A cigarette equipment management method

By establishing information files and artificial neural network models to predict the length of fault intervals, combined with clustering statistical methods, the scientific problem of the timing of cigarette equipment maintenance and spare parts procurement has been solved, the timeliness of equipment maintenance and the rationality of spare parts procurement have been achieved, and the cost has been reduced. Production Impact and Expenses.

CN115793581BActive Publication Date: 2024-10-25ZHANGJIAKOU CIGARETTE FACTORY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211471985.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-07-23
Publication Date
2024-10-25
Estimated Expiration
2041-07-23

AI Technical Summary

Technical Problem

In the field of cigarette production, the timing of equipment maintenance and spare parts replacement lacks objective data support, which can easily lead to delayed or advanced maintenance, resulting in production impact and additional costs, and the quantity and timing of spare parts procurement are difficult to predict scientifically.

Method used

By establishing spare parts information files, equipment maintenance files and component replacement files, combined with the artificial neural network model to predict the length of the fault interval, determine the maintenance opportunity, and use clustering statistical methods to calculate the spare parts demand and procurement timing to ensure the timeliness and rationality of spare parts procurement. sex.

Benefits of technology

It achieves timely equipment maintenance and scientific spare parts procurement, reduces maintenance costs and waste of spare parts, and improves the normal operation of production and the quality of spare parts.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115793581B_ABST
    Figure CN115793581B_ABST
Patent Text Reader

Abstract

The present invention discloses a cigarette equipment management method, including step 1: establishing files, step 2: determining input values, step 3: constructing a prediction model, step 4: determining maintenance timing, and step 5: calculating spare parts purchase timing, taking the company's maximum spare parts inventory as the upper limit, determining the spare parts purchase quantity, and determining the spare parts purchase timing in combination with the shortest spare parts use time and spare parts purchase time. The present invention can predict the equipment maintenance timing through spare parts time parameters and equipment operation parameters, and determine the spare parts purchase quantity through previous equipment maintenance and spare parts replacement records, and determine the spare parts purchase timing in combination with spare parts purchase time.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] This application is a divisional application of the invention patent with application number: 202110837189.X and invention name: A cigarette equipment management system and method. Technical Field

[0002] The invention relates to the field of workshop equipment management systems, and in particular to a cigarette equipment management method. Background Art

[0003] There are generally a large number of processing equipment in the production workshops of various manufacturing enterprises. After a certain period of operation, some wearing parts or other parts of the equipment reach a certain degree of wear and tear and need to be replaced. For commonly used parts, there will be spare parts stored in the warehouse, which can be quickly retrieved when maintenance or replacement of spare parts is needed.

[0004] In the field of cigarette production, the timing for equipment maintenance or spare parts replacement is generally post-maintenance or replacement, that is, maintenance or replacement of spare parts is carried out when production problems occur or failures affect equipment operation. Some maintenance work and spare parts replacement are preventive work. This preventive work usually relies on subjective judgment based on the operating experience of maintenance personnel and lacks objective data support, which can easily cause maintenance to be delayed or advanced. If maintenance is delayed, equipment failure will occur, affecting the normal operation of production, while maintenance too early will lead to increased maintenance costs and spare parts costs.

[0005] At present, most of the spare parts purchased by enterprises are reported by maintenance personnel. Generally, the planned purchase quantity is more than the actual use quantity. The main purpose is to prevent the shortage of spare parts during sudden failure repairs. However, this method is not suitable for equipment with low failure rate and long failure cycle. Sometimes spare parts will fission during storage and cannot be used. This situation is particularly prominent for rubber products. Therefore, for workshops, there is an urgent need for a scientific system and method to predict the timing of maintenance and assist in determining the quantity and timing of spare parts purchase. Summary of the invention

[0006] Based on the above situation, the present application provides a cigarette equipment management method, which can predict the maintenance timing of equipment through the time parameters of spare parts and the operating parameters of the equipment, and determine the purchase quantity of spare parts through previous equipment maintenance and spare parts replacement records, and determine the purchase timing of spare parts based on the spare parts purchase time.

