A method and system for monitoring landfill environment

By constructing a looseness notch wave map and pollutant diffusion analysis, daily average diffusion monitoring data is generated, which solves the problem of environmental monitoring of landfill sites, reduces the risk of soil and groundwater pollution, and ensures that garbage is landfilled according to the class.

CN115508255BActive Publication Date: 2024-11-26GUIZHOU GEOLOGY & MINERAL FOUNDATION ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211183509.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-09-27
Publication Date
2024-11-26
Estimated Expiration
2042-09-27

AI Technical Summary

Technical Problem

The environment of the landfill site is difficult to effectively monitor, resulting in the waste not being filled by category, causing soil and groundwater pollution.

Method used

By obtaining historical wind direction information and soil looseness in the three-dimensional coordinate system of soil, a looseness notch diagram is constructed, combined with groundwater sampling information, the diffusion azimuth angle and linear seepage rate of pollutants are determined, and the daily average diffusion monitoring data is generated, and the visualization is carried out. Displayed in the system to guide garbage classification dumping and monitoring.

Benefits of technology

Effectively monitor the environment of landfill sites, reduce the risk of soil and groundwater pollution, and ensure that garbage is landfilled according to the category.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115508255B_ABST
    Figure CN115508255B_ABST
Patent Text Reader

Abstract

The present invention discloses a monitoring method and system for a landfill environment, which comprises: obtaining historical wind direction information of the landfill environment within a historical period of time, determining the soil looseness of the landfill environment according to the three nitrogen contents corresponding to the landfill environment; constructing a looseness trap map according to the soil looseness and the historical wind direction information; obtaining groundwater sampling information collected in multiple directions; determining the diffusion azimuth of pollutants according to the concentration difference of pollutants in adjacent directions in the looseness trap map and the groundwater sampling information, and determining the linear seepage rate corresponding to the pollutant in the diffusion azimuth according to the hydraulic gradient of the landfill and the concentration difference of pollutants in adjacent directions; generating daily average diffusion monitoring data for the landfill environment according to the diffusion azimuth and the linear seepage rate, and importing the daily average diffusion monitoring data into a preset visualization system to generate a corresponding visualization monitoring screen.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of garbage disposal, and in particular to a method and system for monitoring the environment of a garbage landfill site. Background Art

[0002] Currently, most urban garbage is disposed of by landfill. Landfills are usually located in wide areas far away from concentrated urban areas. Because they are far away from cities and have low transportation convenience, it is difficult to effectively monitor the landfill environment. In addition, in related scenarios, garbage usually needs to be sorted before landfill. However, due to the lack of effective monitoring, garbage is often dumped without following the classification, which makes it difficult to effectively implement classified landfilling, which easily leads to soil and groundwater pollution. Summary of the invention

[0003] In view of the technical problems existing in the prior art, the present invention provides a method and system for monitoring the environment of a landfill site, aiming to effectively monitor the environment of a landfill site, thereby effectively reducing the risk of soil and groundwater pollution caused by unclassified landfill of garbage.

[0004] To achieve the above objectives, the present invention is implemented through the following technical solutions:

[0005] According to a first aspect of an embodiment of the present invention, a method for monitoring a landfill environment is provided, comprising:

[0006] Obtaining historical wind direction information of the landfill environment over a period of time in history, wherein the historical wind direction information corresponds to the current season, and determining the soil looseness of the soil of the landfill environment in a three-dimensional coordinate system according to the nitrogen content corresponding to the landfill environment;

[0007] According to the soil looseness and the historical wind direction information, a looseness trap map is constructed, wherein the trap direction of the lobe of the looseness trap map is related to the direction of the maximum soil looseness;

[0008] Acquiring groundwater sampling information collected in multiple directions, wherein the multiple directions have a one-to-one correspondence with garbage classification dumping areas of the landfill site;

[0009] Determine the diffusion azimuth of the pollutants according to the looseness notch map and the concentration difference of the pollutants in adjacent directions in the groundwater sampling information, and determine the linear seepage rate of the pollutants corresponding to the diffusion azimuth according to the hydraulic gradient of the landfill site and the concentration difference of the pollutants in adjacent directions;

[0010] According to the diffusion azimuth and the linear seepage rate, daily average diffusion monitoring data for the landfill site environment is generated, and the daily average diffusion monitoring data is imported into a preset visualization system so that the preset visualization system generates corresponding visualization monitoring screens according to each daily average diffusion monitoring data.

