Water resource management equipment for construction projects

By designing water resource management equipment in construction projects and using components of water resource treatment and purification mechanisms, the problem of sewage quality affecting the construction environment is solved, effective filtration and purification of sewage is achieved, and the secondary utilization and construction environment of water resources are ensured. Cleanliness.

CN116282681BActive Publication Date: 2025-01-10CHINA CONSTR SECOND ENG BUREAU LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202310173694.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-02-28
Publication Date
2025-01-10
Estimated Expiration
2043-02-28

AI Technical Summary

Technical Problem

In construction environments, the quality of sewage affects the stability of mixed cement concrete, and sewage recycling and filtration is required to ensure the secondary utilization of water resources.

Method used

A water resource management equipment for construction projects was designed, including water resource treatment mechanism, water injection mechanism, sample monitoring mechanism, preliminary storage mechanism and purification mechanism. Through extraction of storage tanks, stirrers, microbial monitoring casings, and water quality spectroscopy analysis Components such as instruments, filter storage tanks, reactors and activated carbon filter storage tanks realize sewage analysis, filtration and purification treatment.

Benefits of technology

Effectively remove residual impurities and odors in sewage, ensure the cleanliness of water sources, improve the utilization rate of water resources, and suppress dust in the construction environment through ultrasonic atomizer.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116282681B_ABST
    Figure CN116282681B_ABST
Patent Text Reader

Abstract

The present invention discloses a water resource management device for a construction project, comprising a water resource treatment mechanism for purifying construction sewage, a water injection mechanism connected to the water resource treatment mechanism for injecting sewage into the water resource treatment mechanism, a sample monitoring mechanism connected to the water resource treatment mechanism for extracting a small amount of sewage for sample monitoring and targeted sewage treatment, a preliminary storage mechanism for storing sewage or purified water sources, and a purification mechanism for accessing the treated water source inside the preliminary storage mechanism for final filtration and use. The present application can fully purify sewage through a series of purification refluxes, thereby achieving sewage purification and secondary use.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of water resource purification, and in particular to water resource management equipment for construction projects. Background Art

[0002] The "rainwater storage device for water resource management" disclosed in the application number "CN202121878202.8" is also an increasingly mature technology, which records "including a load-bearing base, a hinge, a universal wheel, a collection body, a collection piece, a support column, a connecting plate, a threaded plate, a movable groove, a movable block, a threaded motor, a threaded rod, a limit plate, a connecting column, a filter tank, a liquid level sensor, an extraction pump, a transmission pipe, a spray body, a spray port and a placement piece. This utility model belongs to the technical field of pulverizers, specifically a rainwater storage device for water resource management, which effectively solves the defects of most of the rainwater storage devices for water resource management on the market that are simple in function and simple in structure. While ensuring the basic rainwater collection and filtration effect, it can also irrigate rainwater to avoid waste, further improving the practicality of the entire device. It is a very excellent rainwater storage device for water resource management", but the water resource management equipment still has the following defects in actual use:

[0003] Nowadays, water is indispensable in the construction environment based on construction projects, and the quality of water also tests the stability of mixed cement concrete when used. In addition, there will be some sewage in some construction projects. In order to better manage water resources and ensure the normal utilization rate of water, it is also necessary to recycle and filter some sewage and then achieve secondary utilization. Summary of the invention

[0004] The present invention provides a water resource management device for a construction project, which can recycle and filter construction sewage to ensure water resource utilization.

[0005] The technical problem to be solved is: Nowadays, water is indispensable in the construction environment based on construction projects, and the quality of water also tests the stability of mixed cement concrete when used. In addition, there will be some sewage in some construction projects. In order to better manage water resources and ensure the normal utilization rate of water, it is also necessary to recycle and filter some sewage and then achieve secondary utilization.