[0007] The technical solution adopted by the present invention to solve the technical problem is:

[0008] A cigarette equipment management method comprises the following steps:

[0009] Step 1: Create a file

[0010] Establish spare parts information files, spare parts usage files, equipment maintenance files and part / component replacement files in the information management module;

[0011] The contents entered into the spare parts information file include: spare parts code, spare parts name, applicable model, manufacturer, recommended use time of spare parts, purchase time and warranty period;

[0012] The contents entered into the spare parts usage file include: spare parts code, spare parts usage equipment and spare parts usage quantity;

[0013] The contents entered into the equipment maintenance file include: maintenance date, fault cause analysis, maintenance spare parts name and spare parts code;

[0014] The contents entered into the part / assembly replacement file include: replacement date, replacement reason and spare part code used for the part / assembly;

[0015] Step 2: Enter the value to confirm

[0016] Determine the recommended usage time of spare parts from the established files and determine the usage time of spare parts on the machine based on the spare parts replacement time, and determine the equipment operation time from the equipment status collection module;

[0017] Step 3: Prediction model construction

[0018] A maintenance prediction module is built through an artificial neural network model. The parameters obtained in step 2 are used as input factors, and the failure interval duration is used as the output factor to establish a key parameter prediction model. The failure interval duration of spare parts is predicted through two neurons.

[0019] Step 4: Determine the timing of maintenance

[0020] The maintenance time is determined based on the equipment operating parameters and fault interval time collected by the equipment status acquisition module. When the equipment operating parameters are within the safety parameter range, the equipment operating parameters are stable, and the maintenance time is determined by the fault interval time predicted by the maintenance prediction module, which is the sum of the spare parts replacement date and the fault interval time. When the equipment operating parameters exceed the safety parameter range, this is the time for maintenance;

[0021] Step 5: Calculate spare parts purchase timing

[0022] The cluster statistics-limit setting method is used for calculation. The spare parts replacement cycle and the replacement quantity in the corresponding cycle are determined according to the replacement date of spare parts in the equipment maintenance file. The on-machine usage time of different spare parts is determined through the spare parts replacement cycle. The spare parts warranty time is obtained from the spare parts information file. Combined with the usage time requirements met by the inventory spare parts, the spare parts brand is used as the clustering condition. Under this condition, the demand for spare parts within a certain period is determined.

[0023] The company's maximum spare parts inventory is used as the upper limit to determine the quantity of spare parts to be purchased. The timing of spare parts purchase is determined based on the shortest time the spare parts are used on the machine and the spare parts procurement time.

[0024] The beneficial effects brought by the present invention are:

[0025] An information management module has been established, which includes spare parts information files, spare parts usage files, equipment maintenance files, and parts / component replacement files. The relevant information parameters of spare parts, spare parts usage, equipment maintenance, and parts / component replacement are recorded in a complete and unified manner. When it is necessary to query replacement and maintenance records or spare parts parameter information, it is convenient for later management and query. After recording the usage of spare parts of different brands, they can be screened according to their usage quality, and higher quality spare parts can be purchased later;

[0026] The maintenance prediction module uses the spare parts' on-machine usage time, recommended usage time, and equipment operation time as input values ​​through the neural network prediction model, and outputs the fault interval time through the intermediate neurons. This method is based on specific values ​​and objectively predicts the fault interval, which is highly credible. In addition, this module uses the equipment operating parameter range of the equipment status acquisition module as a reference to determine the maintenance timing. Since the maintenance timing is confirmed instantly according to the current status of the equipment, the confirmation method takes comprehensive factors into consideration, which is of great significance to the effective and timely maintenance of the equipment.

