Prefabricated overhead structure and construction method of expressway in high-intensity permafrost area
By adopting the prefabricated overhead structure of highways in high-intensity permafrost areas in the construction of highway bridges on the Qinghai-Tibet Plateau, combined with pile foundations, pressure-bearing plates, hollow box components and asphalt concrete pavements, the protection of frozen soil and earthquake resistance are solved. Solving the problem of insufficient performance, the stability of the structure and the seismic performance are improved.
Patent Information
- Application Number
- CN202211225261.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-10-09
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2042-10-09
AI Technical Summary
In the permafrost areas of the Qinghai-Tibet Plateau, highway bridge construction faces the problem of insufficient protection of the permafrost layer and insufficient seismic performance. Especially in high-intensity earthquake areas, it is difficult to design a structure that can both protect the permafrost layer and withstand the impact of earthquakes with existing technology. bridge structure.
Adopt a prefabricated overhead structure for highways in high-severity permafrost areas, including pile foundations, pressure-bearing plates, hollow box components and rafts. The pile foundation and hollow box component layer are formed by splicing prefabricated units, combined with asphalt concrete paving. layer, design seismic bearings and reserved connecting steel bars to form an integrated structure to improve seismic performance.
This structure can effectively reduce the settlement caused by the melting of frozen soil, avoid the risk of overall falling beams and collapse during major earthquakes, adapt to the construction conditions in alpine areas, ensure the safety and reliability of the quality of stress-bearing components, and carry out assembly construction through assembly methods. Improve seismic performance.
Smart Images

Figure CN115680005B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of highway assembly construction, and in particular to an assembled overhead structure of a highway in a high-intensity permafrost region and a construction method thereof. Background Art
[0002] Among the expressway networks currently planned in my country, only the last section of the G6 Beijing-Tibet Expressway, the Golmud-Lhasa section, has not yet been completed. Due to the special geographical and climatic conditions of the Qinghai-Tibet Plateau, the design route crosses a permafrost zone of about 400 kilometers. This special geological condition still makes the Beijing-Tibet Expressway face the difficulty of how to build it.
[0003] In actual engineering, the permafrost layer under the roadbed is cooled by regulating convection, radiation or conduction, or by comprehensive regulation, but diseases may still occur. In order to prevent the heat absorbed by the black road surface through thermal radiation from being transferred to the frozen soil roadbed, engineering researchers proposed a "bridge instead of road" response plan. At present, the main forms of the superstructure of the built highway bridges are prestressed concrete small box beams, prestressed concrete T beams, and prestressed concrete hollow slabs. The lower structure uses pile foundations to transfer the load of the superstructure to the foundation. However, the bridge construction plan in the frozen soil area of the Qinghai-Tibet Plateau requires not only special design of the pile foundation, but also effective seismic measures to resist earthquakes. On May 22, 2021, a magnitude 7.4 earthquake occurred in Maduo County, Qinghai, resulting in the damage of many bridges. The displacement of the main beam along the longitudinal bridge direction was too large, exceeding the shear deformation capacity of the support, resulting in beam fall damage. According to the China Earthquake Motion Parameter Zoning Map, the Qinghai-Tibet Expressway is located in a high-intensity area, with a seismic fortification level of VII to IX, of which 55.9% are in the VIII zone and 14.3% in the IX zone. Insufficient seismic measures may lead to failure of the bridge structure.
[0004] Therefore, it is necessary to design new overhead bridge structures that can adapt to the special conditions of permafrost areas, protect the frozen soil layer, and resist the impact of earthquake damage in high-intensity areas. Summary of the invention
[0005] The purpose of the present invention is to provide an assembled overhead structure and construction method for a highway in a high-intensity permafrost area, so as to at least solve the problem of protecting the frozen soil layer and resisting the impact of earthquake damage in high-intensity areas.
[0006] In order to achieve the above object, the technical solution adopted by the present invention is:
[0007] Prefabricated overhead structures of expressways in high-intensity permafrost areas, the structures comprising pile foundations, bearing plates and hollow box-type components;
[0008] The pressure bearing plate is located on the top of the pile foundation, and a plurality of convex strips perpendicular to the line direction are arranged on the pressure bearing plate;
[0009] The hollow box-shaped member is in the shape of a square tube, and has grooves arranged along its length at the bottom;
[0010] A plurality of hollow box-type components are arranged on the top of the pressure plate, in a direction perpendicular to the line, and close to each other along the line direction; the convex strips on the top of the pressure plate are inserted into the grooves on the bottom of the hollow box-type components.
