A satellite beam coverage deduction method based on on-orbit satellite data resource pool
By correlating satellite data and eliminating outliers, and combining high-precision orbital models to predict the visibility time between NGSO satellites and earth stations, the problem of low NGSO satellite resource utilization has been solved, and efficient utilization of NGSO satellite resources has been achieved.
Patent Information
- Application Number
- CN202211468157.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-11-22
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2042-11-22
AI Technical Summary
The communication time between NGSO satellites and earth stations is insufficient, and existing technologies cannot efficiently utilize NGSO satellite resources.
By correlating TLE data, UCS data, and Satbeam data, outliers are eliminated. The Wright criterion is used for multiple iterations, and combined with the SGP4 or SDP4 orbital model, the visibility time between the NGSO satellite and the earth station is predicted. The earth station antenna is then pointed in advance to avoid beam alignment issues.
Accurately predicting the time when the NGSO satellite beam covers the earth station avoids wasting time during the beam alignment process and improves the utilization efficiency of the NGSO satellite.
Smart Images

Figure CN115767567B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of satellite communications, and in particular relates to a satellite beam coverage range deduction method based on an on-orbit satellite data resource pool in this field. Background Art
[0002] With the development of aerospace industry, the number of NGSO satellites has increased dramatically. However, due to the fast moving speed of NGSO satellites and the short visible time with the earth station, the utilization rate of NGSO satellite resources is low. According to statistical analysis, the orbital period of NGSO satellites with an orbital altitude of 500 km is about 95 minutes, but the average visible time with the earth station in each period is only 2.7 minutes, which is only one thirty-fifth of the orbital period. In addition, during the 2.7-minute visible time, the beam of the NGSO satellite may not always cover the earth station. When the satellite beam covers the earth station, beam alignment will consume some time. The communication time between the NGSO satellite and the earth station is actually far less than 2.7 minutes. Therefore, how to efficiently use the visible time between the NGSO satellite and the earth station is the basis for improving the utilization rate of NGSO resources. Summary of the invention
[0003] The technical problem to be solved by the present invention is to provide a satellite beam coverage range deduction method based on an on-orbit satellite data resource pool. By deducing the trajectory and beam pointing of the NGSO satellite, the earth station antenna is pointed toward the NGSO satellite before the beam of the NGSO satellite covers the earth station, thereby avoiding the time waste caused by temporarily adjusting the antenna pointing and making full use of the time that the NGSO satellite can serve the earth station.
[0004] The present invention adopts the following technical solution:
[0005] A satellite beam coverage range deduction method based on an on-orbit satellite data resource pool, the improvement of which is that it includes the following steps:
[0006] Step 1: Associate TLE data, UCS data, and Satbeam data to obtain the on-orbit satellite data resource pool:
[0007] TLE data, UCS data, and Satbeam data have a common Norad_id and are associated through Norad_id;
[0008] Step 2: Assume that the error of the satellite orbit data in the on-orbit satellite data resource pool follows a normal distribution. If a measurement value with a residual error greater than 3σ is found, the on-orbit satellite data of the measurement value is considered to be an outlier point and is removed. Repeat the above process of removing outliers, and use the Wright criterion to repeatedly cycle and remove outliers in the satellite orbit data until the calculation result is stable. The specific steps are as follows:
[0009] Extract the satellite data in orbit for a period of time, classify it according to time, obtain the position error sample 1, and calculate the position error mean μ 1 and standard deviation σ 1 ;
[0010] Set the confidence interval [μ 1 -3σ 1 , μ 1 +3σ 1 ], process the position error sample 1, if the position error exceeds the confidence interval, remove the error sample, obtain the position error sample 2, and then calculate the position error mean μ 2 and standard deviation σ 2 ;
[0011] Set a new confidence interval [μ 2 -3σ 2 , μ 2 +3σ 2 ], process the new sample cyclically until the calculation result is stable;
[0012] Step 3: read the latest orbit information from the in-orbit satellite data resource pool after removing outliers, and perform orbit deduction through the SGP4 or SDP4 orbit model;
[0013] Step 4: Predict the visibility time of NGSO satellites and earth stations:
[0014] Through step 3, we can get the position of NGSO satellite at any time (x 1 ,y 1 ,z 1 ), let the location of the earth station be (x 2 ,y 2 ,z 2 ), the distance D between the satellite and the earth station is calculated using the following formula:
[0015]
[0016] Then calculate the distance D from the satellite to the ground plane by the following formula: h :
[0017]
[0018] In the above formula, R is the distance from the satellite to the center of the earth, and Re is the radius of the earth;
[0019] The condition for the satellite and the earth station to be visible is that the direct distance between them is smaller than the distance from the satellite to the ground plane, that is, D h >D;
[0020] Step 5: When the satellite and the earth station are visible, read the satellite's beam coverage information, calculate the satellite beam coverage area, determine when the earth station will be covered by the satellite beam, and point the earth station antenna to the position when the satellite beam covers the earth station in advance.