[0006] In order to solve the above technical problems, the present invention adopts the following technical solutions:

[0007] The present invention provides a water resource management device for a construction project, comprising a water resource treatment mechanism, a water injection mechanism, a sample monitoring mechanism, a preliminary storage mechanism and a purification mechanism;

[0008] The water resource treatment mechanism includes an extraction storage tank, an agitator arranged in the extraction storage tank, and a driving motor installed on the extraction storage tank for driving the agitator;

[0009] The water injection mechanism comprises a water injection riser, which is connected to the water inlet of the extraction storage tank;

[0010] The sample monitoring mechanism includes a microbial monitoring sleeve connected to the inside of the extraction storage tank through a connecting conduit, a sampling monitoring room arranged at the top of the microbial monitoring sleeve, and a monitoring control box installed on the sampling monitoring room, wherein a water quality spectrometer is arranged in the monitoring control box, the microbial monitoring sleeve is connected to an L-shaped pipe, the L-shaped pipe is connected to a water resource management box, and a filter is arranged in the water resource management box;

[0011] The water outlet of the water resource management box is connected to a vertical conduit, on which a solenoid valve is installed, the lower end of the vertical conduit is connected to the water outlet at the bottom of the extraction storage tank, and the upper end is connected to a filter tank, both ends of the filter tank are provided with protective top covers, on which a sealing solenoid valve is installed, and the vertical conduit is connected to a water injection riser through a horizontal conduit;

[0012] The preliminary storage mechanism comprises a processing tank, on which a plurality of injection sleeves communicating with the interior of the processing tank are provided, and a three-way pipe is installed on the injection sleeve;

[0013] The purification mechanism comprises a reactor for accessing a water source in a processing tank, and activated carbon filtering tanks are arranged in sequence at the water outlet of the reactor.

[0014] The present invention provides a water resource management device for a construction project. Furthermore, a top cover is installed on the top of the extraction storage tank, a mixing groove is opened in the middle of the top cover, a coupling is installed in the mixing groove, and the driving motor is connected to the coupling.

[0015] The present invention provides a water resource management device for a construction project. Furthermore, a connecting groove is provided on the top side wall of the extraction and storage tank, a water delivery flange pipe is connected to the connecting groove, a U-shaped access hose is connected to the water delivery flange pipe, and the U-shaped access hose is connected to the water injection riser.

[0016] The present invention provides a water resource management device for a construction project. Furthermore, two cavities are arranged inside the processing storage tank.

[0017] The present invention provides a water resource management device for a construction project. Further, a liquid injection slot is provided in the middle of the top of the reaction kettle, and an assembly cover is installed at the liquid injection slot.

[0018] The present invention provides a water resource management device for a construction project. Further, a filter core mounting frame is arranged on the side of the reaction kettle, and the activated carbon filter storage tank is installed on the filter core mounting frame.

[0019] The present invention provides a water resource management device for a construction project, further comprising a water resource extraction box, wherein an ultrasonic atomizer is arranged in the water resource extraction box, wherein the ultrasonic atomizer is connected to an atomizing nozzle arranged on the top of the water resource extraction box, and the water resource extraction box is connected to a U-shaped access hose.

[0020] The present invention provides a water resource management device for a construction project. Further, one end of the U-shaped access hose is sealed and connected to a water flow velocity measuring tube, the other end of the water flow velocity measuring tube is connected to a connecting conduit, and a monitoring meter is installed on the water flow velocity measuring tube.

[0021] The present invention provides a water resource management device for a construction project, further comprising a placement frame, a triangular bracket being installed on the placement frame, a supporting gasket being provided at the top of the triangular bracket, a plurality of tightening openings being provided around the supporting gasket, a tightening screw being provided in the tightening opening, a tightening pin being provided in the tightening screw, and an extraction storage tank being vertically installed on the top of the tightening pin.

[0022] The present invention provides a water resource management device for a construction project. Furthermore, a square bracket is installed at the end of the water resource management box, a transverse frame is installed on the square bracket, a water capacity detector is provided at the bottom of the transverse frame, and the water capacity detector is connected to the water resource management box through a transverse conduit.

