A multi-layer sandwich hollow steel tube foam concrete power tower

By introducing straightening components and reinforcement rods into the multi-layer sandwich hollow steel pipe foam concrete electric tower, the problems of inconvenient transportation and casting and insufficient load strength are solved, and convenient assembly and high-strength support of the tower are achieved , suitable for later maintenance needs.

CN115898124BActive Publication Date: 2024-11-12QINGDAO HUIJINTONG ELECTRIC POWER EQUIP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211562113.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-12-07
Publication Date
2024-11-12
Estimated Expiration
2042-12-07

AI Technical Summary

Technical Problem

The existing multi-layer sandwich hollow steel pipe foam concrete electric tower is inconvenient during transportation and pouring, and it is difficult to ensure load-bearing strength and support firmness, which is prone to bending problems and difficulty in maintenance.

Method used

A multi-layer sandwich hollow steel pipe foam concrete electric tower including tower base and tower rod is designed. Through the combination of straightening components and reinforcement rods, the tower rods are easily assembled and adjusted, the pressure is shared, and the tower rods are ensured to ensure the stability of the tower rods. and improve load bearing strength inside the tower by filling foam concrete.

Benefits of technology

It improves the transportation convenience of the tower and the simplicity of casting operation, ensures the load-bearing strength and support firmness of the tower, facilitates the straightening of the tower rod after damage, and extends the service life of the tower rod.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115898124B_ABST
    Figure CN115898124B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of power towers, specifically a multi-layer sandwich hollow steel tube foam concrete power tower, comprising a tower base and a tower pole, a straightening member is installed on the outer side of the tower pole, the tower base comprises an upper support plate, a connecting rod is arranged on the lower side of the upper support plate, a lower support plate is arranged on the lower side of the connecting rod, side support rods are arranged at both ends of the upper side of the lower support plate, a conical rod is arranged on the upper side of the upper support plate, a first insulating rubber layer is arranged on the outer side of the conical rod, an inner support frame is installed inside the conical rod, and a first flange ring is arranged on the upper side of the conical rod. The present invention can conveniently assemble the tower base and the tower pole, facilitate the removal of bubbles in the foam concrete cast in the hollow steel tube, support the columnar rod by the reinforcing rod to share the pressure of the columnar rod, adjust the distance between the columnar rod and the reinforcing rod by the straightening member, and can straighten the damaged and bent columnar rod.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of power towers, in particular to a multi-layer sandwich hollow steel tube foam concrete power tower. Background Art

[0002] The tower of overhead transmission line is a supporting structure for conductors and lightning conductors, so that the conductors can meet the distance requirements from the ground and objects, and can withstand the loads of the conductors, lightning conductors and their own loads as well as external loads. The multi-layer sandwich hollow steel tube foam concrete power tower refers to a power tower made of steel tubes filled with foam concrete, which has the advantages of light weight and good rigidity.

[0003] A Chinese patent discloses a multi-layer sandwich hollow steel tube foam concrete power tower (authorization announcement number CN103628731B). The patented technology conical steel tube foam concrete column includes two layers of steel tubes and a reinforced foam concrete column poured in the two layers of steel tubes. The raw material of the reinforced foam concrete column is reinforced foam concrete. The reinforced foam concrete includes waste brick slag, fly ash, stone powder, sand, gypsum, composite admixture, liquid foaming agent and steel fiber. The tower of the present invention is light in weight, strong in bearing capacity, low in cost and good in quality. However, the above-mentioned device is an integrated structure, which is inconvenient to transport. The foam concrete pouring is difficult. It is inconvenient to remove the bubbles in the foam concrete after pouring, and the bearing strength of the power tower cannot be guaranteed. The hollow steel tube is directly used as the tower pole of the power tower. The tower pole is subjected to a large force and will be bent. The support firmness is poor. It cannot be straightened after being damaged and bent, which is not conducive to the maintenance of the hollow steel tube in the later stage.

