Multiphase switching converter and its control circuit

By using a daisy chain architecture and a clock signal generated by an upper-level controller in a multi-phase switching converter, the problem of difficult logic and structural adjustment when the load current demand increases is solved, and the effects of flexible adjustment and cost reduction are achieved.

CN116054569BActive Publication Date: 2024-10-15SG MICRO CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111261865.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-10-28
Publication Date
2024-10-15
Estimated Expiration
2041-10-28

AI Technical Summary

Technical Problem

When the load current demand of existing multi-phase switching converters increases, the number of phases of the controller needs to be increased, resulting in difficult and costly logic, circuit and structural adjustment problems.

Method used

Multi-phase switching converters using a daisy chain architecture allow the total number of phases to be easily adjusted according to application requirements by connecting multiple control circuits as a daisy chain, and simplify the control process and reduce circuit costs through the clock signal generated by the upper controller.

Benefits of technology

It realizes flexible adjustment of the total number of phases of the multi-phase switching converter, simplifies the design of the upper controller, and reduces the difficulty of system development and the overall cost.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116054569B_ABST
    Figure CN116054569B_ABST
Patent Text Reader

Abstract

The present application discloses a multi-phase switching converter and a control circuit thereof, including a plurality of control circuits connected in a daisy chain architecture, wherein the control circuit is configured to operate in a preparatory state when receiving a preparatory state input signal, and to generate a preparatory state output signal and a switch control signal for controlling a corresponding switch circuit when receiving a clock signal from a communication bus in the preparatory state. Only the preparatory state signal is transmitted between the plurality of control circuits, and the signal for starting the control circuit is participated by the clock signal generated by the upper controller, so the upper controller does not need to track the position of the current unit in real time during the control process of all units, which can greatly simplify the design of the upper controller and reduce the circuit cost.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power supply, and more specifically, to a multi-phase switching converter and a control circuit thereof. Background Art

[0002] The exponential growth of the scale of Internet of Things (IoT) cloud services has driven significant progress in data centers, networks, and telecommunications equipment. At the same time, the continued increase in data and information has posed new challenges to the processing efficiency of servers in data centers. Therefore, how to efficiently power and dissipate heat for these devices while minimizing power consumption has become an important issue in the existing power supply technology field.

[0003] Multiphase switching converter is a technology that connects multiple switching circuits in parallel and distributes the switching modulation process to different phases to achieve the adjustment and control of the power supply. The PWM (pulse width modulation) signals between phases in the multiphase power supply can be the same or staggered by a certain phase, so that the fluctuation frequency seen by the output and input is the product of the switching frequency in each phase and the number of phases, thereby reducing the need for filter capacitors and reducing the current impact on the input, while speeding up the response to load changes. Multiphase switching converters are widely used in power supply solutions for high-performance CPUs due to their superior performance.

[0004] For a multi-phase switching converter using a single controller, if the load current demand increases, the number of phases of the control circuit converter needs to increase accordingly. Accordingly, the logic, circuit, control circuit structure and size of the controller also need to be adjusted accordingly. This undoubtedly greatly increases the difficulty of system development and the overall cost. Summary of the invention

[0005] In view of the above problems, an object of the present invention is to provide a multi-phase switching converter and a control circuit thereof.

[0006] According to one aspect of an embodiment of the present invention, a multi-phase switching converter is provided, comprising: a plurality of switch circuits coupled in parallel, wherein each switch circuit has an input terminal coupled to an input voltage and an output terminal coupled to a load to provide an output voltage; and a plurality of control circuits connected in a daisy chain architecture, respectively coupled to the plurality of switch circuits, wherein each control circuit has a first terminal, a second terminal and a third terminal, wherein the first terminal is coupled to the second terminal of a previous control circuit to receive a preparatory input signal, the second terminal is coupled to the first terminal of a subsequent control circuit to provide a preparatory output signal, and the third terminal is coupled to a communication bus to receive a clock signal, wherein each control circuit is configured to operate in a preparatory state when receiving the preparatory input signal, and to generate a preparatory output signal and a switch control signal for controlling the corresponding switch circuit when receiving the clock signal in the preparatory state.

[0007] Optionally, a first end of a first control circuit among the multiple control circuits and a second end of a last control circuit among the multiple control circuits are coupled to a loop-back line to form a loop chain with the multiple control circuits.

