A method for installing photovoltaic power plants on water

By using modular floating photovoltaic structures and floating auxiliary installation tools, the overall installation of photovoltaic modules was achieved, solving the problems of low construction efficiency and high cost in the construction of floating photovoltaic power generation facilities, and realizing efficient and convenient floating photovoltaic installation.

CN115432599BActive Publication Date: 2024-11-15天津港航工程有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211083749.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-09-06
Publication Date
2024-11-15
Estimated Expiration
2042-09-06

AI Technical Summary

Technical Problem

In the construction of existing floating photovoltaic power generation facilities, the large amount of work involved in assembling photovoltaic panels leads to low construction efficiency, high ship and labor costs, and makes it impossible to achieve large-scale rapid construction.

Method used

Modular floating photovoltaic structures and floating auxiliary installation tools are adopted. The photovoltaic modules are installed as a whole through the combination of overhead supports, brackets and hangers. Barges are used for land assembly and water hoisting. Combining onshore assembly and water hoisting reduces the demand for ships and human resources.

Benefits of technology

This has enabled low-cost and efficient floating photovoltaic installation, reducing construction time and labor costs, improving construction efficiency, and lowering facility costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115432599B_ABST
    Figure CN115432599B_ABST
Patent Text Reader

Abstract

The invention discloses an integrated installation method of photovoltaic power generation on water, which is completed by using an auxiliary installation tool on water; the auxiliary installation tool on water comprises an overhead support for fixing a photovoltaic module and suspending its bottom, a bracket with rollers and a self-floating function, and a hanger for connecting the bracket with a crane; the installation steps comprise: S1, the photovoltaic module is fixed on a barge and transported to a construction site, S2, the bracket is centrally placed directly below the photovoltaic module, S3, a lifting hook, a hanger, and a bracket are sequentially connected by ropes; S4, the photovoltaic module is separated from the overhead support and transported to the top of an above-water pile foundation structure; S5, the photovoltaic module is inserted and fixed to the pile foundation structure; S6, the bracket falls and floats on the water surface, and the hanger is separated from the bracket; the method utilizes the auxiliary installation tool on water to achieve docking and fixing of a lifting module of a modular above-water photovoltaic structure with an above-water pile foundation structure, without occupying a large amount of ships and human resources, and the entire construction process is efficient and convenient, with low operating costs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of photovoltaic technology on water surfaces, lakes, offshore and open seas, and in particular to an integrated installation method of photovoltaic technology on water surfaces. Background Art

[0002] At present, photovoltaic power generation equipment needs to be assembled from a large number of scattered components. For photovoltaic panels alone, the power of a single photovoltaic panel commonly used at this stage is 550Wp, and to complete a 100MWp offshore photovoltaic power station, it is necessary to assemble about 180,000 photovoltaic panels, which means that the photovoltaic power generation equipment itself is a huge workload.

[0003] In recent years, the construction of photovoltaic power generation facilities on water has been carried out on a large scale. Due to the particularity of water operations, each working surface of photovoltaic power generation facilities on water requires the cooperation of ships, which makes it impossible to carry out construction on a large scale. If a large number of cumbersome assembly operations are also completed on water, it is definitely not a feasible solution. Therefore, in order to reduce the number of operating ships and improve construction efficiency, it is necessary to design a modular water photovoltaic structure and a corresponding convenient installation method to achieve a construction method that combines onshore assembly with water surface hoisting, which not only saves the time of ship operations, but also saves labor costs and facility construction costs. Summary of the invention

[0004] The purpose of the present invention is to provide a method for installing photovoltaic power plants on water that can achieve low-cost, efficient and convenient construction.

