A layer-by-layer expansion cantilever structure with variable cross-section concrete inclined column and construction method

The layer-by-layer expanding cantilever structure with a vibrating assembly and convex strip mechanism addresses inefficiencies in constructing variable-section concrete inclined columns by accelerating concrete pouring and densification, enhancing construction efficiency and stability.

CN115711012BActive Publication Date: 2024-12-06JIANGSU SHUANGLOU CONSTR GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211583550.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-12-10
Publication Date
2024-12-06
Estimated Expiration
2042-12-10

AI Technical Summary

Technical Problem

Existing methods for constructing variable-section concrete inclined columns are inefficient due to the slow descent of thick concrete, leading to prolonged construction times.

Method used

A layer-by-layer expanding cantilever structure with a vibrating assembly, including hard rubber tubes and vibrating rods, is used to accelerate the downward movement of concrete during pouring, combined with a convex strip mechanism to compact and densify the concrete.

Benefits of technology

The method significantly enhances construction efficiency by accelerating concrete pouring and densifying the concrete, thereby improving the stability and speed of the construction process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115711012B_ABST
    Figure CN115711012B_ABST
Patent Text Reader

Abstract

The present application relates to a variable-section concrete inclined column with a layer-by-layer expanding cantilever structure and a construction method, and relates to the technical field of cast-in-place concrete; it comprises a supporting frame inclined relative to the vertical direction, and a concrete layer cast and formed on the supporting frame, the supporting frame is provided with a vibrating assembly, and the vibrating assembly is used to vibrate the concrete when pouring the concrete; the vibrating assembly comprises a protective pipe and a vibrating rod inserted in the protective pipe; the protective pipe is arranged along the height direction of the supporting frame; the present application has the effect of improving the concrete pouring efficiency and improving the stability of the inclined column construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of cast-in-place concrete, and in particular to a layer-by-layer expanding cantilever structure with variable cross-section concrete inclined column and a construction method. Background Art

[0002] In recent years, with the continuous development and improvement of architectural technology, the shapes of various buildings, especially public buildings, have developed in a variety of ways, such as being new, unique, and special. For buildings with facades that cantilever layer by layer, in order to meet the needs of building functions while taking into account the needs of shape while ensuring structural safety, such buildings are often designed with variable-section concrete inclined columns to ensure the stability of the cantilevered structure of the building.

[0003] Existing variable cross-section concrete inclined columns such as Figure 1 and Figure 2 As shown, Figure 1 It shows the structure of a formed concrete inclined column, which specifically includes a support frame 21 and a concrete layer 22 cast along the height direction of the support frame 21; Figure 2 It shows the structure of the support frame 21 before the concrete is poured. As can be seen from the figure, the bottom of the support frame 21 is installed on the upper surface of the building floor 1, and the support frame 21 is inclined relative to the vertical direction. During construction, the support frame 21 is first formed by tying a number of steel bars, and then the bottom of the support frame 21 is fixedly installed on the upper surface of the building floor 1, and then the template 3 is laid on the outer peripheral wall of the support frame 21, so that the template 3 and the bottom of the building floor 1 enclose a pouring space 23, and then concrete is poured into the above-mentioned pouring space 23. After the concrete is poured and formed, the template 3 is removed to complete the construction of the variable-section concrete inclined column 2.

[0004] With respect to the above-mentioned related technologies, the inventors found that if the pouring space enclosed by the formwork is large, that is, the cross-section of the formed variable-section concrete inclined column is large, then when pouring concrete from the top of the pouring space into the pouring space by using the above-mentioned method, due to the thick texture of the concrete and the slow downward speed, it takes a long time for the concrete to descend to the bottom of the pouring space and then gradually fill the entire pouring space, which can easily lead to low construction efficiency, so it needs to be improved. Summary of the invention

[0005] In order to improve the construction efficiency of variable-section concrete inclined columns, the present application provides a layer-by-layer expanding cantilever structure variable-section concrete inclined column and a construction method.

