A method for collaborative mining of close-range coal seams and overlying coal pillars

By adopting collaborative mining methods in the close-range coal seam, the cooperation between comprehensive discharge hydraulic support and comprehensive mining hydraulic support is solved, and the problems of coal column storage and safety hazards in the section are achieved. The coal-free columns of the close-range coal seam are fully realized Mining improves mining efficiency and safety.

CN115898402BActive Publication Date: 2024-11-15CHINA UNIV OF MINING & TECH +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211506344.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-11-28
Publication Date
2024-11-15
Estimated Expiration
2042-11-28

AI Technical Summary

Technical Problem

Under high stress, soft rock and special geological conditions, there are problems such as difficulty in retaining coal columns in sections, increasing support costs and potential safety hazards during the mining of close-range coal seams, especially due to the small spacing between the close-range coal seams, when mining the coal seams, The mutual influence is significant, resulting in waste of coal resources and security risks.

Method used

A method of collaborative mining of close-range coal seams and overlying section coal columns is adopted. By arranging a comprehensive mechanized coal mining tunnel under the section coal columns, it is divided into L1 and L2 sections to carry out coal mining operations at the same time, and the comprehensive release is used. The hydraulic support and the comprehensive mining hydraulic support cooperate with each other and operate in a circular manner to achieve coordinated mining of coal seams and coal columns in the overlying section.

Benefits of technology

The coal-free column mining of the close-range coal seam has been achieved, which reduces the waste of coal resources and safety risks, improves mining efficiency and safety, is innovative and economical, and is suitable for the safe mining of the close-range coal seam.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115898402B_ABST
    Figure CN115898402B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for coordinated mining of a close-range coal seam and an overlying coal pillar, comprising the following steps: after excavating a transport tunnel, a return air tunnel, and opening a cut in the close-range coal seam below the coal pillar, a fully mechanized coal mining is carried out by simultaneously arranging a fully mechanized hydraulic support and a fully mechanized hydraulic support in the cut; the fully mechanized mining section mines coal according to the process of cutting coal, moving the fully mechanized hydraulic support, and moving the front scraper conveyor; the fully mechanized caving section mines coal according to the process of cutting coal, moving the fully mechanized hydraulic support, moving the front scraper conveyor, placing the overlying coal pillar, and pulling and moving the rear scraper conveyor; the fully mechanized mining section and the fully mechanized caving section coordinate operations to realize the coordinated mining of the close-range coal seam and the overlying coal pillar. The method of the present invention gives full play to the dual technical advantages of fully mechanized caving and fully mechanized caving, can realize the full mining of coal resources without coal pillars, has strong technical innovation, is easy to operate, has high economy and practicality, and has broad application prospects.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of coal mining technology, and in particular to a method for coordinated mining of a close-range coal seam and an overlying section coal pillar. Background Art

[0002] Coal is the main energy source in my country, accounting for about 70% of the primary energy structure. For a long time in the future, the status of coal as the main energy source will not change. At present, most mines in my country still use the method of retaining section coal pillars for working face coal mining operations, especially for high stress, soft rock and special geological conditions. In order to achieve safe mining, the width of the section coal pillars is often more than 30 to 40 meters, which causes a large amount of waste of coal resources on the one hand, and the coal pillars left in the goaf are prone to spontaneous combustion and instability, causing safety problems. At the same time, my country's close-range coal seams are widely distributed and have rich resource reserves. Under such coal seam geological conditions, due to the small spacing between close-range coal seams, the mutual influence during coal seam mining is significant, and there are a series of problems such as difficulty in retaining section coal pillars, increased support costs, and increased potential safety hazards. Summary of the invention

[0003] The purpose of the present invention is to provide a method for coordinated mining of close-range coal seams and overlying section coal pillars, so as to solve a series of problems such as difficulty in setting up section coal pillars, increased support costs, and increased potential safety hazards.

[0004] To achieve the above object, the present invention adopts the following technical solutions:

[0005] A method for collaborative mining of a close-range coal seam and an overlying coal pillar, comprising:

[0006] a. Dig coal transportation tunnels and return air tunnels under the coal pillars in the overlying section according to the layout of comprehensive mechanized coal mining tunnels;

[0007] b. When the coal transport tunnel and the return air tunnel are excavated to the boundary of the working face, a cut is made, and coal mining equipment and support equipment are arranged in the cut; coal transport equipment is arranged in the coal transport tunnel;

[0008] c. The coal mining area is divided into L1 section and L2 section. During the mining operation of the working face, the L1 section and the L2 section are mining at the same time;

[0009] d. During the advancement of the working face, the L2 section and the L1 section cooperate with each other and operate in a cycle;

[0010] e. Repeat steps c to d until the coordinated mining of the close-range coal seams and the overlying coal pillars in the entire area is completed.

