Method, equipment and medium for preventing unexpected movement of fully automatic coupled operation train

Through offline analysis of the train route map and dynamic authorization mechanism, the protection problem of the train signal control system during coupling operations and test pull operations is solved, and effective protection against the forward movement of coupled trains and coupler breakage is achieved, improving operations. Efficiency and safety.

CN116176663BActive Publication Date: 2024-10-18CASCO SIGNAL LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202211569970.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-12-08
Publication Date
2024-10-18
Estimated Expiration
2042-12-08

AI Technical Summary

Technical Problem

The existing train signal control system fails to effectively prevent the forward movement of the coupled train and coupler breakage during the test pull operation during fully automatic coupling operations. It also lacks protection methods for undesired movement and a configuration that combines specific line map features. options, resulting in limited operational efficiency and safety.

Method used

Through offline analysis of the station line map, the maximum forward movement distance of the coupled train when it is hit and the maximum protection distance of the coupler breakage during the test pull operation are calculated. Combined with the trackside area controller and interlocking system, the coupling operation and test pull are realized. Dynamic authorization and protection of operations ensure that the train performs operations within a safe range and aborts operations in the event of undesired movement.

Benefits of technology

It supports trial pull protection at any location and forward protection of coupled trains, simplifies the protection design under line map conditions, improves train operation efficiency and safety, and reduces software development workload.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116176663B_ABST
    Figure CN116176663B_ABST
Patent Text Reader

Abstract

The present invention relates to a method, device and medium for preventing trains from unexpected movement during fully automatic coupling operation. The method comprises: S1, analyzing the station route map offline; S2, the on-board controller sends a coupling ready request or a trial pull request to the trackside area controller; S3, when the requesting train is located in the static coupling operation area of ​​the "combined protection coupling operation area", the trackside area controller sends a logic section locking request to the interlocking system; otherwise, after confirming the train status, the coupling authorization or the trial pull authorization is directly sent to the on-board controller; S4, after the train receives the coupling authorization sent by the trackside area controller, the train maintains the brake application state and continuously sends the coupling request to the trackside area controller; after the train receives the trial pull authorization sent by the trackside area controller, the train continuously sends the trial pull request to the trackside area controller during the trial pull operation. Compared with the prior art, the present invention has the advantages of supporting trial pull protection at any location and forward movement protection of coupled trains.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a train signal control system, and in particular to a method, equipment and medium for protecting fully automatic coupled operation trains from unexpected movement. Background Art

[0002] When the train performs fully automatic coupling operation, the uncoupling train will hit the coupled train under ATO control. The impact must be strong enough to ensure that the couplers can be connected normally. After the couplers are connected, the uncoupling train needs to apply traction in the opposite direction of the original coupling direction and perform a "test pull operation" to ensure that the couplers are connected normally. There are two problems in the above operation process that require protection by the signal system:

[0003] 1. When the coupled train is hit, it may move forward, and the signal system needs to confirm that there are no safety restriction points within the range of its forward movement;

[0004] 2. During the test pulling operation, the coupler may break. The signal system needs to ensure that there are no safety restriction points in the running distance of the train performing the test pulling from the time when the abnormality of the broken coupler is detected to the time when the train stops completely;

[0005] To protect against the above scenarios, the signal system must confirm that there are no safety restriction points within a certain range on both sides of the coupled train before authorizing the coupling operation and the test pulling operation.

[0006] Regarding the protection of the test pull, after searching, Chinese patent publication number CN113844506A discloses a method and device for automatic test pull of a train, which can perform more efficient automatic test pull of the train, does not increase the equipment cost during the automatic test pull, can improve the operating efficiency of the train, and can improve the availability of the FAO system and / or CBTC system. However, the existing method has the following problems:

[0007] 1. Failure to consider the forward movement protection of the coupled train;

[0008] 2. Does not support pull-through protection at any location;

[0009] 3. Lack of abstraction of protection methods for various unexpected movements;

[0010] 4. There are no configuration options designed to combine specific route map features to simplify protection design under ideal route map conditions. Summary of the invention

[0011] The purpose of the present invention is to overcome the defects of the above-mentioned prior art and to provide a method, equipment and medium for protecting fully automatic coupled operation trains from unexpected movement.

