A kind of hanging beam with adjustable hanging point and its installation method
By designing a suspension beam with adjustable lifting points, using the box beam structure and pin assembly to adjust the position of the lifting point, and setting a nylon pad at the lower hanging part, the problem of frequent adjustment of the length of the wire rope during the lifting of offshore wind power monopile foundations is solved. Improved hoisting flexibility and economic benefits, and extended service life.
Patent Information
- Application Number
- CN202211569341.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-12-08
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2042-12-08
AI Technical Summary
When hoisting offshore wind power monopile foundations, the length of the wire rope needs to be frequently adjusted, resulting in increased construction costs and time. The existing fixed lifting point beams cannot meet the lifting needs under different operating conditions.
A hanging beam with adjustable hanging points is designed, which adopts a box beam structure. Through the combination of the upper hanging point and the lower hanging point connector, the height adjustment of the hanging point position is realized by using the first and second pin components, and the height of the hanging point is adjusted at the lower hanging part. Nylon backing plates are installed to reduce wire rope friction and improve the flexibility and wear resistance of the suspension beam.
It improves the flexibility and economic benefits of hoisting, extends the service life of the hoisting beam and wire rope, reduces construction costs, enhances the versatility and adaptability of the hoisting beam, and ensures hoisting safety.
Smart Images

Figure CN115924727B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of hoisting hanging beams, and in particular to a hanging beam with adjustable hanging points and a method for installing the hanging beam. Background Art
[0002] The weight and diameter of offshore wind power monopile foundation are large, and a lifting beam is required to keep the monopile foundation balanced during the lifting process to avoid damage to the monopile foundation by the lifting cable. Most domestic monopile lifting beams are fixed at the lifting point. Due to the change restrictions of factors such as the position of the monopile lifting lug, pile length, and water depth, it is necessary to match steel wire ropes of different lengths for lifting. As a result, the length of the steel wire rope needs to be increased or decreased during construction to ensure that the pile bottom is in the appropriate position, thus increasing construction costs and time. Summary of the invention
[0003] The technical problem to be solved by the present invention is to overcome the deficiencies of the prior art. The first purpose is to provide a hanging beam with adjustable hanging points which is easy to hoist, has a long service life and a stable structure.
[0004] The second object of the present invention is to provide a method for installing a hanging beam with adjustable hanging points, which is easy to hoist, has a long service life and a stable structure.
[0005] The technical solution adopted in the present invention is: the hanging beam with adjustable hanging points includes a hanging beam body, the hanging beam body is a box beam structure, two upper hanging point connecting parts are relatively arranged on the upper part of the hanging beam body, the upper hanging point connecting parts include two relatively arranged first upper hanging parts and a second upper hanging part, the first upper hanging part and the second upper hanging part each include two relatively arranged first hanging ears, a first pin shaft assembly is detachably connected between the two first hanging ears, lower hanging point connecting parts are arranged at both ends of the hanging beam body, the lower hanging point connecting parts include a first lower hanging part and a second lower hanging part located below the first lower hanging part, the first lower hanging part and the second lower hanging part each include two relatively arranged second hanging ears, a second pin shaft assembly is detachably connected between the two second hanging ears, and a leg base is arranged at the bottom of the hanging beam body.
[0006] Further, the first pin shaft assembly includes a first pin shaft, both ends of which are connected with a first pin shaft outer ring and a first pin shaft inner ring located in the first pin shaft outer ring, each of the first pin shaft inner ring is connected to the first pin shaft by four external hexagonal bolts, each of the first pin shaft outer ring is connected to the first pin shaft by six external hexagonal bolts, and a first handle is also provided on the first pin shaft.
[0007] Further, the second pin shaft assembly includes a second pin shaft, both ends of which are connected with a second pin shaft outer ring and a second pin shaft inner ring located in the second pin shaft outer ring, each of the second pin shaft inner ring is connected to the first pin shaft by four external hexagonal bolts, each of the second pin shaft outer ring is connected to the second pin shaft by six external hexagonal bolts, and a second handle is also provided on the second pin shaft.
