Value delivery and bidding evaluation management method for metallurgical equipment throughout its life cycle
Through the full life cycle value delivery system of metallurgical equipment, using three-dimensional model and TAG bit number technologies, the problem of difficult equipment value is solved, the accurate delivery of equipment value and the optimization of bidding process is achieved, and the bid evaluation efficiency and data are improved. Management compliance.
Patent Information
- Application Number
- CN202211491070.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-11-25
- Publication Date
- 2024-12-17
- Estimated Expiration
- 2042-11-25
AI Technical Summary
The equipment value of metallurgical equipment is difficult to accurately and timely reflect. The existing technology mainly relies on manual entry or offline filling, which is time-consuming and labor-intensive and error-prone, and lacks effective management methods for full-life cycle value delivery and bidding evaluation.
Design a full life cycle value delivery system for metallurgical equipment, including the factory digital center subsystem and the EPC engineering value management subsystem. Through three-dimensional models, TAG bit numbers, WBS decomposition structure and BJ series templates, the equipment value is standardized and structured and processed. Data transmission, optimize the bidding process.
It improves the accuracy and delivery speed of equipment value, enhances the objectivity and speed of bid evaluation, optimizes the bidding process in the equipment procurement stage, ensures data compliance and competitiveness, and forms value data throughout the life cycle.
Smart Images

Figure CN115936739B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of metallurgical technology, and in particular to a method for managing the value delivery and bidding evaluation of metallurgical equipment throughout its life cycle. Background Art
[0002] At present, in addition to delivering the physical production line to the owner, the EPC general contractor in the metallurgical industry also includes digital completion delivery, and the digital content includes but is not limited to BIM three-dimensional models, equipment value, etc. The BIM model directly reflects the actual status of the project completion delivery and provides a structured basis for digital completion delivery information.
[0003] However, the value of equipment is difficult to reflect accurately and timely. It either needs to be entered manually or exported from the BIM list details and filled in offline and then imported. This is time-consuming and labor-intensive, and it is easy to make mistakes when exporting and importing the list details. Therefore, it is urgent to design a value delivery and bidding evaluation management method for metallurgical equipment throughout its life cycle to solve the above problems. Summary of the invention
[0004] The purpose of the present invention is to provide a method for managing the value delivery and bidding evaluation of metallurgical equipment throughout its life cycle, so as to solve the above-mentioned deficiencies in the prior art.
[0005] In order to achieve the above object, the present invention provides the following technical solutions:
[0006] The value delivery system for the entire life cycle of metallurgical equipment includes a factory digital center subsystem and an EPC engineering value management subsystem. The factory digital center subsystem is used for digital delivery of completed projects. The factory digital center subsystem includes compiling a three-dimensional model, compiling a factory object TAG number, transmitting TAG number information to the EPC engineering value management subsystem, collecting value information after standardized and structured processing of each module, and displaying value information on the three-dimensional model. The EPC engineering value management subsystem includes a budget estimate module, a procurement module, a settlement module, an operation and maintenance module, and standardized and structured processing of value information. The value delivery system for the entire life cycle of metallurgical equipment also includes a bidding subsystem, which includes a bidding module, a bidding module, a bid evaluation module, and a winning bid list module.
[0007] Furthermore, the estimate module, procurement module, settlement module and operation and maintenance module in the EPC engineering value management subsystem receive the bit number information transmitted by the factory digital center subsystem, and the standardized and structured processed value information is transmitted to the factory digital center subsystem through value delivery.
[0008] Furthermore, the TAG number is the physical location code of the equipment extracted from the three-dimensional model, and the TAG number is used to encode the data transmission of the equipment list in the estimation stage, procurement stage, final settlement stage, and operation stage of the "one code for all" project.
[0009] Furthermore, the basis for project division and budget preparation is the WBS decomposition structure. The EPC engineering value management subsystem prepares or collects budget value information based on the WBS decomposition structure, transmits TAG number information to the bidding subsystem, and collects procurement, settlement and operation and maintenance value information.
[0010] Furthermore, the engineering cost database for the value delivery of the entire life cycle of metallurgical equipment is based on the WBS code and TAG code value delivery list, including the estimated value, procurement value, settlement value, and operation and maintenance value of equipment and facilities. The value can be summarized at different levels of WBS granularity.
