Method, device, electronic equipment and storage medium for early warning of risks in high-altitude operations
Through real-time heart rate information and energy consumption information, the target model is constructed, and the problem of inaccurate risk judgment in high-altitude operations is solved, timely warning of risks of high-altitude operations is achieved, and safety is improved.
Patent Information
- Application Number
- CN202310111430.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-02-10
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2043-02-10
AI Technical Summary
During high-altitude operations, staff cannot promptly and effectively determine whether there is a risk of falling, resulting in the occurrence of safety accidents.
Through real-time heart rate information and energy consumption information, a target model is built to determine the operation status and risk level to achieve risk warning.
It realizes timely and effective assessment and early warning of risks during high-altitude operations, reducing the probability of falling accidents.
Smart Images

Figure CN116311773B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of safety protection based on high-altitude operations, and in particular to a high-altitude operation risk early warning method, device, electronic equipment and storage medium. Background Art
[0002] There are great safety risks for workers when performing high-altitude operations. If safety warnings are not given in time, safety accidents may occur.
[0003] At present, the risk perception during high-altitude operations is usually based on the work experience of the staff to control the working time and rest time. However, in the actual work process, the staff are blindly confident in their own physical strength, which leads to unreasonable distribution of physical strength during the climbing process, or high tension during the operation, resulting in inaccurate risk judgment and even falling from heights.
[0004] In order to solve the above problems, it is necessary to provide timely risk warnings when workers are working at high altitudes. Summary of the invention
[0005] The present invention provides a high-altitude operation risk warning method, device, electronic device and storage medium to solve the problem that when the target user is working at high altitude, it is impossible to timely and effectively judge whether the target user has a risk of falling based on work experience.
[0006] In a first aspect, an embodiment of the present invention provides a method for early warning of risks of high-altitude operations, comprising:
[0007] Determine a target model corresponding to the target user according to the real-time heart rate information of the target user during the aerial work; wherein the working state during the aerial work includes a climbing state and a resting state, and the real-time heart rate information includes climbing heart rate information in the climbing state and resting heart rate information in the resting state;
[0008] Processing the real-time heart rate information based on the target model to obtain a work status of the target user at a work moment corresponding to at least one heart rate collection moment;
[0009] According to the energy consumption information and corresponding climbing heart rate information corresponding to the target user in the climbing state, the risk level of the target user during the operation is determined and an early warning is issued.
[0010] In a second aspect, an embodiment of the present invention further provides a high-altitude operation risk warning device, comprising:
[0011] A target model determination module is used to determine a target model corresponding to the target user according to the real-time heart rate information of the target user during the aerial work process; wherein the working state during the aerial work process includes a climbing state and a resting state, and the real-time heart rate information includes climbing heart rate information in the climbing state and resting heart rate information in the resting state;
[0012] A work status determination module, used for processing the real-time heart rate information based on the target model to obtain the work status of the target user at a work moment corresponding to at least one heart rate collection moment;
[0013] The risk warning module is used to determine the risk level of the target user during the operation and issue a warning according to the energy consumption information and corresponding climbing heart rate information corresponding to the target user in the climbing state.
[0014] In a third aspect, an embodiment of the present invention further provides an electronic device, including:
[0015] at least one processor; and
[0016] a memory communicatively connected to the at least one processor; wherein,
[0017] The memory stores a computer program that can be executed by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the high-altitude work risk warning method described in any embodiment of the present invention.
[0018] In a fourth aspect, an embodiment of the present invention further provides a computer-readable storage medium, wherein the computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the high-altitude work risk warning method described in any embodiment of the present invention when executed.
[0019] The technical solution of this embodiment is to determine the target model corresponding to the target user according to the real-time heart rate information of the target user during the high-altitude operation, determine the target sample heart rate information based on the similarity between the real-time heart rate information and each sample heart rate information, and determine the target model to be used corresponding to the target sample heart rate information as the target model corresponding to the real-time heart rate information of the target user. The real-time heart rate information is processed based on the target model to obtain the target user's operation state at the operation moment corresponding to at least one heart rate collection moment. The predicted instantaneous efficiency of the target user at the operation moment corresponding to each heart rate collection moment can be determined based on the target model. When the predicted instantaneous efficiency is 1, it indicates that the target user's operation state is a climbing state, and when the predicted instantaneous efficiency is 0, it indicates that the target user's operation state is a resting state. According to the energy consumption information corresponding to the target user in the climbing state and the corresponding climbing heart rate information, the risk level of the target user in the operation process is determined, and an early warning is issued. In the actual operation process of the target user, the corresponding risk level is determined through the energy consumption information and the climbing heart rate information in the climbing state, and an early warning is issued. The problem that when the target user is working at high altitude, it is impossible to timely and effectively judge whether the target user has the risk of falling based on work experience is solved. By analyzing the real-time heart rate information of the target user and combining the energy consumption information of the target user in the climbing state, it is achieved to timely and effectively assess the risks in the target user's operation process and timely issue risk warnings to the target user.
