CL composite concrete shear wall and its construction method
Through the construction method of prefabricated CL composite concrete shear wall, threaded pipes and connecting steel bars are used for pre-fixing, which solves the problem of difficult handling and fixing of CL mesh panels, and improves construction efficiency and quality.
Patent Information
- Application Number
- CN202211235473.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-10-10
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2042-10-10
AI Technical Summary
During the construction of existing concrete shear walls, it is difficult to handle and fix CL mesh panels, resulting in low construction efficiency. The existing technology relies on manual handling, which increases labor intensity.
The construction method of prefabricated CL composite concrete shear wall is adopted. By precasting the foundation layer and insulation layer on the CL mesh plate, and pre-fixing is used to form a connecting layer to improve construction efficiency and convenience.
It improves the construction efficiency and quality of shear walls, reduces the intensity of labor, simplifies the handling and fixing process, reduces the probability of concrete entering the threaded pipe, and improves the connection accuracy and strength.
Smart Images

Figure CN115506511B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of concrete shear walls, and in particular to CL composite concrete shear walls and construction methods thereof. Background Art
[0002] The CL building system is a new composite concrete shear wall building system. Its core component, the CL composite concrete shear wall, is a wall that integrates force bearing and heat preservation formed by pouring concrete on both sides of the CL grid plate (a grid made of two layers of steel welded mesh with EPS insulation board sandwiched in the middle and fixed with tension bolts).
[0003] At present, concrete shear walls are generally formed by transporting CL grid panels and insulation panels to the site for installation and then cast in situ. Therefore, the CL grid panels need to be transported. The existing transportation process is completely manual, with high labor intensity and low efficiency. In addition, the CL grid panels need to be fixed after the transportation process, which is very inconvenient. Therefore, the difficulty of pouring concrete shear walls is increased, thereby reducing the construction efficiency of shear walls. Summary of the invention
[0004] In order to improve the construction efficiency of shear walls, the present application provides a CL composite concrete shear wall and a construction method thereof.
[0005] In the first aspect, the CL composite concrete shear wall provided in the present application adopts the following technical solution:
[0006] The CL composite concrete shear wall comprises a plurality of wall bodies, wherein the wall bodies comprise a foundation layer formed by pouring two layers of concrete on a CL grid plate and a thermal insulation layer located between the two foundation layers, wherein the two foundation layers are connected together by a connecting mechanism, and a connecting layer for fixing the thermal insulation layer is formed by pouring concrete on the two foundation layers and located on both sides of the thermal insulation layer, and the connecting mechanism comprises:
[0007] Two threaded pipes, the two threaded pipes are respectively arranged on two base layers;
[0008] Two connecting steel bars, one end of the two connecting steel bars is rotated and connected together and passes through the insulation layer, and at the same time, the ends of the two connecting steel bars away from the rotation are respectively threaded on two threaded pipes and are used to fix the two base layers together.
[0009] By adopting the above technical scheme, concrete is first poured on the CL grid plate to form a foundation layer, so the foundation layer is first prefabricated, and then the connecting steel bar is passed through the insulation layer, and then one end of the connecting steel bar is threadedly connected to the threaded pipe of one of the foundation layers, and then the other foundation layer is brought close to the connecting steel bar, and the other connecting steel bar is turned and threadedly connected to the threaded pipe of the other foundation layer, so that the two foundation layers are fixedly connected together, and the insulation layer is located between the two foundation layers, and then concrete is poured between the two foundation layers and the insulation layer to form a connecting layer, and the connecting layer fixes the two foundation layers and the insulation layer together.
[0010] Therefore, the CL grid plate is first prefabricated into the foundation layer, and then the foundation layer and the insulation layer are transported to the construction site, and then pre-fixed by connecting two connecting steel bars to the threaded pipe, and then pouring concrete to form a connecting layer, so as to complete the casting and obtain the shear wall, thereby improving the convenience of shear wall construction and improving the construction efficiency of the shear wall.
[0011] Optionally, the threaded pipe is in a sealed state at one end inside the base layer, the connecting steel bar is pressed against the bottom wall of the threaded pipe for positioning, one end of the threaded pipe protrudes out of the base layer and a sealing cap is threadedly connected to the pipe mouth to seal the threaded pipe.
[0012] By adopting the above technical scheme, when prefabricating the foundation layer, the threaded pipe is fixedly installed on the CL grid plate, so that one end of the threaded pipe seal is located inside the CL grid plate, and one end of the threaded pipe opening extends to the outside of the CL grid plate, and then the sealing cap is threadedly connected to the threaded pipe, and then concrete is poured on the CL grid plate to obtain the foundation layer. When two foundation layers need to be connected, the sealing cap is removed, thereby reducing the probability of concrete entering the threaded pipe when pouring the foundation layer, and also reducing the probability of dust entering the threaded pipe when transporting the foundation layer, thereby reducing the probability of concrete and impurities entering the threaded pipe and causing adverse effects on the connection of the foundation layer. At the same time, when connecting the steel bars, they are pressed against the threaded pipe for positioning, thereby improving the accuracy of the position during connection, thereby further improving the construction efficiency of the shear wall, and also improving the construction efficiency of the shear wall.