[0008] Furthermore, two nylon pads are arranged opposite to each other on the second lower hanging part, and a space for the steel wire rope to pass through is arranged between the two nylon pads.
[0009] Furthermore, reinforcing ribs are provided on both sides of the first lifting ear and the second lifting ear.
[0010] Furthermore, the leg base includes two first legs arranged on one side of the suspension beam body and two second legs arranged on the other side of the suspension beam body, the two first legs are in an eight-shape and are welded by a first reinforcement member, and the two second legs are in an eight-shape and are welded by a second reinforcement member.
[0011] In addition, a method for installing a suspension beam with adjustable suspension points is characterized in that it comprises the following steps:
[0012] Step S1, barging the beam: after the beam is prefabricated, the beam and the monopile foundation are transported to the construction site, the beam is barged using the construction site crane and placed vertically on the deck of the crane ship, one end of the lifting wire rope is hung on the hook of the crawler crane, the lifting wire rope is connected to the beam using a shackle, and the beam is barged to a suitable position;
[0013] Step S2, hanging the lower hanging point: the height adjustment of the hanging point position can be realized by switching the second pin shaft assembly between the first lower hanging part and the second lower hanging part. After the hanging beam is erected on the deck, the second pin shaft assembly is taken out, the auxiliary wire rope is passed through the main hanging wire rope, and the upper part of the auxiliary wire rope is hung on the hook of the crawler crane. The hook of the crawler crane is raised to lift the wire rope to a suitable position. At the same time, the second pin shaft assembly is inserted into the pin hole of the lower hanging point connector by a forklift and tightened. Then, the main hanging wire rope is lowered to the second pin shaft assembly to complete the hanging of the lower hanging point.
[0014] Step S3, hanging the upper hanging point: fold the two annular slings in half respectively, take out the first pin assembly when hanging, lower the two ends of the annular sling to the first hanging part and the second hanging part respectively by the crawler crane, further insert the two first pin assemblies into the pin holes at the first hanging part and the second hanging part respectively and tighten them, after hanging, the crawler crane puts the annular sling into the position of the first pin assembly, completes the hanging of an annular sling at one hanging point connection piece, and similarly connects the second annular sling to another hanging point connection piece of the hanging beam;
[0015] Step S4, hoisting construction: during the pile lifting construction, the lifting belts of the two upper lifting point connectors are hung into the hook teeth of the main hook, and the steel wire ropes of the two lower lifting point connectors are hung to the main lifting ears of the single pile. The single pile is turned vertically through the cooperation of the lifting points at the tail of the single pile, and moved into the dragon mouth of the pile holder. After the self-sinking of the single pile foundation is completed, the lifting beam is recovered to the deck surface.
[0016] In step S1, a lifting wire rope is connected to four small lifting ears at the top of the lifting beam using a shackle, and the lifting beam is lifted upside down to a suitable position using four-point horizontal lifting.
[0017] The present invention has the following beneficial effects:
[0018] 1. By setting two upper hanging point connectors and two lower hanging point connectors on the main body of the lifting beam, the lifting situation is simulated according to parameters such as the length of the single pile, water depth, and the length of the configured wire rope, and the appropriate lifting point position is selected, thereby improving the flexibility of lifting and being able to adapt to the requirements of single pile posture control and lifting height under different operating conditions;
[0019] 2. The outrigger base is set to facilitate storage and transportation, reduce the contact area between the main body of the beam and the deck, reduce the wear of the main body of the beam, strengthen the protection of the beam, and extend the service life;
[0020] 3. The height of the hanging beam should be set reasonably, taking into account the working condition lifting height and the feasibility of hanging wire ropes at sea, reducing the length of wire ropes, controlling construction costs and enhancing economic benefits;
[0021] 4. The height adjustment of the hanging point position can be realized by switching the second pin assembly between the first lower hanging part and the second lower hanging part, thereby increasing the versatility and adaptability of the hanging beam, improving the utilization rate of a single set of steel wire ropes, and improving economic benefits; the connection is realized by the first pin assembly and the second pin assembly, which can be easily disassembled and is stable and firm;
[0022] 5. By providing a nylon pad at the second lower hanging part, the steel wire rope on the second lower hanging part passes through the space for the steel wire rope to pass through, which can avoid direct contact and friction between the steel wire rope on the second lower hanging part and the main body of the hanging beam, thereby avoiding wire and strand breakage of the steel wire rope and damage to the main body of the hanging beam, enhancing the wear resistance and impact resistance of the main body of the hanging beam, while reducing the wear of the steel wire rope, extending the service life of the sling, and ensuring the safety of lifting. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the structures shown in these drawings without paying creative work.
