Field engineering management methods and rice-fish farming methods under the rice-fish model
Through aerial survey instruments, the width of the aquaculture ditch in rice and fishing fields was calculated and adjusted, and the problem of excessive proportion of rice and fishing fields was solved, and the scientificity and standardization of rice and fishery co-farming was realized, ensuring the reasonable planning of rice planting and fishery farming was ensured. .
Patent Information
- Application Number
- CN202211496726.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-11-25
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2042-11-25
AI Technical Summary
Some regions and practitioners pursue economic benefits in the rice and fish farming model, resulting in the excessive proportion of rice and fishing fields ditches, which affects the normal rice planting area and production. How to scientifically control the proportion of aquaculture ditches and engineering construction in rice and fishing fields becomes Problems that need to be solved urgently.
Through aerial survey instruments, including aerial survey drones, the parameters of rice and fishing fields are obtained, the width of preset breeding ditches is calculated, and the ditch proportion is trimmed according to the ditch proportion formula to ensure that the ditch proportion is within 10%, and scientific field engineering management and co-operation are achieved Implementation of strategies.
Accurately calculate and adjust the proportion of rice and fishing fields, improve the scientificity and standardization of rice and fishery co-climbing, avoid waste of field area, and ensure reasonable planning and operation of rice planting and fishery farming.
Smart Images

Figure CN115876163B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of agricultural production, and specifically relates to a field engineering management method under a rice-fish mode and a rice-fish co-cultivation method. Background Art
[0002] In recent years, the rice-fish farming model has developed rapidly and has become an important means to stabilize national food security, promote agricultural quality and efficiency, promote green agricultural development, and help farmers increase production and income. However, some regions and practitioners have pursued economic benefits unilaterally, resulting in a situation where the proportion of rice-fish field ditches is too large, which will lead to a reduction in rice planting area and affect normal rice production. Therefore, how to better control the proportion of breeding ditches in rice-fish fields, help guide the construction of rice-fish field projects, and investigate and standardize the proportion of rice-fish field ditches has become an urgent problem to be solved. Summary of the invention
[0003] The present invention relates to a field engineering management method and a rice-fish farming method under a rice-fish model, which can at least solve some defects of the prior art.
[0004] The present invention relates to a field engineering management method under a rice-fishing mode, comprising:
[0005] Obtaining rice-fish field parameters by aerial survey instruments, wherein the rice-fish field parameters include the length L and the width W of the rice-fish field, and calculating the area S and the length-to-width ratio α of the rice-fish field;
[0006] Determine the preset ditch proportion β of the rice-fish field;
[0007] Based on the groove ratio calculation formula β = 2B (α + 1) / sqrt (αS) - 4B 2 / S, calculate the preset breeding ditch width B0 of the rice-fish field according to the existing parameters;
[0008] For newly built rice-fish fields, the breeding ditch is excavated according to the preset breeding ditch width B0;
[0009] For the established rice-fish fields, the rice-fish field parameters obtained by aerial survey instruments also include the actual breeding ditch width B1. B1 is compared with B0. When B1≠B0, the breeding ditch is trimmed so that B1=B0.
[0010] As one of the implementation modes, the aerial survey instrument includes an aerial survey drone.
[0011] As one of the implementation modes, the aerial survey drone is used to obtain images of the rice-fish field and transmit the image information to a remote controller. The remote controller analyzes the image information through image analysis software to obtain the parameters of the rice-fish field.
[0012] As one of the implementation methods, the preset ditch proportion β of the rice-fish field is ≤10%.
[0013] The present invention also relates to a rice-fish farming method, comprising:
[0014] Construction or reconstruction of rice-fish fields according to the field engineering management methods under the above rice-fish model;
[0015] Rice cultivation and fish farming are carried out according to pre-defined rice-fish farming strategies.
[0016] As one of the implementation methods, fish farming includes cultivating crayfish in aquaculture ditches.
[0017] As one of the implementation methods, the rice-fish farming strategy includes a water management strategy, and the irrigation and drainage operations of the rice-fish fields are implemented according to the formulated water management strategy, wherein the water level of the breeding ditch and the groundwater level are monitored in real time to guide the irrigation and drainage operations.