[0011] Furthermore, the coal mining equipment and supporting equipment include coal mining machines, front scraper conveyors, fully-mechanized caving hydraulic supports, fully-mechanized mining hydraulic supports and rear scraper conveyors; the fully-mechanized caving hydraulic supports and fully-mechanized mining hydraulic supports are arranged side by side, the area where the fully-mechanized caving hydraulic supports are located is the L1 section, and the area where the fully-mechanized mining hydraulic supports are located is the L2 section; the rear scraper conveyor is arranged at the bottom of the fully-mechanized caving hydraulic supports, and the front scraper conveyor is arranged at the top of the fully-mechanized mining hydraulic supports; the coal transportation equipment is a transfer machine and a belt conveyor.

[0012] Furthermore, the fully-mechanized caving hydraulic support is arranged in the L1 section of the lower coal seam located below the coal pillar of the overlying section, and the fully-mechanized mining hydraulic support is arranged in the L2 section of the lower coal seam without the coal pillar of the overlying section.

[0013] Furthermore, in the L2 section where the comprehensive mining hydraulic supports are arranged, coal mining is carried out according to the technological process of coal mining machine cutting coal, moving the comprehensive mining hydraulic supports, and moving the front scraper conveyor; in the L1 section where the comprehensive caving hydraulic supports are arranged, coal mining is carried out according to the technological process of coal mining machine cutting coal, moving the comprehensive caving hydraulic supports, moving the front scraper conveyor, placing the overlying section coal pillar, and pulling and moving the rear scraper conveyor.

[0014] Furthermore, the advancement direction of the coal mining face arranged below the coal pillar in the overlying section is consistent with the length direction of the coal pillar in the overlying section.

[0015] Furthermore, when excavating the coal transportation tunnel in the coal mining face, it should be located outside the coal pillar in the overlying section, with a horizontal distance of S.

[0016] Furthermore, the rock layer thickness M between the coal discharge port of the fully mechanized caving hydraulic support in the S section of the coal mining working face and the lower coal seam is less than 2m.

[0017] Furthermore, the total length of the coal mining face is the sum of the fully mechanized caving L1 section and the fully mechanized caving L2 section, and the length of the fully mechanized caving L1 section is the sum of the horizontal distance S and the width L of the coal pillar in the overlying section.

[0018] Compared with the prior art, the present invention has the following technical effects:

[0019] The method for the coordinated mining of a close-range coal seam and an overlying section coal pillar of the present invention gives full play to the dual technical advantages of comprehensive mining and comprehensive caving, and can realize the full mining of close-range overlying coal resources without coal pillars. It has strong technical innovation, convenient operation, high economy and practicality, and broad application prospects. It can provide a new idea and method for the coordinated mining of close-range coal seams and overlying section coal seams. The method can realize the zero-pressure full mining of close-range overlying coal resources. The method is safe and reliable, highly innovative, and has obvious beneficial effects. It can provide a reference for the safe mining of close-range coal seams, has high economy and practicality, and has broad application prospects.

[0020] The thickness M of the rock layer in the middle of the lower coal seam of the present invention is generally less than 2m, so as to reduce the caving of gangue and improve the coal caving effect of the coal pillar in the overlying section. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is the working surface and equipment layout diagram of the present invention;

[0022] Figure 2 is a cross-sectional view taken along line AA of the present invention;

[0023] Figure 3 It is a schematic diagram of the research and selection process of the horizontal distance S of the present invention;

[0024] In the figure: 1-coal mining machine; 2-coal transport tunnel; 3-return air tunnel; 4-belt conveyor; 5-transfer machine; 6-fully-mechanized caving hydraulic support; 7-fully-mechanized caving hydraulic support; 8-rear scraper conveyor; 9-front scraper conveyor; 10-coal pillar in the overlying section; 11-rock layer between the coal pillar in the overlying section and the lower coal seam; 12-lower coal seam; 13-coal caving opening. DETAILED DESCRIPTION