[0012] The purpose of the present invention can be achieved by the following technical solutions:

[0013] According to a first aspect of the present invention, a method for preventing unexpected movement of a fully automatic coupled train is provided, the method comprising the following steps:

[0014] Step S1, offline analysis of the station line map, calculation of the line status within the range of "maximum forward movement distance of the coupled train when hit" and "maximum protection distance of the coupler breakage in the test pull operation" outside the end point of the static coupling operation area;

[0015] Step S2: The train receives a coupling instruction from the ATS, and the onboard controller sends a coupling ready request or a test pull request to the trackside area controller;

[0016] Step S3: After receiving the request, if the requesting train is located in the static coupling operation area of ​​the "combined protection coupling operation area", the trackside area controller sends a logic section locking request to the interlocking system; otherwise, it does not send a logic section locking request to the interlocking system, and after confirming the train status, it directly sends the coupling authorization or the trial pulling authorization to the on-board controller;

[0017] Step S4, after the train receives the coupling authorization sent by the trackside area controller, it keeps the brake applied and continues to send coupling requests to the trackside area controller; after the train receives the trial pulling authorization sent by the trackside area controller, it starts the trial pulling operation and continues to send trial pulling requests to the trackside area controller during the trial pulling operation.

[0018] As a preferred technical solution, if the range described in step S1 and the interlocking operation area are located in the same logical section, and the interlocking operation area is not limited, then when the interlocking and trial pulling operations are performed in this interlocking operation area, there is no need to interlock to confirm the locking status of the section, and the attribute of the interlocking operation area is recorded as "non-combined protection interlocking operation area".

[0019] As a preferred technical solution, if the range described in step S1 exceeds the logical section where the coupling operation area is located, or the coupling operation area has invaded the limit, then when performing coupling and trial pulling operations in this coupling operation area, it is necessary to interlock and confirm whether there is a backup route in the section where the range exceeds the coupling operation area, and whether the turnout is locked, and record the attribute of the coupling operation area as "combined protection coupling operation area".

[0020] As a preferred technical solution, step S2 is specifically as follows:

[0021] When the train receives a coupling instruction from the ATS and the onboard controller determines that the train is safely positioned completely in the static coupling operation area, the train sends a coupling ready request or a trial pull request to the trackside area controller based on the currently executed coupling operation task.

[0022] As a preferred technical solution, step S2 is specifically as follows:

[0023] When the train receives a coupling instruction from ATS, and there are no switches or intrusions within the range of "maximum forward movement distance of the coupled train when hit" outside the safety positioning of the coupled train and the range of "maximum protection distance for coupler breakage in trial pulling operation" outside the safety positioning of the uncoupled train, the train sends a coupling ready request or a trial pulling request to the trackside area controller according to the currently executed coupling operation task.

[0024] As a preferred technical solution, the method further includes:

[0025] Step S51: If the train needs to stop the test pulling operation during the test pulling operation, the train continues to send a test pulling request to the trackside area controller before ensuring that the train can remain stationary.

[0026] As a preferred technical solution, the situations in which the test pulling operation should be terminated include detecting that the displacement exceeds the standard and the coupler state is abnormal.

[0027] As a preferred technical solution, the method further includes:

[0028] Step S52: The coupling operation or the trial pulling operation is completed normally, and the train stops sending coupling requests or trial pulling requests to the trackside area controller; after the trackside area controller determines that the on-board controller no longer sends coupling requests or trial pulling requests, the coupling operation is completed.

[0029] As a preferred technical solution, the said ending the joint hanging operation is specifically as follows:

[0030] If the current joint operation area is "non-joint protection joint operation area", the joint operation will be terminated directly;

[0031] If the current interlocking operation area is the "combined protection interlocking operation area", the trackside area controller should stop sending the logical section locking request to the interlocking and end the interlocking operation at the same time.

[0032] As a preferred technical solution, the method further includes:

[0033] Step S53, if the current coupling operation area is the "combined protection coupling operation area", before the on-board controller stops sending the coupled operation request or the trial pulling request, the trackside area controller should also continue to send the logic section locking request to the interlocking; if the communication between the on-board controller and the trackside area controller is interrupted during the operation, the trackside area controller should no longer authorize the on-board controller to perform the corresponding coupled operation or trial pulling operation, and continue to send the logic section locking request to the interlocking until the trackside area controller can ensure that the train is stationary.

[0034] According to a second aspect of the present invention, there is provided an electronic device, comprising a memory and a processor, wherein a computer program is stored in the memory, and the method described above is implemented when the processor executes the program.

