Boiler recovery device water replenishment system and water level control method and device thereof

Through the valve adjustment method of the three-way water supply pipeline system, the problem of poor water level adjustment accuracy in the boiler recovery device is solved, more efficient water level control is achieved, and the safety and stability of the boiler operation are ensured.

CN115507357BActive Publication Date: 2024-10-29HUADIAN ELECTRIC POWER SCI INST CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202211128352.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-09-16
Publication Date
2024-10-29
Estimated Expiration
2042-09-16

AI Technical Summary

Technical Problem

The existing boiler recuperator water level adjustment method has poor accuracy and cannot effectively control the recuperator water level, causing the water level to be too high or too low, affecting the safety and stability of the boiler operation.

Method used

Using a three-way water replenishment pipeline system, by obtaining the current water level deviation value, using the correction relationship and the speed increase ratio to calculate the valve opening value, and adjusting the valve opening of the first, second, and third water replenishment pipelines respectively, to realize the recycler Precise adjustment of water level.

Benefits of technology

It improves the accuracy and efficiency of the water level adjustment of the recuperator, overcomes the adjustment inertia and non-linearity, ensures the stability of the water level, and enhances the safety and stability of the boiler operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115507357B_ABST
    Figure CN115507357B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of boiler operation control, and specifically discloses a boiler recovery water supply system and a water level control method and device thereof, wherein the recovery water supply system includes a first water supply pipeline, a second water supply pipeline, and a third water supply pipeline connected to the recovery and having successively increasing pipe diameters; the water level control method includes: obtaining the current water level deviation value, determining the set values ​​of the valve adjustments on the three water supply pipelines according to three different correction relationships and three different speed increase ratios, and determining the first valve opening value, the second valve opening value, and the third valve opening value corresponding to the three valves based on the three set values, so as to achieve water level regulation in the recovery. In the present application, the valves of the three-way water supply pipelines of the recovery are realized to quickly open or close the valve opening when they are in different opening intervals, so as to overcome the nonlinearity of the regulating valve and the regulating inertia of the water level to the greatest extent, and ensure the water level regulation accuracy and regulation efficiency of the recovery.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of boiler operation control, and in particular to a water level control method and device for a boiler recovery device water replenishment system, and a boiler recovery device water replenishment system. Background Art

[0002] In a steam turbine generator set, the liquid water used to heat the boiler to obtain high-temperature and high-pressure steam mainly comes from the recovery device. After passing through the steam turbine, the high-temperature and high-pressure steam in the boiler can return to the recovery device through the condenser, thus realizing the water circulation of the entire system.

[0003] However, the high-temperature and high-pressure steam in the boiler can be used not only to drive the steam turbine to generate electricity, but also to provide heat for production or living in enterprises. Obviously, the liquid water finally formed by this part of the steam will no longer circulate into the recovery device; in addition, the steam discharged from the low-pressure cylinder terminal of the steam turbine can also be transported to the heating enterprise as heating steam for use, which reduces the flow of liquid water circulating into the recovery device to a certain extent. If the water level of the recovery device is too high, it will reduce the steam condensation area of ​​the recovery device, increase the oxygen content in the condensed water, aggravate the corrosion of the heat exchange copper tube of the recovery device, destroy the vacuum value of the recovery device, and even easily cause serious accidents such as wear of the turbine thrust bearing and large axial displacement. If the water level of the recovery device is too low, it will cause the recovery water pump to run idle and cavitation, endangering the safe and stable operation of the recovery water pump and the generator set; therefore, it is of great significance to reasonably and effectively control and accurately adjust the water level of the recovery device hot well.

[0004] In order to effectively regulate the water level in the recycler, a water supply pipeline can be configured for the recycler, and the water supply amount of the water supply pipeline can be controlled and regulated by a PID regulator; however, the current water level regulation method in the recycler cannot achieve a good regulation effect, resulting in poor water level control accuracy and low water level regulation quality. Summary of the invention

[0005] The purpose of the present invention is to provide a water level control method and device for a boiler recovery device water replenishment system and a boiler recovery device water replenishment system, so as to improve the water level regulation accuracy and regulation efficiency of the boiler recovery device to a certain extent.

[0006] In order to solve the above technical problems, the present invention provides a water level control method of a recovery water supply system of a boiler, wherein the recovery water supply system comprises a first water supply pipeline, a second water supply pipeline and a third water supply pipeline connected to the recovery and having successively increasing pipe diameters;

[0007] The water level control method comprises:

[0008] Obtaining a current water level deviation value, correcting the current water level deviation value according to a first correction relationship to obtain a first corrected deviation value whose absolute value is not less than the absolute value of the current water level deviation value, amplifying the first corrected deviation value according to a first growth rate ratio to obtain a first process value, and determining a first valve opening value according to the first process value;

[0009] Correcting the current water level deviation value according to a second correction relationship to obtain a second corrected deviation value whose absolute value is not less than the absolute value of the current water level deviation value, obtaining a second process value after amplifying the second corrected deviation value according to a second growth rate ratio, and determining a second valve opening value according to the second process value;

[0010] The current water level deviation value is corrected according to a third correction relationship to obtain a third corrected deviation value whose absolute value is not less than the absolute value of the current water level deviation value, a third process value is obtained after the third corrected deviation value is amplified according to a third growth rate ratio, and a third valve opening value is determined according to the third process value; wherein the first growth rate ratio, the second growth rate ratio and the third growth rate ratio are respectively determined according to the first valve opening value at the last moment, the second valve opening value at the last moment and the third valve opening value at the last moment;

[0011] The first valve of the first water supply pipeline, the second valve of the second water supply pipeline, and the third valve of the third water supply pipeline are respectively adjusted in opening according to the first valve opening value, the second valve opening value, and the third valve opening value to adjust the water level in the recoverer.

[0012] Optionally, it also includes:

[0013] The current drainage flow of the recycling device is converted into a valve adjustment amount according to the first conversion relationship, the second conversion relationship and the third conversion relationship to obtain a first adjustment amount, a second adjustment amount and a third adjustment amount; and the current drainage change of the recycling device is converted into a correction amount of the valve adjustment amount to obtain a first correction amount, a second correction amount and a third correction amount;

[0014] performing sum operations on the first adjustment amount and the first correction amount, the second adjustment amount and the second correction amount, and the third valve adjustment amount and the third correction amount respectively to obtain a first valve feedforward adjustment amount, a second valve feedforward adjustment amount, and a third valve feedforward adjustment amount;

[0015] Correspondingly, the process of determining the first valve opening value according to the first process value includes:

[0016] Performing PID calculation with the first valve feedforward adjustment amount as a feedforward value and the first process value to obtain the first valve opening value;

[0017] The process of determining the second valve opening value according to the second process value comprises:

[0018] Performing PID calculation with the second valve feedforward adjustment amount as a feedforward value and the second process value to obtain the second valve opening value;

[0019] The process of determining the third valve opening value according to the third process value comprises:

[0020] The third valve feedforward adjustment amount is used as a feedforward value and the third process value are used together to perform PID operation to obtain the third valve opening value.

[0021] Optionally, it also includes:

[0022] If the current water level deviation value is less than 0, and the current opening of the first valve is less than the first preset opening; the current openings of the second valve and the third valve are kept unchanged, and the opening of the first valve is increased;

[0023] If the current water level deviation value is less than 0, and the current opening of the first valve is greater than the first preset opening and less than the second preset opening, and the current opening of the second valve is less than the third preset opening, the current opening of the third valve is kept unchanged, and the first valve and the second valve are adjusted to increase their openings; wherein the first preset opening is less than the second preset opening;

[0024] If the current water level deviation value is less than 0, and the current opening of the first valve is greater than or equal to the second preset opening and / or the current opening of the second valve is greater than the third preset opening, the openings of the first valve, the second valve and the third valve are increased and adjusted respectively.

