Drainage pipeline arrangement device and method for central urban area
By designing basic components and functional components in the drainage pipe arrangement device, inner wall cleaning, inspection and repair are realized, which solves the problem of damage to the stability of the foundation surface during the drainage pipeline arrangement process, and improves arrangement efficiency and safety.
Patent Information
- Application Number
- CN202211469532.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-11-22
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2042-11-22
AI Technical Summary
Existing drainage pipeline arrangement devices used in central urban areas require excavation and repair of drainage pipelines, which affects the stability of the foundation surface and increases the risk of damage to the drainage pipelines after arrangement.
A device is designed that contains basic components and functional components. The basic components drive the functional components to move within the drainage pipe section to achieve inner wall cleaning, inspection and repair operations, and avoid repairing leaks on the external sides of the drainage pipe.
It effectively ensures the stability of the foundation surface of the drainage pipeline, reduces the risk of damage to the drainage pipeline after arrangement, and improves the efficiency and safety of the drainage pipeline arrangement.
Smart Images

Figure CN116001326B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a drainage pipeline tidying device and method, in particular to a drainage pipeline tidying device and method for use in a central urban area. Background Art
[0002] The drainage pipes in the central urban area are used to discharge and treat sewage, so as to ensure the environment of the central urban area. In order to ensure the smooth flow of the drainage pipes, the drainage pipe arrangement device used in the central urban area is an important pipe treatment device. In the existing drainage pipe arrangement device used in the central urban area, it is necessary to excavate the drainage pipe section that needs to be repaired, and perform external side leak repair on the drainage pipe section that needs to be repaired. Since it is necessary to excavate the foundation surface of the drainage pipe, the stability of the foundation surface of the drainage pipe is affected, and the risk of damage to the arranged drainage pipe is increased.
[0003] The present invention has the technical features of cleaning, inspecting and repairing the inner wall of the drainage pipe section that needs to be repaired, and effectively explores and studies the technical problem of affecting the stability of the foundation surface of the drainage pipe by repairing the external side leaks after excavating the drainage pipe section that needs to be repaired.
[0004] The statements here only provide background technology related to the present invention and do not necessarily constitute prior art. The technical solution of the present invention is made based on the technical briefing document provided by the applicant on October 20, 2022, which solves actual technical problems in the work process, and the existing technical problems, technical features and technical effects in the similar patent literature and background technology obtained through retrieval. Summary of the invention
[0005] The object of the present invention is a drainage pipe arrangement device for use in a central urban area.
[0006] The object of the present invention is a method for arranging drainage pipes in a central urban area.
[0007] In order to overcome the above-mentioned technical shortcomings, the purpose of the present invention is to provide a drainage pipe tidying device and method for the central urban area, thereby ensuring the stability of the foundation surface of the drainage pipe and reducing the risk of damage to the arranged drainage pipe.
[0008] In order to achieve the above-mentioned purpose, the technical solution adopted by the present invention is: a drainage pipe arrangement device for use in a central urban area, comprising a foundation component device arranged on a vertical shaft at the lower part of a drainage pipe section that needs to be arranged and a vertical shaft at the upper part of a drainage pipe section that needs to be arranged, and a functional component device arranged on the foundation component device and passing through the drainage pipe section that needs to be arranged.
[0009] Due to the design of the basic component device and the functional component device, the basic component device can be used to drive the functional component device to move in the drainage pipe section that needs to be sorted out, and the functional component device can be used to clean, inspect and repair the inner wall of the drainage pipe section that needs to be sorted out, thereby solving the technical problem of affecting the stability of the foundation surface of the drainage pipe after excavating the drainage pipe section that needs to be repaired and repairing the external side leaks. Therefore, the stability of the foundation surface of the drainage pipe is guaranteed, and the risk of damage to the sorted drainage pipe is reduced.
[0010] The present invention is designed to interconnect the basic component device and the functional component device in a manner that the inner wall cleaning, detection and repair operations are carried out in the drainage pipe section that needs to be sorted out.
[0011] The present invention is designed to connect the functional component device with the basic component device in a disc-type docking manner.
[0012] The present invention designs that the basic component device is configured to include a first plug, a second plug, a first trailer, a second trailer, a first winch, a second winch, a high-pressure pump unit, an air compressor unit and a pipeline crawler.
[0013] The present invention designs that the functional component device is arranged to include a moving frame, a pipeline cleaning machine, an image pickup machine and a pipeline inner wall repairing machine.
[0014] The technical effects of the above five technical solutions are: realizing the operation setting inside the drainage pipe section that needs to be sorted out, realizing the sorting of the inner wall of the drainage pipe, and no longer needing to repair the leak on the external side of the drainage pipe.
[0015] The present invention is designed that a first plugger, a first winch, an air compressor unit, a mobile frame and a pipe cleaning machine are respectively arranged on a first trailer, and the first trailer is arranged at a lower part of a drainage pipe section that needs to be sorted out, and a second winch, an air compressor unit, a pipe crawling machine, a mobile frame, an image pickup machine and a pipe inner wall repair machine are respectively arranged on a second trailer, and the second trailer is arranged at an upper part of the drainage pipe section that needs to be sorted out.
[0016] The technical effect of the above technical scheme is that the first plugger, the second plugger, the first trailer, the second trailer, the first winch, the second winch, the high-pressure pump group, the air compressor group, the pipeline crawling machine, the mobile frame, the pipeline cleaning machine, the image pickup machine and the pipeline inner wall repair machine constitute the basic technical scheme of the present invention and solve the technical problem of the present invention.
[0017] The present invention is designed that the first plugger and the second plugger are respectively configured as a support seat, an inner supporting plate, a screw shaft, a tightening nut, a receiving groove plate, a first inflatable ring bag and a first stop valve, and a sliding hole body is provided on the vertical part of the support seat, an open groove body is provided on the horizontal part of the support seat and a receiving groove body is provided on the peripheral side surface of the inner supporting plate, a first mounting hole body is provided on the inner supporting plate and the sliding hole body is configured to be connected to the screw shaft, the inner end head of the screw shaft is configured to be connected to the inner end face portion of the inner supporting plate and the screw shaft is configured to be threadedly connected to the tightening nut, the inner end face portion of the tightening nut is configured to be contact-connected to the vertical part of the support seat and the peripheral side surface portion of the inner supporting plate is configured to be connected to the receiving groove plate, and the receiving groove body and the receiving groove plate are configured to be received and connected to the first inflatable ring bag And the inflation tube of the first inflatable ring bag is arranged to be connected in series with the first mounting hole body, the inflation tube port portion of the first inflatable ring bag is arranged to be connected with the inner port portion of the first stop valve and the outer port portion of the first stop valve is arranged to be connected with the air compressor unit, the support seat is arranged to be an L-shaped plate-like body, the inner bearing plate is arranged to be a convex disc-like body and the screw shaft is arranged to be a plain bolt, the tightening nut is arranged to be a hexagonal nut and the accommodating groove plate is arranged to be a V-shaped annular groove-like body, the first inflatable ring bag is arranged to be an annular air vent and the first stop valve is arranged to be a spherical stop valve, the sliding hole body is arranged to be a strip-shaped hole body and the opening groove body and the accommodating groove body are respectively arranged to be U-shaped opening bodies, the first mounting hole body is arranged to be a hole-like body and the inner port portion of the first mounting hole body is arranged to be distributed in mutual communication with the accommodating groove body.
[0018] The technical effect of the above technical solution is to achieve built-in airtight sealing of the port of the drain pipe.
[0019] The present invention is designed that at least two first inflatable ring bags are arranged in the accommodating groove body and the accommodating groove plate, and the ratio of the diameter of the gas accommodating cavity of the first inflatable ring bag located on the outside to the diameter of the gas accommodating cavity of the first inflatable ring bag located on the inside is set to 1.5-1.8:1.
[0020] The technical effect of the above technical solution is that: multiple built-in air chambers are superimposed and sealed.
[0021] The present invention is designed that the first trailer and the second trailer are respectively configured as full trailers with guide wheel assemblies, and the rear part of the upper end face of the first trailer is configured to be connected to the first winch, the front part of the upper end face of the first trailer is respectively configured to be connected to the first plugging device, the high-pressure pump unit, the air compressor unit, the mobile frame and the pipeline cleaning machine, and the rear part of the upper end face of the second trailer is respectively configured to be connected to the second winch, the front part of the upper end face of the second trailer is respectively configured to be connected to the second plugging device, the air compressor unit, the pipeline crawling machine, the mobile frame, the image pickup machine and the pipeline inner wall repair machine, and the towing hook of the first trailer and the towing hook of the second trailer are respectively configured to be connected to the mobile chassis, and the guide wheel assembly of the first trailer and the guide wheel assembly of the second trailer are respectively configured to include a support beam , a fixed shaft and a rotating wheel, the lower end of the support beam is respectively arranged to be connected to the rear side of the frame of the first trailer and the rear side of the frame of the second trailer, a U-shaped opening body is arranged at the upper end of the support beam and the ends of the fixed shaft are respectively arranged to be connected to the inner walls of the U-shaped opening body of the support beam, the fixed shaft is arranged to be rotatably connected to the rotating wheel and the support beam is arranged to be an L-shaped frame-like body, the fixed shaft is arranged to be a rod-like body with an annular flange body in the middle part and the rotating wheel is arranged to be a circular disc-like body with a groove body on the peripheral side part, the rotating wheels are arranged to be arranged and distributed at intervals along the center line of the fixed shaft and the annular flange body of the fixed shaft is arranged to be contact-connected to the side part of the rotating wheel, and the rotating wheels are respectively arranged to be connected to the first winch and the second winch.
[0022] The technical effect of the above technical solution is that split vehicle transportation support is realized on the vertical shaft of the lower part of the drainage pipe section that needs to be arranged and the vertical shaft of the upper part of the drainage pipe section that needs to be arranged.
[0023] The present invention is designed that the first winch and the second winch are respectively configured as winches with hydraulic motors, and the hydraulic port of the hydraulic motor of the first winch and the hydraulic port of the hydraulic motor of the second winch are respectively configured to be connected to the hydraulic device of the mobile chassis, the first winch is configured to be connected to the first trailer and the second winch is configured to be connected to the second trailer, and the wire rope of the first winch and the wire rope of the second winch are respectively configured to be connected to the mobile frame.
[0024] The technical effect of the above technical solution is that it realizes the rope traction movement setting of the mobile frame in the drainage pipe section that needs to be sorted out.
[0025] The present invention designs that the high-pressure pump group is arranged to be connected to the first trailer and the output port of one of the high-pressure pumps of the high-pressure pump group is arranged to be connected to the pipeline cleaning machine.
[0026] The technical effect of the above technical solution is to provide high-pressure water flow and sewage discharge settings.
[0027] The present invention designs that the air compressor unit is arranged to be connected to the first trailer and the second trailer, and the output port of the air compressor unit is arranged to be connected to the first plugging device, the second plugging device and the pipeline inner wall repairing machine respectively.
[0028] The technical effect of the above technical solution is to provide a high-pressure air flow setting.
[0029] The present invention designs that the pipeline crawler is configured as a pipeline crawler and the pipeline crawler is configured to be connected to the first trailer, and the pipeline crawler is configured to be connected to the steel wire rope of the first hoist or the steel wire rope of the second hoist respectively.
[0030] The technical effect of the above technical solution is that it realizes the traction setting of the rope in the drainage pipe section that needs to be sorted out.
[0031] The present invention is designed that the movable frame is configured to include a connecting flange, an intermediate shaft, a swing frame, an adjusting screw, an axle, a first traveling wheel and a second traveling wheel, and a through-hole body is arranged at the inner end of the swing frame, the first through-hole body and the second through-hole body are respectively arranged in the middle part of the swing frame, and a first branch plate part is arranged on one side part of the outer end of the swing frame, a second branch plate part is arranged on the other side part of the outer end of the swing frame, and an ear seat part is arranged on the upper part of the outer end surface of the connecting flange, the ends of the intermediate shaft are respectively configured to be connected to the inner hole wall of the connecting flange, and the intermediate shaft is configured to be connected to the through-hole body, the upper end of the adjusting screw is configured to be threadedly connected to the ear seat part, and the lower end of the adjusting screw is configured to be connected to the first through-hole body, the outer ends of the first branch plate part and the outer ends of the second branch plate part are respectively configured to be connected to the axle, and one of the ends of the axle is configured to be rotatably connected to the first traveling wheel, the other end of the axle is configured to be rotatably connected to the second traveling wheel, and the second through-hole body is respectively configured to be connected to the wire rope of the first winch and the first The wire ropes of the two winches are connected, the connecting flange is set as a flange and the intermediate shaft is set as a rod-shaped body with an annular groove in the middle part, the annular groove of the intermediate shaft is set to be connected to the swing frame and the swing frame is set as a Y-shaped sheet body, the adjusting screw is set as a dry-shaped bolt and the annular groove of the adjusting screw is set to be connected to the swing frame, the axle is set as a rod-shaped body with an annular groove at the end and the annular groove at one of the ends of the axle is set to be connected to the first traveling wheel, the annular groove at the other end of the axle is set to be connected to the second traveling wheel, the first traveling wheel and the second traveling wheel are respectively set as circular disc-shaped bodies and the ear seat part is set as a sheet-shaped body with a threaded hole body, the threaded hole body of the ear seat part is set to be connected to the adjusting screw and the through-hole body, the first through-hole body and the second through-hole body are respectively set as circular hole-shaped bodies, the first branch plate part and the second branch plate part are respectively set as rectangular sheet-shaped bodies and the connecting flange is respectively set to be connected to the pipeline cleaning machine, the image pickup machine and the pipeline inner wall repair machine through connecting bolts and nuts, and the moving frame is set to be connected to the first trailer and the second trailer.