[0023] Compared with the prior art, the present invention has the following beneficial effects:

[0024] 1. The sewage of this application enters the water resource treatment mechanism through the water injection mechanism, and is diverted to the sample monitoring mechanism through the water resource treatment mechanism for sewage analysis. Then, the diverted sewage is filtered through the water resource management box and returned to the water resource treatment mechanism. According to the sewage analysis results, the sewage in the water resource treatment mechanism is purified in a targeted manner. The purified water source is filtered and stored in the filter storage tank, and finally enters the preliminary storage mechanism for storage. When in use, the water source is injected from the preliminary storage mechanism into the purification mechanism for purification to remove residual impurities and odors in the sewage and ensure the cleanliness of the water source;

[0025] 2. This application sets up a water resource extraction box to extract part of the water source first, which is preferentially used for the atomization operation of the atomizer, which greatly facilitates some dusty outdoor construction environments and suppresses dust.

[0026] The present invention will be further described below in conjunction with the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a schematic diagram of the structure of the present invention;

[0028] Figure 2 It is a schematic diagram of the structure of the sample monitoring mechanism of the present invention;

[0029] Figure 3 A schematic diagram of the preliminary storage mechanism for installing the present invention;

[0030] Figure 4 A schematic diagram of the structure of the preliminary storage mechanism is highlighted for the present invention;

[0031] Figure 5 It is a schematic diagram of the purification mechanism structure of the present invention.

[0032] Reference numerals:

[0033] 1. Water resource treatment mechanism; 11. Triangular bracket; 12. Support gasket; 13. Tighten the opening; 14. Tighten the pin; 15. Extraction storage tank; 16. Top cover; 17. Mixing and stirring slot; 18. Coupling; 19. Drive motor; 2. Water injection mechanism; 21. Connection slot; 22. Water delivery flange pipe; 23. U-shaped access hose; 24. Water injection riser; 25. Water flow velocity measuring tube; 3. Sample monitoring mechanism; 31. Connecting conduit; 32. Conduit; 33. Microbial monitoring sleeve; 34. Sampling monitoring room; 35. Monitoring control box; 36. L-shaped pipe; 37. Water resource management box; 38. Square bracket; 39. Transverse frame; 391, transverse duct; 392, water capacity detector; 393, filter tank; 394, protective top cover; 395, sealed solenoid valve; 4, preliminary storage mechanism; 41, mounting frame; 42, processing tank; 43, injection sleeve; 44, three-way pipe; 45, trapezoidal bracket; 5, purification mechanism; 51, reactor; 52, liquid injection slot; 53, assembly cover; 54, filter element mounting frame; 55, activated carbon filter tank; 6, vertical duct; 7, horizontal duct; 8, water resource extraction box; 81, square slot; 82, protective mesh cover; 83, protective pad; 84, atomizing nozzle; 9, placement frame. DETAILED DESCRIPTION

[0034] like Figure 1-Figure 5 As shown, a water resource management device for a construction project of the present invention comprises a water resource treatment mechanism 1, a water injection mechanism 2, a sample monitoring mechanism 3, a preliminary storage mechanism 4 and a purification mechanism 5. The water resource treatment mechanism 1 comprises an extraction storage tank 15, a top cover 16 is installed on the top of the extraction storage tank 15, a mixing and stirring groove 17 is opened in the middle of the top cover 16, a coupling 18 is installed in the middle of the groove of the mixing and stirring groove 17, a driving motor 19 is fixedly installed on the top of the coupling 18, an agitator is arranged inside the extraction storage tank 15, and the output end of the driving motor 19 is transmission-connected to the agitator.

[0035] The water injection mechanism 2 includes a connecting groove 21 opened on the top side wall of the extraction and storage tank 15, one end of the connecting groove 21 is connected to a water supply flange pipe 22, the water supply flange pipe 22 is connected to a U-shaped access hose 23 through a plurality of flange screws, the U-shaped access hose 23 is connected to a water injection riser 24, and the sewage is injected into the extraction and storage tank 15 from the water injection riser 24.