[0011] The bidding evaluation management method for the full life cycle value delivery of metallurgical equipment includes the metallurgical equipment full life cycle value delivery system,
[0012] S1. Generate bidding list: The bidding module generates the bidding list based on the TAG number and equipment type transmitted by the procurement module of the EPC engineering value management subsystem and the BJ series template;
[0013] S2. Supplier selection: The bidding module is used to collect supplier bidding data according to the standard BJ series template. The bid evaluation module compares the sub-items and component prices of each supplier's bidding list according to the BJ series template and selects suppliers with appropriate prices;
[0014] S3. Collection of winning bid lists: The winning bid list module collects the winning bid lists according to the superior TAG code and returns them to the procurement module in the EPC engineering value management subsystem.
[0015] Furthermore, the BJ series template is a bidding template, and the value of the procurement stage is downwardly expanded and subdivided using TAG codes, further decomposing and standardizing general equipment and commonly used non-standard equipment according to components or assembly relationships to form a bidding template.
[0016] Furthermore, the BJ series templates are used for suppliers' bid quotations. The bid quotations in the BJ series templates include winning bid data, and the winning bid data are aggregated to form a procurement value. Through the association relationship of the TAG number, the procurement amount value of the previous level TAG number is assigned.
[0017] Furthermore, based on the WBS structure, TAG codes and BJ series, the digital value delivery of equipment and facilities is realized, and three standard databases are established, namely the WBS decomposition structure library, the standard equipment TAG code library, and the standard BJ series bidding template.
[0018] Furthermore, in the EPC project, the standard WBS decomposition structure library is used as the main framework of the project, and the standard TAG code library is used as the equipment list, which is mounted under the WBS structure. The standard BJ series bidding is used, and the BJ series winning equipment list is mounted under the TAG code. The procurement value is aggregated to the upper level TAG according to the winning list. That is, the TAG code is used as a bridge, which is associated with the WBS upward and the BJ series winning equipment downward.
[0019] In the above technical scheme, the present invention provides a method for managing the value delivery and bidding evaluation of the entire life cycle of metallurgical equipment. The present invention improves the digital value delivery process of the EPC general contracting project in the metallurgical industry and increases the delivery speed. Through the standardized decomposition of equipment, the comparative analysis of the quotation details is realized, and the objectivity and review speed of the bid evaluation are significantly improved, which also provides support and data accumulation for the compliance and competitiveness of future bidding projects; the present invention mainly solves the four stages of metallurgical equipment combined with the three-dimensional model to achieve the value delivery of the entire life cycle, and optimizes the bidding process in the equipment procurement stage, standardizes general equipment and commonly used non-standard equipment, and realizes the collection of value data in the procurement stage. The value data is integrated to form the value data of the entire life cycle, and at the same time, a structured completion delivery database for construction projects is generated, which also provides support and data accumulation for the compliance and competitiveness of future bidding projects. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings.
[0021] Figure 1 A schematic diagram of the value delivery and bidding evaluation management functions of metallurgical equipment throughout its life cycle is provided for an embodiment of the value delivery and bidding evaluation management method for metallurgical equipment throughout its life cycle of the present invention.
[0022] Figure 2 A schematic diagram for comparing equipment purchase price details provided for an embodiment of the method for value delivery and bidding evaluation management of metallurgical equipment throughout its life cycle according to the present invention.
[0023] Figure 3 A schematic diagram of detailed comparative analysis of host structure equipment provided for an embodiment of the method for value delivery and bidding evaluation management of metallurgical equipment throughout its life cycle according to the present invention.
[0024] Figure 4 A schematic diagram of a delivery list provided for an embodiment of the method for managing the value delivery and bidding evaluation of metallurgical equipment throughout its life cycle according to the present invention.
[0025] Figure 5 A schematic diagram of a digital value delivery data structure flow chart provided for an embodiment of a method for managing value delivery and bidding evaluation for metallurgical equipment throughout its life cycle according to the present invention.
[0026] Figure 6 A schematic diagram of the WBS decomposition structure provided for an embodiment of the method for managing the value delivery and bidding evaluation of metallurgical equipment throughout its life cycle according to the present invention.
