A hybrid converter uncontrolled charging method and device

By controlling the AC side to be energized and turning on the T4 transistors in sequence according to the capacitor voltage in the hybrid converter, the problems of inrush current and extended energy harvesting time when the full-bridge submodule is turned on are solved, and a safer and more stable charging process is achieved.

CN115441756BActive Publication Date: 2024-11-15CSG EHV POWER TRANSMISSION +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110621962.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-06-04
Publication Date
2024-11-15
Estimated Expiration
2041-06-04

AI Technical Summary

Technical Problem

In the scenario of connecting a hybrid converter to a high-voltage long-line charging station, when the T4 tube of the full-bridge submodule is turned on, a large inrush current is generated in the converter arm and DC circuit, which prolongs the time for the half-bridge submodule to successfully harvest power and detect faults, and increases the risk of voltage divergence in the submodule.

Method used

An uncontrolled charging method for a hybrid converter is adopted. By controlling the AC side to be energized, the power harvesting status of the full-bridge submodules is cyclically detected. The T4 transistors are turned on in a distributed manner according to the capacitor voltage from large to small. The T4 transistors of the full-bridge submodules are turned on gradually using a preset slope to ensure that all non-faulty modules can successfully harvest power in a short time.

Benefits of technology

It reduces the inrush current of the converter arm and DC circuit, shortens the energy harvesting and fault diagnosis time of the half-bridge submodule, reduces the risk of voltage divergence in the submodule, and ensures the safe and stable operation of the DC system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115441756B_ABST
    Figure CN115441756B_ABST
Patent Text Reader

Abstract

The present invention discloses an uncontrolled charging method for a hybrid converter, including: controlling the AC side of the hybrid converter to be charged; cyclically detecting the energy-taking state of the full-bridge submodule; sorting the full-bridge submodules that have successfully taken energy and whose T4 tubes are not turned on in order from large to small according to the submodule capacitor voltage; turning on the T4 tubes of the full-bridge submodules at a certain slope; and finally turning on the T4 tubes of all non-faulty full-bridge submodules. In the uncontrolled charging stage, the T4 tubes of the full-bridge submodules are turned on in a dispersed manner, which reduces the impact current of the converter bridge arm and the DC circuit, and reduces the risk of damage to the converter and the power switch device; at the same time, the half-bridge submodule can be made to take energy successfully earlier, shortening the time for the submodule to judge its own fault, reducing the risk of submodule voltage divergence, and ensuring the safe, stable and efficient operation of the DC system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of direct current power transmission, and in particular to an uncontrolled charging method and a device for a hybrid converter. Background Art

[0002] In the existing DC transmission projects, in order to take into account the requirements of DC fault ride-through capability and economy, a hybrid converter is often formed by connecting multiple half-bridge submodules and multiple full-bridge submodules in series in a certain proportion. The half-bridge submodule is composed of two switch devices T1-T2 connected in series and connected in parallel with a capacitor, and the full-bridge submodule is composed of two switch devices T1-T2 connected in series, two switch devices T3-T4 connected in series, and three parts of capacitors connected in parallel. Before the AC side of the hybrid converter is energized, the capacitors of the half-bridge submodule and the full-bridge submodule have no voltage, the submodule energy source is not started, there is no trigger pulse, and the switch devices are all in the off state. When the AC side is energized, the AC voltage can charge all submodules through the anti-parallel diode inside the switch device, during which the T4 tube of the full-bridge submodule will be turned on, further charging the half-bridge submodule, and finally all submodules will reach the startup state from the energy source. This process is the uncontrolled charging stage. After the submodule self-power supply works normally, a trigger pulse is generated to control the on and off of the switch device, so that the capacitor voltage of all submodules reaches the rated value, and finally it can be unlocked normally. It can be seen that in the uncontrolled charging stage, the fast and effective energy acquisition of the submodule is the key to the subsequent process.

