Phase-locked measurement method and system for wake flow of dual wind turbines based on PIV

By setting up a scaled model and a PIV measurement system with an external rotational speed sensor on the wind tunnel platform, the problem of complexity and low accuracy of wake measurement for twin wind turbine units is solved, high-precision wake measurement is achieved, and the measurement cost is reduced. Cost and complexity.

CN115434874BActive Publication Date: 2024-10-29HUANENG CLEAN ENERGY RES INST
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202211053850.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-08-30
Publication Date
2024-10-29
Estimated Expiration
2042-08-30

AI Technical Summary

Technical Problem

The wake measurement of twin wind turbine units is complex and has low accuracy, making it difficult to implement in practical applications and affecting the operating conditions and aerodynamic performance of the units in the wind farm.

Method used

A PIV-based wake phase-locked measurement method for twin wind turbine units is adopted. By setting up a scaled model and particle image velocimetry PIV measurement system on the wind tunnel platform, and an external rotational speed sensor, the measurement difficulty and cost are reduced and the measurement accuracy is improved.

Benefits of technology

It achieves high-precision measurement of the wake of a double wind turbine unit, reduces the complexity and cost of measurement, facilitates implementation, and improves the accuracy of measurement results.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115434874B_ABST
    Figure CN115434874B_ABST
Patent Text Reader

Abstract

The present application proposes a phase-locked measurement method and system for the wake of a twin wind turbine unit based on PIV, the method comprising: setting a scaled model of a twin wind turbine unit and a PIV measurement system on a wind tunnel platform, the scaled model comprising a motor and a coupling; setting a speed sensor in an area outside the coupling, the speed sensor comprising two detection panels; adjusting the top screw of each coupling, wherein the adjusted top screw cuts the detection area between the two detection panels when rotating with the coupling to the corresponding speed sensor; connecting the signal line of the speed sensor to the signal transmission interface of the PIV measurement system, and supplying power to each speed sensor and the PIV measurement system; when the top screw cuts the detection area of ​​the speed sensor, sending the pulse signal output by the sensor to the PIV measurement system, driving the PIV measurement system to capture images, and measuring the wake of the scaled model. The method reduces the difficulty and cost of phase-locked measurement of the wake of a twin wind turbine unit.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of wind power generation, and in particular to a phase-locked measurement method and system for the wake of a dual wind turbine unit based on PIV. Background Art

[0002] At present, the proportion of wind power generation in the power supply system is increasing. In order to improve the efficiency of wind power generation, twin-rotor wind turbines are gradually becoming popular in wind power generation.

[0003] Among them, the wake of the twin wind turbine unit has a direct impact on the aerodynamic performance and operational reliability of the unit, and will affect the operating conditions of each unit in the wind farm. Therefore, it is necessary to measure the wake of the twin wind turbine unit to facilitate timely adjustment of the unit. However, due to the counter-rotation effect of the twin wind turbine unit, there will be complex aerodynamic characteristics in the flow field, such as the rotation, unsteadiness, three-dimensional effect, tip vortex shedding, root vortex shedding and flow separation in the local area of ​​the blade, which makes the experimental measurement of the flow structure more difficult. The measurement method of the twin wind turbine unit wake in the related art has a complex measurement process, is inconvenient to implement in practical applications, and has low measurement accuracy.

[0004] Therefore, how to reduce the difficulty of measuring the wake of a dual wind turbine unit and improve the accuracy of the measurement results has become an urgent problem that needs to be solved. Summary of the invention

[0005] The present application aims to solve one of the technical problems in the related art at least to some extent.

[0006] To this end, the first purpose of the present application is to propose a phase-locked measurement method for the wake of a dual wind turbine unit based on PIV. This method places the speed sensor of the dual wind turbine unit externally, which facilitates the construction of a scaled model for PIV measurement of the wake of the dual wind turbine unit, reduces the difficulty and cost of the phase-locked measurement of the wake of the dual wind turbine unit, and improves the accuracy of the wake measurement of the dual wind turbine unit.

[0007] The second object of the present application is to propose a phase-locked measurement system for the wake of a dual wind turbine unit based on PIV;

[0008] A third object of the present application is to provide a non-transitory computer-readable storage medium.

[0009] To achieve the above-mentioned purpose, the first embodiment of the present application is to propose a phase-locked measurement method of the wake of a dual wind turbine unit based on PIV, the method comprising the following steps:

[0010] A scaled model of a dual wind turbine set and a particle image velocimetry (PIV) measurement system are arranged on a wind tunnel platform, wherein the scaled model includes two motors and a coupling corresponding to each of the motors;

[0011] A rotation speed sensor is arranged in a preset area outside each coupling, and each rotation speed sensor includes two detection panels;

[0012] Adjusting the top screw of each coupling, wherein the adjusted top screw cuts the detection area between the two detection panels when the coupling rotates to the corresponding rotation speed sensor;

[0013] Connecting the signal line of each rotation speed sensor to the signal transmission interface of the PIV measurement system, supplying power to each rotation speed sensor and the PIV measurement system, and controlling the wind tunnel platform to generate airflow to drive the dual wind wheels to rotate;

[0014] When the top screw cuts the detection area of ​​the rotation speed sensor, the pulse signal output by the sensor is sent to the PIV measurement system, the PIV measurement system is driven to capture images, and the wake of the scaled model is measured.