[0027] Figure 7 A schematic diagram of a procurement inquiry and quotation sheet provided for an embodiment of the method for value delivery and bidding evaluation management of metallurgical equipment throughout its life cycle according to the present invention.
[0028] Figure 8 A standard coding diagram is provided for an embodiment of the method for managing the value delivery and bidding evaluation of metallurgical equipment throughout its life cycle according to the present invention.
[0029] Fig. 9 A schematic diagram of the correspondence between the engineering WBS structure and the equipment TAG code provided in the embodiment of the metallurgical equipment full life cycle value delivery and bidding evaluation management method of the present invention.
[0030] Fig.10 A schematic diagram of the corresponding relationship between the engineering equipment TAG code and the BJ series component decomposition provided in the embodiment of the metallurgical equipment full life cycle value delivery and bidding evaluation management method of the present invention. DETAILED DESCRIPTION
[0031] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention will be further described in detail below with reference to the accompanying drawings.
[0032] like Figure 1-10As shown in the figure, the value delivery system of metallurgical equipment throughout its life cycle includes the factory digital center subsystem and the EPC engineering value management subsystem. The factory digital center subsystem is used for digital delivery of completed equipment. The factory digital center subsystem includes compiling three-dimensional models, compiling factory object TAG numbers, transmitting TAG number information to the EPC engineering value management subsystem, collecting value information after standardized and structured processing of each module, and displaying value information on the three-dimensional model. The EPC engineering value management subsystem includes the budget module, procurement module, settlement module, operation and maintenance module, and standardized and structured processing of value information. Based on the content of digital delivery and the management requirements of the EPC project itself, the value life cycle of equipment has four main stages, namely, the budget stage, procurement stage, settlement stage, and operation and maintenance stage. Among them, the procurement stage has the longest cycle, the large amount of data, and involves bidding, bid evaluation and other processes. The four stages of metallurgical equipment are combined with three-dimensional models to realize the value delivery of the entire life cycle, and optimize the bidding process of the equipment procurement stage. The value delivery system of metallurgical equipment throughout its life cycle also includes a bidding subsystem, which includes a bidding module, a bidding module, a bid evaluation module, and a winning bid list module.
[0033] Furthermore, the estimate module, procurement module, settlement module and operation and maintenance module in the EPC engineering value management subsystem receive the bit number information transmitted by the factory digital center subsystem, standardize and structure the value information, and transmit the standardized and structured processed value information to the factory digital center subsystem through value delivery.
[0034] Furthermore, the TAG number is the physical location code of the equipment extracted from the three-dimensional model, and the TAG number is used to encode the data transfer in the estimation stage, procurement stage, final settlement stage, and operation stage of the equipment list in the "one code for all" project.
[0035] Furthermore, the basis for project division and budget preparation is the WBS decomposition structure. The EPC project value management subsystem prepares or collects budget value information based on the WBS decomposition structure, transmits TAG number information to the bidding subsystem, and collects procurement, settlement and operation and maintenance value information.
[0036] Furthermore, the engineering cost database for the value delivery of the entire life cycle of metallurgical equipment is based on the WBS code and TAG code value delivery list, including the estimated value, procurement value, settlement value, and operation and maintenance value of equipment and facilities. The value can be summarized at different levels of WBS granularity.
[0037] The bidding evaluation management method for the value delivery of the whole life cycle of metallurgical equipment includes the value delivery system of the whole life cycle of metallurgical equipment.
[0038] S1. Generate bidding list: The bidding module generates the bidding list based on the TAG number and equipment type transmitted by the procurement module of the EPC engineering value management subsystem and the BJ series template;
[0039] S2. Supplier selection: The bidding module is used to collect supplier bidding data according to the standard BJ series template. The bid evaluation module compares the sub-items and component prices of each supplier's bidding list according to the BJ series template and selects suppliers with appropriate prices;
[0040] S3. Collection of winning bid lists: The winning bid list module collects the winning bid lists according to the superior TAG code and returns them to the procurement module in the EPC engineering value management subsystem.
[0041] Furthermore, the BJ series templates are bidding templates, and the value of the procurement stage is expanded and subdivided downward using TAG codes, further decomposing and standardizing general equipment and commonly used non-standard equipment according to components or assembly relationships to form a bidding template.