[0003] In the scenario of charging a hybrid converter connected to a high-voltage long line, the line capacitance is large. When the full-bridge submodules turn on the T4 tube together, the low end of the converter DC side is clamped, and the voltage at both ends will suddenly increase. At this time, the converter bridge arm and the DC circuit will generate a large impact current, which may damage the converter and power switch devices in severe cases. At the same time, the control system needs to wait until all full-bridge submodules have successfully obtained energy before turning on the T4 tube together, which makes the half-bridge submodule take longer to obtain energy successfully, prolonging the time for the submodule to judge its own fault and increasing the risk of submodule voltage divergence. Therefore, it is necessary to study the uncontrolled charging method of the hybrid converter. Summary of the invention

[0004] The purpose of this application is to provide an uncontrolled charging method and device for a hybrid converter, which can reduce the impact current generated by the converter bridge arm and the DC circuit when the full-bridge submodule turns on the T4 tube. At the same time, it can shorten the time for the half-bridge submodule to successfully obtain energy and identify its own fault, reduce the risk of submodule voltage divergence, and ensure the safe, stable and efficient operation of the DC system.

[0005] In order to achieve the above objectives, the solution of this application is:

[0006] On the one hand, the present application provides an uncontrolled charging method for a hybrid converter, wherein a single bridge arm of the hybrid converter includes a half-bridge submodule and a full-bridge submodule connected in series; the uncontrolled charging method includes:

[0007] Control the AC side of the hybrid converter to be energized;

[0008] Cyclic detection of the energy acquisition state of the full-bridge submodule according to a first time interval Δt1;

[0009] In the second time interval Δt2, the full-bridge sub-modules that have successfully obtained energy and whose T4 tube is not turned on are sorted in descending order according to the sub-module capacitor voltage;

[0010] In the third time interval Δt3, according to the sorting result, the T4 tube of the full-bridge submodule is turned on at a preset slope X / s;

[0011] When the T4 tubes of all non-faulty full-bridge submodules are turned on, uncontrolled charging ends.

[0012] Preferably, controlling the AC side of the hybrid converter to be charged refers to charging the submodules of the converter by connecting the AC bus, so that the submodule power supply can obtain energy and work normally, and prepare for the conduction of the T4 tube of the full-bridge submodule.

[0013] Preferably, in each first time interval Δt1, the energy acquisition state of the full-bridge sub-module is detected only once.

[0014] Preferably, after the capacitor voltage of the full-bridge submodule reaches the startup value and the hardware startup time has passed and communication with the control system is established, it is determined to be in a successful energy acquisition state, otherwise it is determined to be in a waiting energy acquisition state.

[0015] Preferably, the full-bridge submodules that do not turn on the T4 tube in each of the third time intervals Δt3 participate in the reordering in the next first time interval Δt1, wherein Δt2<Δt1, Δt3=Δt1-Δt2.

[0016] Preferably, in the uncontrolled charging stage, it is necessary to turn on the T4 tubes of all non-faulty full-bridge submodules, and the faulty full-bridge submodule will be directly bypassed after successfully obtaining energy, and will not participate in the step of sorting the submodule capacitor voltages from large to small.

[0017] On the other hand, the present application provides an uncontrolled charging device for a hybrid converter, wherein a single bridge arm of the hybrid converter includes a half-bridge submodule and a full-bridge submodule connected in series; the uncontrolled charging device includes:

[0018] An AC side connection unit, used to control the AC side of the hybrid converter to be energized;

[0019] An energy acquisition state unit, used for cyclically detecting the energy acquisition state of the full-bridge submodule according to a first time interval Δt1;

[0020] A sorting unit is used to sort the full-bridge sub-modules that have successfully obtained energy and whose T4 tubes are not turned on in order from large to small according to the sub-module capacitor voltages within the second time interval Δt2;

[0021] A conduction unit, used for conducting the T4 tube of the full-bridge submodule at a preset slope X / s according to the sorting result within a third time interval Δt3;

[0022] The uncontrolled charging end judgment unit is used to turn on the T4 tubes of all non-fault full-bridge sub-modules to end the uncontrolled charging.

[0023] Preferably, after the capacitor voltage of the full-bridge submodule reaches the startup value and the hardware startup time has passed and communication with the control system is established, it is determined to be in a successful energy acquisition state, otherwise it is determined to be in a waiting energy acquisition state.

[0024] Preferably, the full-bridge submodules that do not turn on the T4 tube in each of the third time intervals Δt3 participate in the reordering in the next first time interval Δt1, wherein Δt2<Δt1, Δt3=Δt1-Δt2.

[0025] Preferably, in the uncontrolled charging stage, it is necessary to turn on the T4 tubes of all non-faulty full-bridge submodules. The faulty full-bridge submodule will be directly bypassed after successfully obtaining energy and will not participate in the operation of sorting the submodule capacitor voltages from large to small in the sorting unit.