[0020] It should be understood that the contents described in this section are not intended to identify the key or important features of the embodiments of the present invention, nor are they intended to limit the scope of the present invention. Other features of the present invention will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0022] Figure 1 This is a flow chart of a high-altitude operation risk warning method provided according to Embodiment 1 of the present invention;
[0023] Figure 2 This is a flow chart of a high-altitude operation risk warning method provided according to Embodiment 2 of the present invention;
[0024] Figure 3 is a flow chart of a method for determining a job status according to a second embodiment of the present invention;
[0025] Figure 4is a schematic diagram of a target user's operating status at each operating time provided according to the second embodiment of the present invention;
[0026] Figure 5 This is a schematic diagram of a process of risk level determination and early warning provided according to Embodiment 2 of the present invention;
[0027] Figure 6 This is a schematic diagram of the structure of a high-altitude operation risk warning device provided according to Embodiment 3 of the present invention;
[0028] Figure 7 It is a structural schematic diagram of an electronic device for implementing the high-altitude operation risk warning method according to an embodiment of the present invention. DETAILED DESCRIPTION
[0029] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0030] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the numbers used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein.
[0031] Before elaborating on the technical solution in detail, the application scenarios of the technical solution are briefly introduced to make the technical solution more clearly understood. For workers who work at high altitudes, such as workers who work on pole towers, during the entire high-altitude operation process, workers need to climb from the bottom to the highest point. In this process, due to problems such as physical exhaustion, the climbing speed and intensity need to be controlled to avoid excessive physical exhaustion, resulting in problems such as falling from high altitude. At present, when working at high altitudes, it is common for old employees to be physically exhausted during the later operation and maintenance operations due to the fast climbing speed (high intensity) in the early stage; at the same time, there are also cases where inexperienced new employees have a greatly reduced climbing speed of the pole tower due to psychological tension. In order to solve the above problems, the technical solution proposes a method for determining the working status of workers during high-altitude operations based on heart rate information, such as when to rest, when to work, the length of rest and the length of work, etc. At the same time, during the climbing process of the workers, if the risk of falling of the workers is detected, a risk warning is issued in time.
[0032] Embodiment 1
[0033] Figure 1 A flowchart of a high-altitude work risk warning method is provided for embodiment 1 of the present invention. This embodiment can be applied to situations in which corresponding risk assessments are performed on the real-time heart rate information of workers performing high-altitude work, as well as the energy consumption information of the workers during work, and risk warnings are issued to the workers in a timely manner. The method can be executed by a high-altitude work risk warning device, which can be implemented in the form of hardware and / or software, and can be configured in a computing device that can execute the high-altitude work risk warning method.
[0034] like Figure 1 As shown, the method includes:
[0035] S110. Obtain sample heart rate information of at least one sample user during aerial work, so as to construct a corresponding model to be used according to each sample heart rate information.
[0036] Before determining the target model corresponding to the target user based on the real-time heart rate information of the target user during the high-altitude operation, the method also includes: obtaining sample heart rate information of at least one sample user during the high-altitude operation; for each sample user, determining the climbing speed of the current sample user based on the current heart rate information and historical heart rate information of the current sample user in the climbing state; obtaining the instantaneous climbing efficiency at the corresponding heart rate collection moment based on the climbing height and climbing speed of the current sample user; and constructing a current to-be-used model corresponding to the current sample heart rate information based on at least one instantaneous climbing efficiency during the high-altitude operation, so as to determine the working state of the current sample user at the corresponding working moment based on the current to-be-used model.
[0037] Among them, the aerial work process includes climbing state and resting state, and the sample heart rate information includes the first sample heart rate in the climbing state and the second sample heart rate in the resting state. The current heart rate information is the heart rate information corresponding to the current heart rate collection moment of the current sample user, and the historical heart rate information is the heart rate information corresponding to the historical moment adjacent to the current heart rate collection moment.
