Installation assembly of floor climbing type concrete placing boom and installation method thereof
By introducing a fixed support mechanism and support unit with adjustable length into the installation assembly of the floor climbing fabric machine, the problems of tower body tilt and connection instability are solved, and the safety of the structure is improved.
Patent Information
- Application Number
- CN202211699397.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-12-28
- Publication Date
- 2025-02-28
- Estimated Expiration
- 2042-12-28
AI Technical Summary
During the installation process of the floor climbing fabric machine, the tilt is prone to occur between the climbing frame and the tower body, resulting in unstable connection effect and affecting structural safety.
An installation assembly is provided, including a climbing frame body, a cloth machine, a concrete conveying mechanism and a fixed support mechanism. The fixed support mechanism can vary the length as the tower body increases and abuts against one side of the cloth machine through the support unit, providing additional support to prevent the tower body from tilting.
By adding a fixed support mechanism and support unit, the inclination between the climbing frame and the tower body is effectively prevented, the stability of the connection is improved, and the impact on structural safety is reduced.
Smart Images

Figure CN115874815B_ABST
Abstract
Description
Technical Field
[0001] The embodiments of the present application relate to the technical field of building construction, and in particular to an installation assembly of a floor climbing concrete placing boom and an installation method thereof. Background Art
[0002] With the rise of the construction industry, my country has become the country with the largest number of super high-rise buildings or the fastest growing number of super high-rise buildings. As a representative building in a city, super high-rise buildings are the weather vane of the city. Generally, super high-rise buildings are located in the core area, which leads to the characteristics of large construction volume, long construction period and small construction site. In order to ensure the continuity of concrete pouring and reduce the frequency of repeated dismantling and modification of pump pipes, climbing concrete placing cranes are often used in the existing construction process.
[0003] Climbing concrete placing machines include floor climbing concrete placing machines, mobile concrete placing machines and elevator shaft climbing concrete placing machines. In the selection process of various climbing concrete placing machines, floor climbing concrete placing machines have advantages over mobile concrete placing machines, such as large spreading radius and independent climbing after one installation. Compared with elevator shaft climbing concrete placing machines and mobile hydraulic concrete placing machines, floor climbing concrete placing machines are convenient and flexible in the selection of installation locations and are not restricted. Therefore, floor climbing concrete placing machines are often used in super high-rise buildings. The basic principle of the application of floor climbing concrete placing machines is to first determine the height of the tower body of the floor climbing concrete placing machine and the radius covered by the boom through overlay, climbing planning and blind spot verification. After the determination, the climbing frame, tower body, boom assembly and delivery pump pipe are assembled in sequence, and finally debugged and put into use. Hydraulic transmission rods are required during the climbing process, and this cycle is carried out to achieve dynamic conversion of different floors.
[0004] However, the difficulty in installing the floor climbing concrete placing boom is that when installing the floor climbing concrete placing boom, a climbing frame, a tower body, an arm assembly and a conveying pump pipe are spliced, and the tower body is heavy and long, so it is very easy for the climbing frame and the tower body of the floor climbing concrete placing boom to tilt during the splicing process, resulting in collisions between the tower body of the floor climbing concrete placing boom and concrete components, steel components between two adjacent floors, and tower cranes, and then it is very easy for the connection effect to be unstable, which causes the climbing of the floor climbing concrete placing boom to affect the structural safety.
[0005] In order to solve the above problems, the present invention is proposed. Summary of the invention
[0006] The present application provides an installation component of a floor climbing concrete placing boom and an installation method thereof, which solves the technical problem that after the floor climbing concrete placing boom is installed, the climbing frame, the tower body, the boom assembly and the delivery pump pipe are spliced, and the tower body is heavy and long, so it is very easy for the climbing frame to tilt and collide with concrete components, steel components and tower cranes during the splicing process, and then it is very easy to have an unstable connection effect, thereby causing the climbing of the floor climbing concrete placing boom to affect the structural safety.