[0006] The present application provides a layer-by-layer expansion cantilever structure with variable cross-section concrete inclined column, which adopts the following technical solution:

[0007] A variable-section concrete inclined column with a layer-by-layer expanding cantilever structure comprises a supporting frame inclined relative to the vertical direction, and a concrete layer cast on the supporting frame; a vibrating assembly is provided on the supporting frame, and the vibrating assembly is used to vibrate concrete when pouring concrete; the vibrating assembly comprises a protective tube and a vibrating rod inserted in the protective tube; the protective tube is arranged along the height direction of the supporting frame.

[0008] By adopting the above technical solution, after the support frame is erected, a template is laid on the outside of the support frame to form a pouring space, and then concrete is poured into the pouring space. During this process, the vibrator is started to vibrate, and the vibration is transmitted to the protective pipe, and then transmitted to the concrete by the protective pipe, so that the concrete can be accelerated downward under the action of the vibration force, and the pouring process of the concrete is accelerated.

[0009] Preferably, the protective tube includes at least two hard rubber tubes, the hard rubber tubes correspond to the vibrating rods one by one, and the vibrating rods are inserted in the corresponding hard rubber tubes; a fixed cavity is arranged inside the supporting frame, each diagonal of the fixed cavity corresponds to a hard rubber tube, and the hard rubber tubes are arranged along the height direction of the supporting frame, the top of the hard rubber tube is connected to the top of the supporting frame, and the bottom of the hard rubber tube is in contact with the bottom of the supporting frame.

[0010] By adopting the above technical solution, hard rubber hoses are arranged correspondingly at the diagonals inside the supporting frame so that the two hard rubber hoses are arranged crosswise, that is, the hard rubber hoses are bound to be arranged at an angle rather than vertically. The advantage of such an arrangement is that the contact area between the hard rubber hoses and the injected concrete can be increased to optimize the effect of rapid downward movement of the concrete under the vibration of the hard rubber hoses, thereby further improving the pouring efficiency.

[0011] Preferably, the vibration assembly also includes a convex strip embedded in the outer peripheral wall of each hard rubber tube, and a movable member for driving all the convex strips to reciprocate radially along the corresponding hard rubber tube, and the movable member is used to make the outer surface of the convex strip protrude from the outer peripheral wall of the hard rubber tube when the convex strip moves in a direction away from the hard rubber tube.

[0012] By adopting the above technical solution, when pouring concrete, the vibrating rod drives the hard rubber hose to vibrate, and at the same time, the moving part drives the convex strip to reciprocate radially along the hard rubber hose, which, on the one hand, increases the vibration action area of ​​the concrete, and on the other hand, when the convex strip moves away from the hard rubber hose, the convex strip protrudes from the outside of the hard rubber hose, so that the convex strip can play a pushing role on the concrete around it, that is, it plays a role in compacting the surrounding concrete and reducing the gaps between the concrete.

[0013] Preferably, an embedding groove is provided on the outer peripheral wall of each of the hard rubber tubes near the convex strip, and the convex strip is inserted into the corresponding embedding groove; the movable parts are arranged in a one-to-one correspondence with the hard rubber tubes, and each of the movable parts includes a movable ring plate, a connecting rod, a vibration rod, and a reset part, the movable ring plate is inserted in the embedding groove, and the side walls of the movable ring plate and the convex strip facing each other are provided with mutually adaptable and fitting docking surfaces, the vibration rod is inserted at the bottom of the hard rubber tube, the movable ring plate and the vibration rod are connected by a connecting rod, and the connecting rod is slidably connected to the hard rubber tube along the length direction of the hard rubber tube, and the reset part is used to make the convex strip embedded in the embedding groove when the movable ring plate moves in a direction away from the vibration rod.

[0014] By adopting the above technical solution, the arrangement of the docking surface enables that when the movable ring plate moves toward the direction approaching the vibration rod, the movable ring plate pushes the convex strip so that the convex strip moves in the direction away from the embedding groove. At this time, the vibration rod will move in the direction away from the hard rubber hose driven by the movable ring plate and the connecting rod. During this movement, the vibration rod pushes the concrete at the bottom of the hard rubber hose to further compact the concrete; when the movable ring plate moves in the direction away from the vibration rod, the movable ring plate drives the vibration rod to move and reset, and the convex strip is reset and retracted into the embedding groove under the action of the reset member; during this process, the movable ring plate can be manually driven to reciprocate along the height direction of the embedding groove, or an external lifting device, such as a cylinder, can be connected to drive the movable ring plate to reciprocate.

