to realize the fixed connection between the new tower 18 and the upper steel plate 12. The lower steel plate 13 is provided with a third vertical hole 17 on the outer circumference. The double-layer steel plate structure is fixedly connected with the expanded column 7 by inserting appropriate bolt fasteners into the third vertical hole 17. The double-layer steel plate structure can realize the adjustment of the height of the wind turbine tower foundation after expansion, and also realize the radial adjustment of the wind turbine tower foundation after expansion. It is suitable for assembling wind turbine towers of different diameters, so as to realize the capacity expansion without changing the foundation position of the wind turbine set.
[0053] The construction method of the beam-slab type wind power on-site expansion foundation comprises the following steps:
[0054] S1, casting the extended bottom plate 10 according to the size of the prefabricated extended rib beam 9;
[0055] S2, positioning and assembling the prefabricated extended rib beam 9 between adjacent original foundation rib beams 3, that is, placing the slot 91 provided at the bottom of the prefabricated extended rib beam 9 on the original foundation ring beam 2 corresponding to the original foundation rib beam 3, the prefabricated extended rib beam 9 at the slot 91 does not need to be connected to the original foundation ring beam 2, and a through hole is provided on the prefabricated extended rib beam 9 to facilitate passing the embedded steel bar through and connecting with the original foundation bottom plate 4, and the embedded steel bar passes through the bottom original foundation bottom plate 4 and then pours the grouting material, so that the foundation force transmission is clearer;
[0056] S3, positioning and assembling the prefabricated extended ring beam 8 between adjacent prefabricated extended rib beams 9, that is, the prefabricated extended ring beam 8 is welded to the ring beam connecting steel bars 94 at both ends of the prefabricated extended rib beam 9 through the end embedded steel bars 82 at both ends, and the connection grooves 81 at both ends of the prefabricated extended ring beam 8 are poured and filled to improve the connection stability between the prefabricated extended rib beam 9 and the prefabricated extended ring beam 8, and a through hole is provided on the prefabricated extended ring beam 8 to facilitate the connection with the extended bottom plate 10 after passing through the embedded steel bars, and the grouting material is poured after the embedded steel bars pass through the bottom extended bottom plate 10;
[0057] S4, longitudinal embedded steel bars 93 are evenly distributed along the height of the end side of the prefabricated extended rib beam 9 close to the extended platform column 7, and the longitudinal embedded steel bars 93 are overlapped with the steel bars in the extended platform column 7 overlapped at the upper part on site to form a whole and then cast; radial embedded steel bars 92 are also evenly distributed in the horizontal direction of the extended platform column 7; wherein the radial embedded steel bars 92 are welded to the steel bars inside the original foundation platform column by chiseling the outer concrete of the original foundation platform column 1, and the longitudinal embedded steel bars 93 on the prefabricated extended rib beam 9 and the longitudinal steel bars exposed by chiseling on the original foundation rib beam 3 are extended by welding and overlapped with the steel bars in the extended platform column 7 overlapped at the upper part on site to form a whole and then cast;
[0058] S5. Install the double-layer steel plate structure on the platform formed by the original foundation column 1 and the extended column 7. Fix the upper steel plate 12 of the double-layer steel plate structure to the original foundation column 1 through the prestressed anchor bolts on the original foundation column 1. Fix the upper steel plate 12 to the bottom of the new tower 18 and the lower steel plate 13 to the extended column 7 through bolt fasteners. Specifically: the upper steel plate 12 is mounted on the prestressed anchor bolts of the original foundation piles through the first vertical holes 15 and then fixed with bolt fasteners to achieve a fixed connection between the upper steel plate 12 and the original foundation column 1; suitable bolt fasteners are inserted into the second vertical holes 16 on the outer circumference of the upper steel plate 12, and fixed with bolt fasteners at the top of the new tower 18 and the bottom of the upper steel plate 12 to achieve a fixed connection between the new tower 18 and the upper steel plate 12; suitable bolt fasteners are inserted into the third vertical holes 17 on the outer circumference of the lower steel plate 13 to achieve a fixed connection between the lower steel plate 13 and the extended column 7 in the double-layer steel plate structure.
[0059] S6, pouring new concrete columns;
[0060] S7. Wrap multiple annular prestressed steel strands 11 around the cast-in-place expansion column 7, and fix the ends through anchor heads. Specifically, chisel off part of the surface of the original foundation column 1, and cast the expansion column 7 through formwork. The uneven contact surface after chiseling is used to enhance the bonding force between the new and old concrete columns to a certain extent.
[0061] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution, which should be included in the scope of the claims of the present invention.