[0024] Figure 1 It is a schematic diagram of the planar structure of the present invention;
[0025] Figure 2 yes Figure 1 A cross-sectional view of
[0026] Figure 3 This is a schematic diagram of the planar structure of the first pin assembly of the present invention. Figure 1 ;
[0027] Figure 4 This is a schematic diagram of the planar structure of the first pin assembly of the present invention. Figure 2 ;
[0028] Figure 5 This is a schematic diagram of the planar structure of the second pin assembly of the present invention. Figure 1 ;
[0029] Figure 6 This is a schematic diagram of the planar structure of the second pin assembly of the present invention. Figure 2 ;
[0030] Figure 7 This is a schematic diagram of the planar structure of the nylon pad of the present invention. Figure 1 ;
[0031] Figure 8 This is a schematic diagram of the planar structure of the nylon pad of the present invention. Figure 2 .
[0032] The reference numerals are as follows:
[0033] 1. The main body of the lifting beam; 2. The upper hanging point connector; 3. The first upper hanging part; 5. The second upper hanging part; 6. The first lifting ear; 7. The first pin assembly; 8. The lower hanging point connector; 9. The first lower hanging part; 10. The second lower hanging part; 11. The second lifting ear; 12. The second pin assembly; 13. The support leg base; 15. The first pin; 16. The first pin outer ring; 17. The first pin inner ring; 18. The first handle; 19. The second pin; 20. The second pin outer ring; 21. The second pin inner ring; 22. The second handle; 23. The nylon pad; 100. The lifting beam.
[0034] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION
[0035] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0036] It should be noted that all directional indications in the embodiments of the present invention, such as up, down, left, right, front, back, clockwise, counterclockwise, etc., are only used to explain the relative position relationship, movement status, etc. between the components in a certain specific posture. If the specific posture changes, the directional indication will also change accordingly.
[0037] In addition, the descriptions of "first", "second", etc. in the present invention are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the technical solutions between the various embodiments can be combined with each other, but they must be based on the ability of ordinary technicians in the field to implement them. When the combination of technical solutions is contradictory or cannot be implemented, it should be considered that such a combination of technical solutions does not exist and is not within the scope of protection required by the present invention.
[0038] like Figure 1 to Figure 2 As shown, in this embodiment, the hanging beam 100 with adjustable hanging points includes a hanging beam body 1, and the hanging beam body 1 is a box beam structure. Two upper hanging point connectors 2 are relatively arranged on the upper part of the hanging beam body 1, and the upper hanging point connectors 2 include two relatively arranged first upper hanging parts 3 and a second upper hanging part 5, and the first upper hanging part 3 and the second upper hanging part 5 each include two relatively arranged first hanging ears 6, and a first pin shaft assembly 7 is detachably connected between the two first hanging ears 6, and lower hanging point connectors 8 are arranged at both ends of the hanging beam body 1, and the lower hanging point connectors 8 include a first lower hanging part 9 and a second lower hanging part 10 located below the first lower hanging part 9, and the first lower hanging part 9 and the second lower hanging part 10 each include two relatively arranged second hanging ears 11, and a second pin shaft assembly 12 is detachably connected between the second hanging ears 11, and a support leg base 13 is arranged at the bottom of the hanging beam body 1.