[0015] Preferably, the reset member includes a rack arranged on the connecting rod, a gear meshing with the rack, a rotating rod rotatably connected to the hard rubber hose, and a pull rope wrapped around the rotating rod; the rack is arranged along the length direction of the connecting rod, the gear is sleeved on the rotating rod, one end of the pull rope is wrapped around the rotating rod, and the other end is connected to the convex strip.

[0016] By adopting the above technical solution, when the movable ring plate drives the connecting rod to move downward, the gear drives the rotating rod to rotate under the action of the rack, and the rotating rod releases the pull rope so that the convex strip can move in the direction away from the embedding groove. When the movable ring plate drives the connecting rod to move upward and reset, the gear drives the rotating rod to rotate under the action of the rack so that the rotating rod reels the pull rope. At this time, the convex strip will be reinserted into the embedding groove driven by the pull rope to achieve reset.

[0017] Preferably, a scraper is provided on the inner wall of each embedding groove, and the scraper is attached to the surface of the corresponding convex strip.

[0018] By adopting the above technical solution, when one side of the convex strip moves to the outside of the embedding groove, the scraper blade contacts the concrete, and the concrete is easily adhered to the outer surface of the scraper blade. When the convex strip is re-embedded into the embedding groove, the scraper blade can scrape off the concrete adhered to the outer surface of the convex strip, thereby reducing the situation where the embedding groove is blocked by concrete.

[0019] Preferably, a support frame is set up on the building floor, a vibrating assembly is installed in the support frame, and a template is laid on the periphery of the support frame;

[0020] Pour concrete into the pouring space enclosed by the formwork, and at the same time vibrate the concrete in the pouring space through the vibrating assembly;

[0021] During the concrete pouring process, the vibrating assembly is driven upward and hits the formwork;

[0022] After the concrete in the pouring space has been poured to the top of the supporting frame, the pouring is stopped and the vibrating assembly is removed; the formwork is removed after the specified period of curing;

[0023] Repeat the above steps in order from low to high floors of the building until the pouring of concrete inclined columns on all floors is completed.

[0024] Preferably, before "pouring concrete into the pouring space enclosed by the template", the method further comprises:

[0025] A plurality of supporting steel pipes of different heights are added to the formwork on the inclined side of the supporting frame to support the formwork and the supporting frame through the supporting steel pipes; a channel steel is added to the bottom of the formwork on one side of the inclined part of the supporting frame to reinforce the connection between the bottom end of the supporting frame and the building floor through the channel steel.

[0026] By adopting the above technical scheme, a supporting steel pipe is connected to the formwork on the inclined side of the supporting frame, and the end of the supporting steel pipe away from the formwork can be connected to the ground or other fixed and reliable objects in the surrounding area, so that the supporting steel pipe, the formwork and other fixed and reliable objects in the surrounding area can form a stable triangular structure together, thereby strengthening the support stability of the inclined side of the supporting frame. The heights of the supporting steel pipes are different, so the upper ends of the supporting steel pipes can be connected to different heights of the lateral formwork of the supporting frame to further strengthen the lateral stability of the inclined side of the supporting frame. At the same time, considering that the lateral pressure of the supporting frame is relatively large, channel steel is added to the bottom of the lateral part of the supporting frame to strengthen the connection between the supporting frame and the building floor, wherein the channel steel can specifically be No. 16 channel steel.

[0027] Preferably, the “laying of templates on the periphery of the supporting frame” includes:

[0028] Lay the formwork on the periphery of the supporting frame, open a pouring hole through the formwork, and insert a vibrating rod into the pouring hole;

[0029] The “vibrating the concrete in the pouring space by means of a vibrating assembly” includes:

[0030] The concrete is vibrated by means of a vibrating assembly and a vibrating rod in the casting hole.