[0027] In the procurement statistics module, based on the data in the information management module, the prohibited procurement quantity and spare parts procurement timing are confirmed according to the spare parts inventory and spare parts procurement time. This module has important guiding significance for the timeliness of spare parts procurement and the rationality of the purchase quantity. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments:

[0029] Figure 1 It is a module diagram of the system d of the present invention;

[0030] Figure 2 It is a schematic diagram of the maintenance prediction module of the present invention. DETAILED DESCRIPTION

[0031] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0032] Example 1

[0033] Reference Figures 1-2A cigarette equipment management system includes an information management module and a maintenance prediction module, an equipment status collection module and a purchase statistics module that are communicatively connected to the information management module. The information management module includes spare parts information files, spare parts usage files, equipment maintenance files and part / component replacement files.

[0034] Among them, the spare parts information file is filled in manually and its contents include: spare parts code, spare parts name, applicable model, manufacturer, recommended use time of spare parts, purchase time and warranty period;

[0035] The spare parts usage file is filled in manually and includes: spare parts code, equipment used by spare parts, and quantity of spare parts used;

[0036] Equipment maintenance records are filled in manually and include: maintenance date, fault cause analysis, maintenance spare parts name and spare parts code;

[0037] The part / assembly replacement file is recorded manually and includes: replacement date, replacement reason and spare part code used for the part / assembly.

[0038] The information management module can be used to easily count the usage time and manufacturers of spare parts of each brand. The quality of spare parts from different manufacturers can be counted and screened later.

[0039] Among them, the maintenance prediction module is built through an artificial neural network model, which is used to predict the fault interval of processing equipment. It has 3 input values, 1 output value, and 2 neurons. Its input values ​​are the time the spare parts are used on the machine, the recommended time the spare parts are used, and the time the equipment is running. The output value is the fault interval.

[0040] Specifically, the length of time that a spare part is used on a machine is the difference between the current time and the spare part replacement date.

[0041] Among them, the equipment status acquisition module collects equipment operating parameters and equipment operating time in real time, and compares them with the safety range of the operating parameters; when the equipment operating parameters are within the safety parameter range, the equipment runs stably, and the maintenance timing is determined based on the fault interval duration predicted by the maintenance prediction module and the time point of the last fault, that is, the sum of the spare parts replacement date and the fault interval duration. When the equipment operating parameters exceed the safety parameter range, this is the time for maintenance.

[0042] As a preferred solution of this embodiment, the equipment status acquisition module uses a data acquisition card for real-time acquisition, which includes a communication interface, a sensor and an information acquisition system. Specifically, it connects the relevant I / O points or other interfaces of the production equipment with the corresponding sensors to collect corresponding processing information, including various parameters of equipment operation, etc. Optionally, the equipment information can also be collected in Ethernet mode or other ways.

[0043] Among them, the procurement statistics module calculates the machine usage time and spare parts cycle demand of different spare parts according to the replacement date of the part / component replacement file of the information management module, determines the spare parts procurement quantity according to the company's spare parts inventory, and determines the spare parts procurement timing based on the procurement time.

[0044] Specifically, the procurement statistics module uses clustering statistics to determine the quantity and timing of spare parts procurement, specifically: determine the spare parts replacement cycle and the replacement quantity of the corresponding cycle according to the replacement date of the spare parts in the equipment maintenance file, and determine the machine usage time of different spare parts through the spare parts replacement cycle, obtain the spare parts warranty time from the spare parts information file, and combine the usage time requirements met by the inventory spare parts, take the spare parts brand as the clustering condition, and determine the demand for spare parts within a certain period under this condition;

[0045] The company's maximum spare parts inventory is used as the upper limit to determine the quantity of spare parts to be purchased. The timing of spare parts purchase is determined based on the shortest time the spare parts are used on the machine and the spare parts procurement time.

[0046] Example 2

[0047] Reference Figures 1-2 A cigarette equipment management system includes an information management module and a maintenance prediction module, an equipment status acquisition module and a purchase statistics module which are communicatively connected with the information management module.

[0048] Specifically, the information management module includes spare parts information files, spare parts usage files, equipment maintenance files and part / assembly replacement files, and all are automatically counted after being entered into the computer.