[0013] Optionally, a pouring space for concrete to enter is formed between two adjacent walls, a pouring layer for connecting the two walls is formed on the pouring space, a first fixing groove is opened on the base layer, a second fixing groove is opened on the side wall of the first fixing groove, a first fixing plate which is clip-fitted with the first fixing groove is arranged on the side wall of the base layer away from the first fixing groove, and a second fixing plate which can clip-fit with the first fixing groove and the second fixing groove is arranged on the first fixing plate.
[0014] By adopting the above technical scheme, the first fixing groove and the second fixing groove are cast and formed by pouring the foundation layer, and after the foundation layer of the previous wall is connected together through the connecting mechanism, the first fixing groove is facing downward and the first fixing plate is facing upward, and then the foundation layer of the next wall is placed on the previous wall, so that the first fixing plate and the second fixing plate on the lower foundation layer are clamped and installed on the first fixing groove, and then the connecting steel bar is threadedly connected to the threaded pipes of the two foundation layers, so that the connecting steel bar pulls the two foundation layers closer to each other, so that the first fixing plates on the two foundation layers are closer to each other, so that the two second fixing plates are clamped and installed on the second fixing groove for positioning, and a pouring space is formed between the upper and lower walls, thereby realizing the connection of the two walls in the vertical direction, and the connection method of the two walls in the horizontal and vertical directions is the same, and then the same method is used to connect multiple walls, and then the connection layer is poured and concrete enters the pouring space to form a pouring layer, and the concrete also pours the first fixing plate and the second fixing plate, so that the multiple walls are fixedly connected together, thereby improving the efficiency and quality when connecting the two walls.
[0015] Optionally, the connecting steel bars pass through the corners of the insulation layer, and placement spaces are formed between the two base layers and the insulation layers. Steel bar skeletons that are in conflict with the base layer and the insulation layer are placed on the two placement spaces, and the connecting layer is formed on the steel bar skeletons by pouring concrete.
[0016] By adopting the above technical solution, the connecting steel bars are passed through the corners of the insulation layer, and then two steel bar skeletons are placed between the base layer and the insulation layer. The steel bar skeletons are in contact with the base layer and the insulation layer, and then concrete is poured on the steel bar skeletons for support, thereby improving the strength of the connecting layer, and the two steel bar skeletons position the insulation layer, thereby improving the accuracy of the position of the insulation layer, thereby improving the quality of the shear wall.
[0017] In a second aspect, the present application provides a construction method for the CL composite concrete shear wall, which adopts the following technical solution:
[0018] A construction method for the CL composite concrete shear wall according to any one of the first aspects, comprising the following construction steps:
[0019] S1, pouring the foundation layer, fixing the threaded pipe and the CL grid plate together, then threading the plugging cap onto the threaded pipe for plugging, and then pouring concrete to obtain the foundation layer;
[0020] S2. Connect the foundation wall, pass two connecting steel bars through the insulation layer, then place the insulation layer and the steel skeleton, and then thread the connecting steel bars to the threaded pipes located on the two foundation layers, so as to achieve the connection of the foundation wall;
[0021] S3, install the subsequent wall, move the two base layers of the subsequent wall close to the base wall, so that the first fixing plate and the second fixing plate are snap-fitted and installed on the first fixing groove, and then use the method of connecting the base wall to connect the subsequent wall. After the wall connection is completed, the second fixing plate is snap-fitted and installed on the second fixing groove for positioning, and at the same time, a casting space is formed. Subsequently, the same method is used to connect multiple walls, and then the casting layer and the connecting layer are cast to complete the casting of the subsequent wall, thereby realizing the construction of the entire shear wall.
[0022] By adopting the above technical scheme, the threaded pipe is fixedly installed on the CL grid plate, and the sealing cover is threadedly connected to the threaded pipe for sealing, and then the foundation layer is cast, and then the connecting steel bar is passed through the insulation layer, and then the connecting steel bar is threadedly connected to the two threaded pipes, so as to connect the two foundation layers to obtain the foundation wall; then the two foundation layers are close to the foundation wall, so that the first fixing plate and the second fixing plate are clamped and installed on the first fixing groove, and then the two foundation layers are connected using the method of connecting the foundation wall, and the second fixing plate is clamped and installed on the second fixing groove for positioning, so as to realize the connection of subsequent walls, and at the same time a casting space is formed between the two walls, so as to realize the connection of the two walls, and then multiple walls are connected in sequence, and then the connecting layer is cast, and concrete enters the casting space to obtain a casting layer, and the casting layer is used to fix two adjacent walls, so as to realize the casting of the connection of multiple walls, and finally a shear wall is obtained, thereby improving the convenience when casting the wall, and also improving the convenience and connection strength when connecting the two walls, thereby improving the construction efficiency and quality of the shear wall.