[0036] The sample monitoring mechanism 3 includes a connecting conduit 31 connected to the bottom side of the extraction storage tank 15, the connecting conduit 31 is connected to a conduit 32, one end of the conduit 32 is provided with a microorganism monitoring sleeve 33, the top of the microorganism monitoring sleeve 33 is provided with a sampling monitoring chamber 34, the top of the sampling monitoring chamber 34 is fixedly installed with a monitoring control box 35 through a flange, and a water quality spectrometer is fixedly installed inside the monitoring control box 35 for analyzing the sewage inside the extraction storage tank 15. A small amount of sewage inside the extraction storage tank 15 enters the microorganism monitoring sleeve 33 through the connecting conduit 31 and is analyzed by the water quality spectrometer.

[0037] An L-shaped pipe 36 is connected to the side wall at the bottom of the microbial monitoring sleeve 33, and a solenoid valve is installed on the L-shaped pipe 36. One end of the L-shaped pipe 36 is sealed and connected to a water resource management box 37. A filter is provided in the water resource management box 37 to filter out pollutants in the water. The water outlet of the water resource management box 37 is connected to a vertical conduit 6, and a solenoid valve is installed on the vertical conduit 6. The lower end of the vertical conduit 6 is connected to the water outlet at the bottom of the extraction storage tank 15, and the vertical conduit 6 is connected to the water injection riser 24 through the horizontal conduit 7. When the solenoid valve is opened, the water in the water resource management box 37 flows back from the water injection riser 24 to the extraction storage pipe. According to the results of the analysis by the spectrometer, filter materials and some disinfection raw materials are added to the extraction storage tank 15 for sewage purification.

[0038] The upper end of the vertical conduit 6 is connected to a filter tank 393, which is a filter and storage device. Both ends of the filter tank 393 are provided with a protective top cover 394, and a sealing solenoid valve 395 is installed on the top of the protective top cover 394. The vertical conduit 6 is connected to the water inlet end of the filter tank 393. The water outlet end of the filter tank 393 is connected to the preliminary storage mechanism 4.

[0039] The preliminary storage mechanism 4 includes a processing tank 42, which is mounted on a mounting frame 41 disposed on the ground, wherein the processing tank 42 may have two cavities inside, one for storing sewage and the other for storing purified water, and the top of the processing tank 42 is provided with a plurality of injection sleeves connected to the inside of the processing tank 42, and a three-way pipe 44 is installed on the injection sleeve for injecting or pumping water into the processing tank 42, and the water outlet end of the filter tank 393 is connected to one of the three-way pipes 44 for injecting the water in the filter tank 393 into the processing tank 42 for preliminary storage. Trapezoidal brackets 45 are installed at both ends of the processing tank 42 for protecting the processing tank 42.

[0040] The purification mechanism 5 includes a reactor 51, a liquid injection slot 52 is provided in the middle of the top of the reactor 51, an assembly cover 53 is installed at the liquid injection slot 52, and a plurality of reactor 51 filter core mounting frames 54 for filtering processing are arranged on the side of the reactor 51, and a plurality of activated carbon filter storage tanks 55 for filtering are sequentially installed horizontally on the filter core mounting frames 54, and the activated carbon filter storage tanks 55 are filled with activated carbon core materials for filtering processing. By connecting the reactor 51 and the three-way pipe 44, the water source in the processing tank 42 is injected into the reactor 51. When in use, the water in the reactor 51 is pumped out by a water pump, and the water source passes through the activated carbon filter storage tank 55 for final purification and use. By using the activated carbon filter storage tank 55 and a plurality of activated carbon core materials, impurities in the water source can be quickly removed.

[0041] The driving motor 19, microbial monitoring sleeve 33, water quality spectrometer and water capacity detector 392 of the present application are all electrically connected to an external power supply through an external PLC controller.