[0004] Therefore, those skilled in the art provide a multi-layer sandwich hollow steel tube foam concrete power tower to solve the problems raised in the above background technology. Summary of the invention

[0005] The object of the present invention is to provide a multi-layer sandwich hollow steel tube foam concrete power tower to solve the problems raised in the above background technology.

[0006] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a multi-layer sandwich hollow steel tube foam concrete power tower, comprising a tower base and a tower pole, the tower pole is located at the upper side of the tower base, a straightening member is installed on the outer side of the tower pole, the tower base comprises an upper support plate, a connecting rod is arranged on the lower side of the upper support plate, a lower support plate is arranged on the lower side of the connecting rod, side support rods are arranged at both ends of the upper side of the lower support plate, a conical rod is arranged on the upper side of the upper support plate, a first insulating rubber layer is arranged on the outer side of the conical rod, an inner support frame is installed inside the conical rod, a first flange ring is arranged on the upper side of the conical rod, and a first flange ring is arranged on the lower side of the conical rod. A first grouting opening is provided, a first groove is provided on the upper side of the conical rod, the tower rod comprises a second flange ring, a column rod is arranged on the upper side of the second flange ring, a third flange ring is arranged on the upper side of the column rod, an insertion rod is arranged on the lower side of the second flange ring, a second groove is provided on the upper side of the third flange ring, first mounting plates are provided on both sides of the second flange ring, a reinforcement rod is provided on the upper side of the first mounting plate, second mounting plates are provided on both sides of the third flange ring, a second insulating rubber layer is provided on the outer side of the column rod, a cable mounting frame is provided on the outer side of the second insulating rubber layer, and a second grouting opening is provided on the lower side of the column rod.

[0007] As a further solution of the present invention: a second fixing hole is opened on the upper side of the first flange ring, a first fixing hole is opened on the upper side of the third flange ring, a first screw is arranged on the upper side of the second flange ring, and a third fixing hole is arranged on the outer side of the cable mounting frame.

[0008] As a further solution of the present invention: fourth fixing holes are provided at the front and rear sides of the columnar rod, the straightening member includes a pull plate, a pull rod is provided on the front side of the pull plate, a first clamp is provided at one front end of the pull rod, a second clamp is installed at the other front end of the pull rod, a third screw is installed at the front end of the second clamp, a second screw is provided at the outer end of the pull plate, a gasket is provided at the outer rear end of the second screw, and a spring is provided on the outer side of the second screw at the front side of the gasket.

[0009] As a further solution of the present invention: the position of the insertion rod corresponds to the first slot, and the insertion rod is inserted at the internal position of the first slot; the position of the insertion rod corresponds to the second slot, and the insertion rod is inserted at the internal position of the second slot.

[0010] As a further solution of the present invention: the second flange ring is fixed at the upper side of the first flange ring, the tower rod is fixed at the upper side of the tower base through the second flange ring and the first flange ring, and the interiors of the conical rod and the columnar rod are filled with foam concrete.

[0011] As a further solution of the present invention: the front end of the straightening member is fixed at an outer position of the reinforcing rod, and the rear end of the straightening member is fixed at an outer position of the tower pole.

[0012] As a further solution of the present invention: the position of the first screw corresponds to the second fixing hole, the first screw is fixed at the internal position of the second fixing hole, the position of the first screw corresponds to the first fixing hole, and the first screw is fixed at the internal position of the first fixing hole.

[0013] As a further solution of the present invention: the second screw rod corresponds to the position of the fourth fixing hole, the rear end of the second screw rod rotates to the inner position of the fourth fixing hole, and the gasket is fixed to the outer position of the tower rod by a spring.

[0014] As a further solution of the present invention: the rear end of the second clamp is rotated to the front side position of the pull rod, and the front end of the second clamp is fixed to the front end position of the first clamp by a third screw.