[0018] The present invention has at least the following beneficial effects: the present invention can accurately calculate the rice-fish field-ditch ratio or accurately obtain the preset breeding ditch width, thereby guiding practitioners to scientifically dig breeding ditches in rice-fish fields, or investigate and correct the rice-fish field-ditch ratio, thereby improving the scientificity and standardization of rice-fish farming. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0020] Figure 1 Schematic diagram of rice-fish field parameters involved in Embodiment 1 of the present invention;
[0021] Figure 2 A graph showing the relationship between the ditch ratio, the rice-fish field area, and the aspect ratio involved in the first embodiment of the present invention;
[0022] Figure 3 A schematic diagram of the structure of a first monitoring tube provided in Embodiment 3 of the present invention;
[0023] Figure 4 A schematic diagram of the structure of a second monitoring tube provided in Embodiment 3 of the present invention;
[0024] Figure 5 A schematic diagram of an arrangement of an image acquisition device provided in Embodiment 3 of the present invention;
[0025] Figure 6 Another schematic diagram of the arrangement of the image acquisition device provided in the third embodiment of the present invention;
[0026] Figure 7 A schematic diagram of a semi-automatic monitoring system for paddy field water level provided in Embodiment 3 of the present invention;
[0027] Figure 8 This is a schematic diagram of the arrangement of monitoring tubes provided in Embodiment 3 of the present invention. DETAILED DESCRIPTION
[0028] The technical solutions in the embodiments of the present invention are described clearly and completely below. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0029] Embodiment 1
[0030] like Figure 1 The embodiment of the present invention provides a field engineering management method under the rice-fish model, comprising:
[0031] Obtaining rice-fish field parameters by aerial survey instruments, wherein the rice-fish field parameters include the length L and the width W of the rice-fish field, and calculating the area S and the length-to-width ratio α of the rice-fish field;
[0032] Determine the preset ditch proportion β of the rice-fish field;
[0033] Based on the groove ratio calculation formula β = 2B (α + 1) / sqrt (αS) - 4B 2 / S, calculate the preset breeding ditch width B0 of the rice-fish field according to the existing parameters;
[0034] For a newly built rice-fish field, a breeding ditch 400 is excavated according to the preset breeding ditch width B0;
[0035] For the rice-fish field that has been built, the rice-fish field parameters obtained by the aerial survey instrument also include the actual breeding ditch width B1. B1 is compared with B0. When B1≠B0, the breeding ditch 400 is trimmed to make B1=B0.
[0036] The ditch ratio β is the ratio of the breeding ditch area to the rice-fish field area. Generally speaking, the breeding ditch 400 is a ring ditch excavated along the circumference of the rice-fish field, and the ditch widths on all sides are the same. In one embodiment, the preset ditch ratio β of the rice-fish field is ≤10%, which can meet the current relevant regulations.
[0037] In addition, it should be noted that the above ditch ratio calculation formula is mainly applicable to rectangular rice-fish fields.
[0038] In one embodiment, the aerial survey instrument comprises an aerial survey drone. Preferably, the aerial survey drone is used to obtain images of the rice-fish field and transmit the image information to a remote controller, and the remote controller analyzes the image information through image analysis software to obtain the rice-fish field parameters.
[0039] Optionally, the image analysis software uses Imange J software, and the collected rice-fish field pictures are imported into ImageJ image processing software. After setting the scale, the length and area measurement tools of the software are used to obtain the rice-fish field parameters.
[0040] This embodiment can accurately calculate the rice-fish field ditch ratio or accurately obtain the preset breeding ditch width, thereby guiding practitioners to scientifically dig breeding ditches 400 in rice-fish fields, or investigate and correct the rice-fish field ditch ratio, thereby improving the scientificity and standardization of rice-fish farming.
[0041] In addition, by collecting a large number of rice-fish field parameters, based on the ditch ratio calculation formula (a large number of rice-fish field parameters can also be obtained by random function assignment based on this calculation formula), the relationship between the ditch ratio and the rice-fish field area and aspect ratio can be obtained as follows: Figure 2 As shown; thus, according to the preset ditch proportion β of the rice-fish field, the matching relationship between the rice-fish field area and the aspect ratio is obtained, which is convenient for practitioners to reasonably plan the rice-fish field (especially the case of dividing a block of rice fields into multiple rice-fish fields). For example, based on the collected rice field block images, a geometric model of the rice field block can be established. Under the constraint of the matching relationship between the rice-fish field area and the aspect ratio, the rice field block can be reasonably divided into multiple rice-fish fields through image processing software to avoid waste of field area.
