A train controller resource inheritance method and device based on vehicle-to-vehicle communication

Through the resource request and authorization transfer between the on-board controller and the resource controller in the vehicle-to-vehicle communication system, resource inheritance between controllers is realized, which solves the switching problem caused by the loss of location information and device function failure, and improves the efficiency of the vehicle-to-vehicle communication system. Efficiency and stability of train operation.

CN116039707BActive Publication Date: 2024-10-18CASCO SIGNAL LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202211503886.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-11-28
Publication Date
2024-10-18
Estimated Expiration
2042-11-28

AI Technical Summary

Technical Problem

In the vehicle-to-vehicle communication signal system, how to realize mutual inheritance and smooth switching of resources between different controllers and solve the problem of controller switching caused by the loss of location information and equipment function failure.

Method used

The on-board controller sends the resource request area to the resource controller, compares the actual protection area and the resource area, calculates the union and complement, realizes resource storage and authorization transfer, and ensures resource inheritance during controller switching.

Benefits of technology

It realizes the smooth inheritance of resources between train controllers, improves operating efficiency, and avoids the problems of resource loss and discontinuous switching.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116039707B_ABST
    Figure CN116039707B_ABST
Patent Text Reader

Abstract

The present invention relates to a method and device for inheriting resources of a train controller based on vehicle-to-vehicle communication. The method comprises the following steps: Step 1: the vehicle controller CC sends a request for resource area Z1 to the resource controller WRC according to the area Z1 that is currently requesting resources; Step 2: after the resource controller WRC receives the request area sent by the vehicle controller CC, it sends the Z2 area to the vehicle controller CC according to the request of the vehicle controller CC, wherein Z2=Z1; Step 3: after the vehicle controller CC receives the area Z2 transmitted by the resource controller WRC, it compares the area with the actual protection area Z3 where it is located. If Z3 exceeds the area range of Z2, it proceeds to step 4; if not, it proceeds to step 5, etc. Compared with the prior art, the present invention has the advantages of realizing smooth inheritance of resources between train controllers and ensuring the operation efficiency of the train.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a train signal control system, and in particular to a train controller resource inheritance method and device based on vehicle-to-vehicle communication. Background Art

[0002] The train control system based on vehicle-to-vehicle communication is one of the development directions of the train control system. The system mainly uses the on-board controller as the main control device, calculates and plans the corresponding path through the on-board device, applies for relevant resources from the resource manager and obtains authorization. The on-board device controls the operation of the train safely and efficiently based on the obtained resource information and related restrictions.

[0003] In the current train-to-train communication signal system, due to the existence of situations such as loss of location information of on-board equipment and failure of equipment functions, corresponding redundant controllers need to be set up in the train-to-train communication signal system so that the train operation can continue to be completed in the face of emergencies.

[0004] However, how to solve the mutual inheritance of resources between different controllers and achieve smooth switching between controllers is a technical problem that needs to be studied and solved in the current vehicle-to-vehicle communication system. Summary of the invention

[0005] The purpose of the present invention is to overcome the defects of the above-mentioned prior art and to provide a train controller resource inheritance method and device based on vehicle-to-vehicle communication.

[0006] The purpose of the present invention can be achieved by the following technical solutions:

[0007] According to a first aspect of the present invention, a train controller resource inheritance method based on vehicle-to-vehicle communication is provided, comprising the following steps:

[0008] Step 1: The vehicle controller CC sends a request for resource zone Z1 to the resource controller WRC according to the zone Z1 for which resources are being requested at this time;

[0009] Step 2: After receiving the request area from the vehicle controller CC, the resource controller WRC sends the Z2 area to the vehicle controller CC according to the request of the vehicle controller CC, where Z2 = Z1;

[0010] Step 3: After receiving the area Z2 transmitted by the resource controller WRC, the onboard controller CC will compare the area with the actual protection area Z3 where it is located. If Z3 exceeds the area range of Z2, it will go to step 4; if not, it will go to step 5;

[0011] Step 4: After the vehicle controller CC triggers the emergency brake, it goes to step 6;

[0012] Step 5: The vehicle controller CC obtains the union of the protection area Z3 and the resource request area Z1, and then obtains the complement of each WRC area to obtain Z4, and sends Z4 to the resource controller WRC. The resource controller WRC stores the Z4 area sent by the vehicle controller CC;

[0013] Step 6: If the vehicle controller CC continues to control the vehicle, then return to step 1; otherwise, proceed to step 7;