[0025] Optionally, it also includes:

[0026] When the first valve is in manual adjustment state, if the current water level deviation value is less than 0 and the current opening of the second valve is less than the third preset opening, the current opening of the third valve is kept unchanged and the second valve is adjusted to increase the opening;

[0027] When the second valve is in manual adjustment state, if the current water level deviation value is less than 0, determine whether the current opening of the first valve is less than the second preset opening. If so, keep the current opening of the third valve unchanged and increase the opening of the first valve; if not, increase the opening of the first valve and the third valve.

[0028] Optionally, it also includes:

[0029] If the current water level deviation value is greater than 0 and the current opening of the third valve is greater than a fourth preset opening, the current openings of the first valve and the second valve are kept unchanged, and the opening of the third valve is adjusted to decrease;

[0030] If the current water level deviation value is greater than 0, the current opening of the third valve is not greater than the fourth preset opening and greater than the fifth preset opening, and the current opening of the second valve is greater than the sixth preset opening, if not, the current opening of the first valve is kept unchanged, and the openings of the third valve and the second valve are reduced and adjusted; wherein the fourth preset opening is greater than the fifth preset opening;

[0031] If the current water level deviation value is greater than 0, and the current opening of the third valve is not greater than the fifth preset opening and / or the current opening of the second valve is not greater than the sixth preset opening, the openings of the first valve, the second valve and the third valve are respectively reduced.

[0032] Optionally, it also includes:

[0033] When any one of the following three conditions is met: the water level signal of the hot well of the recycler is abnormal, the inlet valve of the water supply main is in a closed state, and the outlet valve of the water supply main is in a closed state, the first valve, the second valve, and the third valve are switched to a manual adjustment state;

[0034] Wherein, judging whether the inlet valve of the water supply main pipe is in a closed state includes:

[0035] When the closed position point of the water supply main inlet valve is in the on state and the open position point is in the off state, the water supply main inlet valve is in the closed state;

[0036] Determining whether the outlet valve of the water supply main pipe is in a closed state includes:

[0037] When the closed position point of the water supply main pipe outlet valve is in the on state and the open position point is in the off state, the water supply main pipe outlet valve is in the closed state.

[0038] Optionally, it also includes:

[0039] When the closed position point of the first valve is in the on state and the open position point is in the off state, the first valve is switched to the manual adjustment state;

[0040] When the closed position point of the second valve is in the on state and the open position point is in the off state, the second valve is switched to the manual adjustment state;

[0041] When the closed position point of the third valve is in the on state and the open position point is in the off state, the third valve is switched to the manual adjustment state.

[0042] A water level control device for a boiler recovery water supply system, the recovery water supply system comprising a first water supply pipeline, a second water supply pipeline and a third water supply pipeline connected to the recovery and having successively increasing pipe diameters;

[0043] The water level control device comprises:

[0044] a first operation module, configured to obtain a current water level deviation value, correct the current water level deviation value according to a first correction relationship to obtain a first corrected deviation value whose absolute value is not less than the absolute value of the current water level deviation value, obtain a first process value by expanding the first corrected deviation value according to a first growth rate ratio, and determine a first valve opening value according to the first process value;

[0045] a second operation module, configured to correct the current water level deviation value according to a second correction relationship to obtain a second corrected deviation value whose absolute value is not less than the absolute value of the current water level deviation value, obtain a second process value after amplifying the second corrected deviation value according to a second growth rate ratio, and determine a second valve opening value according to the second process value;

[0046] A third operation module is used to correct the current water level deviation value according to a third correction relationship to obtain a third corrected deviation value whose absolute value is not less than the absolute value of the current water level deviation value, obtain a third process value after amplifying the third corrected deviation value according to a third growth rate ratio, and determine a third valve opening value according to the third process value; wherein the first growth rate ratio, the second growth rate ratio and the third growth rate ratio are respectively determined according to the first valve opening value at the previous moment, the second valve opening value at the previous moment and the third valve opening value at the previous moment;

[0047] A control and adjustment module is used to adjust the opening of the first valve of the first water supply pipeline, the second valve of the second water supply pipeline, and the third valve of the third water supply pipeline according to the first valve opening value, the second valve opening value, and the third valve opening value, so as to adjust the water level in the recoverer.

[0048] A boiler recovery water supply system, comprising: a first water supply pipeline, a second water supply pipeline and a third water supply pipeline connected to the recovery pipeline and having successively increasing diameters; a first valve, a second valve and a third valve respectively arranged on the first water supply pipeline, the second water supply pipeline and the third water supply pipeline;

[0049] It includes a processor for executing the steps of the water level control method of the boiler recovery device water replenishment system as described in any of the above items to adjust the opening of the first valve, the second valve and the third valve.

[0050] Optionally, the processor and the first valve, the second valve and the third valve are connected respectively through a first PID regulator, a second PID regulator and a third PID regulator; the processor adjusts the opening of the first valve, the second valve and the third valve respectively through the first PID regulator, the second PID regulator and the third PID regulator.

[0051] The present invention provides a boiler recovery device water replenishment system and a water level control method and device thereof, wherein the recovery device water replenishment system includes a first water replenishment pipeline, a second water replenishment pipeline and a third water replenishment pipeline connected to the recovery device and having successively increasing pipe diameters; the water level control method includes: obtaining a current water level deviation value, correcting the current water level deviation value according to a first correction relationship to obtain a first corrected deviation value whose absolute value is not less than the absolute value of the current water level deviation value, expanding the first corrected deviation value according to a first growth rate ratio to obtain a first process value, and determining a first valve opening value according to the first process value; correcting the current water level deviation value according to a second correction relationship to obtain a second corrected deviation value whose absolute value is not less than the absolute value of the current water level deviation value, and expanding the second corrected deviation value according to a second growth rate ratio to obtain a second process value value, and determine the second valve opening value according to the second process value; correct the current water level deviation value according to the third correction relationship to obtain a third corrected deviation value whose absolute value is not less than the absolute value of the current water level deviation value, obtain the third process value after expanding the third corrected deviation value according to the third growth rate ratio, and determine the third valve opening value according to the third process value; wherein the first growth rate ratio, the second growth rate ratio and the third growth rate ratio are respectively determined according to the first valve opening value at the previous moment, the second valve opening value at the previous moment, and the third valve opening value at the previous moment; according to the first valve opening value, the second valve opening value and the third valve opening value, the openings of the first valve of the first water supply pipeline, the second valve of the second water supply pipeline, and the third valve of the third water supply pipeline are respectively adjusted to adjust the water level in the recycler.

[0052] In the present application, three water supply pipelines are configured for the recoverer. In the process of controlling the three different water supply pipelines to replenish the recoverer with water, different valve adjustment amounts are set separately according to the current water level deviation, so as to ensure the rationality of the water level adjustment in the recoverer to a certain extent. On this basis, two adjustment acceleration processes are performed respectively by correction and speed increase according to the current water level deviation, so as to realize the rapid opening or closing of the valve opening of the three-way water supply pipeline when the valves are in different opening ranges, thereby overcoming the nonlinearity of the regulating valve and the adjustment inertia of the water level in the recoverer to the greatest extent, and ensuring faster and more precise control of the water level stability of the recoverer. BRIEF DESCRIPTION OF THE DRAWINGS

[0053] In order to more clearly illustrate the embodiments of the present invention or the technical solutions of the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0054] Figure 1 A schematic flow chart of a water level control method for a boiler recovery water replenishment system provided in an embodiment of the present application;

[0055] Figure 2 A schematic diagram of the framework structure of a boiler recovery water replenishment system provided in an embodiment of the present application;

[0056] Figure 3 A logic diagram is formed for the water level setting value and the water level deviation value provided in the embodiment of the present invention;

[0057] Figure 4 A control logic diagram of a first valve of a first water supply pipeline provided in an embodiment of the present invention;

[0058] Figure 5 A control logic diagram of a second valve of a second water supply pipeline provided in an embodiment of the present invention;

[0059] Figure 6 A control logic diagram of a third valve of a third water supply pipeline provided in an embodiment of the present invention;

[0060] Figure 7 A structural block diagram of a water level control device of a boiler recovery device water replenishment system provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0061] At present, in the conventional process of adjusting the water level in the recovery device of the boiler, although two water supply pipelines are configured for the recovery device, the current method of adjusting the water supply amount of the two water supply pipelines is often to adjust the valve openings of the two water supply pipelines to the same size synchronously, or to manually control the adjustment by the staff. Obviously, this adjustment method cannot guarantee the rationality of the water level adjustment of the recovery device to the greatest extent.