[0011] In one embodiment, the step of constructing a looseness trap map according to the soil looseness and the historical wind direction information includes:

[0012] For each sampling coordinate point at a three-dimensional coordinate position, the soil looseness is mapped from the three-dimensional coordinate space to the two-dimensional coordinate space to obtain the projection looseness of the sampling coordinate point with the same horizontal coordinate and vertical coordinate in the two-dimensional coordinate space;

[0013] Connecting the sampling coordinate points with the same projection looseness in adjacent directions in sequence to obtain initial rings corresponding to the projection looseness;

[0014] Starting from the innermost initial ring, determining the maximum Euclidean distance between adjacent initial rings, and using the historical wind direction in the historical wind direction information as the initial trap direction;

[0015] In the initial notch direction, determine the contribution value of the maximum Euclidean distance between adjacent initial rings to the initial notch direction, and based on the contribution value and the corresponding projection looseness, determine the notch points of each initial ring in turn in the initial notch direction, and construct the looseness notch map based on the initial rings and the notch points.

[0016] In one embodiment, the step of sequentially connecting the sampling coordinate points with the same projection looseness in adjacent directions to obtain the initial rings corresponding to the projection looseness includes:

[0017] When there are corresponding five or more identical projection loosenesses in the same direction, calculating the Euclidean distance between two adjacent projection loosenesses in the identical multiple projection loosenesses;

[0018] The center points of the two adjacent projection looseness with the smallest Euclidean distance are taken as the first loose center, the center points of the two adjacent projection looseness with the largest Euclidean distance are taken as the second loose center, the sampling coordinate point closest to the first loose center among the more than five sampling coordinate points with the same projection looseness is taken as the first spare sampling point, and the sampling coordinate point farthest from the second loose center among the more than five sampling coordinate points with the same projection looseness is taken as the second spare sampling point;

[0019] The center point of the first spare sampling point and the second spare sampling point is taken as the first target sampling coordinate point, the first target sampling coordinate point is taken as the projection looseness in this direction, and the sampling coordinate points with the same projection looseness in the adjacent direction are connected in sequence to obtain the initial ring corresponding to each projection looseness.

[0020] In one embodiment, the method comprises:

[0021] When there are corresponding five or less identical projection loosenesses in the same direction, calculating the Euclidean distance between two adjacent projection loosenesses in the identical multiple projection loosenesses, and calculating the average Euclidean distance of the Euclidean distances;

[0022] Taking the projection looseness closest to the center of the landfill as a reference point, in the direction corresponding to the projection looseness, determine the second target sampling point according to the average Euclidean distance, and use the second target sampling point as the projection looseness in this direction, and connect the sampling coordinate points with the same projection looseness in the adjacent direction in sequence to obtain the initial rings corresponding to each projection looseness.

[0023] In one embodiment, the step of determining the contribution value of the maximum Euclidean distance between adjacent initial rings to the initial notch direction in the initial notch direction includes:

[0024] In the initial notch direction, determine the angle between the maximum Euclidean distance between adjacent annular graphs and the initial notch direction, and determine the contribution value of the maximum Euclidean distance corresponding to the initial annular graph to the initial notch direction according to the angle, wherein the contribution value is inversely proportional to the angle;

[0025] The step of determining each initial annular notch point in the initial notch direction in sequence according to the contribution value and the corresponding projection looseness comprises:

[0026] Calculate the product of the contribution value and the corresponding maximum Euclidean distance, and move the projection looseness corresponding to the initial ring of the innermost circle toward the center of the landfill site by the corresponding product in the initial notch direction to obtain the notch point of the initial ring of the innermost circle;

[0027] In the initial notch direction, the projection looseness corresponding to the initial ring is moved to the notch point corresponding to the previous initial ring by the product corresponding to the initial ring to obtain the notch point corresponding to the initial ring, and so on to determine the notch point of each initial ring.