[0026] After adopting the above scheme, the beneficial effects of the present invention are:

[0027] (1) The T4 tubes of the full-bridge submodules are dispersed to reduce the impact current of the converter bridge arm and DC circuit, and reduce the risk of damage to the converter device and power switch components;

[0028] (2) In the uncontrolled charging stage, the half-bridge submodule can be powered earlier, thereby shortening the time for the submodule to identify its own fault and reducing the risk of submodule voltage divergence;

[0029] (3) It only changes the full-bridge submodule conduction T4 tube strategy, without adding new primary or secondary equipment, which is more suitable for engineering sites;

[0030] (4) It is applicable to high-voltage and ultra-high-voltage DC projects, as well as two-terminal and multi-terminal DC projects, and has strong adaptability. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 This is a flow chart of a hybrid converter uncontrolled charging method according to an embodiment of the present application;

[0032] Figure 2 It is a schematic diagram of the topological structure of a hybrid converter in which the bridge arm is composed of multiple full-bridge modules and multiple half-bridge modules connected in series;

[0033] Figure 3 is a computer execution flow chart of a hybrid converter uncontrolled charging method according to another embodiment of the present application;

[0034] Figure 4 It is a schematic diagram of a hybrid inverter uncontrolled charging device proposed in this application. DETAILED DESCRIPTION

[0035] The specific implementation modes of the present invention are described in detail below with reference to the accompanying drawings.

[0036] Figure 1 The figure shows an embodiment of a hybrid converter uncontrolled charging method proposed in the present application, wherein a single bridge arm of the hybrid converter includes a half-bridge submodule and a full-bridge submodule connected in series; the method includes the following steps:

[0037] S1: Control the AC side of the hybrid converter to be energized;

[0038] S2: cyclically detecting the energy acquisition state of the full-bridge submodule according to a first time interval Δt1;

[0039] S3: within the second time interval Δt2, the full-bridge sub-modules that have successfully obtained energy and whose T4 tubes are not turned on are sorted in descending order according to the sub-module capacitor voltages;

[0040] S4: within a third time interval Δt3, according to the sorting result, turn on the T4 tube of the full-bridge submodule at a preset slope X / s;

[0041] S5: When the T4 tubes of all non-faulty full-bridge submodules are turned on, the uncontrolled charging ends.

[0042] In a preferred embodiment, controlling the AC side of the hybrid converter to be charged refers to charging the submodules of the converter by connecting the AC bus, so that the submodule power supply can obtain energy and work normally, and prepare for the conduction of the T4 tube of the full-bridge submodule.

[0043] In a preferred embodiment, in each first time interval Δt1, the energy acquisition state of the full-bridge sub-module is detected only once.

[0044] In a preferred embodiment, after the capacitor voltage of the full-bridge submodule reaches the startup value and the hardware startup time has passed and communication with the control system is established, it is determined to be in a successful energy acquisition state, otherwise it is determined to be in a waiting energy acquisition state.

[0045] In a preferred embodiment, the full-bridge submodules that do not turn on the T4 tube in each of the third time intervals Δt3 participate in the reordering in the next first time interval Δt1, wherein Δt2<Δt1, Δt3=Δt1-Δt2.

[0046] In a preferred embodiment, in the uncontrolled charging stage, it is necessary to turn on the T4 tubes of all non-faulty full-bridge submodules. The faulty full-bridge submodule will be directly bypassed after successfully obtaining energy and will not participate in the step of sorting the submodule capacitor voltages from large to small.

[0047] Combine the following Figure 2 The bridge arm shown is a hybrid converter composed of multiple full-bridge modules and multiple half-bridge modules connected in series to introduce the uncontrolled charging method of the present application. Figure 2 As shown, a single hybrid converter consists of six bridge arms, each of which consists of H half-bridge sub-modules, F full-bridge sub-modules and 1 bridge arm reactor in series. The half-bridge sub-module consists of two switching devices T1-T2 connected in series and connected in parallel with a capacitor. The full-bridge sub-module consists of two switching devices T1-T2 connected in series, two switching devices T3-T4 connected in series and a capacitor connected in parallel. Figure 3 As shown in the computer execution flow chart of the hybrid converter uncontrolled charging method, the uncontrolled charging method includes the following steps:

[0048] (1) Control the AC side of the hybrid converter to be energized; connect the AC bus to charge the submodules of the six bridge arms of the converter;

[0049] (2) cyclically detecting the energy-taking status of the full-bridge submodules according to the first time interval Δt1; the voltages of the full-bridge submodules in the six bridge arms will successively reach the energy-taking power supply start-up value, and the energy-taking status of all full-bridge submodules is detected once at each time interval Δt1;

[0050] (3) In the second time interval Δt2, the full-bridge sub-modules that have successfully obtained energy and whose T4 tube is not turned on are sorted in descending order according to the sub-module capacitance voltage; at this time, the full-bridge sub-modules that have successfully obtained energy can self-check for faults, and only the non-faulty full-bridge sub-modules can participate in the sorting, and the faulty modules are directly bypassed;

[0051] (4) In the third time interval Δt3, according to the sorting result in step (3), the T4 tubes of the full-bridge submodules are turned on at a certain slope X / s; within Δt3, the full-bridge submodules in the sequence of step (3) that do not have T4 tubes turned on are re-sorted in the next first time interval Δt1, wherein the time interval Δt2 is less than Δt1, and Δt3 is equal to Δt1-Δt2; in this step, the voltage between the DC side terminals of the hybrid converter will increase according to the increase in the number of full-bridge submodules with T4 tubes turned on, and the rising rate is positively correlated with the size of the slope X / s.

[0052] (5) Determine whether the number of full-bridge submodules with turned-on T4 tubes is less than the number of non-faulty full-bridge submodules in the hybrid converter. If so, return to step (2). Otherwise, uncontrolled charging ends. When the T4 tubes of all full-bridge submodules are turned on, the voltage between the DC side terminals of the hybrid converter reaches the maximum. At this time, all the full-bridge submodules in the six bridge arms can be equivalent to half-bridge submodules, and continue to charge uncontrolled together with other half-bridge submodules. As the number of full-bridge submodules is constantly decreasing, the charging rate of the half-bridge submodule increases, and the energy acquisition time of the half-bridge submodule is shortened, so that self-checking faults can be performed earlier.

[0053] like Figure 4 The figure shows an uncontrolled charging device of a hybrid converter provided by an embodiment of the present application, wherein a single bridge arm of the hybrid converter includes a half-bridge submodule and a full-bridge submodule connected in series; the uncontrolled charging device includes:

[0054] The AC side connection unit 101 is used to control the AC side of the hybrid converter to be energized;

[0055] The energy acquisition state unit 102 is used to cyclically detect the energy acquisition state of the full-bridge submodule according to the first time interval Δt1. In each first time interval Δt1, the energy acquisition state of the full-bridge submodule is detected only once.

[0056] The sorting unit 103 is used to sort the full-bridge sub-modules that have successfully obtained energy and whose T4 tubes are not turned on in order from large to small according to the sub-module capacitor voltages within the second time interval Δt2;

[0057] The conduction unit 104 is used to conduct the T4 tube of the full-bridge submodule at a preset slope X / s according to the sorting result within a third time interval Δt3;

[0058] The uncontrolled charging end determination unit 105 is used to turn on the T4 tubes of all non-faulty full-bridge submodules to end the uncontrolled charging.

[0059] In a preferred embodiment, after the capacitor voltage of the full-bridge submodule reaches the startup value and the hardware startup time has passed and communication with the control system is established, it is determined to be in a successful energy acquisition state, otherwise it is determined to be in a waiting energy acquisition state.

[0060] In a preferred embodiment, the full-bridge submodules that do not turn on the T4 tube in each of the third time intervals Δt3 participate in the reordering in the next first time interval Δt1, wherein Δt2<Δt1, Δt3=Δt1-Δt2. In a preferred embodiment, in the uncontrolled charging stage, it is necessary to turn on the T4 tubes of all non-faulty full-bridge submodules, and the faulty full-bridge submodule will be directly bypassed after the energy is successfully obtained, and will not participate in the operation of sorting the submodule capacitance voltage from large to small in the sorting unit.

[0061] The above detailed description is a specific description of one feasible embodiment of the present invention. The embodiment is not intended to limit the patent scope of the present invention. Any equivalent implementation or modification that does not deviate from the present invention should be included in the patent scope of this case.