[0039] Among them, the main body of the hanging beam 1 is mainly made of Q355B material, and is welded into a box beam structure through steel plates. It is in the shape of a rectangular parallelepiped, and is reinforced and connected by a stiffened plate inside. After grinding, it is painted for corrosion protection. The hanging beam is 10.16m long, 1.7m wide, 4.18m high, and weighs about 49.4t. The upper hanging point connector 2 is used to connect the hanging beam to the crane hook. Two 800t×10m annular slings are folded in half when connected. When the annular slings are connected and stretched, they are at an angle of 60 degrees to the horizontal direction. The first pin assembly 7 is used to connect the sling between the hanging beam and the crane hook, and the second pin assembly 12 is used to connect the hanging beam to the single pile wire rope.
[0040] It should be noted that the height adjustment of the hanging point position can be achieved by switching the second pin shaft assembly 12 between the first lower hanging part 9 and the second lower hanging part 10. If the single pile touches the mud when it is vertical and the depth of the pile bottom into the mud is too large, in order to reduce the impact of dragging mud on the entry of the single pile into the dragon mouth, the second pin shaft assembly 12 can be inserted into the first lower hanging part 9 located at the high hanging point position and a wire rope can be hung to increase the height of the pile top; if the elevation of the pile bottom is greater than the elevation of the mud surface when the single pile is vertical, the wire rope can be hung to the second lower hanging part 10 located at the low hanging point position. By switching the high and low hanging point positions, the feasibility of adjusting the hanging point position can be achieved, thereby increasing the number of times the single pile main hanging wire rope is used.
[0041] With respect to the deficiencies of the prior art, in the present invention, two upper hanging point connectors 2 and two lower hanging point connectors 8 are provided on the main body 1 of the suspension beam, and the lifting situation is simulated according to parameters such as the length of the single pile, the water depth, and the length of the configured wire rope, and a suitable hanging point position is selected, thereby improving the flexibility of lifting and being able to adapt to the requirements for the posture control and lifting height of the single pile under different operating conditions; the provision of the support leg base 13 facilitates storage and transportation, reduces the contact area between the main body 1 of the suspension beam and the deck, reduces the wear of the main body 1 of the suspension beam, strengthens the protection of the suspension beam, and prolongs the service life; the height adjustment of the hanging point position can be achieved by switching the second pin shaft assembly 12 between the first lower hanging part 9 and the second lower hanging part 10, thereby increasing the versatility and adaptability of the suspension beam, improving the utilization rate of a single set of wire ropes, and improving the economic benefits; the connection is achieved by the first pin shaft assembly 7 and the second pin shaft assembly 12, which can be easily disassembled and is stable and firm, so that the suspension beam 100 with adjustable hanging points has the advantages of easy lifting, long service life and stable structure.
[0042] In certain embodiments, such as Figure 3 to Figure 4As shown, the first pin assembly 7 includes a first pin 15, both ends of the first pin 15 are connected with a first pin outer ring 16 and a first pin inner ring 17 located in the first pin outer ring 16, each of the first pin inner ring 17 is connected to the first pin 15 by four external hexagonal bolts, each of the first pin outer ring 16 is connected to the first pin 15 by six external hexagonal bolts, and the first pin 15 is also provided with a first handle 18. The first pin 15 has a diameter of 300 mm, is made of 42CrMo material, and is made by forging processing technology, each of the first pin inner ring 17 is connected to the first pin 15 by four M26 external hexagonal bolts, and each of the first pin outer ring 16 is connected to the first pin 15 by six M33 external hexagonal bolts.
[0043] Specifically, the first handle 18 can facilitate the disassembly of the first pin 15. The first pin outer ring 16 and the first pin inner ring 17 are connected to both ends of the first pin 15, so that the first pin assembly 7 as a whole forms a stable connection structure, which is relatively stable during lifting.