[0023] Optionally, when the first fixing plate and the second fixing plate are clamped and installed on the first fixing groove, the base layer is guided and positioned by a positioning mechanism, and the positioning mechanism includes:
[0024] Two positioning seats, the two positioning seats abut against the two foundation layers of the front wall and are provided with positioning grooves for positioning the foundation layer of the rear wall, and the two positioning seats are positioned by a locking mechanism;
[0025] The guide member is arranged on the positioning seat and is used to guide the two base layers of the rear wall to the two positioning grooves for positioning. When the base layer is snap-fitted to the positioning groove, the first fixing plate and the second fixing plate are snap-fitted to the first fixing groove. After the connecting steel bar can drive the base layer to be separated from the positioning groove, the second fixing plate can be snap-fitted to the second fixing groove for positioning.
[0026] By adopting the above technical solution, the base layer is installed in the positioning groove through the guide member, the positioning groove positions the base layer, and the first fixed plate and the second fixed plate can be installed in the first fixed groove, and then the connecting steel bar is rotated to drive the base layer to move on the positioning groove, so that the second fixed plate is installed in the second fixed groove for positioning, and after the wall connection is completed, the locking mechanism is opened to remove the positioning mechanism, and the positioning mechanism is installed at the wall where it needs to be connected, thereby improving the convenience when connecting the wall, thereby improving the construction efficiency of the shear wall.
[0027] Optionally, the locking mechanism comprises:
[0028] A locking tube and a locking rod, wherein the locking tube and the locking rod are arranged on two positioning seats and the sliding sleeves are arranged together;
[0029] A locking screw, the locking screw passing through the two positioning seats and being threadedly connected to a locking nut for fixing;
[0030] A positioning component is arranged on the positioning seat and contacts the base layer for positioning the positioning seat.
[0031] By adopting the above technical solution, the locking screw is turned to disengage the locking tube, and then the two positioning seats can be removed. When the positioning seats need to be installed, the two positioning seats are pressed against the two base layers of the previous wall, the locking screw is passed through the two positioning seats, and then the locking nut is threadedly connected to the locking screw, and then positioned through the positioning assembly. After the positioning is completed, the locking nut is turned to press against the positioning seat for positioning, thereby improving the convenience of wall connection and the accuracy of the position during connection, thereby improving the construction efficiency and construction quality of the shear wall.
[0032] Optionally, the positioning component includes:
[0033] A blocking plate, the blocking plate abuts against the two positioning seats and the base layer and is used to position the positioning seats, and the locking screw and the locking tube pass through the blocking plate to position the blocking plate, and the blocking plate and the positioning seat are used to block the casting space;
[0034] A positioning plate, which is detachably arranged on the blocking plate and abuts against the base layer on a side adjacent to the blocking plate for positioning;
[0035] The sealing plate is plugged into the blocking plate and contacts the base layer and is used to seal the placement space.
[0036] By adopting the above technical scheme, the positioning plate is installed on the blocking plate, and the blocking plate is placed between the two positioning seats, so that the locking screw and the locking tube pass through the blocking plate to position the blocking plate, and then the blocking plate and the positioning plate are in contact with the two adjacent side walls of the base layer, and the blocking plate and the positioning seat are used to block the pouring space, and then the locking nut is tightened on the positioning seat to fix the positioning seat, and then the positioning plate is removed, and then the two base layers of the next wall are installed on the positioning grooves of the two positioning seats through the guide clip, and then the sealing plate is plugged and installed on the blocking plate, so the two sealing plates are in contact with the base layer to block the placement space, and then concrete can be poured, so there is no need to add additional templates to block the pouring space and the placement space, so the blocking can be achieved while the base layer is positioned and installed, thereby improving the construction efficiency of the shear wall.
[0037] Optionally, the guide member is a guide cover which is respectively arranged on two positioning seats and is used to guide the base layer.
[0038] By adopting the above technical solution, the guide cover is used to guide the foundation layer into the positioning groove, thereby improving the construction efficiency of the shear wall.
[0039] Optionally, a support plate is mounted on the positioning groove and contacts the base layer and is used to position the base layer.
[0040] By adopting the above technical solution, the two base layers are connected together and then separated from the positioning grooves, and then the two support plates are clamped and installed on the two positioning grooves. Therefore, the two positioning plates are positioned against the two base layers, thereby reducing the probability of displacement of the base layers and improving the construction quality of the shear wall.