[0014] Step 7: The trackside controller WTC applies to the resource controller WRC for vehicle control authorization;

[0015] Step 8: If the resource controller WRC allows the trackside controller WTC to control the train, then go to step 9, otherwise return to step 7;

[0016] Step 9: After receiving the vehicle control authorization from the resource controller WRC, the trackside controller WTC requests the resource controller WRC to obtain the resources of the vehicle controller CC;

[0017] Step 10, after receiving the request, the resource controller WRC sends the resource area Z4 stored in the onboard controller CC to the trackside controller WTC, so that the trackside controller WTC obtains the area previously stored by the onboard controller CC, thereby realizing resource inheritance of controller switching.

[0018] As a preferred technical solution, in the step 2, after receiving the request from the vehicle controller CC regarding the resource area, the resource controller WRC will send the Z1 area back to the vehicle controller CC to indicate confirmation.

[0019] As a preferred technical solution, in the step 3, the protection area Z3 where the train is located represents a region range, and the region range represents the region range where the train is located in the worst case.

[0020] As a preferred technical solution, in the step three, the area range of Z3 does not exceed Z2, indicating that the protection area of ​​the vehicle controller CC at this time is still within the applied resource range and does not exceed the authorized area, that is, the protection area of ​​Z3 is in a reasonable and correct state; if Z3 exceeds the Z2 area at this time, that is, an unauthorized area appears in Z3, it is in an unsafe state at this time.

[0021] As a preferred technical solution, in the step five, the area Z4 stored in the resource controller WRC is the complement of the union of the resource application area Z1 of the onboard controller CC and the protection area Z3, which is used to ensure that the resources owned by the onboard controller CC itself still exist, and also complete the storage task of the resource area of ​​the onboard controller CC, ensuring that the subsequent trackside controller WTC can successfully obtain the storage area of ​​the onboard controller CC.

[0022] As a preferred technical solution, in the step six, if the vehicle controller CC does not fail at this time, the vehicle controller CC will repeat the above resource storage process to ensure resource transition for subsequent controller switching.

[0023] As a preferred technical solution, when the onboard controller CC loses the right to control the vehicle, the trackside controller WTC takes over the control of the vehicle instead of the onboard controller CC.

[0024] As a preferred technical solution, the trackside controller WTC applies to the resource controller WRC for the right to control the vehicle. After the trackside controller WTC obtains the right to control the vehicle, the trackside controller WTC requests the resource controller WRC for the resources stored in the resource controller WRC by the on-board controller CC. After receiving the request from the trackside controller WTC, the resource controller WRC transfers the stored resources to the trackside controller WTC to achieve smooth inheritance of resources.

[0025] According to a second aspect of the present invention, there is provided a device for the train controller resource inheritance method based on vehicle-to-vehicle communication, comprising an onboard controller CC, a trackside controller WTC and a resource controller WRC.

[0026] As a preferred technical solution, the onboard controller CC is the main train controller, and the train is controlled by the onboard controller CC during normal operation;

[0027] The trackside controller WTC is a backup redundant train controller, which replaces the onboard controller CC to control the train in case the position information of the onboard controller CC is lost or the equipment function fails;

[0028] The resource controller WRC is responsible for distributing resources in the operating line to the train controller to ensure that the train can successfully obtain movement authorization in the line.

[0029] According to a third aspect of the present invention, there is provided an electronic device, comprising a memory and a processor, wherein a computer program is stored in the memory, and the method described above is implemented when the processor executes the program.

[0030] According to a fourth aspect of the present invention, there is provided a computer-readable storage medium having a computer program stored thereon, wherein the program implements the method described when executed by a processor.

[0031] Compared with the prior art, the present invention has the following advantages:

[0032] 1) The present invention coordinates the steps of sending, storing and restoring train resources among the onboard controller CC, the resource controller WRC and the trackside train controller WTC, thereby achieving smooth inheritance of resources between train controllers in the vehicle-to-vehicle communication system and ensuring the operation efficiency of the train.