[0044] In certain embodiments, such as Figures 5 and 6 As shown, the second pin assembly 12 includes a second pin 19, both ends of the second pin 19 are connected with a second pin outer ring 20 and a second pin inner ring 21 located in the second pin outer ring 20, each of the second pin inner ring 21 is connected to the first pin 15 by four external hexagonal bolts, each of the second pin outer ring 20 is connected to the second pin 19 by six external hexagonal bolts, and a second handle 22 is also provided on the second pin 19. The diameter of the second pin 19 is 350 mm, made of 42CrMo material, and made by forging processing technology, each of the second pin inner ring 21 is connected to the first pin 15 by four M26 external hexagonal bolts, and each of the second pin outer ring 20 is connected to the first pin 15 by six M33 external hexagonal bolts.
[0045] Specifically, the second handle 22 can facilitate the disassembly of the second pin 19. The second pin outer ring 20 and the second pin inner ring 21 are connected to both ends of the second pin 19, so that the second pin assembly 12 forms a stable connection structure as a whole, which is more stable during lifting.
[0046] In certain embodiments, such as Figures 7 and 8 As shown, two nylon pads 23 are arranged opposite to each other on the second lower hanging part 10, and a space for the steel wire rope to pass through is arranged between the two nylon pads 23. Each nylon pad 23 is connected to the second lower hanging part 10 by six hexagon socket head screws.
[0047] Specifically, by providing a nylon pad 23 at the second lower hanging part 10, the steel wire rope on the second lower hanging part 10 passes through the space for the steel wire rope to pass through, which can avoid direct contact and friction between the steel wire rope on the second lower hanging part 10 and the suspension beam body 1, thereby avoiding wire and strand breakage of the steel wire rope and damage to the suspension beam body 1, enhancing the wear resistance and impact resistance of the suspension beam body 1, while reducing the wear of the steel wire rope, extending the service life of the sling, and ensuring the safety of lifting.
[0048] In some embodiments, reinforcing ribs are provided on both sides of the first lifting eye 6 and the second lifting eye 11. Specifically, the first lifting eye 6, the second lifting eye 11 and the suspension beam body 1 are integrally formed, and the strength of the first lifting eye 6 and the second lifting eye 11 is enhanced by the provision of the reinforcing ribs, so that the sling can be stable when it is hoisted on the first lifting eye 6 and the second lifting eye 11.
[0049] In some embodiments, the leg base 13 includes two first legs arranged on one side of the suspension beam body 1 and two second legs arranged on the other side of the suspension beam body 1, the two first legs are in an eight-shaped shape and are welded by a first reinforcement member, and the two second legs are in an eight-shaped shape and are welded by a second reinforcement member. Specifically, the two first legs are in an eight-shaped shape and the two second legs are in an eight-shaped shape, so that the suspension beam body 1 becomes more stable and simple; the first reinforcement member and the second reinforcement member are square steel.
[0050] In addition, the present invention also provides a method for installing the suspension beam with adjustable suspension points, which comprises the following steps:
[0051] Step S1, barging the lifting beam: after the lifting beam 100 is prefabricated, the lifting beam 100 and the monopile foundation are transported to the construction site, the lifting beam 100 is barged and placed vertically on the deck of the crane ship using the construction site crane, one end of the lifting wire rope is hung on the hook of the crawler crane, the lifting wire rope is connected to the lifting beam 100 using a shackle, and the lifting beam 100 is barged to a suitable position;
[0052] Specifically, the lifting beam 100 and the monopile foundation are transported to the construction site together by a transport ship; after the transport ship is berthed, one end of the lifting wire rope is hung on the hook of the crawler crane, and the construction personnel carry the shackle and take the cage to the transport ship, and use the shackle to connect the lifting wire rope to the four small lifting ears at the top of the lifting beam 100, and use four-point horizontal lifting to barge the lifting beam 100 to a suitable position.