[0025] The technical solution in the embodiment of the present invention will be described in detail below with reference to the accompanying drawings in the present invention:

[0026] The present invention discloses a method for coordinated mining of a close-range coal seam and an overlying coal pillar, comprising the following steps: after excavating a transport tunnel, a return air tunnel and opening a cut in the close-range coal seam below the coal pillar, a fully mechanized coal mining is carried out by simultaneously arranging a fully mechanized caving hydraulic support and a fully mechanized mining hydraulic support in the cut; the fully mechanized mining section mines coal according to the process of cutting coal, moving the fully mechanized caving hydraulic support and moving the front scraper conveyor; the fully mechanized caving section mines coal according to the process of cutting coal, moving the fully mechanized caving hydraulic support, moving the front scraper conveyor, placing the overlying coal pillar and pulling and moving the rear scraper conveyor; the fully mechanized mining section and the fully mechanized caving section coordinate operations to realize coordinated mining of the close-range coal seam and the overlying coal pillar.

[0027] The designed production capacity of a mine in a certain mining area is 5.00Mt / a. The main coal seams are 3 coal and 5 coal, and the interlayer spacing is 1.0-2.0m. The coal seam is buried at a depth of about 420m, and the average thicknesses of 3 coal and 5 coal are 3.5m and 4.0m respectively. 3 coal is coking coal and has a high mining value. However, in the early stage, considering the strong mining stress and the soft rock conditions of the roof and floor, a section coal pillar of about 35m was generally reserved, resulting in a large amount of coal resource waste. During the 5 coal mining process, affected by the stress of the overlying section coal pillar, the cost of tunnel support and maintenance is high, affecting the safe and efficient production of the working face. In combination with the collaborative mining method of a close-range coal seam and an overlying section coal pillar of the present invention, its specific steps are described as follows:

[0028] ① According to the actual conditions of the mine, under the section coal pillar 10, the coal transportation tunnel 2 and the return air tunnel 3 are excavated according to the comprehensive mechanized coal mining tunnel layout mode, and the advancing direction of the coal mining working face is consistent with the length direction of the section coal pillar 10;

[0029] ② When the coal transport tunnel 2 of the coal mining face is excavated, it is located outside the coal pillar 10 in the overlying section. According to the numerical simulation results of the vertical stress influence range Figure 3 , the final designed horizontal distance S is 15m to avoid the stress influence range of the overlying section coal pillar 10;

[0030] ③ When the coal transport tunnel 2 and the return air tunnel 3 are excavated to the boundary of the working face, a cut is made, and the main coal mining and supporting equipment such as the coal mining machine 1, the front scraper conveyor 9, the fully mechanized caving hydraulic support 6 and the fully mechanized mining hydraulic support 7, and the rear scraper conveyor 8 are arranged in the cut, and the main coal transport equipment such as the transfer machine 5 and the belt conveyor 4 are arranged in the coal transport tunnel 2;

[0031] ④ The fully mechanized caving hydraulic support 6 is arranged in the L1 section of the lower coal seam 12 below the overlying section coal pillar 10, with a length of 50m; the fully mechanized mining hydraulic support 7 is arranged in the L2 section of the lower coal seam 12 without the overlying section coal pillar 10, with a length of 100m;

[0032] ⑤ The thickness M of the rock layer 11 between the overlying coal pillar 10 and the lower coal seam 12 is 1.0-2.0 m, so as to reduce the gangue discharge and improve the coal discharge effect of the overlying coal pillar 10;

[0033] ⑥ The coal discharge port 13 of the fully mechanized caving hydraulic support 6 in the S section of the coal mining working face is always kept closed to prevent the overlying excess rock from mixing into the rear scraper conveyor 8;

[0034] ⑦ The total length of the coal mining face is designed to be 150m, which is the sum of the fully mechanized caving L1 section of 50m and the fully mechanized caving L2 section of 100m. The length of the fully mechanized caving L1 section is 50m, which is the sum of the horizontal distance S and the width L of the coal pillar 10 in the overlying section;