[0015] Compared with the prior art, the present invention has the following beneficial effects:

[0016] 1. The multi-layer sandwich hollow steel tube foam concrete power tower of the present invention can conveniently assemble the tower base and the tower pole, improve the convenience of transportation, facilitate the pouring operation of the foam concrete, facilitate the removal of bubbles in the foam concrete in the hollow steel tube, and ensure the bearing strength of the power tower;

[0017] 2. Support the columnar rods through reinforcement rods to share the pressure of the columnar rods, avoid bending due to large force, improve the firmness of the support, adjust the distance between the columnar rods and the reinforcement rods through straightening components, and straighten the damaged and bent columnar rods, which is beneficial to the later maintenance of the hollow steel pipes. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a structural schematic diagram of a multi-layer sandwich hollow steel tube foam concrete power tower;

[0019] Figure 2 A perspective view of a tower base in a multi-layer sandwich hollow steel tube foam concrete power tower;

[0020] Figure 3 A perspective view of a tower pole in a multi-layer sandwich hollow steel tube foam concrete power tower;

[0021] Figure 4 It is a structural schematic diagram of a straightening component in a multi-layer sandwich hollow steel tube foam concrete power tower;

[0022] Figure 5 It is a multi-layer sandwich hollow steel tube foam concrete power tower Figure 1 Schematic diagram of the structure of part A.

[0023] In the figure: 1, tower base; 2, tower pole; 3, straightening member; 4, upper support plate; 5, connecting rod; 6, lower support plate; 7, side support rod; 8, tapered rod; 9, inner support frame; 10, first insulating rubber layer; 11, first flange ring; 12, first slot; 13, first slurry penetration port; 14, second flange ring; 15, columnar rod; 16, third flange ring; 17, second insulating rubber layer; 18, first mounting plate; 19, The second mounting plate; 20, the reinforcing rod; 21, the insert rod; 22, the second slot; 23, the cable mounting bracket; 24, the second slurry penetration port; 25, the first screw; 26, the first fixing hole; 27, the second fixing hole; 28, the third fixing hole; 29, the fourth fixing hole; 30, the pull plate; 31, the pull rod; 32, the second screw; 33, the gasket; 34, the spring; 35, the first clip; 36, the second clip; 37, the third screw. DETAILED DESCRIPTION