[0041] In summary, the present application includes at least one of the following beneficial technical effects:
[0042] The CL grid plate is prefabricated into the foundation layer, and then the foundation layer and the insulation layer are transported to the construction site. Then, two connecting steel bars are threadedly connected to the threaded pipe for pre-fixation, and then concrete is poured to form a connecting layer. In this way, the shear wall is cast and completed, thereby improving the convenience of shear wall construction and improving the construction efficiency of the shear wall. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] Figure 1 It is a three-dimensional structural schematic diagram of the present application;
[0044] Figure 2 It is a schematic diagram of the structure of a single wall of the present application, omitting the connecting layer;
[0045] Figure 3 It is a partial exploded view of the present application, mainly showing the plugging cover and the plugging column;
[0046] Figure 4 It is a schematic diagram of the structure of the positioning mechanism and the locking mechanism in the present application, and one of the guide covers is exploded;
[0047] Figure 5 It is a structural schematic diagram of the positioning mechanism and positioning assembly in this application.
[0048] 1. Wall; 11. Foundation layer; 12. Insulation layer; 13. Connection layer; 14. Placement space; 15. Steel bar skeleton; 16. First fixing groove; 17. Second fixing groove; 18. First fixing plate; 19. Second fixing plate; 2. Connection mechanism; 21. Threaded pipe; 22. Connecting steel bar; 23. Sealing cover; 24. Sealing column; 3. Positioning mechanism; 31. Positioning seat; 32. Guide cover; 33. Positioning section; 34. Guide section; 35. Positioning groove; 36. Support plate; 4. Locking mechanism; 41. Locking pipe; 42. Locking rod; 43. Locking screw; 44. Locking nut; 5. Positioning assembly; 51. Blocking plate; 52. Positioning plate; 53. Sealing plate; 54. Plug-in block; 55. Plug-in groove; 61. Pouring space; 62. Pouring layer. DETAILED DESCRIPTION
[0049] The present application is further described in detail below with reference to the accompanying drawings 1-5.
[0050] The embodiments of the present application disclose a CL composite concrete shear wall and a construction method thereof.
[0051] Reference Figure 1 The CL composite concrete shear wall includes multiple wall bodies 1. The wall body 1 includes a foundation layer 11 formed by two layers of concrete poured on the CL grid plate and an insulation layer 12 located between the two foundation layers 11. The foundation layer 11 and the insulation layer 12 are both cube-shaped. The two foundation layers 11 are connected together by a connecting mechanism 2. A connecting layer 13 for fixing the insulation layer 12 is formed on the two foundation layers 11 and on both sides of the insulation layer 12 by pouring concrete.
[0052] Reference Figure 1 and Figure 2 Two connecting mechanisms 2 are arranged horizontally at intervals and are located at the two corners of the top of the insulation layer 12. The connecting mechanism 2 includes two threaded pipes 21 and two connecting steel bars 22. The threaded pipes 21 are fixedly mounted on the CL grid plate and are in a horizontal state. At the same time, one end of the threaded pipe 21 close to the outer side of the foundation layer 11 extends to the outside of the side wall on the opposite side of the two foundation layers 11, and the axes of the threaded pipes 21 on the two foundation layers 11 are parallel.
[0053] Reference Figure 2 and Figure 3One end of the threaded pipe 21 located inside the base layer 11 is in a sealed state, and the end of the threaded pipe 21 located outside the base layer 11 is threadedly connected with a blocking cover 23, and a blocking column 24 connected to the inner thread of the threaded pipe 21 is coaxially fixedly mounted on the blocking cover 23, and the blocking cover 23 is pressed against the threaded pipe 21 for positioning, so that the sealed end of the threaded pipe 21 and the blocking cover 23 simultaneously block concrete and impurities from entering the threaded pipe 21.
[0054] Reference Figure 1 , Figure 2 and Figure 3 When pouring the foundation layer 11, first fix the threaded pipe 21 to the CL grid plate, and then thread the blocking column 24 onto the threaded pipe 21, so that the blocking cover 23 is pressed against the threaded pipe 21 for positioning, and then pour concrete to prefabricate the foundation layer 11. One end of the threaded pipe 21 connected to the blocking cover 23 is located outside the foundation layer 11. Therefore, when it is transported to the place where it needs to be installed, the two foundation layers 11 can be connected by twisting and removing the blocking cover 23.
[0055] Reference Figure 1 , Figure 2 A placement space 14 is formed between the insulation layer 12 and the two base layers 11, and a steel skeleton 15 is placed on the two placement spaces 14. The steel skeleton 15 is in contact with the side wall on the opposite side of the insulation layer 12 and the base layer 11, and the connecting layer 13 is formed on the steel skeleton 15 by pouring concrete.