[0008] Optionally, the switch control signal has a high level state, a low level state and an intermediate level state, and the corresponding switch circuit can perform actions including turning on the upper tube, turning on the lower tube and being in a high-impedance state in response to the above three states of the switch control signal.

[0009] Optionally, the preparatory state input signal includes a connection preparatory state input signal and a freewheeling preparatory state input signal.

[0010] Optionally, the standby state output signal includes a connection standby state output signal and a freewheeling standby state output signal.

[0011] Optionally, the clock signal includes a turn-on clock signal and a freewheeling clock signal.

[0012] Optionally, each control circuit includes: a configuration register, used to configure whether the corresponding control circuit participates in the loop chain, whether it is the first control circuit, and whether it is the last control circuit.

[0013] Optionally, each control circuit includes: a reset control module, which is used to transmit a status feedback signal to an upper controller via the communication bus, and the upper controller determines whether only one control circuit in the circulation chain is in a ready state based on the status feedback signal, wherein when there is no or more than one control circuit in the circulation chain is in the ready state, the reset control module receives a reset signal from the upper controller via the communication bus and performs a circuit reset.

[0014] Optionally, each control circuit includes: a counting module, which is used to count the pulses of the clock signal in the preparatory state, determine the total number of phases in the circulation chain at the current moment, and transmit the total number of phases to the upper controller via the communication bus.

[0015] Optionally, each control circuit includes: a phase-cut control module, which is used to receive a phase-cut instruction from a host controller via the communication bus in the preparatory state, and determine whether to stop power output or start power output of the corresponding switching circuit based on the phase-cut instruction.

[0016] Optionally, each control circuit includes: a detection and control module, configured to compare the current sampling signal of the corresponding switching circuit with the current threshold, and determine whether the inductor current in the corresponding switching circuit is reversed based on the comparison result, and transmit the inductor current reverse indication signal to the upper controller via the communication bus.

[0017] Optionally, the detection and control module is further configured to receive a threshold setting signal from the upper controller via the communication bus, and set the current threshold according to the threshold setting signal.

[0018] According to another aspect of an embodiment of the present invention, a control circuit for a multi-phase switching converter is provided, which is connected with other control circuits to form a daisy chain architecture, wherein the multi-phase switching converter includes a plurality of switching circuits coupled in parallel, and the control circuit includes: a first end, coupled to the second end of a previous control circuit in the daisy chain architecture to receive a preparatory input signal; a second end, coupled to the first end of a subsequent control circuit in the daisy chain architecture to provide a preparatory output signal; and a third end, coupled to a communication bus to receive a clock signal, wherein the control circuit is configured to operate in a preparatory state when the preparatory input signal is received, and to generate a preparatory output signal and a switch control signal for controlling the corresponding switching circuit when the clock signal is received in the preparatory state.

[0019] Optionally, when the control circuit is set as the first control circuit in the daisy chain architecture, its first end is coupled to the loopback connection line, and when the control circuit is set as the last control circuit in the daisy chain architecture, its second end is coupled to the loopback connection line, so as to form a circular chain between the control circuit and the remaining multiple control circuits.

[0020] Optionally, the switch control signal has a high level state, a low level state and an intermediate level state, and the corresponding switch circuit can perform actions including turning on the upper tube, turning on the lower tube and being in a high-impedance state in response to the above three states of the switch control signal.

[0021] Optionally, the preparatory state input signal includes a connection preparatory state input signal and a freewheeling preparatory state input signal.

[0022] Optionally, the standby state output signal includes a connection standby state output signal and a freewheeling standby state output signal.

[0023] Optionally, the clock signal includes a turn-on clock signal and a freewheeling clock signal.

[0024] Optionally, the control circuit includes: a configuration register, used to configure whether the corresponding control circuit participates in the loop chain, whether it is the first control circuit, and whether it is the last control circuit.

[0025] Optionally, the control circuit includes: a reset control module, used to transmit a status feedback signal to an upper controller via the communication bus, and the upper controller determines whether only one control circuit in the circulation chain is in a ready state based on the status feedback signal, wherein when there is no or more than one control circuit in the circulation chain is in the ready state, the reset control module receives a reset signal from the upper controller via the communication bus and performs a circuit reset.

[0026] Optionally, the control circuit includes: a counting module, which is used to count the pulses of the clock signal in the preparatory state, determine the total number of phases in the circulation chain at the current moment, and transmit the total number of phases to the upper controller via the communication bus.