[0015] Optionally, in one embodiment of the present application, adjusting the top screw of each coupling includes: adjusting the position of the top screw or the two detection panels, and extending the length of the top screw to a preset length, wherein the preset length matches the length of the two detection panels, so that when the top screw rotates to the corresponding speed sensor, it is located between the two detection panels.

[0016] Optionally, in one embodiment of the present application, power is supplied to each of the rotational speed sensor and the PIV measurement system, including: connecting the power line of the rotational speed sensor to a DC power supply with a preset voltage value, and supplying power to the rotational speed sensor through the DC power supply; connecting the input end of a potentiometer to the DC power supply, connecting the output end of the potentiometer to the PIV measurement system, and adjusting the output voltage of the potentiometer, and providing a 5V DC voltage to the PIV measurement system through the potentiometer.

[0017] Optionally, in one embodiment of the present application, a scaled model of a dual wind turbine group and a particle image velocimetry (PIV) measurement system are set on a wind tunnel platform, including: installing a tower device on the wind tunnel platform; setting up a cabin on the tower device, and connecting the two motors in the cabin; and setting up a laser transmitter and two charge-coupled device (CCD) cameras according to the position of the tower device and the requirements for the shooting section distance from the tower device.

[0018] Optionally, in one embodiment of the present application, the preset area outside the coupling includes: a solid wall area inside the cabin near the coupling.

[0019] Optionally, in one embodiment of the present application, after setting up the laser emitter and two charge-coupled device (CCD) cameras, it also includes: debugging and calibrating the two CCD cameras; after driving the PIV measurement system to capture images, it also includes: updating the lighting position of the laser emitter and the shooting cross-section multiple times, performing the debugging and calibration after each update, and capturing a preset number of images at the angle after each update.

[0020] To achieve the above-mentioned purpose, the second embodiment of the present application further proposes a phase-locked measurement system for the wake of a dual wind turbine unit based on PIV, comprising the following modules:

[0021] A first setting module is used to set a scaled model of a dual wind turbine set and a particle image velocimetry (PIV) measurement system on a wind tunnel platform, wherein the scaled model includes two motors and a coupling corresponding to each of the motors;

[0022] A second setting module is used to set a rotation speed sensor in a preset area outside each of the couplings, each of the rotation speed sensors including two detection panels;

[0023] An adjustment module, used for adjusting the top screw of each coupling, wherein the adjusted top screw cuts the detection area between the two detection panels when the coupling rotates to the corresponding rotation speed sensor;

[0024] A control module, used to connect the signal line of each of the rotation speed sensors to the signal transmission interface of the PIV measurement system, supply power to each of the rotation speed sensors and the PIV measurement system, and control the wind tunnel platform to generate airflow to drive the dual wind wheels to rotate;

[0025] The measuring module is used to send the pulse signal output by the sensor to the PIV measuring system when the top screw cuts the detection area of ​​the rotation speed sensor, drive the PIV measuring system to capture images, and measure the wake of the scaled model.

[0026] Optionally, in one embodiment of the present application, the adjustment module is specifically used to: adjust the position of the top screw or the two detection panels, and extend the length of the top screw to a preset length, and the preset length matches the length of the two detection panels, so that when the top screw rotates to the corresponding speed sensor, it is located between the two detection panels.

[0027] Optionally, in one embodiment of the present application, the control module is specifically used to: connect the power line of the speed sensor to a DC power supply with a preset voltage value, and power the speed sensor through the DC power supply; connect the input end of the potentiometer to the DC power supply, connect the output end of the potentiometer to the PIV measurement system, and adjust the output voltage of the potentiometer, and provide a 5V DC voltage to the PIV measurement system through the potentiometer.

[0028] In order to implement the above-mentioned embodiments, the third aspect embodiment of the present application also proposes a non-temporary computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, the phase-locked measurement method of the wake of a dual wind turbine unit based on PIV in the above-mentioned embodiment is implemented.

[0029] The technical solution provided by the embodiments of the present application brings at least the following beneficial effects: the present application first constructs a scaled model of a twin wind turbine unit, wherein the speed sensor of the twin wind turbine unit is externalized to facilitate the processing of the scaled model and meet the requirements of the phase-locked measurement of the scaled model. Furthermore, a PIV-based wake phase-locked measurement is performed on the scaled model of the unit. Compared with the measurement of the actual twin wind turbine unit, it is convenient to arrange the measurement equipment and obtain the measurement data, and it is convenient to switch the shooting section, thereby reducing the complexity and measurement cost of the phase-locked measurement of the twin wind turbine unit wake, and facilitating implementation. In addition, images are shot at multiple angles, and high-precision wake measurement data is obtained through the PIV algorithm, thereby improving the accuracy of the twin wind turbine unit wake measurement.