[0042] Embodiment 2
[0043] The embodiment of the present invention provides a rice-fish farming method, comprising:
[0044] The rice-fish field is constructed or renovated according to the field engineering management method under the rice-fish model provided in the first embodiment;
[0045] Rice cultivation and fish farming are carried out according to pre-defined rice-fish farming strategies.
[0046] Among them, preferably, fishery farming includes crayfish farming in the farming ditch 400.
[0047] In one of the embodiments, the rice-fish farming strategy includes a water management strategy, and the irrigation and drainage operations of the rice-fish field are implemented according to the formulated water management strategy, wherein the water level of the breeding ditch and the groundwater level are monitored in real time to guide the irrigation and drainage operations.
[0048] Embodiment 3
[0049] The embodiment of the present invention provides a semi-automatic monitoring system for water level in a rice field, which can be used for water level monitoring in a rice-fish field in the second embodiment above.
[0050] like Figure 5-Figure 8 , the paddy field water level semi-automatic monitoring system includes:
[0051] A water level monitoring device, comprising a monitoring pipe and a columnar float capable of floating on water; the monitoring pipe is vertically inserted into a water level monitoring point of a paddy field, and comprises a water inlet pipe section 1 and a calibration pipe section 2 located above the water inlet pipe section 1, the water inlet pipe section 1 is provided with a water inlet channel, and the pipe wall of the calibration pipe section 2 is provided with a hollow area; the float is movably arranged in the monitoring pipe;
[0052] An image acquisition device 300, wherein the image acquisition device 300 is installed in or near a paddy field through a mounting bracket, and the hollow area of the calibration pipe section 2 is located within the acquisition range of the image acquisition device 300;
[0053] The processor 500 is used to receive the data sent by the image acquisition device 300 and perform image analysis to obtain the water level at the water level monitoring point.
[0054] In one embodiment, the rice field implements the rice-fishing model. Accordingly, Figure 5-Figure 7 The rice field includes a rice field and a breeding ditch 400 surrounding the rice field; the breeding ditch 400 can be used for breeding crayfish and the like. For the above rice field, the water level monitoring that may be involved includes the breeding ditch water level, field water level and groundwater level, wherein the field water level is the difference between the breeding ditch water level and the ditch depth (if and only if the breeding ditch water level is greater than the ditch depth, otherwise the rice field water level is 0), so the field water level can be known based on the monitoring of the breeding ditch water level.
[0055] Preferably, a breeding ditch water level monitoring point is provided in the breeding ditch 400, and the monitoring pipe at the breeding ditch water level monitoring point corresponds to the first monitoring pipe 100, and the water inlet pipe section 1 of the first monitoring pipe 100 is at least partially located above the ditch bottom, and preferably the bottom end of the water inlet pipe section 1 is flush with the ditch bottom. When it is difficult to ensure flushness with the ditch bottom, it is advisable to make the bottom end of the water inlet pipe section 1 below the ditch bottom to avoid measurement errors when the bottom end of the water inlet pipe section 1 is located above the ditch bottom (for example, when the breeding ditch 400 is dry, the water level measured at this time is the water level in the pipe, and the water level displayed by the float does not match the actual water level in the breeding ditch); a groundwater level monitoring point is provided at the geometric center of the rice field, and the monitoring pipe at the groundwater level monitoring point corresponds to the second monitoring pipe 200, and the water inlet pipe section 1 of the second monitoring pipe 200 at least partially extends into the groundwater layer.