[0049] Among them, the spare parts information file can be coded on the spare parts in advance to input the spare parts information. When the spare parts information needs to be input, just scan the code to obtain it. Its content includes: spare parts code, spare parts name, applicable model, manufacturer, recommended use time of spare parts, purchase time, storage location and warranty period;

[0050] Spare parts usage files include: spare parts code, spare parts usage equipment, spare parts replacement process and spare parts usage quantity;

[0051] Equipment maintenance files include: maintenance date, fault cause analysis, maintenance process, spare parts name, spare parts code, and maintenance responsible person;

[0052] The part / assembly replacement file includes: replacement date, replacement reason, replacement process, spare parts code used for the part / assembly and the person responsible for the replacement.

[0053] The information management module can be used to easily count the usage time and manufacturers of spare parts of each brand. The quality of spare parts from different manufacturers can be counted and screened later.

[0054] Among them, the maintenance prediction module is built through an artificial neural network model, which is used to predict the fault interval of processing equipment. It has 3 input values, 1 output value, and 2 neurons. Its input values ​​are the time the spare parts are used on the machine, the recommended time the spare parts are used, and the time the equipment is running. The output value is the fault interval.

[0055] Specifically, the length of time that a spare part is used on a machine is the difference between the current time and the spare part replacement date.

[0056] Among them, the equipment status acquisition module collects equipment operating parameters and equipment operating time in real time, and compares them with the safety range of the operating parameters; when the equipment operating parameters are within the safety parameter range, the equipment runs stably, and the maintenance timing is determined based on the fault interval duration predicted by the maintenance prediction module and the time point of the last fault, that is, the sum of the spare parts replacement date and the fault interval duration. When the equipment operating parameters exceed the safety parameter range, this is the time for maintenance.

[0057] As a preferred solution of this embodiment, the equipment status acquisition module uses a data acquisition card for real-time acquisition, which includes a communication interface, a sensor and an information acquisition system. Specifically, it connects the relevant I / O points or other interfaces of the production equipment with the corresponding sensors to collect corresponding processing information, including various parameters of equipment operation, etc. Optionally, the equipment information can also be collected in Ethernet mode or other ways.

[0058] Among them, the procurement statistics module calculates the machine usage time and spare parts cycle demand of different spare parts according to the replacement date of the part / component replacement file of the information management module, determines the spare parts procurement quantity according to the company's spare parts inventory, and determines the spare parts procurement timing based on the procurement time.

[0059] Specifically, the procurement statistics module uses clustering statistics to determine the quantity and timing of spare parts procurement, specifically: determine the spare parts replacement cycle and the replacement quantity of the corresponding cycle according to the replacement date of the spare parts in the equipment maintenance file, and determine the machine usage time of different spare parts through the spare parts replacement cycle, obtain the spare parts warranty time from the spare parts information file, and combine the usage time requirements met by the inventory spare parts, take the spare parts brand as the clustering condition, and determine the demand for spare parts within a certain period under this condition;

[0060] The company's maximum spare parts inventory is used as the upper limit to determine the quantity of spare parts to be purchased. The timing of spare parts purchase is determined based on the shortest time the spare parts are used on the machine and the spare parts procurement time.

[0061] Example 3

[0062] Reference Figures 1-2 A cigarette equipment management method is provided. The method is applied to a cigarette equipment management system described in Examples 1 to 2, and comprises the following steps:

[0063] Step 1: Create a file

[0064] Establish spare parts information files, spare parts usage files, equipment maintenance files and part / component replacement files in the information management module;

[0065] The contents entered into the spare parts information file include: spare parts code, spare parts name, applicable model, manufacturer, recommended use time of spare parts, purchase time and warranty period;

[0066] The contents entered into the spare parts usage file include: spare parts code, spare parts usage equipment and spare parts usage quantity;

[0067] The contents entered into the equipment maintenance file include: maintenance date, fault cause analysis, maintenance spare parts name and spare parts code;

[0068] The contents entered into the part / assembly replacement file include: replacement date, replacement reason and spare part code used for the part / assembly;

[0069] Step 2: Enter the value to confirm

[0070] Determine the recommended usage time of spare parts from the established files and determine the on-machine usage time of spare parts based on the spare parts replacement time, and determine the equipment operation time from the equipment status collection module;

[0071] Step 3: Prediction model construction

[0072] A maintenance prediction module is built through an artificial neural network model. The parameters obtained in step 2 are used as input factors, and the failure interval duration is used as the output factor to establish a key parameter prediction model. The failure interval duration of spare parts is predicted through two neurons.