[0021] The beneficial effects of the present invention are:
[0022] The method disclosed in the present invention can accurately predict the time when the NGSO satellite beam covers the earth station. Before the NGSO satellite beam covers the earth station, the earth station antenna is pointed to the NGSO satellite in advance, thereby avoiding occupying the time when the NGSO satellite beam covers the earth station due to the beam alignment process, making full use of the visible time between the NGSO satellite and the earth station, and improving the utilization efficiency of the NGSO satellite. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a schematic flow diagram of the method of the present invention;
[0024] Figure 2 This is the distribution diagram of UNW position error before and after the ISS satellite forecast period of 1d with infield value processing;
[0025] Figure 3 It is the distribution diagram of UNW position error before and after wild value processing for the ISS satellite forecast period of 6 to 7 days;
[0026] Figure 4 It is a schematic diagram of the relative positions of satellites and earth stations. DETAILED DESCRIPTION
[0027] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0028] Embodiment 1. This embodiment discloses a method for deducing satellite beam coverage based on an on-orbit satellite data resource pool. The on-orbit satellite data resource pool is obtained by associating and fusing on-orbit satellite data such as TLE data, UCS data, and Satbeam data. The satellite position information in the resource pool is subjected to multiple cycles of processing using the Wright criterion to remove outliers, thereby obtaining high-confidence satellite position information. The satellite trajectory is deduced by combining the position information after removing outliers with a high-precision orbit model to predict the visible time of the NGSO satellite and the earth station. The beam pointing direction and coverage of the NGSO satellite within the visible time are calculated to predict the time when the NGSO satellite beam covers the earth station. Before the NGSO satellite beam covers the earth station, the earth station antenna is pointed to the NGSO satellite in advance to avoid the beam alignment process occupying the time when the NGSO satellite beam covers the earth station.
[0029] like Figure 1 As shown, the specific steps include:
[0030] Step 1: Associate TLE data, UCS data, and Satbeam data to obtain the on-orbit satellite data resource pool:
[0031] TLE data, UCS data, and Satbeam data have a common Norad_id, and are associated through Norad_id; some of the data overlap, and the overlapping data can verify each other. The overlapping data is shown in the following table:
[0032]
[0033] Step 2: Assume that the error of the satellite orbit data in the on-orbit satellite data resource pool obeys the normal distribution. According to the normal distribution law of random error, the probability that the residual error falls outside ±3σ is about 0.3%. If a measurement value with a residual error greater than 3σ is found, the on-orbit satellite data of the measurement value is considered to be an outlier point and is removed. Repeat the above process of removing outliers, and use the Wright criterion to repeatedly cycle and remove outliers in the satellite orbit data until the calculation result is stable. The specific steps are as follows:
[0034] Extract the satellite data in orbit for a period of time, classify it according to time, obtain the position error sample 1, and calculate the position error mean μ 1 and standard deviation σ 1 ;
[0035] Set the confidence interval [μ 1 -3σ 1 , μ 1 +3σ 1 ], process the position error sample 1, if the position error exceeds the confidence interval, remove the error sample, obtain the position error sample 2, and then calculate the position error mean μ 2 and standard deviation σ 2 ;
[0036] Set a new confidence interval [μ 2 -3σ 2 , μ 2 +3σ 2 ], process the new sample cyclically until the calculation result is stable;
[0037] The ISS satellite with an orbital altitude of about 400 km was selected for analysis (ISS, international spacesation). The error samples of the ISS satellite were classified and the outliers were processed based on the on-orbit satellite data of one month. The position error distribution of the evolution error in the UNW (along-track direction, vertical direction and normal to the orbital plane) direction before and after the outlier processing within the forecast period of 1 day is shown in Fig. Figure 2 It can be seen that when the forecast period is within 1 day, the position error distribution of the three directions of UNW before processing is unclear due to the influence of outliers. After removing the outliers, the position errors of the three directions of UNW basically obey the normal distribution with a mean of 0. The position error distribution of the evolution error in the forecast period of 6 to 7 days before and after outlier processing is shown in Figure 3 It can be seen that when the forecast period is 6 to 7 days, the position error distribution of the three directions of UNW before processing is unclear due to the influence of outliers. After removing the outliers, the position errors of the three directions of UNW deviate from the normal distribution, and the mean is not 0.
[0038] Among the errors in the three directions, the error in the U direction is the largest. Taking the U direction as an example, the error analysis results are shown in the following table:
[0039]
[0040] From the table above we can see that:
[0041] (1) The proportion of samples to be eliminated is mostly below 20%. Therefore, if the sample size is sufficient, it is reasonable to simplify and directly adopt a 20% elimination ratio;
[0042] (2) After outlier processing, both the error mean and standard deviation are improved;
[0043] (3) As the forecast period increases, the mean and standard deviation of the position error also increase, and the mean gradually deviates from the initial value close to 0. When the forecast period exceeds 4 days, the absolute value of the mean error exceeds 1 km.
[0044] (4) As the forecast period increases, the normality of the error becomes less and less obvious, and the error above 4 days is no longer normally distributed.