[0011] Further, the structure also includes an integration layer;
[0012] The top of the hollow box-shaped member is provided with convex strips arranged along the length direction thereof, and concrete is poured above a number of the hollow box-shaped members to form the integrated layer;
[0013] The top of the integrated layer is a plane, and the bottom forms convex strips arranged in a direction perpendicular to the circuit.
[0014] Furthermore, the structure further comprises a raft plate and a support, wherein the raft plate and the support are arranged between the bearing plate and the pile foundation;
[0015] The raft slab is arranged on the top of the pile foundation, and the support is arranged on the top of the raft slab and supports the pressure plate.
[0016] Furthermore, the structure also includes an asphalt concrete pavement layer, and the asphalt concrete pavement layer is arranged on the top of the integrated layer.
[0017] Further, the raft comprises a plurality of prefabricated units, and the plurality of prefabricated units are arranged along a line direction;
[0018] A sunken groove is arranged in the center of the top of the pile foundation;
[0019] The joints of adjacent prefabricated units are arranged perpendicular to the line direction and correspond to the pile foundation up and down; concrete is poured in the joints of adjacent prefabricated units and the grooves on the top of the pile foundation, so as to splice the adjacent prefabricated units and the pile foundation into one.
[0020] Furthermore, the pressure plates are arranged along the line direction, and the joints of adjacent pressure plates are spliced by pouring concrete.
[0021] Furthermore, a splicing block is provided between the end of the hollow box-type component and the pressure plate.
[0022] Furthermore, the hollow box-shaped member is provided with reserved connecting steel bars;
[0023] The reserved connecting steel bars are arranged on both sides of the bottom groove of the hollow box-shaped member, along the length direction thereof and with the ends exposed;
[0024] The reserved connecting steel bars are also arranged in the top convex strips of the hollow box-type component, arranged perpendicular to the length direction thereof and with the ends exposed.
[0025] On the other hand, a construction method of an assembled overhead structure of a highway in a high-intensity permafrost region as described above is provided, the method comprising:
[0026] Prefabricate the pile foundation and pre-set the groove on the top of the pile foundation;
[0027] precast units of precast rafts;
[0028] Prefabricate the pressure plate and pre-set convex strips on the top of the pressure plate;
[0029] Prefabricate hollow box-shaped components and pre-set grooves at the bottom of the hollow box-shaped components;
[0030] The prefabricated units of the raft slab are hoisted to the top of the pile foundation, and concrete is poured into the joints of adjacent prefabricated units and the grooves on the top of the pile foundation to achieve splicing;
[0031] A support is set at the top of the pile foundation, and the bearing plate is installed to the designed position. The joints of adjacent bearing plates are connected by wet joints.
[0032] The hollow box-shaped member is hoisted to the top of the pressure plate, and the convex strip on the top of the pressure plate is inserted into the groove at the bottom of the hollow box-shaped member.
[0033] Furthermore, the method further comprises:
[0034] When prefabricating hollow box-shaped components, a convex strip is preset on the top of the hollow box-shaped components;
[0035] After the hollow box-type component is hoisted to the top of the pressure plate, concrete is poured above the hollow box-type component to form an integrated layer.
[0036] Compared with the prior art, the present invention has the following beneficial effects:
[0037] Compared with the bridge structure, the overhead structure provided by the present invention adopts a pile-slab foundation, which can reduce the settlement caused by thawing of frozen soil and avoid the risk of overall beam drop and collapse of the structure during a major earthquake. In order to adapt to the unfavorable construction conditions in high-altitude cold areas, an assembly method is adopted for assembly construction to ensure the quality, safety and reliability of the load-bearing components. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, drawings of other embodiments can be obtained based on these drawings without paying creative work.
[0039] Figure 1 This is a cross-sectional layout diagram of an embodiment of the present invention.
[0040] Figure 2 This is a elevational layout diagram of an embodiment of the present invention.
[0041] Figure 3 This is a plan view of the lower structure pile-sheet foundation according to an embodiment of the present invention.