[0062] To this end, the present application provides a technical solution for more reasonably adjusting the water level in the recycler.

[0063] In order to enable those skilled in the art to better understand the scheme of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0064] like Figures 1 to 6 As shown, Figure 1 A schematic flow chart of a water level control method for a boiler recovery water replenishment system provided in an embodiment of the present application; Figure 2 A schematic diagram of the framework structure of a boiler recovery water replenishment system provided in an embodiment of the present application; Figure 3 A logic diagram is formed for the water level setting value and the water level deviation value provided in the embodiment of the present invention; Figure 4 A control logic diagram of a first valve of a first water supply pipeline provided in an embodiment of the present invention; Figure 5 A control logic diagram of a second valve of a second water supply pipeline provided in an embodiment of the present invention; Figure 6 A control logic diagram of the third valve of the third water replenishment pipeline provided in an embodiment of the present invention.

[0065] In a specific embodiment of the present application, the recoverer 10 in the recoverer water supply system of the boiler is respectively connected to a first water supply pipeline 20, a second water supply pipeline 30 and a third water supply pipeline 40 with successively increasing diameters.

[0066] Reference Figure 2, the first water supply pipeline 20, the second water supply pipeline 30 and the third water supply pipeline 40 are respectively provided with a first valve 21, a second valve 31 and a third valve 41 for adjusting the water flow of the three-way water supply pipeline. In addition, a water supply main inlet valve 50 is commonly connected at the inlet side of the first water supply pipeline 20, the second water supply pipeline 30 and the third water supply pipeline 40, and a water supply main outlet valve 60 is commonly connected at the outlet side of the first water supply pipeline 20, the second water supply pipeline 30 and the third water supply pipeline 40. It can be understood that under normal circumstances, the water supply main inlet valve 50 and the water supply main outlet valve 60 should be kept in a normally open state. The adjustment of the water level in the recycler 10 is mainly achieved by controlling the opening size of the three valves of the three-way water supply pipeline.

[0067] Based on the above-mentioned recycler water replenishment system, the process of implementing the water level control method of the recycler in the present application may include:

[0068] S110: Obtain the current water level deviation value.

[0069] Reference Figure 3 The current water level deviation value referred to in this embodiment refers to the difference between the actual value of the current water level of the recycler and the normal value of the water level.

[0070] S121: Correct the current water level deviation value according to the first correction relationship to obtain a first corrected deviation value whose absolute value is not less than the absolute value of the current water level deviation value.

[0071] S122: A first process value is obtained by amplifying the first corrected deviation value according to a first speed-increasing ratio, and a first valve opening value is determined according to the first process value.

[0072] The first speed increasing ratio is determined according to the first valve opening value at the last moment.

[0073] It can be understood that the first valve opening value in this embodiment is also the adjustment amount for adjusting the opening of the first valve of the first water supply pipeline.

[0074] Usually, for a recycling device or other equipment involving water level regulation, after determining the current water level deviation value, the water level deviation value is generally used directly as the process value, and the constant 0 is used as the set value to set the corresponding valve opening adjustment amount. However, this conventional water level regulation method has low regulation efficiency and cannot quickly and effectively achieve accurate water level regulation in the recycling device.

[0075] To this end, in this embodiment, the current water level deviation value is first corrected according to the first correction relationship; it should be noted that the first correction relationship is the corresponding relationship between the water level deviation in the recycler and the corrected deviation value of the water level set in advance. Figure 4The first correction relationship is not necessarily a fixed ratio relationship. Referring to Table 1, Table 1 shows a set of water level deviation values ​​of the recycler and the corresponding first correction deviation values ​​provided in this embodiment.

[0076] Table 1:

[0077]

[0078] The units of the water level deviation value and the first corrected deviation value in Table 1 are both water level height (mm); referring to Table 1, it can be seen that when the absolute value of the water level deviation value is larger, the difference between the absolute value of the first corrected deviation value and the water level deviation value is larger. Obviously, based on the corrected deviation value, it is beneficial to raise the water level in the recycler to return to the standard water level state more quickly.

[0079] In order to further improve the water level regulation efficiency of the recycler, after determining the first corrected deviation value based on the current water level deviation, the first increase ratio is further set based on the first valve opening value at the last moment when the first valve opening was last regulated, and the absolute value of the first corrected deviation value is further increased based on the first increase ratio as the first process value for regulating the first valve, that is, the first process value is obtained by multiplying the first increase ratio and the first corrected deviation value. Referring to Table 2, Table 2 is a set of first valve opening values ​​of different sizes at the last moment and the corresponding first increase ratios provided in this embodiment.

[0080] Table 2:

[0081]

[0082] Similar to the above-mentioned first correction relationship, the corresponding relationship between the first valve opening value at the previous moment and the corresponding first speed increase ratio can also be preset by the staff. Figure 4 Indicated by F4(X); as for the setting method, it can be set based on historical valve adjustment data or staff work experience, and there is no specific limitation on this in this application.

[0083] In this embodiment, two acceleration processes are performed based on the current water level deviation in the recoverer to obtain the water level adjustment set value of the first valve of the first water supply pipeline, and the first valve opening value of the first valve is determined based on this. This can accelerate the rapid opening or closing of the regulating valve opening when the first valve is in different opening ranges, overcome the nonlinearity of the regulating valve and the adjustment inertia of the water level in the recoverer to the greatest extent, and ensure faster and more accurate control of the water level stability of the recoverer.

[0084] S131: Correct the current water level deviation value according to the second correction relationship to obtain a second corrected deviation value whose absolute value is not less than the absolute value of the current water level deviation value.

[0085] S132: Obtain a second process value by amplifying the second corrected deviation value according to a second speed-increasing ratio, and determine a second valve opening value according to the second process value.

[0086] The second speed increasing ratio is determined according to the second valve opening value at the last moment.

[0087] S141: Correct the current water level deviation value according to the third correction relationship to obtain a third corrected deviation value whose absolute value is not less than the absolute value of the current water level deviation value.

[0088] S142: Obtain a third process value by amplifying the third corrected deviation value according to a third speed-increasing ratio, and determine a third valve opening value according to the third process value.

[0089] The third speed increasing ratio is determined according to the third valve opening value at the last moment.

[0090] Similar to the above-mentioned process of determining the first valve opening value, in the process of determining the second valve opening value of the second valve on the second water supply pipeline and the third valve opening value of the third valve on the third water supply pipeline, the current water level deviation value is also accelerated twice to obtain the second process value and the third process value, and the second valve opening value and the third valve opening value are determined respectively by the second process value and the third process value.

[0091] The difference is that, because the diameters of the first water supply pipeline, the second water supply pipeline and the third water supply pipeline are different, in this embodiment, different first correction relationships, second correction relationships and third correction relationships are set for the three water supply pipelines respectively; similarly, the first increase rate ratio, the second increase rate ratio and the third increase rate ratio are also set respectively, so as to ensure that the valve openings corresponding to the three water supply pipelines can be adjusted more reasonably and independently, thereby ensuring the rationality of the water level adjustment of the recoverer.

[0092] Refer to Tables 3 to 6, wherein Table 3 is a set of water level deviation values ​​of the recovery device and the corresponding second corrected deviation values ​​provided in this embodiment; Table 4 is a set of second valve opening values ​​of different sizes at the previous moment and the corresponding second increase rate ratio provided in this embodiment; Table 5 is a set of water level deviation values ​​of the recovery device and the corresponding third corrected deviation values ​​provided in this embodiment; Table 4 is a set of third valve opening values ​​of different sizes at the previous moment and the corresponding third increase rate ratio provided in this embodiment.