[0035] ⑧ During the mining operation of the working face, the L2 section of the fully mechanized hydraulic support 7 is arranged, and the coal is mined according to the process of the coal mining machine 1 cutting coal, moving the fully mechanized hydraulic support 7, and moving the front scraper conveyor 9; the L1 section of the fully mechanized caving hydraulic support 6 is arranged, and the coal is mined according to the process of the coal mining machine 1 cutting coal, moving the fully mechanized caving hydraulic support 6, moving the front scraper conveyor 9, placing the overlying section coal pillar 10, and pulling and moving the rear scraper conveyor 8;

[0036] ⑨ During the advancement of the working face, the fully mechanized mining hydraulic support 7 in the L2 section and the fully mechanized caving hydraulic support 6 in the L1 section cooperate with each other and operate in a cycle;

[0037] ⑩ Repeat steps ⑧ to ⑨ until the coordinated mining operation of the close-range coal seam 12 and the overlying coal pillar 10 in the entire area is completed.

[0038] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Any simple modification and equivalent changes made to the above embodiments based on the technical essence of the present invention shall fall within the protection scope of the present invention.

Claims

1. A method for collaborative mining of close-range coal seams and overlying coal pillars, characterized in that: include: a. Excavate the coal transportation tunnel (2) and the return air tunnel (3) below the coal pillar in the overlying section according to the layout of the comprehensive mechanized coal mining tunnel; b. When the coal transport tunnel (2) and the return air tunnel (3) are excavated to the boundary of the working face, a cut is made and coal mining equipment and support equipment are arranged in the cut; coal transport equipment is arranged in the coal transport tunnel (2); c. The coal mining area is divided into L1 section and L2 section. During the mining operation of the working face, the L1 section and the L2 section are mining at the same time; d. During the advancement of the working face, the L2 section and the L1 section cooperate with each other and operate in a cycle; the advancement direction of the coal mining working face arranged below the overlying section coal pillar (10) is consistent with the length direction of the overlying section coal pillar (10); e. Repeat steps c~d until the entire area of ​​the coal seam and the overlying section of the coal pillars of the collaborative mining operation is completed; The coal mining equipment and support equipment include a coal mining machine (1), a front scraper conveyor (9), a fully mechanized caving hydraulic support (6), a fully mechanized mining hydraulic support (7), and a rear scraper conveyor (8); the fully mechanized caving hydraulic support (6) and the fully mechanized mining hydraulic support (7) are arranged side by side, the area where the fully mechanized caving hydraulic support (6) is located is the L1 section, and the area where the fully mechanized mining hydraulic support (7) is located is the L2 section; the rear scraper conveyor (8) is arranged at the bottom of the fully mechanized caving hydraulic support (6), and the front scraper conveyor (9) is arranged at the top of the fully mechanized mining hydraulic support (7); the coal transportation equipment includes a transfer machine (5) and a belt conveyor (4); The fully-mechanized caving hydraulic support (6) is arranged in the L1 section of the lower coal seam below the overlying section coal pillar (10), and the fully-mechanized mining hydraulic support (7) is arranged in the L2 section of the lower coal seam without the overlying section coal pillar (10); Arrange the L2 section of the fully mechanized mining hydraulic support (7), and mine coal according to the process of the coal mining machine (1) cutting coal, moving the fully mechanized mining hydraulic support (7), and moving the front scraper conveyor (9); arrange the L1 section of the fully mechanized caving hydraulic support (6), and mine coal according to the process of the coal mining machine (1) cutting coal, moving the fully mechanized caving hydraulic support (6), moving the front scraper conveyor (9), placing the overlying section coal pillar (10), and pulling and moving the rear scraper conveyor (8); The thickness M of the rock layer between the overlying coal pillar (10) and the lower coal seam is less than 2 m.

2. A method for collaborative mining of close-range coal seams and overlying coal pillars according to claim 1, characterized in that: When the coal transport tunnel (2) is excavated at the coal mining face, it should be located outside the overlying coal pillar (10) at a horizontal distance of S.

3. The method for collaborative mining of close-range coal seams and overlying coal pillars according to claim 1, characterized in that: The coal discharge opening (13) of the fully-mechanized caving hydraulic support (6) in the fully-mechanized caving L1 section coal mining working face without an overlying section coal pillar is always kept in a closed state.

4. A method for collaborative mining of close-range coal seams and overlying coal pillars according to claim 2, characterized in that: The total length of the coal mining face is the sum of the fully mechanized caving L1 section and the fully mechanized caving L2 section. The length of the fully mechanized caving L1 section is the sum of the horizontal distance S and the width L of the overlying section coal pillar (10).