[0056] Reference Figure 1 , Figure 2 One end of the connecting steel bar 22 is coaxially rotated and connected together, and the end of the connecting steel bar 22 away from the rotation is provided with a threaded section. At the same time, the connecting steel bar 22 passes through the boundary of the top of the insulation layer 12, and the ends of the two connecting steel bars 22 away from the rotation are respectively threadedly connected to the inner side walls of the threaded pipes 21 located on the two base layers 11, and the connecting steel bars 22 are pressed against the inner bottom wall of the threaded pipe 21 for positioning.
[0057] Reference Figure 1 , Figure 2 , pass the connecting steel bars 22 through the insulation layer 12, and then place the insulation layer 12 between the two foundation layers 11, then place the two steel bar skeletons 15 into the two placement spaces 14, and then thread the connecting steel bars 22 onto the threaded pipes 21 of the two foundation layers 11, so that the connecting steel bars 22 are pressed against the inner bottom wall of the threaded pipe 21 for positioning, thereby realizing the connection of a single wall 1, and then pour concrete on the steel bar skeletons 15 to form a connecting layer 13, and the two connecting layers 13 fix the insulation layer 12 and the two foundation layers 11 together, thereby realizing the pouring of a single wall 1.
[0058] Reference Figure 2 , Figure 3A first fixing groove 16 is provided on the side wall on the same side of the two base layers 11, and a second fixing groove 17 is provided on the side wall on the opposite side of the two first fixing grooves 16, and a first fixing plate 18 is fixedly installed on the side wall of the two base layers 11 away from the first fixing groove 16, and a second fixing plate 19 is fixedly installed on the side wall on the opposite side of the two first fixing plates 18, and the first fixing plate 18 and the second fixing plate 19 have the same width and can be snap-fitted to the first fixing groove 16, and the second fixing plate 19 can be snap-fitted with the second fixing groove 17; at the same time, the first fixing groove 16 and the second fixing groove 17 are also provided on the bottom end of the base layer 11, and the first fixing plate 18 and the second fixing plate 19 are also fixedly installed on the top of the base layer 11.
[0059] Reference Figure 1 , Figure 2 , Figure 4 After the pouring of the previous wall 1 is completed, the two base layers 11 of the next wall 1 are brought close to the top of the previous wall 1, so that the first fixing plate 18 and the second fixing plate 19 on the two base layers 11 of the previous wall 1 are snap-fitted and installed on the first fixing grooves 16 of the two base layers 11 of the next wall 1, and then the next wall 1 is connected using the method of connecting the previous wall 1. In the process of connecting the walls 1, the two base layers 11 are pulled close to each other, the base layers 11 move to pull the second fixing plate 19 close to the second fixing groove 17, and the two base layers 11 are connected together. After that, the two second fixing plates 19 are respectively snap-fitted and installed on the two second fixing grooves 17 for positioning. At this time, a pouring space 61 is formed between the two adjacent walls 1, and then the connecting layer 13 is poured. When pouring the connecting layer 13, concrete enters the pouring space 61 to form a pouring layer 62. The pouring layer 62 is used to fix and connect the two walls 1 in the vertical direction, and the connection method of the two walls 1 in the horizontal direction is the same, so as to fix and connect multiple walls 1. At the same time, multiple walls 1 can also be connected together and then poured together, thereby realizing the construction of shear wall.
[0060] The working principle of the embodiment of the present application is as follows:
[0061] The connecting steel bars 22 are passed through the insulation layer 12, and then the insulation layer 12 is placed between the two foundation layers 11. Subsequently, the two steel bar skeletons 15 are placed in the two placement spaces 14, and then the connecting steel bars 22 are threadedly connected to the threaded pipes 21 located on the two foundation layers 11 to achieve the connection of the single wall 1, and then concrete is poured into the steel bar skeletons 15 to form a connecting layer 13 to achieve the pouring of the single wall 1.
[0062] When connecting two walls 1, the two base layers 11 of the rear wall 1 are moved close to the top of the front wall 1, so that the first fixing plate 18 and the second fixing plate 19 are snap-fitted and installed on the first fixing groove 16, and then the rear wall 1 is connected using the method of connecting the front wall 1. During the process of connecting the walls 1, the second fixing plate 19 is pulled and snap-fitted and installed on the second fixing groove 17 for positioning, and then the connecting layer 13 and the pouring layer 62 are poured. The pouring layer 62 is used to fix the two walls 1 together. At the same time, multiple walls 1 can be poured in sequence or multiple walls 1 can be poured together according to actual conditions to fix the multiple walls 1 together, thereby realizing the construction of the shear wall, thereby improving the construction efficiency of the shear wall.
[0063] The present application embodiment provides a construction method for a CL composite concrete shear wall.
