A method for implementing energy monitoring in vibroflotation construction

By monitoring energy consumption during the vibrating construction phase and performing data adjustments, the problem of poor energy management in the existing technology is solved, and construction efficiency and hole-making efficiency are improved.

CN115628772BActive Publication Date: 2025-03-07四川华能泸定水电有限公司 +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202211088589.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-09-07
Publication Date
2025-03-07
Estimated Expiration
2042-09-07

AI Technical Summary

Technical Problem

In the prior art, it is difficult to effectively monitor and manage energy consumption during vibration impulse construction, resulting in low construction efficiency.

Method used

By obtaining the water pressure, water volume, electricity volume, air pressure and gas volume in the vibrating construction stage, the consumption of each energy is determined, and the energy preset amount of the second stage is adjusted based on these data to achieve energy management.

Benefits of technology

The energy management efficiency of vibration construction is improved, the hole-making efficiency is steadily increased, and the construction efficiency is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115628772B_ABST
    Figure CN115628772B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of building construction technology, and specifically to an implementation method for energy monitoring of vibro-compacting construction, comprising the following steps: S1, obtaining the water pressure and water volume of water used in the first vibro-compacting construction stage, the electricity used, and the air pressure and air volume used; S2, determining the amount of each energy consumed in the first vibro-compacting construction stage based on the water pressure, water volume, electricity used, air pressure and air volume; S3, obtaining the preset amount of each energy in the second vibro-compacting construction stage; and the amount of each energy consumed in the first vibro-compacting construction stage; S4, adjusting the preset amount of each energy in the second vibro-compacting construction stage; the present invention collects data by using sensors in a vibro-compactor, a power supply device and a high-pressure water supply device to determine the energy consumption of the vibro-compactor and the actual situation of the stratum at the depth of the vibro-compactor when making a hole, and makes corresponding adjustments to the equipment according to the vibro-compactor depth and the hole-making speed, thereby steadily increasing the hole-making efficiency and greatly improving the construction efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of building construction, and more specifically, to an implementation method for energy monitoring in vibro-impact construction. Background Art

[0002] Vibroflotation, also known as vibration water flushing, is a foundation reinforcement method developed based on the principle that sandy soil foundations can be compacted by adding water and vibration. Later, it was used to set vibroflotation replacement gravel piles in clay layers. Vibroflotation is a foundation reinforcement treatment method to improve poor foundations to meet the foundation requirements of buildings (structures). The method used in vibroflotation construction is vibroflotation. Brief description of the invention

[0003] 1. Technical problems to be solved

[0004] In view of the problems existing in the prior art, the purpose of the present invention is to provide an implementation method for energy monitoring of vibroflotation construction, which has the advantage that it can better monitor the energy consumption during vibroflotation construction and control each device through the monitoring data, so as to achieve good energy management.

[0005] 2. Technical solution

[0006] To solve the above problems, the present invention adopts the following technical solutions.

[0007] A method for implementing energy monitoring of vibroflotation construction comprises the following steps:

[0008] S1. Obtain the water pressure and water volume, the electricity consumption, and the gas pressure and gas volume used in the first vibroflotation construction stage;

[0009] S2. Determine the amount of each energy consumed in the first vibroflotation construction stage based on the water pressure, water volume, electricity, air pressure and air volume;

[0010] S3, obtaining the preset amount of each energy source in the second vibro-construction stage; and the amount of each energy source consumed in the first vibro-construction stage;

[0011] S4. Based on the amount of each energy consumed in the first vibro-flotation construction stage, adjusting the preset amount of each energy in the second vibro-flotation construction stage.

[0012] Optionally, the water pressure and water volume, electricity consumption, and gas pressure and gas volume used in the first vibroflotation construction stage may include:

[0013] The sum of water consumption, electricity consumption and gas consumption of each construction unit during the first vibro-flotation construction stage.

