A sliding track type hanging basket system

Through the sliding track-type hanging basket system, the horizontal and large-area construction at the bottom of the large-span ultra-high corridor is solved, and the existing technology is difficult to meet the needs of special-shaped facade installation, achieving the effect of material transportation and precise installation.

CN116025142BActive Publication Date: 2025-03-25GUANGDONG NO 1 CONSTRUCTION ENGINEERING CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202310248691.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-03-15
Publication Date
2025-03-25
Estimated Expiration
2043-03-15

AI Technical Summary

Technical Problem

The prior art is difficult to carry out large-scale construction in the bottom of a large-span ultra-high corridor, and the ordinary hanging basket supports are insufficient to meet the needs of installation of special-shaped facades.

Method used

The sliding track-type hanging basket system is adopted, including cantilever bracket, first track, second track, fasteners, track crawlers and hanging baskets. It walks on pre-installed tracks through large cantilever sliding tracks to meet the precise adjustment of material transportation and the ceiling aluminum plate at the bottom of the corridor.

Benefits of technology

The horizontal large-area construction at the bottom of the large-span ultra-high corridor has been achieved, ensuring material transportation and precise installation, improving the stability and safety of construction, and overcoming the problem of insufficient stability of ordinary hanging basket brackets.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116025142B_ABST
    Figure CN116025142B_ABST
Patent Text Reader

Abstract

The present invention provides a sliding track type hanging basket system, comprising: a cantilever bracket, the cantilever bracket is installed on the special-shaped side surface of the bottom corridor; the free end of the cantilever bracket extends out of the bottom corridor; a first track, the first track is installed at the bottom of the bottom corridor; a second track, the second track is installed on the free end of the cantilever bracket; the second track is parallel to the first track; a fastener, the fastener is installed on the upper corridor; the fastener is connected to the free end of the cantilever bracket through a steel wire rope; a track crawler, the track crawler is respectively installed on the first track and the second track; a hanging basket, hoists are respectively provided at both ends of the hanging basket; the hoists at both ends are respectively connected to the track crawlers on the first track and the second track through steel wire ropes. This scheme realizes large-scale horizontal construction under the corridor bridge, with good working conditions, safe walking of workers under the ceiling, and good operating conditions.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of large-span and ultra-high corridor bottom construction equipment, and in particular to a sliding track type hanging basket system. Background Art

[0002] With the rapid development of my country's industry, steel structures are getting taller, larger in scale and span, and more complex in shape. More large-span venues, high-rise buildings, structures, and small and medium-sized buildings are using steel structures, such as high-altitude cantilevered steel structure pedestrian corridors. These special-shaped steel structures have complex facades and most of the curtain walls are curved. Not only are they difficult to construct, but with the development of construction technology, multiple types of work are being constructed simultaneously and project time is being compressed. For example, if the bottom garden landscape project needs to meet deadlines, it needs to be constructed simultaneously. The garden landscape has undulating terrain, and lightweight backfill materials are arranged in an interlaced manner, so it is impossible to set up a full-floor scaffolding; or the subway cover is limited to a load of 2t / m 2 , large cranes cannot travel to the bottom of the corridor to carry out full-coverage lifting operations; if a self-propelled straight-arm lifting platform is used, the installation efficiency is low, and the middle of the corridor is a construction blind spot. The straight arm extension length and height are insufficient, and precise construction cannot be carried out. The Chinese utility model patent with application number 202221033277 discloses a special-shaped facade hanging track-type mobile hanging basket, including: multiple support structures distributed around the outer contour of the building, the support structures are fixed to the standard layer or roof layer of the building structure; electric hoist tracks, connected to each of the support structures; hanging basket tracks, connected to each of the support structures, located on the outside of the electric hoist tracks, and equidistantly distributed with the electric hoist tracks; however, this solution can only move linearly to carry out side construction of the building, and cannot carry out large-scale horizontal construction like the bottom of the corridor bridge. Summary of the invention

[0003] In order to solve the above problems, the present invention provides a sliding track type hanging basket system, which is suitable for large-area horizontal construction like the bottom of a corridor bridge.