[0005] To this end, the technical solution of the present invention is as follows:

[0006] A method for installing photovoltaic power plants on water, which is completed by using an auxiliary installation tool on water; the auxiliary installation tool on water includes an overhead support, a bracket and a hanger; wherein:

[0007] The overhead support is composed of a plurality of legs, which are arranged below the photovoltaic module and correspond to a plurality of plugs at the bottom of the photovoltaic module one by one and are coaxially arranged; each leg is a columnar structure with a blind hole on the top surface, and its bottom end is fixed on the hull deck; the length from the bottom surface of the blind hole on the leg to the top of the columnar structure is adapted to the axial length of the plug, so that the photovoltaic module can be stably inserted into each leg through the plug; the length from the bottom surface of the upper blind hole on the leg to the bottom end of the columnar structure is adapted to the axial height of the bracket, so that the bracket can be placed below the photovoltaic module;

[0008] The bracket includes a truss beam group, a self-floating component, an anti-collision pad group and a roller group; the length of the self-floating component is greater than the lateral length of the photovoltaic component, and its width is less than the spacing between adjacent plugs at the bottom of the photovoltaic component; the truss beam group is composed of two truss beams whose length is greater than the length of the self-floating component, and the two are symmetrically fixed on the two long sides of the buoy group, and a hanging point is respectively arranged on the top surface of both ends of each truss beam; the anti-collision pad group is composed of two anti-collision pads, which are symmetrically arranged and respectively fixed on the outer wall surface of the truss beam opposite to the self-floating component; the roller group is composed of a plurality of rollers, which are arranged at intervals on the bottom surfaces of the two truss beams, so that the bracket 3 can move freely on the hull deck through the roller group; each roller also has a locking function;

[0009] The hanger is a rectangular frame formed by four truss beams connected end to end and fixed, and a hanging point is respectively arranged at the four top corners of the top and bottom surfaces of the rectangular frame; the hanger is arranged above the bracket, and the four hanging points arranged on the bottom surface are respectively arranged in one-to-one correspondence with the four hanging points on the two truss beams of the bracket.

[0010] Furthermore, the self-floating assembly is composed of a plurality of buoys, foam blocks or air bags arranged in a rectangular array and connected to each other.

[0011] Furthermore, the anti-collision air cushion adopts a rubber pad.

[0012] Furthermore, the truss beam in the bracket and the truss beam constituting the hanger are made of reinforced concrete truss beam, steel truss beam, or truss beam formed by combining concrete and steel.

[0013] The above-mentioned method for installing photovoltaic power plants on water is adopted, and the installation steps are as follows:

[0014] S1. Several sets of photovoltaic modules that have been assembled are transported to the barge in sequence, so as to be transported to the construction site at one time; wherein each set of photovoltaic modules is arranged on the barge in the following manner: the photovoltaic modules are hoisted onto the barge, and are temporarily fixed on the barge deck through overhead supports, and the height of the overhead layer for placing the bracket is maintained between the photovoltaic modules and the barge deck;

[0015] S2. After the photovoltaic modules are transported to the construction site, the two lifting points on the top surface of the hanger and the two lifting points on the bottom surface of the hanger on the same side are connected to the hoisting equipment through ropes or fall chains to pull the bracket to smoothly pass through the overhead supports under each photovoltaic module and fix it in the center position under the photovoltaic module;

[0016] S3. Before hoisting, adjust the positions of the two anti-collision pads on the bracket so that they are placed on the contact surface between the bracket and the photovoltaic module during the hoisting process to prevent dislocation and reduce stress concentration; then, connect the four hanging points on the top surface of the hanger to the crane hook through ropes, and connect the four hanging points on the bottom surface of the hanger to the four hanging points on the bracket through ropes; tie the cable wind rope on the bracket in advance;

[0017] S4, vertically lift the photovoltaic module to separate the bottom plug from the overhead support, and then horizontally lift the photovoltaic module to the top of the pile foundation structure built on the water, and prepare to put the bottom plug of the photovoltaic module into the hollow socket set at the top of each pile foundation of the pile foundation structure;

[0018] S5. The hoisting height is lowered so that the plug at the bottom of the photovoltaic module is inserted into the hollow socket provided at the top of each pile foundation of the pile foundation structure, and the verticality of the photovoltaic module is adjusted at the same time, so as to permanently fix the plug at the bottom of the photovoltaic module to the pile foundation;

[0019] S6, the hoisting height continues to drop, so that the bracket falls into the water and floats on the water surface. At this time, the rope between the bracket and the hanger is in a relaxed state, so that the hook between the rope and the bracket is naturally disengaged, and the crane ship retracts the hanger;

[0020] S7. Use the guy rope pre-tied to the bracket to drag the bracket out from between the pile foundation structures, and the installation of the photovoltaic module is completed.