[0033] 2) The present invention ensures that the resources owned by the onboard controller CC itself still exist by sending the complementary set area, avoiding the situation where the onboard controller CC loses its own resources and cannot operate after sending the resource area to the resource controller WRC. At the same time, the storage task of the resource area of ​​the onboard controller CC is also completed, ensuring that the subsequent trackside controller WTC can successfully obtain the storage area of ​​the onboard controller CC. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] Figure 1 is a schematic diagram of the device of the present invention;

[0035] Figure 2 Flow chart of the method of the present invention. DETAILED DESCRIPTION

[0036] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0037] like Figure 2 As shown, the train controller resource inheritance method based on vehicle-to-vehicle communication of the present invention comprises the following steps:

[0038] Step 1: The onboard controller CC sends a request for resource zone Z1 to the resource controller WRC according to the zone Z1 for which resources are being requested at the moment.

[0039] Step 2: After receiving the request area from the vehicle controller CC, the resource controller WRC sends the Z2 (Z2=Z1) area to the vehicle controller CC according to the request of the vehicle controller CC.

[0040] Step 3: After receiving the area Z2 transmitted by the resource controller WRC, the onboard controller CC will compare the area with the actual protection area Z3 where it is located. If Z3 exceeds the area range of Z2, it will go to step 4. If not, it will go to step 5.

[0041] Step 4: The vehicle controller CC triggers the emergency brake, and then enters step 6.

[0042] Step 5: The vehicle controller CC obtains the union of the protection area Z3 and the resource request area Z1, and then obtains the complement of each WRC area to obtain Z4, and sends Z4 to the resource controller WRC. The resource controller WRC stores the Z4 area sent by the vehicle controller CC;

[0043] Step 6: If the vehicle controller CC continues to control the vehicle at this time, return to step 1; otherwise, go to step 7.

[0044] Step 7: The onboard controller CC no longer controls the train, and the trackside controller WTC applies to the resource controller WRC for authorization to control the train;

[0045] Step 8: If the resource controller WRC allows the trackside controller WTC to control the train, then go to step 9, otherwise go to step 7;

[0046] Step 9: After receiving the vehicle control authorization from the resource controller WRC, the trackside controller WTC requests the resource controller WRC to re-educate (obtain the resources of the vehicle controller CC)

[0047] Step 10: After receiving the re-education request, the resource controller WRC sends the resource area Z4 stored in the onboard controller CC to the trackside controller WTC, so that the trackside controller WTC obtains the area previously stored by the onboard controller CC, thereby realizing resource inheritance of controller switching.

[0048] In step 1, before the vehicle controller CC obtains the resource area Z1, it needs to make a request to the resource controller WRC.

[0049] In step 2, after receiving the request from the vehicle controller CC about the resource area, the resource controller WRC will send the Z1 area back to the vehicle controller CC (the area is called Z2 at this time) to indicate confirmation.

[0050] The protection area Z3 where the train is located in step 3 represents a region range, which represents the region range where the train is located in the worst case.

[0051] In step 3, the area range of Z3 does not exceed Z2, which means that the protection area of ​​the vehicle controller CC is still within the resource range of the application and does not exceed the authorized area, that is, the protection area of ​​Z3 is in a reasonable and correct state. If Z3 exceeds the Z2 area at this time, that is, an unauthorized area appears in Z3, it is in an unsafe state at this time. This will lead to step 4, and the vehicle controller CC will trigger the emergency brake

[0052] In step 5, the area Z4 stored in the resource controller WRC is the complement of the union area of ​​the resource application area Z1 and the protection area Z3 of the vehicle controller CC. The purpose is to ensure that the resources owned by the vehicle controller CC itself still exist by sending the complement area, avoiding the situation where the vehicle controller CC loses its own resources and cannot operate after sending the resource area to the resource controller WRC. At the same time, the storage task of the resource area of ​​the vehicle controller CC is also completed, ensuring that the subsequent trackside controller WTC can successfully obtain the storage area of ​​the vehicle controller CC.

[0053] In step six, if the vehicle controller CC has not failed at this time, the vehicle controller CC will repeat the above resource storage process to ensure resource transition for subsequent controller switching.

[0054] In steps 7, 8, 9 and 10, when the onboard controller CC loses the right to control the vehicle, the trackside controller WTC replaces the onboard controller CC to control the vehicle. At this time, the trackside controller WTC will apply for the right to control the vehicle from the resource controller WRC. After the trackside controller WTC obtains the right to control the vehicle, the trackside controller WTC needs to request the resource controller WRC for the resources stored in the resource controller WRC by the onboard controller CC. After receiving the request from the trackside controller WTC, the resource controller WRC will pass the stored resources to the trackside controller WTC to achieve smooth inheritance of resources.