[0030] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] The above and / or additional aspects and advantages of the present application will become apparent and easily understood from the following description of the embodiments in conjunction with the accompanying drawings, in which:

[0032] Figure 1 A flow chart of a phase-locked measurement method of a wake of a dual wind turbine unit based on PIV proposed in an embodiment of the present application;

[0033] Figure 2 A schematic diagram of a specific arrangement scenario of a scaled model and a PIV measurement system proposed in an embodiment of the present application;

[0034] Figure 3 A schematic structural diagram of a nacelle of a specific dual wind turbine unit proposed in an embodiment of the present application;

[0035] Figure 4 A schematic diagram of a specific deployment scenario of a rotation speed sensor proposed in an embodiment of the present application;

[0036] Figure 5 A signal transmission schematic diagram of a rotation speed sensor proposed in an embodiment of the present application;

[0037] Figure 6 A flowchart of a specific PIV-based phase-locked measurement method for the wake of a dual wind turbine unit proposed in an embodiment of the present application;

[0038] Figure 7 A schematic structural diagram of a phase-locked measurement system for the wake of a dual wind turbine unit based on PIV proposed in an embodiment of the present application. DETAILED DESCRIPTION

[0039] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.

[0040] It should be noted that in the embodiments of the present application, the wake of the twin wind turbine group can be phase-locked measured by using teleoscopic particle image velocimetry (PIV). PIV technology is a method that evenly spreads particles with a density close to that of the fluid in the wind tunnel flow field, based on the principle of stereoscopic vision, and uses two or more charge coupled device (CCD) cameras arranged off-axis to capture particle images of the observation area illuminated by a laser sheet. Then, a series of calculations such as cross-correlation and interpolation algorithms are performed on the collected particle images to finally obtain the flow observation technology of the spatial displacement information of the particles in the observation area. PIV is an experimental measurement method that can measure the three-component velocity field on a two-dimensional section in a flow field.

[0041] However, due to the large size of the twin wind turbine unit and site restrictions, it is inconvenient to arrange equipment and test data when measuring the wake of the actual twin wind turbine unit through PIV technology, the operation is complicated, and the test is difficult. Therefore, in an embodiment of the present application, a scaled model of the twin wind turbine unit is constructed, and the scaled model of the twin wind turbine unit is subjected to PIV-based phase-locked measurement. Among them, in order to obtain the three-dimensional evolution characteristics of a phase flow of a twin wind turbine unit, a speed sensor such as a photoelectric encoder is generally built into the rotating shaft of the rotating part of the unit. However, the photoelectric encoder or other types of speed sensors are inconvenient to process in the scaled model of the wind turbine unit, and the speed sensor cannot be built in, resulting in the inability to achieve phase-locked measurement of the wake of the scaled model of the unit.

[0042] To this end, the present application proposes a phase-locked measurement method for the wake of a dual wind turbine unit based on PIV. This method uses an external speed measurement device to meet the requirements of phase-locked measurement of a scaled model and reduces the complexity of the wake measurement.

[0043] A phase-locked measurement method and system for the wake of a dual wind turbine unit based on PIV according to an embodiment of the present invention will be described in detail below with reference to the accompanying drawings.

[0044] Figure 1 A flow chart of a phase-locked measurement method for the wake of a dual wind turbine unit based on PIV proposed in an embodiment of the present application, such as Figure 1 As shown, the method comprises the following steps:

[0045] Step S101, setting a scaled model of a twin wind turbine set and a particle image velocimetry (PIV) measurement system on a wind tunnel platform, wherein the scaled model includes two motors and a coupling corresponding to each motor.

[0046] The wind tunnel platform is a platform for artificially generating and controlling airflow. The present application simulates the actual flow of surrounding gas of a twin wind turbine set through the wind tunnel platform, thereby simulating the wake of the twin wind turbine set.

[0047] The tail flow of the twin wind turbine group is the area where the air flow is affected after the airflow passes through the wind turbine group, that is, the area where the wind speed decreases downstream of the twin wind turbine group. The scaled model of the twin wind turbine group is a model formed by reducing the components of the actual twin wind turbine group in the same proportion.

[0048] Specifically, according to the need for PIV measurement of the wake of a twin-rotor wind turbine, a scaled model of the twin-rotor wind turbine and a PIV measurement system are set at corresponding positions on the wind tunnel platform to ensure that the PIV measurement system can comprehensively photograph the wake of the scaled model of the twin-rotor wind turbine. The scaled model includes model components that correspond to the actual components of the twin-rotor wind turbine, such as the twin motors that drive the two wind rotors to rotate, and the couplings corresponding to each motor. The PIV measurement system includes a laser transmitter and two charge-coupled device (CCD) cameras.