[0021] Furthermore, in step S3, the length of the rope between the bracket and the hanger is greater than the distance from the top of the photovoltaic module to the water surface, so that the bracket with rollers and self-floating function falls on the water surface.

[0022] Further, in step S5, the permanent fixing connection method is grouting connection, welding, or bolt connection.

[0023] Further, in step S2 and step S3, the rope is a steel wire rope or a sling.

[0024] Compared with the existing technology, this integrated installation method of water photovoltaics is designed based on a modular water photovoltaic structure. It uses water auxiliary installation tools to connect and fix the lifting module of the modular water photovoltaic structure with the water pile foundation structure. It does not require a large number of ships and human resources, greatly reduces the workload of water installation, and the entire construction process is efficient and convenient, with low operating costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] FIG1( a ) is a side view of transporting several sets of integrated photovoltaic modules to a construction site by a barge in the integrated photovoltaic installation method for water according to the present invention;

[0026] FIG1( b ) is a top view of transporting several sets of integrated photovoltaic modules to a construction site by a barge in the integrated photovoltaic installation method for water in the present invention;

[0027] FIG2(a) is a side view of a bracket with rollers and self-floating function extending into the overhead layer below the photovoltaic module in the method for installing photovoltaic modules on water in the present invention;

[0028] FIG2( b ) is a top view of a bracket with rollers and self-floating function extending into the overhead layer below the photovoltaic module in the method for installing photovoltaic modules on water in the present invention;

[0029] FIG3( a ) is a side view of the entire set of photovoltaic modules being lifted by the bracket in contact with the bottom beam of the photovoltaic modules during hoisting and lifting in the method for integrally installing photovoltaic modules on water of the present invention;

[0030] FIG3( b ) is a top view of the entire photovoltaic assembly being lifted by the bracket in contact with the bottom beam of the photovoltaic assembly during hoisting and lifting in the method for integrally installing photovoltaic assembly on water of the present invention;

[0031] Figure 4 It is a side view of the process in which the plug at the bottom of the photovoltaic module falls into the hollow socket at the top of the pile foundation when hoisting into place in the integrated installation method of the above-water photovoltaic module of the present invention;

[0032] Figure 5 It is a side view of the plug at the bottom of the photovoltaic module falling into the hollow socket at the top of the pile foundation when hoisting into place in the integrated installation method of the floating photovoltaic module of the present invention;

[0033] Figure 6 It is a side view of the bracket falling into the water surface when the hoisting height continues to decrease in the integrated water photovoltaic installation method of the present invention;

[0034] Figure 7 It is a schematic diagram of the hoisting wire rope in the water photovoltaic integrated installation method of the present invention in a disengaged state;

[0035] Figure 8 It is a schematic diagram of extracting a bracket floating on the water surface from between piles in the integrated water photovoltaic installation method of the present invention. DETAILED DESCRIPTION

[0036] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments, but the following embodiments are by no means intended to limit the present invention in any way.

[0037] The above-water photovoltaic overall installation tool and method are designed for modular above-water photovoltaic structures. The modular above-water photovoltaic structure is composed of a pile foundation structure, a socket structure, a photovoltaic panel support structure and a photovoltaic module arranged in sequence from bottom to top; the pile foundation structure is composed of a plurality of pile foundations, which are fixed in the water body according to a preset pile spacing; the socket structure, the photovoltaic panel support structure and the photovoltaic module are connected in sequence to form an integral photovoltaic module, which is used as an integral lifting module. After being assembled on land, the photovoltaic module is transported to the above-water working surface by a barge, and after being plugged and fixedly connected with the pile foundation structure, the installation of the modular above-water photovoltaic structure is completed. In order to realize the connection between the photovoltaic module and the pile foundation structure, the socket structure includes a plurality of cylindrical plugs arranged at the bottom of the photovoltaic module, and a plurality of plate plugs respectively fixed on the inner wall of the top of each pile foundation constituting the pile foundation structure, so that a hollow socket is formed at the top of each pile foundation.