[0042] Figure 4 This is a schematic diagram of assembling the hollow box-type components of the upper structure according to an embodiment of the present invention.
[0043] Figure 5 The figure is a schematic diagram of the connection structure between the pile foundation and the raft according to an embodiment of the present invention.
[0044] Figure 6 A schematic diagram of reserved connecting steel bars for a hollow box-type component according to an embodiment of the present invention.
[0045] In the figure, 1-pile foundation, 2-raft slab, 3-support, 4-pressure plate, 5-hollow box member, 6-integrated layer, 7-joining block, 8-asphalt concrete pavement layer, 9-railing, 10-cast-in-place connection part, 11-pile foundation main reinforcement, 12-reserved connection reinforcement. DETAILED DESCRIPTION
[0046] In order to facilitate the understanding of the present invention, the present invention will be described more fully below with reference to the relevant drawings. The preferred embodiments of the present invention are given in the drawings. However, the present invention can be implemented in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the disclosure of the present invention more thoroughly understood.
[0047] In the description of this patent, it should be understood that the terms "center", "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing this patent and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on this patent.
[0048] In the description of this patent, it should be noted that, unless otherwise clearly specified and limited, the terms "arrange", "connect", "set", etc. should be understood in a broad sense, for example, it can be fixedly connected, set, or detachably connected, set, or integrally connected, set. For ordinary technicians in this field, the specific meanings of the above terms in this patent can be understood according to specific circumstances.
[0049] In a specific implementation, the line direction is defined as the longitudinal direction, and the direction perpendicular to the line direction is defined as the transverse direction, such as Figure 1 The direction from left to right is landscape.
[0050] Embodiment 1:
[0051] This embodiment provides an assembled overhead structure for highways in high-intensity permafrost areas, which is suitable for high-cold permafrost areas with high requirements for seismic fortification intensity. The overhead structure can replace the physical roadbed of the highway and can effectively avoid the heat absorbed by the black road surface from being transferred to the permafrost layer below.
[0052] like Figure 1 and Figure 2 , the structure includes pile foundation 1, raft 2, support 3, pressure plate 4, hollow box-type component 5, integrated layer 6 and asphalt concrete pavement layer 8 from bottom to top. Among them, the pile foundation 1 and the raft 2 constitute the pile-slab foundation. As the lower structure, the raft 2 bears most of the upper vertical load, and the pile foundation 1 bears the effects of earthquakes and other horizontal loads; the upper structure includes the pressure plate 4 and the hollow box-type component 5; the support 3 is arranged between the upper structure and the lower structure, and the support 3 can be a seismic isolation support or a plate rubber support, etc., which can balance the shear force of the upper structure and the lower structure on the raft 2. The position of the support 3 corresponds to the position of the pile foundation 1. The integrated layer 6 is applied above the hollow box-type component 5, and the asphalt concrete pavement layer 8 is laid above the integrated layer 6 as a pavement structure. Railings 9 can be arranged on both sides of the pavement structure, and other auxiliary structures can also be arranged on the pavement structure.
[0053] like Figure 2 and Figure 4 The pressure plate 4 is a prefabricated part, arranged horizontally, and the pressure plate 4 is pre-set with several convex strips perpendicular to the line direction, i.e., transversely, with a height of 10 cm, which are used to position and install the hollow box-type component 5. A transverse groove is formed between adjacent convex strips, and the cross-sections of the convex strips and the grooves are both rectangular. The hollow box-type component 5 is a prefabricated part, in the shape of a square tube, and a groove arranged along its length is provided at the bottom. The cross-section of the groove at the bottom of the hollow box-type component 5 is rectangular, which matches the shape of the top convex strip of the pressure plate 4. Several hollow box-type components 5 can be hoisted to the top of the pressure plate 4, arranged transversely along the line direction, and close to each other longitudinally along the line direction without leaving any gap. The top convex strip of the pressure plate 4 is inserted into the bottom groove of the hollow box-type component 5. In other embodiments, the cross-section of the convex strip at the top of the pressure plate 4 can also adopt other shapes, such as an isosceles trapezoid with a small top and a large bottom, and the groove at the top of the pressure plate 4 and the groove at the bottom of the hollow box-type component 5 are also changed accordingly.