[0093] Table 3:

[0094]

[0095] Table 4:

[0096]

[0097] Table 5:

[0098]

[0099] Table 6:

[0100]

[0101] It should be noted that, similar to the first correction relationship, the second correction relationship and the third correction relationship can also be expressed by different broken line functions, such as Figure 5 and Figure 6 As shown, the second correction relationship and the third correction relationship can be represented by F2(X) and F3(X) respectively; and the second speed increasing ratio and the third speed increasing ratio can be represented by F5(X) and F6(X) respectively.

[0102] S150: adjusting the openings of the first valve of the first water supply pipeline, the second valve of the second water supply pipeline, and the third valve of the third water supply pipeline respectively according to the first valve opening value, the second valve opening value, and the third valve opening value to adjust the water level in the recycler.

[0103] After respectively determining the first valve opening value, the second valve opening value, and the third valve opening value corresponding to the first valve of the first water supply pipeline, the second valve of the second water supply pipeline, and the third valve of the third water supply pipeline, the first valve and the second valve can be independently controlled and adjusted.

[0104] To sum up, in the process of adjusting the water level in the recovery device of the boiler in the present application, the valve openings of the three-way water supply pipelines are independently adjusted according to the current water level deviation in the recovery device, rather than the three-way water supply pipelines adjusting the valve openings synchronously, thereby improving the rationality of the three-way water supply pipelines to adjust the water supply to the recovery device separately; on this basis, two acceleration processings are also carried out respectively for the current water level deviation, so as to realize the rapid opening or closing of the valve openings of the three-way water supply pipelines when the valves are in different opening ranges, thereby overcoming the nonlinearity of the regulating valve and the adjustment inertia of the water level in the recovery device to the greatest extent, and ensuring faster and more precise control of the water level stability of the recovery device.

[0105] Based on the above discussion, the present application further considers that, for the recycler, the water level is affected by the water flow rate of the recycler in addition to the water flow rate of each water supply pipeline. It is also affected by the water flow output in the recycler. Obviously, when the water flow output in the recycler is large, the water flow rate in the recycler is also relatively large. For this reason, in another optional embodiment of the present application, it can further include:

[0106] S21: convert the current drainage flow of the recovery device into a valve adjustment amount according to the first conversion relationship, the second conversion relationship and the third conversion relationship to obtain the first adjustment amount, the second adjustment amount and the third adjustment amount; and convert the current drainage change of the recovery device into a valve adjustment amount correction amount to obtain the first correction amount, the second correction amount and the third correction amount.

[0107] S22: performing sum operations on the first adjustment amount and the first correction amount, the second adjustment amount and the second correction amount, and the third valve adjustment amount and the third correction amount, respectively, to obtain the first valve feedforward adjustment amount, the second valve feedforward adjustment amount, and the third valve feedforward adjustment amount;

[0108] Accordingly, the process of determining the first valve opening value in step S122 in the above embodiment may specifically include:

[0109] The first valve feedforward adjustment amount is used as a feedforward value and a first process value to perform PID operation together to obtain a first valve opening value.

[0110] The process of determining the second valve opening value in step S132 in the above embodiment may specifically include:

[0111] The second valve feedforward adjustment amount is used as the feedforward value and the second process value to perform PID operation together to obtain the second valve opening value;

[0112] The process of determining the third valve opening value in step S142 in the above embodiment may specifically include:

[0113] The third valve feedforward adjustment amount is used as the feedforward value and the third process value to perform PID operation together to obtain the third valve opening value.

[0114] Reference Figures 4 to 6 ,exist Figures 4 to 6The inlet water feed flow rate of the low-pressure deaerator is the current drainage flow rate of the recycler. In addition, the current drainage change amount of the recycler can be the drainage change amount of the recycler within a preset time period. For example, the preset time period can be set to 8s, then the current drainage change amount of the recycler is the difference between the drainage flow rate at the current moment and the drainage flow rate at 8s ago. Obviously, the current drainage change amount may be positive or negative. And in the process of determining the current drainage change amount in three different water replenishment pipelines, different preset time lengths can be set for each water replenishment pipeline to obtain different current drainage changes; of course, the preset time length corresponding to each water replenishment pipeline can also be set to be completely consistent, so as to determine the same feedforward water supply amount, and no specific restrictions are made in this embodiment.

[0115] After determining the current drainage flow and current drainage change of the recovery device, it is necessary to further convert them into the opening adjustment amount for adjusting the three different valves, that is, for different sizes of current drainage flow and current drainage change, the corresponding valve needs to be adjusted to what extent.

[0116] Because the diameters of the first water supply pipeline, the second water supply pipeline and the third water supply pipeline are different, the valve opening adjustment amounts corresponding to the three water supply pipelines are also different for the current drainage flow of the recycler. For the first water supply pipeline, the feedforward water supply amount and the first conversion relationship can be converted and calculated to obtain the first adjustment amount.

[0117] On this basis, the current displacement change is also adjusted and converted according to the corresponding valve opening, so that the first correction amount can be obtained based on the current displacement change; and the first adjustment amount and the first correction amount are summed to obtain the first valve feedforward adjustment amount.

[0118] It can be understood that the first conversion relationship can be considered as the corresponding relationship between the current drainage flow of different sizes and the corresponding first adjustment amount required to adjust the opening of the first valve for the first valve. The first correction amount can be regarded as a correction to the first adjustment amount, and if the current drainage change amount is positive, the first correction amount is positive, and if the current drainage change amount is negative, the first correction amount is negative.

[0119] Because the current drainage flow and the first adjustment amount may not have a fixed proportional relationship, that is, there may be different proportional relationships between the current drainage flow and the corresponding first adjustment amount for different size intervals, for this reason, the first conversion relationship can also be expressed by a broken line function. Figure 4 As shown, the first conversion relationship can be represented by a broken line function F7(X). As shown in Table 7, Table 7 is a set of current drainage flow and corresponding first adjustment amount provided by this embodiment.

[0120] Table 7:

[0121]

[0122] After the first valve feedforward adjustment amount is determined, the first valve feedforward adjustment amount and the first process value determined in the above embodiment can be jointly subjected to PID operation by a PID regulator to obtain a first valve opening value.

[0123] It can be understood that the operation of determining the first valve opening value based on the first valve feedforward adjustment amount and the first process value in the present embodiment is a relatively common PID adjustment operation method, which is equivalent to the set value being 0 in this operation process; a valve opening adjustment ratio can be first determined based on the first process quantity, and the valve opening adjustment ratio and the first valve feedforward adjustment amount can be summed, and the summation result is the first valve opening value.

[0124] Similarly, the second valve on the second water supply pipeline can also use the above similar method to determine the current drainage change. Of course, if the current drainage changes of the three water supply pipelines are consistent, there is no need to repeat the calculation. Of course, the second conversion relationship between the current drainage flow and the second adjustment amount should be different from the above first conversion relationship, such as Figure 5 As shown, the second conversion relationship can be represented by a broken line function F8(X). Referring to Table 8, Table 8 is a set of current drainage flow and corresponding second adjustment amount provided in this embodiment.

[0125] Table 8:

[0126]

[0127] After determining the second adjustment amount, the current displacement change amount can be converted into the second correction amount, and the second adjustment amount and the second correction amount are summed to obtain the second valve feedforward adjustment amount. It should be noted that for the same current displacement change amount, the proportional coefficients for converting the three correction amounts can be different, which are set according to actual needs and are not specifically limited in this application.

[0128] Likewise, the second valve opening value may be determined based on the second valve feedforward adjustment variable and the second process value determined above.

[0129] Similarly, in the process of determining the third valve on the third water supply pipeline, the third conversion relationship satisfied between the current drainage flow and the third adjustment amount is also different from the first conversion relationship and the second conversion relationship mentioned above. Figure 6 As shown, the third conversion relationship can be represented by a broken line function F9(X). Referring to Table 9, Table 9 is a set of current drainage flow and corresponding third adjustment amount provided in this embodiment.

[0130] Table 9:

[0131]

[0132] Similar to the above determination of the first valve opening value and the second valve opening value, the third valve opening value in this embodiment can also be determined based on the third valve feedforward adjustment amount and the third process value.