[0038] Referring to FIG. 1( a ) and FIG. 1( b ), a water auxiliary installation tool for the integrated installation of water photovoltaics comprises an overhead support 8 , a bracket 3 and a hanger 5 ; wherein,

[0039] The overhead support 8 is composed of a plurality of legs, which are arranged below the photovoltaic module and correspond to a plurality of plugs at the bottom of the photovoltaic module one by one and are coaxially arranged; each leg is a columnar structure with a blind hole on the top surface, and its bottom end is fixed on the hull deck; the length from the bottom surface of the blind hole on the leg to the top of the columnar structure is adapted to the axial length of the plug, so that the photovoltaic module can be stably inserted into each leg through the plug; the length from the bottom surface of the upper blind hole on the leg to the bottom end of the columnar structure is adapted to the axial height of the bracket 3, so that the bracket 3 can be placed below the photovoltaic module;

[0040] The bracket 3 includes a truss beam group, a self-floating component, an anti-collision pad group and a roller group; specifically,

[0041] The self-floating assembly is a buoy-type self-floating assembly composed of a plurality of buoys arranged in a rectangular array and connected to each other; the length of the self-floating assembly is greater than the lateral length of the photovoltaic assembly, and the width thereof is less than the spacing between adjacent plugs at the bottom of the photovoltaic assembly;

[0042] The truss beam group is composed of two truss beams whose length is greater than that of the self-floating assembly. The two truss beams are symmetrically fixed on the two long sides of the buoy group, and a hanging point is respectively arranged on the top surface of both ends of each truss beam; wherein the truss beam adopts a steel truss beam;

[0043] The anti-collision cushion group is composed of two anti-collision cushions, which are symmetrically arranged and respectively fixed on the outer wall surface of the truss beam opposite to the self-floating component; wherein the anti-collision air cushion adopts a rubber cushion;

[0044] The roller group is composed of a plurality of rollers, which are arranged at intervals on the bottom surfaces of the two truss beams, so that the bracket 3 can move freely on the hull deck through the roller group;

[0045] The hanger 5 is a rectangular frame formed by four truss beams connected end to end and fixed, and a hanging point is respectively arranged at the four corners of the top and bottom surfaces of the rectangular frame; the hanger 5 is arranged above the bracket 3, and the four hanging points arranged on the bottom surface are respectively arranged in a one-to-one correspondence with the four hanging points on the two truss beams of the bracket 3; wherein, the truss beams constituting the hanger 5 are made of steel truss beams.

[0046] The above-mentioned method for installing photovoltaic power plants on water is adopted, and the installation steps are as follows:

[0047] S1. Referring to FIG. 1(a) and FIG. 1(b), several sets of photovoltaic modules 7 that have been assembled are transported to the barge 2 in sequence, so as to be transported to the construction site at one time. Each set of photovoltaic modules 7 is arranged on the barge 2 in the following manner: the photovoltaic modules 7 are hoisted onto the barge 2, and are temporarily fixed to the deck of the barge 2 by overhead supports 8, and an overhead layer height for placing the bracket 3 is maintained between the photovoltaic modules 7 and the deck of the barge 2.

[0048] S2, referring to FIG. 2(a) and FIG. 2(b), after the photovoltaic modules 7 are transported to the construction site, the two hanging points on the top surface of the hanger 5 and the two hanging points on the bottom surface of the hanger 5 on the same side are connected to the winch through the wire rope, so as to pull the bracket 3 smoothly through the overhead support 8 under each photovoltaic module 7 and fix it at the center position under the photovoltaic module 7;

[0049] S3. Referring to FIG. 3(a) and FIG. 3(b), before lifting, adjust the positions of the two anti-collision pads on the bracket 3 so that they are placed at the contact surface between the bracket 3 and the photovoltaic module 7 during the lifting process to prevent dislocation and reduce stress concentration; then, connect the four lifting points on the top surface of the hanger 5 to the crane hook through the lifting wire rope 6, and connect the four lifting points on the bottom surface of the hanger 5 to the four lifting points on the bracket 3 through the connecting wire rope 4; pre-tie the cable wind rope on the bracket 3; wherein, the length of the wire rope between the bracket 3 and the hanger 5 is greater than the distance from the top of the photovoltaic module 7 to the water surface, so that the bracket with rollers and self-floating function falls on the water surface;