[0014] Optionally, the power supply device is used to control the power consumed in the first and second vibro-impact construction stages, and the sensors provided in the power supply device include a voltage sensor for monitoring the power supply voltage and a current sensor for monitoring the power supply current;

[0015] The high-pressure water supply device is used to control the amount of water consumed in the first and second vibroflotation construction stages, and the sensors arranged in the high-pressure water supply device include a pressure sensor for monitoring the water pressure and a flow sensor for monitoring the water amount;

[0016] The high-pressure air supply device is used to control the amount of air consumed in the first and second vibro-impact construction stages, and the sensor in the high-pressure water supply device includes an air pressure sensor for monitoring the air pressure and an air flow sensor for monitoring the air volume;

[0017] The voltage sensor, current sensor, pressure sensor, flow sensor, air pressure sensor, air flow sensor, vibro-voltage sensor, and vibro-current sensor are all connected to the host.

[0018] Optionally, the water pressure and water volume of water used in the first vibroflotation construction stage, the amount of electricity used, and the pressure and gas volume of gas used in step S1 include:

[0019] The sensing data of the voltage sensor, current sensor, pressure sensor, flow sensor, air pressure sensor, and airflow sensor are obtained, and based on the sensing data, the water pressure and water volume, the electricity consumption, and the air pressure and gas volume used in the first vibro-impact construction phase are determined.

[0020] Optionally, further including:

[0021] The depth and hole-making speed of the construction unit in the first vibro-flotation construction phase are obtained, and a relationship between the depth and hole-making speed and the amount of each energy consumed is established.

[0022] Optionally, a motion sensor for monitoring the vibration depth and hole-making speed in the first and second vibration construction stages, a vibration voltage sensor for monitoring the operating voltage of the construction unit, and a vibration current sensor for monitoring the operating current of the vibrator are provided inside the construction unit.

[0023] Optionally, sensing data of the motion sensor is acquired, and based on the sensing data, the depth and hole-making speed of the construction unit in the first vibro-flotation construction phase are determined.

[0024] Optionally, in step S4, adjusting the preset amount of each energy source in the second vibro-construction stage based on the amount of each energy source consumed in the first vibro-construction stage includes:

[0025] Based on the depth and hole-making speed of the second vibro-construction construction unit, combined with the relationship between the depth and hole-making speed and the amount of each energy consumed, the working voltage and current of the construction unit are adjusted based on the vibro-construction voltage sensor and the vibro-construction current sensor.

[0026] Optionally, during the first and second vibration construction stages, the high-pressure water supply device is controlled by the host computer, and the frequency and pressure of the high-pressure water supply device are preset according to a depth preset given curve.

[0027] 3. Beneficial effects

[0028] Compared with the prior art, the advantages of the present invention are:

[0029] (1) This scheme reasonably uses sensors in the vibrator, power supply device and high-pressure water supply device to collect data, and integrates and processes the data through the host, so as to determine the energy consumption of the vibrator and the actual situation of the stratum at the depth of the vibrator during drilling. According to the depth of the vibrator and the drilling speed, the equipment is adjusted accordingly, the drilling efficiency is steadily increased, and the construction efficiency is greatly improved.

[0030] (2) After a point construction is carried out, the host can control the high-pressure water supply device to preset the frequency and pressure of the high-pressure water supply device according to the depth preset given curve, and can also simultaneously realize the frequency conversion and voltage conversion wireless control of the high-pressure water pump.

[0031] (3) The water flow rate is measured by the rotation speed of the rotor. The motion sensor may include a GPS module, a distance sensor, a gyroscope, etc., which is mainly used to monitor the hole-making speed of the vibrator. The air pressure and air flow rate of the high-pressure air supply device during use are collected through the air pressure sensor and the air flow sensor. Then, the equipment can be adjusted accordingly according to the vibrator depth and hole-making speed, thereby steadily increasing the hole-making efficiency.