[0031] By adopting the above technical solution, since the steel bars at the bottom of the support frame are dense, it is difficult to vibrate the concrete and it is easy to leak vibration. Therefore, when installing the formwork, a casting hole can be opened in the side wall of the formwork at the bottom of the support frame. When pouring concrete, a vibrating rod is inserted into the casting hole for vibration, so that the concrete at the bottom of the support frame is denser. At the same time, the casting hole can also be used as an exhaust hole when pouring concrete, which is convenient for discharging excess air in the pouring space during the pouring process and reducing the gap between the concrete. After the air is discharged, the casting hole can be sealed.

[0032] In summary, the present application includes at least one of the following beneficial technical effects:

[0033] 1. By adding a vibrating assembly, opening a pouring hole on the template, inserting a vibrating rod in the pouring hole, and making the vibrating rod and the vibrating assembly cooperate with each other to improve the pouring efficiency of concrete;

[0034] 2. By adding multiple steel pipes of different lengths between the inclined formwork and the building floor, and using channel steel to reinforce the connection between the bottom of the support frame and the building floor, the stability of the formwork system can be improved;

[0035] 3. By adding an adjustable top support between the top of the formwork and the beams and slabs of the surrounding building floors, it is convenient to adjust and correct the inclination angle later. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] Figure 1 It is a schematic diagram used to reflect the variable cross-section concrete inclined column structure in the background technology.

[0037] Figure 2 It is a cross-sectional view of a variable-section inclined column structure used to illustrate the molding in the background technology.

[0038] Figure 3 It is a structural schematic diagram of a variable-section concrete inclined column with a layer-by-layer expanding cantilever structure in Example 1.

[0039] Figure 4 It is a schematic diagram used to illustrate the positional relationship between the support frame and the vibrating assembly before concrete is poured in Example 1.

[0040] Figure 5 It is a schematic diagram used to illustrate the installation position of the hard rubber hose in the support frame before pouring concrete in Example 1.

[0041] Figure 6 is a schematic diagram for illustrating the structure of a hard rubber hose in Example 2;

[0042] Figure 7 is a cross-sectional view used to reflect the internal structure of the hard rubber hose in Example 2;

[0043] Figure 8 It is a schematic diagram used to reflect the structure of the reset element in Example 2.

[0044] Explanation of the reference numerals in the accompanying drawings: 1. building floor; 11. beam and slab; 2. inclined concrete column; 21. supporting frame; 22. concrete layer; 23. casting space; 24. fixed cavity; 3. formwork; 31. casting opening; 4. vibrating assembly; 41. protective pipe; 411. hard rubber hose; 412. embedding groove; 413. scraper; 42. convex strip; 43. moving part; 431. moving ring plate; 4311. docking surface; 432. connecting rod; 434. vibrating rod; 435. reset part; 4351. rack; 4352. gear; 4353. rotating rod; 4354. pull rope; 44. vibrating rod; 5. supporting steel pipe. DETAILED DESCRIPTION

[0045] The following is combined with Figure 3-8 This application is described in further detail.

[0046] Combination Figure 3 and Figure 4 The concrete inclined columns of the present application are applied to the floors of the cantilevered buildings with gradual expansion, such as Figure 3 The five-story building floor 1 shown specifically includes a vertical floor slab and a plurality of horizontal beams and slabs 11 arranged along the height direction of the vertical floor slab. The beams and slabs 11 are layered, and the length of the beams and slabs 11 increases layer by layer. Adjacent beams and slabs 11 are connected by concrete inclined columns 2. The cross-section of the height direction of the concrete inclined columns 2 of the first floor is V-shaped, and the concrete inclined columns 2 corresponding to the floors above the second floor have the same shape. It should be noted that, in combination with the prior art, it can be known that the shape of the formed concrete inclined columns 2 only requires changing the structure of the support skeleton 21, and the support skeleton 21 is formed by binding a plurality of steel bars. It is a prior art to change the support skeleton 21 by changing the binding method, so it will not be repeated in this article. This application will focus on solving the problem of how to improve the efficiency of concrete pouring.