[0064] Reference Figure 1 , Figure 2 and Figure 3 , the construction method applied to CL composite concrete shear wall includes the following construction steps:
[0065] S1, pouring the foundation layer 11, fixing the threaded pipe 21 and the CL grid plate together, then threading the plugging cover 23 onto the threaded pipe 21 for plugging, and then pouring concrete to obtain the foundation layer 11;
[0066] S2, connecting the foundation wall 1, passing two connecting steel bars 22 through the insulation layer 12, then placing the insulation layer 12 and the steel skeleton 15, and then threading the connecting steel bars 22 to the threaded pipes 21 located on the two foundation layers 11, so as to achieve the connection of the foundation wall 1;
[0067] S3, install subsequent wall 1 and pour, place the two base layers 11 of the subsequent wall 1 close to the basic wall 1, so that the first fixing plate 18 and the second fixing plate 19 are snap-fitted and installed on the first fixing groove 16, and then use the method of connecting the basic wall 1 to connect the subsequent wall 1. After the wall 1 is connected, the second fixing plate 19 is snap-fitted and installed on the second fixing groove 17 for positioning, and a pouring space 61 is formed at the same time. Subsequently, multiple walls 1 are connected using the same method, and then the pouring layer 62 and the connecting layer 13 are poured to complete the pouring of the wall 1, thereby realizing the construction of the entire shear wall.
[0068] Reference Figure 1 , Figure 4When the first fixing plate 18 and the second fixing plate 19 are snapped into the first fixing groove 16, the base layer 11 is guided and positioned by the positioning mechanism 3. The positioning mechanism 3 includes two positioning seats 31 and a guide member. The two positioning seats 31 abut against the outer walls of the two base layers 11 of the previous wall 1, and the positioning seat 31 is in a horizontal state and the two ends extend to the two sides of the base layer 11 respectively, and a positioning groove 35 is opened on the top of the positioning seat 31. The positioning groove 35 is used to position the two base layers 11 of the latter wall 1; when the two base layers 11 are snapped and installed on the two positioning grooves 35 respectively, the first fixing plate 18 and the second fixing plate 19 are both snapped and installed on the first fixing groove 16, and after the base layer 11 is separated from the positioning groove 35, the second fixing plate 19 is snapped and installed on the second fixing groove 17 for positioning, thereby completing the connection of the two walls 1, and at this time, the two positioning grooves 35 are snapped and installed with support plates 36, and the two support plates 36 abut against the two opposite side walls of the two base layers 11 for positioning the two base layers 11.
[0069] Reference Figure 4 The guide member is a guide cover 32 fixedly mounted on the upper surfaces of the two positioning seats 31, and the guide cover 32 includes a positioning section 33 and a prism-shaped guide section 34 that are integrally arranged and vertical, the positioning section 33 is fixedly mounted on the upper surface of the positioning seat 31, and the inner side wall of the positioning section 33 is flush with the inner side wall of the positioning groove 35, and the guide section 34 is located at the top of the positioning section 33, and the vertical projection of the top of the guide section 34 is located on the side of the vertical projection of the bottom end of the guide section 34 away from the positioning groove 35; first, the base layer 11 is brought into contact with the inner side wall of the guide section 34, and then the base layer 11 moves downward, and the base layer 11 is snap-fitted and installed on the inner side wall of the positioning section 33 under the action of the guide section 34, and then the base layer 11 continues to move downward and can be snap-fitted and installed on the positioning groove 35, thereby realizing the guide snapping of the base layer 11 to the positioning groove 35.
[0070] Reference Figure 4 , Figure 5 The two positioning seats 31 are positioned by a locking mechanism 4. Two locking mechanisms 4 are provided and are located at both ends of the positioning seats 31. The locking mechanism 4 includes a locking tube 41 and a locking rod 42, a locking screw 43 and a positioning assembly 5. The locking tube 41 and the locking rod 42 are fixedly mounted on the side walls on the opposite side of the two positioning seats 31, and the locking tube 41 is slidably sleeved on the locking rod 42, so as to realize the sliding sleeve of the locking tube 41 and the locking rod 42 together; the locking screw 43 horizontally passes through the two positioning seats 31, and the locking screw 43 is located below the locking tube 41. At the same time, a locking nut 44 is threadedly connected to the locking screw 43, and the head of the locking screw 43 and the locking nut 44 are pressed against the opposite side walls of the two positioning seats 31 for positioning.
[0071] Reference Figure 4 , Figure 5The positioning assembly 5 is arranged on the positioning seat 31 and contacts the base layer 11 for positioning the positioning seat 31. The positioning assembly 5 includes a blocking plate 51, a positioning plate 52 and a sealing plate 53. The two ends of the blocking plate 51 contact the side walls on the opposite sides of the two positioning seats 31, and the locking tube 41 and the locking screw 43 both pass through the blocking plate 51 horizontally and are used to position the blocking plate 51. The blocking plate 51 contacts the base layers 11 of the upper and lower walls 1 to block the pouring space 61. At the same time, the upper and lower surfaces of the blocking plate 51 are flush with the upper and lower surfaces of the positioning seat 31; the positioning plate 52 is detachably mounted on the upper surface of the blocking plate 51 by screws, and when the positioning seat 31 is installed, the positioning plate 52 contacts the upper surface of the base layer 11 for positioning the positioning seat 31. After the positioning seat 31 is fixedly installed, the positioning plate 52 is removed to reduce the interference caused by the positioning plate 52 on the installation of the base layer 11.