[0133] Based on the above discussion, in the process of adjusting the valve openings of the three different water supply pipelines in this embodiment, in addition to considering the current actual water level of the recoverer, the influence of the water flow rate discharged from the low-pressure deaerator on the water level change of the recoverer is also fully considered. The two factors are combined to jointly determine a more reasonable valve opening, thereby improving the real-time dynamic balance capability and anti-interference capability of the recoverer water supply system.

[0134] Based on the above discussion, during the control and adjustment process of the three-way water supply pipeline, each water supply pipeline can be independently adjusted automatically or manually, that is, the valve opening value can be set independently by the staff.

[0135] Taking into account that the three-way water supply pipelines have a certain mutual influence on the water supply to the recycler, when the three-way water supply pipelines are all in the state of automatic adjustment, the priority of the valve adjustment of the three-way water supply pipelines can be set.

[0136] In an optional embodiment of the present application, the process of respectively adjusting the valves between the three water supply pipelines may include:

[0137] S311: If the current water level deviation value is less than 0, and the current opening of the first valve is less than the first preset opening; the current openings of the second valve and the third valve are kept unchanged, and the opening of the first valve is increased;

[0138] S312: If the current water level deviation value is less than 0, and the current opening of the first valve is greater than the first preset opening and less than the second preset opening, and the current opening of the second valve is less than the third preset opening, then the current opening of the third valve is kept unchanged, and the openings of the first valve and the second valve are increased and adjusted; wherein the first preset opening is less than the second preset opening.

[0139] S313: If the current water level deviation value is less than 0, and the current opening of the first valve is greater than or equal to the second preset opening and / or the current opening of the second valve is greater than the third preset opening, the first valve, the second valve and the third valve are adjusted to increase their openings respectively.

[0140] It can be understood that when the water level deviation value is less than 0, it means that the water level in the current recovery device is low, and the water replenishment amount to the recovery device needs to be increased, that is, the valve openings on the three-way water replenishment pipeline need to be increased. At this time, the opening of the first valve on the first water replenishment pipeline with the smallest pipe diameter can be increased first, while the openings of the second valve and the third valve remain unchanged. At this time, the opening adjustment method of the first valve can refer to the process of determining the opening value of the first valve in the above embodiment, and this will not be repeated in this embodiment.

[0141] When the opening of the first valve increases to the first preset opening, and the current water level deviation is still less than 0, it means that only increasing the opening of the first valve cannot ensure that the water level in the recoverer effectively returns to the normal water level. At this time, it is necessary to start the adjustment of increasing the opening of the second valve, while the opening of the third valve remains unchanged; until the opening of the second valve has also increased to a larger opening, that is, reaching the third preset opening, it means that only increasing the openings of the first valve and the second valve cannot make the water level in the recoverer return to normal. At this time, the adjustment of increasing the opening of the third valve can be started at the same time, thereby ensuring that the three-way water supply pipeline increases the water supply to the recoverer at the same time, so that the water level in the recoverer returns to normal more quickly.

[0142] However, it is further considered that when the opening of the first valve has reached the first preset opening, and the opening of the second valve has not yet reached the third preset opening, it is necessary to increase the opening of both the first valve and the second valve. During this adjustment process, it is possible that the opening of the first valve has been adjusted to be too large, and the second valve has not yet reached the third preset opening. At this time, the increase in the opening of the third valve should also be started; for this reason, when determining whether it is necessary to increase the opening of the third valve, the current openings of the first valve and the second valve can be judged separately at the same time. As long as any one of the two conditions that the current opening of the first valve is greater than the second preset opening or the current opening of the second valve is greater than the third preset opening is met, the increase in the opening of the third valve is started.

[0143] As mentioned above, for each water supply pipeline, the corresponding valve can be adjusted manually or manually. Therefore, in another optional embodiment of the present application, it can further include:

[0144] S321: When the first valve is in manual adjustment state, if the current water level deviation value is less than 0 and the current opening of the second valve is less than the third preset opening, the current opening of the third valve is kept unchanged and the opening of the second valve is increased.

[0145] S322: When the second valve is in manual adjustment state, if the current water level deviation value is less than 0, determine whether the current opening of the first valve is less than the second preset opening. If so, keep the current opening of the third valve unchanged and increase the opening of the first valve; if not, increase the opening of the first valve and the third valve.

[0146] The first valve, the second valve and the third valve may all be in a manual adjustment state. When the current water level deviation is less than 0, that is, the three-way valve needs to be opened and adjusted, when the first valve is in a manual adjustment state, the second valve opening is increased first, and when the valve opening increases to the third preset opening, the third valve opening is increased.

[0147] When the second valve is in the manual adjustment state, the first valve opening is increased first, and when the valve opening increases to be not less than the second preset opening, the third valve opening is started to increase.

[0148] Of course, it is also possible that the third valve is in a manually adjusted state. In this case, the first valve opening is increased first. When the valve opening increases to the first preset opening, the second valve opening is increased. If the second valve opening is also increased to the corresponding third preset opening, and the water level in the recovery device still cannot return to the normal level, an alarm can be issued to prompt the staff to manually adjust the opening of the third valve, or adjust other equipment in the entire steam turbine generator set to promote the water level in the recovery device to return to normal, thereby ensuring the normal operation of the entire system.

[0149] It is understandable that in actual applications, there may be two valves in manual adjustment state at the same time, and only one valve in automatic adjustment state. At this time, there is no need to consider the priority issue. The remaining valve in automatic adjustment can be directly adjusted according to the above method of determining the opening value of each valve.

[0150] Based on the above discussion, it can be seen that in this embodiment, when the water level in the recycler is low, the valve of the water supply pipeline with a small diameter is increased first, and when the water level in the recovery period is high, the opening of the valves of each water supply pipeline is adjusted according to different priorities. In an optional embodiment of the present application, the valve adjustment process of the three-way water supply pipeline may include:

[0151] S41: If the current water level deviation value is greater than 0 and the current opening of the third valve is greater than the fourth preset opening, the current openings of the first valve and the second valve are kept unchanged, and the opening of the third valve is adjusted to decrease.

[0152] S42: If the current water level deviation value is greater than 0, the current opening of the third valve is not greater than the fourth preset opening and less than the fifth preset opening, and the current opening of the second valve is greater than the sixth preset opening, if not, the current opening of the first valve is kept unchanged, and the openings of the third valve and the second valve are reduced. The fourth preset opening is greater than the fifth preset opening.

[0153] S43: If the current water level deviation value is greater than 0, and the current opening of the third valve is not greater than the fifth preset opening and / or the current opening of the second valve is not greater than the sixth preset opening, the first valve, the second valve and the third valve are respectively adjusted to reduce their openings.

[0154] The priority of adjusting the valves is opposite to that when the water level in the water recovery device is low; when the current water level deviation value is greater than 0, that is, it is necessary to adjust the opening of each valve to reduce the degree, at this time, the third valve is preferentially adjusted to reduce the opening, while the openings of the first valve and the second valve remain unchanged, and only when the opening of the third valve is reduced to greater than or equal to the fourth preset opening and less than the fifth preset opening, the opening reduction adjustment of the second valve is started, while the opening of the first valve remains unchanged; until the opening of the second valve is reduced to the sixth preset opening or the opening of the third valve is reduced to less than the fifth preset opening, the opening reduction adjustment of the first valve is started.

[0155] Similar to the way each valve is adjusted when the water level in the above-mentioned water recycler is low, when the third valve is in manual adjustment state, the second valve opening is reduced first, and when its valve opening is reduced to the sixth preset opening, the first valve opening is reduced.

[0156] When the second valve is in the manual adjustment state, the opening of the third valve is reduced first, and when the opening of the third valve is reduced to the fifth preset opening, the first valve opening is started to be reduced.

[0157] Of course, it is also possible that the first valve is in a manually adjusted state. In this case, the third valve opening is increased first. When the valve opening is reduced to the fourth preset opening, the second valve opening is reduced. If the second valve opening is also reduced to the corresponding sixth preset opening, and the water level in the recovery device still cannot return to the normal level, an alarm can be issued to prompt the staff to manually adjust the opening of the first valve, or adjust other equipment in the entire steam turbine generator set to promote the water level in the recovery device to return to normal, so as to ensure the normal operation of the entire system.