[0049] In one embodiment of the present application, a scaled model of a twin wind turbine set and a particle image velocimetry (PIV) measurement system are set on a wind tunnel platform, including: firstly installing a tower device on the wind tunnel platform, then installing a cabin on the tower device, and connecting two motors at corresponding positions in the cabin, and couplings corresponding to each motor. Then, according to the position of the tower device and the requirements of the shooting section distance from the tower device, a laser transmitter and two charge coupled device (CCD) cameras are set up.

[0050] For example, Figure 2As shown, the shooting section is a fixed section in the wake area downstream of the scaled model 10, and the CCD camera 30 takes a picture of the section to obtain the particle image in the section. After fixing the position of the tower device of the scaled model, the position of the laser emitter 20 is determined according to the position coordinates of the tower device and the requirements of the shooting section distance from the tower device, and then the position of the CCD camera 30 is determined according to the distance requirements between the CCD camera and the shooting section, and a bracket is set up to install the laser emitter 20 and two CCD cameras 30, and then the laser emitter 20 and the CCD camera 30 are connected to the computer to obtain the measurement data for calculation and facilitate control thereof in the subsequent process. Among them, the shooting height of the CCD camera can be adapted to the height of the double wind wheel in the scaled model, so as to accurately and completely shoot the observation area in the wake area. In order to ensure that the shooting section can be shot continuously at high speed in the future, the CCD camera set in this application can meet the nanosecond shooting response requirements.

[0051] It should be noted that the scaled model and PIV measurement system set up in the present application also include the actual wind turbine and other components required to realize PIV measurement, such as the wind turbine rotor, etc. Since the measurement method of the present application is not mainly aimed at controlling these components, they will not be described in detail here.

[0052] Step S102: a rotation speed sensor is arranged in a preset area outside each coupling, and each rotation speed sensor includes two detection panels.

[0053] The speed sensor is used to detect the speed of the blades rotating at high speed. The area where the speed sensor is set in the present application is near the outside of the coupling, and a speed sensor is set in the outer area of ​​each of the two couplings, so that the speed sensor is externally placed at the rotating shaft of the rotating component. The speed sensor in the present application can be a photoelectric sensor, each of which includes two detection panels, and the speed of the blade is measured by detecting the time when an opaque object driven by the rotation of the blade appears between the two detection panels.

[0054] In one embodiment of the present application, the Figure 3 The speed sensor is arranged in the manner shown. Figure 3 The cabin of the unit shown includes a motor 1 and its corresponding coupling 1, a motor 2 and its corresponding coupling 2, and sensors 1 and 2 arranged near the two couplings. A rotating shaft runs through the two motors and the two couplings.

[0055] The preset area outside the coupling selected in this example is the solid wall area inside the cabin near the coupling. When arranging the sensor, first divide the installation area at the solid wall position of the cabin near each coupling, and stick the back plate of the sensor and other components to fix the sensor in this area. Specifically, through holes for fixing the sensor and through holes for connecting the power line and signal line of the sensor can be set on the back plate. Then, fix the speed sensor on the back plate and arrange the two detector panels of the sensor. In order to meet the requirements of subsequent PIV measurement, the arranged speed sensor has a response frequency of 1kHz.

[0056] It should be noted that in this example, the two speed sensors are arranged on the solid wall on the same side of the cabin. In actual applications, the speed sensors can also be arranged in other areas outside the rotating shaft according to the limitations of different working scenarios.

[0057] Step S103, adjusting the top screw of each coupling, wherein the adjusted top screw cuts the detection area between the two detection panels when the coupling rotates to the corresponding rotation speed sensor.

[0058] Among them, the top screw of the coupling is the opaque object detected by the speed sensor of this application. When the wind wheel drives the rotating shaft to rotate, the top screw rotates in a circular motion with the coupling and passes through the corresponding speed sensor position once in each cycle.

[0059] Specifically, since it is necessary to ensure that the sensor can detect the top screw for speed measurement, the original top screw of the coupling must be adjusted to ensure that when the top screw subsequently rotates with the coupling to the corresponding speed sensor, it can cut the detection area between the two detection panels.

[0060] In one embodiment of the present application, when adjusting the top screw of each coupling, the top screw and the corresponding speed sensor can be adjusted jointly, including first adjusting the position of the top screw or the two detection panels so that the horizontal position of the top screw is between the horizontal positions of the two detection panels, that is, Figure 3 When the coordinate system is established with the rotating axis in as the horizontal coordinate, the horizontal coordinate of the top screw is between the horizontal coordinates of the two detection panels. Specifically, the position of the top screw or the arrangement position of the detection panel can be adjusted according to the difficulty of adjustment. The width of the groove formed by the two detector panels and the back plate is 4 to 8 mm, so that the top screw can pass through the two detection panels. Then, the length of the top screw is extended to a preset length, which matches the length of the two detection panels. For example, the length of the extended top screw is greater than the length of the detection panel, and the length difference between the two is within a preset range.