[0035] According to a third aspect of the present invention, there is provided a computer-readable storage medium having a computer program stored thereon, wherein the program implements the method described above when executed by a processor.

[0036] Compared with the prior art, the present invention has the following advantages:

[0037] 1) The present invention can support the test pulling protection at any location and the forward movement protection of the coupled train;

[0038] 2) The present invention comprehensively considers the forward movement protection and trial pulling protection of the coupled train during the coupling operation, abstracts the unexpected movement models of trains in different operation processes, uses a unified method for protection, and reduces the workload of software development;

[0039] 3) The present invention combines the design configuration options of specific line map features to offline identify areas that do not require trackside area controllers and interlocking for joint protection, simplifying the online calculation amount under ideal line map conditions. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] Figure 1 It is a specific flow chart of the method of the present invention;

[0041] Figure 2 A schematic diagram of the scene of coupling in the static coupling operation area;

[0042] Figure 3 Schematic diagram of the scene connected at any point. DETAILED DESCRIPTION

[0043] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0044] like Figure 2 and Figure 3 The following are typical scenarios of coupling in a static coupling operation area and coupling at any point. Figure 1 The steps shown in the figure are as follows to introduce the two joint operation processes:

[0045] Step A: Analyze the station line map offline and calculate the line status within the range of "maximum forward movement distance of the coupled train when hit" and "maximum protection distance of coupler breakage in test pulling operation" outside the end point of the static coupling operation area:

[0046] 1) If the range and the joint hanging operation area are located in the same logical section (such as the joint hanging operation protection area on the right side of Figure 2), and the joint hanging operation area does not intrude, then when performing joint hanging and trial pulling operations in this joint hanging operation area, there is no need to interlock to confirm the locking status of the section, and the attribute of the joint hanging operation area is recorded as "non-joint protection joint hanging operation area";

[0047] 2) If the range exceeds the logical section where the coupling operation area is located, or the coupling operation area has violated the limit or there is a turnout (such as the coupling operation protection area on the left in Figure 2), when performing coupling and trial pulling operations in this coupling operation area, it is necessary to interlock and confirm whether there is a backup route in the section where the range exceeds the coupling operation area, and whether the turnout (if any) is locked, and record the attribute of the coupling operation area as "combined protection coupling operation area";

[0048] Figure 2 The length of the "coupling operation protection zone" shown in the figure is determined by the type of coupling operation to be performed in the current coupling operation zone, the "maximum forward movement distance of the coupled train when being hit" and the "maximum protection distance for coupler breakage in the test pulling operation";

[0049] Step B-1: When the train receives a coupling instruction from the ATS, and the onboard controller determines that the train is safely positioned completely in the static coupling operation area as shown in Figure 2, the train sends a coupling ready request or a test pull request to the trackside area controller according to the coupling operation task currently being performed;

[0050] Step B-2, the train is at the position shown in Figure 3. When the train receives the coupling instruction from ATS, it is not located in any static coupling operation area. The coupled train will dynamically calculate whether there are switches and intrusion limits in the "coupling operation protection area" outside its safety positioning according to its own safety positioning. If there are no switches and intrusion limits, the train will send a coupling ready request or a test pull request to the trackside area controller according to the currently executed coupling operation task;

[0051] Step C: After the trackside area controller receives the ready request for coupling or the test pull request sent by the train, when the requesting train is located in the static coupling operation area of ​​the "combined protection coupling operation area", the trackside area controller sends a logical section locking request to the interlocking; otherwise, it does not send a logical section locking request to the interlocking, and after confirming the train status, it directly sends the coupling authorization or the test pull authorization to the vehicle;

[0052] Step D: After receiving the coupling authorization sent by the trackside area controller, the train should maintain the brake application state and continue to send coupling requests to the trackside area controller; after receiving the trial pulling authorization sent by the trackside area controller, the train can start the trial pulling operation and continue to send trial pulling requests to the trackside area controller during the trial pulling operation;

[0053] Step E-1: If the train detects that the displacement exceeds the standard or the coupler status is abnormal during the test pulling operation, the test pulling operation should be stopped, and the test pulling request should be continuously sent to the trackside area controller before ensuring that the train can remain stationary;

[0054] Step E-2, the coupling operation or the trial pulling operation is completed normally, and the train stops sending coupling requests or trial pulling requests to the trackside area controller; after the trackside area controller determines that the on-board controller no longer sends coupling requests or trial pulling requests, if the current coupling operation area is a "non-combined protection coupling operation area", the coupling operation is directly terminated; if the current coupling operation area is a "combined protection coupling operation area", the trackside area controller should stop sending logical section locking requests to the interlocking and terminate the coupling operation at the same time.