[0032] The technical effect of the above technical solution is that: the external docking setting of the disk body is realized, and the connection strength with other docking components is improved.
[0033] The present invention is designed that the pipeline cleaning machine is configured to include a first docking flange, a second docking flange, a water spray disc, an inner gear disc, a power gear, a support gear, a first support claw beam, a connecting rod and a cleaning brush, and the inner end surface portion of the first docking flange and the inner end surface portion of the second docking flange are respectively configured to be connected to the first support claw beam, one of the end heads of the connecting rod is respectively configured to be connected to the first support claw beam and the other end head of the connecting rod is respectively configured to be connected to the water spray disc, the power gear and the support gear are respectively configured to be meshedly connected to the inner hole teeth of the inner gear disc and the outer peripheral side surface portion of the inner gear disc is configured to be connected to the cleaning brush, the support gear is configured to be rotatably connected to one of the first support claw beams through a shaft and the power gear is configured to be rotatably connected to the other of the first support claw beams through a rotating shaft, and the power gear is located between the power gear and the first The rotating shaft between the support claw beams is configured to be connected to the motor end shaft and the first docking flange and the second docking flange are respectively configured to be connected to the mobile frame through connecting bolts and nuts, the water spray plate is configured to be connected to the high-pressure pump group through a pipeline and the first docking flange and the second docking flange are configured to be flanges, the water spray plate is configured to be a circular disc-shaped body with water spray holes on the peripheral side and the inner gear plate is configured to be an inner gear body, the power gear and the support gear are respectively configured to be column gears with annular grooves on the peripheral side and the first support claw beam is configured to be an L-shaped rod-shaped body, the connecting rod is configured to be a rod-shaped body and the cleaning brush is configured to be an industrial brush body, the three first support claw beams are configured to be arranged and distributed at intervals along the circumferential line of the inner gear plate and two of the support gears and one power gear are respectively configured to be arranged on the three first support claw beams, and the pipeline cleaning machine is configured to be connected to the first trailer.
[0034] The technical effect of the above technical solution is that it realizes the brushing and high-pressure water jetting arrangement of the inner wall of the drain pipe.
[0035] The present invention is designed that the image pickup machine is configured to include a third docking flange, a fourth docking flange, a first intermediate support plate, a second support claw beam, a camera, a tightening screw and a lighting lamp, and one of the ends of the second support claw beam is respectively configured to be connected to the inner end surface portion of the third docking flange and the inner end surface portion of the fourth docking flange, another end of the second support claw beam is configured to be connected to the inner wall of the hole of the first intermediate support plate, and a second mounting hole body and a threaded hole body are respectively provided on the first intermediate support plate, the second mounting hole body is configured to be accommodatingly connected to the camera and the threaded hole body is configured to be connected to the tightening screw, the inner end of the tightening screw is configured to be contactingly connected to the camera and the second support claw beam is configured to be connected to the lamp holder of the lighting lamp, the third docking flange and the fourth docking flange are respectively configured to be flanges and the first intermediate support plate is configured to be an annular ring body, the The two supporting claw beams are set as L-shaped rod-shaped bodies and the vertical end of the second supporting claw beam is set to be connected to the first intermediate supporting plate, the oblique end of the second supporting claw beam is respectively set to be connected to the third docking flange and the fourth docking flange and the camera is set as a digital camera, the tightening screw is set as a hexagonal bolt and the lighting lamp is set as an LED lighting lamp, the second mounting hole body and the threaded hole body are respectively set as circular hole-shaped bodies and the inner port portion of the threaded hole body is set to be interconnected with the second mounting hole body, the second mounting hole body and the threaded hole body are respectively set to be arranged at intervals along the circumference of the first intermediate supporting plate and the second supporting claw beam and the lighting lamp are respectively set to be arranged at intervals along the circumference of the first intermediate supporting plate, the image pickup machine is set to be connected to the second trailer and the third docking flange and the fourth docking flange are respectively set to be connected to the moving frame through connecting bolts and nuts.
[0036] The technical effect of the above technical solution is that: image detection setting of the inner wall of the drainage pipe is realized.
[0037] The present invention is designed that a pipeline inner wall repair machine is configured to include a fifth docking flange, a sixth docking flange, a second intermediate support plate, a third support claw beam, a corner block, a second inflatable ring bag, a second stop valve, a side support plate, a swing rod and a heating lamp, and one of the ends of the third support claw beam is respectively configured to be connected to the inner end face portion of the fifth docking flange and the inner end face portion of the sixth docking flange, and the other end of the third support claw beam is respectively configured to be connected to the side portion of the second intermediate support plate and the inner end face portion of the corner block, and a third mounting hole body is configured on the second intermediate support plate, an inflatable tube of the second inflatable ring bag is configured to be connected in series with the third mounting hole body, and an outer port portion of the inflatable tube of the second inflatable ring bag is configured to be connected to an inner port portion of the second stop valve, an outer port portion of the second stop valve is configured to be connected to an air compressor unit, and the inner side surface portion of the second inflatable ring bag is respectively configured to be contact-connected to the outer end face portions of the second intermediate support plate and the corner block, and the inner hole wall of the side support plate is configured to be connected to the position The third support claw beam is connected between the sixth docking flange and the second intermediate support plate, and one of the ends of the swing rod is arranged to be connected to the outer side surface of the side support plate, and the other end of the swing rod is arranged to be connected to the lamp holder of the heating lamp and the pipeline inner wall repair machine is arranged to be connected to the second trailer, the fifth docking flange and the sixth docking flange are respectively arranged to be connected to the mobile frame through connecting bolts and nuts, and the fifth docking flange and the sixth docking flange are respectively arranged to be flanges, the second intermediate support plate and the side support plate are respectively arranged to be circular ring bodies, the third support claw beam and the swing rod are arranged to be strip bodies and the corner block is arranged to be a seat body, the second inflatable ring bag is arranged to be an annular air bag and the second stop valve is arranged to be a spherical stop valve, the heating lamp is arranged to be a ceramic heating lamp and the third mounting hole body is arranged to be a circular hole body, the third support claw beam and the corner block are respectively arranged to be spaced apart and distributed along the circumference of the second intermediate support plate, and the swing rod and the heating lamp are respectively arranged to be spaced apart and distributed along the circumference of the side support plate.
[0038] The technical effect of the above technical solution is that: patching and repairing the inner wall of the drain pipe is achieved.
[0039] The present invention is designed that the first plugger, the second plugger, the first winch, the second winch, the high-pressure pump group, the air compressor group, the pipeline crawler, the mobile frame, the pipeline cleaning machine and the image pickup machine are arranged to be distributed in the manner of inner wall repair, and the first plugger, the second plugger, the first winch, the second winch, the high-pressure pump group, the air compressor group, the pipeline crawler, the mobile frame, the pipeline cleaning machine, the image pickup machine and the pipeline inner wall repair machine are arranged to be distributed in the manner of motorized transportation with the first trailer and the second trailer, and the fifth docking flange, the sixth docking flange, the third docking flange, the fourth docking flange, the first docking flange and the second docking flange are respectively arranged to be connected to the connecting flange.
[0040] The present invention designs a method for tidying up drainage pipes in a central urban area, and the steps are: a basic component device drives a functional component device to move in a drainage pipe section that needs to be tidyed up, and the functional component device cleans, inspects and repairs the inner wall of the drainage pipe section that needs to be tidyed up.
[0041] The technical effect of the above technical solution is: highlighting the technical characteristics of the need to organize the inner wall of the drainage pipe section for cleaning, inspection and repair operations, and introducing the application in the technical field of drainage pipe organization methods for central urban areas.
[0042] The present invention is designed, and its steps are: when the drainage pipe is to be sorted out, the mobile chassis is connected with the tow hook of the first trailer, the first trailer is placed on the vertical shaft of the lower part of the drainage pipe section that needs to be sorted out, the rotating wheel on the first trailer is placed on the upper end of the vertical shaft of the lower part of the drainage pipe section that needs to be sorted out, the mobile chassis is separated from the tow hook of the first trailer, the mobile chassis is connected with the tow hook of the second trailer, the second trailer is placed on the vertical shaft of the upper part of the drainage pipe section that needs to be sorted out, the rotating wheel on the second trailer is placed on the upper end of the vertical shaft of the upper part of the drainage pipe section that needs to be sorted out, the mobile chassis is separated from the tow hook of the second trailer, the first plugging device is placed in the vertical shaft of the lower part of the drainage pipe section that needs to be sorted out, and the second plugging device is placed in the vertical shaft of the upper part of the drainage pipe section that needs to be sorted out. In the process, the support seat is placed at the bottom of the shaft, the anchor rod is installed in the open groove body, the support seat is installed on the bottom of the shaft through the anchor rod, the inner bearing plate is adjusted to move up and down on the sliding hole body, the inner bearing plate is located at the center of the drainage pipe, the tightening nut is rotated on the screw shaft, the tightening nut acts on the vertical part of the support seat, and the inner bearing plate is installed on the support seat, the outer port of the first stop valve is connected to the air compressor unit, the air compressor unit is in a working state, the first stop valve is in an open state, and the air compressor unit injects high-pressure air into the first inflatable ring bag, so that the first inflatable ring bag is in an expanded state in the receiving groove body and the receiving groove plate, and the first inflatable ring bag located on the first plugger is used to block the port of the lower part of the drainage pipe section that needs to be sorted out. The first inflatable ring bag on the second plugger blocks the port of the upper part of the drainage pipe section that needs to be sorted out, and then the first stop valve is in a closed state, so that the air compressor unit is in a non-working state, and the output pipe of the air compressor unit is placed in the drainage pipe section that needs to be sorted out, so that the air compressor unit is in a working state, and the air compressor unit inflates the drainage pipe section that needs to be sorted out, and the input pipe of the high-pressure pump unit is placed in the drainage pipe section that needs to be sorted out, so that the high-pressure pump unit is in a working state, and the sewage in the drainage pipe section that needs to be sorted out is discharged by the high-pressure pump unit. When the sewage in the drainage pipe section that needs to be sorted out is discharged, the high-pressure pump unit is in a non-working state. When the oxygen content of the air in the drainage pipe section that needs to be sorted out reaches the operating standard, the air compressor unit is in a non-working state, and the pipeline crawler is removed from the drainage pipe section that needs to be sorted out. Put the pipe crawler into the vertical shaft of the upper part of the drainage pipe section to be sorted out, put the wire rope of the second winch onto the rotating wheel on the second trailer, connect the end of the wire rope of the second winch to the pipe crawler, make the pipe crawler move in the drainage pipe section to be sorted out, make the second winch rotate in the opposite direction, make the wire rope of the second winch in a released state, drive the wire rope of the second winch to move in the drainage pipe section to be sorted out, when the pipe crawler reaches the vertical shaft of the lower part of the drainage pipe section to be sorted out, take the pipe crawler out of the vertical shaft of the lower part of the drainage pipe section to be sorted out, thereby putting the wire rope of the second winch into the drainage pipe section to be sorted out, and put the first mobile frame into the vertical shaft of the lower part of the drainage pipe section to be sorted out.The second through-hole body on the first movable frame is connected with the steel wire rope of the second winch, the first running wheel and the second running wheel on the first movable frame are placed in the drainage pipe section that needs to be sorted, the adjusting screw on the first movable frame is rotated in the threaded hole body of the ear seat part on the first movable frame and the first through-hole body on the first movable frame, the swing frame on the first movable frame is swung on the intermediate shaft on the first movable frame, the connecting flange on the first movable frame is located in the center of the drainage pipe, the second movable frame is placed in the vertical shaft of the lower part of the drainage pipe section that needs to be sorted, the second through-hole body on the second movable frame is connected with the steel wire rope of the first winch, The first and second driving wheels on the frame are placed in the drainage pipe section that needs to be sorted out, so that the adjusting screw on the second moving frame rotates in the threaded hole body of the ear seat part on the second moving frame and the first through hole body on the second moving frame, so that the swing frame on the second moving frame swings on the intermediate shaft on the second moving frame, so that the connecting flange on the second moving frame is located in the center of the drainage pipe, so as to realize the centering of the connecting flange in the drainage pipe, put the pipeline cleaning machine into the vertical shaft of the lower part of the drainage pipe section that needs to be sorted out, connect the first docking flange with the connecting flange on the first moving frame through connecting bolts and nuts, and connect the