[0024] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0025] See also Figures 1 to 5In an embodiment of the present invention, a multi-layer sandwich hollow steel tube foam concrete power tower comprises a tower base 1 and a tower pole 2, wherein the tower pole 2 is located at the upper side of the tower base 1, and a straightening member 3 is installed on the outer side of the tower pole 2. The tower base 1 comprises an upper support plate 4, a connecting rod 5 is arranged on the lower side of the upper support plate 4, a lower support plate 6 is arranged on the lower side of the connecting rod 5, and side support rods 7 are arranged at both ends of the upper side of the lower support plate 6, a conical rod 8 is arranged on the upper side of the upper support plate 4, a first insulating rubber layer 10 is arranged on the outer side of the conical rod 8, an inner support frame 9 is installed inside the conical rod 8, a first flange ring 11 is arranged on the upper side of the conical rod 8, a first slurry penetration port 13 is opened on the lower side of the conical rod 8, and a first card slot 12 is opened on the upper side of the conical rod 8. The tower pole 2 comprises a second flange ring 14, a column-shaped rod 15 is arranged on the upper side of the second flange ring 14, a third flange ring 16 is arranged on the upper side of the column-shaped rod 15, a plug rod 21 is arranged on the lower side of the second flange ring 14, a second card slot 22 is opened on the upper side of the third flange ring 16, first mounting plates 18 are arranged on both sides of the second flange ring 14, a reinforcing rod 20 is arranged on the upper side of the first mounting plate 18, second mounting plates 19 are arranged on both sides of the third flange ring 16, a second insulating rubber layer 17 is arranged on the outer side of the column-shaped rod 15, a cable mounting bracket 23 is arranged on the outer side of the second insulating rubber layer 17, a second slurry penetration opening 24 is opened on the lower side of the column-shaped rod 15, the plug rod 21 corresponds to the position of the first card slot 12, the plug rod 21 is inserted at the inner position of the first card slot 12, and the plug rod 21 is inserted into the second card slot 12. The positions of the card slots 22 correspond to each other, the insertion rod 21 is inserted into the inner position of the second card slot 22, the second flange ring 14 is fixed to the upper position of the first flange ring 11, the tower pole 2 is fixed to the upper position of the tower base 1 through the second flange ring 14 and the first flange ring 11, the interior of the conical rod 8 and the columnar rod 15 are filled with foam concrete, the front end of the straightening member 3 is fixed to the outer position of the reinforcing rod 20, and the rear end of the straightening member 3 is fixed to the outer position of the tower pole 2. First, the tower base 1, the tower pole 2 and the straightening member 3 are carried to the installation position, a foundation pit is opened on the ground at the installation position, the foundation pit is compacted and concrete is poured in, the lower support plate 6 is inserted into the concrete, the upper support plate 4 is parallel to the concrete plane, the concrete wraps the side support rod 7 and the connecting rod 5, and waits for the concrete to After solidification, the installation of the tower base 1 is completed, and the foam concrete is poured into the interior of the conical rod 8 through the first slot 12, and the foam concrete wraps the inner support frame 9. The foam concrete inside the conical rod 8 fills the gap on the lower side of the upper support plate 4 through the first grouting port 13. The tower rod 2 is taken out, and the plug rod 21 is inserted into the first slot 12. The second flange ring 14 is pressed to the upper side of the first flange ring 11, and the second flange ring 14 is fixed to the first flange ring 11. The outer end of the straightening member 3 is clamped to the outside of the reinforcement rod 20, and the inner end of the straightening member 3 is fixed to the outside of the tower rod 2. The columnar rod 15 is straightened, and the foam concrete is poured into the interior of the columnar rod 15 through the second slot 22. The foam concrete on the inner side of the columnar rod 15 fills the gap inside the conical rod 8 through the second grouting port 24, and then,Install the second set of tower poles 2 and the straightening member 3, and fix the second tower pole 2 to the upper side of the first tower pole 2 through the second flange ring 14 and the third flange ring 16. After completion, install and fix the cables through the cable mounting frame 23.

[0026] exist Figure 2 , 3 Middle: A second fixing hole 27 is provided on the upper side of the first flange ring 11, a first fixing hole 26 is provided on the upper side of the third flange ring 16, a first screw 25 is provided on the upper side of the second flange ring 14, a third fixing hole 28 is provided on the outer side of the cable mounting frame 23, the first screw 25 corresponds to the position of the second fixing hole 27, the first screw 25 is fixed at the inner position of the second fixing hole 27, the first screw 25 corresponds to the position of the first fixing hole 26, the first screw 25 is fixed at the inner position of the first fixing hole 26, the insertion rod 21 is inserted into the first slot 12, the second flange ring 14 is pressed to the upper side of the first flange ring 11, and the first screw 25 is rotated into the inner part of the second fixing hole 27 , fix the second flange ring 14 and the first flange ring 11, the outer end of the straightening member 3 is clamped to the outside of the reinforcement rod 20, the inner end of the straightening member 3 is fixed to the outside of the tower pole 2, the columnar rod 15 is straightened, and the foamed concrete is poured into the interior of the columnar rod 15 through the second clamping groove 22. The foamed concrete on the inside of the columnar rod 15 fills the gap inside the conical rod 8 through the second slurry penetration port 24. Then, the second set of tower poles 2 and the straightening member 3 are installed, the first screw rod 25 is rotated into the first fixing hole 26, and the second tower pole 2 is fixed to the upper side of the first tower pole 2 through the second flange ring 14 and the third flange ring 16. After completion, the cable is installed and fixed through the cable mounting frame 23 and the third fixing hole 28.