[0028] In one embodiment, the step of determining the diffusion azimuth of pollutants according to the looseness notch map and the concentration difference of pollutants in adjacent directions in the groundwater sampling information includes:

[0029] Substituting the concentration difference of pollutants in adjacent directions in the groundwater sampling information into a pre-constructed absolute square gradient vector formula to obtain the diffusion trend direction, and substituting the trap direction in the looseness trap map into the formation dip angle attribute formula to obtain the diffusion formation direction;

[0030] According to the diffusion trend direction and the diffusion stratum direction, a pollutant structure tensor trace based on absolute square gradient is calculated;

[0031] Under the constraint of the pollutant structure tensor trace, the diffusion azimuth of the pollutant is determined according to the concentration difference of the pollutant in adjacent directions in the groundwater sampling information.

[0032] In one embodiment, the method further comprises:

[0033] According to a plurality of preset garbage classifications corresponding to the landfill environment and the looseness notch map, classified dumping channels for the landfill environment and the channel orientation of each classified dumping channel corresponding to the looseness notch map are planned, so that corresponding dumping channels, channel gates and channel guiding devices can be set according to the classified dumping channels and the corresponding channel orientations, and the classified dumping channels correspond to the garbage classified dumping areas;

[0034] Obtaining the type of garbage loaded on each garbage transport vehicle entering the landfill environment, and determining the corresponding target classification dumping channel of the garbage transport vehicle according to the type of garbage;

[0035] According to the entry channel of the garbage transport vehicle into the garbage landfill environment and the target classification dumping channel, planning the driving route of the garbage transport vehicle and determining the guidance information of the channel guidance device along the driving route;

[0036] The driving route is sent to the garbage transport vehicle, and the channel guidance device is controlled to display the corresponding guidance information. The garbage transport vehicle is monitored according to the driving route, and when it is determined that the garbage transport vehicle has arrived at the target classification dumping channel, the channel gate corresponding to the target classification dumping channel is controlled to open.

[0037] According to a second aspect of an embodiment of the present invention, a monitoring system for a landfill environment is provided, the system comprising:

[0038] A monitoring terminal, the monitoring terminal being used to perform the monitoring of the landfill environment as described in any one of the first aspects;

[0039] A wind vane in communication with the monitoring terminal, the wind vane being used to collect historical wind direction information of the landfill environment over a period of time;

[0040] A water sample collection device is communicatively connected to the monitoring terminal, and is used to collect groundwater sampling information in a corresponding direction.

[0041] Beneficial effects: The present invention provides a method and system for monitoring the environment of a landfill site. Compared with the prior art, the present invention has the following beneficial effects:

[0042] By determining the diffusion azimuth of pollutants and the linear seepage rate corresponding to the pollutants at the diffusion azimuth; and then generating daily average diffusion monitoring data for the landfill environment based on the diffusion azimuth and the linear seepage rate, and generating corresponding visual monitoring images based on the daily average diffusion monitoring data, the environment of the landfill environment can be effectively monitored, thereby effectively reducing the risk of soil and groundwater pollution caused by garbage not being landfilled according to classification. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] Figure 1 The present invention is a flow chart of a method for monitoring a landfill environment.

[0044] Figure 2 According to an implementation provided by the present invention Figure 1 Flowchart of step S12 in FIG.

[0045] Figure 3 According to an implementation provided by the present invention Figure 2 Flowchart of step S122 in FIG.

[0046] Figure 4 According to an implementation provided by the present invention Figure 1 Flowchart of step S14 in FIG. DETAILED DESCRIPTION

[0047] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0048] See also Figure 1 The present invention provides a method for monitoring the environment of a landfill site, see Figure 1 As shown, the method for monitoring the landfill environment includes:

[0049] In step S11, historical wind direction information of the landfill environment within a historical period of time is obtained, wherein the historical wind direction information corresponds to the current season, and the looseness of the soil of the landfill environment in a three-dimensional coordinate system is determined according to the nitrogen content corresponding to the landfill environment;

[0050] In the embodiment of the present disclosure, historical wind direction information in corresponding directions is collected by setting up wind vanes at different positions in the landfill environment, and the historical wind direction information is stored as a log for uploading.

[0051] In the embodiments of the present disclosure, the three nitrogens specifically refer to ammonia nitrogen, nitrite nitrogen, and nitrate nitrogen, all of which are pollutants generated after landfilling. These pollutants will increase the content of microorganisms in the soil, thereby changing the looseness of the soil after landfilling.