[0042] Furthermore, the water resource management device also includes a water resource extraction box 8, a square slot 81 is provided in the middle of the side wall of the water resource extraction box 8, a protective mesh cover 82 is provided at the square slot 81, a protective pad 83 is provided at the top of the water resource extraction box 8, an atomizing nozzle 84 for dust reduction is provided in the middle of the top of the protective pad 83, an ultrasonic atomizer is connected to the bottom of the atomizing nozzle 84 through a sealing conduit 32, and the water resource extraction box 8 is connected to the U-shaped access hose 23. When water is injected into the extraction storage tank 15, a part of the water enters the water resource extraction box 8 and is sprayed out after atomization treatment to perform real-time dust reduction.

[0043] One end of the U-shaped access hose 23 is sealed and connected to a water flow velocity measuring tube 25, and the other end of the water flow velocity measuring tube 25 is connected to a connecting conduit 31. A monitoring meter is installed on the water flow velocity measuring tube 25 to monitor the water flow velocity and flow rate in the U-shaped access hose 23 for easy control.

[0044] Specifically, a placement frame 9 is set on the ground, and the water resource extraction box 8 is installed on the placement frame 9. A triangular bracket 11 is installed on the placement frame 9. A supporting gasket 12 is set at the top of the triangular bracket 11. A plurality of tightening openings 13 are opened around the supporting gasket 12. A tightening screw is set in the tightening opening 13, and a tightening pin 14 is set in the tightening screw. An extraction storage tank 15 is vertically installed on the top of the tightening pin 14.

[0045] Square brackets 38 are installed at both ends of the water resource management box 37, and a transverse frame 39 is fixed on the square bracket 38 by assembling screws. A water capacity detector 392 is provided at the bottom of the transverse frame 39. The water capacity detector 392 is connected to the water resource management box 37 through a transverse conduit 391, and is used to detect the water volume in the water resource management box 37.

[0046] The operation process is as follows:

[0047] First, the external water source to be treated or the water source to be treated stored in the processing tank 42 is injected into the extraction storage tank 15 through the water injection riser 24. A part of the water source enters the water resource extraction box 8 through the U-shaped access hose 23, and the atomized water vapor generated by the ultrasonic atomizer is sprayed out through two atomizing nozzles 84 to avoid dust adhesion under the influence of the building environment.

[0048] Then a part of the water source of the extraction storage tube flows into the microorganism monitoring sleeve 33, and the water source is monitored by the water quality spectrometer and imaged and scanned. After a series of inductions, the image after monitoring will be on the outer wall of the monitoring control box. The water source in the microorganism monitoring sleeve 33 is transferred to the water resource management box 37 for preliminary filtration under the pushing force of the external booster pump, and the filtered water source flows back to the extraction storage tank 15 again, and then according to the analysis results of the water quality spectrometer, filter materials and some disinfection raw materials are added to the extraction storage tank 15, and the drive motor 19 is started to drive the agitator to rotate to achieve sewage disinfection and filtration. The disinfected water source is monitored again by the water quality spectrometer, and injected into the filter storage tank 393 if it is qualified, otherwise it is filtered again, and the water source in the filter storage tank 393 is transferred to the processing storage tank 42 for storage. When it is used, the water source is finally filtered through the purification mechanism 5 and can be used.

[0049] The embodiments described above are merely descriptions of preferred implementation modes of the present invention and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should all fall within the protection scope determined by the claims of the present invention.