[0004] To achieve the above object, the technical solution adopted by the present invention is as follows:

[0005] A sliding track type hanging basket system, comprising:

[0006] A cantilever bracket, wherein the cantilever bracket is installed on the irregular side surface of the bottom corridor; the free end of the cantilever bracket extends outside the bottom corridor;

[0007] A first track, the first track being installed at the bottom of the ground floor corridor;

[0008] A second track, the second track being mounted on a free end of the cantilever bracket; the second track being parallel to the first track;

[0009] A fastener, the fastener is installed on the upper corridor; the fastener is connected to the free end of the cantilever bracket through a steel wire rope;

[0010] A track crawler, the track crawler is installed on the first track and the second track respectively; the track crawler is provided with a pulley;

[0011] A hanging basket, wherein hoists are respectively arranged at both ends of the hanging basket; the hoists at both ends are respectively connected to the pulleys of the track crawlers on the first track and the second track through steel wire ropes.

[0012] Furthermore, the first rail and the second rail are both made of I-beams.

[0013] Furthermore, the cantilever bracket includes:

[0014] A plurality of vertical poles, the bottom ends of which are installed on the special-shaped side surfaces of the ground floor corridor through embedded parts;

[0015] A cross bar, wherein the fixed end of the cross bar is mounted on the top end of the vertical bar; the second track is mounted on the bottom surface of the free end of the cross bar; an ear plate is provided on the top surface of the free end of the cross bar; and the ear plate is connected to a fastener through a steel wire rope.

[0016] Furthermore, the embedded parts include:

[0017] Embedded panels, which are pre-embedded on the ground floor corridor;

[0018] A connecting L-plate is welded to the embedded plate; the bottom end of the vertical pole is mounted on the connecting L-plate by bolts.

[0019] Furthermore, the embedded plate includes:

[0020] Plates;

[0021] A plurality of L-shaped anchor bars are welded on both sides of the plate; one side of the L-shaped anchor bar is vertically welded to the plate, and the other side is parallel to the plate.

[0022] Furthermore, the L-shaped anchor bars on both sides of the plate face in opposite directions.

[0023] Furthermore, the vertical poles and horizontal poles are both made of I-beam structure.

[0024] Furthermore, the first track is installed on the main steel structure at the bottom of the ground floor corridor through connecting steel passages.

[0025] Furthermore, the track crawler is a manual crawler.

[0026] Furthermore, a front auxiliary crawler is provided in front of the track crawler, and a rear auxiliary crawler is provided at the rear; the track crawler is connected to the front auxiliary crawler and the rear auxiliary crawler through a connecting rod; the front auxiliary crawler is connected to the left side of one end of the hanging basket; the rear auxiliary crawler is connected to the right side of one end of the hanging basket.

[0027] The present invention provides a sliding track type hanging basket system, comprising: a cantilever bracket, the cantilever bracket is installed on the special-shaped side of the bottom corridor; the free end of the cantilever bracket extends outside the bottom corridor; a first track, the first track is installed at the bottom of the bottom corridor; a second track, the second track is installed on the free end of the cantilever bracket; the second track is parallel to the first track; a fastener, the fastener is installed on the upper corridor; the fastener is connected to the free end of the cantilever bracket through a steel wire rope; a track crawler, the track crawler is respectively installed on the first track and the second track; a hanging basket, hoists are respectively provided at both ends of the hanging basket; the hoists at both ends are respectively connected to the track crawlers on the first track and the second track through steel wire ropes. By adopting a large cantilever sliding track type hanging basket, walking on the pre-installed track, it can meet the transportation of materials, the precise adjustment of the ceiling aluminum plate at the bottom of the corridor, and the fixed-point installation can be achieved. The working conditions are good, and the workers can walk safely under the ceiling. The operating conditions are good, and the above difficulties are effectively overcome. By setting up elevated steel supports and structural anchors, the problem of ordinary hanging basket supports being insufficiently stable and unable to meet the requirements of on-site special-shaped facade installation is solved. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 It is a front view structural schematic diagram of a sliding track type hanging basket system;

[0029] Figure 2 It is a structural schematic diagram of the cantilever bracket;

[0030] Figure 3 It is a structural schematic diagram of the embedded plate;

[0031] Figure 4 is a schematic diagram of the connection structure between the second track and the track crawler;

[0032] Figure 5 is a schematic diagram of the connection structure between the first track and the track crawler;

[0033] Figure 6 It is a right view structural schematic diagram of the sliding track type hanging basket system.

[0034] Explanation of the attached icons: cantilever bracket 1, vertical pole 11, horizontal pole 12, embedded parts 13, embedded plate 131, connecting L plate 132, plate 133, L-shaped anchor bar 134, ear plate 14, first track 2, second track 3, connecting steel passage 31, fastener 4, track crawler 5, pulley 51, front auxiliary crawler 52, rear auxiliary crawler 53, connecting rod 54, hanging basket 6, hoist 61, ground floor corridor 7, upper floor corridor 8, steel wire rope 9, first steel wire rope 91, second steel wire rope 92. DETAILED DESCRIPTION

[0035] The embodiments of the present disclosure are described in detail below with reference to the accompanying drawings.