[0052] In step S12, a looseness notch map is constructed according to the soil looseness and the historical wind direction information, wherein the notch direction of the lobe of the looseness notch map is related to the direction of the maximum soil looseness;

[0053] In step S13, groundwater sampling information collected in multiple directions is obtained, and the multiple directions have a one-to-one correspondence with the garbage classification dumping areas of the landfill site;

[0054] In the embodiment of the present disclosure, groundwater sampling information in the corresponding direction is collected by a water sample collection device pre-buried before landfill.

[0055] In step S14, the diffusion azimuth of the pollutants is determined according to the looseness notch map and the concentration difference of the pollutants in adjacent directions in the groundwater sampling information, and the linear seepage rate corresponding to the pollutants in the diffusion azimuth is determined according to the hydraulic gradient of the landfill site and the concentration difference of the pollutants in adjacent directions;

[0056] In the embodiment of the present disclosure, the linear seepage rate corresponding to the pollutant at the diffusion azimuth is determined according to a preset corresponding relationship between the concentration difference and the linear seepage rate.

[0057] In step S15, daily average diffusion monitoring data for the landfill environment is generated based on the diffusion azimuth and the linear seepage rate, and the daily average diffusion monitoring data is imported into a preset visualization system so that the preset visualization system generates corresponding visualization monitoring screens based on the daily average diffusion monitoring data.

[0058] Among them, the diffusion azimuth can show the diffusion direction and source direction of pollutants, the linear seepage rate can reflect the current outward diffusion speed of pollutants, and can show whether it exceeds the predetermined landfill site range.

[0059] The above technical scheme determines the diffusion azimuth of pollutants and the linear seepage rate corresponding to the pollutants at the diffusion azimuth; then generates daily average diffusion monitoring data for the landfill environment based on the diffusion azimuth and the linear seepage rate, and generates corresponding visual monitoring images based on the daily average diffusion monitoring data. The environment of the landfill environment can be effectively monitored, thereby effectively reducing the risk of soil and groundwater pollution caused by unclassified landfill of garbage.

[0060] In one embodiment, see Figure 2 As shown, in step S12, the step of constructing a looseness trap map according to the soil looseness and the historical wind direction information includes:

[0061] In step S121, for each sampling coordinate point at a three-dimensional coordinate position, the soil looseness is mapped from the three-dimensional coordinate space to the two-dimensional coordinate space to obtain the projected looseness of the sampling coordinate point with the same horizontal coordinate and vertical coordinate projected in the two-dimensional coordinate space;

[0062] In the disclosed embodiment, each sampling coordinate point can be projected vertically downward to obtain the projected looseness of the sampling coordinate point with the same horizontal and vertical coordinates projected in the two-dimensional coordinate space, wherein the maximum soil looseness can be used as the projected looseness corresponding to the sampling coordinate point.

[0063] In step S122, the sampling coordinate points with the same projection looseness in adjacent directions are connected in sequence to obtain initial rings corresponding to the projection looseness;

[0064] It can be understood that the initial ring corresponding to each of the projection loosenesses surrounds the center of the monitored landfill environment, and the projection loosenesses on the same initial ring are the same.

[0065] In step S123, starting from the innermost initial ring, the maximum Euclidean distance between adjacent initial rings is determined, and the historical wind direction in the historical wind direction information is used as the initial trap direction;

[0066] In step S124, in the initial notch direction, the contribution value of the maximum Euclidean distance between adjacent initial rings to the initial notch direction is determined, and based on the contribution value and the corresponding projection looseness, the notch points of each initial ring are determined in turn in the initial notch direction, and the looseness notch map is constructed based on the initial rings and the notch points.

[0067] In one embodiment, see Figure 3 As shown, in step S122, the step of sequentially connecting the sampling coordinate points with the same projection looseness in adjacent directions to obtain the initial ring corresponding to each projection looseness includes:

[0068] In step S1221, when there are corresponding five or more identical projection loosenesses in the same direction, the Euclidean distance between two adjacent projection loosenesses in the identical multiple projection loosenesses is calculated;

[0069] In step S1222, the center points of the two adjacent projection loosenesses with the smallest Euclidean distance are taken as the first loose center, the center points of the two adjacent projection loosenesses with the largest Euclidean distance are taken as the second loose center, the sampling coordinate point closest to the first loose center among the more than five sampling coordinate points with the same projection looseness is taken as the first spare sampling point, and the sampling coordinate point farthest from the second loose center among the more than five sampling coordinate points with the same projection looseness is taken as the second spare sampling point;

[0070] In step S1223, the center point of the first backup sampling point and the second backup sampling point is used as the first target sampling coordinate point, the first target sampling coordinate point is used as the projection looseness in this direction, and the sampling coordinate points with the same projection looseness in the adjacent direction are connected in sequence to obtain the initial ring corresponding to each projection looseness.