[0007] In a first aspect, the present application provides an installation assembly for a floor climbing concrete placing boom, comprising a climbing frame body, a concrete placing boom, a concrete conveying mechanism, and a fixed support mechanism;
[0008] The climbing frame body is arranged in a hole of the top floor, and is used to support the tower body of the concrete placing boom. The tower body of the concrete placing boom is in a vertical state and passes through between the floor boards and extends upward and protrudes from the climbing frame body.
[0009] One end of the concrete conveying mechanism is connected to the concrete truck, and the other end of the concrete conveying mechanism extends along the height direction of the concrete placing boom tower body, and the concrete conveying mechanism is arranged on one side of the concrete placing boom tower body, and the concrete conveying mechanism can convey the concrete in the concrete truck to the processing platform of the concrete placing boom;
[0010] The fixed support mechanism is fixedly arranged on a side of the concrete placing boom away from the concrete conveying mechanism. The fixed support mechanism can be extended accordingly as the tower body of the concrete placing boom is extended. A support unit is arranged on a side of the fixed support mechanism close to the concrete placing boom, and the support unit can support the concrete placing boom.
[0011] Preferably, the fixed support mechanism comprises a fixed base and a plurality of assembly units;
[0012] The fixed base is detachably mounted on the bottom of the material placing machine, and the assembly unit includes connecting arms which are connected in sequence, and the connecting arm is arranged parallel to a side wall of the material placing machine;
[0013] The plurality of assembly units are detachably connected via a fixing assembly;
[0014] The upper and lower ends of the connecting arm are connected to the holes of the floor slab in upper and lower directions.
[0015] Preferably, the support unit comprises a plurality of guide rods spaced apart on the connecting arm, a spring sleeved on the guide rods, and a locking mechanism for restraining the guide rods;
[0016] The guide rod is arranged horizontally, and one end of the guide rod is fixedly connected to the connecting arm, and the other end of the guide rod is provided with a pressing block, and a side wall of the pressing block abuts against a side wall of the material placing machine.
[0017] Preferably, the material placing machine comprises a tower platform, a mounting arm, and a plurality of segmented tower bodies;
[0018] The tower body platform is fixedly arranged on the bottom surface, and a plurality of segmented tower body bodies are sequentially connected to form the tower body. One end of the tower body is arranged on the tower body platform, and the other end of the tower body is detachably connected to the mounting arm.
[0019] Preferably, the concrete conveying mechanism and the mounting arm are connected via a connecting structure.
[0020] Preferably, the connecting structure comprises a connecting pipe body, a lower support and an upper support;
[0021] The lower support is detachably connected to the tower body, and the lower support has a first horizontal through hole;
[0022] The upper support is hinged to the top of the lower support, and the top of the upper support has a central through hole;
[0023] One end of the connecting pipe body extends transversely and is inserted into the first horizontal through hole, and passes through the central through hole upward and extends to the second horizontal through hole of the mounting arm and extends toward one side.
[0024] Preferably, the connecting pipe body comprises a first elbow, a second elbow, a third elbow, a fourth elbow and a joint clamp which are connected in sequence;
[0025] The bottom end of the first curved pipe is connected to the first connecting straight pipe, the right end of the first curved pipe passes through the first horizontal through hole and is connected to the bottom end of the second curved pipe, the top end of the second curved pipe is connected to the bottom end of the second connecting straight pipe, the top end of the second connecting straight pipe is connected to the bottom end of the third curved pipe, the left end of the third curved pipe is connected to the right end of the fourth connecting pipe, and the top of the fourth connecting pipe is connected to the third connecting straight pipe;
[0026] The connected curved pipe and straight pipe are fixed by the joint clamp.
[0027] Preferably, the joint clamp is locked by an open elastic pin.
[0028] Preferably, the climbing frame body comprises at least two layers of climbing frames, and the two layers of climbing frames are arranged in the holes of the floor slab at intervals in the upper and lower parts;
[0029] The climbing frame comprises a circular bottom wall, an annular side wall and a moving track;
[0030] The circular bottom wall is detachably connected to the floor hole, and the annular side wall is arranged on the top outer edge of the circular bottom wall;
[0031] The moving track is arranged on the inner circle of the circular bottom wall, and the moving track is arranged to extend vertically.