[0055] The above steps are the resource inheritance process of switching from CC to WTC, which is consistent with the process of switching from WTC to CC, so it will not be described in detail in this embodiment.

[0056] The above is an introduction to a method embodiment. The following is a further explanation of the solution of the present invention through an apparatus embodiment.

[0057] like Figure 1 As shown, the train controller resource inheritance device based on vehicle-to-vehicle communication mainly includes the onboard controller CC, the trackside controller WTC and the resource controller WRC. Among them, the onboard controller CC is the main train controller. During normal operation, the train is controlled by the onboard controller CC. The trackside controller WTC is a backup redundant train controller. In the case of loss of the position information of the onboard controller CC or failure of the equipment function, it replaces the onboard controller CC to control the train and ensure the normal operation of the train. The resource controller WRC is mainly responsible for distributing resources in the operating line to the train controller (CC, WTC), ensuring that the train can successfully obtain the mobile authorization in the line, thereby improving the actual operation efficiency.

[0058] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working process of the described module can refer to the corresponding process in the aforementioned method embodiment, and will not be repeated here.

[0059] The electronic device of the present invention includes a central processing unit (CPU), which can perform various appropriate actions and processes according to computer program instructions stored in a read-only memory (ROM) or loaded from a storage unit into a random access memory (RAM). In the RAM, various programs and data required for device operation can also be stored. The CPU, ROM and RAM are connected to each other via a bus. An input / output (I / O) interface is also connected to the bus.

[0060] Multiple components in the device are connected to the I / O interface, including: input units, such as keyboards, mice, etc.; output units, such as various types of displays, speakers, etc.; storage units, such as disks, optical disks, etc.; and communication units, such as network cards, modems, wireless communication transceivers, etc. The communication unit allows the device to exchange information / data with other devices through computer networks such as the Internet and / or various telecommunication networks.

[0061] The processing unit performs the various methods and processes described above, such as the method of the present invention. For example, in some embodiments, the method of the present invention can be implemented as a computer software program, which is tangibly contained in a machine-readable medium, such as a storage unit. In some embodiments, part or all of the computer program can be loaded and / or installed on the device via a ROM and / or a communication unit. When the computer program is loaded into RAM and executed by the CPU, one or more steps of the method of the present invention described above can be performed. Alternatively, in other embodiments, the CPU can be configured to perform the method of the present invention by any other appropriate means (e.g., by means of firmware).

[0062] The functions described above herein may be performed at least in part by one or more hardware logic components. For example, without limitation, exemplary types of hardware logic components that may be used include: field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), complex programmable logic devices (CPLDs), and the like.

[0063] The program code for implementing the method of the present invention can be written in any combination of one or more programming languages. These program codes can be provided to a processor or controller of a general-purpose computer, a special-purpose computer or other programmable data processing device, so that the program code, when executed by the processor or controller, enables the functions / operations specified in the flow chart and / or block diagram to be implemented. The program code can be executed entirely on the machine, partially on the machine, partially on the machine as a stand-alone software package and partially on a remote machine, or entirely on a remote machine or server.

[0064] In the context of the present invention, a machine-readable medium may be a tangible medium that may contain or store a program for use by or in conjunction with an instruction execution system, device, or equipment. A machine-readable medium may be a machine-readable signal medium or a machine-readable storage medium. A machine-readable medium may include, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices, or equipment, or any suitable combination of the foregoing. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.

[0065] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can easily think of various equivalent modifications or replacements within the technical scope disclosed by the present invention, and these modifications or replacements should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention shall be based on the protection scope of the claims.