[0053] Step S2, hanging the lower hanging point: the height adjustment of the hanging point position can be realized by switching the second pin shaft assembly 12 between the first lower hanging part 9 and the second lower hanging part 10. After the hanging beam 100 is erected on the deck, the second pin shaft assembly 12 is taken out, the auxiliary wire rope is passed through the main hanging wire rope, and the upper part of the auxiliary wire rope is hung on the hook of the crawler crane. The hook of the crawler crane is raised to lift the wire rope to a suitable position. At the same time, the second pin shaft assembly 12 is inserted into the pin hole of the lower hanging point connector 8 by a forklift and tightened, and then the main hanging wire rope is lowered to the second pin shaft assembly 12 to complete the hanging of the lower hanging point;
[0054] Specifically, the hoisting conditions are simulated according to the parameters such as the length of the single pile, the water depth, and the length of the configured wire rope, and the appropriate hoisting point position is selected. If the single pile touches the mud when it is vertical, and the depth of the pile bottom into the mud is too large, in order to reduce the impact of dragging mud on the entry of the single pile into the dragon mouth, the second pin assembly 12 can be inserted into the first lower hanging part 9 located at the high hanging point position and the wire rope can be hung to increase the height of the pile top; if the elevation of the pile bottom is greater than the mud surface elevation when the single pile is vertical, the wire rope can be hung to the second lower hanging part 10 located at the low hanging point position. By switching the high and low hanging point positions, the feasibility of the adjustable hanging point position is realized, and the utilization times of the single pile main hoisting wire rope are increased.
[0055] Step S3, hanging the upper hanging point: fold the two annular slings in half respectively, take out the first pin assembly 7 when hanging, lower the two ends of the annular sling to the first hanging part 3 and the second hanging part 5 respectively by the crawler crane, further insert the two first pin assemblies 7 into the pin holes at the first hanging part 3 and the second hanging part 5 respectively and tighten them, after hanging, the crawler crane puts the annular sling into the position of the first pin assembly 7, completes the hanging of an annular sling at one hanging point connector 2, and similarly connects the second annular sling to another hanging point connector 2 of the hanging beam 100;
[0056] Specifically, the two endless slings are 800t slings of the same length.
[0057] Step S4, hoisting construction: During the pile lifting construction, the lifting belts of the two upper lifting point connectors 2 are hung into the hook teeth of the main hook, and the steel wire ropes of the two lower lifting point connectors 8 are hung to the main lifting ears of the single pile. The single pile is turned vertically through the cooperation of the lifting points at the tail of the single pile, and moved into the dragon mouth of the pile holder. After the self-sinking of the single pile foundation is completed, the lifting beam 100 is recovered to the deck surface.
[0058] With respect to the deficiencies of the prior art, the installation method of the suspension beam with adjustable suspension points aims to improve the shortcomings of the existing offshore wind power single pile foundation suspension beam, such as narrow application range and complex installation. In the present invention, by setting the upper suspension point and the lower suspension point on the suspension beam body 1, the suspension situation is simulated according to the parameters such as the length of the single pile, the water depth, and the length of the configured wire rope, and the appropriate suspension point position is selected, thereby improving the flexibility of the suspension and being able to adapt to the requirements of the single pile posture control and the lifting height under different operating conditions; the arrangement of the support leg base 13 facilitates storage and transportation, reduces the contact area between the suspension beam body 1 and the deck, reduces the wear of the suspension beam body 1, strengthens the protection of the suspension beam, and prolongs the service life; the height adjustment of the suspension point position can be achieved by switching the second pin shaft assembly 12 between the first lower suspension part 9 and the second lower suspension part 10, thereby increasing the versatility and adaptability of the suspension beam and improving the use of a single set of wire ropes The rate is improved and the economic benefits are improved; the height of the hanging beam is set reasonably, considering the working condition lifting height and the feasibility of hanging wire rope at sea, reducing the length of the wire rope configuration, controlling the construction cost and enhancing the economic benefits; the connection is achieved through the first pin shaft assembly 7 and the second pin shaft assembly 12, which can be easily disassembled and is stable and firm; by providing a nylon pad 23 at the second lower hanging part 10, the wire rope on the second lower hanging part 10 passes through the space for the wire rope to pass through, which can avoid the direct contact and friction between the wire rope on the second lower hanging part 10 and the hanging beam body 1, thereby avoiding the wire and strand breakage of the wire rope and the damage of the hanging beam body 1, enhancing the wear resistance and impact resistance of the hanging beam body 1, and reducing the wear of the wire rope, extending the service life of the sling, ensuring the safety of lifting, so that the hanging beam 100 with adjustable hanging points has the advantages of easy lifting, long service life and stable structure.