[0072] Reference Figure 4 , Figure 5 , four sealing plates 53 are provided and can be detachably installed on the upper and lower surfaces of the two blocking plates 51, and plug-in grooves 55 are opened on the upper and lower surfaces of the blocking plates 51, and the sealing plates 53 are fixedly installed on one end close to the blocking plates 51 and are plugged into the plug-in blocks 54 that cooperate with the plug-in grooves 55. At the same time, the width of the sealing plates 53 is smaller than the length of the blocking plates 51, and the top and bottom ends of the two sealing plates 53 are flush with the top and bottom ends of the base layers 11 of the two walls 1, and the four sealing plates 53 are in contact with the opposite side walls of the four base layers 11, so as to block the four placement spaces 14 of the two adjacent walls 1. When multiple walls 1 need to be installed, the multiple walls 1 are fixedly connected together, and the multiple positioning seats 31 for positioning are fixedly connected together, and then the blocking plates 51 and the sealing plates 53 are fixedly installed on both sides of the multiple walls 1, and the blocking plates 51 and the sealing plates 53 are used to block the placement spaces 14 and the pouring spaces 61 of the multiple walls 1.
[0073] The working principle of the embodiment of the present application is as follows:
[0074] First, connect the two foundation layers 11 of the foundation wall 1, pass the locking tube 41 and the locking screw 43 through the blocking plate 51, then slide the locking tube 41 and the locking rod 42 together, so that the locking screw 43 passes through the two positioning seats 31, and thread the locking nut 44 onto the locking screw 43, then the blocking plate 51 and the positioning plate 52 are pressed against the two side walls of the foundation layer 11 for positioning, and then the locking nut 44 is tightened against the positioning seat 31 to fix the two positioning seats 31, and then the positioning plate 52 is removed, and then the foundation layer 11 is clamped and installed on the positioning groove 35 under the guidance of the guide cover 32, and the first fixing plate 18 and the second fixing plate 19 are clamped and installed on the first fixing plate The second fixing plate 19 is mounted on the second fixing groove 16 for positioning, so as to connect the two foundation layers 11 of the subsequent wall 1, and then the foundation layer 11 of the subsequent wall 1 is installed in the same way. After the connection is completed, the blocking plate 51 is located on both sides of the multiple walls 1 and is used to block the pouring space 61, and then the four sealing plates 53 are plugged and installed on the two blocking plates 51, and then the pouring of the connecting layer 13 can be started. At the same time, the concrete enters the pouring space 61 to form a pouring layer 62, thereby realizing the connection pouring of the multiple walls 1, thereby realizing the construction of the shear wall and improving the construction efficiency and quality of the shear wall.
[0075] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A construction method for CL composite concrete shear wall, characterized by: A CL composite concrete shear wall comprises a plurality of wall bodies (1), wherein the wall bodies (1) comprise a base layer (11) formed by pouring two layers of concrete on a CL grid plate and a thermal insulation layer (12) located between the two base layers (11), wherein the two base layers (11) are connected together via a connecting mechanism (2), and connecting layers (13) for fixing the thermal insulation layer (12) are formed on the two base layers (11) and located on both sides of the thermal insulation layer (12) by pouring concrete, and the connecting mechanism (2) comprises: Two threaded tubes (21), the two threaded tubes (21) being respectively arranged on two base layers (11); Two connecting steel bars (22), one end of the two connecting steel bars (22) being connected together by rotation and passing through the thermal insulation layer (12), and at the same time, the ends of the two connecting steel bars (22) away from the rotation are respectively threadedly connected to the two threaded pipes (21) and are used to fix the two base layers (11) together; The construction method includes the following construction steps: S1, pouring the foundation layer (11), fixing the threaded pipe (21) and the CL grid plate together, then threading the plugging cover (23) onto the threaded pipe (21) for plugging, and then pouring concrete to obtain the foundation layer (11); S2, connecting the foundation wall (1), passing two connecting steel bars (22) through the insulation layer (12), then placing the insulation layer (12) and the steel skeleton (15), and then threading the connecting steel bars (22) to the threaded pipes (21) located on the two foundation layers (11), thereby achieving the connection of the foundation wall (1); S3, installing the subsequent wall (1), placing the two foundation layers (11) of the subsequent wall (1) close to the basic wall (1), so that the first fixing plate (18) and the second fixing plate (19) are snap-fitted and installed on the first fixing groove (16), and then the subsequent wall (1) is connected using the method of connecting the basic wall (1). After the wall (1) is connected, the second fixing plate (19) is snap-fitted and installed on the second fixing groove (17) for positioning, and a casting space (61) is formed at the same time. Subsequently, multiple walls (1) are connected using the same method, and then the casting layer (62) and the connecting layer (13) are cast to complete the casting of the subsequent wall (1), thereby realizing the construction of the entire shear wall; When the first fixing plate (18) and the second fixing plate (19) are snap-fitted and mounted on the first fixing groove (16), the base layer (11) is guided and positioned by a positioning mechanism (3), wherein the positioning mechanism (3) comprises: Two positioning seats (31), the two positioning seats (31) abutting against two base layers (11) of a preceding wall (1) and provided with positioning grooves (35) for positioning the base layer (11) of a succeeding wall (1), the two positioning seats (31) being positioned by a locking mechanism (4); A guide member, the guide member is arranged on the positioning seat (31) and is used to guide the two base layers (11) of the rear wall (1) to the two positioning grooves (35) for positioning; when the base layer (11) is snap-fitted to the positioning groove (35), the first fixing plate (18) and the second fixing plate (19) are snap-fitted to the first fixing groove (16); and after the connecting steel bar (22) can drive the base layer (11) to be separated from the positioning groove (35), the second fixing plate (19) can be snap-fitted to the second fixing groove (17) for positioning.