[0027] Optionally, the control circuit includes: a phase-cut control module, which is used to receive a phase-cut instruction from a host controller via the communication bus in the preparatory state, and determine whether to stop power output or start power output of the corresponding switching circuit based on the phase-cut instruction.

[0028] Optionally, the control circuit includes: a detection and control module, configured to compare the current sampling signal of the corresponding switching circuit with the current threshold, and determine whether the inductor current in the corresponding switching circuit is reversed based on the comparison result, and transmit the inductor current reverse indication signal to the upper controller via the communication bus.

[0029] Optionally, the detection and control module is further configured to receive a threshold setting signal from the upper controller via the communication bus, and set the current threshold according to the threshold setting signal.

[0030] The multi-phase switching converter of the embodiment of the present invention includes a plurality of control circuits connected in a daisy chain architecture, wherein the control circuit is configured to operate in a preparatory state when receiving a preparatory state input signal, and to generate a preparatory state output signal and a switch control signal for controlling the corresponding switch circuit when receiving a clock signal from a communication bus in the preparatory state. Due to the use of the daisy chain architecture, the user can easily adjust the total number of phases of the multi-phase switch according to the needs of the specific application. If the number of phases needs to be increased, it is only necessary to add a new control circuit and corresponding external components to the daisy chain architecture.

[0031] In addition, only the preparatory state signal is transmitted between the multiple control circuits in the loop chain, and the signal to start the control circuit is participated by the clock signal generated by the upper controller. Therefore, the upper controller does not need to track the position of the current unit in real time during the control process of all units, which can greatly simplify the design of the upper controller and reduce circuit costs.

[0032] In addition, the multi-phase switching converter of the embodiment of the present invention uses a unified and simple chip or circuit to construct a circulation chain, which only requires the control circuits in the circulation chain to maintain a sequence, and does not require them to be connected in sequence, which simplifies the difficulty of circuit modification and greatly reduces the cost of the circuit. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] The above and other objects, features and advantages of the present invention will become more apparent through the following description of the embodiments of the present invention with reference to the accompanying drawings, in which:

[0034] Figure 1 is a schematic block diagram of a multi-phase switching converter 100 according to an embodiment of the present invention;

[0035] Figure 2 is a schematic block diagram of a control circuit 101A according to an embodiment of the present invention;

[0036] Figure 3 An analog and logic combination detection circuit for detecting that more than one control circuit enters a ready state according to an embodiment of the present invention;

[0037] Figure 4 is a state transition diagram of the control circuit 101A according to an embodiment of the present invention. DETAILED DESCRIPTION

[0038] The specific embodiments of the present invention will be described in detail below in conjunction with the accompanying drawings. It should be noted that the embodiments described herein are only for illustration and are not intended to limit the present invention. In the following description, a large number of specific details are set forth to facilitate a thorough understanding of the present invention. However, it will be appreciated by those of ordinary skill in the art that these specific details are not necessary for implementing the present invention. In addition, in some embodiments, in order to avoid confusing the present invention, known circuits, materials or methods are not specifically described.

[0039] Throughout the specification, references to "one embodiment", "an embodiment", "an example" or "an example" mean that a particular feature, structure or characteristic described in conjunction with the embodiment or example is included in at least one embodiment of the present invention. Therefore, the phrases "in one embodiment", "in an embodiment", "an example" or "an example" appearing in various places throughout the specification do not necessarily refer to the same embodiment or example. In addition, the particular features, structures or characteristics may be combined in one or more embodiments or examples in any suitable combination and / or sub-combination. In addition, it should be understood by those of ordinary skill in the art that the figures provided herein are for illustrative purposes, wherein the same reference numerals indicate the same elements. It should be understood that when an element is said to be "connected to" or "coupled" to another element, it may be directly connected or coupled to the other element or there may be an intermediate element. In contrast, when an element is said to be "directly connected to" or "directly coupled to" another element, there is no intermediate element. In addition, the mutually synchronized or equal signals referred to in the specification may have a slight time difference between each other in actual applications due to delays caused by signal processing.