[0042] Furthermore, the BJ series templates are used for suppliers' bid quotations. The bid quotations in the BJ series templates include winning bid data, and the winning bid data are aggregated to form the procurement value. Through the association relationship of the TAG number, the procurement amount value of the previous level TAG number is assigned.
[0043] Furthermore, based on the WBS structure, TAG codes and BJ series, the digital value delivery of equipment and facilities is realized, and three standard databases are established, namely the WBS decomposition structure library, the standard equipment TAG code library, and the standard BJ series bidding template.
[0044] Furthermore, in the EPC project, the standard WBS decomposition structure library is used as the main framework of the project, and the standard TAG code library is used as the equipment list, which is mounted under the WBS structure. The standard BJ series bidding is used, and the BJ series winning equipment list is mounted under the TAG code. The procurement value is aggregated to the upper level TAG according to the winning list. That is, the TAG code is used as a bridge, which is associated with the WBS upward and the BJ series winning equipment downward.
[0045] Example 1
[0046] The value delivery system for the whole life cycle of metallurgical equipment includes the factory digital center subsystem and the EPC engineering value management subsystem. The factory digital center subsystem is used for digital delivery of completed equipment. The factory digital center subsystem includes compiling three-dimensional models, compiling factory object TAG numbers, transmitting TAG number information to the EPC engineering value management subsystem, collecting value information after standardized and structured processing of each module, and displaying value information on the three-dimensional model. The EPC engineering value management subsystem includes the budget module, procurement module, settlement module, operation and maintenance module, and standardized and structured processing of value information. Based on the content of digital delivery and the management requirements of the EPC project itself, the equipment value life cycle has four main stages, namely, the budget stage, procurement stage, settlement stage, and operation and maintenance stage. Among them, the procurement stage has the longest cycle, the large amount of data, and involves bidding, bid evaluation and other processes. The four stages of metallurgical equipment are combined with three-dimensional models to realize the value delivery of the whole life cycle, optimize the bidding process of the equipment procurement stage, and the value delivery system for the whole life cycle of metallurgical equipment also includes the bidding subsystem, which includes the bidding module, the bidding module, the bid evaluation module and the winning bid list module.
[0047] The estimate module, procurement module, settlement module and operation and maintenance module in the EPC engineering value management subsystem receive the bit number information transmitted by the factory digital center subsystem, standardize and structure the value information, and deliver the standardized and structured value information to the factory digital center subsystem through value delivery; the TAG bit number is the physical location code of the equipment extracted from the three-dimensional model, and the TAG bit number uses this code to transmit data in the estimate stage, procurement stage, settlement stage, and operation stage of the equipment list in the "one code for all" project. After the equipment list is one code for all, the amount of value generated in each stage has a direct correlation (horizontally), and the WBS design realizes hierarchical decomposition (superior and subordinate relationship), and uses WBS coding combined with TAG bits to establish an association relationship. Through the WBS structure and TAG code, digital value delivery of various granularities in the stages of equipment and facility estimate, procurement, settlement value, etc.
[0048] WBS coding rules: WBS coding rules can reflect the hierarchical characteristics, and there are two coding methods.
[0049] Coding method 1: Divide the levels by digits. The example is as follows: the first two digits XX represent the first level, the third and fourth digits represent the second level, and the last digit represents the third level. The WBS decomposition structure of standard process facilities is established. Coding method 1 example:
[0050]
[0051] Coding method 2: Use separator codes to represent levels, with one separator representing level 1. An example is as follows: A standard process facility WBS decomposition structure is established based on levels such as level 1 (process), level 2 (facility), level 3 (system), and level 4 (area).
[0052] Encoding method 2 example:
[0053]
[0054] The implementation methods of encoding method one or two are all within the scope of the present invention. TAG code encoding rules: TAG equipment bit number is set to 8 segments, among which: the base code is 2 Arabic numerals, the facility code is 2 uppercase letters, the facility serial number is 1 Arabic numeral or uppercase letter (1-9, ABC... in sequence after greater than 10), the WBS code is 3 Arabic numerals, the WBS extension code is 3 Arabic numerals, the separator is 1 half-width symbol "-", the professional code is 1 Arabic numeral or uppercase letter (1-9, ABC... in sequence after greater than 10), and the serial number is 3 Arabic numerals. Examples are as follows:
[0055]
[0056] Note: "N" represents Arabic numerals, "A" represents uppercase English letters, and "X" indicates that the number position can be either Arabic numerals or uppercase English letters.