[0032] The installation assembly also includes an auxiliary support unit, which is arranged between adjacent floor slabs and includes a plurality of disc-shaped scaffolds that are arranged in a columnar shape in a horizontal and vertical manner.
[0033] On the other hand, a method for installing a floor-climbing concrete placing boom adopts the installation assembly of the floor-climbing concrete placing boom, and the method comprises the following steps:
[0034] S1. Preserve holes on the floor slab;
[0035] S2. Install the climbing frame body at the reserved holes on the floor slab;
[0036] S3, installing the concrete placing machine on the ground;
[0037] S4, installing the concrete conveying mechanism on the concrete placing boom;
[0038] S5. Whole machine debugging
[0039] The present application provides an installation assembly and an installation method of a floor climbing concrete placing boom, which have the following beneficial effects:
[0040] By adding a fixed support mechanism, one side of the concrete placing boom can be further supported and fixed. The fixed support mechanism is arranged on the floor slab and can change its length as the tower body increases. At the same time, the support unit is abutted against one side of the concrete placing boom, so the concrete placing boom can be better supported to prevent the climbing frame, tower body, boom assembly and conveying pump pipe from tilting and colliding with concrete components, steel components and tower cranes due to splicing and the heavy and long tower body. This can easily lead to unstable connection effect, thereby reducing the impact of the climbing of the floor-climbing concrete placing boom on the structural safety. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] Figure 1 This is a schematic diagram of the overall structure of the installation components of the floor climbing concrete placing boom of the present application;
[0042] Figure 2 This is a schematic diagram of the structure of the lower part of the material placing machine of the present application;
[0043] Figure 3 This is a schematic diagram of the structure of the upper part of the material placing machine of this application;
[0044] Figure 4 This is a schematic diagram of the three-dimensional structure of the climbing frame body of the present application;
[0045] Figure 5 This is a schematic diagram of the structure of the fixed support mechanism of the present application;
[0046] Figure 6 This is a schematic diagram of the structure of the support unit of the present application.
[0047] In the figure:
[0048] 1. Climbing frame body, 11. Climbing frame, 111. Meander bottom wall, 112. Annular side wall, 113. Moving track, 2. Concrete placing machine, 21. Tower platform, 22. Mounting arm, 23. Segmented tower body, 3. Concrete conveying mechanism; 4. Fixed supporting mechanism, 41. Fixed base, 42. Assembly unit, 421. Connecting arm, 5. Support unit, 51. Guide rod, 52. Spring, 6. Connecting structure, 61. Connecting pipe body, 611. First bend pipe, 612. Second bend pipe, 613. Third bend pipe, 614. Fourth bend pipe, 615. Joint clamp, 62. Lower support, 63. Upper support, 7. First connecting straight pipe, 8. Second connecting straight pipe, 9. Third connecting straight pipe, 10. Auxiliary supporting unit, 101. Disc-type scaffolding, a. Floor slab. DETAILED DESCRIPTION
[0049] In order to enable those skilled in the art to better understand the technical solutions in the present application, the technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work should fall within the scope of protection of the present application.
[0050] like Figure 1 and Figure 2 As shown, the present application discloses an installation assembly of a floor climbing concrete placing boom, comprising a climbing frame body 1, a concrete placing boom 2, a concrete conveying mechanism 3 and a fixed support mechanism 4;
[0051] The climbing frame body 1 is arranged in the hole of the top floor a, and the climbing frame body 1 is used to support the tower body of the concrete placing boom 2. The tower body of the concrete placing boom 2 is in a vertical state and passes through the floors a and extends upward and protrudes from the climbing frame body 1.