[0040] Figure 11 is a schematic block diagram of a multi-phase switching converter 100 according to an embodiment of the present invention, comprising switch circuits 111-11N (N is an integer greater than 1) coupled in parallel, and control circuits 101-10N connected in a daisy chain architecture. Each of the switch circuits has an input terminal coupled to an input voltage Vin and an output terminal coupled to a load to provide an output voltage Vout. The control circuits 101-10N are respectively coupled to the switch circuits 111-11N, wherein each control circuit 10i (i=1, 2, ... N) has a first end, a second end and a third end, wherein the first end is coupled to the second end of the previous control circuit to receive the preparatory input signal Takei_on and the freewheeling preparatory input signal Takei_off, the second end is coupled to the first end of the next control circuit to provide the preparatory output signal Passi_on and the freewheeling preparatory output signal Passi_off, and the third end is coupled to the communication bus to receive the clock signal CP_on and the freewheeling clock signal CP_off (not shown in the figure). The control circuit 101i is configured to enter the preparatory state upon receiving the preparatory input signals Takei_on and Takei_off, and to generate the preparatory output signals Passi_on and Passi_off and the switch control signal PWMi for controlling the corresponding switch circuit 11i when the pulses of the clock signals CP_on and CP_off are detected in the preparatory state. In some embodiments, the switch circuit 11i is a synchronous buck circuit, including an upper tube HSi, a lower tube LSi, an inductor Li, and an output capacitor Coi. The switch control signal PWMi has three level states. When the switch control signal PWMi is in a high level state, the upper tube HSi is turned on and the lower tube LSi is turned off; when the switch control signal PWMi is in a low level state, the upper tube HSi is turned off and the lower tube LSi is turned on; when the switch control signal PWMi is in an intermediate level state, the freewheeling diode of the upper tube HSi enters a high impedance state, allowing the output current to drop rapidly.

[0041] In some embodiments, when the control circuit 101i receives the on-preparation state input signal Takei_on, it enters the on-preparation state. The preparatory state refers to the state of the control circuit 101i between being turned off and fully started. The control circuit 101i generally completes the configuration of relevant parameters and settings in the preparatory state. At the same time, the control circuit 101i also determines whether the pulse of the on-clock signal CP_on is detected in the on-preparation state. When the pulse of the on-clock signal CP_on is detected, the control circuit 101i is officially started and enters the on-state, and the output on-preparation state output signal Passi_on and the switch control signal PWMi are in a high level state, so that the upper tube HSi in the switch circuit 11i is turned on and the lower tube LSi is turned off. When the control circuit 101i receives the freewheeling preparation state input signal Takei_off, it enters the freewheeling preparation state. At the same time, the control circuit 101i determines whether the freewheeling clock signal CP_off is detected in the freewheeling preparation state. When the freewheeling clock signal CP_off is detected, the control circuit 101i enters the freewheeling state and outputs the freewheeling preparation state output signal Passi_off and the switch control signal PWMi as a low level, so that the upper tube HSi in the switch circuit 11i is turned off and the lower tube LSi is turned on.

[0042] Generally, the switch control signals PWM1~PWMN are synchronized with the pulses of the on-clock signal CP_on and the freewheeling clock signal CP_off, respectively. For example, the rising edge of the switch control signal PWMi is synchronized with the on-clock signal CP_on, so that when the on-clock signal CP_on is detected, the upper tube HSi is turned on and the lower tube LSi is turned off; the falling edge of the switch control signal PWMi is synchronized with the freewheeling clock signal CP_off, so that when the freewheeling clock signal CP_off is detected, the upper tube HSi is turned off and the lower tube LSi is turned on, triggering the corresponding switch circuit 11i to provide power output to the load. In some embodiments, the duty cycle of the switch control signals PWM1~PWMN is modulated based on the time interval between the on-clock signal CP_on and the freewheeling clock signal CP_off.

[0043] In some embodiments, the first end of the first control circuit among the multiple control circuits 101-10N and the second end of the last control circuit among the multiple control circuits 101-10N are coupled to the loopback connection line to form a loop chain with the multiple control circuits 101-10N. Any of the multiple control circuits 101-10N can be used as the first control circuit and the last control circuit, and it is not necessary to correspond to its physical position in the daisy chain architecture. When a control circuit is configured as the first control circuit or the last control circuit, it only needs to be connected to the loopback connection line through internal logic to form a loop chain. It is only required that the control circuits in the loop chain maintain a sequential order, and it is not required that they must be connected in sequence, so it can greatly improve the convenience of users designing circuits according to specific applications.

