A pre-buried assembled cantilever scaffolding
By designing a pre-embedded pre-embedded pre-embedded scaffolding, the combination of support plates, longitudinal and transverse support members, anchor pulling parts and pulling ropes is solved, and the complex problems of the pre-embedded steps of traditional cantilever scaffolding are achieved, simplifying assembly and improving Safety performance effect.
Patent Information
- Application Number
- CN202310278562.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-03-21
- Publication Date
- 2025-02-25
- Estimated Expiration
- 2043-03-21
AI Technical Summary
Traditional cantilever scaffolding requires pre-embedded support parts, resulting in increased construction period and cost, and complex construction, low safety performance, and poor suspension stability.
A pre-embedded prefabricated cantilever scaffolding is designed, using the first support plate and the second support plate as the frame structure, and is fixed to the floor slab through longitudinal and transverse support, and is connected to the construction using anchor pulling parts and draw ropes. Scaffolding, simplifying assembly process and improving stability.
It realizes assembly without the need for embedded support, simplifies construction process, reduces construction period and costs, and improves the stability and safety performance of cantilever scaffolding.
Smart Images

Figure CN116290701B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building construction, in particular to an assembled cantilever scaffolding free of pre-embedded parts. Background Art
[0002] Scaffolding is a working platform set up to ensure the smooth progress of each construction process.
[0003] In construction, aerial work is an indispensable link. Cantilever scaffolding is a cantilevered support composed of horizontal or diagonal bars extended from the building, suspended above the bottom surface. As a common aerial work equipment, it has many types and is widely used in construction.
[0004] Due to the need for structural design and load-bearing, traditional cantilever scaffolding has some defects: traditional cantilever scaffolding requires pre-embedded support parts, that is, the embedded parts need to be installed in advance, and after the installation is completed, it is necessary to wait for the concrete to solidify and form. After the operation is completed, the embedded parts need to be removed to make room for subsequent projects, resulting in increased construction period and cost. In addition, traditional cantilever scaffolding has the problems of complex construction, low safety performance, and poor suspension stability.
[0005] Based on the above, the present application provides a pre-buried assembled cantilever scaffolding to solve the defects of the prior art. Summary of the invention
[0006] The object of the present invention is to provide a pre-buried assembled cantilever scaffolding to solve the problems raised in the above-mentioned background technology.
[0007] In order to solve the above technical problems, the present invention provides the following technical solutions: an assembled cantilever scaffolding without pre-embedded parts, comprising: a first support plate, the first support plate is used to be placed on a certain floor; and a second support plate, the second support plate is used to be placed on another floor, and the second support plate is located at the lower end of the first support plate, and the second support plate extends to the outer edge side of the floor; and a longitudinal support member, the longitudinal support member is used to support between the floor and the first support plate, and to support between the floor and the second support plate; and a construction scaffold, the construction scaffold is used to be placed on the outer edge side of the floor, extending along the stacking direction of the floor, and the lower end of the construction scaffold is supported on the second support plate; and an anchor member, the anchor member is used to connect the construction scaffold to the first support plate, and to connect the construction scaffold to the second support plate, thereby providing a pulling force pointing to the direction of the floor to the construction scaffold.
[0008] Preferably, the construction scaffolding includes a plurality of grid structures, which are distributed along the extension direction of the second support plate and supported by the portion of the second support plate extending out of the outer edge of the floor slab. The anchor members extend to pass through the plurality of grid structures in sequence and are connected to the nodes corresponding to the plurality of grid structures.
[0009] Preferably, the construction scaffolding also includes: a plurality of connecting rods, which are used to connect the corresponding nodes of the grid structure in pairs; and a plurality of pull ropes, one end of each pull rope is used to connect the connecting rod to the node connected to the grid structure, and the other end is used to connect the first support plate.
[0010] Preferably, each grid-like structure is composed of a plurality of cross bars and a plurality of vertical bars, and the cross bars and the vertical bars, the nodes and the connecting rods, and the nodes and the anchors are all connected by fasteners.
[0011] Preferably, a pre-buried assembled cantilever scaffolding free of components further comprises a protective net, which is placed on a side of the construction scaffolding away from the first support plate and the second support plate.