second docking flange with the connecting flange on the second moving frame through connecting bolts and nuts. The water spray plate is connected to the connecting flange of the high-pressure pump group through a pipeline, and the input port of one of the high-pressure pumps of the high-pressure pump group is connected to the water tank through a pipeline. The pipeline on the input port of another high-pressure pump of the high-pressure pump group is placed in the vertical shaft of the lower part of the drainage pipe section that needs to be sorted out, so that the first winch, the second winch, the high-pressure pump group and the motor on the power gear are in working state, the water spray plate and the inner gear plate move in the drainage pipe section that needs to be sorted out, so that the high-pressure water flow is sprayed to the inner wall of the drainage pipe through the water spray hole of the water spray plate, and the inner gear plate is rotated on the power gear and the supporting gear, so that the cleaning brush sweeps the inner wall of the drainage pipe, and the sewage generated by the cleaning flows back to the lower part of the sorted drainage pipe section. The sewage is discharged from the shaft of the drainage pipe by another high-pressure pump located in the high-pressure pump group to clean the inner wall of the drainage pipe. After the cleaning of the inner wall of the drainage pipe is completed, the first winch, the second winch, the high-pressure pump group and the motor located on the power gear are placed in a non-working state. The first docking flange is separated from the connecting flange located on the first mobile frame by connecting bolts and nuts, and the second docking flange is separated from the connecting flange located on the second mobile frame. The pipeline cleaning machine is lifted out of the shaft of the lower part of the drainage pipe section that needs to be cleaned, and the connecting flange located on the first mobile frame is connected to the connecting flange located on the second mobile frame by connecting bolts and nuts. Through the first winch and the second winch,The first movable frame and the second movable frame are driven to move in the drainage pipe to reach the vertical shaft of the upper part of the drainage pipe section that needs to be sorted out, and the connecting flange on the first movable frame is separated from the connecting flange on the second movable frame, and the image pickup machine is placed in the vertical shaft of the upper part of the drainage pipe section that needs to be sorted out, and the third docking flange is connected to the connecting flange on the first movable frame through connecting bolts and nuts, and the fourth docking flange is connected to the connecting flange on the second movable frame through connecting bolts and nuts, so that the first winch, the second winch, the camera and the lighting are in working state, the first intermediate support plate moves in the drainage pipe section that needs to be sorted out, and the camera picks up image signals from the inner wall of the drainage pipe to realize the inner wall of the drainage pipe. The image detection processing of the inner wall of the drain pipe is performed to obtain the accurate position of the damaged part of the drain pipe. When the image detection processing of the inner wall of the drain pipe is completed, the image pickup machine is returned to the vertical shaft of the upper part of the drain pipe section, and the first winch, the second winch, the camera and the lighting lamp are placed in a non-working state. The third docking flange is separated from the connecting flange on the first mobile frame, and the fourth docking flange is separated from the connecting flange on the second mobile frame. The image pickup machine is lifted out of the vertical shaft of the upper part of the drain pipe section that needs to be sorted, and the glass fiber cloth is wrapped around one circle according to the diameter of the drain pipe, and the adhesive resin is applied to the outer surface of the glass fiber cloth, and then the glass fiber cloth is wrapped around for another circle. The glass fiber cloth is wrapped around for at least three circles to obtain the drain pipe. The pipe repair sleeve is installed on the repair sleeve and the second inflatable ring bag, and then a 3-6mm adhesive resin layer is applied on the outer side of the repair sleeve of the drainage pipe, and the pipe inner wall repair machine is placed in the vertical shaft of the upper part of the drainage pipe section to be sorted out, and the fifth docking flange is connected to the connecting flange on the first mobile frame through connecting bolts and nuts, and the sixth docking flange is connected to the connecting flange on the second mobile frame through connecting bolts and nuts, and the outer port of the second stop valve is connected to the air compressor unit through a pipeline, so that the second stop valve is in an open state, and the first winch and the second winch are in a working state, and the second intermediate support plate and the side support plate are moved in the drainage pipe section that needs to be sorted out. When the second intermediate support plate reaches the damaged part of the drainage pipe, The first winch and the second winch are in a non-working state, the repair sleeve is placed on the damaged part of the drain pipe, and then the air compressor unit is in a working state, and the air compressor unit inflates the second inflatable ring bag. When the second inflatable ring bag is in an expanded state, the adhesive resin layer of the repair sleeve is connected to the damaged part of the drain pipe. The air compressor unit is in a non-working state, and the second inflatable ring bag is deflated. The second inflatable ring bag is separated from the repair sleeve, and then the first winch and the second winch are in a working state. The second middle support plate and the side support plate move in the arrangement of the drain pipe section. When the heating lamp reaches the repair sleeve, the first winch and the second winch are in a non-working state, and the heating lamp is in a working state to solidify the adhesive resin in the repair sleeve.After the curing treatment of the adhesive resin in the repair sleeve is completed, the heating lamp is put into a non-working state, and then the first winch and the second winch are put into a working state, and the pipeline inner wall repair machine is moved to the vertical shaft of the upper part of the drainage pipe section, and the fifth docking flange is separated from the connecting flange on the first mobile frame, and the sixth docking flange is separated from the connecting flange on the second mobile frame. The pipeline inner wall repair machine is lifted out of the vertical shaft of the upper part of the drainage pipe section, and the second through-hole body on the first mobile frame is separated from the wire rope of the second winch, and the second through-hole body on the second mobile frame is separated from the wire rope of the second winch. The second through hole body on the moving frame is separated from the steel wire rope of the first hoist, and the moving frame is lifted out of the vertical shaft of the upper part of the drainage pipe section, and the steel wire rope of the second hoist and the steel wire rope of the first hoist are respectively reeled in, so that the first stop valve is in an open state, and the high-pressure air in the first inflatable ring bag is released, so that the first inflatable ring bag is in an empty state, and the anchor rod is taken out from the open trough body and the bottom of the vertical shaft, and the first plugging device is lifted out of the vertical shaft of the lower part of the drainage pipe section, and the second plugging device is lifted out of the vertical shaft of the upper part of the drainage pipe section, thereby completing the drainage pipe section.
[0043] The technical effect of the above technical solution is: to achieve sequential operation of the dual ports of the drainage pipe section, thereby improving the efficiency of drainage pipe arrangement.
[0044] In the present technical solution, the basic component devices and functional component devices for cleaning, inspecting and repairing the inner wall of the drainage pipe section that needs to be sorted out are important technical features. In the technical field of drainage pipe sorting devices and methods used in central urban areas, it has novelty, creativity and practicality. The terms in the present technical solution can be explained and understood using patent documents in this technical field. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0046] Figure 1 is a schematic diagram of the present invention,
[0047] Figure 2 is a schematic diagram of the structure of the first occluder 1 and the second occluder 2,
[0048] Figure 3 is a schematic diagram of the structure of the mobile frame 91,
[0049] Figure 4is a schematic diagram of the structure of the pipeline cleaning machine 92,
[0050] Figure 5 is a schematic diagram of the structure of the image pickup machine 93,
[0051] Figure 6 is a schematic diagram of the structure of the pipeline inner wall repair machine 94,
[0052] First plugging device-1, second plugging device-2, first trailer-3, second trailer-4, first winch-5, second winch-6, high-pressure pump unit-7, air compressor unit-8, pipeline crawling machine-9, mobile frame-91, pipeline cleaning machine-92, image pickup machine-93, pipeline inner wall repair machine-94, support seat-11, inner bearing plate-12, screw shaft-13, tightening nut-14, receiving groove plate-15, first inflatable ring bag-16, first stop valve-1 7. Sliding hole 111, opening slot 112, containing slot 121, first mounting hole 122, support beam 31, fixed shaft 32, rotating wheel 33, connecting flange 911, intermediate shaft 912, swing frame 913, adjusting screw 914, axle 915, first running wheel 916, second running wheel 917, ear seat 9111, through hole 9131, first through hole 9132, first branch plate 9133, second branch plate part-9134, second through hole body-9135, first docking flange-921, second docking flange-922, water spray plate-923, inner gear plate-924, power gear-925, support gear-926, first support claw beam-927, connecting rod-928, cleaning brush-929, third docking flange-931, fourth docking flange-932, first intermediate support plate-933, second support claw beam-934, Camera 935, tightening screw 936, lighting lamp 937, second mounting hole body 9351, threaded hole body 9352, fifth docking flange plate 941, sixth docking flange plate 942, second intermediate support plate 943, third support claw beam 944, corner block 945, second inflatable ring bag 946, second stop valve 947, side support plate 948, swing rod 949, heating lamp 940, third mounting hole body 9431. DETAILED DESCRIPTION
[0053] According to the Examination Guidelines, terms such as “having”, “including” and “comprising” used in the present invention should be understood as not dispensing with the existence or addition of one or more other elements or combinations thereof.
[0054] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0055] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0056] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other. In addition, unless otherwise specified, the equipment and materials used in the following examples are commercially available. If the processing conditions are not clearly stated, please refer to the purchased product manual or proceed according to conventional methods in the art.
[0057] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0058] A drainage pipeline arrangement device for use in a central urban area, Figure 1This is the first embodiment of the present invention, which is specifically described in conjunction with the accompanying drawings. It includes a first plugger 1, a second plugger 2, a first trailer 3, a second trailer 4, a first winch 5, a second winch 6, a high-pressure pump group 7, an air compressor group 8, a pipeline crawler 9, a mobile frame 91, a pipeline cleaning machine 92, an image pickup machine 93 and a pipeline inner wall repair machine 94. The first plugger 1, the first winch 5, the air compressor group 8, the mobile frame 91 and the pipeline cleaning machine 92 are respectively arranged on the first trailer 3, and the first trailer 3 is arranged at the lower part of the drainage pipe section that needs to be sorted out. The second winch 6, the air compressor group 8, the pipeline crawler 9, the mobile frame 91, the image pickup machine 93 and the pipeline inner wall repair machine 94 are respectively arranged on the second trailer 4, and the second trailer 4 is arranged at the upper part of the drainage pipe section that needs to be sorted out.
[0059] In this embodiment, the first occluder 1 and the second occluder 2 are respectively configured as a support seat 11, an inner bearing plate 12, a screw shaft 13, a tightening nut 14, a receiving groove plate 15, a first inflatable ring bag 16 and a first stop valve 17, and a sliding hole body 111 is provided on the vertical part of the support seat 11, an opening groove body 112 is provided on the horizontal part of the support seat 11, and a receiving groove body 121 is provided on the peripheral side surface of the inner bearing plate 12, a first mounting hole body 122 is provided on the inner bearing plate 12, and the sliding hole body 111 is configured to be connected to the screw shaft 13, the inner end head of the screw shaft 13 is configured to be connected to the inner end face portion of the inner bearing plate 12, and the screw shaft 13 is configured to be threadedly connected to the tightening nut 14, the inner end face portion of the tightening nut 14 is configured to be contact-connected to the vertical part of the support seat 11, and the peripheral side surface portion of the inner bearing plate 12 is configured to be connected to the receiving groove plate 15, and the receiving groove body 121 and the receiving groove plate 15 are configured to be connected to the first inflatable ring bag 16. The air ring bag 16 is connected in an accommodating manner and the inflation tube of the first inflatable ring bag 16 is arranged to be connected in series with the first mounting hole body 122, the inflation tube port portion of the first inflatable ring bag 16 is arranged to be connected to the inner port portion of the first stop valve 17 and the outer port portion of the first stop valve 17 is arranged to be connected to the air compressor unit 8, the support seat 11 is arranged to be an L-shaped plate-like body, the inner supporting plate 12 is arranged to be a convex disc-like body and the screw shaft 13 is arranged to be a plain column bolt, the tightening nut 14 is arranged to be a hexagonal nut and the accommodating groove plate 15 is arranged to be a V-shaped annular groove-like body, the first inflatable ring bag 16 is arranged to be an annular air vent and the first stop valve 17 is arranged to be a spherical stop valve, the sliding hole body 111 is arranged to be a strip-shaped hole body and the opening groove body 112 and the accommodating groove body 121 are respectively arranged to be U-shaped opening bodies, the first mounting hole body 122 is arranged to be a hole-like body and the inner port portion of the first mounting hole body 122 is arranged to be distributed in a mutually connected manner with the accommodating groove body 121.
[0060] A supporting connection point for the air compressor unit 8 is formed by the first plugger 1 and the second plugger 2. The connection with the air compressor unit 8 is realized by the first stop valve 17. The pipe opening of the drainage pipe is sealed by the support seat 11, the inner support plate 12, the screw shaft 13, the tightening nut 14, the receiving groove plate 15, the first inflatable ring bag 16, the sliding hole body 111, the opening groove body 112, the receiving groove body 121 and the first mounting hole body 122. The technical purpose is to be used as a component for port sealing of the lower part of the drainage pipe section that needs to be sorted out and the upper part of the drainage pipe section that needs to be sorted out.
[0061] In this embodiment, at least two first inflatable ring bags 16 are arranged in the accommodating groove body 121 and the accommodating groove plate 15, and the ratio of the diameter of the gas accommodating cavity of the first inflatable ring bag 16 located on the outside to the diameter of the gas accommodating cavity of the first inflatable ring bag 16 located on the inside is set to 1.5-1.8:1.
[0062] The technical purpose is to improve the effect of blocking the pipe opening of the drainage pipe.