[0057] The basis for the division of engineering projects and the preparation of budget estimates is the WBS decomposition structure. In the EPC engineering value management subsystem, budget estimate value information is compiled or collected based on the WBS decomposition structure, and TAG number information is transmitted to the bidding subsystem to collect procurement, settlement and operation and maintenance value information; the engineering cost library for the value delivery of the entire life cycle of metallurgical equipment is based on the WBS code and TAG code value delivery list, including the budget estimate value, procurement value, settlement value, and operation and maintenance value of equipment and facilities. The value can be summarized at different levels of WBS granularity.
[0058] Example 2
[0059] This embodiment is further limited on the basis of the first embodiment. The bidding evaluation management method for the full life cycle value delivery of metallurgical equipment includes a metallurgical equipment full life cycle value delivery system.
[0060] S1. Generate bidding list: The bidding module generates the bidding list based on the TAG number and equipment type transmitted by the procurement module of the EPC engineering value management subsystem and the BJ series template;
[0061] S2. Supplier selection: The bidding module is used to collect supplier bidding data according to the standard BJ series template. The bid evaluation module compares the sub-items and component prices of each supplier's bidding list according to the BJ series template and selects suppliers with appropriate prices;
[0062] S3. Collection of winning bid lists: The winning bid list module collects the winning bid lists according to the superior TAG code and returns them to the procurement module in the EPC engineering value management subsystem.
[0063] The BJ series templates are bidding templates, and the value of the procurement stage is expanded and subdivided downward using TAG codes, further decomposing and standardizing general equipment and commonly used non-standard equipment according to components or assembly relationships to form a bidding template; the BJ series templates are used for suppliers' bid quotations. The bid quotations in the BJ series templates include winning bid data, and the winning bid data are aggregated to form the procurement value. Through the association relationship of the TAG number, the procurement amount value of the upper-level TAG number is assigned.
[0064] Classification of BJ series bidding templates and component decomposition method: According to the similarity of equipment procurement components, a unified template is formulated, the data format is standardized, and a standard is formed. The equipment procurement quotation data is stored in a structured manner (previously it was an attachment), so that the bidding data can be refined and compared between different bidders. According to the equipment procurement category, several types of equipment procurement inquiry and quotation forms are set, including: BJ1 electromechanical product inquiry and quotation form, BJ2 three-electric, public auxiliary non-standard or large equipment inquiry and quotation form, BJ3 electrical panels, boxes, cabinets inquiry and quotation form, BJ4 equipment design inquiry and quotation form, BJ5 non-standard mechanical equipment inquiry and quotation form, BJ6 single-machine complete equipment inquiry and quotation form, BJ7 cooperative manufacturing equipment quotation form, BJ8 reused equipment inquiry and quotation form, BJ9 complete equipment inquiry and quotation form and BJ10 imported equipment (bid) quotation form.
[0065] For each type of equipment purchase inquiry and quotation, first set up the equipment purchase sub-item and set a unique sub-item standard code. For example, the "single machine complete set equipment inquiry and quotation" is divided into 16 sub-items, namely host structure equipment, host mechanical supporting equipment, etc., and each sub-item is set with a standard sub-item code: BJ6-01, BJ6-02, etc.
[0066] For each type of equipment procurement sub-item, set equipment procurement parts and set unique standard part codes. For example, "Host structure equipment" sets four types of procurement parts, namely general structural parts, processed structural parts, metal processing parts, and special materials. Each procurement part has a standard part code: BJ6-01-01, BJ6-01-02, BJ6-01-03, BJ6-01-04.
[0067] Based on the WBS structure, TAG code and BJ series, the digital value delivery of equipment and facilities is realized. Three standard databases are established, namely the WBS breakdown structure library, the standard equipment TAG code library and the standard BJ series bidding template. In the EPC project, the standard WBS breakdown structure library is cited as the main framework structure of the project, and the standard TAG code library is cited as the equipment list, which is mounted under the WBS structure. The standard BJ series is used for bidding, and the list of BJ series winning equipment is mounted under the TAG code. The procurement value is aggregated to the upper level TAG according to the winning list. That is, the TAG code is used as a bridge, which is associated with the WBS upward and with the BJ series winning equipment downward.