[0158] It is understandable that the first preset opening, the second preset opening, the third preset opening, the fourth preset opening, the fifth preset opening, and the sixth preset opening can be set by the staff based on actual experience or can be determined based on the statistics of the historical data of each valve adjustment, and this is not specifically limited in this application. Referring to Table 10, Table 10 is a set of preset openings corresponding to each valve opening provided in this embodiment.

[0159]

[0160] Based on the above discussion, this application takes into account the mutual influence of different water supply pipelines on the water supply in the recovery device. Therefore, according to the diameter of the three-way water supply pipeline, the valve flow regulation characteristics and the reasonable valve opening overlap, outside the overlap range, when increasing the water supply output, the relatively small diameter regulating valve is opened first, and when reducing the water supply output, the relatively large diameter regulating valve is closed first. Within the overlap range, the three-way regulating valve is automatically opened or closed synchronously according to the water level deviation value to adjust the corresponding rate, which is beneficial to control the stability of the water level in the recovery device.

[0161] Based on the above discussion, the three valves on the three-way water supply pipeline can be controlled in an automatic adjustment state or a manual adjustment state; on this basis, in addition to the staff actively switching the valves on one or more water supply pipelines to a manual state, the system itself can also determine in real time based on the current state of each valve whether the adjustment of each valve needs to be switched to a manual state. Optionally, in an optional embodiment of the present application, it may also specifically include:

[0162] When any one of the following three conditions is met: the water level signal of the hot well of the recycler is abnormal, the inlet valve of the water supply main is in a closed state, and the outlet valve of the water supply main is in a closed state, the first valve, the second valve, and the third valve are switched to a manual adjustment state;

[0163] Among them, judging whether the inlet valve of the water supply main pipe is in a closed state includes:

[0164] When the closed position point of the water supply main inlet valve is in the on state and the open position point is in the off state, the water supply main inlet valve is in the closed state;

[0165] Determine whether the outlet valve of the water supply main is in the closed state, including:

[0166] When the closed position point of the water supply main outlet valve is in the on state and the open position point is in the off state, the water supply main outlet valve is in the closed state.

[0167] It should be noted that in order to monitor the current actual water level in the recoverer in real time, a large number of water level sensors need to be redundantly arranged in the recoverer. If the recoverer hot well water level signals output by each water level sensor are abnormal, it means that the water level sensor in the recoverer is faulty and there may be other unknown faults. At this time, the three valves of the three-way water supply pipeline should be switched to manual adjustment state, and the staff shall decide how to control the valve adjustment of the three-way water supply pipeline.

[0168] In addition, refer to Figure 2 The inlet ends of the three-way water supply pipelines are connected to a water supply main pipe inlet valve 50; and the outlet ends of the three-way water supply pipelines are connected to a water supply main pipe outlet valve 60. Obviously, if any of the two valves is in a closed state, the adjustment of the valves on the three-way water supply pipelines is invalid, and it is also necessary to switch to a manual adjustment state.

[0169] On this basis, the water supply main inlet valve 50 and the water supply main outlet valve 60 are both electric valves. In order to ensure the accuracy of judging whether the two valves are in a closed state or an open state, the conduction and disconnection states of the closed position points and the open position points of the two valves are judged respectively to ensure the accuracy of the valve state judgment.

[0170] Taking the state judgment of the water supply main inlet valve 50 as an example, under normal circumstances, if the water supply main inlet valve is in a closed state, then its valve travel switch should run to the closed position point, at which time the closed position point is in a conducting state, and the open position point is in a disconnected state; conversely, if the water supply main inlet valve 50 is in an open state, then its valve travel switch should run to the open position point, at which time the closed position point is in a disconnected state, and the open position point is in a disconnected state; in actual applications, in order to ensure the accuracy of the state judgment of the water supply main inlet valve, redundant judgments are made on and off states of the closed position point and the open position point at the same time, and only when the closed position point is in a conducting state and the open position point is in a disconnected state, is it determined that the water supply main inlet valve 50 is in a closed state. Reference Figure 4 When detecting the on / off status of the closed position point and the open position point, if the detection result is on, the output is 1, and if the detection result is off, the output is 0. Figure 4 In the process, the result of the open position point is inverted and the state of the closed position point is subjected to an "AND" logic operation. When the operation results are both 1, it indicates that the inlet valve 50 of the water supply main pipe is in the closed state.

[0171] Similarly, a similar method is used to judge the state of the water supply main pipe outlet valve 60. Only the state of the open position point of the water supply main pipe outlet valve 60 is inverted and then subjected to an "AND" logic operation with the state of the closed position point. If the operation results are both yes, it means that the water supply main pipe outlet valve 60 is in a closed state.

[0172] The above is a description of an embodiment in which three water supply pipelines need to be switched to manual adjustment status at the same time. Figures 4 to 6 On the basis that there is no abnormal water level signal of the hot well in the recycler and the inlet valve of the water replenishment main pipe and the outlet valve of the water replenishment main pipe are both in an open state, in an optional embodiment of the present application, it may further include:

[0173] When the closed position point of the first valve is in the on state and the open position point is in the off state, the first valve is switched to the manual adjustment state;

[0174] When the closed position point of the second valve is in the on state and the open position point is in the off state, the second valve is switched to the manual adjustment state;

[0175] When the closed position point of the third valve is in the on state and the open position point is in the off state, the third valve is switched to the manual adjustment state.

[0176] For the first valve, the second valve and the third valve, when any one of the valves is in the closed state, the valve needs to be switched to the manual adjustment state, and the staff actively controls the adjustment of the valve.

[0177] Similar to the judgment of whether the water supply main inlet valve and the water supply main outlet valve are in the closed state, whether the first valve, the second valve and the third valve are in the closed state also needs to be redundantly judged on the conduction and disconnection states of the closed position points and the open position points corresponding to the three valves respectively. The judgment method can be similar to the above, and it will not be repeated in this embodiment.

[0178] The water level control device of the recovery device water replenishment system of the boiler provided in an embodiment of the present invention is introduced below. The water level control device of the recovery device water replenishment system of the boiler described below and the water level control method of the recovery device water replenishment system of the boiler described above can be referred to each other.

[0179] Figure 7 A structural block diagram of a water level control device of a boiler recovery water supply system provided in an embodiment of the present invention, wherein the recovery water supply system comprises a first water supply pipeline, a second water supply pipeline and a third water supply pipeline connected to the recovery and having successively increasing pipe diameters; Figure 7 The water level control device of the recovery water supply system of the boiler in the invention may include:

[0180] A first operation module 100 is used to obtain a current water level deviation value, correct the current water level deviation value according to a first correction relationship to obtain a first corrected deviation value whose absolute value is not less than the absolute value of the current water level deviation value, amplify the first corrected deviation value according to a first growth rate ratio to obtain a first process value, and determine a first valve opening value according to the first process value;

[0181] A second operation module 200 is used to correct the current water level deviation value according to a second correction relationship to obtain a second corrected deviation value whose absolute value is not less than the absolute value of the current water level deviation value, obtain a second process value after amplifying the second corrected deviation value according to a second growth rate ratio, and determine a second valve opening value according to the second process value;

[0182] A third operation module 300 is used to correct the current water level deviation value according to a third correction relationship to obtain a third corrected deviation value whose absolute value is not less than the absolute value of the current water level deviation value, obtain a third process value after amplifying the third corrected deviation value according to a third growth rate ratio, and determine a third valve opening value according to the third process value; wherein the first growth rate ratio, the second growth rate ratio and the third growth rate ratio are respectively determined according to the first valve opening value at the previous moment, the second valve opening value at the previous moment and the third valve opening value at the previous moment;

[0183] The control and adjustment module 400 is used to adjust the opening of the first valve of the first water supply pipeline, the second valve of the second water supply pipeline, and the third valve of the third water supply pipeline according to the first valve opening value, the second valve opening value, and the third valve opening value, so as to adjust the water level in the recoverer.