[0063] In the present embodiment, the first trailer 3 and the second trailer 4 are respectively configured as full trailers with guide wheel assemblies, and the rear portion of the upper end surface of the first trailer 3 is configured to be connected to the first winch 5, the front portion of the upper end surface of the first trailer 3 is respectively configured to be connected to the first plugging device 1, the high-pressure pump group 7, the air compressor group 8, the mobile frame 91 and the pipeline cleaning machine 92, and the rear portion of the upper end surface of the second trailer 4 is respectively configured to be connected to the second winch 6, the front portion of the upper end surface of the second trailer 4 is respectively configured to be connected to the second plugging device 2, the air compressor group 8, the pipeline crawling machine 9, the mobile frame 91, the image pickup machine 93 and the pipeline inner wall repair machine 94, and the towing hook of the first trailer 3 and the towing hook of the second trailer 4 are respectively configured to be connected to the mobile chassis, and the guide wheel assembly of the first trailer 3 and the guide wheel assembly of the second trailer 4 are respectively configured to include a support beam 31, a fixed The shaft 32 and the rotating wheel 33, the lower end of the support beam 31 is respectively arranged to be connected to the rear side of the frame of the first trailer 3 and the rear side of the frame of the second trailer 4, a U-shaped opening body is provided at the upper end of the support beam 31 and the ends of the fixed shaft 32 are respectively arranged to be connected to the inner wall of the U-shaped opening body of the support beam 31, the fixed shaft 32 is arranged to be rotatably connected to the rotating wheel 33 and the support beam 31 is arranged to be an L-shaped frame body, the fixed shaft 32 is arranged to be a rod-shaped body with an annular flange body in the middle part and the rotating wheel 33 is arranged to be a circular disc-shaped body with a groove body on the peripheral side part, the rotating wheels 33 are arranged to be arranged and distributed at intervals along the center line of the fixed shaft 32 and the annular flange body of the fixed shaft 32 is arranged to be contact-connected with the side part of the rotating wheel 33, and the rotating wheels 33 are respectively arranged to be connected to the first winch 5 and the second winch 6.
[0064] The first trailer 3 and the second trailer 4 form support connection points for the first plugger 1, the second plugger 2, the first winch 5, the second winch 6, the high-pressure pump group 7, the air compressor group 8, the pipeline crawling machine 9, the mobile frame 91, the pipeline cleaning machine 92, the image pickup machine 93 and the pipeline inner wall repairing machine 94. The first trailer 3 realizes connection with the first plugger 1, connection with the high-pressure pump group 7, connection with the air compressor group 8, connection with the mobile frame 91, connection with the pipeline cleaning machine 92, and the second trailer 4 realizes connection with the second plugger 2 and connection with the air compressor group 8. It realizes connection with the pipeline crawler 9, connection with the mobile frame 91, connection with the image pickup machine 93, and connection with the pipeline inner wall repair machine 94. The support beam 31, the fixed shaft 32 and the rotating wheel 33 realize the support processing of the steel wire rope of the first winch 5 and the steel wire rope of the second winch 6. Its technical purpose is to be used as a component for transporting the first plugger 1, the second plugger 2, the first winch 5, the second winch 6, the high-pressure pump group 7, the air compressor group 8, the pipeline crawler 9, the mobile frame 91, the pipeline cleaning machine 92, the image pickup machine 93 and the pipeline inner wall repair machine 94.
[0065] In this embodiment, the first winch 5 and the second winch 6 are respectively configured to have hydraulic motor winches and the hydraulic port of the hydraulic motor of the first winch 5 and the hydraulic port of the hydraulic motor of the second winch 6 are respectively configured to be connected to the hydraulic device of the mobile chassis, the first winch 5 is configured to be connected to the first trailer 3 and the second winch 6 is configured to be connected to the second trailer 4, and the wire rope of the first winch 5 and the wire rope of the second winch 6 are respectively configured to be connected to the mobile frame 91.
[0066] The first winch 5 and the second winch 6 form supporting connection points for the first trailer 3, the second trailer 4 and the movable frame 91. The first winch 5 realizes connection with the first trailer 3, the second winch 6 realizes connection with the second trailer 4, and the first winch 5 and the second winch 6 realize connection with the movable frame 91. The technical purpose is to serve as a component for driving the movable frame 91 to move in the drainage pipe.
[0067] In the present embodiment, the high-pressure pump group 7 is configured to be connected to the first trailer 3 and the output port portion of one of the high-pressure pumps of the high-pressure pump group 7 is configured to be connected to the pipeline cleaning machine 92 .
[0068] A supporting connection point for the first trailer 3 and the pipe cleaning machine 92 is formed by the high-pressure pump group 7. The connection with the first trailer 3 and the pipe cleaning machine 92 is realized by the high-pressure pump group 7. The technical purpose is to serve as a component for extracting sewage from the drainage pipe and providing high-pressure water to the pipe cleaning machine 92.
[0069] In this embodiment, the air compressor unit 8 is configured to be connected to the first trailer 3 and the second trailer 4, and the output port portion of the air compressor unit 8 is respectively configured to be connected to the first plugger 1, the second plugger 2 and the pipeline inner wall repair machine 94.
[0070] Through the air compressor unit 8, support connection points for the first plugger 1, the second plugger 2, the first trailer 3 and the pipe cleaning machine 92 are formed. The air compressor unit 8 realizes connection with the first plugger 1, the second plugger 2, the first trailer 3, the second trailer 4, and the pipe cleaning machine 92. The technical purpose is to serve as a component for providing high-pressure air to the drainage pipe, the first plugger 1, the second plugger 2 and the pipe cleaning machine 92.
[0071] In this embodiment, the pipeline crawler 9 is configured as a pipeline crawler and the pipeline crawler 9 is configured to be connected to the first trailer 3, and the pipeline crawler 9 is configured to be connected to the wire rope of the first winch 5 or the wire rope of the second winch 6 respectively.
[0072] The pipe crawler 9 forms a supporting connection point for the first trailer 3, the first winch 5 and the second winch 6. The pipe crawler 9 realizes connection with the first trailer 3, the first winch 5 and the second winch 6. Its technical purpose is to serve as a component for passing the steel wire rope of the first winch 5 or the steel wire rope of the second winch 6 through the drainage pipe.
[0073] In this embodiment, the movable frame 91 is configured to include a connecting flange 911, an intermediate shaft 912, a swing frame 913, an adjusting screw 914, an axle 915, a first running wheel 916 and a second running wheel 917, and a through hole 9131 is provided at the inner end of the swing frame 913, a first through hole 9132 and a second through hole 9135 are provided in the middle of the swing frame 913, and a first branch plate portion 9133 is provided on one side of the outer end of the swing frame 913, a second branch plate portion 9134 is provided on the other side of the outer end of the swing frame 913, and an ear seat portion 9111 is provided on the upper part of the outer end surface of the connecting flange 911, The ends of the intermediate shaft 912 are respectively arranged to be connected to the inner hole wall of the connecting flange 911 and the intermediate shaft 912 is arranged to be connected to the through hole body 9131, the upper end of the adjusting screw 914 is arranged to be threadedly connected to the ear seat portion 9111 and the lower end of the adjusting screw 914 is arranged to be connected to the first through hole body 9132, the outer end of the first branch plate portion 9133 and the outer end of the second branch plate portion 9134 are respectively arranged to be connected to the axle 915 and one of the ends of the axle 915 is arranged to be rotatably connected to the first running wheel 916, and the other end of the axle 915 is arranged to be rotatably connected to the second running wheel 917 and the second through hole body 9135 is respectively arranged In order to connect with the wire rope of the first hoist 5 and the wire rope of the second hoist 6, the connecting flange 911 is set as a flange and the intermediate shaft 912 is set as a rod-shaped body with an annular groove in the middle part, the annular groove of the intermediate shaft 912 is set to connect with the swing frame 913 and the swing frame 913 is set as a Y-shaped sheet body, the adjusting screw 914 is set as a dry-shaped bolt and the annular groove of the adjusting screw 914 is set to connect with the swing frame 913, the axle 915 is set as a rod-shaped body with an annular groove at the end and the annular groove of one end of the axle 915 is set to connect with the first running wheel 916, and the annular groove of the other end of the axle 915 is set to connect with the second running wheel 916. 17 is connected, the first driving wheel 916 and the second driving wheel 917 are respectively configured as circular disc-shaped bodies and the ear seat portion 9111 is configured as a sheet-shaped body with a threaded hole body, the threaded hole body of the ear seat portion 9111 is configured to be connected to the adjusting screw 914 and the through-hole body 9131, the first through-hole body 9132 and the second through-hole body 9135 are respectively configured as circular hole-shaped bodies, the first branch plate portion 9133 and the second branch plate portion 9134 are respectively configured as rectangular sheet-shaped bodies and the connecting flange plate 911 is respectively configured to be connected to the pipeline cleaning machine 92, the image pickup machine 93 and the pipeline inner wall repair machine 94 through connecting bolts and nuts, and the moving frame 91 is configured to be connected to the first trailer 3 and the second trailer 4.
[0074] The movable frame 91 forms supporting connection points for the first trailer 3, the second trailer 4, the first hoist 5, the second hoist 6, the pipeline cleaning machine 92, the image pickup machine 93 and the pipeline inner wall repairing machine 94. The movable frame 91 realizes the connection with the first trailer 3 and the second trailer 4. The second through-hole body 9135 realizes the connection with the first hoist 5 and the second hoist 6. The connecting flange 911 realizes the connection with the pipeline cleaning machine 92 and the image pickup machine 93. In order to connect with the pipe inner wall repair machine 94, an intermediate shaft 912, a swing frame 913, an adjusting screw 914, an axle 915, a first running wheel 916, a second running wheel 917, an ear seat portion 9111, a through hole body 9131, a first through hole body 9132, a first branch plate portion 9133 and a second branch plate portion 9134 are used to realize motion support processing for the connecting flange 911. The technical purpose is to serve as a component for driving the pipe cleaning machine 92, the image pickup machine 93 and the pipe inner wall repair machine 94 to move in the drainage pipe.
[0075] In this embodiment, the pipe cleaning machine 92 is configured to include a first docking flange 921, a second docking flange 922, a water spray disc 923, an inner toothed disc 924, a power gear 925, a support gear 926, a first support claw beam 927, a connecting rod 928 and a cleaning brush 929, and the inner end surface of the first docking flange 921 and the inner end surface of the second docking flange 922 are respectively configured to be connected to the first support claw beam 927, one of the ends of the connecting rod 928 is respectively configured to be connected to the first support claw beam 927 and the other end of the connecting rod 928 is respectively configured to be connected to the water spray disc 923, the power gear 925 and the support gear 926 are respectively configured to be meshedly connected to the inner hole teeth of the inner toothed disc 924 and the outer peripheral side surface of the inner toothed disc 924 is configured to be connected to the cleaning brush 929, the support gear 926 is configured to be rotatably connected to one of the first support claw beams 927 through a shaft and the power gear 925 is configured to be rotatably connected to another of the first support claw beams 927 through a rotating shaft, located The rotating shaft between the power gear 925 and the first supporting claw beam 927 is configured to be connected to the motor end shaft and the first docking flange 921 and the second docking flange 922 are respectively configured to be connected to the moving frame 91 through connecting bolts and nuts, the water spray plate 923 is configured to be connected to the high-pressure pump group 7 through a pipeline and the first docking flange 921 and the second docking flange 922 are configured to be flanges, the water spray plate 923 is configured to be a circular disc-shaped body with water spray holes on the peripheral side and the inner toothed disc 924 is configured to be an inner gear body, the power gear 925 and the support gear 926 are respectively configured to be column gears with annular grooves on the peripheral side and the first supporting claw beam 927 is configured to be an L-shaped rod-shaped body, the connecting rod 928 is configured to be a rod-shaped body and the cleaning brush 929 is configured to be an industrial brush body, three first supporting claw beams 927 are configured to be arranged and distributed at intervals along the circumferential line of the inner toothed disc 924 and two supporting gears 926 and one power gear 925 are respectively arranged on the three first supporting claw beams 927, and the pipeline cleaning machine 92 is configured to be connected to the first trailer 3.
[0076] Through the pipe cleaning machine 92, a supporting connection point for the first trailer 3, the high-pressure pump group 7 and the mobile frame 91 is formed. The pipe cleaning machine 92 realizes the connection with the first trailer 3. The water spray plate 923 realizes the connection with the high-pressure pump group 7. The first docking flange 921 and the second docking flange 922 realize the connection with the mobile frame 91. The inner gear plate 924, the power gear 925, the support gear 926, the first support claw beam 927 and the cleaning brush 929 realize the sweeping and brushing of the drainage pipe. The connection between the water spray plate 923 and the first support claw beam 927 is realized by the connecting rod 928. The technical purpose is to be used as a component for cleaning the drainage pipe.
[0077] In this embodiment, the image pickup machine 93 is configured to include a third docking flange 931, a fourth docking flange 932, a first intermediate support plate 933, a second support claw beam 934, a camera 935, a tightening screw 936 and an illuminating lamp 937, and one end of the second support claw beam 934 is respectively configured to be connected to the inner end surface of the third docking flange 931 and the inner end surface of the fourth docking flange 932, and the other end of the second support claw beam 934 is configured to be connected to the inner wall of the hole of the first intermediate support plate 933 and A second mounting hole 9351 and a threaded hole 9352 are respectively provided on the first intermediate support plate 933, the second mounting hole 9351 is configured to be accommodatedly connected to the camera 935 and the threaded hole 9352 is configured to be connected to the tightening screw 936, the inner end of the tightening screw 936 is configured to be contact-connected to the camera 935 and the second supporting claw beam 934 is configured to be connected to the lamp holder of the lighting lamp 937, the third docking flange 931 and the fourth docking flange 932 are respectively configured to be flanges and the first intermediate support plate 933 is configured to be annular The second support claw beam 934 is configured as an L-shaped rod-shaped body and the vertical end of the second support claw beam 934 is configured to be connected to the first intermediate support plate 933, the oblique end of the second support claw beam 934 is respectively configured to be connected to the third docking flange 931 and the fourth docking flange 932 and the camera 935 is configured as a digital camera, the tightening screw 936 is configured as a hexagonal bolt and the lighting lamp 937 is configured as an LED lighting lamp, the second mounting hole body 9351 and the threaded hole body 9352 are respectively configured as circular hole bodies and the threaded hole body 9351 and the threaded hole body 9352 are respectively configured as circular hole bodies and the threaded hole body 9352 is ... The inner port portion of 352 is arranged to be interconnected with the second mounting hole body 9351, the second mounting hole body 9351 and the threaded hole body 9352 are respectively arranged to be spaced apart along the circumference of the first intermediate support plate 933, and the second support claw beam 934 and the lighting lamp 937 are respectively arranged to be spaced apart along the circumference of the first intermediate support plate 933, the image pickup machine 93 is arranged to be connected to the second trailer 4, and the third docking flange plate 931 and the fourth docking flange plate 932 are respectively arranged to be connected to the movable frame 91 through connecting bolts and nuts.