[0044] Due to the adoption of the daisy chain architecture, users can easily adjust the total number of phases of the multi-phase switch according to the needs of specific applications. If the number of phases needs to be increased, only new control circuits and corresponding external components need to be added to the daisy chain architecture. In addition, only the preparatory state signal is transmitted between the multiple control circuits in the loop chain, and the signal to start the control circuit is participated by the clock signal generated by the upper controller. Therefore, the upper controller does not need to distinguish the position of the current unit during the control process of all units, which can greatly simplify the design of the upper controller and reduce the circuit cost.

[0045] In one embodiment, each control circuit is coupled to a communication bus and can communicate with a host controller via the communication bus. The host controller can determine whether only one control circuit in the current cycle chain is in a standby state based on the state feedback signal transmitted by each control circuit, and perform circuit reset based on the judgment result. Or the host controller determines whether to perform phase cutting based on the current sampling signal transmitted by each control circuit, the total number of phases in the current cycle chain and / or the load current, and generates a phase cutting instruction. Each control circuit receives a phase cutting instruction from the host controller via the communication bus, and determines whether to stop power output or start power output of the corresponding switch circuit based on the phase cutting instruction, and makes the standby state input signal equal to the standby state output signal while stopping power output of the corresponding switch circuit.

[0046] The communication bus here can use common buses such as I2C, SPI, SCI, UART, CAN, etc. When using the I2C bus, the PMBUS or SMBUS protocol can be selected.

[0047] Figure 21 is a schematic block diagram of a control circuit 101A according to an embodiment of the present invention, comprising a switch control module 1011 and a configuration register 1012. The switch control module 1011 generates a switch preparation state output signal Pass1_on based on a switch preparation state input signal Take1_on and a switch clock signal CP_on, and outputs a switch control signal PWM1 in a high level state. The switch control module 1011 generates a freewheeling preparatory state output signal Passi_off based on a freewheeling preparatory state input signal Take1_off and a freewheeling clock signal CP_off, and outputs a switch control signal PWM1 in a low level state.

[0048] The configuration register 1012 is used to configure whether the control circuit 101A participates in the loop chain (Nonuse position), whether it is the first control circuit (Head position), and whether it is the last control circuit (Tail position). When the configuration register 1012 is configured as the Nonuse position, the control circuit 101A does not participate in the loop chain, the circuit is short-circuited internally, and is only used to transmit the preparatory state signal, that is, the preparatory state input signal is equal to the preparatory state output signal. When the configuration register 1012 is configured as the Head position, the control circuit 101A couples the first end to the loopback connection through internal logic. When the configuration register 1012 is configured as the Tail position, the control circuit 101A couples the first end to the loopback connection through internal logic.

[0049] In some embodiments, the control circuit 101A further includes a reset control module 1013. The reset control module 1013 is used to transmit state feedback signals Wired_OR_on>0, Wired_AND_on<2, Wired_OR_off>0 and Wired_AND_off<2 to the upper controller via the communication bus. The upper controller determines whether only one control circuit in the cycle chain is in the standby state based on the state feedback signal. When there is no or more than one control circuit in the cycle chain is in the standby state, the upper controller provides a reset signal (i.e., the signal Nomal is low) to the first control circuit via the communication bus. The reset control module 1013 of the first control circuit performs circuit reset based on the reset signal to restart the entire cycle chain. Among them, Wired_OR_on>0 and Wired_OR_off>0 indicate whether there is a control circuit in the preparatory state in the current cycle chain. When Wired_OR_on>0 and Wired_OR_off>0 are high levels, it indicates that there is a control circuit in the preparatory state in the current cycle chain. When Wired_OR_on>0 and Wired_OR_off>0 are low levels, it indicates that there is no control circuit in the preparatory state in the current circuit. Wired_AND_on<2 and Wired_AND_off<2 indicate whether the number of control circuits in the preparatory state in the current cycle chain is less than 2. When Wired_AND_on<2 and Wired_AND_off<2 are high levels, it indicates that the number of control circuits in the preparatory state in the current cycle chain is less than 2. When Wired_AND_on<2 and Wired_AND_off<2 are low levels, it indicates that the number of control circuits in the preparatory state in the current cycle chain is greater than 2.