[0054] like Figure 2, an integrated layer 6 is arranged above the hollow box-shaped member 5, and the integrated layer 6 is a cast-in-place structure and is arranged horizontally. The top of the hollow box-shaped member 5 is also provided with convex strips arranged along its length direction, and the cross section of the convex strips is rectangular. After a number of hollow box-shaped members 5 are arranged closely together longitudinally, a transverse groove is formed between the top convex strips of adjacent hollow box-shaped members 5, and the cross section of the groove is also rectangular. Concrete is poured on the top of the several hollow box-shaped members 5 to form an integrated layer 6. The top of the cast integrated layer 6 is a plane, and the bottom is formed with convex strips arranged transversely along the line direction perpendicular to the top structure of the hollow box-shaped member 5, and the cross section of the convex strips is rectangular. In other embodiments, the cross section of the convex strips on the top of the hollow box-shaped member 5 can also be of other shapes. Since the integrated layer 6 is a cast-in-place structure, there is no restriction on the cross-sectional shape of the convex strips on the top of the hollow box-shaped member 5. Since a groove structure is formed on the top after a number of hollow box-shaped members 5 are arranged closely together longitudinally, the integrated layer 6 formed by pouring concrete can effectively connect the hollow box-shaped members 5. The thickness of the integration layer 6 on the hollow box-shaped component 5 is 7 cm.
[0055] like Figure 2 and Figure 3 , the raft 2 is arranged on the top of the pile foundation 1, and the support 3 is arranged on the top of the raft 2 and supports the pressure plate 4. The pile foundation 1 and the raft 2 are both prefabricated structures. The plane size of the raft 2 matches the design width of the road surface, and a temperature seam is set within a certain length range. The raft 2 includes a number of prefabricated units, and the prefabricated units are arranged longitudinally along the line direction. A sunken groove is arranged in the center of the top of the pile foundation 1, and connecting steel bars are reserved in the groove, and the main reinforcement 11 of the pile foundation in the pile foundation 1 is exposed to a position higher than the raft 2. The splicing seams of adjacent prefabricated units are arranged transversely perpendicular to the line direction and correspond to the pile foundation 1 up and down, and connecting steel bars are also reserved at the ends of the prefabricated units. Concrete is poured in the splicing seams of adjacent prefabricated units and the groove at the top of the pile foundation 1, and the connecting steel bars in the groove at the top of the pile foundation 1 after binding and connection, the main reinforcement 11 of the pile foundation and the connecting steel bars of the prefabricated units are poured therein, so that the adjacent prefabricated units and the pile foundation 1 are spliced into one. Such a segmented design scheme can reduce the scale of the pile-slab foundation.
[0056] In this embodiment, the pile foundations 1 are arranged in two rows longitudinally. In other embodiments, the pile foundations 1 at the bottom of the raft 2 may also be arranged in a matrix or plum blossom arrangement.
[0057] According to previous studies, the thickness of the permafrost active layer of the Qinghai-Tibet Expressway is 1m to 6m, and it increases year by year with time and climate change. Since the raft 2 can share most of the loads transmitted by the upper structure, the pile length is designed to be about 5m after penetrating the active layer. The main function of the pile foundation 1 is to provide horizontal constraints on the structure, and damage is not allowed during earthquakes. The diameter and number of the pile foundation 1 can be designed according to the horizontal earthquake action.
[0058] In this embodiment, the thickness of the raft 2 ranges from 25cm to 35cm, and the concrete grade should not be lower than C30. The width of the pile-slab foundation matches the designed width of the road surface. The width of the raft 2 is 12m, the length of the prefabricated unit of the raft 2 is 4.5m, and the cast-in-place connection part is 1m wide. The raft 2 is provided with a 2cm wide temperature seam every 100m along the centerline of the road. The spacing of the pile foundation 1 along the driving direction is 10m, and the pile length ranges from 8m to 12m. The number and reinforcement of the pile foundation 1 are designed according to the response spectrum method and time history analysis method in the seismic design.
[0059] In this embodiment, a seismic isolation bearing or a plate-type rubber bearing is arranged at the position of the top of the raft 2 corresponding to the pile foundation 1. The seismic isolation bearing is arranged at the center line position of the raft 2 perpendicular to the driving direction, and the plate-type rubber bearing is arranged at the rest of the positions. The seismic isolation effect should ensure that the ultimate bearing capacity of the lower pile foundation meets the requirements under the action of the E2 earthquake.