[0078] Through the image pickup machine 93, a supporting connection point for the second trailer 4 and the mobile frame 91 is formed. The image pickup machine 93 realizes the connection with the second trailer 4. The third docking flange 931 and the fourth docking flange 932 realize the connection with the mobile frame 91. The first intermediate support plate 933, the second support claw beam 934, the camera 935, the tightening screw 936, the lighting lamp 937, the second mounting hole body 9351 and the threaded hole body 9352 realize the pickup of images of the drainage pipe. The technical purpose is to be used as a component for imaging the inner wall of the drainage pipe.
[0079] In this embodiment, the pipeline inner wall repair machine 94 is configured to include a fifth docking flange 941, a sixth docking flange 942, a second intermediate support plate 943, a third support claw beam 944, a corner block 945, a second inflatable ring bag 946, a second stop valve 947, a side support plate 948, a swing rod 949 and a heating lamp 940, and one end of the third support claw beam 944 is respectively configured to be connected to the inner end surface of the fifth docking flange 941 and the inner end surface of the sixth docking flange 942, and the other end of the third support claw beam 944 is respectively configured to be connected to the inner end surface of the second intermediate support plate 943. The side surface portion is connected to the inner end surface portion of the corner block 945 and is set as a third mounting hole body 9431 on the second intermediate support plate 943, the inflation tube of the second inflatable ring bag 946 is set to be connected in series with the third mounting hole body 9431 and the outer port portion of the inflation tube of the second inflatable ring bag 946 is set to be connected to the inner port portion of the second stop valve 947, the outer port portion of the second stop valve 947 is set to be connected to the air compressor unit 8 and the inner side surface portion of the second inflatable ring bag 946 is respectively set to be contact-connected with the outer end surface portions of the second intermediate support plate 943 and the corner block 945, and the inner hole wall of the side support plate 948 is set to be connected to the The third support claw beam 944 located between the sixth docking flange 942 and the second intermediate support plate 943 is connected and one end of the swing rod 949 is configured to be connected to the outer side surface of the side support plate 948, and the other end of the swing rod 949 is configured to be connected to the lamp holder of the heating lamp 940 and the pipeline inner wall repair machine 94 is configured to be connected to the second trailer 4, the fifth docking flange 941 and the sixth docking flange 942 are respectively configured to be connected to the mobile frame 91 through connecting bolts and nuts, and the fifth docking flange 941 and the sixth docking flange 942 are respectively configured to be flanges, and the second intermediate support plate 94 3 and the side support plate 948 are respectively configured as circular ring bodies, the third support claw beam 944 and the swing rod 949 are configured as strip bodies and the corner block 945 is configured as a seat body, the second inflatable ring bag 946 is configured as an annular air bag and the second stop valve 947 is configured as a spherical stop valve, the heating lamp 940 is configured as a ceramic heating lamp and the third mounting hole body 9431 is configured as a circular hole body, the third support claw beam 944 and the corner block 945 are respectively configured to be arranged and distributed at intervals along the circumference of the second intermediate support plate 943 and the swing rod 949 and the heating lamp 940 are respectively configured to be arranged and distributed at intervals along the circumference of the side support plate 948.
[0080] Through the pipe inner wall repair machine 94, a supporting connection point for the second trailer 4, the air compressor unit 8 and the mobile frame 91 is formed. The pipe inner wall repair machine 94 realizes the connection with the second trailer 4. The second stop valve 947 realizes the connection with the air compressor unit 8. The fifth docking flange 941 and the sixth docking flange 942 realize the connection with the mobile frame 91. The second intermediate support plate 943, the third support claw beam 944, the corner block 945, the second inflatable ring bag 946, the side support plate 948, the swing rod 949, the heating lamp 940 and the third mounting hole body 9431 realize the repair of the damaged part of the drainage pipe. The technical purpose is to be used as a component for repairing the damaged inner wall of the drainage pipe.
[0081] In this embodiment, the first plugger 1, the second plugger 2, the first winch 5, the second winch 6, the high-pressure pump group 7, the air compressor group 8, the pipeline crawler 9, the mobile frame 91, the pipeline cleaning machine 92 and the image pickup machine 93 and the pipeline inner wall repair machine 94 are arranged to be distributed in the manner of inner wall repair, and the first plugger 1, the second plugger 2, the first winch 5, the second winch 6, the high-pressure pump group 7, the air compressor group 8, the pipeline crawler 9, the mobile frame 91, the pipeline cleaning machine 92, the image pickup machine 93 and the pipeline inner wall repair machine 94 and the first trailer 3 and the second trailer 4 are arranged to be distributed in the manner of motorized transportation, and the fifth docking flange 941, the sixth docking flange 942, the third docking flange 931, the fourth docking flange 932, the first docking flange 921 and the second docking flange 922 are respectively arranged to be connected to the connecting flange 911.
[0082] In one of the supporting examples of the first embodiment of the present invention, the ratio of the diameter of the gas accommodating cavity of the first inflatable annular bag 16 located on the outside to the diameter of the gas accommodating cavity of the first inflatable annular bag 16 located on the inside is set to 1.5:1.
[0083] In a second supporting example of the first embodiment of the present invention, the ratio of the diameter of the gas accommodating cavity of the first inflatable annular bag 16 located on the outside to the diameter of the gas accommodating cavity of the first inflatable annular bag 16 located on the inside is set to 1.8:1.
[0084] In a third supporting example of the first embodiment of the present invention, the ratio of the diameter of the gas accommodating cavity of the first inflatable annular bag 16 located on the outside to the diameter of the gas accommodating cavity of the first inflatable annular bag 16 located on the inside is set to 1.7:1.
[0085] The present invention is further described below in conjunction with examples. The following examples are intended to illustrate the present invention rather than to further limit the present invention.
[0086] A drainage pipe tidying method for a central urban area, the steps of which are: when tidying the drainage pipe, the motorized chassis is connected to the towing hook of the first trailer 3, the first trailer 3 is placed on the vertical shaft of the lower part of the drainage pipe section to be tidyed, the rotating wheel 33 on the first trailer 3 is placed on the upper end of the vertical shaft of the lower part of the drainage pipe section to be tidyed, the motorized chassis is separated from the towing hook of the first trailer 3, the motorized chassis is connected to the towing hook of the second trailer 4, the second trailer 4 is placed on the vertical shaft of the upper part of the drainage pipe section to be tidyed, the rotating wheel 33 on the second trailer 4 is placed on the upper end of the vertical shaft of the upper part of the drainage pipe section to be tidyed, the motorized chassis is separated from the towing hook of the second trailer 4, the first plugging device 1 is placed in the vertical shaft of the lower part of the drainage pipe section to be tidyed, the second plugging device 2 is placed in the vertical shaft of the upper part of the drainage pipe section to be tidyed, the support seat 11 is placed at the bottom of the vertical shaft, the anchor rod is installed in the open slot 112, and the support seat 11 is installed by the anchor rod At the bottom of the shaft, the inner plate 12 is adjusted to move up and down on the sliding hole 111, so that the inner plate 12 is located at the center of the drain pipe, and the jacking nut 14 is rotated on the screw shaft 13, so that the jacking nut 14 acts on the vertical part of the support seat 11, thereby installing the inner plate 12 on the support seat 11, connecting the outer port of the first stop valve 17 with the air compressor unit 8, so that the air compressor unit 8 is in a working state, and the first stop valve 17 is in an open state, and the air compressor is The first inflatable annular bag 16 is injected with high-pressure air by the group 8, so that the first inflatable annular bag 16 is in an expanded state in the containing groove body 121 and the containing groove plate 15, so that the first inflatable annular bag 16 located on the first plugging device 1 blocks the port of the lower part of the drainage pipe section that needs to be sorted out, and the first inflatable annular bag 16 located on the second plugging device 2 blocks the port of the upper part of the drainage pipe section that needs to be sorted out, and then the first stop valve 17 is in a closed state, so that the air compressor group 8 is in a non-working state.
[0087] Put the output pipe of the air compressor unit 8 into the drainage section to put the air compressor unit 8 in working condition. The air compressor unit 8 will inflate the drainage section. Put the input pipe of the high-pressure pump unit 7 into the drainage section to be sorted out. Put the high-pressure pump unit 7 in working condition. The high-pressure pump unit 7 will discharge the sewage in the drainage section to be sorted out. When the sewage in the drainage section to be sorted out is discharged, the high-pressure pump unit 7 will be in non-working condition. When the oxygen content of the air in the drainage section to be sorted out reaches the operating standard, the air compressor unit 8 will be in non-working condition.
[0088] Put the pipeline crawler 9 from the vertical shaft of the upper part of the drainage pipe section that needs to be sorted out into the drainage pipe section that needs to be sorted out, put the wire rope of the second winch 6 onto the rotating wheel 33 located on the second trailer 4, connect the end of the wire rope of the second winch 6 to the pipeline crawler 9, make the pipeline crawler 9 move in the drainage pipe section that needs to be sorted out, make the second winch 6 rotate in the opposite direction, make the wire rope of the second winch 6 in a released state, drive the wire rope of the second winch 6 to move in the drainage pipe section that needs to be sorted out, when the pipeline crawler 9 reaches the vertical shaft of the lower part of the drainage pipe section that needs to be sorted out, take the pipeline crawler 9 out of the vertical shaft of the lower part of the drainage pipe section that needs to be sorted out, so as to put the wire rope of the second winch 6 into the drainage pipe section that needs to be sorted out,
[0089] Put the first mobile frame 91 into the vertical shaft of the lower part of the drainage pipe section that needs to be sorted out, connect the second through-hole body 9135 on the first mobile frame 91 with the wire rope of the second hoist 6, put the first running wheel 916 and the second running wheel 917 on the first mobile frame 91 into the drainage pipe section that needs to be sorted out, make the adjusting screw 914 on the first mobile frame 91 rotate in the threaded hole body of the ear seat part 9111 on the first mobile frame 91 and the first through-hole body 9132 on the first mobile frame 91, make the swing frame 913 on the first mobile frame 91 swing on the intermediate shaft 912 on the first mobile frame 91, make the connecting flange 911 on the first mobile frame 91 be located at the center of the drainage pipe, put the second mobile frame 91 into In the vertical shaft of the lower part of the drainage pipe section that needs to be arranged, the second through-hole body 9135 on the second moving frame 91 is connected to the wire rope of the first hoist 5, and the first running wheel 916 and the second running wheel 917 on the second moving frame 91 are placed in the drainage pipe section that needs to be arranged, so that the adjusting screw 914 on the second moving frame 91 rotates in the threaded hole body of the ear seat part 9111 on the second moving frame 91 and the first through-hole body 9132 on the second moving frame 91, so that the swing frame 913 on the second moving frame 91 swings on the intermediate shaft 912 on the second moving frame 91, so that the connecting flange 911 on the second moving frame 91 is located in the center of the drainage pipe, so as to realize the centering treatment of the connecting flange 911 in the drainage pipe.