[0071] In one embodiment, in step S122, the method further includes:

[0072] When there are corresponding five or less identical projection loosenesses in the same direction, calculating the Euclidean distance between two adjacent projection loosenesses in the identical multiple projection loosenesses, and calculating the average Euclidean distance of the Euclidean distances;

[0073] Taking the projection looseness closest to the center of the landfill as a reference point, in the direction corresponding to the projection looseness, determine the second target sampling point according to the average Euclidean distance, and use the second target sampling point as the projection looseness in this direction, and connect the sampling coordinate points with the same projection looseness in the adjacent direction in sequence to obtain the initial rings corresponding to each projection looseness.

[0074] In one embodiment, in step S124, the step of determining the contribution value of the maximum Euclidean distance between adjacent initial rings to the initial notch direction in the initial notch direction includes:

[0075] In the initial notch direction, determine the angle between the maximum Euclidean distance between adjacent annular graphs and the initial notch direction, and determine the contribution value of the maximum Euclidean distance corresponding to the initial annular graph to the initial notch direction according to the angle, wherein the contribution value is inversely proportional to the angle;

[0076] In step S124, the step of sequentially determining each initial ring notch point in the initial notch direction according to the contribution value and the corresponding projection looseness includes:

[0077] Calculate the product of the contribution value and the corresponding maximum Euclidean distance, and move the projection looseness corresponding to the initial ring of the innermost circle toward the center of the landfill site by the corresponding product in the initial notch direction to obtain the notch point of the initial ring of the innermost circle;

[0078] In the initial notch direction, the projection looseness corresponding to the initial ring is moved to the notch point corresponding to the previous initial ring by the product corresponding to the initial ring to obtain the notch point corresponding to the initial ring, and so on to determine the notch point of each initial ring.

[0079] In one embodiment, see Figure 4 As shown, in step S14, the step of determining the diffusion azimuth of pollutants according to the looseness notch map and the concentration difference of pollutants in adjacent directions in the groundwater sampling information includes:

[0080] In step S141, the concentration difference of pollutants in adjacent directions in the groundwater sampling information is substituted into the pre-constructed absolute square gradient vector formula to obtain the diffusion trend direction, and the trap direction in the looseness trap map is substituted into the formation dip angle attribute formula to obtain the diffusion formation direction;

[0081] In step S142, according to the diffusion trend direction and the diffusion formation direction, a pollutant structure tensor trace based on absolute square gradient is calculated;

[0082] In step S143, under the constraint of the pollutant structure tensor trace, the diffusion azimuth of the pollutant is determined according to the concentration difference of the pollutant in adjacent directions in the groundwater sampling information.

[0083] In one embodiment, the method further comprises:

[0084] According to a plurality of preset garbage classifications corresponding to the landfill environment and the looseness notch map, classified dumping channels for the landfill environment and the channel orientation of each classified dumping channel corresponding to the looseness notch map are planned, so that corresponding dumping channels, channel gates and channel guiding devices can be set according to the classified dumping channels and the corresponding channel orientations, and the classified dumping channels correspond to the garbage classified dumping areas;

[0085] Obtaining the type of garbage loaded on each garbage transport vehicle entering the landfill environment, and determining the corresponding target classification dumping channel of the garbage transport vehicle according to the type of garbage;

[0086] According to the entry channel of the garbage transport vehicle into the garbage landfill environment and the target classification dumping channel, planning the driving route of the garbage transport vehicle and determining the guidance information of the channel guidance device along the driving route;

[0087] The driving route is sent to the garbage transport vehicle, and the channel guidance device is controlled to display the corresponding guidance information. The garbage transport vehicle is monitored according to the driving route, and when it is determined that the garbage transport vehicle has arrived at the target classification dumping channel, the channel gate corresponding to the target classification dumping channel is controlled to open.