[0052] Furthermore, the climbing frame body 1 includes at least two layers of climbing frames 11, and the two layers of climbing frames 11 are arranged in the holes of the floor a at intervals. The two layers of climbing frames 11 are respectively arranged at the upper and lower ends of the holes of the floor a. Before installing the tower body of the concrete placing machine 2, at least two layers of climbing frames 11 must be installed on the reserved holes on the floor to support the whole machine. The connection between the climbing frame and the reserved holes on the floor is fixed with connecting screws, and the corresponding position deviation of the upper and lower three holes is not more than 20mm within 6m.
[0053] The climbing frame 11 includes a circular bottom wall 111 , an annular side wall 112 and a moving track 113 .
[0054] The circular bottom wall 111 is detachably connected to the hole of the floor slab a, and the annular side wall 112 is disposed at the top outer edge of the circular bottom wall 111 .
[0055] The moving track 113 is disposed on the inner circle of the circular bottom wall 111 , and the moving track 113 is vertically extended.
[0056] Furthermore, the material placing machine 2 comprises a tower platform 21, a mounting arm 22, and a plurality of segmented tower bodies 23;
[0057] The tower body platform 21 is fixedly arranged on the bottom surface, and a plurality of segmented tower body main bodies 23 are connected in sequence to form the tower body. One end of the tower body is arranged on the tower body platform 21, and the other end of the tower body is fixedly connected to the tower body platform 21. The mounting arm 22 is arranged on the tower body platform 21 and is detachably connected to the top of the tower body.
[0058] One end of the concrete conveying mechanism 3 is connected to the concrete truck, and the other end of the concrete conveying mechanism 3 extends along the height direction of the tower body of the concrete placing boom 2. The concrete conveying mechanism 3 is arranged on one side of the tower body of the concrete placing boom 2. The concrete conveying mechanism 3 can convey the concrete in the concrete truck to the processing platform of the concrete placing boom 2.
[0059] The fixed support mechanism 4 is fixedly arranged on a side of the concrete placing boom 2 away from the concrete conveying mechanism 3. The fixed support mechanism 4 can be extended accordingly as the tower body of the concrete placing boom 2 is extended. A support unit 5 is arranged on a side of the fixed support mechanism 4 close to the concrete placing boom 2. The support unit 5 can support the concrete placing boom 2.
[0060] The present application can further support and fix one side of the concrete placing boom 3 by adding a fixed support mechanism 4, and the fixed support mechanism 4 is arranged on the floor a and can change its length as the tower body increases. At the same time, the support unit 5 is abutted against one side of the concrete placing boom, so as to better support the concrete placing boom and prevent the climbing frame, tower body, boom assembly and conveying pump pipe from tilting and colliding with concrete components, steel components and tower cranes easily during the splicing process due to the splicing and the heavy and long tower body, thereby easily resulting in unstable connection effect, thereby reducing the impact of the climbing of the floor climbing concrete placing boom on the structural safety.
[0061] Furthermore, the fixed support mechanism 4 includes a fixed base 41 and a plurality of assembly units 42 .
[0062] The fixed base 41 is detachably mounted on the bottom of the material placing machine 2 . The assembly unit 42 includes connecting arms 421 that are sequentially connected to form a connecting arm 421 . The connecting arm 421 is arranged parallel to a side wall of the material placing machine 2 .
[0063] The plurality of assembly units 42 are detachably connected via fixing components.
[0064] The upper and lower ends of the connecting arm 421 are connected to the holes of the floor slab a in upper and lower directions.
[0065] Furthermore, the support unit 5 includes a plurality of guide rods 51 spaced apart on the connecting arm 421 , a spring 52 sleeved on the guide rods 51 , and a locking mechanism 53 for restraining the guide rods 51 .
[0066] The guide rod 51 is arranged horizontally, and one end of the guide rod 51 is fixedly connected to the connecting arm 421, and the other end of the guide rod 51 is provided with a pressing block 54, and a side wall of the pressing block 54 abuts against a side wall of the material placing machine 2. The side wall of the tower body is further supported by the supporting unit 5, so that the fixing effect of the tower body is better, and good support can prevent the tower body from tilting.
[0067] Furthermore, the concrete conveying mechanism 3 and the mounting arm 22 are connected via a connecting structure 6 .