[0047] Reference Figure 3 and Figure 4 Embodiment 1 of the present application discloses a variable-section concrete inclined column with a layer-by-layer expanding cantilever structure, comprising a supporting frame 21 and a concrete layer 22 cast on the supporting frame 21; before pouring concrete, a template 3 is laid on the periphery of the supporting frame 21, and the template 3 adopts a 16mm thick double-sided laminated wooden template. The template 3 of a specified shape and size can be prefabricated according to the shape of the molded concrete inclined column 2, and a casting space 23 is enclosed by the template 3.

[0048] Reference Figure 4 and Figure 5A fixed cavity 24 is provided in the support frame 21, and a vibrating assembly 4 is inserted in the fixed cavity 24. The vibrating assembly 4 is used to vibrate the concrete when pouring concrete into the pouring space 23 to accelerate the concrete to fill the entire pouring space 23; the vibrating assembly 4 includes a protective tube 41 and a vibrating rod 44 inserted in the protective tube 41. The protective tube 41 includes at least two hard rubber tubes 411. The hard rubber tubes 411 and the vibrating rods 44 are arranged one by one. Each diagonal of the fixed cavity 24 corresponds to a hard rubber tube 411. The upper end of the hard rubber tube 411 can be passed through a steel wire or the like. The vibrating rod 44 is detachably connected to the top of the fixed cavity 24, and the lower end of the hard rubber tube 411 is in contact with the bottom of the supporting frame 21; the vibrating rod 44 is inserted into the hard rubber tube 411 along the length direction of the corresponding hard rubber tube 411, and the surface of the vibrating rod 44 is in contact with the inner wall of the hard rubber tube 411, and the vibrating rod 44 can slide relative to the length direction of the corresponding hard rubber tube 411 and detach from the corresponding hard rubber tube 411; when pouring concrete, the vibrating rod 44 is energized to vibrate, and the vibration force is transmitted to the concrete around the hard rubber tube 411 through the peripheral wall of the hard rubber tube 411 to accelerate the downward movement of the concrete.

[0049] The present application also discloses a construction method for a layer-by-layer expansion cantilever structure with variable cross-section concrete inclined columns, comprising the following steps:

[0050] Step 101 , erecting a support frame 21 on the building floor 1 , installing a vibrating assembly 4 in the support frame 21 , and laying a template 3 on the periphery of the support frame 21 .

[0051] In practice, for the first floor of the building floor 1, a V-shaped support frame 21 is added to one side of the building floor 1, and a template 3 is laid on the outer wall and the bottom wall of the support frame 21, so that the template 3 encloses a V-shaped casting space 23, and a vibrating assembly 4 is installed in the casting space 23. In addition, when laying the template 3, a casting hole 31 is opened through the side wall of the template 3 at the intersection near the V-shaped support frame 21, and a vibrating rod 44 is inserted into the casting hole 31, so that the vibrating rod 44 extends into the casting space 23, so that when the concrete is subsequently poured, the concrete is vibrated to make the concrete in the casting space 23 more dense; in addition, an exhaust reservation similar to the casting hole 31 can also be opened in the middle of the template 3 on the upper part of the support frame 21, so as to facilitate the discharge of air inside the casting space 23 when the concrete is poured, and the exhaust reservation is capped after the bubbles are discharged.

[0052] Step 102, add multiple support steel pipes 5 of different heights to the formwork 3 on the inclined side of the support frame 21 to support the formwork 3 and the support frame 21 through the support steel pipes 5, and add channel steel to the bottom of the formwork 3 on one side of the inclined part of the support frame 21 to reinforce the connection between the bottom end of the support frame 21 and the building floor 1 through the channel steel.