[0050] like Figure 3 An analog and logic combination detection circuit for detecting that more than one control circuit enters a ready state according to an embodiment of the present invention, Figure 3 The transistors M1-MN in the circuit are equivalent to multiple control circuits 101-10N. The control circuit in the standby state outputs a wired-and output with a positive current of I, and is connected to the pull-up load M0 with a positive pull-up current of 1.5*I with the corresponding outputs of other control circuits. If only one control circuit is in the standby state, the signal Wired_AND_on<2 cannot be presented as a logic low level. If more than one control circuit is in the standby state, Wired_AND_on<2 is presented as a logic low level. Using this analog circuit can not only realize the parasitic state detection in the standby state in the loop chain, but also the circuit is simple and can greatly reduce the circuit scale.

[0051] Continue to refer to Figure 2In some embodiments, the control circuit 101A further includes a counting module 1014, a phase-cutting control module 1015, and a detection and control module 1016. The counting module 1014 is used to count the pulses of the clock signal CP_on and / or CP_off in the preparatory state, obtain the number of pulses at the current moment, thereby determining the total number of phases Total_NO in the circulation chain at the current moment, and transmitting the total number of phases Total_NO to the upper controller via the communication bus. In some other embodiments, the multi-phase switching converter 100 further includes a common pulse counter, and each control circuit obtains the count value of the common pulse counter when in the preparatory state, subtracts it from the count value obtained last time, and obtains the total number of phases in the current circulation chain.

[0052] The phase-cut control module 1015 is used to receive the phase-cut instructions Add and Drop from the upper controller via the communication bus in the preparation state, and determine whether to exit or join the cycle based on the phase-cut instructions. For example, when the load is too light, the upper controller provides the phase-cut instruction Drop to perform a phase-reduction operation; when the load is too heavy, the upper controller provides the phase-cut instruction Add to perform a phase-addition operation. Figure 4 is a state transition diagram of the control circuit 101A according to an embodiment of the present invention, as shown in Figure 4 As shown, the control circuit 101A enters the preparatory state when receiving the preparatory input signal Take1_on, and determines whether the phase-cut instruction Drop is detected in the preparatory state. If the phase-cut instruction Drop is received in the preparatory state, it exits the loop when receiving the clock signal CP_on, so that the corresponding switch circuit 111 stops power output and makes the preparatory input signal equal to the preparatory output signal; when the control circuit 101A is in the disengaged state, it enters the preparatory state when receiving the preparatory input signal Take1_on, and determines whether the phase-cut instruction Add is detected in the preparatory state. If the phase-cut instruction Add is received in the preparatory state, it joins the loop when receiving the clock signal CP_on, so that the corresponding switch circuit 111 starts to output power. In addition, Figure 4 The transition of the control circuit 101A between the freewheeling state and the on state has been described above and will not be repeated here.

[0053] Continue to refer to Figure 2, the detection and control module 1016 is configured to compare the current sampling signal Irc of the switch circuit 111 with the current threshold, and determine whether the inductor current in the corresponding switch circuit is reversed according to the comparison result, and transmit the inductor current reverse indication signal DCM to the upper controller via the communication bus. In addition, the detection and control module 1016 is also configured to receive the threshold setting signal U and the high-impedance control signal Z from the upper controller via the communication bus, and set the high and low current thresholds of the circuit and the switching between the two according to the threshold setting signal U, and control the switch control module 1011 to output the switch control signal PWM1 as an intermediate level according to the high-impedance control signal Z, so that the switch circuit 111 works in a high-impedance state.

[0054] It should be noted that Figure 1 The multiple control circuits 101 to 10N in the embodiment may respectively have and Figure 2 The circuit shown has the same structure, so it can be built with a simple, unified chip or circuit Figure 1 The loop chain in the circuit greatly simplifies the circuit design and reduces the circuit cost.

[0055] In summary, the multi-phase switching converter according to an embodiment of the present invention includes a plurality of control circuits connected in a daisy chain architecture, wherein the control circuit is configured to operate in a preparatory state when receiving a preparatory state input signal, and to generate a preparatory state output signal and a switch control signal for controlling the corresponding switch circuit when receiving a clock signal from a communication bus in the preparatory state. Due to the use of a daisy chain architecture, the user can easily adjust the total number of phases of the multi-phase switch according to the needs of specific applications. If the number of phases needs to be increased, it is only necessary to add a new control circuit and corresponding external components to the daisy chain architecture.