[0056] In one embodiment, if Figure 3 , the first monitoring pipe 100 also includes a first sedimentation pipe section 3 and a connecting pipe section 4, wherein the first sedimentation pipe section 3 and the connecting pipe section 4 are both solid wall pipes, and the first sedimentation pipe section 3, the water inlet pipe section 1, the connecting pipe section 4 and the calibration pipe section 2 of the first monitoring pipe 100 are connected in sequence. The first sedimentation pipe section 3 is set, and the silt carried by the water in the pipe can be settled in the first sedimentation pipe section 3 to ensure the accuracy and reliability of the water level monitoring of the breeding ditch. The bottom end of the first sedimentation pipe section 3 is a closed end; in addition, when the bottom end of the water inlet pipe section 1 of the first monitoring pipe 100 is set flush with the bottom of the breeding ditch 400, the first sedimentation pipe section 3 is inserted into the soil layer at the bottom of the breeding ditch 400 to achieve the installation of the first monitoring pipe 100.
[0057] In one embodiment, the length of the first sedimentation pipe section 3 is 0.5m to 2m; the length of the water inlet pipe section 1 is 0.5m to 2m; the length of the connecting pipe section 4 is 0.5m to 2m; and the length of the calibration pipe section 2 is 1 to 2m. Of course, in actual applications, the lengths of the various pipe sections can be adjusted according to the specific conditions on site.
[0058] The first monitoring tube 100 may be an integrally formed tube or a split assembled structure, for example, the calibration tube section 2 and the connecting tube section 4 may be detachably connected.
[0059] In one embodiment, if Figure 4 , the second monitoring pipe 200 also includes a second sedimentation pipe section 5, a soil water anti-seepage pipe section 6 and a surface runoff anti-seepage pipe section 7, wherein the second sedimentation pipe section 5, the soil water anti-seepage pipe section 6 and the surface runoff anti-seepage pipe section 7 are all solid wall pipes, and the second sedimentation pipe section 5, the water inlet pipe section 1, the soil water anti-seepage pipe section 6, the surface runoff anti-seepage pipe section 7 and the calibration pipe section 2 of the second monitoring pipe 200 are connected in sequence. Preferably, the bottom end of the surface runoff anti-seepage pipe section 7 is flush with the field surface, which can ensure the accuracy of groundwater level monitoring. The second sedimentation pipe section 5 is set, and the sediment carried by the inlet water in the pipe can be settled in the second sedimentation pipe section 5 to ensure the accuracy and reliability of groundwater level monitoring. The bottom end of the second sedimentation pipe section 5 is a closed end; in addition, the second sedimentation pipe section 5 can also improve the installation stability of the second monitoring pipe 200.
[0060] In one embodiment, the length of the second sedimentation pipe section 5 is 0.5m to 2m; the length of the water inlet pipe section 1 is 0.5 to 3m; the length of the soil water seepage prevention pipe section 6 is 1.5 to 2m; the length of the surface runoff seepage prevention pipe section 7 is 1.2 to 1.5m; and the length of the calibration pipe section 2 is 1 to 2m. Of course, in actual applications, the lengths of the various pipe sections can be adjusted according to the specific conditions on site.
[0061] The second monitoring pipe 200 may be an integrally formed pipe or a split assembled structure, for example, the calibration pipe section 2 and the surface runoff anti-seepage pipe section 7 may be detachably connected.
[0062] Preferably, a filter screen is provided on the outer wall of the water inlet pipe section 1 to prevent soil and silt from blocking the water inlet channel or silt from entering the monitoring pipe and affecting the normal activity of the float. In one embodiment, the filter screen has a mesh size of 10 to 50.
[0063] Preferably, the water inlet channel includes a plurality of water inlet holes, each of which is spirally distributed between the top and bottom ends of the water inlet pipe section 1, so as to ensure the accuracy of water level monitoring. In one embodiment, the spacing between adjacent spirals is in the range of 8 to 12 cm; the vertical spacing between two adjacent water inlet holes is in the range of 0.8 to 1.5 cm.
[0064] In one embodiment, a hollow window is provided on the calibration pipe section 2, and the hollow window preferably has a certain width, so that the image acquisition device 300 can capture the floating body exposed from the hollow window. The hollow window can be a continuous window with a certain height; multiple hollow windows can also be provided on the calibration pipe section 2, and each hollow window is distributed in sequence along the length direction of the calibration pipe section 2. A small spacing is preferably used between adjacent hollow windows, for example, within the range of 1 to 2 cm; in this embodiment, there are three hollow windows on the calibration pipe section 2, and the height of the hollow windows is about 50 cm.