[0061] Therefore, by adjusting the position of the top screw or the detection panel and the length of the top screw, it is ensured that when the top screw rotates with the coupling to the corresponding speed sensor, the top screw is between the two detection panels. Figure 4 As shown, the arranged rotation speed sensor includes a sensor signal and power line 11 , a sensor indicator light 12 and two detection panels 13 . After adjustment, the top screw 14 can cut the detection area of ​​the two detection panels 13 .

[0062] Step S104, connecting the signal line of each speed sensor to the signal transmission interface of the PIV measurement system, supplying power to each speed sensor and the PIV measurement system, and controlling the wind tunnel platform to generate airflow to drive the dual wind wheels to rotate.

[0063] Specifically, the signal line of the speed sensor is first connected to the signal transmission interface of the PIV measurement system, such as the High Definition Multimedia Interface (HDMI), so that the subsequent PIV measurement system can start measuring according to the signal detected by the speed sensor. After the power line and signal transmission line of the speed sensor and the PIV measurement system are connected, power is supplied to the speed sensor and the PIV measurement system, and the wind tunnel platform is controlled to generate controllable airflow, so that the wake of the simulated dual wind turbine unit can be measured during operation.

[0064] It should be noted that the speed sensor can be powered according to the working voltage required by the speed sensor. For example, the photoelectric sensor selected in this application can be connected to a 24V DC battery to drive the speed sensor to operate. However, the PIV measurement system needs to be connected to a 5V signal source, which is usually lower than the working voltage of the photoelectric sensor. Therefore, in order to ensure the normal operation of the speed sensor and the PIV measurement system and avoid setting too many external power supplies to reduce the measurement cost, in one embodiment of the present application, it is also proposed as follows Figure 5 The signal access method of the speed sensor shown in the figure, in this embodiment, the power line of the speed sensor is connected to a DC power supply with a preset voltage value, and the speed sensor is powered by the DC power supply. The input end of the potentiometer is connected to the DC power supply, and the output end of the potentiometer is connected to the PIV measurement system, the output voltage of the potentiometer is adjusted, and a 5V DC voltage is provided to the PIV measurement system through the potentiometer.

[0065] Specifically, if Figure 5As shown, the 24V DC battery 100 first supplies power to the sensor 200, and the sensor 200 transmits the detected signal to the junction box 300 through the signal line. The output end of the 24V DC battery is also connected to the first input end of the potentiometer 400, and the first output end of the junction box 300 is connected to the second input end of the potentiometer 400. The potentiometer 400 adjusts the 24V DC voltage received at the first input end to 5V by adjusting the internal sliding resistor in combination with the electrical signal input from the junction box 300, and inputs the converted voltage to the HDMI cable 500 of the PIV measurement system to power the PIV measurement system. The signal transmitted by the signal line is also transmitted to the HDMI cable 500 of the PIV measurement system.

[0066] Step S105, when the top screw cuts the detection area of ​​the rotation speed sensor, the pulse signal output by the sensor is sent to the PIV measurement system, the PIV measurement system is driven to capture images, and the wake of the scaled model is measured.

[0067] In the embodiment of the present application, when the actual measurement is carried out, the scaled model runs under the airflow generated by the wind tunnel platform, and the double wind wheels in the unit start to rotate. When the extension screw of the coupling triggers the action range of the speed sensor, the sensor sends a pulse signal. Figure 5 The transmission method shown is sent to the PIV connecting line, triggering the CCD camera of the PIV measurement system to start shooting the observation section, and performing a series of calculations based on the collected images based on relevant fusion and interpolation algorithms, thereby obtaining the wake measurement results of the scaled model of the dual wind turbine group.

[0068] It is understandable that, since the position of the extension screw is fixed, the laser transmitter and the two CCD cameras are always triggered to run when the wind rotor rotates to the corresponding phase angle, so that the phase of the two wind rotors is locked at a fixed phase angle position for shooting and measurement, thus realizing the phase-locked measurement of the wake of the dual wind turbine unit. In one embodiment of the present application, the phase angle of the wind rotor for phase-locked measurement can be changed according to the measurement requirements by adjusting the top screw of the coupling or the arrangement position of the external speed sensor, for example, Figure 1 As shown, the fixed wind wheel is photographed at a phase angle of 0°. In addition, the top screws of the two couplings can be adjusted differently so that the two wind wheels have different phase angles for phase-locked measurement.

[0069] Based on the above embodiments, in order to improve the accuracy of PIV measurement. In one embodiment of the present application, after setting up the laser transmitter and two charge-coupled device (CCD) cameras, it also includes: debugging and calibrating the two CCD cameras. Specifically, calibrating the two CCD cameras includes first obtaining the internal and external parameters of the camera through the camera calibration method in the relevant technology, so as to facilitate subsequent camera debugging and calculation according to the parameters of the camera. Debugging the CCD camera includes adjusting the setting position and shooting angle of the CCD camera and adjusting the focal length of the two CCD cameras to overlap with the laser sheet on the measurement section, so as to improve the integrity and clarity of the captured image, etc., to ensure the measurement quality of the PIV measurement system. After the camera is debugged, the debugging results are also calibrated, and the subsequent actual measurement is measured according to the calibrated parameters.