[0012] Preferably, the anchor member and the connecting rod are extended to be connected with the protective net, and the anchor member and the connecting rod are provided with pin holes on one side close to the protective net, and pin plates are provided at positions corresponding to the protective net and the pin holes, and the pin holes and the pin plates are connected by bolts and nuts.
[0013] Preferably, the first support plate and the second support plate are both fixedly provided with an anchor base, and the anchor member is a rod, and its end away from the construction scaffolding passes through the anchor base; the end of the anchor member is also provided with an anchor bolt connected thereto, and the anchor bolt abuts against the anchor base to form a pulling and fixing effect on the construction scaffolding.
[0014] Preferably, a pull member support seat is fixedly provided on both the first support plate and the second support plate, the pull member support seat is located between the anchor base and the construction scaffolding, and the anchor pull member also passes through the pull member support seat.
[0015] Preferably, the longitudinal support member is a rod member, and the longitudinal support member includes support seats located at both ends thereof, the support seat at one end of the longitudinal support member is connected to the first support plate or the second support plate, and the support seat at the other end is used to abut against the floor slab.
[0016] Preferably, the first support plate and the second support plate are both composed of a plurality of I-beams arranged in parallel, and the cantilever scaffolding further includes a transverse support member, and the transverse support member is supported between pairs of I-beams.
[0017] Compared with the prior art, the beneficial effects achieved by the present invention are as follows: the present invention discloses an assembled cantilever scaffolding without pre-embedded parts, firstly, a first support plate and a second support plate are arranged between the floor slabs as the frame structure of the cantilever scaffolding, providing a fulcrum platform for the setting of the construction scaffolding, and secondly, longitudinal support members and transverse support members are arranged, and the first support plate and the second support plate are supported and fixed between the floor slabs, avoiding the step of setting pre-embedded parts in traditional scaffolding, and anchor pull members are also arranged to connect the construction scaffolding with the frame structure, which is simple to assemble, and finally, a pull rope is arranged to disperse the force on the first support plate, thereby improving the stability and safety of the cantilever scaffolding. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0019] Figure 1 is a schematic structural diagram of a cantilever scaffold in a side view according to an embodiment of the present invention;
[0020] Figure 2 It is a schematic structural diagram of the cantilever scaffolding in the embodiment of the present invention in the front view;
[0021] Figure 3 In the embodiment of the present invention, the cantilever scaffolding is Figure 1 Detailed view of point A in the middle;
[0022] Figure 4 In the embodiment of the present invention, the cantilever scaffolding is Figure 1 Detailed view of point B in the middle;
[0023] Figure 5 In the embodiment of the present invention, the cantilever scaffolding is Figure 1 Detailed view of position C in the middle;
[0024] In the figure:
[0025] A first support plate 1;
[0026] A second supporting plate 2;
[0027] Longitudinal support members 3a, 3b, support seats 31a, 31b;
[0028] Construction scaffold 4, grid structure 41, node 411, cross bar 412, vertical bar 413, connecting rod 42, pull rope 43a, 43b, fastener 44;
[0029] Anchor members 5a, 5b, anchor bases 52a, 52b, anchor bolts 53a, 53b, and member support bases 54a, 54b;
[0030] Pin holes 51a, 51b, 421;
[0031] Protection net 6, latch plate 61;
[0032] Transverse supports 7a, 7b;
[0033] The first floor slab 8a, the second floor slab 8b, and the third floor slab 8c. DETAILED DESCRIPTION
[0034] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0035] Scaffolding is a working platform set up to ensure the smooth progress of each construction process. Cantilever scaffolding is a cantilever bracket composed of horizontal bars or diagonal bars cantilevered from the building, suspended above the bottom surface. As a common aerial work equipment, it has many types and is widely used in construction. Due to the structural design and load-bearing needs, traditional cantilever scaffolding has some defects: traditional cantilever scaffolding requires pre-embedded support parts, that is, embedded parts need to be installed in advance, and after installation, it is necessary to wait for the concrete to solidify and form. After the operation is completed, the embedded parts need to be removed to make room for subsequent projects, resulting in an increase in construction period and cost. In addition, traditional cantilever scaffolding has the problems of complex construction, low safety performance, and poor suspension stability.
[0036] Based on the above defects, the present application provides an embodiment, which is the best solution for a pre-buried assembled cantilever scaffold. Specifically, the present embodiment takes a three-story floor as an example to illustrate the structure of the cantilever scaffold.