[0059] The above description is only a preferred embodiment of the present invention, and does not limit the patent scope of the present invention. All equivalent structural changes made by using the contents of the present invention specification and drawings under the inventive concept of the present invention, or directly / indirectly applied in other related technical fields are included in the patent protection scope of the present invention.
Claims
1. A hanging beam with adjustable hanging points, characterized in that: The invention comprises a suspension beam body (1), wherein the suspension beam body (1) is a box beam structure, wherein two upper suspension point connecting members (2) are arranged relatively on the upper part of the suspension beam body (1), wherein the upper suspension point connecting members (2) comprise two first upper suspension parts (3) and a second upper suspension part (5) arranged relatively, wherein the first upper suspension part (3) and the second upper suspension part (5) each comprise two first lifting ears (6) arranged relatively, wherein a first pin shaft assembly (7) is detachably connected between the two first lifting ears (6), and wherein the suspension beam body (1) comprises two first upper suspension parts (3) and a second upper suspension part (5) arranged relatively, wherein the first upper suspension part (3) and the second upper suspension part (5) each comprise two first lifting ears (6) arranged relatively, wherein the ... each comprise two first upper suspension parts (3) and a second upper suspension part (5) each comprise two first upper suspension parts (6) arranged relatively, wherein the first upper suspension parts (3) and the second upper suspension part (5) each comprise two first upper suspension parts (6) arranged relatively, wherein the first upper suspension parts (3) and the second upper suspension part (5) each comprise two first upper suspension parts (6) arranged relatively, wherein the first upper suspension parts (3 Both ends of the main body (1) are provided with lower suspension point connecting members (8), the lower suspension point connecting members (8) comprising a first lower suspension part (9) and a second lower suspension part (10) located below the first lower suspension part (9), the first lower suspension part (9) and the second lower suspension part (10) each comprising two second suspension ears (11) arranged opposite to each other, a second pin shaft assembly (12) being detachably connected between the second suspension ears (11), and a leg base (13) being provided at the bottom of the suspension beam main body (1); The second pin shaft assembly (12) comprises a second pin shaft (19), both ends of which are connected to a second pin shaft outer ring (20) and a second pin shaft inner ring (21) located in the second pin shaft outer ring (20), and a second handle (22) is also provided on the second pin shaft (19); the height adjustment of the suspension point position can be achieved by switching the second pin shaft assembly (12) between the first lower suspension part (9) and the second lower suspension part (10); if the single pile touches mud when it is vertical, and the depth of the pile bottom entering the mud is too large, in order to reduce the influence of the dragging mud on the entry of the single pile into the dragon mouth, the second pin shaft assembly (12) can be inserted into the first lower suspension part (9) located at the high suspension point position and a steel wire rope can be hung to increase the height of the pile top; if the elevation of the pile bottom is greater than the elevation of the mud surface when the single pile is vertical, the steel wire rope can be hung to the second lower suspension part (10) located at the low suspension point position, and the feasibility of adjusting the suspension point position can be achieved by switching the high and low suspension point positions, thereby increasing the number of times the steel wire rope for the main suspension of the single pile is used.
2. A hanging beam with adjustable hanging points according to claim 1, characterized in that: The first pin shaft assembly (7) comprises a first pin shaft (15), both ends of the first pin shaft (15) are connected to a first pin shaft outer ring (16) and a first pin shaft inner ring (17) located in the first pin shaft outer ring (16), each of the first pin shaft inner ring (17) is connected to the first pin shaft (15) via four external hexagonal bolts, each of the first pin shaft outer ring (16) is connected to the first pin shaft (15) via six external hexagonal bolts, and the first pin shaft (15) is also provided with a first handle (18).