[0070] Furthermore, after driving the PIV measurement system to capture an image and perform calculations in this step, it also includes: updating the lighting position and shooting section of the laser transmitter multiple times, performing the above-mentioned debugging and calibration after each update, and shooting a preset number of images at the angle after each update. That is, this implementation can change the lighting position and shooting section according to the shooting section requirements required for calculation, and ensure that the required number of images are shot at each angle, for example, 50 images are shot at each angle, so that the PIV measurement system can subsequently perform algorithm interpolation, fusion and other operations based on sufficient measurement data processing, further improving the accuracy of the measurement results.

[0071] In summary, the PIV-based phase-locked measurement method for the wake of a twin wind turbine unit in the embodiment of the present application first constructs a scaled model of the twin wind turbine unit, wherein the speed sensor of the twin wind turbine unit is externalized to facilitate the processing of the scaled model and meet the requirements for phase-locked measurement of the scaled model. Furthermore, the PIV-based wake phase-locked measurement is performed on the scaled model of the unit. Compared with measuring the actual twin wind turbine unit, it is convenient to arrange the measurement equipment and obtain the measurement data, and it is convenient to switch the shooting interface, which reduces the complexity and measurement cost of the phase-locked measurement of the wake of the twin wind turbine unit and facilitates implementation. In addition, images are captured at multiple angles, and high-precision wake measurement data is obtained through the PIV algorithm, which improves the accuracy of the wake measurement of the twin wind turbine unit.

[0072] In order to more clearly illustrate the implementation process of the phase-locked measurement method of the wake of a dual wind turbine unit based on PIV according to an embodiment of the present application, a specific embodiment of the measurement method is described in detail below. Figure 6 The flowchart of a specific PIV-based phase-locked measurement method for the wake of a dual wind turbine set proposed in the embodiment of the present application is shown in FIG. Figure 6 As shown, the method comprises the following steps:

[0073] Step S601, installing the tower.

[0074] Step S602, installing the nacelle, the motor and the coupling.

[0075] Step S603, sticking a small sensor component near the coupling.

[0076] In this step, the back plate of the sensor is glued, small parts required for arranging the sensor are arranged, and the sensor and its connecting wires are arranged.

[0077] Step S604, extending the top screw of the coupling.

[0078] Step S605, connect 24V DC current and transmit it to the PIV HDMI line through the potentiometer

[0079] Step S606, set up the laser polishing machine and two CCD cameras, connect them to the computer, and perform debugging and calibration.

[0080] Step S607 , perform measurement and change the lighting position and shooting section according to the shooting section requirements, and shoot 50 images at each angle.

[0081] It should be noted that, in this embodiment, the specific implementation method of each step can refer to the description of the above embodiment, and the specific implementation method is similar, so it will not be repeated here.

[0082] In order to implement the above embodiment, the present application also proposes a phase-locked measurement system for the wake of a dual wind turbine unit based on PIV. Figure 7 A schematic diagram of the structure of a phase-locked measurement system for the wake of a dual wind turbine unit based on PIV proposed in an embodiment of the present application is shown in FIG. Figure 7 As shown, the system includes a first setting module 100 , a second setting module 200 , an adjustment module 300 , a control module 400 and a measurement module 500 .

[0083] The first setting module 100 is used to set up a scaled model of a twin wind turbine set and a particle image velocimetry (PIV) measurement system on a wind tunnel platform, wherein the scaled model includes two motors and a coupling corresponding to each motor.

[0084] The second setting module 200 is used to set a rotation speed sensor in a preset area outside each coupling, and each rotation speed sensor includes two detection panels.

[0085] The adjustment module 300 is used to adjust the top screw of each coupling, wherein the adjusted top screw cuts the detection area between the two detection panels when the coupling rotates to the corresponding rotation speed sensor.

[0086] The control module 400 is used to connect the signal line of each speed sensor to the signal transmission interface of the PIV measurement system, supply power to each speed sensor and the PIV measurement system, and control the wind tunnel platform to generate airflow to drive the dual wind wheels to rotate.

[0087] The measuring module 500 is used to send the pulse signal output by the sensor to the PIV measuring system when the top screw cuts the detection area of ​​the rotation speed sensor, drive the PIV measuring system to capture images, and measure the wake of the scaled model.

[0088] Optionally, in one embodiment of the present application, the adjustment module 300 is specifically used to: adjust the position of the top screw or the two detection panels, and extend the length of the top screw to a preset length, the preset length matches the length of the two detection panels, so that when the top screw rotates to the corresponding speed sensor, it is between the two detection panels.