[0038] In the present technical solution, in order to accurately determine the working state of the target user at each moment during the aerial work, a target model corresponding to the target user can be pre-built to determine the corresponding working state based on the target model. In order to make the target model more accurate, it is necessary to obtain a large amount of sample heart rate information of sample users during the aerial work. Among them, the so-called sample user can be a tester participating in the aerial work, or can also be an actual staff member participating in the aerial work, etc. The sample heart rate information can be understood as the heart rate information of the sample user during the aerial work. It can be understood that the heart rate information of the sample user during the aerial work is not always fixed, but floats within a heart rate range. Therefore, the sample heart rate information includes the heart rate information of the sample user at at least one heart rate collection moment, and since the working state of the sample user during the operation includes a resting state and a climbing state, by analyzing the heart rate information under different working states, a to-be-used model corresponding to the sample user can be constructed, so that when a user with heart rate information similar to the sample heart rate information is detected, the acquired heart rate information is analyzed and processed based on the corresponding to-be-used model to determine the working state of the user at each moment during the aerial work.
[0039] In actual application, the travel speed of each sample user during the high-altitude operation may be different. The travel speed of each sample user is regarded as a uniform speed, and sample heart rate information at at least one travel speed can be obtained. Among them, the heart rate information of the sample user during the climbing process is used as the first sample heart rate information, and the effective heart rate information collection data is the heart rate information that does not exceed 0.8-1.2 times the preset heart rate information. After the heart rate data of the tower climbing operation is collected, the second sample heart rate information in the rest state (not climbing the tower and not working) is immediately collected.
[0040] After obtaining sample heart rate information of a large number of sample users, the heart rate fitting function can be obtained by fitting based on the following formula:
[0041]
[0042] Wherein, X(t) represents the current sample heart rate information of the current sample user, A is the first fitting parameter, B is the second fitting parameter, C is the third fitting parameter, T1 is the time function related to time in the climbing state, T2 is the time function related to time in the resting state, k1 represents the first heart rate adjustment parameter, and k2 represents the second heart rate adjustment parameter.
[0043] Among them, T1 can be expressed as a discretized time function, that is, T1 = [T 11 ,T 12 ,...T 1i ...T 1n], T2 can also be expressed as a discrete time function, that is, T2 = [T 21 ,T 22 ,...T 2i ...T 2n ]. Among them, T 1i and T 2i is time t i The instantaneous operating status representation, its value is only "0" or "1". For example, when t i When the moment is in climbing state, T 1i = "1" and T 2i = "0"; when t i When the moment is in rest state, T 1i = "0" and T 2i =“1”.
[0044] In this technical solution, the current sample user includes climbing state and resting state during high-altitude operation. Correspondingly, the heart rate fitting function X(t) also includes two parts, namely, the first heart rate fitting function in the climbing state And the second heart rate fitting function in the resting state
[0045] Specifically, for each sample user at any travel speed, a corresponding heart rate fitting function can be corresponded. After collecting a large amount of sample heart rate information of sample users, the heart rate fitting function is fitted based on the sample heart rate information, and the parameter information in the heart rate fitting function can be obtained, specifically including A as the first fitting parameter, B as the second fitting parameter, C as the third fitting parameter, k1 represents the first heart rate adjustment parameter, and k2 represents the second heart rate adjustment parameter.
[0046] Furthermore, after determining the heart rate fitting function, the sample heart rate information at each travel speed can be classified and decoupled. Since aerial work is a continuous and intensive work, there is a specific relationship between the heart rate curve X(t) and the travel speed v. The speed fitting function corresponding to the travel speed using the following decoupling formula can be expressed by the following formula:
[0047]
[0048] Among them, v(t) represents the climbing speed of the sample user at time t, X(t) represents the sample heart rate information corresponding to the sample user at time t, t0 is the historical moment closest to time t, v(t0) represents the moving speed of the sample user at time t0, X(t0) represents the sample heart rate information corresponding to the sample user at time t0, and D represents the speed correction parameter.
[0049] Similarly, after analyzing the sample heart rate information and speed information of a large number of sample users, parameter information in the speed fitting function, that is, the speed correction parameter D, can be obtained.
[0050] Furthermore, in order to further determine the optimal route, the instantaneous climbing efficiency η of the climbing operation is set to determine the working status of the sample user during the high-altitude operation.