[0053] In implementation, Figure 4 As shown, the supporting steel pipe 5 is located at the formwork 3 on the inclined side of the supporting frame 21, the number of the supporting steel pipe 5 can be 3, one end of the supporting steel pipe 5 is connected to the side wall of the formwork 3, and the other end can be connected to the ground or a fixed and reliable object around it, so as to strengthen the supporting stability of the formwork 3 on the inclined side through the supporting steel pipe 5, and the height of the position where the supporting steel pipe 5 is connected to the formwork 3 from the ground is 1 / 4, 1 / 2, and 3 / 4 of the height of the formed concrete inclined column 2, respectively; in addition, No. 16 channel steel can be used for reinforcing the connection between the bottom of the supporting frame 21 and the building floor 1 to improve the stability of the connection.

[0054] Step 103 , pouring concrete into the pouring space 23 enclosed by the template 3 , and vibrating the concrete by means of the vibrating assembly 4 and the vibrating rod 44 in the pouring hole 31 .

[0055] Step 104 , during the process of pouring concrete, the vibrating assembly 4 is driven to move upward and knock the formwork 3 .

[0056] During implementation, concrete is poured from the top of the pouring space 23 into the pouring space 23. The concrete moves downward under the vibration of the vibrating assembly 4, thereby first filling the bottom of the pouring space 23. The operator can drive the protective pipe 41 and the vibrating rod 44 to move upward at a specified speed during the pouring process, and knock on the template 3 during the upward movement to make the concrete in the pouring space 23 denser.

[0057] Step 105, after the concrete in the pouring space 23 is poured to the top of the supporting frame 21, the pouring is stopped and the vibrating assembly 4 is taken out; and the mold is removed after the mold is cured for a specified period of time.

[0058] During implementation, when the concrete liquid level in the pouring space 23 moves up to the top of the pouring space 23, the operator will completely pull the protective pipe 41 out of the pouring space 23, stop pouring at this time, and remove the formwork 3 after the concrete is solidified and formed, completing the construction of the concrete inclined column 2 on the first floor of the building.

[0059] Step 106, repeat the above steps in order from low to high floors of the building floor 1 until the pouring of the concrete inclined columns 2 of all floors is completed.

[0060] During implementation, after completing the construction of the concrete inclined columns 2 on the first floor of the building floor 1, the above-mentioned operation steps are repeated layer by layer in order from low to high to carry out the construction of the concrete inclined columns 2 until all required processes of pouring the concrete inclined columns 2 are completed; in addition, when pouring the concrete inclined columns 2 between the beams and slabs 11 of adjacent floors, an adjustable top support is installed between the upper beams and slabs 11 and the top of the formwork 3, so as to facilitate the correction of the inclination of the concrete inclined columns 2 at a later stage.

[0061] Example 2

[0062] The difference between Example 2 of the present application and Example 1 is that: Figure 6 and Figure 7 The vibrating assembly 4 includes a convex strip 42 embedded in each hard rubber tube 411, and a moving member 43 for driving the convex strip 42 to reciprocate radially along the corresponding hard rubber tube 411; the side wall of the hard rubber tube 411 is provided with an embedding groove 412, and the number of the embedding grooves 412 corresponds to the number of the convex strips 42. The number of the convex strips 42 in the present application is 2; a scraper 413 is welded to the inner wall of each embedding groove 412 near the notch, and the side wall of the scraper 413 away from the inner wall of the embedding groove 412 is attached to the side wall of the convex strip 42; through the moving member When the movable member 43 drives the convex strip 42 to move in a direction away from the embedding groove 412, the side of the convex strip 42 close to the scraper 413 can move outside the embedding groove 412. At this time, the convex strip 42 can push the concrete around the hard rubber tube 411, thereby achieving the effect of compacting the concrete; and when the movable member 43 drives the convex strip 42 to move in a direction close to the embedding groove 412, the scraper 413 can scrape off the concrete attached to the surface of the convex strip 42, and the convex strip 42 can finally be completely inserted into the embedding groove 412 driven by the movable member 43.