[0056] In addition, only the preparatory state signal is transmitted between the multiple control circuits in the loop chain, and the signal to start the control circuit is participated by the clock signal generated by the upper controller. Therefore, the upper controller does not need to track the position of the current unit in real time during the control process of all units, which can greatly simplify the design of the upper controller and reduce circuit costs.

[0057] In addition, the multi-phase switching converter of the embodiment of the present invention uses a unified and simple chip or circuit to construct a circulation chain, which only requires the control circuits in the circulation chain to maintain a sequence, and does not require them to be connected in sequence, which simplifies the difficulty of circuit modification and greatly reduces the cost of the circuit.

[0058] In the above description, the well-known structural elements and steps are not described in detail. However, it should be understood by those skilled in the art that the corresponding structural elements and steps can be realized by various technical means. In addition, in order to form the same structural elements, those skilled in the art can also design methods that are not completely the same as the methods described above. In addition, although each embodiment is described above respectively, this does not mean that the measures in each embodiment cannot be advantageously used in combination.

[0059] According to the embodiments of the present invention, as described above, these embodiments do not describe all the details in detail, nor do they limit the invention to specific embodiments. Obviously, many modifications and changes can be made based on the above description. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can make good use of the present invention and the modified use based on the present invention. The scope of protection of the present invention shall be based on the scope defined by the claims of the present invention.

Claims

1. A multi-phase switching converter, comprising: A plurality of switch circuits coupled in parallel, wherein each switch circuit has an input terminal coupled to an input voltage and an output terminal coupled to a load to provide an output voltage; as well as A plurality of control circuits connected in a daisy chain architecture are respectively coupled to the plurality of switch circuits, wherein each control circuit has a first end, a second end and a third end, wherein the first end is coupled to the second end of a preceding control circuit to receive a preparatory input signal, the second end is coupled to the first end of a succeeding control circuit to provide a preparatory output signal, and the third end is coupled to a communication bus to receive a clock signal. Each control circuit is configured to operate in a ready state when receiving the ready state input signal, and to generate a ready state output signal and a switch control signal for controlling a corresponding switch circuit when receiving the clock signal in the ready state. The preparatory state input signal includes a connection preparatory state input signal and a freewheeling preparatory state input signal, the preparatory state output signal includes a connection preparatory state output signal and a freewheeling preparatory state output signal, and the clock signal includes a connection clock signal and a freewheeling clock signal. Each control circuit is configured to enter a connection preparation state upon receiving a connection preparation state input signal, and determine whether a pulse of a connection clock signal is detected in the connection preparation state; when a pulse of a connection clock signal is detected, the control circuit is formally started and enters the connection state, and outputs a connection preparation state output signal and a switch signal as a high level state; and to enter a freewheeling preparation state upon receiving a freewheeling preparation state input signal, and determine whether a freewheeling clock signal is detected in the freewheeling preparation state; when the freewheeling clock signal is detected, the control circuit enters the freewheeling state, and outputs a freewheeling preparation state output signal and a switch control signal as a low level.

2. The multi-phase switching converter according to claim 1, wherein: A first terminal of a first control circuit among the plurality of control circuits and a second terminal of a last control circuit among the plurality of control circuits are coupled to the loop-back line to form a loop chain with the plurality of control circuits.

3. The multi-phase switching converter according to claim 1, wherein: The switch control signal has a high level state, a low level state and an intermediate level state, and the corresponding switch circuit can perform actions including turning on the upper tube, turning on the lower tube and being in a high-impedance state in response to the above three states of the switch control signal.

4. The multi-phase switching converter according to claim 1, wherein: Each control circuit includes: The configuration register is used to configure whether the corresponding control circuit participates in the loop chain, whether it is the first control circuit, and whether it is the last control circuit.

5. The multi-phase switching converter according to claim 1, wherein: Each control circuit includes: A reset control module is used to transmit a state feedback signal to an upper controller via the communication bus, and the upper controller determines whether only one control circuit in the circulation chain is in a standby state according to the state feedback signal. Wherein, when none or more than one control circuit in the circulation chain is in the standby state, the reset control module receives a reset signal from the upper controller via the communication bus to perform circuit reset.

6. The multi-phase switching converter according to claim 2, wherein: Each control circuit includes: The counting module is used to count the pulses of the clock signal in the preparatory state, determine the total number of phases in the circulation chain at the current moment, and transmit the total number of phases to the upper controller via the communication bus.