[0032] (4) The output energy of the vibrator at different depths can be preset by collecting the data, thereby realizing the automatic operation of the vibrator and greatly improving the construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0034] Figure 1 It is a schematic flow chart of the implementation method of the vibro-construction energy monitoring of the present invention;

[0035] Figure 2This is a system module diagram of the present invention. DETAILED DESCRIPTION

[0036] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0037] See also Figure 1 The present invention provides a method for implementing energy monitoring of vibroflotation construction, comprising the following steps:

[0038] S1. Obtain the water pressure and water volume, the electricity consumption, and the gas pressure and gas volume used in the first vibroflotation construction stage;

[0039] The water pressure and water volume, the electricity consumption, and the gas pressure and gas volume used in the first vibroflotation construction stage are obtained in step S1, including:

[0040] Acquire sensor data of the voltage sensor, current sensor, pressure sensor, flow sensor, air pressure sensor, and air flow sensor, and determine the water pressure and water volume, electricity consumption, and air pressure and air volume of the first vibroflotation construction phase based on the sensor data;

[0041] The water pressure and water volume, electricity consumption, and gas pressure and gas volume used in the first vibroflotation construction stage may include:

[0042] In the first vibro-construction stage, the total water consumption, electricity consumption and gas consumption of each construction unit (such as vibro-construction piles in vibro-construction) is calculated.

[0043] The power supply device is used to control the amount of electricity consumed in the first and second vibro-impact construction stages. The sensors arranged in the power supply device include a voltage sensor for monitoring the power supply voltage and a current sensor for monitoring the power supply current.

[0044] The high-pressure water supply device is used to control the amount of water consumed in the first and second vibration construction stages. The sensors arranged in the high-pressure water supply device include a pressure sensor for monitoring the water pressure and a flow sensor for monitoring the water amount.

[0045] The high-pressure air supply device is used to control the amount of air consumed in the first and second vibro-impact construction stages, and the sensors in the high-pressure water supply device include an air pressure sensor for monitoring the air pressure and an air flow sensor for monitoring the air volume.

[0046] The voltage sensor, current sensor, pressure sensor, flow sensor, air pressure sensor, air flow sensor, vibro-voltage sensor, and vibro-current sensor are all connected to the host.

[0047] Through external sensors and the host, the water pressure, air pressure, airflow, water volume, voltage, current and no-load current of the vibrator are monitored to see if they are normal. During the operation of the power supply device and the high-pressure water supply device, the current sensor and voltage sensor inside the power supply device will send the operating current and voltage data of the power supply device to the host. The water pressure sensor and flow sensor in the high-pressure water supply device will send the water pressure and water flow data during the operation of the high-pressure water supply device to the host, and collect and determine the amount of each energy consumed in the first vibratory construction stage.

[0048] In some embodiments, the solution further includes obtaining the depth and hole-making speed of the construction unit in the first vibration construction stage, and establishing a relationship between the depth and hole-making speed and the amount of each energy consumed.

[0049] S2. Determine the amount of each energy consumed in the first vibroflotation construction stage based on the water pressure, water volume, electricity, air pressure and air volume;

[0050] The host is connected with the vibrator, the high-pressure water supply device, the high-pressure air supply device and the power supply device, and the vibrator, the high-pressure water pump of the high-pressure water supply device and the power supply device are used to control the power supply box through the host;

[0051] In the first vibration construction stage, when the vibrator has not penetrated, the main engine is used to control the high-pressure water supply device to increase the water supply frequency and pressure.

[0052] See also Figure 2 The voltage, current, pressure, flow, air pressure and airflow in the first and second construction of the construction unit are detected through voltage sensors, current sensors, pressure sensors, flow sensors, air pressure sensors and airflow sensors, and the construction unit can also realize detection by motion sensors, vibro-surge voltage sensors and vibro-surge current sensors.