[0051] Specifically, the instantaneous climbing efficiency corresponding to the sample user can be determined based on the following formula:
[0052]
[0053] Where η represents the instantaneous climbing efficiency, Δt represents the time difference between two adjacent heart rate collection moments, Δh represents the climbing height of the sample user within Δt, v(t) represents the climbing speed of the sample user at time t, and v(t+Δt) represents the climbing speed of the sample user at time t+Δt.
[0054] Based on this, a to-be-used model corresponding to each sample user may be constructed to determine the job status of the current sample user at the corresponding job moment based on the current to-be-used model.
[0055] S120: Determine a target model corresponding to the target user according to the real-time heart rate information of the target user during the aerial work.
[0056] The working state during the aerial work process includes the climbing state and the resting state, and the real-time heart rate information includes the climbing heart rate information in the climbing state and the resting heart rate information in the resting state. The target user can be understood as the staff who is currently working at the aerial work. The target model can be understood as a model for determining the working state of the target user at each working moment during the working process.
[0057] In actual applications, in order to better assist the target user in performing high-altitude operations, the real-time heart rate information of the target user during the actual operation process can be obtained, and the target model corresponding to the target user can be called from the to-be-used model corresponding to each sample heart rate information, so as to determine the target user's working status at the working moment corresponding to each heart rate collection moment based on the target model.
[0058] S130. Process the real-time heart rate information based on the target model to obtain a working status of the target user at a working moment corresponding to at least one heart rate collection moment.
[0059] S140: Determine the risk level of the target user during the operation according to the energy consumption information and the corresponding climbing heart rate information of the target user in the climbing state, and issue a warning.
[0060] Among them, the energy consumption information can be understood as the physical energy consumption information of the target user during the climbing process. It is understandable that during the operation, when the target user is in a resting state, the target user's energy gradually recovers, and in a climbing state, the energy is gradually consumed. Therefore, falling accidents during high-altitude operations mostly occur in the climbing state. Based on this, in order to timely detect whether the target user has a risk of falling, this technical solution obtains the climbing heart rate information of the target user in the climbing state, and at the same time determines the energy consumption information of the target user, so as to determine the risk level of the target user during the operation based on the corresponding energy consumption information and the corresponding climbing heart rate information, and issue an early warning.
[0061] The technical solution of this embodiment is to determine the target model corresponding to the target user according to the real-time heart rate information of the target user during the high-altitude operation, determine the target sample heart rate information based on the similarity between the real-time heart rate information and each sample heart rate information, and determine the target model to be used corresponding to the target sample heart rate information as the target model corresponding to the real-time heart rate information of the target user. The real-time heart rate information is processed based on the target model to obtain the target user's operation state at the operation moment corresponding to at least one heart rate collection moment. The predicted instantaneous efficiency of the target user at the operation moment corresponding to each heart rate collection moment can be determined based on the target model. When the predicted instantaneous efficiency is 1, it indicates that the target user's operation state is a climbing state, and when the predicted instantaneous efficiency is 0, it indicates that the target user's operation state is a resting state. According to the energy consumption information corresponding to the target user in the climbing state and the corresponding climbing heart rate information, the risk level of the target user in the operation process is determined, and an early warning is issued. In the actual operation process of the target user, the corresponding risk level is determined through the energy consumption information and the climbing heart rate information in the climbing state, and an early warning is issued. The problem that when the target user is working at high altitude, it is impossible to timely and effectively judge whether the target user has the risk of falling based on work experience is solved. By analyzing the real-time heart rate information of the target user and combining the energy consumption information of the target user in the climbing state, it is achieved to timely and effectively assess the risks in the target user's operation process and timely issue risk warnings to the target user.
[0062] Embodiment 2
[0063] Figure 2 A flowchart of a high-altitude operation risk warning method provided in Embodiment 2 of the present invention, and optionally, a detailed description of the high-altitude operation risk warning method is provided.
[0064] like Figure 2 As shown, the method includes:
[0065] S210: Determine a target model corresponding to the target user according to the real-time heart rate information of the target user during the aerial work.
[0066] In practical applications, in order to determine the target model corresponding to the target user, during the high-altitude operation, the target user's real-time heart rate can be collected based on the heart rate collection equipment to obtain real-time heart rate information; based on the similarity algorithm, the target sample heart rate information corresponding to the real-time heart rate information is determined from at least one sample heart rate information; the model to be used corresponding to the target sample heart rate information is determined as the target model corresponding to the target user.