[0037] Specifically, Figure 1 , is the structural diagram of the cantilever scaffolding in side view, Figure 1 It is shown in the figure that the cantilever scaffolding includes a first support plate 1 and a second support plate 2. The first support plate 1 is placed on the second floor slab 8b, and the second floor slab 8b supports the first support plate 1. The second support plate 2 is placed on the first floor slab 8a, and the first floor slab 8a supports the second support plate 2, so that the second support plate 2 is located at the lower end of the first support plate 1. At the same time, the second support plate 2 extends to the outer edge side of the first floor slab 8a, and the extended part serves as a platform for building a construction scaffolding 4, that is, the first support plate 1 and the second support plate 2 serve as the frame structure of the cantilever scaffolding.
[0038] Furthermore, in the present embodiment, the first support plate 1 and the second support plate 2 are both composed of a plurality of I-beams arranged in parallel, the arrangement direction of the I-beams points to the wall panels on both sides of the floor slab, and each I-beam of the second support plate 2 extends out of the outer edge side of the first floor slab 8a, and the I-beams of the first support plate 1 and the I-beams of the second support plate 2 extend in the same direction.
[0039] Furthermore, in order to avoid fixing the first support plate 1 and the second support plate 2 by setting embedded parts, as shown in FIG. Figure 1 , indicating that the cantilever scaffolding also includes longitudinal support members 3a, 3b, the longitudinal support member 3a is supported between the lower side of the third floor slab 8c and the first support plate 1, and the longitudinal support member 3b is supported between the lower side of the second floor slab 8b and the second support plate 2, so that the longitudinal support members 3a, 3b respectively fix the first support plate 1 and the second support plate 2 to avoid displacement of the first support plate 1 and the second support plate 2 in the stacking direction of the floor slabs.
[0040] Furthermore, in the present embodiment, each I-beam of the first support plate 1 is correspondingly provided with two longitudinal support members 3 a , and each I-beam of the second support plate 2 is correspondingly provided with two longitudinal support members 3 b .
[0041] Further, such as Figure 1 The longitudinal support members 3a and 3b are specifically rods, wherein in order to increase the stability of the longitudinal support members 3a and 3b, support seats 31a are arranged at both ends of the longitudinal support member 3a, the support seat 31a at one end of the longitudinal support member 3a is welded to the I-beam of the first support plate 1, and the support seat 31a at the other end abuts against the lower side of the third floor slab 8c; at the same time, support seats 31b are arranged at both ends of the longitudinal support member 3b, the support seat 31b at one end of the longitudinal support member 3b is welded to the I-beam of the second support plate 2, and the support seat 31a at the other end abuts against the lower side of the second floor slab 8b.
[0042] Furthermore, the cantilever scaffolding also includes transverse support members 7a and 7b, which are also rods and are supported between two I-beams. Specifically, the transverse support member 7a is supported between two I-beams of the first support plate 1, and the transverse support member 7b is supported between two I-beams of the second support plate 2.
[0043] Further, such as Figure 1 After the frame structure of the cantilever scaffolding is completed, a construction scaffolding 4 needs to be built on the frame. In the present embodiment, the construction scaffolding 4 is placed on the outer edge of the three-story slab and extends along the stacking direction of the three-story slab. The lower end of the construction scaffolding 4 is supported on the second support plate 2 and extends out of the outer edge of the first floor slab 8a.
[0044] Further, such as Figure 1 In this embodiment, the construction scaffolding 4 includes two grid structures 41, which are vertically arranged between the floor slabs. The two grid structures 41 are distributed along the extension direction of the second support plate 2 and are supported by the part of the second support plate 2 extending out of the outer edge of the floor slab.
[0045] Further, such as Figure 2 , is a structural schematic diagram of the cantilever scaffolding in the front view, showing that each grid structure 41 is composed of a plurality of cross bars 412 and a plurality of vertical bars 413, the plurality of vertical bars 413 are arranged parallel to the longitudinal supports 3a, 3b, the cross bars 412 and the vertical bars 413 are arranged vertically, the plurality of cross bars 412 are evenly spaced along the stacking direction of the floors, the plurality of vertical bars 413 are evenly spaced along the extending direction of the cross bars 412, and the cross bars 412 and the vertical bars 413 are connected by fasteners 44.