[0068] The connecting structure 6 includes a connecting tube body 61 , a lower support 62 and an upper support 63 .
[0069] The lower support 62 is detachably connected to the tower body, and the lower support 62 has a first horizontal through hole.
[0070] The upper support 63 is hinged to the top of the lower support 62, and the top of the upper support 63 has a central through hole 631;
[0071] One end of the connecting tube body 61 extends transversely and is inserted into the first horizontal through hole 621 , and passes through the central through hole 631 upward and extends to the second horizontal through hole 221 of the mounting arm 22 and extends toward one side.
[0072] Furthermore, the connecting pipe body 61 includes a first curved pipe 611 , a second curved pipe 612 , a third curved pipe 613 , a fourth curved pipe 614 and a joint clamp 615 which are connected in sequence.
[0073] The bottom end of the first curved pipe 611 is connected to the first connecting straight pipe 7, the right end of the first curved pipe 611 passes through the first horizontal through hole 621 and is connected to the bottom end of the second curved pipe 612, the top end of the second curved pipe 612 is connected to the bottom end of the second connecting straight pipe 8, the top end of the second connecting straight pipe 8 is connected to the bottom end of the third curved pipe 613, the left end of the third curved pipe 613 is connected to the right end of the fourth curved pipe 614, and the top of the fourth curved pipe 614 is connected to the third connecting straight pipe 9.
[0074] The connected curved pipe and straight pipe are fixed by the joint clamp 615 .
[0075] Furthermore, the joint clamp 615 is locked by an open elastic pin (not shown in the figure). After the pipe joint clamp 615 is installed, the connecting block must be locked with the open elastic pin to ensure safety.
[0076] Furthermore, the installation assembly also includes an auxiliary support unit 10, which is arranged between adjacent floor slabs a, and includes a plurality of disc-type scaffolds 101 arranged in a columnar shape in a horizontal and vertical manner. The auxiliary support unit 10 is optimized in structure, and a disc-type scaffold support system is used to support the load concentration area of the tower frame of the concrete placing machine. Compared with the traditional steel pipe fastener scaffold, it is lighter in weight, has a higher erection efficiency, and a more stable center of gravity.
[0077] It should be noted that the auxiliary support unit 10 plays the role of auxiliary support and is easy to install and disassemble, further preventing the tower body from tilting and achieving a stabilizing effect.
[0078] The present application also discloses a method for installing a floor climbing concrete placing boom, using an installation assembly of the floor climbing concrete placing boom, the method comprising the following steps:
[0079] S1. Preserve holes on the floor slab a.
[0080] S2. Install the climbing frame body 1 at the reserved holes on the floor slab a.
[0081] S3, installing the material placing boom 2 on the ground.
[0082] S4, installing the concrete conveying mechanism 3 on the concrete placing boom 2.
[0083] S5. Debug the whole machine.
[0084] Specifically, preparations are required before installation. The plane position is determined and marked by superimposing the structural drawings using CAD software. Then, climbing planning and collision detection are carried out through BIM modeling combined with tower cranes and steel components to determine the installation height and effective radius, and the HGY32 model is selected.
[0085] During installation, a standardized wooden template is used to reserve the hole size, and it is placed accurately at the reserved hole location. Two reinforcing steel bars with the same diameter as the floor reinforcement are set around the hole, extending out to 1 / 2 of the hole width from the edge of the hole.
[0086] The climbing frame of the floor climbing concrete placing boom has two layers. The upper frame mainly bears the horizontal load, and the lower frame bears the horizontal load and the vertical load of the whole machine. Φ48×3mm disc buckles are selected for support. Before erection, load verification is performed based on the maximum bending moment, maximum horizontal force, vertical force, and torque data. The maximum spacing of the frame uprights is calculated to be 900mm*900mm.
[0087] According to the effective lifting radius of the tower crane, a suitable stockpile yard is selected in advance for integrated assembly and lifting. The three tower sections can be assembled on the ground first, and after the ladder, concrete delivery pipe, tower platform and other components are assembled, the whole tower can be lifted and installed on the base frame.