[0036] The following describes the embodiments of the present disclosure through specific examples, and those skilled in the art can easily understand other advantages and effects of the present disclosure from the contents disclosed in this specification. Obviously, the described embodiments are only a part of the embodiments of the present disclosure, rather than all of the embodiments. The present disclosure can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present disclosure. It should be noted that the following embodiments and features in the embodiments can be combined with each other without conflict. Based on the embodiments in the present disclosure, all other embodiments obtained by ordinary technicians in the field without making creative work are within the scope of protection of the present disclosure.

[0037] Embodiment 1

[0038] like Figure 1 The figure shows a structural schematic diagram of a sliding track type hanging basket system, including:

[0039] A cantilever bracket 1, wherein the cantilever bracket 1 is installed on the irregular side surface of the bottom corridor 7; the free end of the cantilever bracket 1 extends out of the bottom corridor 7;

[0040] A first track 2, wherein the first track 2 is installed at the bottom of the ground floor corridor 7;

[0041] A second track 3, wherein the second track 3 is mounted on a free end of the cantilever bracket 1; the second track 3 is parallel to the first track 2;

[0042] A fastener 4, wherein the fastener 4 is installed on the upper corridor 8; the fastener 4 is connected to the free end of the cantilever bracket 1 through a steel wire rope 9;

[0043] A track crawler 5, which is installed on the first track 2 and the second track 3 respectively; a pulley 51 is provided on the track crawler 5;

[0044] The hanging basket 6 has hoists 61 at both ends, and the hoists 61 at both ends are connected to the track crawlers 5 on the first track 2 and the second track 3 respectively through steel wire ropes 9. For the hanging basket 6, the hoist 61 is fixed to the designated position behind the hanging arm of the hanging basket 6 with a pin, a locking pin and a bolt, and the spring of the locking pin must be leveled and locked. The electrical box is hung on the rear railing of the hanging basket 6, the centrifugal trigger safety lock is installed on the support plate in the middle of the hanging arm, and the upper limit switch is installed on the top of the hanging arm, so that when the hanging basket 6 rises to the specified position, the upper limit switch is triggered, and then the rise is stopped, so as to achieve the safety protection of the lifting.

[0045] In some projects, the north-south curvature of the bottom plane of the corridor ceiling is different, and the sliding track of the hanging basket 6 needs to be kept parallel. Therefore, an 18# I-beam welded cantilever bracket 1 is used to fix the second track 3 on the outside. The cantilever length of the cantilever bracket 1 is adaptively applied according to the size of the curvature, so that the first track 2 and the second track 3 remain parallel.

[0046] In the specific implementation, the first rail 2 and the second rail 3 are both made of I-beam, specifically 18# I-beam, each hanging basket 6 has two hanging points, and two hanging basket hoists 61 are used to lift the hanging basket 6 platform. Each hanging point is connected to the 18# I-beam beam by a manual track crawler 5, and the hanging basket 6 is hung on the track crawler 5 by a shackle. Because the hanging basket 6 has many auxiliary ropes, in order to avoid swaying in the air and twisting, the auxiliary rope is hung with a heavy hammer and is 1.5m away from the bottom plate of the hanging basket 6.

[0047] In a specific implementation, the cantilever bracket 1 includes: a plurality of vertical poles 11, the bottom ends of the vertical poles 11 are installed on the special-shaped side surfaces of the ground floor corridor 7 through embedded parts 13; a cross bar 12, the fixed end of the cross bar 12 is installed on the top of the vertical pole 11; the second track 3 is installed on the bottom surface of the free end of the cross bar 12; the top surface of the free end of the cross bar 12 is provided with an ear plate 14; the ear plate 14 is connected to the fastener 4 through a steel wire rope 9. Further, the vertical poles 11 and the cross bar 12 are both I-beam structures.

[0048] In a specific implementation, the embedded part 13 includes: an embedded plate 131, which is pre-embedded on the ground floor corridor 7; a connecting L plate 132, which is welded on the embedded plate 131; and the bottom end of the vertical pole 11 is installed on the connecting L plate 132 by bolts. Further, the embedded plate 131 includes: a plate 133; a plurality of L-shaped anchor bars 134, which are welded on both sides of the plate 133; one side of the L-shaped anchor bar 134 is vertically welded on the plate 133, and the other side is parallel to the plate 133. Further, the L-shaped anchor bars 134 on both sides of the plate 133 face opposite directions. The embedded plate 131 has a simple structure, and its connection with the ground floor corridor 7 is reliable. Moreover, the connecting L plate 132 can be removed after construction, which is convenient for subsequent construction operations.