[0055] Step E-3, if the current coupling operation area is the "combined protection coupling operation area" (i.e. the static coupling operation area in Figure 2), before the on-board controller stops sending the coupled operation request or the trial pulling request, the trackside area controller should also continue to send the logic section locking request to the interlocking. If the communication between the on-board controller and the trackside area controller is interrupted during the operation, the trackside area controller should no longer authorize the on-board controller to perform the corresponding coupled operation or trial pulling operation, and continue to send the logic section locking request to the interlocking until the trackside area controller can ensure that the train is stationary.

[0056] The above is an introduction to the method embodiment. The following is a further explanation of the scheme of the present invention through electronic equipment and storage medium embodiments.

[0057] The electronic device of the present invention includes a central processing unit (CPU), which can perform various appropriate actions and processes according to computer program instructions stored in a read-only memory (ROM) or loaded from a storage unit into a random access memory (RAM). In the RAM, various programs and data required for device operation can also be stored. The CPU, ROM and RAM are connected to each other via a bus. An input / output (I / O) interface is also connected to the bus.

[0058] Multiple components in the device are connected to the I / O interface, including: input units, such as keyboards, mice, etc.; output units, such as various types of displays, speakers, etc.; storage units, such as disks, optical disks, etc.; and communication units, such as network cards, modems, wireless communication transceivers, etc. The communication unit allows the device to exchange information / data with other devices through computer networks such as the Internet and / or various telecommunication networks.

[0059] The processing unit performs the various methods and processes described above, such as the method of the present invention. For example, in some embodiments, the method of the present invention can be implemented as a computer software program, which is tangibly contained in a machine-readable medium, such as a storage unit. In some embodiments, part or all of the computer program can be loaded and / or installed on the device via a ROM and / or a communication unit. When the computer program is loaded into RAM and executed by the CPU, one or more steps of the method of the present invention described above can be performed. Alternatively, in other embodiments, the CPU can be configured to perform the method of the present invention by any other appropriate means (e.g., by means of firmware).

[0060] The functions described above herein may be performed at least in part by one or more hardware logic components. For example, without limitation, exemplary types of hardware logic components that may be used include: field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chip (SOCs), complex programmable logic devices (CPLDs), and the like.

[0061] The program code for implementing the method of the present invention can be written in any combination of one or more programming languages. These program codes can be provided to a processor or controller of a general-purpose computer, a special-purpose computer or other programmable data processing device, so that the program code, when executed by the processor or controller, enables the functions / operations specified in the flow chart and / or block diagram to be implemented. The program code can be executed entirely on the machine, partially on the machine, partially on the machine as a stand-alone software package and partially on a remote machine, or entirely on a remote machine or server.

[0062] In the context of the present invention, a machine-readable medium may be a tangible medium that may contain or store a program for use by or in conjunction with an instruction execution system, device, or equipment. A machine-readable medium may be a machine-readable signal medium or a machine-readable storage medium. A machine-readable medium may include, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices, or equipment, or any suitable combination of the foregoing. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.

[0063] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can easily think of various equivalent modifications or replacements within the technical scope disclosed by the present invention, and these modifications or replacements should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention shall be based on the protection scope of the claims.

Claims

1. A method for preventing unexpected movement of fully automatic coupled trains. It is characterized in that The method comprises the following steps: Step S1, offline analysis of the station line map, calculation of the line status within the range of "maximum forward movement distance of the coupled train when hit" and "maximum protection distance of coupler breakage in test pulling operation" outside the end point of the static coupling operation area; Step S2: the train receives a coupling instruction from the ATS, and the onboard controller sends a coupling ready request or a test pull request to the trackside area controller; Step S3: After receiving the request, if the requesting train is located in the static coupling operation area of ​​the "combined protection coupling operation area", the trackside area controller sends a logic section locking request to the interlocking system; otherwise, it does not send a logic section locking request to the interlocking system, and after confirming the train status, it directly sends the coupling authorization or the trial pulling authorization to the on-board controller; Step S4, after receiving the coupling authorization sent by the trackside area controller, the train maintains the brake application state and continues to send coupling requests to the trackside area controller; after receiving the trial pulling authorization sent by the trackside area controller, the train starts the trial pulling operation, and continues to send trial pulling requests to the trackside area controller during the trial pulling operation; If the range described in step S1 exceeds the logical section where the coupling operation area is located, or the coupling operation area has invaded the limit, when performing coupling and trial pulling operations in this coupling operation area, it is necessary to interlock and confirm whether there is a backup route in the section where the range exceeds the coupling operation area, and whether the turnout is locked, and record the attribute of the coupling operation area as "combined protection coupling operation area".