[0063] Reference Figure 6 , Figure 7 and Figure 8 The moving member 43 includes a moving ring plate 431, a connecting rod 432, a vibrating rod 434 and a reset member 435; the moving ring plate 431 is annular, and its lower end is inserted into the embedding groove 412, and docking surfaces 4311 are provided on the two side walls where the moving ring plate 431 and the convex strip 42 are close to each other. The two docking surfaces 4311 are adapted to fit together, and the docking surfaces 4311 make the outer diameter of the moving ring plate 431 gradually decrease in the direction away from its top. When the moving ring plate 431 gradually moves downward along the length direction of the embedding groove 412, the convex strip 42 can move in the direction away from the embedding groove 412 under the action of the moving ring plate 431 and the docking surface 4311.

[0064] Reference Figure 6 , Figure 7 and Figure 8 The vibration rod 434 is inserted into the bottom end of the hard rubber tube 411, and the vibration rod 434 is slidably connected along the length direction of the hard rubber tube 411. The vibration rod 434 is connected to the movable ring plate 431 through a connecting rod 432. The reset member 435 is used to drive the protruding strip 42 to re-embed into the embedding groove 412 when the movable ring plate 431 moves in a direction away from the vibration rod 434.

[0065] Reference Figure 7 and Figure 8The reset member 435, the convex strip 42 and the connecting rod 432 are arranged in a one-to-one correspondence. The reset member 435 includes a rack 4351 arranged on the corresponding connecting rod 432, a gear 4352 meshingly connected to the corresponding rack 4351, a rotating rod 4353 arranged in a one-to-one correspondence with the gear 4352, and a pull rope 4354 wound around the corresponding rotating rod 4353; the length direction of the rack 4351 is parallel to the length direction of the corresponding connecting rod 432, the rotating rod 4353 is rotatably connected to the hard rubber hose 411, and the corresponding gear 4352 is fixedly sleeved on the rotating rod 4353, one end of the pull rope 4354 is wound around the rotating rod 4353, and the other end is bonded to the end of the corresponding convex strip 42.

[0066] The working principle of a variable-section concrete inclined column with a layer-by-layer expanding cantilever structure disclosed in Example 2 of the present application is as follows: a support frame 21 is erected on the building floor 1, a vibrating assembly 4 is installed in the support frame 21, and a template 3 is laid on the periphery of the support frame 21 to enclose a casting space 23 through the template 3, and then concrete is poured into the casting space 23 from the top of the casting space 23. During the pouring process, all vibrating rods 44 are energized to vibrate, and the vibration force is transmitted to the hard hose 411, and then transmitted to the concrete through the hard hose 411 to accelerate the downward movement of the concrete, and the movable ring plate 43 is driven manually or by external lifting equipment to move in a direction close to the vibration rod 434, so that the convex strip 42 and the vibration rod 434 move back and forth in a direction away from the hard hose 411, thereby vibrating and compacting the concrete around the hard hose 411, thereby improving the casting efficiency of the concrete inclined column 2.

[0067] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A layer-by-layer expansion cantilever structure variable cross-section concrete inclined column, comprising a support frame (21) inclined relative to the vertical direction, and a concrete layer (22) cast on the support frame (21), Features: A vibrating assembly (4) is provided on the support frame (21), and the vibrating assembly (4) is used to vibrate concrete when pouring concrete; the vibrating assembly (4) comprises a protective tube (41) and a vibrating rod (44) inserted into the protective tube (41); the protective tube (41) is arranged along the height direction of the support frame (21); The protective tube (41) comprises at least two hard rubber tubes (411), the hard rubber tubes (411) correspond to the vibrating rods (44) one by one, and the vibrating rods (44) are inserted into the corresponding hard rubber tubes (411); The vibrating assembly (4) further comprises a convex strip (42) embedded on the outer peripheral wall of each hard rubber tube (411), and a moving member (43) for driving all the convex strips (42) to reciprocate along the radial direction of the corresponding hard rubber tube (411), wherein the moving member (43) is used to make the outer surface of the convex strip (42) protrude from the outer peripheral wall of the hard rubber tube (411) when the convex strip (42) moves in a direction away from the hard rubber tube (411); An embedding groove (412) is formed on the outer peripheral wall of each hard rubber tube (411) near the convex strip (42), and the convex strip (42) is inserted into the corresponding embedding groove (412); the moving parts (43) are arranged in a one-to-one correspondence with the hard rubber tube (411), and each moving part (43) includes a moving ring plate (431), a connecting rod (432), a vibration rod (434), and a reset part (435); The movable ring plate (431) is inserted into the embedding groove (412), and the side walls of the movable ring plate (431) and the convex strip (42) facing each other are provided with mutually adapted butt joint surfaces (4311), and the vibration rod (434) is inserted into the bottom of the hard rubber tube (411), and the movable ring plate (431) and the vibration rod (434) are connected by a connecting rod (432), and the connecting rod (432) is slidably connected in the hard rubber tube (411) along the length direction of the hard rubber tube (411), and the reset member (435) is used to make the convex strip (42) embed into the embedding groove (412) when the movable ring plate (431) moves in a direction away from the vibration rod (434).