[0065] The diameter of the above-mentioned float is preferably slightly smaller than the inner diameter of the monitoring tube, for example, the difference between the two diameters is in the range of 0.5 to 1 cm. In one embodiment, the above-mentioned float is a foam strip that does not absorb water or has poor water absorption.
[0066] In one embodiment, the columnar float in the first monitoring tube 100 is a calibrated float, and the float calibration method is:
[0067] After the first monitoring pipe 100 is installed in the breeding ditch 400, the bottom end of the calibration pipe section 2 is used as the water level zero scale, and a predetermined length is calibrated upward from the water level zero scale, and the floating body above the predetermined length is removed;
[0068] The predetermined length is equal to the actual water level of the breeding ditch; the initial length of the float before calibration is equal to the distance between the bottom end of the corresponding water inlet pipe section 1 and the bottom end of the corresponding calibration pipe section 2.
[0069] Based on the above method, the water level monitoring device at the water level monitoring point of the breeding ditch can intuitively and accurately reflect the water level of the breeding ditch 400, thereby improving the detection accuracy of the breeding ditch 400 and the field water level.
[0070] It can be understood that the above method limits the actual length of the columnar float in the first monitoring tube 100, that is, the length of the float during the monitoring process, which can prevent inaccurate water level detection of the breeding ditch due to installation errors of the first monitoring tube 100 and other reasons.
[0071] The redundant floating body can be removed by cutting, etc. The floating body can be marked so that the image acquisition device 300 can accurately capture the image of the floating body; for example, a mark can be drawn on the floating body with a marker pen.
[0072] For determining the initial length of the float before calibration, optionally, the following method is adopted: the bottom plug of the first monitoring tube 100 is removed, and the first monitoring tube 100 is placed in open water so that the immersion depth of the first monitoring tube 100 is the length of its sand settling tube section, that is, when the water level in the first monitoring tube 100 just reaches the bottom end of the water inlet section 1 of the first monitoring tube 100 (corresponding to the water inlet hole at the lowest end), the excess length of the float is removed so that the top end of the float is flush with the bottom end of the calibration tube section 2.
[0073] Preferably, the breeding ditch water level monitoring point and the groundwater level monitoring point collect data through the same image acquisition device 300, which can reduce the number of equipment, equipment cost, operation cost and maintenance cost while ensuring the accuracy and reliability of the detection results.
[0074] In one embodiment, if Figure 5 , taking the line connecting the aquaculture ditch water level monitoring point and the groundwater level monitoring point as the reference line, the mounting bracket is set on the ridge on one side of the aquaculture ditch water level monitoring point, the intersection of the reference line and the ridge is the reference point, and the deviation distance of the mounting bracket relative to the reference point is 2 to 10 meters. This method is particularly suitable for general fields or situations where the distance between the aquaculture ditch water level monitoring point and the groundwater level monitoring point is less than 100 meters.
[0075] In another embodiment, Figure 6 , the line connecting the aquaculture ditch water level monitoring point and the groundwater level monitoring point is used as the reference line, and the mounting bracket is set on the vertical line of the reference line. The line connecting the location of the mounting bracket and the aquaculture ditch water level monitoring point is defined as the first reference line, and the line connecting the location of the mounting bracket and the groundwater level monitoring point is defined as the second reference line. The angle between the first reference line and the second reference line should not be greater than the maximum wide angle of the image acquisition device 300; the length of the first reference line and the length of the second reference line should not be greater than the farthest effective visual distance of the image acquisition device 300. This method is particularly suitable for ultra-wide fields or when the distance between the aquaculture ditch water level monitoring point and the groundwater level monitoring point is greater than 100m.
[0076] In one of the embodiments, the position of the image acquisition device 300, the midpoint of the calibration pipe section 2 of the first monitoring tube 100, and the midpoint of the calibration pipe section 2 of the second monitoring tube 200 are on the same horizontal plane. Generally, the position of the image acquisition device 300 is not moved up and down arbitrarily, which can improve the accuracy of image acquisition and water level monitoring.
[0077] The image acquisition device 300 may be a camera, and the hollow surface of the calibrated pipe section 2 faces the camera head of the camera.
[0078] In one embodiment, the installation height of the image acquisition device 300 relative to the field surface is 2 to 3 meters, which can be controlled within a relatively small measurement error range.