[0089] Optionally, in one embodiment of the present application, the control module 400 is specifically used to: connect the power line of the speed sensor to a DC power supply with a preset voltage value, and power the speed sensor through the DC power supply; connect the input end of the potentiometer to the DC power supply, connect the output end of the potentiometer to the PIV measurement system, and adjust the output voltage of the potentiometer, and provide a 5V DC voltage to the PIV measurement system through the potentiometer.

[0090] Optionally, in one embodiment of the present application, the first setting module 100 is specifically used to: install a tower device on a wind tunnel platform; set up a cabin on the tower device and connect two motors in the cabin; set up a laser transmitter and two charge-coupled device (CCD) cameras according to the position of the tower device and the requirements of the shooting section distance from the tower device.

[0091] Optionally, in one embodiment of the present application, the preset area outside the coupling includes: a solid wall area inside the cabin near the coupling.

[0092] Optionally, in one embodiment of the present application, the first setting module 100 is also used to: debug and calibrate two CCD cameras; the measurement module 500 is also used to: update the lighting position and shooting section of the laser emitter multiple times, debug and calibrate after each update, and shoot a preset number of images at the angle after each update.

[0093] It should be noted that the above explanation of the embodiment of the phase-locked measurement method of the wake of a dual wind turbine unit based on PIV is also applicable to the system of this embodiment, and will not be repeated here.

[0094] In summary, the PIV-based phase-locked measurement system for the wake of a twin wind turbine unit in the embodiment of the present application first constructs a scaled model of the twin wind turbine unit, wherein the speed sensor of the twin wind turbine unit is externalized to facilitate the processing of the scaled model and meet the requirements for phase-locked measurement of the scaled model. Furthermore, the PIV-based wake phase-locked measurement is performed on the scaled model of the unit. Compared with measuring the actual twin wind turbine unit, it is convenient to arrange the measurement equipment and obtain the measurement data, and it is convenient to switch the shooting interface, which reduces the complexity and measurement cost of the phase-locked measurement of the wake of the twin wind turbine unit and facilitates implementation. In addition, images are captured at multiple angles, and high-precision wake measurement data is obtained through the PIV algorithm, which improves the accuracy of the wake measurement of the twin wind turbine unit.

[0095] In order to implement the above embodiments, the present application also proposes a non-temporary computer-readable storage medium on which a computer program is stored. When the computer program is executed by a processor, a phase-locked measurement method for the wake of a dual wind turbine unit based on PIV as described in any of the above embodiments is implemented.

[0096] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0097] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of this application, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0098] Any process or method description in a flowchart or otherwise described herein may be understood to represent a module, fragment or portion of code comprising one or more executable instructions for implementing the steps of a custom logical function or process, and the scope of the preferred embodiments of the present application includes alternative implementations in which functions may not be performed in the order shown or discussed, including performing functions in a substantially simultaneous manner or in the reverse order depending on the functions involved, which should be understood by technicians in the technical field to which the embodiments of the present application belong.

[0099] The logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as an ordered list of executable instructions for implementing logical functions, and can be embodied in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute the instructions), or in combination with these instruction execution systems, devices or apparatuses. For the purpose of this specification, "computer-readable medium" can be any device that can contain, store, communicate, propagate or transmit a program for use by an instruction execution system, device or apparatus, or in combination with these instruction execution systems, devices or apparatuses. More specific examples of computer-readable media (a non-exhaustive list) include the following: an electrical connection with one or more wires (electronic device), a portable computer disk box (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), a fiber optic device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be paper or other suitable medium on which the program is printed, since the program may be obtained electronically, for example, by optically scanning the paper or other medium and then editing, interpreting or processing in other suitable ways if necessary, and then stored in a computer memory.

[0100] It should be understood that the various parts of the present application can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, multiple steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.

[0101] A person skilled in the art may understand that all or part of the steps in the method for implementing the above-mentioned embodiment may be completed by instructing related hardware through a program, and the program may be stored in a computer-readable storage medium, which, when executed, includes one or a combination of the steps of the method embodiment.

[0102] In addition, each functional unit in each embodiment of the present application may be integrated into a processing module, or each unit may exist physically separately, or two or more units may be integrated into one module. The above-mentioned integrated module may be implemented in the form of hardware or in the form of a software functional module. If the integrated module is implemented in the form of a software functional module and sold or used as an independent product, it may also be stored in a computer-readable storage medium.

[0103] The storage medium mentioned above may be a read-only memory, a magnetic disk or an optical disk, etc. Although the embodiments of the present application have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limiting the present application. A person of ordinary skill in the art may change, modify, replace and modify the above embodiments within the scope of the present application.