2. According to claim 1, a layer-by-layer expansion cantilever structure with variable cross-section concrete inclined column, Features: A fixed cavity (24) is arranged inside the support frame (21), each diagonal of the fixed cavity (24) corresponds to a hard rubber tube (411), and the hard rubber tube (411) is arranged along the height direction of the support frame (21), the top of the hard rubber tube (411) is connected to the top of the support frame (21), and the bottom of the hard rubber tube (411) is in contact with the bottom of the support frame (21).

3. According to claim 2, a layer-by-layer expansion cantilever structure with variable cross-section concrete inclined column, Features: The reset member (435) includes a rack (4351) arranged on the connecting rod (432), a gear (4352) meshed with the rack (4351), a rotating rod (4353) rotatably connected to the hard rubber tube (411), and a pull rope (4354) wound around the rotating rod (4353); the rack (4351) is arranged along the length direction of the connecting rod (432), the gear (4352) is sleeved on the rotating rod (4353), one end of the pull rope (4354) is wound around the rotating rod (4353), and the other end is connected to the convex strip (42).

4. According to claim 3, a layer-by-layer expansion cantilever structure with variable cross-section concrete inclined column, Features: The inner wall of each embedding groove (412) at the notch is provided with a scraper (413), and the scraper (413) is attached to the surface of the corresponding convex strip (42).

5. The construction method of the layer-by-layer expansion cantilever structure variable cross-section concrete inclined column according to claim 1, Features: The steps include: A support frame (21) is set up on the building floor (1), a vibrating assembly (4) is installed in the support frame (21), and a template (3) is laid on the periphery of the support frame (21); Concrete is poured into the pouring space (23) enclosed by the template (3), and at the same time, the concrete in the pouring space (23) is vibrated by a vibrating assembly (4); During the pouring of concrete, the vibrating assembly (4) is driven to move upward and strike the formwork (3); After the concrete in the pouring space (23) is poured to the top of the supporting frame (21), the pouring is stopped, the vibrating assembly (4) is taken out, and the mold is removed after being cured for a specified period of time; The aforementioned steps are repeated in order from the lowest to the highest floors of the building (1) until the pouring of the concrete inclined columns (2) of all floors is completed.

6. The construction method of the layer-by-layer expansion cantilever structure variable cross-section concrete inclined column according to claim 5, Features: Before the step of "pouring concrete into the pouring space (23) enclosed by the template (3), the method further comprises: A plurality of support steel pipes (5) of different heights are added to the formwork (3) on one side of the inclined support frame (21) so as to support the formwork (3) and the support frame (21) through the support steel pipes (5); and a channel steel is added to the bottom of the formwork (3) on one side of the inclined support frame (21) so as to reinforce the connection between the bottom end of the support frame (21) and the building floor (1) through the channel steel.

7. The construction method of the layer-by-layer expansion cantilever structure variable cross-section concrete inclined column according to claim 6, Features: The "laying of the template (3) on the periphery of the supporting frame (21)" comprises: A template (3) is laid on the periphery of the support frame (21), a casting hole (31) is formed through the template (3), and a vibrating rod (44) is inserted into the casting hole (31); The “vibrating the concrete in the pouring space (23) by means of the vibrating assembly (4)” includes: The concrete is vibrated by means of a vibrating assembly (4) and a vibrating rod (44) in the casting hole (31).