[0050] S4. See Figure 4 , vertically lift the photovoltaic assembly 7 to separate the bottom plug from the overhead support 8, and then horizontally lift the photovoltaic assembly 7 to the top of the pile foundation structure built on the water, and prepare to put the bottom plug of the photovoltaic assembly 7 into the hollow socket set at the top of each pile foundation of the pile foundation structure;

[0051] S5. See Figure 5, the hoisting height is lowered, so that the plug at the bottom of the photovoltaic module 7 is inserted into the hollow socket set at the top of each pile foundation of the pile foundation structure, and the verticality of the photovoltaic module 7 is adjusted at the same time, so as to permanently fix the plug at the bottom of the photovoltaic module 7 to the pile foundation; wherein the permanent fixing connection method is grouting connection, welding, or bolt connection; taking the grouting connection method as an example, after the plug at the bottom of the photovoltaic module 7 is inserted into the hollow socket at the top of each pile foundation of the pile foundation structure and the verticality adjustment is completed, cement slurry is poured into the chamber to form a grouting layer between the plug and the inner wall of the cavity, and after the cement slurry is cured, each plug is reliably connected to the pile foundation;

[0052] S6. See Figure 6 and Figure 7 , the hoisting height continues to drop, causing the bracket 3 to fall into the water and float on the water surface 1. At this time, the connecting wire rope 4 between the bracket 3 and the hanger 5 is in a relaxed state, causing the hook between the rope and the bracket 3 to naturally disengage, and the crane ship retracts the hanger 5;

[0053] S7, see Figure 8 , the bracket 3 is dragged out from between the pile foundation structures using the guy rope pre-tied to the bracket 3, and the photovoltaic assembly 7 is installed.

[0054] In summary, the overall installation method of photovoltaic power on the water can greatly reduce the workload of installation on the water, and the overall installation of photovoltaic power on the water can be completed only by relying on offshore lifting equipment. There is no need to carry out inefficient operations such as photovoltaic panel assembly, line connection, and structural component assembly on the sea surface, which occupy a large number of ships and human resources.

[0055] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The above embodiments and descriptions only describe the principles of the present invention. The present invention may be subject to various changes and improvements without departing from the spirit and scope of the present invention. These changes and improvements fall within the scope of the present invention. The scope of protection claimed by the present invention is defined by the attached claims and their equivalents.