Claims

1. A train controller resource inheritance method based on vehicle-to-vehicle communication, characterized in that: The following steps are involved: Step 1: The vehicle controller CC sends a request for resource zone Z1 to the resource controller WRC according to the zone Z1 for which resources are being requested at this time; Step 2: After receiving the request area from the vehicle controller CC, the resource controller WRC sends the Z2 area to the vehicle controller CC according to the request of the vehicle controller CC, where Z2 = Z1; Step 3: After receiving the area Z2 transmitted by the resource controller WRC, the onboard controller CC will compare the area with the actual protection area Z3 where it is located. If Z3 exceeds the area range of Z2, it will go to step 4; if not, it will go to step 5; Step 4: After the vehicle controller CC triggers the emergency brake, it goes to step 6; Step 5: The vehicle controller CC obtains the union of the protection area Z3 and the resource request area Z1, and then obtains the complement of each WRC area to obtain Z4, and sends Z4 to the resource controller WRC. The resource controller WRC stores the Z4 area sent by the vehicle controller CC; Step 6: If the vehicle controller CC continues to control the vehicle, then return to step 1; otherwise, proceed to step 7; Step 7: The trackside controller WTC applies to the resource controller WRC for vehicle control authorization; Step 8: If the resource controller WRC allows the trackside controller WTC to control the train, then go to step 9, otherwise return to step 7; Step 9: After receiving the vehicle control authorization from the resource controller WRC, the trackside controller WTC requests the resource controller WRC to obtain the resources of the vehicle controller CC; Step 10, after receiving the request, the resource controller WRC sends the resource area Z4 stored in the onboard controller CC to the trackside controller WTC, so that the trackside controller WTC obtains the area previously stored by the onboard controller CC, thereby realizing resource inheritance of controller switching.

2. A train controller resource inheritance method based on vehicle-to-vehicle communication according to claim 1, characterized in that: In the step 2, after receiving the request from the vehicle controller CC regarding the resource area, the resource controller WRC will send the Z1 area back to the vehicle controller CC to indicate confirmation.

3. A train controller resource inheritance method based on vehicle-to-vehicle communication according to claim 1, characterized in that: In the step 3, the protection area Z3 where the train is located represents a region range, and the region range represents the region range where the train is located in the worst case.

4. A train controller resource inheritance method based on vehicle-to-vehicle communication according to claim 1, characterized in that: In the step three, the area range of Z3 does not exceed Z2, which means that the protection area of ​​the vehicle controller CC is still within the applied resource range and does not exceed the authorized area, that is, the protection area of ​​Z3 is in a reasonable and correct state; if Z3 exceeds the Z2 area at this time, that is, an unauthorized area appears in Z3, it is in an unsafe state at this time.

5. A train controller resource inheritance method based on vehicle-to-vehicle communication according to claim 1, characterized in that: In the step five, the area Z4 stored in the resource controller WRC is the complement of the union of the resource application area Z1 of the onboard controller CC and the protection area Z3, which is used to ensure that the resources owned by the onboard controller CC itself still exist. At the same time, it also completes the storage task of the resource area of ​​the onboard controller CC, ensuring that the subsequent trackside controller WTC can successfully obtain the storage area of ​​the onboard controller CC.

6. A train controller resource inheritance method based on vehicle-to-vehicle communication according to claim 1, characterized in that: In the step 6, if the vehicle controller CC does not fail at this time, the vehicle controller CC will repeat the above resource storage process to ensure resource transition for subsequent controller switching.

7. A train controller resource inheritance method based on vehicle-to-vehicle communication according to claim 1, characterized in that: When the onboard controller CC loses the right to control the train, the trackside controller WTC takes over the control of the train instead of the onboard controller CC.

8. A train controller resource inheritance method based on vehicle-to-vehicle communication according to claim 7, characterized in that: The trackside controller WTC applies for the right to control the vehicle from the resource controller WRC. After the trackside controller WTC obtains the right to control the vehicle, the trackside controller WTC requests the resource controller WRC for the resources stored in the resource controller WRC by the onboard controller CC. After receiving the request from the trackside controller WTC, the resource controller WRC transfers the stored resources to the trackside controller WTC to achieve smooth inheritance of resources.

9. A device for the train controller resource inheritance method based on vehicle-to-vehicle communication as claimed in claim 1, characterized in that: It includes the onboard controller CC, the trackside controller WTC and the resource controller WRC.

10. The device according to claim 9, characterized in that The onboard controller CC is the main train controller, and the train is controlled by the onboard controller CC during normal operation; The trackside controller WTC is a backup redundant train controller, which replaces the onboard controller CC to control the train in case the position information of the onboard controller CC is lost or the equipment function fails; The resource controller WRC is responsible for distributing resources in the operating line to the train controller to ensure that the train can successfully obtain movement authorization in the line.

11. An electronic device comprising a memory and a processor, wherein a computer program is stored in the memory, wherein: When the processor executes the program, the method according to any one of claims 1 to 8 is implemented.

12. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the method according to any one of claims 1 to 8 is implemented.

Citation Information

Patent Citations

  • Downgrading management system of train control system based on train-train communication

    CN110104031A

  • Train autonomous operation system with degradation management device and application thereof

    CN112249097A