Claims

1. A water resource management device for a construction project, characterized in that: It includes a water resource treatment mechanism (1), a water injection mechanism (2), a sample monitoring mechanism (3), a preliminary storage mechanism (4) and a purification mechanism (5); The water resource treatment mechanism (1) comprises an extraction storage tank (15), an agitator arranged in the extraction storage tank (15), and a drive motor (19) installed on the extraction storage tank (15) for driving the agitator; The water injection mechanism (2) comprises a water injection riser (24), and the water injection riser (24) is connected to the water inlet of the extraction storage tank (15); The sample monitoring mechanism (3) comprises a microbial monitoring sleeve (33) connected to the inside of the extraction storage tank (15) through a connecting conduit (31), a sampling monitoring chamber (34) arranged at the top of the microbial monitoring sleeve (33), and a monitoring control box (35) installed on the sampling monitoring chamber (34), wherein a water quality spectrometer is arranged in the monitoring control box (35), the microbial monitoring sleeve (33) is connected to an L-shaped pipe (36), the L-shaped pipe (36) is connected to a water resource management box (37), and a filter is arranged in the water resource management box (37); The water outlet of the water resource management box (37) is connected to a vertical conduit (6), and a solenoid valve is installed on the vertical conduit (6). The lower end of the vertical conduit (6) is connected to the water outlet at the bottom of the extraction storage tank (15), and the upper end is connected to a filter storage tank (393). Both ends of the filter storage tank (393) are provided with protective top covers (394), and a sealing solenoid valve (395) is installed on the protective top cover (394). The vertical conduit (6) is connected to the water injection riser (24) through a horizontal conduit (7); The preliminary storage mechanism (4) comprises a processing storage tank (42), the processing storage tank (42) is provided with a plurality of injection sleeves connected to the interior of the processing storage tank (42), and a three-way pipe (44) is installed on the injection sleeve; The purification mechanism (5) comprises a reaction kettle (51) for accessing the water source in the processing tank (42), and an activated carbon filtering tank (55) is arranged in sequence at the water outlet of the reaction kettle (51); A connecting groove (21) is provided on the top side wall of the extraction storage tank (15), a water delivery flange pipe (22) is connected to the connecting groove (21), a U-shaped access hose (23) is connected to the water delivery flange pipe (22), and the U-shaped access hose (23) is connected to the water injection riser (24); It also comprises a water resource extraction box (8), wherein an ultrasonic atomizer is arranged in the water resource extraction box (8), and the ultrasonic atomizer is connected to an atomizing nozzle (84) arranged on the top of the water resource extraction box (8), and the water resource extraction box (8) is connected to a U-shaped access hose (23).

2. The water resource management equipment for construction projects according to claim 1, characterized in that: A top cover (16) is installed on the top of the extraction storage tank (15), a mixing and stirring groove (17) is opened in the middle of the top cover (16), a coupling (18) is installed in the mixing and stirring groove (17), and the driving motor (19) is connected to the coupling (18).

3. The water resource management equipment for construction projects according to claim 1, characterized in that: Two cavities are arranged inside the processing storage tank (42).

4. The water resource management equipment for construction projects according to claim 1, characterized in that: A liquid injection slot (52) is provided in the middle of the top of the reaction kettle (51), and an assembly cover (53) is installed at the liquid injection slot (52).

5. The water resource management equipment for construction projects according to claim 1, characterized in that: A filter core mounting frame (54) is arranged on the side of the reaction kettle (51), and the activated carbon filter storage tank (55) is mounted on the filter core mounting frame (54).

6. The water resource management equipment for construction projects according to claim 1, characterized in that: One end of the U-shaped access hose (23) is sealed and connected to a water flow velocity measuring tube (25), the other end of the water flow velocity measuring tube (25) is connected to a connecting conduit (31), and a monitoring meter is installed on the water flow velocity measuring tube (25).

7. The water resource management equipment for construction projects according to claim 1, characterized in that: It also includes a placement frame (9), on which a triangular bracket (11) is installed, a support gasket (12) is provided at the top of the triangular bracket (11), a plurality of tightening openings (13) are provided around the support gasket (12), a tightening screw is provided in the tightening opening (13), a tightening pin (14) is provided in the tightening screw, and an extraction storage tank (15) is vertically installed on the top of the tightening pin (14).

8. The water resource management equipment for construction projects according to claim 1, characterized in that: A square bracket (38) is installed at the end of the water resource management box (37), a transverse frame (39) is installed on the square bracket (38), a water capacity detector (392) is provided at the bottom of the transverse frame (39), and the water capacity detector (392) is connected to the water resource management box (37) through a transverse conduit (391).

Citation Information

Patent Citations

  • Rainwater accumulation device for water resource management

    CN215530601U

  • Sewage treatment tank for sewage treatment

    CN213446555U

  • Sewage treatment device for paper mill

    CN216584498U