[0053] For example, during the operation of the vibrator to make a hole, the motion sensor will transmit the real-time depth data of the vibrator and the real-time hole-making speed data of the vibrator to the host, and the voltage sensor and current sensor inside the vibrator will transmit the voltage and current data of the vibrator during operation to the host. During the operation of the vibrator, the host will compare and calculate the operating current and voltage data of the power supply device with the voltage and current data during operation according to the mechanical energy conservation formula: Ek1+Ep1=Ek2+Ep2, that is, the power output of the power supply device = the power consumed by the vibrator +The work done by the vibrator on the soil is used to calculate the energy consumed by the vibrator in its operation. The energy required for hole making at this depth is calculated based on the vibrator depth data transmitted by the motion sensor and recorded. When the output voltage and current of the power supply device and the output water pressure and water flow of the high-pressure water supply device remain unchanged, the hole making speed of the vibrator is relatively fast. The output voltage and current of the power supply device are reduced through the host control so that the output water pressure and water flow of the high-pressure water supply device remain unchanged. The hole making speed of the vibrator is still relatively fast, which means that the soil at this depth is relatively loose. The output water pressure and water flow of the high-pressure water supply device should be reduced through the host control to keep the hole-making speed of the vibrator between 2.5m / min and 3m / min. When the output voltage and current of the power supply device and the output water pressure and water flow of the high-pressure water supply device remain unchanged, the hole-making speed of the vibrator is slow. The output voltage and current of the power supply device are increased through the host control to keep the output water pressure and water flow of the high-pressure water supply device unchanged. The hole-making speed of the vibrator is still slow, which means that the soil at this depth is relatively compact. At this time, the high-pressure water supply should be increased through the host control. The output water pressure and water flow of the water device are used to keep the hole-making speed of the vibrator between 2.5m / min and 3m / min. If the hole-making speed of the vibrator is still slow when the output water pressure and water flow of the high-pressure water supply device are increased to keep the output voltage and current of the power supply device unchanged, it means that the stratum at this depth may have rocks that prevent the vibrator from making holes. The output power of the power supply device and the high-pressure water supply device is controlled by the host, and then the output power of the power supply device and the high-pressure water supply device is adjusted accordingly according to the vibrator depth and hole-making speed, thereby stably increasing the hole-making efficiency;

[0054] S3, obtaining the preset amount of each energy source in the second vibro-construction stage; and the amount of each energy source consumed in the first vibro-construction stage;

[0055] After the first vibro-flotation construction phase, the host is used to control the high-pressure water supply device, and the frequency and pressure of the high-pressure water supply device are preset according to the depth preset given curve. At the same time, the frequency conversion and voltage conversion of the high-pressure water pump are controlled wirelessly;

[0056] S4. Based on the amount of each energy consumed in the first vibro-flotation construction stage, the preset amount of each energy in the second vibro-flotation construction stage is adjusted. Specifically, the adjustment can be based on factors such as geological characteristics.

[0057] The construction unit is provided with a motion sensor for monitoring the vibrothelium depth and hole-making speed in the first and second vibrothelium construction stages, a vibrothelium voltage sensor for monitoring the operating voltage of the construction unit, and a vibrothelium current sensor for monitoring the operating current of the vibrothelium. The sensing data of the motion sensor is obtained, and the depth and hole-making speed of the construction unit in the first vibrothelium construction stage are determined based on the sensing data.

[0058] In step S4, adjusting the preset amount of each energy source in the second vibro-construction stage based on the amount of each energy source consumed in the first vibro-construction stage includes:

[0059] Based on the depth and hole-making speed of the second vibro-construction construction unit, combined with the relationship between the depth and hole-making speed and the amount of each energy consumed, the working voltage and current of the construction unit are adjusted based on the vibro-construction voltage sensor and the vibro-construction current sensor.

[0060] During the first and second vibro-impact construction stages, the high-pressure water supply device is controlled by the host, and the frequency and pressure of the high-pressure water supply device are preset according to the depth preset given curve.