[0049] In a specific implementation, the first rail 2 is installed on the main steel structure at the bottom of the ground floor corridor 7 through a connecting steel through 31, the connecting steel through 31 is welded to the main steel structure, and the first rail 2 is welded to the connecting steel through 31 to increase the stability of the connection.

[0050] In a specific implementation, the track crawler 5 adopts a manual crawler, and the platform of the hanging basket 6 is horizontally moved by the manual crawler, which reduces costs and facilitates employees to perform delicate operations.

[0051] In the specific implementation, in order to ensure the safety of construction workers in the hanging basket 6 platform, ear plates 14 are installed at the bottom of the steel corridor, and four east-west safety steel wire ropes 9 are set in the north-south direction. The steel wire ropes 9 are connected to the main steel structure through the ear plates 14. During construction, the safety ropes of the construction workers in the hanging basket 6 are connected to the safety steel wire ropes 9.

[0052] During the high-altitude operation of the hanging basket 6, another factor that affects safety is strong wind. Strong wind will blow the hanging basket 6 to swing left and right, causing the personnel to stand unsteadily, and there is a risk of falling of objects and personnel. At present, to prevent the hanging basket 6 from shaking, ropes or rods are often used to connect the hanging basket 6 to the building again to stabilize the hanging basket 6, but the disadvantage is also obvious that it is inconvenient to move, and it has to be repeatedly untied and tied. The Chinese utility model with application number 201920357488 discloses a rail-type translatable electric hanging basket, in which a balance bar is connected and fixed between the lifting ears of the two translation vehicles, and the stabilizing frame includes two hanging rods fixedly connected to the balance bar, and a support rod is connected between the two hanging rods. A guide cylinder for inserting the hanging rod is fixed to the bottom of the hanging basket. The utility model uses a stabilizing frame to prevent the hanging basket from shaking. However, the structure of this scheme can only prevent the vertical shaking of the hanging basket. The side of the hanging basket is most exposed to wind force, and the side is also the most likely to cause lateral swing due to wind force. Due to the size restrictions of various structural parts, the balance bar and the hanging rod cannot be too large. When exposed to strong wind force, it is still easy to cause lateral shaking due to insufficient rigidity or breakage of the components or due to the gap between the translation vehicle and the rail (if there is no gap, the translation vehicle cannot move). In addition, due to the existence of the hanging rod, it is easy to bump into things when walking, using tools, or carrying materials during construction, which will affect the construction safety of workers. Therefore, the present scheme provides another scheme for stabilizing the hanging basket 6, wherein a front auxiliary crawler 52 is provided in front of the track crawler 5, and a rear auxiliary crawler 53 is provided in the rear; the track crawler 5 is connected to the front auxiliary crawler 52 and the rear auxiliary crawler 53 through a connecting rod 54 to prevent the front and rear auxiliary crawlers from moving closer to the track crawler 5 after being subjected to force, and at the same time, the track crawler 5 can also drive the front and rear auxiliary crawlers to move simultaneously when it is running; the front auxiliary crawler 52 is connected to the right side of one end of the hanging basket 6 through a steel wire rope 9; the rear auxiliary crawler 53 is connected to the left side of one end of the hanging basket 6 through a steel wire rope 9, and both ends of the hanging basket 6 are respectively pulled by three forces and form a stable triangular force-bearing structure with the track, which can better prevent the hanging basket 6 from shaking when blown by crosswind. Furthermore, the front auxiliary crawler 52 and the rear auxiliary crawler 53 are connected to the side bottom of the hanging basket 6 through the steel wire rope 9; the hoist 61 is installed on the upper part of the hanging basket 6, so that both the bottom and the upper part of the hanging basket 6 are subjected to tension, which prevents the hanging basket 6 from swinging slightly when it is stressed, and improves the stability of the hanging basket 6. At the same time, because the steel wire rope 9 is connected to the hanging basket 6 outside the two sides of the hanging basket 6, it does not occupy the operating space inside the hanging basket 6, which is convenient for workers to operate.