[0067] It is understandable that the sample heart rate information corresponding to the sample user at different travel speeds is different, and different sample heart rate information corresponds to different models to be used. Based on this, during the high-altitude operation of the target user, the real-time heart rate information of the target user is collected, and the similarity between the real-time heart rate information and each sample heart rate information is calculated based on the similarity algorithm, and the sample heart rate information with the highest similarity is used as the target sample heart rate information. It should be noted that the higher the similarity between the real-time heart rate information and the sample heart rate information, the more similar the target user's operating status at each operating moment during the actual operation process is to the sample user corresponding to the sample heart rate information. Therefore, the model to be used corresponding to the target heart rate information can be retrieved as the target model, so as to analyze and process the real-time heart rate information based on the target model to obtain the operating status of the target user at each operating moment.
[0068] S220: Process the real-time heart rate information based on the target model to obtain a working status of the target user at a working moment corresponding to at least one heart rate collection moment.
[0069] During the actual processing process, the real-time heart rate information is input into the target model, and the predicted instantaneous efficiency of the target user's working moment corresponding to at least one heart rate collection moment during the high-altitude operation is determined based on the target model; based on each predicted instantaneous efficiency, the working status of the target user at the corresponding working moment is determined.
[0070] Among them, the predicted instantaneous efficiency can be understood as the working state of the target user at each working moment determined based on the target model. Based on the analysis above, the sample heart rate information corresponding to the target model is the heart rate information with the highest similarity to the real-time heart rate information, and the target model is a model to be used constructed based on the sample heart rate model. Therefore, the target model can obtain the predicted instantaneous efficiency of the target user at each working moment according to the sample heart rate information, so as to determine the working state at the corresponding working moment based on each predicted instantaneous efficiency. Generally speaking, when the predicted instantaneous efficiency is 0, the working state at the corresponding working moment is the resting state, and when the predicted instantaneous efficiency is greater than 0, the working state at the corresponding working moment is the climbing state.
[0071] Exemplarily, in the target sample heart rate information corresponding to the target model, the first sample heart rate information in the climbing state is within 0-5 minutes, and the heart rate information in the resting state is within 5-8 minutes. After constructing the model to be used based on the target sample heart rate information, the instantaneous climbing efficiency of the corresponding sample user at each working moment can be obtained based on the model to be used, and then the working state at the corresponding working moment can be determined according to the instantaneous climbing efficiency. Therefore, after determining the target heart rate information corresponding to the real-time heart rate information of the target user, calling the corresponding target model can accurately analyze the real-time heart rate information, obtain the predicted instantaneous efficiency of the target user at each working moment, and predict the working state of the target user at the corresponding working moment according to the working state of the sample user corresponding to the target sample heart rate information at each working moment.
[0072] S230: Determine the risk level of the target user during the operation according to the energy consumption information and the corresponding climbing heart rate information of the target user in the climbing state, and issue an early warning.
[0073] Optionally, the risk level of the target user during the operation is determined based on the energy consumption information and the corresponding climbing heart rate information corresponding to the target user in the climbing state, including: obtaining basic parameter information of the target user; processing at least one basic parameter information based on a preset energy consumption function to obtain the energy consumption information of the target user; and determining the risk level corresponding to the target user based on the energy consumption information and the corresponding climbing heart rate information of the target user in the climbing state.
[0074] The basic parameter information includes height, weight and initial physical energy. The energy consumption function can be understood as a function for calculating the energy consumption information of the target user in the climbing state.
[0075] Specifically, when determining the energy consumption information of the target user, it can be determined based on the following formula:
[0076]
[0077] Among them, M(t) represents energy consumption information, M0 represents initial physical energy, Age represents the age of the target user, E represents energy consumption information in the climbing state, k3 represents the energy consumption coefficient in the climbing state, F represents energy recovery information in the resting state, k4 represents the energy recovery coefficient in the resting state, and ω represents the weight of the target user.
[0078] Among them, T1 can be expressed as a discretized time function, that is, T1 = [T 11 ,T 12 ,...T 1i ...T 1n], T2 can also be expressed as a discrete time function, that is, T2 = [T 21 ,T 22 ,...T 2i ...T 2n ]. Among them, T 1i and T 2i is time t i The instantaneous operating status representation, its value is only "0" or "1". For example, when t i When the moment is in climbing state, T 1i = "1" and T 2i = "0"; when t i When the moment is in rest state, T 1i = "0" and T 2i =“1”.