[0090] Put the pipe cleaning machine 92 into the shaft of the lower part of the drainage pipe section that needs to be sorted out, connect the first docking flange 921 with the connecting flange 911 on the first mobile frame 91 through connecting bolts and nuts, connect the second docking flange 922 with the connecting flange 911 on the second mobile frame 91 through connecting bolts and nuts, connect the water spray plate 923 with the output port of one of the high-pressure pumps of the high-pressure pump group 7 through a pipeline, connect the input port of one of the high-pressure pumps of the high-pressure pump group 7 to the water tank through a pipeline, put the pipeline on the input port of another high-pressure pump of the high-pressure pump group 7 into the shaft of the lower part of the drainage pipe section that needs to be sorted out, and make the first winch 5, the second winch 6, the high-pressure pump group 7 and the power gear The motor on 925 is in working state, and the water spray disc 923 and the inner gear disc 924 are moving in the drainage pipe section that needs to be sorted out, so that the high-pressure water flow is sprayed to the inner wall of the drainage pipe through the water spray hole of the water spray disc 923, and the inner gear disc 924 is rotated on the power gear 925 and the support gear 926, so that the cleaning brush 929 sweeps the inner wall of the drainage pipe, and the sewage generated by cleaning flows back to the vertical shaft of the lower part of the drainage pipe section that is sorted out, and the sewage is discharged by another high-pressure pump located in the high-pressure pump group 7, so that the inner wall of the drainage pipe is cleaned. When the cleaning of the inner wall of the drainage pipe is completed, the first winch 5, the second winch 6, the high-pressure pump group 7 and the motor located on the power gear 925 are in non-working state, and the connecting bolts and screws are used to connect the first winch 5, the second winch 6, the high-pressure pump group 7 and the motor located on the power gear 925. The first butt flange 921 is separated from the connecting flange 911 on the first mobile frame 91, and the second butt flange 922 is separated from the connecting flange 911 on the second mobile frame 91. The pipe cleaning machine 92 is lifted out of the vertical shaft of the lower part of the drainage pipe section that needs to be sorted out, and the connecting flange 911 on the first mobile frame 91 is connected to the connecting flange 911 on the second mobile frame 91 through the connecting bolts and nuts. The first mobile frame 91 and the second mobile frame 91 are driven to move in the drainage pipe through the first winch 5 and the second winch 6 to reach the vertical shaft of the upper part of the drainage pipe section that needs to be sorted out. The connecting flange 911 on the movable frame 91 is separated, and the image pickup machine 93 is placed in the vertical shaft of the upper part of the drainage pipe section that needs to be sorted out. The third docking flange 931 is connected to the connecting flange 911 on the first movable frame 91 through connecting bolts and nuts, and the fourth docking flange 932 is connected to the connecting flange 911 on the second movable frame 91 through connecting bolts and nuts. The first winch 5, the second winch 6, the camera 935 and the lighting lamp 937 are in working state, and the first intermediate support plate 933 moves in the drainage pipe section that needs to be sorted out. The camera 935 picks up the image signal of the inner wall of the drainage pipe, realizes image detection processing of the inner wall of the drainage pipe, and obtains the accurate position of the damaged part of the drainage pipe.After the image detection process of the inner wall of the drain pipe is completed, the image pickup machine 93 is returned to the vertical shaft of the upper part of the drain pipe section to be sorted, the first winch 5, the second winch 6, the camera 935 and the lighting lamp 937 are placed in a non-working state, the third docking flange 931 is separated from the connecting flange 911 located on the first movable frame 91, the fourth docking flange 932 is separated from the connecting flange 911 located on the second movable frame 91, and the image pickup machine 93 is lifted out of the vertical shaft of the upper part of the drain pipe section to be sorted.
[0091] According to the diameter of the drain pipe, the glass fiber cloth is wound around once, and the adhesive resin is applied to the outer surface of the glass fiber cloth, and then the glass fiber cloth is wound around for at least three times to obtain a repair sleeve for the drain pipe. The repair sleeve is assembled with the second inflatable ring bag 946, and then a 3-6 mm adhesive resin layer is applied to the outer surface of the repair sleeve of the drain pipe. The pipe inner wall repair machine 94 is placed in the vertical shaft of the upper part of the drainage pipe section, and the fifth docking flange 941 is connected to the connecting flange 911 located on the first mobile frame 91 through the connecting bolts and nuts, and the sixth docking flange 94 is connected to the second inflatable ring bag 946. The connecting flange 911 on the second mobile frame 91 is connected by connecting bolts and nuts, and the outer port of the second stop valve 947 is connected to the air compressor unit 8 through a pipeline, so that the second stop valve 947 is in an open state, and the first winch 5 and the second winch 6 are in a working state. The second intermediate support plate 943 and the side support plate 948 move in the drainage pipe section that needs to be repaired. When the second intermediate support plate 943 reaches the damaged part of the drainage pipe, the first winch 5 and the second winch 6 are in a non-working state, and the repair sleeve is placed on the damaged part of the drainage pipe. Then, the air compressor unit 8 is put into a working state. The air compressor unit 8 inflates the second inflatable ring bag 946. When the second inflatable ring bag 946 is in an expanded state, the adhesive resin layer of the repair sleeve is connected to the damaged part of the drain pipe, and the air compressor unit 8 is in a non-working state. The second inflatable ring bag 946 is deflated, and the second inflatable ring bag 946 is separated from the repair sleeve. Then the first winch 5 and the second winch 6 are in a working state, and the second intermediate support plate 943 and the side support plate 948 are moved in the drainage pipe section. When the heating lamp 940 reaches the repair sleeve, the first winch 5 and the second winch 6 are in a non-working state, and the heating lamp 940 The first and second hoists 5 and 6 are in working state, and the pipe inner wall repair machine 94 is moved to the vertical shaft of the upper part of the drainage pipe section, and the fifth docking flange 941 is separated from the connecting flange 911 on the first mobile frame 91, and the sixth docking flange 942 is separated from the connecting flange 911 on the second mobile frame 91, and the pipe inner wall repair machine 94 is lifted out of the vertical shaft of the upper part of the drainage pipe section.
[0092] Separate the second through-hole body 9135 on the first movable frame 91 from the steel wire rope of the second winch 6, separate the second through-hole body 9135 on the second movable frame 91 from the steel wire rope of the first winch 5, lift the movable frame 91 out of the vertical shaft of the upper part of the drainage pipe section, reel in the steel wire rope of the second winch 6 and the steel wire rope of the first winch 5 respectively, open the first stop valve 17, release the high-pressure air in the first inflatable ring bag 16, empty the first inflatable ring bag 16, remove the anchor rod from the open groove body 112 and the bottom of the vertical shaft, lift the first plug 1 out of the vertical shaft of the lower part of the drainage pipe section, lift the second plug 2 out of the vertical shaft of the upper part of the drainage pipe section, and complete the drainage pipe section.
[0093] In a second embodiment of the present invention, the basic component device and the functional component device are connected to each other in such a manner that cleaning, inspection and repair operations are performed on the inner wall of the drainage pipe section that needs to be repaired.
[0094] In this embodiment, the functional component device is connected to the basic component device in a disc-type docking manner.
[0095] In this embodiment, the basic component device is configured to include a first plugger 1, a second plugger 2, a first trailer 3, a second trailer 4, a first winch 5, a second winch 6, a high-pressure pump group 7, an air compressor group 8 and a pipeline crawler 9.
[0096] In this embodiment, the functional component device is configured to include a moving frame 91, a pipeline cleaning machine 92, an image pickup machine 93 and a pipeline inner wall repairing machine 94.
[0097] The second embodiment of the present invention is based on the first embodiment.
[0098] The second embodiment of the present invention comprises the following steps: the basic component device drives the functional component device to move in the drainage pipe section that needs to be sorted out, and the functional component device cleans, inspects and repairs the inner wall of the drainage pipe section that needs to be sorted out.
[0099] The second embodiment of the present invention is based on the first embodiment.
[0100] The present invention has the following characteristics:
[0101] 1. Due to the design of the basic component device and the functional component device, the basic component device is used to drive the functional component device to move in the drainage pipe section that needs to be sorted out. The functional component device is used to clean, inspect and repair the inner wall of the drainage pipe section that needs to be sorted out, which solves the technical problem of affecting the stability of the foundation surface of the drainage pipe after excavating the drainage pipe section that needs to be repaired and repairing the external side leaks. Therefore, the stability of the foundation surface of the drainage pipe is guaranteed, and the risk of damage to the sorted drainage pipe is reduced.
[0102] 2. Due to the design of the first plugger 1, the second plugger 2, the first trailer 3, the second trailer 4, the first winch 5, the second winch 6, the high-pressure pump unit 7, the air compressor unit 8 and the pipeline crawler 9, the drainage pipe section that needs to be tidied can be emptied and the rope can be placed through it.
[0103] 3. Due to the design of the mobile frame 91, the pipeline cleaning machine 92, the image pickup machine 93 and the pipeline inner wall repairing machine 94, the pipeline cleaning machine 92, the image pickup machine 93 and the pipeline inner wall repairing machine 94 are connected by a butt joint.
[0104] 4. Since the design limits the numerical range of the structural shape, the numerical range is the technical feature in the technical solution of the present invention, rather than a technical feature calculated by a formula or obtained through a limited number of tests. Tests have shown that the technical feature of this numerical range has achieved good technical effects.
[0105] 5. Due to the design of the technical features of the present invention, the effects of the individual and combined technical features have been shown through experiments to have various performance indicators of the present invention that are at least 1.7 times the existing performance indicators, and have been evaluated to have good market value.
[0106] There are other technical features that are connected to the basic component devices and functional component devices for cleaning, inspecting and repairing the inner wall in the drainage pipe section that needs to be sorted out, which are all embodiments of the present invention, and the technical features of the above-mentioned embodiments can be combined arbitrarily. In order to meet the requirements of the Patent Law, Patent Implementing Rules and Examination Guidelines, all possible combinations of the technical features in the above-mentioned embodiments will no longer be described.
[0107] The above-mentioned embodiment is only one implementation form of the drainage pipe arrangement device and method for the central urban area provided by the present invention. Other variations of the scheme provided by the present invention, adding or reducing components or steps therein, or applying the present invention to other technical fields close to the present invention, all fall within the protection scope of the present invention.
Claims
1. A drainage pipe arrangement device for a central urban area, characterized by: The invention comprises a foundation component device arranged on a vertical shaft of a lower part of a drainage pipe section to be arranged and a vertical shaft of an upper part of a drainage pipe section to be arranged, and a functional component device arranged on the foundation component device and passing through the drainage pipe section to be arranged. The basic component device is configured to include a first plugging device (1), a second plugging device (2), a first trailer (3), a second trailer (4), a first winch (5), a second winch (6), a high-pressure pump unit (7), an air compressor unit (8) and a pipeline crawler (9). The functional component device is configured to include a mobile frame (91), a pipeline cleaning machine (92), an image pickup machine (93) and a pipeline inner wall repairing machine (94). A first plugging device (1), a first hoist (5), an air compressor unit (8), a movable frame (91) and a pipe cleaning machine (92) are respectively arranged on the first trailer (3), and the first trailer (3) is arranged at the lower part of the drainage pipe section that needs to be repaired; a second hoist (6), an air compressor unit (8), a pipe crawling machine (9), a movable frame (91), an image pickup machine (93) and a pipe inner wall repairing machine (94) are respectively arranged on the second trailer (4), and the second trailer (4) is arranged at the upper part of the drainage pipe section that needs to be repaired. The first plugging device (1) and the second plugging device (2) are respectively provided with a support seat (11), an inner support plate (12), a screw shaft (13), a tightening nut (14), a receiving groove plate (15), a first inflatable ring bag (16) and a first stop valve (17), and a sliding hole body (111) is provided on the vertical part of the support seat (11), an opening groove body (112) is provided on the horizontal part of the support seat (11), and a receiving groove body (121) is provided on the peripheral side surface of the inner support plate (12), and a first stop valve (17) is provided on the inner support plate (12). A first mounting hole body (122) is provided and the sliding hole body (111) is arranged to be connected to the screw shaft (13), the inner end head of the screw shaft (13) is arranged to be connected to the inner end face portion of the inner bearing plate (12), and the screw shaft (13) is arranged to be threadedly connected to the top nut (14), the inner end face portion of the top nut (14) is arranged to be contact-connected to the vertical portion of the support seat (11), and the peripheral side surface portion of the inner bearing plate (12) is arranged to be connected to the accommodating groove plate (15), and the accommodating groove body (121) and the accommodating groove plate (15) are arranged The air filling tube of the first inflatable ring bag (16) is arranged to be connected in a receiving manner with the first inflatable ring bag (16), and the air filling tube of the first inflatable ring bag (16) is arranged to be connected in series with the first mounting hole body (122), the air filling tube port of the first inflatable ring bag (16) is arranged to be connected to the inner port of the first stop valve (17), and the outer port of the first stop valve (17) is arranged to be connected to the air compressor unit (8), the support seat (11) is arranged to be an L-shaped plate-like body, the inner support plate (12) is arranged to be a convex disc-like body, and the screw shaft (13) is arranged to be a plain column bolt, and the jacking nut (14) is configured as a hexagonal nut and the receiving groove plate (15) is configured as a V-shaped annular groove body, the first inflatable ring bag (16) is configured as an annular air sac and the first stop valve (17) is configured as a spherical stop valve, the sliding hole body (111) is configured as a strip hole body and the opening groove body (112) and the receiving groove body (121) are respectively configured as U-shaped opening bodies, the first installation hole body (122) is configured as a hole body and the inner end portion of the first installation hole body (122) is configured to be interconnected with the receiving groove body (121).
2. The drainage pipe arrangement device for the central urban area according to claim 1 is characterized in that: The basic component device and the functional component device are connected to each other in such a way that the inner wall cleaning, inspection and repair operations are carried out in the drainage pipe section that needs to be arranged.
3. The drainage pipe arrangement device for the central urban area according to claim 2 is characterized in that: The functional component device is connected to the basic component device in a disc-type docking manner.
4. The drainage pipe arrangement device for the central urban area according to claim 1 is characterized in that: At least two first inflatable ring bags (16) are arranged in the containing groove body (121) and the containing groove plate (15), and the ratio of the diameter of the gas containing cavity of the first inflatable ring bag (16) located on the outside to the diameter of the gas containing cavity of the first inflatable ring bag (16) located on the inside is set to 1.5-1.8:
1.