[0184] In an optional embodiment of the present application, it also includes a feedforward operation module, which is used to convert the current drainage flow of the recycling device into a valve adjustment amount according to the first conversion relationship, the second conversion relationship and the third conversion relationship to obtain a first adjustment amount, a second adjustment amount and a third adjustment amount; and convert the current drainage change of the recycling device into a correction amount of the valve adjustment amount to obtain a first correction amount, a second correction amount and a third correction amount; and sum the first adjustment amount and the first correction amount, the second adjustment amount and the second correction amount, and the third valve adjustment amount and the third correction amount respectively to obtain a first valve feedforward adjustment amount, a second valve feedforward adjustment amount and a third valve feedforward adjustment amount;

[0185] Correspondingly, the first operation module 100 is used to perform PID operation with the first valve feedforward adjustment amount as the feedforward value and the first process value to obtain the first valve opening value;

[0186] The second operation module 200 is used to perform PID operation with the second valve feedforward adjustment amount as the feedforward value and the second process value to obtain the second valve opening value;

[0187] The third operation module 300 is used to perform PID operation with the third valve feedforward adjustment amount as a feedforward value and the third process value to obtain the third valve opening value.

[0188] In an optional embodiment of the present application, the control and adjustment module 400 further includes:

[0189] A first regulating unit is used for maintaining the current openings of the second valve and the third valve unchanged and increasing the opening of the first valve if the current water level deviation value is less than 0 and the current opening of the first valve is less than a first preset opening;

[0190] A second regulating unit is used for maintaining the current opening of the third valve unchanged and increasing the opening of the first valve and the second valve if the current water level deviation value is less than 0, and the current opening of the first valve is greater than the first preset opening and less than the second preset opening, and the current opening of the second valve is less than the third preset opening; wherein the first preset opening is less than the second preset opening;

[0191] The third regulating unit is used to increase the opening of the first valve, the second valve and the third valve respectively if the current water level deviation value is less than 0 and the current opening of the first valve is greater than or equal to the second preset opening and / or the current opening of the second valve is greater than the third preset opening.

[0192] In an optional embodiment of the present application, the second regulating unit is further configured to, when the first valve is in a manual adjustment state, if the current water level deviation value is less than 0 and the current opening of the second valve is less than a third preset opening, keep the current opening of the third valve unchanged and increase the opening of the second valve;

[0193] The third adjustment unit is also used to determine whether the current opening of the first valve is less than the second preset opening when the second valve is in manual adjustment state and if the current water level deviation value is less than 0. If so, the current opening of the third valve is kept unchanged and the opening of the first valve is increased; if not, the openings of the first valve and the third valve are increased.

[0194] In an optional embodiment of the present application, the control and adjustment module 400 further includes:

[0195] a fourth regulating unit, configured to keep the current openings of the first valve and the second valve unchanged and to reduce the opening of the third valve if the current water level deviation value is greater than 0 and the current opening of the third valve is greater than a fourth preset opening;

[0196] a fifth regulating unit, for maintaining the current opening of the first valve unchanged and performing opening reduction regulation on the third valve and the second valve if the current water level deviation value is greater than 0, the current opening of the third valve is not greater than the fourth preset opening and greater than the fifth preset opening, and the current opening of the second valve is greater than the sixth preset opening; if not, the current opening of the first valve is maintained unchanged, and the openings of the third valve and the second valve are reduced; wherein the fourth preset opening is greater than the fifth preset opening;

[0197] The sixth regulating unit is used to respectively reduce the opening of the first valve, the second valve and the third valve if the current water level deviation value is greater than 0 and the current opening of the third valve is not greater than the fifth preset opening and / or the current opening of the second valve is not greater than the sixth preset opening.

[0198] In an optional embodiment of the present application, it also includes a state switching module, which is used to switch the first valve, the second valve and the third valve to a manual adjustment state when any one of the following three conditions is met: the water level signal of the hot well of the recoverer is abnormal, the inlet valve of the water supply main is in a closed state, and the outlet valve of the water supply main is in a closed state; wherein, when the closed position point of the inlet valve of the water supply main is in a conducting state and the open position point is in a disconnected state, the inlet valve of the water supply main is in a closed state; when the closed position point of the outlet valve of the water supply main is in a conducting state and the open position point is in a disconnected state, the outlet valve of the water supply main is in a closed state.

[0199] In an optional embodiment of the present application, the state switching module is also used to switch the first valve to a manual adjustment state when the closed position point of the first valve is in an on state and the open position point is in a disconnected state; to switch the second valve to a manual adjustment state when the closed position point of the second valve is in an on state and the open position point is in a disconnected state; and to switch the third valve to a manual adjustment state when the closed position point of the third valve is in an on state and the open position point is in a disconnected state.

[0200] The water level control device of the boiler's recovery device water replenishment system of this embodiment is used to implement the aforementioned water level control method of the boiler's recovery device water replenishment system. Therefore, the specific implementation method of the water level control device of the boiler's recovery device water replenishment system can be seen in the embodiment part of the water level control method of the boiler's recovery device water replenishment system in the previous text, and will not be repeated here.

[0201] The present application also provides an embodiment of a boiler recovery device water replenishment system, and the boiler recovery device water replenishment system may include:

[0202] A first water supply pipeline, a second water supply pipeline and a third water supply pipeline connected to the recovery device and having successively increasing diameters; a first valve, a second valve and a third valve respectively arranged on the first water supply pipeline, the second water supply pipeline and the third water supply pipeline;

[0203] It includes a processor for executing the steps of the water level control method of the boiler recovery device water replenishment system as described in any of the above items to adjust the opening of the first valve, the second valve and the third valve.

[0204] Optionally, the processor and the first valve, the second valve and the third valve are connected respectively through the first PID regulator, the second PID regulator and the third PID regulator; the processor adjusts the opening of the first valve, the second valve and the third valve respectively through the first PID regulator, the second PID regulator and the third PID regulator.

[0205] It can be understood that the steps involving PID calculation in the water level control method of the recovery water replenishment system of the above-mentioned boiler can be implemented by executing the calculation process through a processor, or can be calculated through three PID regulators respectively, which is not limited in this embodiment.

[0206] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply that there is any such actual relationship or order between these entities or operations. Moreover, the term "include", "comprise" or any other variant thereof is intended to cover non-exclusive inclusion, so that the process, method, article or equipment that includes a series of elements are inherent to the elements. In the absence of more restrictions, the elements limited by the sentence "comprise one..." do not exclude the presence of other identical elements in the process, method, article or equipment that includes the elements. In addition, the above-mentioned technical solution provided in the embodiment of the present application is consistent with the corresponding technical solution in the prior art in principle, and the part is not described in detail, so as not to repeat too much.

[0207] The principles and implementation methods of the present invention are described in this article using specific examples. The description of the above embodiments is only used to help understand the method and core ideas of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made to the present invention without departing from the principles of the present invention, and these improvements and modifications also fall within the scope of protection of the claims of the present invention.

Claims

1. A water level control method for a boiler recovery water supply system, It is characterized in that The recycler water replenishment system comprises a first water replenishment pipeline, a second water replenishment pipeline and a third water replenishment pipeline which are connected to the recycler and have successively increasing diameters; The water level control method comprises: Obtain a current water level deviation value, correct the current water level deviation value according to a first correction relationship to obtain a first corrected deviation value whose absolute value is not less than the absolute value of the current water level deviation value, expand the first corrected deviation value according to a first growth rate ratio to obtain a first process value, and determine a first valve opening value according to the first process value, wherein the first process value is the product of the first growth rate ratio and the first corrected deviation value; The current water level deviation value is corrected according to a second correction relationship to obtain a second corrected deviation value whose absolute value is not less than the absolute value of the current water level deviation value, a second process value is obtained after the second corrected deviation value is amplified according to a second growth rate, and a second valve opening value is determined according to the second process value, where the second process value is the product of the second growth rate and the second corrected deviation value; The current water level deviation value is corrected according to a third correction relationship to obtain a third corrected deviation value whose absolute value is not less than the absolute value of the current water level deviation value, a third process value is obtained after the third corrected deviation value is amplified according to a third growth rate ratio, and a third valve opening value is determined according to the third process value, wherein the third process value is the product of the third growth rate ratio and the third corrected deviation value; wherein the first growth rate ratio, the second growth rate ratio and the third growth rate ratio are respectively determined according to the first valve opening value at the last moment, the second valve opening value at the last moment, and the third valve opening value at the last moment; The first valve of the first water supply pipeline, the second valve of the second water supply pipeline, and the third valve of the third water supply pipeline are respectively adjusted in opening according to the first valve opening value, the second valve opening value, and the third valve opening value to adjust the water level in the recoverer.