[0046] Further, such as Figure 1 The cantilever scaffolding also includes anchor members 5a and 5b. The anchor member 5a connects the construction scaffolding 4 with the first support plate 1, and the anchor member 5b connects the construction scaffolding 4 with the second support plate 2, thereby providing a pulling force pointing to the floor direction to the construction scaffolding 4, so that the construction scaffolding 4 is firmly connected with the first support plate 1 and the second support plate 2. At the same time, the anchor members 5a and 5b both play the role of transverse cross bars in traditional scaffolding, and the anchor member 5b also plays the role of transverse sweeping rod in traditional scaffolding.
[0047] Further, such as Figure 1 The anchor member 5a extends to pass through the upper part of the two grid structures 41 in sequence, and the nodes 411 corresponding to the two grid structures 41 are also connected by fasteners 44. The anchor member 5b extends to pass through the lower part of the two grid structures 41 in sequence, and the nodes 411 corresponding to the two grid structures 41 are also connected by fasteners 44.
[0048] Further, such as Figure 1 The construction scaffolding 4 also includes a connecting rod 42, and the connecting rod 42 is used to connect the corresponding nodes 411 in the middle of the two grid structures 41 through fasteners 44; at the same time, in the present embodiment, the construction scaffolding 4 also includes pull ropes 43a and 43b, and the pull ropes 43a and 43b are made of steel wire ropes, one end of the pull rope 43a is connected to one end of the connecting rod 42, one end of the pull rope 43b is connected to the other end of the connecting rod 42, and the other ends of the pull ropes 43a and 43b are connected to the end of the first support plate 1; in this way, the gravity exerted on the construction scaffolding 4 can be decomposed multiple times and transferred to the first support plate 1, thereby reducing the pressure of the construction scaffolding 4 on the second support plate 2, and avoiding the second support plate 2 from being damaged due to excessive load.
[0049] Specifically, both ends of the connecting rod 42 are provided with pin holes, a gusset plate is welded on the first support plate 1 near the outer edge of the second floor slab 8b, and holes are formed on the gusset plate. The two ends of the pull ropes 43a and 43b are respectively tied and connected to the holes of the gusset plate and the pin holes on the connecting rod 42.
[0050] Further, such as Figure 1 The anchor members 5a and 5b are connected to the first support plate 1 and the second support plate 2 respectively in the following manner: the anchor members 5a and 5b are rod members, and a tie base 52a is welded on the I-beam of the first support plate 1, and the end of the anchor member 5a away from the construction scaffolding 4 passes through the tie base 52a, and an anchor bolt 53a is provided at the end of the anchor member 5a, which is screwed to the anchor member 5a, and the anchor bolt 53a abuts against the tie base 52a, forming a pulling and strengthening effect on the construction scaffolding 4; a tie base 52b is welded on the I-beam of the second support plate 2, and the end of the anchor member 5b away from the construction scaffolding 4 passes through the tie base 52b, and an anchor bolt 53b is provided at the end of the anchor member 5b, which is screwed to the anchor member 5b, and the anchor bolt 53b abuts against the tie base 52b, forming a pulling and strengthening effect on the construction scaffolding 4.
[0051] Further, such as Figure 1 A pull piece support seat 54a is welded on the I-beam of the first support plate 1, and the pull piece support seat 54a is located between the tie base 52a and the construction scaffolding 4. The anchor pull piece 5a also passes through the pull piece support seat 54a to support the middle part of the anchor pull piece 5a; at the same time, a pull piece support seat 54b is welded on the I-beam of the second support plate 2, and the pull piece support seat 54b is located between the tie base 52b and the construction scaffolding 4. The anchor pull piece 5b also passes through the pull piece support seat 54b to support the middle part of the anchor pull piece 5b.
[0052] Further, such as Figures 1-2 The cantilever scaffolding also includes a protective net 6, which is placed on a side of the construction scaffolding 4 away from the first support plate 1 and the second support plate 2.