[0045] The evolution error of satellite data on orbit mainly includes data error, model error and method error. The method error is small and can be ignored. Therefore, the data error and model error determine the distribution of the evolution error. When the forecast period is short, the model error is also small. It is mainly due to the data error itself caused by detection and other factors. It is a random error and therefore obeys the zero-mean normal distribution. However, as the forecast period increases, the cumulative model error increases. For low-orbit objects, the model error caused by atmospheric resistance plays a dominant role. The assumption of zero-mean normal distribution in the current early warning calculation is no longer valid.
[0046] Step 3: read the latest orbit information from the in-orbit satellite data resource pool after removing outliers, and perform orbit deduction through the SGP4 or SDP4 orbit model;
[0047] The SGP4 or SDP4 orbit model is a forecast algorithm model that meets the standards of the North American Aerospace Defense Command. The model fully considers the long-term and periodic effects brought about by the non-spherical shape of the earth, the gravitational forces of the sun and the moon, and the gravitational resonance factors, and uses a simple atmospheric model to consider the problem of orbital decay. Combined with the on-orbit satellite data resource pool, a more accurate satellite trajectory can be obtained.
[0048] Step 4: Predict the visibility time of NGSO satellites and earth stations:
[0049] Through step 3, we can get the position of NGSO satellite at any time (x 1 ,y 1 ,z 1 ), let the location of the earth station be (x 2 ,y 2 ,z 2 ), assuming that the relative positions (visibility) of the satellite and the earth station are as follows Figure 4 As shown, the distance D between the satellite and the earth station is calculated using the following formula:
[0050]
[0051] Then calculate the distance D from the satellite to the ground plane by the following formula: h :
[0052]
[0053] In the above formula, R is the distance from the satellite to the center of the earth, and Re is the radius of the earth;
[0054] The condition for the satellite and the earth station to be visible is that the direct distance between them is smaller than the distance from the satellite to the ground plane, that is, D h >D;
[0055] Step 5: When the satellite and the earth station are visible, read the satellite's beam coverage information, calculate the satellite beam coverage area, determine when the earth station will be covered by the satellite beam, and point the earth station antenna to the position when the satellite beam covers the earth station in advance.
[0056] Satellite beam coverage information is mainly obtained through the following ways:
[0057] (1) Beam coverage information of some satellites can be obtained from www.satstar.net;
[0058] (2) The beam coverage information of some satellites can be obtained from the websites of relevant operators;
[0059] (3) If the beam coverage information cannot be obtained, it is considered to be a wide-beam antenna that covers its entire visible area.
Claims
1. A satellite beam coverage deduction method based on an on-orbit satellite data resource pool. It is characterized in that The steps include: Step 1: Associate TLE data, UCS data, and Satbeam data to obtain the on-orbit satellite data resource pool: TLE data, UCS data, and Satbeam data have a common Norad_id and are associated through Norad_id; Step 2: Assume that the error of the satellite orbit data in the on-orbit satellite data resource pool follows a normal distribution. If a measurement value with a residual error greater than 3σ is found, the on-orbit satellite data of the measurement value is considered to be an outlier point and is removed. Repeat the above process of removing outliers, and use the Wright criterion to repeatedly cycle and remove outliers in the satellite orbit data until the calculation result is stable. The specific steps are as follows: Extract the satellite data in orbit for a period of time, classify it according to time, obtain the position error sample 1, and calculate the position error mean μ 1 and standard deviation σ 1 ; Set the confidence interval [μ 1 -3σ 1 , μ 1 +3σ 1 ], process the position error sample 1, if the position error exceeds the confidence interval, remove the error sample, obtain the position error sample 2, and then calculate the position error mean μ 2 and standard deviation σ 2 ; Set a new confidence interval [μ 2 -3σ 2 , μ 2 +3σ 2 ], process the new sample cyclically until the calculation result is stable; Step 3: read the latest orbit information from the in-orbit satellite data resource pool after removing outliers, and perform orbit deduction through the SGP4 or SDP4 orbit model; Step 4: Predict the visibility time of NGSO satellites and earth stations: Through step 3, we can get the position of NGSO satellite at any time (x 1 ,y 1 ,z 1 ), let the location of the earth station be (x 2 ,y 2 ,z 2 ), the distance D between the satellite and the earth station is calculated using the following formula: Then calculate the distance D from the satellite to the ground plane by the following formula: h : In the above formula, R is the distance from the satellite to the center of the earth, and Re is the radius of the earth; The condition for the satellite and the earth station to be visible is that the direct distance between them is smaller than the distance from the satellite to the ground plane, that is, D h >D; Step 5: When the satellite and the earth station are visible, read the satellite's beam coverage information, calculate the satellite beam coverage area, determine when the earth station will be covered by the satellite beam, and point the earth station antenna to the position when the satellite beam covers the earth station in advance.
Citation Information
Patent Citations
Beam switching method and beam switching device
CN109474326A
Method and system for establishing communication link between ground terminal and low-earth-orbit satellite
CN112152693A
Earth station device and method for controlling earth station device
JP2014099755A
Calibration of an earth station antenna using data provided by a satellite
US20030048222A1
Beam automatic selection switching method in multi-beam satellite communication system and apparatus for same
US6421526B1