[0053] Furthermore, since the operation of the hanging basket 6 needs to be moved up and down at any time, and the stability of the hanging basket 6 needs to be increased as the wind force increases, there are two coaxial pulleys 51 on the track crawler 5, and the front and rear auxiliary crawlers 53 also have pulleys 51 respectively, and the hoist 61 is provided with two coaxial and same-sized winding wheels (not shown in the figure); one end of the first steel wire rope 91 is wound around the first winding wheel of the hoist 61, and the other end passes through the first pulley 51 of the track crawler 5 and the pulley 51 of the front auxiliary crawler 52 and is connected to the right side of one end of the hanging basket 6; one end of the second steel wire rope 92 is wound around the second winding wheel of the hoist 61, and the other end passes through the second pulley 51 of the track crawler 5 and the pulley 51 of the rear auxiliary crawler 53 and is connected to the left side of one end of the hanging basket 6. In this way, when the hoist 61 is lifting, as the hanging basket 6 rises, the steel wire ropes 9 on both sides are relaxed and return to the winding wheel of the hoist 61 through the pulley 51 of the auxiliary crawler and the track crawler 5, so that the tension can be stabilized in time during the process of the hanging basket 6 rising. When the hanging basket 6 is descending, after the steel wire ropes 9 between the hoist 61 and the track crawler 5 are relaxed, the steel wire ropes 9 can move through the pulley 51, so that the steel wire ropes 9 on both sides of the hanging basket 6 are also relaxed in time, and the hanging basket 6 can be put down while maintaining the tension. Whether the wheelless rising or falling process, the tension can be kept stable. At the same time, since the tension angle of the steel wire ropes 9 on both sides becomes larger after the rise, the lateral stability of the hanging basket 6 is stronger. When the worker encounters a very large wind, he can control the hanging basket 6 to rise to the corresponding height in time with one-touch operation, so that the hanging basket 6 is further stabilized.

[0054] Embodiment 2

[0055] The difference between this embodiment and the first embodiment is that the track crawler 5 is a remote-controlled crawler to increase the convenience of working operations.

[0056] The present invention provides a sliding track type hanging basket system, comprising: a cantilever bracket, the cantilever bracket is installed on the special-shaped side of the bottom corridor; the free end of the cantilever bracket extends outside the bottom corridor; a first track, the first track is installed at the bottom of the bottom corridor; a second track, the second track is installed on the free end of the cantilever bracket; the second track is parallel to the first track; a fastener, the fastener is installed on the upper corridor; the fastener is connected to the free end of the cantilever bracket through a steel wire rope; a track crawler, the track crawler is respectively installed on the first track and the second track; a hanging basket, hoists are respectively provided at both ends of the hanging basket; the hoists at both ends are respectively connected to the track crawlers on the first track and the second track through steel wire ropes. By adopting a large cantilever sliding track type hanging basket, walking on the pre-installed track, it can meet the transportation of materials, the precise adjustment of the ceiling aluminum plate at the bottom of the corridor, and the fixed-point installation can be achieved. The working conditions are good, and the workers can walk safely under the ceiling. The operating conditions are good, and the above difficulties are effectively overcome. By setting up elevated steel supports and structural anchors, the problem of ordinary hanging basket supports being insufficiently stable and unable to meet the requirements of on-site special-shaped facade installation is solved.

[0057] In the description of the present invention, it is necessary to understand that the terms "middle", "length", "up", "down", "front", "back", "vertical", "horizontal", "inside", "outside", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0058] In the present invention, unless otherwise clearly specified and limited, the first feature "on" the second feature may be that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. "Multiple" means at least two, such as two, three, etc., unless otherwise clearly and specifically limited.

[0059] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0060] The above is only for explaining the implementation mode of the present invention and is not intended to limit the present invention. For those skilled in the art, any modification, equivalent substitution, improvement, etc. made within the spirit and principle of the present invention without creative work should be included in the protection scope of the present invention.