2. A method for preventing unexpected movement of fully automatic coupled trains according to claim 1, It is characterized in that If the range described in step S1 and the joint hanging operation area are located in the same logical section, and the joint hanging operation area is not limited, then when the joint hanging and trial pulling operations are performed in this joint hanging operation area, there is no need to interlock to confirm the locking status of the section, and the attribute of the joint hanging operation area is recorded as "non-joint protection joint hanging operation area".

3. A method for preventing unexpected movement of fully automatic coupled trains according to claim 1, It is characterized in that The step S2 is specifically as follows: When the train receives a coupling instruction from the ATS and the onboard controller determines that the train is safely positioned completely in the static coupling operation area, the train sends a coupling ready request or a trial pull request to the trackside area controller based on the currently executed coupling operation task.

4. A method for preventing unexpected movement of fully automatic coupled trains according to claim 1, It is characterized in that The step S2 is specifically as follows: When the train receives the coupling instruction from ATS, and there are no switches or intrusion limits within the range of "maximum forward movement distance of the coupled train when hit" outside the safety positioning of the coupled train and the range of "maximum protection distance for coupler breakage in trial pulling operation" outside the safety positioning of the uncoupled train, the train sends a coupling ready request or a trial pulling request to the trackside area controller according to the currently executed coupling operation task.

5. A method for preventing unexpected movement of fully automatic coupled trains according to claim 1, It is characterized in that The method further includes: Step S51: If the train needs to stop the test pulling operation during the test pulling operation, the train continues to send a test pulling request to the trackside area controller before ensuring that the train can remain stationary.

6. A method for preventing unexpected movement of fully automatic coupled trains according to claim 5, It is characterized in that The situations in which the test pulling operation should be terminated include detection of excessive displacement and abnormal coupler status.

7. A method for preventing unexpected movement of fully automatic coupled trains according to claim 1, It is characterized in that The method further includes: Step S52: The coupling operation or the trial pulling operation is completed normally, and the train stops sending coupling requests or trial pulling requests to the trackside area controller; after the trackside area controller determines that the on-board controller no longer sends coupling requests or trial pulling requests, the coupling operation is completed.

8. A method for preventing unexpected movement of fully automatic coupled trains according to claim 7, It is characterized in that The specific end of the joint operation is: If the current joint operation area is "non-joint protection joint operation area", the joint operation will be terminated directly; If the current interlocking operation area is the "combined protection interlocking operation area", the trackside area controller should stop sending the logical section locking request to the interlocking and end the interlocking operation at the same time.

9. A method for preventing unexpected movement of fully automatic coupled trains according to claim 1, It is characterized in that The method further includes: Step S53: If the current coupling operation area is the "combined protection coupling operation area", before the on-board controller stops sending the coupled operation request or the trial pulling request, the trackside area controller should also continue to send the logic section locking request to the interlocking. If the communication between the on-board controller and the trackside area controller is interrupted during the operation, the trackside area controller should no longer authorize the on-board controller to perform the corresponding coupled operation or trial pulling operation, and continue to send the logic section locking request to the interlocking until the trackside area controller can ensure that the train is stationary.

10. An electronic device comprising a memory and a processor, wherein a computer program is stored in the memory. It is characterized in that When the processor executes the program, the method according to any one of claims 1 to 9 is implemented.

11. A computer-readable storage medium having a computer program stored thereon, It is characterized in that When the program is executed by a processor, the method according to any one of claims 1 to 9 is implemented.

Citation Information

Patent Citations

  • Automatic train test pulling method and device

    CN113844506A

  • Trial haul test method and device for train set, equipment and readable storage medium

    CN111678714A

  • Train coupling method and system

    CN111891138A