[0079] The above-mentioned monitoring tubes and mounting brackets can be equipped with stable brackets to prevent the monitoring tubes and mounting brackets from breaking or collapsing due to strong convective weather such as strong winds.
[0080] In one embodiment, the image acquisition device 300 takes photos at regular intervals every day; the processor 500 preferably uses image processing software (such as Imange J software) to analyze the photos taken with the calibration pipe section 2, and after the picture is enlarged (it can be enlarged by 200% to 600% as needed), the scale is set (the scale is determined according to the top and bottom positions of the calibration pipe section 2 in the picture), and then the pixel distance between the top of the float and the bottom of the calibration pipe section 2 in the picture is measured and converted according to the scale, thereby obtaining the breeding ditch water level / groundwater level.
[0081] In one of the embodiments, the image acquisition device 300 is also used to capture images of rice in the field, and by analyzing the growth condition of the rice, a data set of the relationship between the growth condition of the rice and the field water level is obtained, so as to determine the impact of the field water level on the growth of rice and facilitate the correction of the water management strategy.
[0082] In one of the embodiments, a rice-shrimp farming mode is adopted, and the image acquisition device 300 is also used to capture images of inner ridges of rice fields. Based on the images of inner ridges of rice fields, the activity of crayfish (for example, the number of crayfish per unit area as a parameter) and the burrowing conditions of crayfish (for example, the number of burrows per unit area and the height of their positions as parameters) are judged, and a data set of the relationship between the activity of crayfish and the water level of breeding ditch and a data set of the relationship between the burrowing conditions of crayfish and the water level of breeding ditch are obtained, so as to judge the impact of the water level of breeding ditch on crayfish breeding, and optimize the water management strategy for crayfish breeding.
[0083] In one of the embodiments, the image acquisition device 300 can also be used to photograph the color of water in the breeding ditch 400 to determine the water quality. At the same time, a water quality monitoring sensor with an electronic display for monitoring the water environment, such as pH, dissolved oxygen, etc., can be installed near the breeding ditch 400 to help timely adjust water and improve the breeding water environment.
[0084] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A field engineering management method under the rice-fish model, characterized in that: include: Obtaining rice-fish field parameters by aerial survey instruments, wherein the rice-fish field parameters include the length L and the width W of the rice-fish field, and calculating the area S and the length-to-width ratio α of the rice-fish field; Determine the preset ditch proportion β of the rice-fish field; Based on the groove ratio calculation formula β = 2B (α + 1) / sqrt (αS) - 4B 2 / S, calculate the preset breeding ditch width B0 of the rice-fish field according to the existing parameters; For newly built rice-fish fields, the breeding ditch is excavated according to the preset breeding ditch width B0; For the established rice-fish fields, the rice-fish field parameters obtained by aerial survey instruments also include the actual breeding ditch width B1. B1 is compared with B0. When B1≠B0, the breeding ditch is trimmed so that B1=B0.
2. The field engineering management method under the rice-fish model as claimed in claim 1, characterized in that: The aerial survey instrument includes an aerial survey unmanned aerial vehicle.
3. The field engineering management method under the rice-fish model as claimed in claim 2, characterized in that: The aerial survey drone is used to obtain images of the rice-fish field and transmit the image information to a remote controller. The remote controller analyzes the image information through image analysis software to obtain the rice-fish field parameters.
4. The field engineering management method under the rice-fish model as claimed in claim 1, characterized in that: The proportion of preset ditches in rice-fish fields is β≤10%.
5. A rice-fish farming method, characterized in that: include: Construction or reconstruction of rice-fish fields according to the field engineering management method under the rice-fish model according to any one of claims 1 to 4; Rice cultivation and fish farming are carried out according to pre-defined rice-fish farming strategies.
6. The rice-fish farming method according to claim 5, characterized in that: Fishery farming includes the cultivation of crayfish in culture ditches.
7. The rice-fish farming method according to claim 5, characterized in that: The rice-fish farming strategy includes a water management strategy, and irrigation and drainage operations of the rice-fish field are implemented according to the formulated water management strategy, wherein the water level of the breeding ditch and the groundwater level are monitored in real time to guide the irrigation and drainage operations.