[0088] The embodiment of the present invention further provides a monitoring system for a landfill environment, the system comprising:

[0089] A monitoring terminal, the monitoring terminal being used to perform the monitoring of the landfill environment as described in any one of the aforementioned embodiments;

[0090] A wind vane in communication with the monitoring terminal, the wind vane being used to collect historical wind direction information of the landfill environment over a period of time;

[0091] A water sample collection device is communicatively connected to the monitoring terminal, and is used to collect groundwater sampling information in a corresponding direction.

[0092] In the disclosed embodiment, the monitoring terminal may be configured with a visualization system or connected to a visualization system, so as to generate corresponding visualization monitoring images from the daily average diffusion monitoring data and display them on the user interface.

[0093] Based on the above ideal embodiments of this application, the relevant staff can make various changes and modifications without departing from the technical concept of this application through the above description. The technical scope of this application is not limited to the content in the specification, and its technical scope must be determined according to the scope of the claims.

[0094] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A method for monitoring a landfill environment, It is characterized in that include: Obtaining historical wind direction information of the landfill environment over a period of time in history, wherein the historical wind direction information corresponds to the current season, and determining the soil looseness of the soil of the landfill environment in a three-dimensional coordinate system according to the nitrogen content corresponding to the landfill environment; According to the soil looseness and the historical wind direction information, a looseness trap map is constructed, wherein the trap direction of the lobe of the looseness trap map is related to the direction of the maximum soil looseness; Acquiring groundwater sampling information collected in multiple directions, wherein the multiple directions have a one-to-one correspondence with garbage classification dumping areas of the landfill site; Determine the diffusion azimuth of the pollutants according to the looseness notch map and the concentration difference of the pollutants in adjacent directions in the groundwater sampling information, and determine the linear seepage rate of the pollutants corresponding to the diffusion azimuth according to the hydraulic gradient of the landfill site and the concentration difference of the pollutants in adjacent directions; According to the diffusion azimuth and the linear seepage rate, daily average diffusion monitoring data for the landfill site environment is generated, and the daily average diffusion monitoring data is imported into a preset visualization system so that the preset visualization system generates corresponding visualization monitoring screens according to each daily average diffusion monitoring data.

2. The method for monitoring the landfill environment according to claim 1, It is characterized in that The step of constructing a looseness trap map according to the soil looseness and the historical wind direction information comprises: For each sampling coordinate point at a three-dimensional coordinate position, the soil looseness is mapped from the three-dimensional coordinate space to the two-dimensional coordinate space to obtain the projection looseness of the sampling coordinate point with the same horizontal coordinate and vertical coordinate in the two-dimensional coordinate space; Connecting the sampling coordinate points with the same projection looseness in adjacent directions in sequence to obtain initial rings corresponding to the projection looseness; Starting from the innermost initial ring, determining the maximum Euclidean distance between adjacent initial rings, and using the historical wind direction in the historical wind direction information as the initial trap direction; In the initial notch direction, determine the contribution value of the maximum Euclidean distance between adjacent initial rings to the initial notch direction, and based on the contribution value and the corresponding projection looseness, determine the notch points of each initial ring in turn in the initial notch direction, and construct the looseness notch map based on the initial rings and the notch points.

3. The method for monitoring the landfill environment according to claim 2, It is characterized in that The step of sequentially connecting the sampling coordinate points with the same projection looseness in adjacent directions to obtain the initial rings corresponding to the projection looseness comprises: When there are corresponding five or more identical projection loosenesses in the same direction, calculating the Euclidean distance between two adjacent projection loosenesses in the identical multiple projection loosenesses; The center points of the two adjacent projection looseness with the smallest Euclidean distance are taken as the first loose center, the center points of the two adjacent projection looseness with the largest Euclidean distance are taken as the second loose center, the sampling coordinate point closest to the first loose center among the more than five sampling coordinate points with the same projection looseness is taken as the first spare sampling point, and the sampling coordinate point farthest from the second loose center among the more than five sampling coordinate points with the same projection looseness is taken as the second spare sampling point; The center point of the first spare sampling point and the second spare sampling point is taken as the first target sampling coordinate point, the first target sampling coordinate point is taken as the projection looseness in this direction, and the sampling coordinate points with the same projection looseness in the adjacent direction are connected in sequence to obtain the initial ring corresponding to each projection looseness.