[0060] In this embodiment, since the pressure plate 4 is the main load-bearing member, the concrete grade is not less than C40, and it should be able to bear the bending moment and shear force transmitted by the upper structure, and the thickness of the pressure plate 4 ranges from 30cm to 35cm. The hollow box-type component 5 is hoisted and placed on the prefabricated pressure plate, and its height can be adjusted according to the route elevation, with a height range of 80cm to 150cm, a top plate thickness of 25cm, and a bottom plate and a web plate thickness of 10cm.
[0061] Similarly, the pressure-bearing plates 4 may also adopt a partitioned design scheme like the raft plate 2 . The pressure-bearing plates 4 are arranged longitudinally along the line direction. Connecting steel bars are reserved at the joints of adjacent pressure-bearing plates 4 and the plates are spliced by pouring concrete.
[0062] like Figure 1 In other embodiments, a splicing block 7 may be provided between the end of the hollow box-shaped member 5 and the pressure plate 4. The splicing block 7 is a cast-in-place structure. Connecting steel bars are reserved at the end of the hollow box-shaped member 5, and connecting steel bars are also reserved at the corresponding position of the pressure plate 4. The connecting steel bars of the two are tied and connected, and then molded and cast to form the splicing block 7, which is used to ensure that the hollow box-shaped member 5 and the pressure plate 4 deform together in the horizontal and vertical directions.
[0063] like Figure 6 In other embodiments, a reserved connection steel bar 12 may be provided in the hollow box-shaped member 5. The reserved connection steel bar 12 may be arranged on both sides of the bottom groove of the hollow box-shaped member 5, arranged along its length direction and with the ends exposed, for binding with the reserved connection steel bars of the pressure plate 4 and casting the splicing block 7. The reserved connection steel bar 12 may also be arranged in the top convex strip of the hollow box-shaped member 5, arranged perpendicular to its length direction and with the ends exposed, for binding with the reserved connection steel bars 12 of the adjacent hollow box-shaped member 5 and casting the integrated layer 6.
[0064] In other embodiments, if the regional seismic fortification intensity is lower than 7 degrees, the bearing plate 4 can replace the lower structure raft 2, and the support 3 can be cancelled, and the pile foundation 1 and the bearing plate 4 can be directly assembled, that is, the bearing plate 4 plays the role of the raft 2. After assembly, the hollow box-type member 5 is installed. The diameter and number of the pile foundation 1 can be reduced as much as possible according to the calculation results and controlled according to the structure.
[0065] Embodiment 2:
[0066] The construction method of the overhead structure proposed in Example 1 specifically includes the following steps:
[0067] S1: First, fill the site to level it to avoid disturbance of the frozen soil layer caused by excavation; for the high-ice content soil layer with shallow burial depth and small thickness under the pile-slab foundation, the high-ice content soil layer can be excavated and backfilled with coarse-grained soil, provided that the design elevation is met.
[0068] S2: Prefabricate the pile foundation 1 and preset a groove on the top of the pile foundation 1. Reinforced bars are reserved in the groove, and the main reinforcement bars 11 in the pile foundation 1 are exposed to a position higher than the raft 2.
[0069] S3: Prefabricate the prefabricated units of the raft slab 2 and reserve the connecting steel bars.
[0070] S4: Prefabricate the pressure-bearing plate 4, and preset convex strips on the top of the pressure-bearing plate 4, and reserve connecting steel bars.
[0071] S5: prefabricate the hollow box-shaped member 5, and preset a groove at the bottom of the hollow box-shaped member 5, and preset a convex strip at the top of the hollow box-shaped member 5. In addition, set a reserved connecting steel bar in the hollow box-shaped member 5.
[0072] S6: hoist the prefabricated units of the raft 2 to the top of the pile foundation 1, pour concrete in the joints between adjacent prefabricated units and the grooves at the top of the pile foundation 1, pour the connecting steel bars in the grooves at the top of the pile foundation 1 after binding and connection, the main reinforcement 11 of the pile foundation and the connecting steel bars of the prefabricated units therein, thereby splicing the adjacent prefabricated units and the pile foundation 1 into one, forming a pile-slab foundation.