7. The multi-phase switching converter according to claim 1, wherein: Each control circuit includes: The phase-cut control module is used to receive a phase-cut instruction from a host controller via the communication bus in the preparatory state, and determine whether to stop or start power output of the corresponding switch circuit based on the phase-cut instruction.

8. The multi-phase switching converter according to claim 1, wherein: Each control circuit includes: The detection and control module is configured to compare the current sampling signal of the corresponding switching circuit with the current threshold, and determine whether the inductor current in the corresponding switching circuit is reversed according to the comparison result, and transmit the inductor current reverse indication signal to the upper controller via the communication bus.

9. The multi-phase switching converter according to claim 8, wherein: The detection and control module is further configured to receive a threshold setting signal from the upper controller via the communication bus, and set the current threshold according to the threshold setting signal.

10. A control circuit for a multi-phase switching converter, connected with other control circuits to form a daisy chain architecture, wherein the multi-phase switching converter comprises a plurality of switch circuits coupled in parallel, and the control circuit comprises: A first end coupled to a second end of a previous control circuit in the daisy chain architecture to receive a ready state input signal; A second terminal coupled to a first terminal of a subsequent control circuit in the daisy chain architecture to provide a ready-state output signal; and The third terminal is coupled to the communication bus to receive a clock signal. The control circuit is configured to operate in a ready state when receiving the ready state input signal, and to generate a ready state output signal and a switch control signal for controlling a corresponding switch circuit when receiving the clock signal in the ready state. The preparatory state input signal includes a connection preparatory state input signal and a freewheeling preparatory state input signal, the preparatory state output signal includes a connection preparatory state output signal and a freewheeling preparatory state output signal, and the clock signal includes a connection clock signal and a freewheeling clock signal. Each control circuit is configured to enter a connection preparation state upon receiving a connection preparation state input signal, and determine whether a pulse of a connection clock signal is detected in the connection preparation state; when a pulse of a connection clock signal is detected, the control circuit is formally started and enters the connection state, and outputs a connection preparation state output signal and a switch signal as a high level state; and to enter a freewheeling preparation state upon receiving a freewheeling preparation state input signal, and determine whether a freewheeling clock signal is detected in the freewheeling preparation state; when the freewheeling clock signal is detected, the control circuit enters the freewheeling state, and outputs a freewheeling preparation state output signal and a switch control signal as a low level.

11. The control circuit according to claim 10, wherein: When the control circuit is set as the first control circuit in the daisy chain architecture, its first end is coupled to the loopback connection line, and when the control circuit is set as the last control circuit in the daisy chain architecture, its second end is coupled to the loopback connection line to form a circular chain between the control circuit and the remaining multiple control circuits.

12. The control circuit according to claim 10, wherein: The switch control signal has a high level state, a low level state and an intermediate level state, and the corresponding switch circuit can perform actions including turning on the upper tube, turning on the lower tube and being in a high-impedance state in response to the above three states of the switch control signal.

13. The control circuit according to claim 10, comprising: The configuration register is used to configure whether the corresponding control circuit participates in the loop chain, whether it is the first control circuit, and whether it is the last control circuit.

14. The control circuit according to claim 10, comprising: A reset control module is used to transmit a state feedback signal to an upper controller via the communication bus, and the upper controller determines whether only one control circuit in the circulation chain is in a standby state according to the state feedback signal. Wherein, when none or more than one control circuit in the circulation chain is in the standby state, the reset control module receives a reset signal from the upper controller via the communication bus to perform circuit reset.

15. The control circuit according to claim 11, comprising: The counting module is used to count the pulses of the clock signal in the preparatory state, determine the total number of phases in the circulation chain at the current moment, and transmit the total number of phases to the upper controller via the communication bus.

16. The control circuit according to claim 10, comprising: The phase-cut control module is used to receive a phase-cut instruction from a host controller via the communication bus in the preparatory state, and determine whether to stop or start power output of the corresponding switch circuit based on the phase-cut instruction.

17. The control circuit according to claim 10, comprising: The detection and control module is configured to compare the current sampling signal of the corresponding switching circuit with the current threshold, and determine whether the inductor current in the corresponding switching circuit is reversed according to the comparison result, and transmit the inductor current reverse indication signal to the upper controller via the communication bus.

18. The control circuit according to claim 17, wherein: The detection and control module is further configured to receive a threshold setting signal from the upper controller via the communication bus, and set the current threshold according to the threshold setting signal.