[0061] Exemplarily, the energy required for punching hole 1 in the first vibro-impacting construction stage and punching hole 2 in the second vibro-impacting construction stage is obtained, and the power of the control appliance is 45KW, the rated current is 86A, the rated voltage is 380V+10% of three-phase AC, the rated frequency is 50HZ, the compaction current is 50A, the rated power of the water pump motor is 22KW, the water pressure during hole forming is 0.3-0.5MP, and the water pressure during hole forming is 0.5-0.8MP. The power supply device is used to control the amount of electricity consumed during the vibro-impacting construction stage. Several bypasses are arranged in the power supply device. The sensors arranged in the power supply device include a voltage sensor for monitoring the power supply voltage of the power supply box and a current sensor for monitoring the power supply current of the power supply box; the high-pressure water supply device is used to control the amount of water consumed during the vibro-impacting construction stage. The sensors in the high-pressure water supply device include a pressure sensor for monitoring water pressure and a flow sensor for monitoring water volume; the high-pressure air supply device is used to control the amount of air consumed during the vibratory construction phase. The sensors in the high-pressure water supply device include a pressure sensor for monitoring air pressure and an air flow sensor for monitoring air volume; the vibrator is equipped with a motion sensor for monitoring the hole-making speed and depth of the vibrator, a voltage sensor for monitoring the operating voltage of the vibrator, and a current sensor for monitoring the operating current of the vibrator; all sensors are wirelessly connected to the host. The voltage sensor refers to a sensor that can sense the measured voltage and convert it into a usable output signal. The two voltage sensors are LV1000 / SP13, which use the closed loop (compensation) of the Hall principle and comply with UL 94-V0 standard insulating shell, current sensor refers to the information that can sense the measured current, and can transform the information sensed by the monitoring into an electrical signal or other required form of information output that meets certain standards according to certain rules. The two current sensor models are ACS759LCB-100B-PFF-T. The working principle of the water pressure sensor is that the pressure of the measured water pressure directly acts on the diaphragm of the sensor, causing the diaphragm to produce a micro-displacement proportional to the water pressure, causing the resistance value of the sensor to change. The model of the water pressure sensor is KGYL-002, and the flow sensor model is DN200. The water flow rotor assembly is mainly composed of a turbine switch shell, a magnetic rotor, and a brake ring. When the water flow switch method is used, its performance is better than the mechanical pressure differential disc structure, and the size is significantly reduced. When the water flows through the turbine switch shell, it drives the magnetic rotor to rotate. When different magnetic poles are close to the Hall element, the Hall element is turned on, and when they leave, the Hall element is disconnected. Thus, the rotor speed can be measured, and the water flow rate can be measured by the rotor speed. The motion sensor can specifically include a GPS module, a distance sensor (such as an ultrasonic radar, a laser radar, etc.), a gyroscope, etc., which are mainly used to monitor the hole-making speed of the vibrator, and the air pressure and air flow of the high-pressure air supply device during use are collected through an air pressure sensor and an air flow sensor;

[0062] After a point construction is carried out, the host can control the high-pressure water supply device to preset the frequency and pressure of the high-pressure water supply device according to the depth preset given curve, and can also synchronously realize the frequency and voltage conversion wireless control of the high-pressure water pump.

[0063] The vibrator and host involved in this embodiment can be freely configured according to the actual application scenario, and the host controls the operation of the vibrator, the high-pressure water supply device and the power supply device using methods commonly used in the prior art.

[0064] The preferred embodiments of the present invention disclosed above are only used to help illustrate the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to the specific implementation methods described. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.