[0073] S7: A support 3 is arranged at the top of the pile foundation 1, and the pressure bearing plate 4 is installed to the designed position. The joints of adjacent pressure bearing plates 4 are connected by wet jointing.
[0074] S8: hoist the hollow box-type component 5 to the top of the pressure-bearing plate 4 , and insert the convex strip on the top of the pressure-bearing plate 4 into the groove at the bottom of the hollow box-type component 5 .
[0075] S9: pouring concrete on the hollow box-shaped member 5 to form an integrated layer 6; the top of the integrated layer 6 is a plane, and the bottom forms convex strips arranged perpendicular to the line direction;
[0076] S10: An asphalt concrete pavement layer 8 is laid on the integrated layer 6 as a pavement structure; guardrails 9 may be arranged on both sides of the pavement structure, and other auxiliary structures may also be arranged on the pavement structure.
[0077] S11: Tie and connect the reserved connecting steel bars at the ends of the hollow box-type components 5 and the reserved connecting steel bars at the corresponding positions of the pressure-bearing plate 4, and then cast them in a mold to form a splicing block 7.
[0078] The assembled overhead structure constructed in this embodiment has a ventilation plate structure with transverse through holes in the structure, which can effectively ventilate and reduce the temperature of the structure, thereby protecting the permafrost layer below. In addition, the overall assembled structure can also disperse disturbances such as earthquakes and improve seismic performance. The overhead structure replaces the physical roadbed of the highway, avoiding the heat absorbed by the black road surface from being transferred to the permafrost layer below, and has the following important engineering advantages:
[0079] 1. Compared with traditional roadbed forms, this overhead structure can reduce the amount of earth and stone filling and excavation, and only requires leveling and partial replacement of the site. The construction process has little impact on the surrounding natural environment.
[0080] 2. Compared with bridge structures, the carriageway is continuous and does not require expansion joints. The stress form is simple and can prevent beams from falling and collapsing due to large earthquakes.
[0081] 3. The overhead structure of the present invention is assembled and constructed using assembled components, which can reduce the process of pouring concrete in a low-temperature environment as much as possible. The assembled components are simple in shape and easy to manufacture and process, which ensures the quality control of the components.
[0082] 4. The lower structure adopts prefabricated pile-slab foundation, and the raft foundation bears most of the foundation bearing capacity, so the drilling depth of the pile foundation can be reduced, and the settlement caused by thaw settlement can be effectively dealt with.
[0083] 5. The upper structure adopts prefabricated reinforced concrete box-type components, which are small in size and convenient for prefabrication and transportation. The hollow part of the box can be ventilated and dissipated to avoid heat transfer into the roadbed and cause the formation of a melting interlayer below.
[0084] 6. The seismic isolation performance of the structure can be designed according to the seismic fortification level, and the purpose of dissipating seismic energy can be achieved by adjusting the layout and number of seismic isolation bearings.
[0085] The above specific examples are used to illustrate the present invention, which is only used to help understand the present invention and is not intended to limit the present invention. For those skilled in the art, according to the concept of the present invention, some simple deductions, modifications or substitutions can be made.
Claims
1. Prefabricated overhead structures of highways in high-intensity permafrost areas, Features: The structure comprises a pile foundation (1), a pressure-bearing plate (4) and a hollow box-type component (5); The pressure plate (4) is located on the top of the pile foundation (1), and a plurality of convex strips perpendicular to the line direction are provided on the pressure plate (4) for positioning and installing the hollow box-type component (5); The hollow box-shaped component (5) is in the shape of a square tube, and has grooves arranged along its length at its bottom; A plurality of the hollow box-shaped components (5) are hoisted to the top of the pressure plate (4), arranged in a direction perpendicular to the line, and close to each other in the line direction; the convex strips on the top of the pressure plate (4) are inserted into the grooves on the bottom of the hollow box-shaped components (5); The structure also includes an integration layer (6); The top of the hollow box-shaped member (5) is provided with convex strips arranged along its length direction, and concrete is poured above a plurality of the hollow box-shaped members (5) to form the integrated layer (6); The top of the integrated layer (6) is a plane, and the bottom forms convex strips arranged in a direction perpendicular to the circuit; A splicing block (7) is provided between the end of the hollow box-type component (5) and the pressure plate (4); the splicing block (7) is a cast-in-place structure, and connecting steel bars are reserved at the end of the hollow box-type component (5). At the same time, connecting steel bars are also reserved at the corresponding position of the pressure plate (4). The connecting steel bars of the two are tied and connected and then cast in a mold to form the splicing block (7), which is used to ensure that the hollow box-type component (5) and the pressure plate (4) deform together in the horizontal and vertical directions.