[0073] Step 4: Determine the timing of maintenance

[0074] The maintenance time is determined based on the equipment operating parameters and fault interval time collected by the equipment status acquisition module. When the equipment operating parameters are within the safety parameter range, the equipment operating parameters are stable, and the maintenance time is determined by the fault interval time predicted by the maintenance prediction module, which is the sum of the spare parts replacement date and the fault interval time. When the equipment operating parameters exceed the safety parameter range, this is the time for maintenance;

[0075] Step 5: Calculate spare parts purchase timing

[0076] The cluster statistics-limit setting method is used for calculation. The spare parts replacement cycle and the replacement quantity in the corresponding cycle are determined according to the replacement date of spare parts in the equipment maintenance file. The on-machine usage time of different spare parts is determined through the spare parts replacement cycle. The spare parts warranty time is obtained from the spare parts information file. Combined with the usage time requirements met by the inventory spare parts, the spare parts brand is used as the clustering condition. Under this condition, the demand for spare parts within a certain period is determined.

[0077] The company's maximum spare parts inventory is used as the upper limit to determine the quantity of spare parts to be purchased. The timing of spare parts purchase is determined based on the shortest time the spare parts are used on the machine and the spare parts procurement time.

[0078] It should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A cigarette equipment management method, Features: The following steps are involved: Step 1: Create a file Establish spare parts information files, spare parts usage files, equipment maintenance files and part / component replacement files in the information management module; The spare parts information file is recorded manually or the spare parts information is entered by coding on the spare parts in advance. When the spare parts information needs to be entered, just scan the code to obtain it; The contents entered into the spare parts information file include: spare parts code, spare parts name, applicable model, manufacturer, recommended use time of spare parts, purchase time and warranty period; The contents entered into the spare parts usage file include: spare parts code, spare parts usage equipment and spare parts usage quantity; The contents entered into the equipment maintenance file include: maintenance date, fault cause analysis, maintenance spare parts name and spare parts code; The contents entered into the part / assembly replacement file include: replacement date, replacement reason and spare part code used for the part / assembly; Step 2: Enter the value to confirm Determine the recommended usage time of spare parts from the established files and determine the usage time of spare parts on the machine based on the spare parts replacement time, and determine the equipment operation time from the equipment status collection module; Step 3: Prediction model construction A maintenance prediction module is built through an artificial neural network model. The parameters obtained in step 2 are used as input factors, and the failure interval duration is used as the output factor to establish a key parameter prediction model. The failure interval duration of spare parts is predicted through two neurons. Step 4: Determine the timing of maintenance The maintenance time is determined based on the equipment operating parameters and fault interval time collected by the equipment status acquisition module. When the equipment operating parameters are within the safety parameter range, the equipment operating parameters are stable, and the maintenance time is determined by the fault interval time predicted by the maintenance prediction module. When the equipment operating parameters exceed the safety parameter range, this is the time for maintenance. The device status acquisition module uses a data acquisition card to collect data in real time, or uses Ethernet mode to collect device information; Step 5: Calculate spare parts purchase timing The cluster statistics-limit setting method is used for calculation. The spare parts replacement cycle and the replacement quantity in the corresponding cycle are determined according to the replacement date of spare parts in the equipment maintenance file. The on-machine usage time of different spare parts is determined through the spare parts replacement cycle. The spare parts warranty time is obtained from the spare parts information file. Combined with the usage time requirements met by the inventory spare parts, the spare parts brand is used as the clustering condition. Under this condition, the demand for spare parts within a certain period is determined. The company's maximum spare parts inventory is used as the upper limit to determine the quantity of spare parts to be purchased. The timing of spare parts purchase is determined based on the shortest time the spare parts are used on the machine and the spare parts procurement time.