[0027] exist Figure 1 , 45: The front and rear sides of the columnar rod 15 are both provided with fourth fixing holes 29, the straightening member 3 includes a pull plate 30, a pull rod 31 is provided on the front side of the pull plate 30, a first clamp 35 is provided at one end of the front side of the pull rod 31, a second clamp 36 is installed at the other end of the front side of the pull rod 31, a third screw 37 is installed at the front end of the second clamp 36, a second screw 32 is provided at the outer end of the pull plate 30, a gasket 33 is provided at the outer rear end of the second screw 32, a spring 34 is provided on the outer side of the second screw 32 at the front side of the gasket 33, the second screw 32 corresponds to the position of the fourth fixing hole 29, the rear end of the second screw 32 rotates at the inner position of the fourth fixing hole 29, and the gasket The sheet 33 is fixed to the outer side of the tower pole 2 by a spring 34, the rear end of the second clip 36 is rotated to the front side of the pull rod 31, the front end of the second clip 36 is fixed to the front end of the first clip 35 by a third screw 37, the first clip 35 is clamped to the outer side of the reinforcement rod 20, the second clip 36 is rotated on the front side of the pull rod 31, the first clip 35 and the second clip 36 are fixed by the third screw 37, the first clip 35 and the second clip 36 slide on the outer side of the reinforcement rod 20, the rear end of the second screw 32 passes through the pull plate 30 and turns into the inside of the fourth fixing hole 29, the spring 34 pushes the gasket 33 to slide on the outer side of the second screw 32, and presses to the outer side of the tower pole 2, so as to straighten the columnar rod 15.

[0028] When the present invention is in use, firstly, the tower base 1, the tower pole 2 and the straightening member 3 are carried to the installation position, a foundation pit is opened on the ground at the installation position, the foundation pit is compacted and concrete is poured in, the lower support plate 6 is inserted into the concrete, the upper support plate 4 is parallel to the concrete plane, the concrete wraps the side support rod 7 and the connecting rod 5, and the installation of the tower base 1 is completed after the concrete solidifies, and the foam concrete is poured into the interior of the conical rod 8 through the first slot 12, the foam concrete wraps the inner support frame 9, and the foam concrete inside the conical rod 8 fills the gap on the lower side of the upper support plate 4 through the first grouting port 13, the tower pole 2 is taken out, the insertion rod 21 is inserted into the first slot 12, the second flange ring 14 is pressed to the upper side of the first flange ring 11, the first screw rod 25 is rotated into the second fixing hole 27 to fix the second flange ring 14 and the first flange ring 11, the first clamp 35 is clamped to the outer side of the reinforcement rod 20, and the second clamp 36 is pulled The front side of the rod 31 rotates, and the first clip 35 and the second clip 36 are fixed by the third screw 37. The first clip 35 and the second clip 36 slide on the outside of the reinforcement rod 20, and the rear end of the second screw 32 passes through the pull plate 30 and turns into the inside of the fourth fixing hole 29. The spring 34 pushes the gasket 33 to slide on the outside of the second screw 32 and presses it to the outside of the tower rod 2. The column rod 15 is straightened, and the foamed concrete is poured into the inside of the column rod 15 through the second slot 22. The foamed concrete on the inside of the column rod 15 fills the gap inside the conical rod 8 through the second slurry opening 24. Then, the second group of tower rods 2 and the straightening member 3 are installed, and the first screw 25 is turned into the first fixing hole 26. The second tower rod 2 is fixed to the upper side of the first tower rod 2 through the second flange ring 14 and the third flange ring 16. After completion, the cable is installed and fixed through the cable mounting frame 23 and the third fixing hole 28.

[0029] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.