Claims
1. A beam-slab type wind power on-site expansion foundation, characterized in that: It includes a cast-in-place expansion column sleeved outside the original foundation column, a prefabricated expansion ring beam, and a plurality of prefabricated expansion rib beams circumferentially arranged between the expansion column and the prefabricated expansion ring beam, the prefabricated expansion rib beams are alternately arranged between the original foundation rib beams, and a double-layer steel plate structure is arranged on the expansion column to increase the height and capacity of the original wind power foundation. The double-layer steel plate structure includes an upper steel plate, a lower steel plate, and a plurality of stiffening ribs circumferentially arranged between the upper steel plate and the lower steel plate, and the upper steel plate is connected to a new tower after the capacity expansion; A through hole is opened in the middle of the upper steel plate and the lower steel plate, and a first vertical hole is opened on the upper steel plate around the through hole to facilitate fixed connection with the prestressed anchor bolts on the original foundation piles. A second vertical hole is opened on the outer circumference of the upper steel plate, and the new tower is installed on the second vertical hole. A through hole corresponding to the second vertical hole is opened on the bottom of the new tower, and a third vertical hole compatible with the extended column is opened on the outer circumference of the lower steel plate.
2. The beam-slab type wind power on-site expansion foundation according to claim 1, characterized in that: The upper steel plate is fixedly connected to the bottom of the new tower by bolts, and the lower steel plate is fixedly connected to the extended platform column by bolts welded to the lower steel bars.
3. The beam-slab type wind power on-site expansion foundation according to claim 1, characterized in that: The second vertical holes on the outer circumference of the upper steel plate are arranged in double rows.
4. The beam-slab type wind power on-site expansion foundation according to claim 1, characterized in that: An annular extended bottom plate is cast at the lower part of the prefabricated extended ring beam, and the extended bottom plate extends to the end of the prefabricated extended rib beam, and the extended bottom plate and the original foundation bottom plate are in the same horizontal plane.
5. The beam-slab type wind power on-site expansion foundation according to claim 1, characterized in that: A plurality of circumferential prestressed steel strands are arranged outside the extension column to reinforce the extension column circumferentially. The two free ends of the prestressed steel strands are fixed by anchor heads with tapered holes at the ends.
6. The construction method of the beam-slab type wind power on-site expansion foundation according to any one of claims 2 to 5, characterized in that: The following steps are involved: S1. Cast the extended bottom plate according to the size of the prefabricated extended rib beam; S2, positioning and assembling the prefabricated extended rib beams between adjacent original basic rib beams; S3, positioning and assembling the prefabricated extended ring beams between adjacent prefabricated extended rib beams; S4. Longitudinal embedded steel bars are evenly distributed along the height of the end side of the prefabricated extended rib beam close to the extended column. The longitudinal embedded steel bars are overlapped with the steel bars in the extended column overlapped at the upper part on site to form a whole and then cast. Radial embedded steel bars are also evenly distributed in the horizontal direction of the extended column. The radial embedded steel bars are welded to the internal steel bars of the original foundation column. S5. Install the double-layer steel plate structure on the table formed by the original foundation column and the extended column, fix the upper steel plate in the double-layer steel plate structure with the original foundation column through the original foundation prestressed anchor bolts, and fix the upper steel plate with the bottom of the new tower and the lower steel plate with the extended column through bolt fasteners; S6, pouring new concrete columns; S7. Wrap multiple annular prestressed steel strands around the cast-in-place expansion column and fix the ends with anchor heads.
7. The construction method of the beam-slab type wind power on-site expansion foundation as claimed in claim 6, characterized in that: The specific steps in step S2 are: placing the groove opened at the bottom of the prefabricated extended rib beam on the original foundation ring beam between the corresponding original foundation rib beams, the prefabricated extended rib beam at the groove does not need to be connected to the original foundation ring beam, and a through hole is opened on the prefabricated extended rib beam to facilitate the connection with the original foundation bottom plate after passing the embedded steel bars, and the embedded steel bars pass through the bottom of the original foundation bottom plate and then pour the grouting material.
8. The construction method of the beam-slab type wind power on-site expansion foundation as claimed in claim 6, characterized in that: The specific steps in step S3 are: the prefabricated extended ring beam is welded with the ring beam connecting steel bars at both ends of the prefabricated extended rib beam through the end embedded steel bars at both ends, the connection grooves at both ends of the prefabricated extended ring beam are poured and filled to improve the connection stability between the prefabricated extended rib beam and the prefabricated extended ring beam, and a through opening is opened on the prefabricated extended ring beam to facilitate the connection with the extended base plate after passing through the embedded steel bars, and the grouting material is poured after the embedded steel bars pass through the bottom extended base plate.
9. The construction method of the beam-slab type wind power on-site expansion foundation as claimed in claim 6, characterized in that: The specific steps in step S5 are: the upper steel plate is mounted on the prestressed anchor bolts of the original foundation piles through the first vertical hole and then fixed by bolt fasteners to achieve a fixed connection between the upper steel plate and the original foundation column; suitable bolt fasteners are inserted into the second vertical holes on the outer circumference of the upper steel plate, and fixed at the top of the new tower and the bottom of the upper steel plate by bolt fasteners to achieve a fixed connection between the new tower and the upper steel plate; suitable bolt fasteners are inserted into the third vertical holes on the outer circumference of the lower steel plate to achieve a fixed connection between the lower steel plate and the extended column in the double-layer steel plate structure.
Citation Information
Patent Citations
Assembly type wind power tower foundation and manufacturing method
CN112267976A
High-performance wind power generation tower foundation reinforcing device
CN112900513A
Wind turbine foundations and wind turbine generator sets
CN210031897U