Claims

1. An uncontrolled charging method for a hybrid converter, wherein a single bridge arm of the hybrid converter comprises a half-bridge submodule and a full-bridge submodule connected in series; the full-bridge submodule comprises four switch devices T1-T4 and a capacitor, wherein: The switch devices T1 and T2 are sequentially connected in series as a first series branch, and the switch devices T3 and T4 are sequentially connected in series as a second series branch. The first series branch, the second series branch and the capacitor are connected in parallel, and the first end of the capacitor is connected to T1 and T3, and the second end of the capacitor is connected to T2 and T4; Characterized in that, the uncontrolled charging method comprises: Control the AC side of the hybrid converter to be energized; Cyclic detection of the energy acquisition state of the full-bridge submodule according to a first time interval Δt1; In the second time interval Δt2, the full-bridge sub-modules that have successfully obtained energy and whose T4 tube is not turned on are sorted in descending order according to the sub-module capacitor voltage; In the third time interval Δt3, according to the sorting result, the T4 tube of the full-bridge submodule that has successfully obtained energy and the T4 tube is not turned on is turned on at a preset slope X / second; the full-bridge submodule that has not turned on the T4 tube in each of the third time intervals Δt3 participates in the next first time interval Δt1 for re-sorting, wherein Δt2<Δt1, Δt3=Δt1-Δt2; In the uncontrolled charging stage, it is necessary to turn on the T4 tubes of all non-faulty full-bridge submodules. The faulty full-bridge submodule will be directly bypassed after the energy is successfully obtained, and will not participate in the step of sorting the submodule capacitor voltages from large to small. When the T4 tubes of all non-faulty full-bridge submodules are turned on, uncontrolled charging ends.

2. The uncontrolled charging method of a hybrid converter according to claim 1, characterized in that: The control of the AC side of the hybrid converter being energized refers to connecting the AC busbar.

3. The uncontrolled charging method of a hybrid converter according to claim 1, characterized in that: In each first time interval Δt1, the energy acquisition state of the full-bridge sub-module is detected only once.

4. The uncontrolled charging method of a hybrid converter according to claim 1, characterized in that: When the capacitor voltage of the full-bridge submodule reaches the startup value and the hardware startup time passes and communication with the control system is established, it is determined to be in a successful energy acquisition state; otherwise, it is determined to be in a waiting energy acquisition state.

5. An uncontrolled charging device for a hybrid converter, wherein a single bridge arm of the hybrid converter comprises a half-bridge submodule and a full-bridge submodule connected in series; the full-bridge submodule comprises four switching devices T1-T4 and a capacitor, wherein: The switch devices T1 and T2 are connected in series in sequence as a first series branch, the switch devices T3 and T4 are connected in series in sequence as a second series branch, the first series branch, the second series branch and the capacitor are connected in parallel, the first end of the capacitor is connected to T1 and T3, and the second end of the capacitor is connected to T2 and T4; characterized in that the uncontrolled charging device includes: An AC side connection unit, used to control the AC side of the hybrid converter to be energized; An energy acquisition state unit, used for cyclically detecting the energy acquisition state of the full-bridge submodule according to a first time interval Δt1; A sorting unit is used to sort the full-bridge sub-modules that have successfully obtained energy and whose T4 tubes are not turned on in order from large to small according to the sub-module capacitor voltages within the second time interval Δt2; A conduction unit is used to conduct the T4 tube of the full-bridge submodule that has successfully obtained energy and whose T4 tube is not turned on at a conduction speed of a preset slope X per second within a third time interval Δt3 according to the sorting result; the full-bridge submodule that has not turned on the T4 tube within each of the third time intervals Δt3 participates in the re-sequencing in the next first time interval Δt1, wherein Δt2<Δt1, Δt3=Δt1-Δt2; in the uncontrolled charging stage, it is necessary to conduct the T4 tubes of all non-faulty full-bridge submodules, and the faulty full-bridge submodule will be directly bypassed after the energy is successfully obtained, and will not participate in the operation of sorting the submodule capacitance voltages in descending order in the sorting unit; The uncontrolled charging end judgment unit is used to turn on the T4 tubes of all non-fault full-bridge sub-modules to end the uncontrolled charging.

6. The uncontrolled charging device for a hybrid converter as claimed in claim 5, characterized in that: When the capacitor voltage of the full-bridge submodule reaches the startup value and the hardware startup time passes and communication with the control system is established, it is determined to be in a successful energy acquisition state; otherwise, it is determined to be in a waiting energy acquisition state.