Claims

1. A method for implementing energy monitoring in vibroflotation construction, characterized in that: The following steps are involved: S1. Obtain the water pressure and water volume, the electricity consumption, and the gas pressure and gas volume used in the first vibroflotation construction stage; The water pressure and water volume of water used, the electricity volume used, and the gas pressure and gas volume used in the first vibro-flotation construction stage include: the sum of the water volume, electricity volume, and gas volume used by each construction unit in the first vibro-flotation construction stage; The power supply device is used to control the power consumed in the first and second vibro-impact construction stages, and the sensors arranged in the power supply device include a voltage sensor for monitoring the power supply voltage and a current sensor for monitoring the power supply current; The high-pressure water supply device is used to control the amount of water consumed in the first and second vibroflotation construction stages, and the sensors arranged in the high-pressure water supply device include a pressure sensor for monitoring the water pressure and a flow sensor for monitoring the water amount; The high-pressure air supply device is used to control the amount of air consumed in the first and second vibro-impact construction stages, and the sensor in the high-pressure water supply device includes an air pressure sensor for monitoring the air pressure and an air flow sensor for monitoring the air volume; The construction unit is provided with a motion sensor for monitoring the vibration depth and hole-making speed in the first and second vibration construction stages, a vibration voltage sensor for monitoring the operating voltage of the construction unit, and a vibration current sensor for monitoring the operating current of the vibrator; The voltage sensor, current sensor, pressure sensor, flow sensor, air pressure sensor, air flow sensor, vibro-voltage sensor, and vibro-current sensor are all connected to the host; The water pressure and water volume, the electricity consumption, and the gas pressure and gas volume used in the first vibroflotation construction stage are obtained in step S1, including: Acquire sensor data of the voltage sensor, current sensor, pressure sensor, flow sensor, air pressure sensor, and air flow sensor, and determine the water pressure and water volume, electricity consumption, and air pressure and air volume of the first vibroflotation construction phase based on the sensor data; Through the use of external sensors and the host, the water pressure, air pressure, airflow, water volume, voltage, current and no-load current of the vibrator are monitored to see if they are normal. During the operation of the power supply device and the high-pressure water supply device, the current sensor and voltage sensor inside the power supply device will send the operating current and voltage data of the power supply device to the host. The water pressure sensor and flow sensor inside the high-pressure water supply device will send the water pressure and water flow data during the operation of the high-pressure water supply device to the host, and collect and determine the amount of each energy consumed in the first vibratory construction stage; S2. Determine the amount of each energy consumed in the first vibroflotation construction stage based on the water pressure, water volume, electricity, air pressure and air volume; The voltage, current, pressure, flow, air pressure and air flow in the first construction and the second construction of the construction unit are detected by means of a voltage sensor, a current sensor, a pressure sensor, a flow sensor, an air pressure sensor and an air flow sensor; Specifically: during the operation of the vibrator to make a hole, the motion sensor will transmit the real-time depth data of the vibrator and the real-time hole-making speed data of the vibrator to the host, and the voltage sensor and current sensor inside the vibrator will transmit the voltage and current data of the vibrator during operation to the host. During the operation of the vibrator, the host will compare and calculate the operating current and voltage data of the power supply device with the voltage and current data during operation. According to the law of conservation of mechanical energy, that is, the power output of the power supply device = the power consumed by the vibrator + the work done by the vibrator on the soil, the energy consumed by the vibrator in doing work on the soil during operation is calculated, and then the energy required for making a hole at this depth is calculated based on the depth data of the vibrator transmitted by the motion sensor, and recorded; S3, obtaining the preset amount of each energy source in the second vibro-construction stage and the amount of each energy source consumed in the first vibro-construction stage; After the first vibro-flotation construction phase, the host is used to control the high-pressure water supply device, and the frequency and pressure of the high-pressure water supply device are preset according to the depth preset given curve. At the same time, the frequency conversion and voltage conversion of the high-pressure water pump are controlled wirelessly; S4. Based on the amount of each energy consumed in the first vibro-flotation construction stage, adjusting the preset amount of each energy in the second vibro-flotation construction stage; In step S4, adjusting the preset amount of each energy source in the second vibroflotation construction stage based on the amount of each energy source consumed in the first vibroflotation construction stage includes: adjusting the working voltage and current of the construction unit based on the vibroflotation voltage sensor and the vibroflotation current sensor, based on the depth and hole-making speed of the second vibroflotation construction unit, in combination with the relationship between the depth and hole-making speed and the amount of each energy source consumed; The method further comprises: Acquire sensor data from the motion sensor, and determine the depth and hole-making speed of the construction unit in the first vibro-flotation construction phase based on the sensor data; The depth and hole-making speed of the construction unit in the first vibro-flotation construction phase are obtained, and a relationship between the depth and hole-making speed and the amount of each energy consumed is established.

2. The implementation method of energy monitoring in vibroflotation construction according to claim 1, characterized in that: During the first and second vibro-impact construction stages, the high-pressure water supply device is controlled by the host computer, and the frequency and pressure of the high-pressure water supply device are preset according to the depth preset given curve.