5. The drainage pipe arrangement device for the central urban area according to claim 1 is characterized in that: The first trailer (3) and the second trailer (4) are respectively configured as full trailers with guide wheel assemblies, and the rear portion of the upper end surface of the first trailer (3) is configured to be connected to a first winch (5), the front portion of the upper end surface of the first trailer (3) is respectively configured to be connected to a first plugging device (1), a high-pressure pump unit (7), an air compressor unit (8), a movable frame (91) and a pipeline cleaning machine (92), and the rear portion of the upper end surface of the second trailer (4) is configured to be connected to a second winch (6), the front portion of the upper end surface of the second trailer (4) is respectively configured to be connected to a second plugging device (2), an air compressor unit (8), a pipeline crawling machine (9), a movable frame (91), an image pickup machine (93) and a pipeline inner wall repairing machine (94), and the towing hook of the first trailer (3) and the towing hook of the second trailer (4) are respectively configured to be connected to a mobile chassis, and the guide wheel assembly of the first trailer (3) and the guide wheel assembly of the second trailer (4) are respectively configured to include a support beam (31), a fixed beam (32), and a plurality of fixed beams (33). A fixed shaft (32) and a rotating wheel (33), the lower end of the support beam (31) is respectively arranged to be connected to the rear side of the frame of the first trailer (3) and the rear side of the frame of the second trailer (4), a U-shaped opening body is arranged at the upper end of the support beam (31) and the ends of the fixed shaft (32) are respectively arranged to be connected to the inner wall of the U-shaped opening body of the support beam (31), the fixed shaft (32) is arranged to be rotatably connected to the rotating wheel (33) and the support beam (31) is arranged to be an L-shaped frame body, the fixed shaft (32) is arranged to be a rod-shaped body with an annular flange body in the middle part and the rotating wheel (33) is arranged to be a circular disc-shaped body with a groove body on the peripheral side part, the rotating wheel (33) is arranged to be arranged and distributed at intervals along the center line of the fixed shaft (32) and the annular flange body of the fixed shaft (32) is arranged to be contact-connected to the side part of the rotating wheel (33), and the rotating wheel (33) is respectively arranged to be connected to the first hoist (5) and the second hoist (6).
6. The drainage pipe arrangement device for the central urban area according to claim 1 is characterized in that: The first hoist (5) and the second hoist (6) are respectively configured as hoists having hydraulic motors, and the hydraulic port of the hydraulic motor of the first hoist (5) and the hydraulic port of the hydraulic motor of the second hoist (6) are respectively configured to be connected to the hydraulic device of the mobile chassis, the first hoist (5) is configured to be connected to the first trailer (3) and the second hoist (6) is configured to be connected to the second trailer (4), and the wire rope of the first hoist (5) and the wire rope of the second hoist (6) are respectively configured to be connected to the mobile frame (91).
7. The drainage pipe arrangement device for the central urban area according to claim 1 is characterized in that: The high-pressure pump group (7) is configured to be connected to the first trailer (3) and an output port portion of one of the high-pressure pumps of the high-pressure pump group (7) is configured to be connected to the pipeline cleaning machine (92).
8. The drainage pipe arrangement device for the central urban area according to claim 1 is characterized in that: The air compressor unit (8) is arranged to be connected to the first trailer (3) and the second trailer (4), and the output port of the air compressor unit (8) is arranged to be connected to the first plugging device (1), the second plugging device (2) and the pipeline inner wall repairing machine (94) respectively.
9. The drainage pipe arrangement device for the central urban area according to claim 1 is characterized in that: The pipeline crawler (9) is configured as a pipeline crawler and is configured to be connected to the first trailer (3). The pipeline crawler (9) is configured to be connected to the steel wire rope of the first hoist (5) or the steel wire rope of the second hoist (6).
10. The drainage pipe arrangement device for the central urban area according to claim 1 is characterized in that: The movable frame (91) is configured to include a connecting flange (911), an intermediate shaft (912), a swing frame (913), an adjusting screw (914), an axle (915), a first running wheel (916) and a second running wheel (917), and a through hole body (9131) is provided at the inner end of the swing frame (913), a first through hole body (9132) and a second through hole body (9135) are provided at the middle part of the swing frame (913), a first branch plate part (9133) is provided at one side of the outer end of the swing frame (913), a second branch plate part (9134) is provided at the other side of the outer end of the swing frame (913), and an ear seat part (9136) is provided at the upper part of the outer end surface of the connecting flange (911). 9111), the ends of the intermediate shaft (912) are respectively arranged to be connected to the inner hole wall of the connecting flange (911), and the intermediate shaft (912) is arranged to be connected to the through hole body (9131), the upper end of the adjusting screw rod (914) is arranged to be threadedly connected to the ear seat portion (9111), and the lower end of the adjusting screw rod (914) is arranged to be connected to the first through hole body (9132), the outer end of the first branch plate portion (9133) and the outer end of the second branch plate portion (9134) are respectively arranged to be connected to the axle (915), and one of the ends of the axle (915) is arranged to be rotatably connected to the first running wheel (916), and the other end of the axle (915) is arranged to be rotatably connected to the second running wheel (917), and the The two through-hole bodies (9135) are respectively configured to be connected to the steel wire rope of the first hoist (5) and the steel wire rope of the second hoist (6), the connecting flange (911) is configured as a flange and the intermediate shaft (912) is configured as a rod-shaped body having an annular groove in the middle portion, the annular groove of the intermediate shaft (912) is configured to be connected to the swing frame (913) and the swing frame (913) is configured as a Y-shaped sheet-shaped body, the adjusting screw rod (914) is configured as a dry-shaped bolt and the annular groove of the adjusting screw rod (914) is configured to be connected to the swing frame (913), the axle (915) is configured as a rod-shaped body having an annular groove at the end and the annular groove at one end of the axle (915) is configured to be connected to the first running wheel (916), and the other end of the axle (915) is configured to be connected to the first running wheel (916). The annular groove of each end is configured to be connected to the second travel wheel (917), the first travel wheel (916) and the second travel wheel (917) are respectively configured as circular disc-shaped bodies, and the ear seat portion (9111) is configured as a sheet-shaped body with a threaded hole body, the threaded hole body of the ear seat portion (9111) is configured to be connected to the adjusting screw (914) and the through hole body (9131), the first through hole body (9132) and the second through hole body (9135) are respectively configured as circular hole-shaped bodies, the first branch plate portion (9133) and the second branch plate portion (9134) are respectively configured as rectangular sheet-shaped bodies, and the connecting flange plate (911) is respectively configured to be connected to the pipeline cleaning machine (92), the image pickup machine (93) and the pipeline inner wall repair machine (94) through connecting bolts and nuts,The mobile frame (91) is configured to be coupled to the first trailer (3) and the second trailer (4).
11. The drainage pipe arrangement device for the central urban area according to claim 1 is characterized in that: The pipeline cleaning machine (92) is configured to include a first docking flange (921), a second docking flange (922), a water spraying disc (923), an inner gear disc (924), a power gear (925), a support gear (926), a first support claw beam (927), a connecting rod (928) and a cleaning brush (929), and the inner end surface of the first docking flange (921) and the inner end surface of the second docking flange (922) are respectively configured to be connected to the first support claw beam (927), and one end of the connecting rod (928) is respectively configured to be connected to the first support claw beam (92 7) connected and the other end of the connecting rod (928) is respectively configured to be connected to the water spray disc (923), the power gear (925) and the support gear (926) are respectively configured to be meshed with the inner hole teeth of the inner gear disc (924) and the outer peripheral side surface of the inner gear disc (924) is configured to be connected to the cleaning brush (929), the support gear (926) is configured to be rotatably connected to one of the first support claw beams (927) through a shaft and the power gear (925) is configured to be rotatably connected to the other of the first support claw beams (927) through a rotating shaft, located The rotating shaft between the power gear (925) and the first supporting claw beam (927) is configured to be connected to the motor end shaft, and the first docking flange (921) and the second docking flange (922) are respectively configured to be connected to the moving frame (91) through connecting bolts and nuts, the water spray disc (923) is configured to be connected to the high-pressure pump group (7) through a pipeline, and the first docking flange (921) and the second docking flange (922) are configured to be flanges, the water spray disc (923) is configured to be a circular disc-shaped body with water spray holes on the peripheral side, and the inner gear disc (924) is configured to be an inner gear body, and the power gear ( 925) and the supporting gear (926) are respectively arranged as column gears with annular grooves on the peripheral side surfaces and the first supporting claw beam (927) is arranged as an L-shaped rod-shaped body, the connecting rod (928) is arranged as a rod-shaped body and the cleaning brush (929) is arranged as an industrial brush body, three first supporting claw beams (927) are arranged to be arranged and distributed along the circumference of the inner gear disc (924) and two supporting gears (926) and one power gear (925) are respectively arranged on the three first supporting claw beams (927), and the pipeline cleaning machine (92) is arranged to be connected to the first trailer (3).
12. The drainage pipe arrangement device for the central urban area according to claim 1 is characterized in that: The image pickup device (93) is configured to include a third docking flange (931), a fourth docking flange (932), a first intermediate support plate (933), a second support claw beam (934), a camera (935), a tightening screw (936) and an illuminating lamp (937), and one end of the second support claw beam (934) is configured to be connected to the inner end face portion of the third docking flange (931) and the inner end face portion of the fourth docking flange (932), and the other end of the second support claw beam (934) is configured to be connected to the inner wall of the hole of the first intermediate support plate (933) and to be connected to the inner wall of the hole of the first intermediate support plate (933). The support plate (933) is provided with a second mounting hole (9351) and a threaded hole (9352), the second mounting hole (9351) is provided to be accommodatedly connected with the camera (935) and the threaded hole (9352) is provided to be connected with the top tightening screw (936), the inner end of the top tightening screw (936) is provided to be contact-connected with the camera (935) and the second supporting claw beam (934) is provided to be connected with the lamp holder of the lighting lamp (937), the third docking flange plate (931) and the fourth docking flange plate (932) are provided to be flanges respectively and the first intermediate support plate (933) is provided to be annular The second support claw beam (934) is configured as an L-shaped rod-shaped body and the vertical end of the second support claw beam (934) is configured to be connected to the first intermediate support plate (933), the oblique end of the second support claw beam (934) is respectively configured to be connected to the third docking flange (931) and the fourth docking flange (932) and the camera (935) is configured as a digital camera, the tightening screw (936) is configured as a hexagonal bolt and the lighting lamp (937) is configured as an LED lighting lamp, the second mounting hole body (9351) and the threaded hole body (9352) are respectively configured as circular hole bodies and the threaded hole body (93 The inner port portion of the mounting hole (9351) is arranged to be interconnected with the second mounting hole body (9351), the second mounting hole body (9351) and the threaded hole body (9352) are arranged to be spaced apart along the circumference of the first intermediate support plate (933), and the second support claw beam (934) and the lighting lamp (937) are arranged to be spaced apart along the circumference of the first intermediate support plate (933), the image pickup machine (93) is arranged to be connected to the second trailer (4), and the third docking flange (931) and the fourth docking flange (932) are arranged to be connected to the moving frame (91) through connecting bolts and nuts.
13. The drainage pipe arrangement device for the central urban area according to claim 1 is characterized in that: The pipeline inner wall repair machine (94) is configured to include a fifth docking flange (941), a sixth docking flange (942), a second intermediate support plate (943), a third support claw beam (944), a corner block (945), a second inflatable ring bag (946), a second stop valve (947), a side support plate (948), a swing rod (949) and a heating lamp (940), and one end of the third support claw beam (944) is respectively configured to be connected to the inner end face portion of the fifth docking flange (941) and the inner end face portion of the sixth docking flange (942), and the other end of the third support claw beam (944) is respectively configured to be connected to the side surface of the second intermediate support plate (943). The second intermediate support plate (943) is connected to the inner end face of the corner block (945) and is provided with a third mounting hole body (9431), the inflation tube of the second inflatable ring bag (946) is provided to be connected in series with the third mounting hole body (9431) and the outer port portion of the inflation tube of the second inflatable ring bag (946) is provided to be connected to the inner port portion of the second stop valve (947), the outer port portion of the second stop valve (947) is provided to be connected to the air compressor unit (8) and the inner side surface portion of the second inflatable ring bag (946) is provided to be connected in contact with the outer end face portions of the second intermediate support plate (943) and the corner block (945), and the inner hole wall of the side support plate (948) is provided to be connected to the outer end face portions of the second intermediate support plate (943) and the corner block (945). The third support claw beam (944) is connected between the sixth docking flange (942) and the second intermediate support plate (943), and one end of the swing rod (949) is arranged to be connected to the outer side surface of the side support plate (948), and the other end of the swing rod (949) is arranged to be connected to the lamp holder of the heating lamp (940), and the pipeline inner wall repair machine (94) is arranged to be connected to the second trailer (4), the fifth docking flange (941) and the sixth docking flange (942) are respectively arranged to be connected to the moving frame (91) through connecting bolts and nuts, and the fifth docking flange (941) and the sixth docking flange (942) are respectively arranged to be flanges, and the second intermediate support plate (943) and the side support plate (948) are respectively configured as circular ring bodies, the third support claw beam (944) and the swing rod (949) are configured as strip bodies and the corner block (945) is configured as a seat body, the second inflatable ring bag (946) is configured as an annular air sac and the second stop valve (947) is configured as a spherical stop valve, the heating lamp (940) is configured as a ceramic heating lamp and the third mounting hole body (9431) is configured as a circular hole body, the third support claw beam (944) and the corner block (945) are respectively configured as spaced-apart arrangements along the circumference of the second intermediate support plate (943) and the swing rod (949) and the heating lamp (940) are respectively configured as spaced-apart arrangements along the circumference of the side support plate (948).