4. The method for monitoring the landfill environment according to claim 3, It is characterized in that The method comprises: When there are corresponding five or less identical projection loosenesses in the same direction, calculating the Euclidean distance between two adjacent projection loosenesses in the identical multiple projection loosenesses, and calculating the average Euclidean distance of the Euclidean distances; Taking the projection looseness closest to the center of the landfill as a reference point, in the direction corresponding to the projection looseness, determine the second target sampling point according to the average Euclidean distance, and use the second target sampling point as the projection looseness in this direction, and connect the sampling coordinate points with the same projection looseness in the adjacent direction in sequence to obtain the initial rings corresponding to each projection looseness.

5. The method for monitoring the landfill environment according to claim 2, It is characterized in that The step of determining the contribution value of the maximum Euclidean distance between adjacent initial rings to the initial notch direction in the initial notch direction comprises: In the initial notch direction, determine the angle between the maximum Euclidean distance between adjacent annular graphs and the initial notch direction, and determine the contribution value of the maximum Euclidean distance corresponding to the initial annular graph to the initial notch direction according to the angle, wherein the contribution value is inversely proportional to the angle; The step of determining each initial annular notch point in the initial notch direction in sequence according to the contribution value and the corresponding projection looseness comprises: Calculate the product of the contribution value and the corresponding maximum Euclidean distance, and move the projection looseness corresponding to the initial ring of the innermost circle toward the center of the landfill site by the corresponding product in the initial notch direction to obtain the notch point of the initial ring of the innermost circle; In the initial notch direction, the projection looseness corresponding to the initial ring is moved to the notch point corresponding to the previous initial ring by the product corresponding to the initial ring to obtain the notch point corresponding to the initial ring, and so on to determine the notch point of each initial ring.

6. The method for monitoring the landfill environment according to claim 1, It is characterized in that The step of determining the diffusion azimuth of pollutants according to the looseness notch map and the concentration difference of pollutants in adjacent directions in the groundwater sampling information comprises: Substituting the concentration difference of pollutants in adjacent directions in the groundwater sampling information into a pre-constructed absolute square gradient vector formula to obtain the diffusion trend direction, and substituting the trap direction in the looseness trap map into the formation dip angle attribute formula to obtain the diffusion formation direction; According to the diffusion trend direction and the diffusion stratum direction, a pollutant structure tensor trace based on absolute square gradient is calculated; Under the constraint of the pollutant structure tensor trace, the diffusion azimuth of the pollutant is determined according to the concentration difference of the pollutant in adjacent directions in the groundwater sampling information.

7. The method for monitoring the landfill environment according to any one of claims 1 to 6, It is characterized in that The method further comprises: According to a plurality of preset garbage classifications corresponding to the landfill environment and the looseness notch map, classified dumping channels for the landfill environment and the channel orientation of each classified dumping channel corresponding to the looseness notch map are planned, so that corresponding dumping channels, channel gates and channel guiding devices can be set according to the classified dumping channels and the corresponding channel orientations, and the classified dumping channels correspond to the garbage classified dumping areas; Obtaining the type of garbage loaded on each garbage transport vehicle entering the landfill environment, and determining the corresponding target classification dumping channel of the garbage transport vehicle according to the type of garbage; According to the entry channel of the garbage transport vehicle into the garbage landfill environment and the target classification dumping channel, planning the driving route of the garbage transport vehicle and determining the guidance information of the channel guidance device along the driving route; The driving route is sent to the garbage transport vehicle, and the channel guidance device is controlled to display the corresponding guidance information. The garbage transport vehicle is monitored according to the driving route, and when it is determined that the garbage transport vehicle has arrived at the target classification dumping channel, the channel gate corresponding to the target classification dumping channel is controlled to open.

8. A landfill environment monitoring system, It is characterized in that The system comprises: A monitoring terminal, the monitoring terminal being used to perform the monitoring of the landfill environment as claimed in any one of claims 1 to 7; A wind vane in communication with the monitoring terminal, the wind vane being used to collect historical wind direction information of the landfill environment over a period of time; A water sample collection device is communicatively connected to the monitoring terminal, and is used to collect groundwater sampling information in a corresponding direction.