Claims

1. A sliding track type hanging basket system, characterized in that: include: A cantilever bracket, wherein the cantilever bracket is installed on the irregular side surface of the ground floor corridor; The free end of the cantilever bracket extends outside the bottom corridor; A first track, the first track being installed at the bottom of the ground floor corridor; A second track, the second track being mounted on a free end of the cantilever bracket; the second track being parallel to the first track; A fastener, the fastener is installed on the upper corridor; the fastener is connected to the free end of the cantilever bracket through a steel wire rope; A track crawler, the track crawler is installed on the first track and the second track respectively; the track crawler is provided with a pulley; A hanging basket, wherein hoists are respectively provided at both ends of the hanging basket; the hoists at both ends are respectively connected to the pulleys of the track crawlers on the first track and the second track through steel wire ropes; A front auxiliary crawler is provided in front of the track crawler, and a rear auxiliary crawler is provided in the rear; the track crawler is connected to the front auxiliary crawler and the rear auxiliary crawler through a connecting rod; the front auxiliary crawler is connected to the left side of one end of the hanging basket; the rear auxiliary crawler is connected to the right side of one end of the hanging basket; The front auxiliary crawler and the rear auxiliary crawler are connected to the side bottom of the hanging basket through steel wire ropes; the hoist is installed on the upper part of the hanging basket, so that both the bottom and the upper part of the hanging basket are subjected to tension, which prevents the hanging basket from swinging slightly when subjected to force, thereby improving the stability of the hanging basket; at the same time, since the steel wire ropes are connected to the hanging basket outside the two sides of the hanging basket, the operating space inside the hanging basket is not occupied, which is convenient for workers to operate; There are two coaxial pulleys on the track crawler, and there are pulleys on the front and rear auxiliary crawlers respectively. The hoist is provided with two coaxial winding wheels of the same size; one end of the first wire rope is wound around the first winding wheel of the hoist, and the other end passes through the first pulley of the track crawler and the pulley of the front auxiliary crawler and is connected to the right side of one end of the hanging basket; one end of the second wire rope is wound around the second winding wheel of the hoist, and the other end passes through the second pulley of the track crawler and the pulley of the rear auxiliary crawler and is connected to the left side of one end of the hanging basket; in this way, when the hoist is lifting, the wire ropes on both sides are relaxed and pass through the auxiliary crawlers due to the rise of the hanging basket. The pulley of the track crawler returns to the hoist winding wheel, so that the hanging basket can be promptly tensioned and stabilized during the rising process; when the hanging basket is descending, after the wire rope between the hoist and the track crawler is relaxed, the wire rope can move through the pulley, so that the wire ropes on both sides of the hanging basket are also relaxed in time, and the hanging basket can be lowered but the tension can be maintained; the tension can be kept stable during the wheelless ascent or descent process. At the same time, since the tension angle of the wire ropes on both sides becomes larger after the ascent, the lateral stability of the hanging basket is stronger. When workers encounter extremely strong winds, they can promptly control the hanging basket to rise to the corresponding height with one-click operation, so that the hanging basket can be further stabilized.

2. The sliding track type hanging basket system according to claim 1, characterized in that: The first rail and the second rail are both made of I-beams.

3. The sliding track type hanging basket system according to claim 1, characterized in that: The cantilever bracket comprises: A plurality of vertical poles, the bottom ends of which are installed on the special-shaped side surfaces of the ground floor corridor through embedded parts; A cross bar, wherein the fixed end of the cross bar is mounted on the top end of the vertical bar; the second track is mounted on the bottom surface of the free end of the cross bar; an ear plate is provided on the top surface of the free end of the cross bar; and the ear plate is connected to a fastener through a steel wire rope.

4. The sliding track type hanging basket system according to claim 3, characterized in that: The embedded parts include: Embedded panels, which are pre-embedded on the ground floor corridor; A connecting L-plate is welded to the embedded plate; the bottom end of the vertical pole is mounted on the connecting L-plate by bolts.

5. The sliding track type hanging basket system according to claim 4, characterized in that: The embedded plate comprises: Plates; A plurality of L-shaped anchor bars are welded on both sides of the plate; one side of the L-shaped anchor bar is vertically welded to the plate, and the other side is parallel to the plate.

6. The sliding track type hanging basket system according to claim 5, characterized in that: The L-shaped anchor bars on both sides of the plate are oriented in opposite directions.

7. The sliding track type hanging basket system according to claim 3, characterized in that: The vertical poles and the horizontal poles are both made of I-beam structures.

8. The sliding track type hanging basket system according to claim 1, characterized in that: The first track is installed on the main steel structure at the bottom of the ground floor corridor through connecting steel tubes.

9. The sliding track type hanging basket system according to any one of claims 1 to 8, characterized in that: The track crawler is a manual crawler.

Citation Information

Patent Citations

  • Rail type translational electric hanging basket

    CN209702154U

  • Special-shaped external facade suspension rail type movable hanging basket

    CN217734783U

  • Hanger rail type electric hanging boat and high-rise long span house, bridge building construction method and use thereof

    CN101514586A

  • Safe and fast double-track construction platform of super high-rise curtain wall

    CN104088449A