[0088] After the tower body is installed, a theodolite is used to check the verticality of the tower body to the horizontal ground, and the allowable deviation is no more than 20mm.
[0089] Install the upper platform to the upper slewing support on the ground, install the connecting buckle between the railings, and then hoist the upper and lower slewing supports and the rear section of the boom onto the tower body; connect the lower support to the tower body with a connecting pin, insert the split pin, and fix the connecting pin; hoist the front section of the boom, connect the front and rear sections of the boom, fix them with bolts, and connect the hydraulic pipelines.
[0090] When assembling the tower body, upper and lower supports and concrete placing boom, a part of the concrete conveying pipe (including straight pipe and curved pipe) has been fixed to the corresponding parts and connected with pipe joint clamps.
[0091] The concrete delivery pipe between the concrete placing boom and the upper support is connected through a 90° elbow. The concrete delivery pipe on the tower body is directly connected to the elbow leading out of the lower support. A rubber sealing ring should be installed before connection.
[0092] After installation, the structural parts, concrete delivery pipelines, hydraulic system, and electrical system must be thoroughly checked before a test run can be carried out; the test operation should be carried out according to the operating procedures, and all actions should be performed at a low speed at the beginning; during operation, check that the hydraulic system pressure should be within the normal working pressure range and not greater than 20Mpa.
[0093] Optimize the assembly method of the concrete placing boom: According to the effective lifting radius of the tower crane, select a suitable stockpiling site in advance, integrate and install the concrete placing boom tower body, ladder, concrete delivery pipe, tower body platform and other components that are installed in sections to speed up the installation cycle.
[0094] BIM modeling enables collision detection: BIM modeling is used to plan the climbing of the concrete placing boom installation, verify the safe distance from steel components such as the tower crane boom, steel columns and steel plate shear walls, resolve the collision risks caused by traditional installation methods, and improve safety during construction.
[0095] CAD operation of floor plan overlay: by overlaying all floor structure plan drawings, select the reserved openings that have no impact on the structural parts to ensure the normal climbing of the concrete placing boom; accurately locate the plane position and effective radius of the concrete placing boom to reduce the blind area of casting.
[0096] Those skilled in the art will readily appreciate other embodiments of the present invention after considering the specification and practicing the invention disclosed herein. This application is intended to cover any variations, uses or adaptations of the present invention that follow the general principles of the present invention and include common knowledge or customary techniques in the art that are not disclosed by the present invention. The specification and examples are to be considered exemplary only, and the true scope and spirit of the present invention are indicated by the following claims.
[0097] It should be understood that the present invention is not limited to the exact construction that has been described above and shown in the drawings and that various modifications and changes may be made without departing from the scope thereof. The scope of the present invention is limited only by the appended claims.
Claims
1. An installation assembly for a floor climbing concrete placing boom, characterized in that: It includes a climbing frame body, a concrete placing machine, a concrete conveying mechanism and a fixed supporting mechanism; The climbing frame body is arranged in a hole of the top floor, and is used to support the tower body of the concrete placing boom. The tower body of the concrete placing boom is in a vertical state and passes through between the floor boards and extends upward and protrudes from the climbing frame body. One end of the concrete conveying mechanism is connected to the concrete truck, and the other end of the concrete conveying mechanism extends along the height direction of the concrete placing boom tower body, and the concrete conveying mechanism is arranged on one side of the concrete placing boom tower body, and the concrete conveying mechanism can convey the concrete in the concrete truck to the processing platform of the concrete placing boom; The fixed support mechanism is fixedly arranged on a side of the concrete placing boom away from the concrete conveying mechanism, and the fixed support mechanism can be extended accordingly as the tower body of the concrete placing boom is extended. A support unit is arranged on a side of the fixed support mechanism close to the concrete placing boom, and the support unit can support the concrete placing boom; The fixed support mechanism includes a fixed base and a plurality of assembly units; The fixed base is detachably mounted on the bottom of the material placing machine, and the assembly unit includes connecting arms which are connected in sequence, and the connecting arm is arranged parallel to a side wall of the material placing machine; The plurality of assembly units are detachably connected via a fixing assembly; The upper and lower ends of the connecting arm are connected to the holes of the floor slab in upper and lower directions; The support unit comprises a plurality of guide rods arranged at intervals on the connecting arm, a spring sleeved on the guide rods, and a locking mechanism for restraining the guide rods; The guide rod is arranged horizontally, and one end of the guide rod is fixedly connected to the connecting arm, and the other end of the guide rod is provided with a pressing block, and a side wall of the pressing block abuts against a side wall of the material placing machine.