Claims

1. A phase-locked measurement method for the wake of a twin wind turbine unit based on PIV, It is characterized in that The following steps are involved: A scaled model of a dual wind turbine set and a particle image velocimetry (PIV) measurement system are arranged on a wind tunnel platform, wherein the scaled model includes two motors and a coupling corresponding to each of the motors; A rotation speed sensor is arranged in a preset area outside each coupling, and each rotation speed sensor includes two detection panels; Adjusting the top screw of each coupling, wherein the adjusted top screw cuts the detection area between the two detection panels when the coupling rotates to the corresponding rotation speed sensor; Connecting the signal line of each rotation speed sensor to the signal transmission interface of the PIV measurement system, supplying power to each rotation speed sensor and the PIV measurement system, and controlling the wind tunnel platform to generate airflow to drive the dual wind wheels to rotate; When the top screw cuts the detection area of ​​the rotation speed sensor, the pulse signal output by the sensor is sent to the PIV measurement system, the PIV measurement system is driven to capture an image, and the wake of the scaled model is measured; The step of adjusting the top screw of each coupling comprises: Adjust the position of the top screw or the two detection panels, and extend the length of the top screw to a preset length, the preset length matches the length of the two detection panels, so that when the top screw rotates to the corresponding rotation speed sensor, it is located between the two detection panels; The scaled model of the dual wind turbine group and the particle image velocimetry (PIV) measurement system are arranged on the wind tunnel platform, including: Installing a tower device on the wind tunnel platform; Arranging a nacelle on the tower device, and connecting the two motors in the nacelle; According to the position of the tower device and the requirements of the shooting section distance from the tower device, a laser transmitter and two charge coupled device (CCD) cameras are set up; The preset area outside the coupling includes: a solid wall area inside the cabin near the coupling.

2. The measuring method according to claim 1, It is characterized in that The supplying power to each of the rotation speed sensors and the PIV measurement system comprises: Connecting a power line of the speed sensor to a DC power supply with a preset voltage value, and supplying power to the speed sensor through the DC power supply; The input end of the potentiometer is connected to the DC power supply, the output end of the potentiometer is connected to the PIV measurement system, and the output voltage of the potentiometer is adjusted to provide a 5V DC voltage to the PIV measurement system through the potentiometer.

3. The measuring method according to claim 1, It is characterized in that After the laser transmitter and two charge coupled device (CCD) cameras are installed, the following is also included: Debugging and calibrating the two CCD cameras; After driving the PIV measurement system to capture an image, the method further includes: The lighting position of the laser transmitter and the shooting cross section are updated multiple times, the debugging and calibration are performed after each update, and a preset number of images are shot at the angle after each update.

4. A phase-locked measurement system for the wake of a twin wind turbine unit based on PIV, It is characterized in that include: A first setting module is used to set a scaled model of a dual wind turbine set and a particle image velocimetry (PIV) measurement system on a wind tunnel platform, wherein the scaled model includes two motors and a coupling corresponding to each of the motors; A second setting module is used to set a rotation speed sensor in a preset area outside each coupling, and each rotation speed sensor includes two detection panels; An adjustment module, used for adjusting the top screw of each coupling, wherein the adjusted top screw cuts the detection area between the two detection panels when the coupling rotates to the corresponding rotation speed sensor; A control module, used to connect the signal line of each of the rotation speed sensors to the signal transmission interface of the PIV measurement system, supply power to each of the rotation speed sensors and the PIV measurement system, and control the wind tunnel platform to generate airflow to drive the dual wind wheels to rotate; A measuring module, used for sending a pulse signal output by the sensor to the PIV measuring system when the top screw cuts the detection area of ​​the rotation speed sensor, driving the PIV measuring system to capture an image, so as to measure the wake of the scaled model; The step of adjusting the top screw of each coupling comprises: Adjust the position of the top screw or the two detection panels, and extend the length of the top screw to a preset length, the preset length matches the length of the two detection panels, so that when the top screw rotates to the corresponding rotation speed sensor, it is located between the two detection panels; The scaled model of the dual wind turbine group and the particle image velocimetry (PIV) measurement system are arranged on the wind tunnel platform, including: Installing a tower device on the wind tunnel platform; Arranging a nacelle on the tower device, and connecting the two motors in the nacelle; According to the position of the tower device and the requirements of the shooting section distance from the tower device, a laser transmitter and two charge coupled device (CCD) cameras are set up; The preset area outside the coupling includes: a solid wall area inside the cabin near the coupling.

5. The measuring system according to claim 4, It is characterized in that The control module is specifically used for: Connecting a power line of the speed sensor to a DC power supply with a preset voltage value, and supplying power to the speed sensor through the DC power supply; The input end of the potentiometer is connected to the DC power supply, the output end of the potentiometer is connected to the PIV measurement system, and the output voltage of the potentiometer is adjusted to provide a 5V DC voltage to the PIV measurement system through the potentiometer.

6. A non-transitory computer-readable storage medium having a computer program stored thereon, It is characterized in that When the computer program is executed by a processor, the phase-locked measurement method for the wake of a twin wind turbine unit based on PIV as claimed in any one of claims 1 to 3 is implemented.

Citation Information

Patent Citations

  • Double-wind-wheel wind turbine generator wind tunnel experiment scale model and working method thereof

    CN113267318A

  • Synchronous moving measurement mechanism for rotor wake flow SPIV measurement and phase-locked measurement method

    CN113504388A