[0053] Further, such as Figure 3 , for this cantilever scaffolding Figure 1 Detailed view of point A in the middle. Figure 4 For this cantilever scaffolding Figure 1 Detailed view of point B in the middle. Figure 5 For this cantilever scaffolding Figure 1 The detail diagram at point C in the middle shows that the anchor members 5a, 5b and the connecting rod 42 are extended to be connected to the protective net 6, and the anchor members 5a, 5b and the connecting rod 42 are provided with latch holes 51a, 51b, 421 on the side close to the protective net 6, and latch plates 61 are provided at positions corresponding to the protective net 6 and the latch holes 51a, 51b, 421, and the latch holes 51a, 51b, 421 are connected to the latch plates 61 by bolts and nuts.
[0054] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0055] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A pre-buried assembled cantilever scaffolding, characterized in that: Included are: A first supporting plate, wherein the first supporting plate is used to be placed on a certain floor; and a second support plate, the second support plate being used to be placed on another floor slab, the second support plate being located at a lower end of the first support plate, and the second support plate extending to an outer edge side of the floor slab; and a longitudinal support member, the longitudinal support member being used for supporting between the floor slab and the first support plate, and for supporting between the floor slab and the second support plate; and a construction scaffold, the construction scaffold is used to be placed on the outer edge side of the floor slab, extends along the stacking direction of the floor slab, and the lower end of the construction scaffold is supported on the second supporting plate; and an anchor member, the anchor member being used to connect the construction scaffolding to the first support plate and to connect the construction scaffolding to the second support plate, so as to provide a pulling force pointing to the floor slab to the construction scaffolding; The construction scaffolding includes a plurality of grid-like structures, which are distributed along the extension direction of the second support plate and supported by the portion of the second support plate extending out of the outer edge of the floor slab, and the anchor member extends to pass through the plurality of grid-like structures in sequence and is connected to the nodes corresponding to the plurality of grid-like structures; The first support plate and the second support plate are both fixedly provided with a tie base, and the anchor member is a rod, and one end of the anchor member away from the construction scaffold passes through the tie base; the end of the anchor member is also provided with an anchor bolt connected thereto, and the anchor bolt abuts against the tie base to form a tightening effect on the construction scaffold; A pull member support seat is fixedly provided on the first support plate and the second support plate. The pull member support seat is located between the anchor base and the construction scaffolding, and the anchor pull member also passes through the pull member support seat.
2. The pre-buried assembled cantilever scaffolding according to claim 1 is characterized in that: The construction scaffolding also includes: A plurality of connecting rods, wherein the connecting rods are used to connect two corresponding nodes of the grid structure; and a plurality of pull ropes, one end of each of which is used to connect the node where the connecting rod is connected to the grid structure, and the other end of each of which is used to connect the first support plate.
3. The pre-buried assembled cantilever scaffolding according to claim 2 is characterized in that: Each of the grid-like structures is composed of a plurality of cross bars and a plurality of vertical bars, and the cross bars and the vertical bars, the nodes and the connecting rods, and the nodes and the anchors are all connected by fasteners.
4. The pre-buried assembled cantilever scaffolding according to any one of claims 2 to 3, characterized in that: A protective net is also included, and the protective net is placed on a side of the construction scaffolding away from the first supporting plate and the second supporting plate.
5. The pre-buried assembled cantilever scaffolding without pre-buried parts according to claim 4, characterized in that: The anchor member and the connecting rod are both extended to be connected with the protective net, and the anchor member and the connecting rod are both provided with pin holes on one side close to the protective net, and the protective net is provided with pin plates at positions corresponding to the pin holes, and the pin holes and the pin plates are connected by bolts and nuts.
6. The pre-buried assembled cantilever scaffolding according to any one of claims 1 to 3, characterized in that: The longitudinal support member is a rod member, and the longitudinal support member includes support seats located at both ends thereof. The support seat at one end of the longitudinal support member is connected to the first support plate or the second support plate, and the support seat at the other end is used to abut against the floor slab.
7. The pre-buried assembled cantilever scaffolding without pre-buried parts according to claim 4 is characterized in that: The first support plate and the second support plate are both composed of a plurality of I-beams arranged in parallel, and the cantilever scaffolding further includes a transverse support member, and the transverse support member is supported between the I-beams in pairs.
Citation Information
Patent Citations
Cable-stayed suspended combined supporting system and construction method based on intelligent monitoring
CN105926916A
Instrument formula shaped steel scaffold frame load -bearing structure that encorbelments
CN205713027U
Steel mesh protective net connecting fastener
CN211173033U