[0079] For example, Figure 3 As shown in the figure, when the target user is performing tower operations, the time function has been discretized (T1 = [T 11 ,T 12 ,...T 1i ...T 1n ],T2=[T 21 ,T 22 ,...T 2i ...T 2n ]), here we use the numerical fast optimization method to find the optimal instantaneous efficiency response node. The specific calculation steps are as follows:
[0080] Dependent variable grid division based on time arrays T1 and T2. Using matrix T1 = [T 11 ,T 12 ,...T 1i ...T 1n ] and T2=[T 21 ,T 22 ,...T 2i ...T 2n ] discretization characteristics, the two-dimensional free grid node division is performed, and the new dependent variable grid after division is T ij (i, j = 1 to n), expressed as the following formula, where the array T ij The value of is "0" or "1";
[0081]
[0082] The dependent variables T1 and T2 matrices of the chessboard grid nodes are assigned values. ij The value assigned is only "0" or "1", where "0" indicates that the direction cannot be advanced, and "1" indicates that the direction can be advanced, thus generating a step-like path in the checkerboard grid nodes.
[0083] Initial screening of specific travel paths. Here, the extreme travel path 1 with extreme conditions of T1 = [1,1,...1...1] and T2 = [0,0,...0...0] and the travel path 2 with 45° alternating direction are selected as the boundary values for optimal route determination.
[0084] Node iteration under the route, see Figure 4 , path 3 can be any direction in the chessboard grid node, but considering the rapid optimization of instantaneous energy efficiency, path 3 can be selected near path 1 and path 2 to achieve rapid optimization and shorten the calculation time; after path 3 is selected, the instantaneous efficiency η1(path 1), η2(path 2), and η3(path 3) at any time t are compared. When η3≥max(η1, η2), it can be regarded as the optimal solution at this time t; otherwise, the optimization will continue; if η3≥max(η1, η2) is satisfied at time t, and t+Δt does not satisfy η3≥max(η1, η2), it is considered that the result at time t is relatively good, and t+Δt needs to be optimized; in order to shorten the calculation time of the secondary optimization, the value distribution of η1(path 1), η2(path 2), and η3(path 3) can be referred to to optimize the optimization process.
[0085] After the optimization calculation is completed, the matrix coefficients T1 and T2 are generated.
[0086] Therefore, through the above calculation process, a fast calculation method for obtaining the optimal operation route can be established. After the optimal solution is completed, the time arrays T1 and T2 of the optimal route and the reference value of the instantaneous speed will be output.
[0087] It should be noted that the path information mentioned in this embodiment is a path determined based on the working status at each working moment. Specifically, according to the working status of the time arrays T1 and T2 at each working moment, the status of the target user at each working moment during the high-altitude operation can be determined.
[0088] Optionally, determining the risk level corresponding to the target user includes: when the climbing heart rate information is greater than the preset heart rate information, determining that the risk level of the target user is a level one risk; when the climbing heart rate information is greater than the preset heart rate information and the energy consumption information is less than the energy lower limit threshold, determining that the risk level of the target user is a level two risk.
[0089] In this technical solution, in order to ensure the safety of the target user during high-altitude operations, especially when the target user is in a climbing state, when the climbing heart rate information is greater than the preset heart rate information, it indicates that the target user's heart rate information is too high, the corresponding work intensity is too high, and the risk of falling is high. At this time, it is necessary to issue a first-level risk warning to the target user. However, due to individual differences, when the target user's heart rate information is high and his energy remains at a high level, he may not necessarily fall. Therefore, in the actual risk warning, the target user's energy consumption information is also taken into account. When the climbing heart rate information is greater than the preset heart rate information, and the energy consumption information is less than the energy lower limit threshold, the target user's risk level is determined to be a second-level risk. At this time, relative to the first-level risk, the second-level risk indicates that the target user's corresponding risk of falling is higher, and it is necessary to issue a warning prompt to the target user in time to prompt the target user to take a rest and avoid high-altitude falling accidents.
[0090] Optionally, determine the actual operating speed of the target user during the high-altitude operation; if the actual operating speed is less than a preset speed threshold, generate a speed warning prompt and issue a warning.