2. The construction method for CL composite concrete shear wall according to claim 1, characterized in that: The threaded tube (21) is in a sealed state at one end located inside the base layer (11); the connecting steel bar (22) is pressed against the inner bottom wall of the threaded tube (21) for positioning; one end of the threaded tube (21) protrudes outside the base layer (11) and a sealing cap (23) for sealing the threaded tube (21) is threadedly connected to the tube opening.
3. The construction method for CL composite concrete shear wall according to claim 1 is characterized in that: A pouring space (61) for concrete to enter is formed between two adjacent walls (1), a pouring layer (62) for connecting the two walls (1) is formed on the pouring space (61), a first fixing groove (16) is provided on the base layer (11), a second fixing groove (17) is provided on the side wall of the first fixing groove (16), a first fixing plate (18) which is snap-fitted with the first fixing groove (16) is provided on the side wall of the base layer (11) away from the first fixing groove (16), and a second fixing plate (19) which is snap-fitted with the first fixing groove (16) and the second fixing groove (17) is provided on the first fixing plate (18).
4. The construction method for CL composite concrete shear wall according to claim 1, characterized in that: The connecting steel bars (22) pass through the corners of the thermal insulation layer (12), and placement spaces (14) are formed between the two base layers (11) and the thermal insulation layer (12). Steel bar skeletons (15) that are in contact with the base layer (11) and the thermal insulation layer (12) are placed on the two placement spaces (14), and the connecting layer (13) is formed on the steel bar skeletons (15) by pouring concrete.
5. The construction method for CL composite concrete shear wall according to claim 1 is characterized in that: The locking mechanism (4) comprises: A locking tube (41) and a locking rod (42), wherein the locking tube (41) and the locking rod (42) are arranged on two positioning seats (31) and are slidably sleeved together; A locking screw (43), the locking screw (43) passing through the two positioning seats (31) and being threadedly connected to a locking nut (44) for fixing; A positioning component (5), wherein the positioning component (5) is arranged on the positioning seat (31) and contacts the base layer (11) for positioning the positioning seat (31).
6. The construction method for CL composite concrete shear wall according to claim 5, characterized in that: The positioning component (5) comprises: a blocking plate (51), the blocking plate (51) abutting against the two positioning seats (31) and the base layer (11) and used to position the positioning seats (31), and the locking screw (43) and the locking tube (41) passing through the blocking plate (51) and used to position the blocking plate (51), and the blocking plate (51) and the positioning seat (31) are used to block the casting space (61); A positioning plate (52), the positioning plate (52) being detachably arranged on the blocking plate (51) and being pressed against the base layer (11) on a side adjacent to the blocking plate (51) for positioning; A sealing plate (53) is inserted into and arranged on the blocking plate (51) and contacts the base layer (11) and is used to seal the placement space (14).
7. The construction method for CL composite concrete shear wall according to claim 1, characterized in that: The guide members are guide covers (32) respectively arranged on two positioning seats (31) and used for guiding the base layer (11).
8. The construction method for CL composite concrete shear wall according to claim 7 is characterized in that: A support plate (36) is mounted on the positioning groove (35) and contacts the base layer (11) and is used to position the base layer (11).
Citation Information
Patent Citations
Concrete shear wall construction process based on steel grating
CN112502325A
Ram soil matrix composite wall and template device that adopts in construction thereof
CN205617614U
Combined shear wall structure
CN212896960U
Shear wall structure assembled based on large wallboard filled with prefabricated lightweight aggregate concrete with grooves
CN215253630U
Wall forming system and method thereof
US20140157704A1