2. The installation assembly of the floor climbing concrete placing boom according to claim 1, characterized in that: The concrete placing machine includes a tower platform, a mounting arm, and a plurality of segmented tower bodies; The tower body platform is fixedly arranged on the bottom surface, and a plurality of segmented tower body bodies are sequentially connected to form the tower body. One end of the tower body is arranged on the tower body platform, and the other end of the tower body is detachably connected to the mounting arm.
3. The installation assembly of the floor climbing concrete placing boom according to claim 2, characterized in that: The concrete conveying mechanism and the mounting arm are connected via a connecting structural member; The connecting structure comprises a connecting pipe body, a lower support and an upper support; The lower support is detachably connected to the tower body, and the lower support has a first horizontal through hole; The upper support is hinged to the top of the lower support, and the top of the upper support has a central through hole; One end of the connecting pipe body extends transversely and is inserted into the first horizontal through hole, and passes through the central through hole upward and extends to the second horizontal through hole of the mounting arm and extends toward one side.
4. The installation assembly of the floor climbing concrete placing boom according to claim 3 is characterized in that: The connecting pipe body comprises a first elbow, a second elbow, a third elbow, a fourth elbow and a joint clamp which are connected in sequence; The bottom end of the first curved pipe is connected to the first connecting straight pipe, the right end of the first curved pipe passes through the first horizontal through hole and is connected to the bottom end of the second curved pipe, the top end of the second curved pipe is connected to the bottom end of the second connecting straight pipe, the top end of the second connecting straight pipe is connected to the bottom end of the third curved pipe, the left end of the third curved pipe is connected to the right end of the fourth curved pipe, and the top of the fourth curved pipe is connected to the third connecting straight pipe; The connected bent pipe and straight pipe are fixed by the joint clamp.
5. The installation assembly of the floor climbing concrete placing boom according to claim 4, characterized in that: The joint clamp is locked by an open elastic pin.
6. The installation assembly of the floor climbing concrete placing boom according to claim 5, characterized in that: The climbing frame body comprises at least two layers of climbing frames, and the two layers of climbing frames are arranged in the holes of the floor slab at intervals in an upper and lower manner; The climbing frame comprises a circular bottom wall, an annular side wall and a moving track; The circular bottom wall is detachably connected to the floor hole, and the annular side wall is arranged on the top outer edge of the circular bottom wall; The moving track is arranged on the inner circle of the circular bottom wall, and the moving track is arranged to extend vertically.
7. The installation assembly of the floor climbing concrete placing boom according to claim 1, characterized in that: The installation assembly also includes an auxiliary support unit, which is arranged between adjacent floor slabs and includes a plurality of disc-shaped scaffolds that are arranged in a columnar shape in a horizontal and vertical manner.
8. A method for installing a floor-climbing concrete placing boom, using the installation assembly of the floor-climbing concrete placing boom according to any one of claims 1 to 7, the method comprising the following steps: S1. Preserve holes on the floor slab; S2. Install the climbing frame body at the reserved holes on the floor slab; S3, installing the concrete placing machine on the ground; S4, installing the concrete conveying mechanism on the concrete placing boom; S5. Debug the whole machine.
Citation Information
Patent Citations
Climbing supporting system of floor internal climbing hydraulic distributing machine
CN106499188A
Concrete distributing machine
CN213234303U
Installation auxiliary device for internal climbing type material distributing machine
CN216406204U