2. The water level control method of the recovery water replenishment system of the boiler according to claim 1, It is characterized in that Also includes: The current drainage flow of the recycling device is converted into a valve adjustment amount according to the first conversion relationship, the second conversion relationship and the third conversion relationship to obtain a first adjustment amount, a second adjustment amount and a third adjustment amount; and the current drainage change of the recycling device is converted into a correction amount of the valve adjustment amount to obtain a first correction amount, a second correction amount and a third correction amount; performing sum operations on the first adjustment amount and the first correction amount, the second adjustment amount and the second correction amount, and the third valve adjustment amount and the third correction amount respectively to obtain a first valve feedforward adjustment amount, a second valve feedforward adjustment amount, and a third valve feedforward adjustment amount; Correspondingly, the process of determining the first valve opening value according to the first process value includes: Performing PID calculation with the first valve feedforward adjustment amount as a feedforward value and the first process value to obtain the first valve opening value; The process of determining the second valve opening value according to the second process value comprises: Performing PID calculation with the second valve feedforward adjustment amount as a feedforward value and the second process value to obtain the second valve opening value; The process of determining the third valve opening value according to the third process value comprises: The third valve feedforward adjustment amount is used as a feedforward value and a PID operation is performed together with the third process value to obtain the third valve opening value.

3. The water level control method of the recovery water replenishment system of the boiler according to claim 1, It is characterized in that Also includes: If the current water level deviation value is less than 0, and the current opening of the first valve is less than the first preset opening; the current openings of the second valve and the third valve are kept unchanged, and the opening of the first valve is increased; If the current water level deviation value is less than 0, and the current opening of the first valve is greater than the first preset opening and less than the second preset opening, and the current opening of the second valve is less than the third preset opening, the current opening of the third valve is kept unchanged, and the first valve and the second valve are adjusted to increase their openings; wherein the first preset opening is less than the second preset opening; If the current water level deviation value is less than 0, and the current opening of the first valve is greater than or equal to the second preset opening and / or the current opening of the second valve is greater than the third preset opening, the openings of the first valve, the second valve and the third valve are increased and adjusted respectively.

4. The water level control method of the recovery water replenishment system of the boiler according to claim 1, It is characterized in that Also includes: When the first valve is in manual adjustment state, if the current water level deviation value is less than 0 and the current opening of the second valve is less than the third preset opening, the current opening of the third valve is kept unchanged and the second valve is adjusted to increase the opening; When the second valve is in manual adjustment state, if the current water level deviation value is less than 0, determine whether the current opening of the first valve is less than the second preset opening. If so, keep the current opening of the third valve unchanged and increase the opening of the first valve; if not, increase the opening of the first valve and the third valve.

5. The water level control method of the recovery water replenishment system of the boiler according to claim 1, It is characterized in that Also includes: If the current water level deviation value is greater than 0 and the current opening of the third valve is greater than a fourth preset opening, the current openings of the first valve and the second valve are kept unchanged, and the opening of the third valve is reduced; If the current water level deviation value is greater than 0, the current opening of the third valve is not greater than the fourth preset opening and greater than the fifth preset opening, and the current opening of the second valve is greater than the sixth preset opening, if not, the current opening of the first valve is kept unchanged, and the openings of the third valve and the second valve are reduced and adjusted; wherein the fourth preset opening is greater than the fifth preset opening; If the current water level deviation value is greater than 0, and the current opening of the third valve is not greater than the fifth preset opening and / or the current opening of the second valve is not greater than the sixth preset opening, the openings of the first valve, the second valve and the third valve are respectively reduced.

6. The water level control method of the recovery water replenishment system of the boiler according to claim 1, It is characterized in that Also includes: When any one of the following three conditions is met: the water level signal of the hot well of the recycler is abnormal, the inlet valve of the water supply main is in a closed state, and the outlet valve of the water supply main is in a closed state, the first valve, the second valve, and the third valve are switched to a manual adjustment state; Wherein, judging whether the inlet valve of the water supply main pipe is in a closed state includes: When the closed position point of the water supply main inlet valve is in the on state and the open position point is in the off state, the water supply main inlet valve is in the closed state; Determining whether the outlet valve of the water supply main pipe is in a closed state includes: When the closed position point of the water supply main pipe outlet valve is in the on state and the open position point is in the off state, the water supply main pipe outlet valve is in the closed state.

7. The water level control method of the recovery water replenishment system of the boiler according to claim 1, It is characterized in that Also includes: When the closed position point of the first valve is in the on state and the open position point is in the off state, the first valve is switched to the manual adjustment state; When the closed position point of the second valve is in the on state and the open position point is in the off state, the second valve is switched to the manual adjustment state; When the closed position point of the third valve is in the on state and the open position point is in the off state, the third valve is switched to the manual adjustment state.

8. A water level control device for a boiler recovery water supply system, It is characterized in that The recycler water replenishment system comprises a first water replenishment pipeline, a second water replenishment pipeline and a third water replenishment pipeline which are connected to the recycler and have successively increasing diameters; The water level control device comprises: a first operation module, configured to obtain a current water level deviation value, correct the current water level deviation value according to a first correction relationship to obtain a first corrected deviation value whose absolute value is not less than the absolute value of the current water level deviation value, obtain a first process value by expanding the first corrected deviation value according to a first growth rate ratio, and determine a first valve opening value according to the first process value; a second operation module, configured to correct the current water level deviation value according to a second correction relationship to obtain a second corrected deviation value whose absolute value is not less than the absolute value of the current water level deviation value, obtain a second process value after amplifying the second corrected deviation value according to a second growth rate ratio, and determine a second valve opening value according to the second process value; A third operation module is used to correct the current water level deviation value according to a third correction relationship to obtain a third corrected deviation value whose absolute value is not less than the absolute value of the current water level deviation value, obtain a third process value after amplifying the third corrected deviation value according to a third growth rate ratio, and determine a third valve opening value according to the third process value; wherein the first growth rate ratio, the second growth rate ratio and the third growth rate ratio are respectively determined according to the first valve opening value at the previous moment, the second valve opening value at the previous moment and the third valve opening value at the previous moment; A control and adjustment module is used to adjust the opening of the first valve of the first water supply pipeline, the second valve of the second water supply pipeline, and the third valve of the third water supply pipeline according to the first valve opening value, the second valve opening value, and the third valve opening value, so as to adjust the water level in the recoverer.

9. A boiler recovery water replenishment system, It is characterized in that include: A first water supply pipeline, a second water supply pipeline and a third water supply pipeline connected to the recovery device and having successively increasing diameters; A first valve, a second valve and a third valve are respectively arranged on the first water supply pipeline, the second water supply pipeline and the third water supply pipeline; It includes a processor for executing the steps of the water level control method of the boiler recovery device water replenishment system as described in any one of claims 1 to 7 to adjust the opening of the first valve, the second valve and the third valve.

10. The boiler recovery water replenishment system according to claim 9, It is characterized in that The processor and the first valve, the second valve and the third valve are connected respectively through the first PID regulator, the second PID regulator and the third PID regulator; the processor adjusts the opening of the first valve, the second valve and the third valve respectively through the first PID regulator, the second PID regulator and the third PID regulator.

Citation Information

Patent Citations

  • Control method of boiler water level and its control system

    CN101101112A

  • Boiler water replenishing system capable of collecting waste heat and condensed water

    CN102607014A