[0030] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A multi-layer sandwich hollow steel tube foam concrete power tower, comprising a tower base (1) and a tower pole (2) installed on the upper side of the tower base (1), characterized in that: A straightening member (3) is installed on the outer side of the tower pole (2); the tower base (1) comprises an upper support plate (4); a connecting rod (5) is arranged on the lower side of the upper support plate (4); a lower support plate (6) is arranged on the lower side of the connecting rod (5); side support rods (7) are arranged at both ends of the upper side of the lower support plate (6); a conical rod (8) is arranged on the upper side of the upper support plate (4); a first insulating rubber layer (10) is arranged on the outer side of the conical rod (8); an inner support frame (9) is installed inside the conical rod (8); a first flange ring (11) is arranged on the upper side of the conical rod (8); and a conical rod (8) is provided on the lower side. A first grouting opening (13) is provided on the upper side of the conical rod (8); the tower rod (2) comprises a second flange ring (14); a columnar rod (15) is provided on the upper side of the second flange ring (14); a third flange ring (16) is provided on the upper side of the columnar rod (15); an insertion rod (21) is provided on the lower side of the second flange ring (14); a second groove (22) is provided on the upper side of the third flange ring (16); first mounting plates (18) are provided on both sides of the second flange ring (14); a reinforcing rod (20) is provided on the upper side of the first mounting plate (18); and both sides of the third flange ring (16) are provided with a plurality of reinforcing rods (21). A second mounting plate (19) is provided on each of the column-shaped rods (15), a second insulating rubber layer (17) is provided on the outer side of the column-shaped rod (15), a cable mounting frame (23) is provided on the outer side of the second insulating rubber layer (17), a second slurry penetration opening (24) is provided on the lower side of the column-shaped rod (15), a second fixing hole (27) is provided on the upper side of the first flange ring (11), a first fixing hole (26) is provided on the upper side of the third flange ring (16), a first screw rod (25) is provided on the upper side of the second flange ring (14), a third fixing hole (28) is provided on the outer side of the cable mounting frame (23), and the column-shaped rod (15) is provided with a plurality of screws at the front and rear sides thereof. A fourth fixing hole (29) is provided, the straightening member (3) comprises a pull plate (30), a pull rod (31) is provided on the front side of the pull plate (30), a first clamp (35) is provided at one end of the front side of the pull rod (31), a second clamp (36) is installed at the other end of the front side of the pull rod (31), a third screw (37) is installed at the front end of the second clamp (36), a second screw (32) is provided at the outer end of the pull plate (30), a gasket (33) is provided at the outer rear end of the second screw (32), and a spring (34) is provided on the outer side of the second screw (32) at a position in front of the gasket (33).

2. A multi-layer sandwich hollow steel tube foam concrete power tower according to claim 1, characterized in that: The position of the insertion rod (21) corresponds to that of the first card slot (12), and the insertion rod (21) is inserted at an internal position of the first card slot (12); the position of the insertion rod (21) corresponds to that of the second card slot (22), and the insertion rod (21) is inserted at an internal position of the second card slot (22).

3. The multi-layer sandwich hollow steel tube foam concrete power tower according to claim 1, characterized in that: The second flange ring (14) is fixed to an upper position of the first flange ring (11), the tower rod (2) is fixed to an upper position of the tower base (1) via the second flange ring (14) and the first flange ring (11), and the interiors of the conical rod (8) and the columnar rod (15) are both filled with foam concrete.

4. The multi-layer sandwich hollow steel tube foam concrete power tower according to claim 1, characterized in that: The front end of the straightening member (3) is fixed at an outer position of the reinforcing rod (20), and the rear end of the straightening member (3) is fixed at an outer position of the tower rod (2).

5. The multi-layer sandwich hollow steel tube foam concrete power tower according to claim 1, characterized in that: The first screw rod (25) corresponds to the position of the second fixing hole (27), and the first screw rod (25) is fixed at an inner position of the second fixing hole (27). The first screw rod (25) corresponds to the position of the first fixing hole (26), and the first screw rod (25) is fixed at an inner position of the first fixing hole (26).

6. The multi-layer sandwich hollow steel tube foam concrete power tower according to claim 1, characterized in that: The second screw rod (32) corresponds to the position of the fourth fixing hole (29), the rear end of the second screw rod (32) rotates to the inner position of the fourth fixing hole (29), and the gasket (33) is fixed to the outer position of the tower rod (2) by means of a spring (34).

7. The multi-layer sandwich hollow steel tube foam concrete power tower according to claim 1, characterized in that: The rear end of the second clamp (36) is rotated to the front side of the pull rod (31), and the front end of the second clamp (36) is fixed to the front end of the first clamp (35) via a third screw rod (37).