Claims

1. A method for installing photovoltaic power plants on water, characterized in that: The installation is completed by using an auxiliary installation tool on water; the auxiliary installation tool on water comprises an overhead support (8), a bracket (3) and a hanger (5); wherein the overhead support (8) is composed of a plurality of legs, which are arranged below the photovoltaic module and correspond to a plurality of plugs at the bottom of the photovoltaic module and are coaxially arranged; each leg is a columnar structure with a blind hole on the top surface, and the bottom end of the leg is fixed on the hull deck; the length from the bottom surface of the blind hole on the leg to the top end of the columnar structure is adapted to the axial length of the plug, so that the photovoltaic module can be stably inserted into each leg through the plug; the length from the bottom surface of the upper blind hole on the leg to the bottom end of the columnar structure is adapted to the axial height of the bracket (3), so that the bracket (3) can be placed below the photovoltaic module; the bracket (3) comprises a truss beam group, a self-floating component, an anti-collision pad group and a roller group; the length of the self-floating component is greater than the lateral length of the photovoltaic module, and the width is less than the horizontal length of the photovoltaic module. The spacing between adjacent plugs at the bottom; the truss beam group is composed of two truss beams whose length is greater than that of the self-floating assembly, and the two truss beams are symmetrically fixed on the two long sides of the buoy group, and a hanging point is respectively arranged on the top surface of both ends of each truss beam; the anti-collision pad group is composed of two anti-collision pads, and the two are symmetrically arranged and respectively fixed on the outer wall surface of the truss beam opposite to the self-floating assembly; the roller group is composed of a plurality of rollers, which are arranged at intervals on the bottom surfaces of the two truss beams, so that the bracket (3) can move freely on the hull deck through the roller group; the hanger (5) is a rectangular frame formed by four truss beams connected end to end and fixed, and a hanging point is respectively arranged at the four top corners of the top and bottom surfaces of the rectangular frame; the hanger (5) is arranged above the bracket (3), and the four hanging points arranged on the bottom surface are respectively arranged in a one-to-one correspondence with the four hanging points on the two truss beams of the bracket (3); The installation steps are as follows: S1. Several sets of photovoltaic modules that have been assembled are transported to a barge in sequence, so as to be transported to the construction site at one time. Each set of photovoltaic modules is arranged on the barge in the following manner: the photovoltaic modules are hoisted onto the barge, and are temporarily fixed to the barge deck via overhead supports (8), and an overhead layer height is maintained between the photovoltaic modules and the barge deck for placing the bracket (3); S2. After the photovoltaic modules are transported to the construction site, two lifting points on the top surface of the hanger (5) and two lifting points on the bottom surface of the hanger (5) on the same side are connected to the hoisting device through ropes or fall chains, so as to pull the bracket (3) to smoothly pass through the overhead support (8) under each photovoltaic module and fix it at the center position under the photovoltaic module; S3. Before lifting, adjust the positions of the two anti-collision pads on the bracket (3) so that they are placed on the contact surface between the bracket (3) and the photovoltaic module during the lifting process to prevent dislocation and reduce stress concentration; then, connect the four lifting points on the top surface of the hanger (5) to the crane hook through ropes, and connect the four lifting points on the bottom surface of the hanger (5) to the four lifting points on the bracket (3) through ropes; and pre-tie the cable wind rope on the bracket (3); S4, vertically lifting the photovoltaic module to separate the bottom plug from the overhead support (8), and then horizontally lifting the photovoltaic module to the top of the pile foundation structure built on the water, preparing to insert the bottom plug of the photovoltaic module into the hollow socket set at the top of each pile foundation of the pile foundation structure; S5. The hoisting height is lowered so that the plug at the bottom of the photovoltaic module is inserted into the hollow socket provided at the top of each pile foundation of the pile foundation structure, and the verticality of the photovoltaic module is adjusted at the same time, so as to permanently fix the plug at the bottom of the photovoltaic module to the pile foundation; S6, the lifting height continues to decrease, so that the bracket (3) falls into the water and floats on the water surface. At this time, the rope between the bracket (3) and the hanger (5) is in a relaxed state, so that the hook between the rope and the bracket (3) is naturally disengaged, and the crane ship retracts the hanger (5); S7. Using the guy rope pre-tied to the bracket (3), the bracket (3) is dragged out from between the pile foundation structures, and the photovoltaic module is installed.

2. The method for installing photovoltaic power plants on water according to claim 1, characterized in that: The self-floating assembly is composed of a plurality of buoys, foam blocks or air bags arranged in a rectangular array and connected to each other.

3. The method for installing photovoltaic power plants on water according to claim 1, characterized in that: The anti-collision air cushion adopts rubber pad.

4. The method for installing photovoltaic power plants on water according to claim 1, characterized in that: The truss beam in the bracket (3) and the truss beam constituting the hanger (5) are made of reinforced concrete truss beams, steel truss beams, or truss beams formed by combining concrete and steel.

5. The method for installing photovoltaic power plants on water according to claim 1, characterized in that: In step S3, the length of the rope between the bracket (3) and the hanger (5) is greater than the distance from the top of the photovoltaic module to the water surface, so that the bracket with rollers and self-floating function falls on the water surface.

6. The method for installing photovoltaic power plants on water according to claim 1, characterized in that: In step S5, the permanent fixing connection method is grouting connection, welding, or bolt connection.

7. The method for installing photovoltaic power plants on water according to claim 1, characterized in that: In step S2 and step S3, the rope is a steel wire rope or a sling.