14. The drainage pipe arrangement device for use in a central urban area according to any one of claims 1 to 13, characterized in that: The first plugging device (1), the second plugging device (2), the first hoist (5), the second hoist (6), the high-pressure pump group (7), the air compressor group (8), the pipeline crawling machine (9), the mobile frame (91), the pipeline cleaning machine (92) and the image pickup machine (93) and the pipeline inner wall repairing machine (94) are arranged in a manner of inner wall repair and the ... The traveling machine (9), the mobile frame (91), the pipeline cleaning machine (92), the image pickup machine (93) and the pipeline inner wall repairing machine (94) are arranged to be distributed in a motorized transport manner with the first trailer (3) and the second trailer (4); the fifth docking flange (941), the sixth docking flange (942), the third docking flange (931), the fourth docking flange (932), the first docking flange (921) and the second docking flange (922) are arranged to be connected to the connecting flange (911), respectively.
15. A drainage pipe tidying method for a drainage pipe tidying device in a central urban area according to claim 1, characterized in that the steps are: The basic component device drives the functional component device to move in the drainage pipe section that needs to be sorted out, and the functional component device cleans, detects and repairs the inner wall of the drainage pipe section that needs to be sorted out.
16. The drainage pipe tidying method according to claim 15, characterized in that the steps are: When the drainage pipe is to be arranged, the mobile chassis is connected to the towing hook of the first trailer (3), the first trailer (3) is placed on the vertical shaft of the lower part of the drainage pipe section to be arranged, the rotating wheel (33) on the first trailer (3) is placed on the upper end of the vertical shaft of the lower part of the drainage pipe section to be arranged, the mobile chassis is separated from the towing hook of the first trailer (3), the mobile chassis is connected to the towing hook of the second trailer (4), the second trailer (4) is placed on the vertical shaft of the upper part of the drainage pipe section to be arranged, the rotating wheel (33) on the second trailer (4) is placed on the upper end of the vertical shaft of the upper part of the drainage pipe section to be arranged, the mobile chassis is separated from the towing hook of the second trailer (4), and the first plugging device (1) is placed in the vertical shaft of the lower part of the drainage pipe section to be arranged , place the second plug (2) in the vertical shaft of the upper part of the drainage pipe section to be arranged, place the support seat (11) at the bottom of the vertical shaft, install the anchor rod in the open groove body (112), install the support seat (11) on the bottom of the vertical shaft through the anchor rod, make the inner plate (12) move up and down on the sliding hole body (111) to adjust, make the inner plate (12) located at the center of the drainage pipe, make the top nut (14) rotate on the screw shaft (13), make the top nut (14) act on the vertical part of the support seat (11), so that the inner plate (12) is installed on the support seat (11), connect the outer port of the first stop valve (17) with the air compressor unit (8), make the air compressor unit (8) in working state, make the first stop valve (17) ) is in an open state, the air compressor unit (8) injects high-pressure air into the first inflatable ring bag (16), so that the first inflatable ring bag (16) is in an expanded state in the receiving tank body (121) and the receiving tank plate (15), so that the first inflatable ring bag (16) located on the first plug (1) blocks the port of the lower part of the drainage pipe section that needs to be sorted out, and the first inflatable ring bag (16) located on the second plug (2) blocks the port of the upper part of the drainage pipe section that needs to be sorted out, and then the first stop valve (17) is in a closed state, so that the air compressor unit (8) is in a non-working state, and the output pipe of the air compressor unit (8) is placed in the drainage pipe section to put the air compressor unit (8) in a working state, and the air compressor unit (8) is used to sort out the drainage pipe section. Inflation treatment, placing the input pipe of the high-pressure pump group (7) into the drainage pipe section that needs to be sorted out, making the high-pressure pump group (7) in a working state, and the sewage in the drainage pipe section that needs to be sorted out is discharged by the high-pressure pump group (7). When the sewage in the drainage pipe section that needs to be sorted out is completely discharged, the high-pressure pump group (7) is placed in a non-working state. When the oxygen content of the air in the drainage pipe section that needs to be sorted out reaches the operating standard, the air compressor group (8) is placed in a non-working state, and the pipeline crawler (9) is placed from the vertical shaft of the upper part of the drainage pipe section that needs to be sorted out into the drainage pipe section that needs to be sorted out, and the steel wire rope of the second winch (6) is placed on the rotating wheel (33) located on the second trailer (4), and the end of the steel wire rope of the second winch (6) is connected to the pipeline crawler (9).The pipeline crawler (9) is moved in the drainage pipe section that needs to be sorted out, and the second winch (6) is rotated in the opposite direction, so that the steel wire rope of the second winch (6) is in a released state, driving the steel wire rope of the second winch (6) to move in the drainage pipe section that needs to be sorted out. When the pipeline crawler (9) reaches the vertical shaft of the lower part of the drainage pipe section that needs to be sorted out, the pipeline crawler (9) is taken out from the vertical shaft of the lower part of the drainage pipe section that needs to be sorted out, so that the steel wire rope of the second winch (6) is placed in the drainage pipe section that needs to be sorted out, and the first movable frame (91) is placed in the vertical shaft of the lower part of the drainage pipe section that needs to be sorted out, and the second through hole body (9135) located on the first movable frame (91) is connected to the steel wire rope of the second winch (6) The first moving frame (916) and the second moving frame (917) are placed together in the drainage pipe section to be arranged, and the adjusting screw (914) on the first moving frame (91) is rotated in the threaded hole body of the ear seat portion (9111) on the first moving frame (91) and the first through hole body (9132) on the first moving frame (91), so that the swing frame (913) on the first moving frame (91) swings on the intermediate shaft (912) on the first moving frame (91), so that the connecting flange (911) on the first moving frame (91) is located at the center of the drainage pipe, and the second moving frame (91) is placed under the drainage pipe section to be arranged. In the vertical shaft of the second moving frame (91), the second through hole body (9135) on the second moving frame (91) is connected with the steel wire rope of the first hoist (5), the first running wheel (916) and the second running wheel (917) on the second moving frame (91) are placed in the drainage pipe section to be arranged, the adjusting screw rod (914) on the second moving frame (91) is rotated in the threaded hole body of the ear seat part (9111) on the second moving frame (91) and the first through hole body (9132) on the second moving frame (91), the swing frame (913) on the second moving frame (91) is swung on the intermediate shaft (912) on the second moving frame (91), and the second moving frame (913) is swung. 1) is located at the center of the drainage pipe, so that the connecting flange (911) is centered in the drainage pipe, the pipe cleaning machine (92) is placed in the vertical shaft of the lower part of the drainage pipe section to be cleaned, the first docking flange (921) is connected to the connecting flange (911) located on the first mobile frame (91) through connecting bolts and nuts, the second docking flange (922) is connected to the connecting flange (911) located on the second mobile frame (91) through connecting bolts and nuts, the water spray plate (923) is connected to the output port of one of the high-pressure pumps of the high-pressure pump group (7) through a pipeline, and the input port of one of the high-pressure pumps of the high-pressure pump group (7) is connected to the water tank through a pipeline,The pipe on the input port of another high-pressure pump of the high-pressure pump group (7) is placed in the vertical shaft of the lower part of the drainage pipe section to be sorted, and the first hoist (5), the second hoist (6), the high-pressure pump group (7) and the motor on the power gear (925) are in working state. The water spray disc (923) and the inner gear disc (924) move in the drainage pipe section to be sorted, so that the high-pressure water flow is sprayed toward the inner wall of the drainage pipe through the water spray hole of the water spray disc (923), and the inner gear disc (924) rotates on the power gear (925) and the support gear (926), so that the cleaning brush (929) sweeps the inner wall of the drainage pipe, and the sewage generated by cleaning flows back to the vertical shaft of the lower part of the drainage pipe section to be sorted. Another high-pressure pump of the high-pressure pump group (7) discharges sewage to clean the inner wall of the drainage pipe. After the cleaning of the inner wall of the drainage pipe is completed, the first hoist (5), the second hoist (6), the high-pressure pump group (7) and the motor on the power gear (925) are placed in a non-working state. The first docking flange (921) is separated from the connecting flange (911) on the first movable frame (91) by connecting bolts and nuts, and the second docking flange (922) is separated from the connecting flange (911) on the second movable frame (91). The pipe cleaning machine (92) is lifted out of the vertical shaft of the lower part of the drainage pipe section to be cleaned, and the first movable frame (91) is connected to the first movable frame (91). ) is connected to the connecting flange (911) on the second movable frame (91) through connecting bolts and nuts, and the first movable frame (91) and the second movable frame (91) are driven to move in the drainage pipe through the first hoist (5) and the second hoist (6) to reach the vertical shaft of the upper part of the drainage pipe section that needs to be arranged, and the connecting flange (911) on the first movable frame (91) is separated from the connecting flange (911) on the second movable frame (91), and the image pickup machine (93) is placed in the vertical shaft of the upper part of the drainage pipe section that needs to be arranged, and the third docking flange (931) is connected to the connecting flange (931) on the first movable frame (91) through connecting bolts and nuts. The connecting flange (911) on the drain pipe is connected, and the fourth docking flange (932) is connected to the connecting flange (911) on the second movable frame (91) through connecting bolts and nuts, so that the first hoist (5), the second hoist (6), the camera (935) and the lighting lamp (937) are in working state, the first intermediate support plate (933) moves in the drainage pipe section that needs to be sorted, and the camera (935) picks up image signals from the inner wall of the drainage pipe to realize image detection processing on the inner wall of the drainage pipe to obtain the accurate position of the damaged part of the drainage pipe. After completing the image detection processing on the inner wall of the drainage pipe, the image pickup machine (93) is returned to the vertical shaft of the upper part of the drainage pipe section.The first hoist (5), the second hoist (6), the camera (935) and the lighting lamp (937) are placed in a non-working state, the third docking flange (931) is separated from the connecting flange (911) on the first movable frame (91), the fourth docking flange (932) is separated from the connecting flange (911) on the second movable frame (91), the image pickup machine (93) is lifted out of the vertical shaft of the upper part of the drainage pipe section to be repaired, the glass fiber cloth is wrapped around the diameter of the drainage pipe, the adhesive resin is applied to the outer surface of the glass fiber cloth, and then the glass fiber cloth is wrapped around for at least three times to obtain a repair sleeve for the drainage pipe, and the repair sleeve is connected to the drain pipe. The second inflatable ring bag (946) is installed, and then a 3-6 mm adhesive resin layer is applied to the outer surface of the repair sleeve of the drainage pipe. The pipe inner wall repair machine (94) is placed in the vertical shaft of the upper part of the drainage pipe section, and the fifth docking flange (941) is connected to the connecting flange (911) located on the first movable frame (91) through connecting bolts and nuts, and the sixth docking flange (942) is connected to the connecting flange (911) located on the second movable frame (91) through connecting bolts and nuts. The outer port of the second stop valve (947) is connected to the air compressor unit (8) through a pipeline, so that the second stop valve (947) is in an open state, and the first winch (5) and the second winch (6) are in In the working state, the second middle support plate (943) and the side support plate (948) move in the drainage pipe section that needs to be repaired. When the second middle support plate (943) reaches the damaged part of the drainage pipe, the first winch (5) and the second winch (6) are placed in a non-working state, and the repair sleeve is placed on the damaged part of the drainage pipe. Then, the air compressor unit (8) is placed in a working state, and the air compressor unit (8) inflates the second inflatable ring bag (946). When the second inflatable ring bag (946) is in an expanded state, the adhesive resin layer of the repair sleeve is connected to the damaged part of the drainage pipe. The air compressor unit (8) is placed in a non-working state, and the second inflatable ring bag (946) is deflated. 946) is separated from the repair sleeve, and then the first winch (5) and the second winch (6) are put into working state, and the second intermediate support plate (943) and the side support plate (948) are moved in the drainage pipe section. When the heating lamp (940) reaches the repair sleeve, the first winch (5) and the second winch (6) are put into non-working state, and the heating lamp (940) is put into working state to cure the adhesive resin in the repair sleeve. After the curing of the adhesive resin in the repair sleeve is completed, the heating lamp (940) is put into non-working state, and the first winch (5) and the second winch (6) are put into working state again, and the pipeline inner wall repair machine (94) is moved to the vertical shaft of the upper part of the drainage pipe section.The fifth docking flange (941) is separated from the connecting flange (911) on the first movable frame (91), the sixth docking flange (942) is separated from the connecting flange (911) on the second movable frame (91), the pipeline inner wall repair machine (94) is lifted out of the vertical shaft of the upper part of the drainage pipe section, the second through hole body (9135) on the first movable frame (91) is separated from the steel wire rope of the second hoist (6), the second through hole body (9135) on the second movable frame (91) is separated from the steel wire rope of the first hoist (5), and the movable frame is (91) is lifted out of the vertical shaft of the upper part of the drainage pipe section, the steel wire rope of the second winch (6) and the steel wire rope of the first winch (5) are respectively reeled in, the first stop valve (17) is in an open state, the high-pressure air in the first inflatable ring bag (16) is released, the first inflatable ring bag (16) is in an empty state, the anchor rod is taken out from the open groove body (112) and the bottom of the vertical shaft, the first plugging device (1) is lifted out of the vertical shaft of the lower part of the drainage pipe section, and the second plugging device (2) is lifted out of the vertical shaft of the upper part of the drainage pipe section, thereby completing the drainage pipe section.