3. A suspension beam with adjustable suspension points according to claim 1 or 2, characterized in that: Each of the second pin shaft inner rings (21) is connected to the second pin shaft (19) via four external hexagonal bolts, and each of the second pin shaft outer rings (20) is connected to the second pin shaft (19) via six external hexagonal bolts.
4. A hanging beam with adjustable hanging points according to claim 3, characterized in that: Two nylon pads (23) are arranged opposite to each other on the second lower hanging part (10), and a space for the steel wire rope to pass through is arranged between the two nylon pads (23).
5. A hanging beam with adjustable hanging points according to claim 4, characterized in that: Reinforcing ribs are provided on both sides of the first lifting lug (6) and the second lifting lug (11).
6. The hanging beam with adjustable hanging points according to claim 1, characterized in that: The leg base (13) comprises two first legs arranged on one side of the suspension beam body (1) and two second legs arranged on the other side of the suspension beam body (1), the two first legs being in an eight-shaped shape and being welded together via a first reinforcement member, and the two second legs being in an eight-shaped shape and being welded together via a second reinforcement member.
7. A method for installing a suspension beam with adjustable suspension points according to any one of claims 1 to 6, characterized in that: It includes the following steps: Step S1, barging the lifting beam: after the lifting beam (100) is prefabricated, the lifting beam (100) and the monopile foundation are transported to the construction site, the lifting beam (100) is barged using a crane on the construction site and placed vertically on the deck of a crane ship, one end of a lifting wire rope is hung on a hook of a crawler crane, the lifting wire rope is connected to the lifting beam (100) using a shackle, and the lifting beam (100) is barged to a suitable position; Step S2, hanging the lower hanging point: the height adjustment of the hanging point position can be achieved by switching the second pin shaft assembly (12) between the first lower hanging part (9) and the second lower hanging part (10). After the hanging beam (100) is erected on the deck, the second pin shaft assembly (12) is taken out, the auxiliary wire rope is passed through the main hanging wire rope, and the upper part of the auxiliary wire rope is hung on the hook of the crawler crane. The hook of the crawler crane is raised to lift the wire rope to a suitable position. At the same time, the second pin shaft assembly (12) is inserted into the pin hole at the lower hanging point connector (8) by a forklift and tightened. Then, the main hanging wire rope is lowered to the second pin shaft assembly (12), and the hanging of the lower hanging point is completed. Step S3, hanging the upper hanging point: fold the two annular slings in half respectively, and when hanging, take out the first pin shaft assembly (7), and lower the two ends of the annular sling to the first hanging part (3) and the second hanging part (5) respectively through the crawler crane, and further insert the two first pin shaft assemblies (7) into the pin holes at the first hanging part (3) and the second hanging part (5) respectively and tighten them. After hanging, the crawler crane puts the annular sling into the position of the first pin shaft assembly (7), and completes the hanging of an annular sling on one hanging point connecting piece (2). Similarly, the second annular sling is connected to the other hanging point connecting piece (2) of the hanging beam (100); Step S4, hoisting construction: During the pile lifting construction, the lifting belts of the two upper lifting point connectors (2) are hung into the hook teeth of the main hook, and the steel wire ropes of the two lower lifting point connectors (8) are hung to the main lifting ears of the single pile. The single pile is turned vertically by the cooperation of the lifting points at the tail of the single pile and moved into the dragon mouth of the pile holder. After the self-sinking of the single pile foundation is completed, the lifting beam (100) is recovered to the deck surface.
8. The method for installing a suspension beam with adjustable suspension points according to claim 7, characterized in that: In step S1, a lifting wire rope is connected to four small lifting ears at the top of the lifting beam (100) using a shackle, and the lifting beam (100) is lifted upside down to a suitable position using four-point horizontal lifting.