2. The assembled overhead structure for highways in high-intensity permafrost areas according to claim 1, Features: The structure further comprises a raft plate (2) and a support (3), wherein the raft plate (2) and the support (3) are arranged between the pressure bearing plate (4) and the pile foundation (1); The raft plate (2) is arranged on the top of the pile foundation (1), and the support (3) is arranged on the top of the raft plate (2) and supports the pressure plate (4).
3. The assembled overhead structure for highways in high-intensity permafrost areas according to claim 2, Features: The structure further comprises an asphalt concrete paving layer (8), wherein the asphalt concrete paving layer (8) is arranged on top of the integrated layer (6).
4. The assembled overhead structure for highway in high-intensity permafrost areas according to claim 3, Features: The raft (2) comprises a plurality of prefabricated units, and the plurality of prefabricated units are arranged along a line direction; A sunken groove is provided in the center of the top of the pile foundation (1); The joints of adjacent prefabricated units are arranged perpendicular to the line direction and correspond to the pile foundation (1) from top to bottom; concrete is poured into the joints of adjacent prefabricated units and the grooves at the top of the pile foundation (1), thereby splicing the adjacent prefabricated units and the pile foundation (1) into one.
5. The assembled overhead structure for highway in high-intensity permafrost areas according to claim 4, Features: The pressure bearing plates (4) are arranged along the line direction, and the joints of adjacent pressure bearing plates (4) are spliced by pouring concrete.
6. The assembled overhead structure for highways in high-intensity permafrost regions according to claim 5, Features: The hollow box-shaped component (5) is provided with reserved connecting steel bars (12); The reserved connection steel bars (12) are arranged on both sides of the bottom groove of the hollow box-shaped component (5), arranged along the length direction thereof and with the ends exposed; The reserved connection steel bars (12) are also arranged in the top convex strip of the hollow box-type component (5), arranged perpendicular to its length direction and with the ends exposed.
7. The construction method of the assembled overhead structure of the expressway in the high-intensity permafrost region as claimed in claim 6, Features: The method comprises: Prefabricate a pile foundation (1), and pre-set a groove on the top of the pile foundation (1); prefabricated units of prefabricated raft (2); Prefabricating a pressure plate (4) and pre-setting a convex strip on the top of the pressure plate (4); Prefabricate a hollow box-shaped member (5), and pre-set a groove at the bottom of the hollow box-shaped member (5); The prefabricated units of the raft slab (2) are hoisted to the top of the pile foundation (1), and concrete is poured into the joints between adjacent prefabricated units and the grooves at the top of the pile foundation (1) to achieve splicing; A support (3) is arranged at the top of the pile foundation (1), and a pressure bearing plate (4) is installed to a designed position, and the joint positions of adjacent pressure bearing plates (4) are connected by wet jointing; The hollow box-shaped component (5) is hoisted to the top of the pressure plate (4), and the convex strip on the top of the pressure plate (4) is inserted into the groove at the bottom of the hollow box-shaped component (5).
8. The construction method of the assembled overhead structure of the expressway in the high-intensity permafrost region according to claim 7, Features: The method further comprises: When the hollow box-shaped member (5) is prefabricated, a convex strip is preset on the top of the hollow box-shaped member (5); After the hollow box-shaped component (5) is hoisted to the top of the pressure-bearing plate (4), concrete is poured above the hollow box-shaped component (5) to form an integrated layer (6).
Citation Information
Patent Citations
High-latitude high-temperature permafrost area highway raft plate-pile composite foundation and construction method
CN108265735A
Permafrost region prefabricated hollow slab base course pavement structure capable of increasing the construction speed
CN112342857A
Rigid connection LNG storage tank foundation double-bearing-platform structure and manufacturing method thereof
CN113293789A
Reinforced concrete precast slab
CN204456621U