[0068] The above description is only by way of illustration of certain exemplary embodiments of the present invention. It is undoubted that those skilled in the art can modify the described embodiments in various ways without departing from the spirit and scope of the present invention. Therefore, the above drawings and descriptions are illustrative in nature and should not be construed as limiting the scope of protection of the claims of the present invention.
Claims
1. The metallurgical equipment full life cycle value delivery system includes the factory digital center subsystem and the EPC engineering value management subsystem, which is characterized by: The factory digital center subsystem is used for digital delivery of completed projects. The factory digital center subsystem includes compiling a three-dimensional model, compiling a TAG number for a factory object, transmitting TAG number information to the EPC engineering value management subsystem, collecting value information after standardized and structured processing of the budget module, procurement module, settlement module and operation and maintenance module, and displaying value information on the three-dimensional model. The EPC engineering value management subsystem includes a budget module, a procurement module, a settlement module, an operation and maintenance module, and standardized and structured value information. The metallurgical equipment life cycle value delivery system also includes a bidding subsystem, which includes a bidding module, a bidding module, a bid evaluation module, and a winning bid list module. The budget module, procurement module, settlement module and operation and maintenance module in the EPC engineering value management subsystem receive the TAG number information transmitted by the factory digital center subsystem. The standardized and structured value information is transmitted to the factory digital center subsystem through value delivery. The TAG number is used to extract the physical location code of the equipment in the three-dimensional model, and the TAG number is used to connect the data transmission of the budget stage, procurement stage, settlement stage and operation and maintenance stage of the equipment list in the project. The EPC engineering value management subsystem compiles or collects the budget value information according to the WBS decomposition structure, transmits the TAG number information to the bidding subsystem, and collects the procurement, settlement and operation and maintenance value information; the engineering cost library of the value delivery of the metallurgical equipment throughout the life cycle is based on the value delivery list of both the WBS decomposition structure and the TAG number, including the budget value, procurement value, settlement value, and operation and maintenance value of the equipment and facilities, and summarizes the value according to the different levels of granularity of the WBS decomposition structure; Among them, the bidding evaluation management method of the bidding subsystem includes: S1. Generate bidding list: The bidding module generates the bidding list based on the TAG number and equipment type transmitted by the procurement module of the EPC engineering value management subsystem and the BJ series template; S2. Supplier selection: The bidding module is used to collect the bid data of suppliers according to the BJ series template. The bid evaluation module compares the sub-items and component prices of each supplier's bid list according to the BJ series template, and selects suppliers with suitable prices; S3. Collection of winning bid lists: The winning bid list module collects the winning bid lists according to the upper-level TAG number and returns them to the procurement module in the EPC engineering value management subsystem; The BJ series template is a bidding template, and the value of the procurement stage is further subdivided by using the TAG number to further decompose and standardize the general equipment and non-standard equipment according to the components or assembly relationship to form a bidding template; The BJ series templates are used for suppliers' bid quotations. The bid quotations in the BJ series templates include winning bid data, and the winning bid data are aggregated to form a procurement value. Through the association relationship of the TAG number, the procurement amount value of the previous level TAG number is assigned.
2. The metallurgical equipment full life cycle value delivery system according to claim 1 is characterized in that: Based on the WBS decomposition structure, TAG number and BJ series templates, the digital value delivery of equipment and facilities is realized, and three standard databases are established, namely the WBS decomposition structure library, the standard equipment TAG number library, and the standard BJ series templates.
3. The metallurgical equipment full life cycle value delivery system according to claim 2 is characterized in that: In the EPC engineering value management subsystem, the standard WBS breakdown structure library is referenced as the main framework structure of the project, and the standard equipment TAG number library is referenced as the equipment detailed list and mounted under the WBS breakdown structure. The standard BJ series template is used for bidding, and the BJ series template winning equipment list is mounted under the standard equipment TAG number. According to the winning list, the procurement value is aggregated to the upper-level standard equipment TAG number. That is, the standard equipment TAG number serves as a bridge, which is associated with the WBS decomposition structure upward and with the BJ series template winning equipment downward.