[0091] In this technical solution, in addition to risk warnings for target users, warnings can also be issued for the target users' operating speed during the operation process. If the actual operating speed is less than the preset speed threshold, a speed warning prompt is generated to remind the target user that the operating speed during the actual operation process is too slow and there may be a problem of not being able to complete the operation task in time, so that the target user can improve his or her own operating speed according to the speed warning prompt.
[0092] For example, Figure 5 As shown, the rate v calculated in real time 实时 (i.e., actual operating speed) and v 预设 (i.e., preset speed threshold) comparison can be used to modify the parameters in the optimal route model and to warn of speed in "abnormal" conditions. 实时 The value is (0.8-1)v 预设 When v 实时 Value<0.8v 预设 When the vehicle is at an abnormal speed, an "abnormal" speed warning will be issued.
[0093] At the same time, the real-time heart rate signal and the real-time fatigue signal are monitored. The real-time fatigue (i.e., the fatigue to be determined) is determined by monitoring the real-time heart rate signal, and then compared with the pre-set heart rate threshold to achieve background data updates for tower operations without early warning and active intervention measures under online early warning.
[0094] Specifically, if the real-time heart rate is ≥100 (i.e., the climbing heart rate information is greater than the preset heart rate information), an intermediate warning (i.e., level 1 risk) is issued. For example, if the real-time heart rate is ≥160, an advanced warning (i.e., level 1 risk) is issued, thereby realizing an "abnormal" heart rate warning. If at this time, M 预测 Value < 0.8M 预设 An intermediate warning is issued (i.e., when the climbing heart rate information is greater than the preset heart rate information and the energy consumption information is less than the energy lower limit threshold, the risk level is determined to be a secondary risk. Or, if M 预测 Value < 0.5M 预设 , and conduct advanced early warning, thereby realizing "abnormal" energy consumption early warning.
[0095] The technical solution of this embodiment is to determine the target model corresponding to the target user according to the real-time heart rate information of the target user during the high-altitude operation, determine the target sample heart rate information based on the similarity between the real-time heart rate information and each sample heart rate information, and determine the target model to be used corresponding to the target sample heart rate information as the target model corresponding to the real-time heart rate information of the target user. The real-time heart rate information is processed based on the target model to obtain the target user's operation state at the operation moment corresponding to at least one heart rate collection moment. The predicted instantaneous efficiency of the target user at the operation moment corresponding to each heart rate collection moment can be determined based on the target model. When the predicted instantaneous efficiency is 1, it indicates that the target user's operation state is a climbing state, and when the predicted instantaneous efficiency is 0, it indicates that the target user's operation state is a resting state. According to the energy consumption information corresponding to the target user in the climbing state and the corresponding climbing heart rate information, the risk level of the target user in the operation process is determined, and an early warning is issued. In the actual operation process of the target user, the corresponding risk level is determined through the energy consumption information and the climbing heart rate information in the climbing state, and an early warning is issued. The problem that when the target user is working at high altitude, it is impossible to timely and effectively judge whether the target user has the risk of falling based on work experience is solved. By analyzing the real-time heart rate information of the target user and combining the energy consumption information of the target user in the climbing state, it is achieved to timely and effectively assess the risks in the target user's operation process and timely issue risk warnings to the target user.
[0096] Embodiment 3
[0097] Figure 6 This is a schematic diagram of the structure of a high-altitude operation risk warning device provided in Embodiment 3 of the present invention. Figure 6 As shown, the device includes: a target model determination module 310, a job status determination module 320 and a risk warning module 330.
[0098] The target model determination module 310 is used to determine the target model corresponding to the target user according to the real-time heart rate information of the target user during the high-altitude operation; wherein the operation state during the high-altitude operation includes a climbing state and a resting state, and the real-time heart rate information includes climbing heart rate information in the climbing state and resting heart rate information in the resting state;
[0099] The operation status determination module 320 is used to process the real-time heart rate information based on the target model to obtain the operation status of the target user at the operation time corresponding to at least one heart rate collection time;
[0100] The risk warning module 330 is used to determine the risk level of the target user during the operation and issue a warning based on the energy consumption information and corresponding climbing heart rate information corresponding to the target user in the climbing state.
[0101] The technical solution of this embodiment is to determine the target model corresponding to the target user according to the real-time heart rate information of the target user during the high-altitude operation, determine the target sample heart rate information based on the similarity between the real-time heart rate information and each sample heart rate information, and determine the target model to be used corresponding to the target sample heart rate information as the target model corresponding to the real-time heart rate information of the target user. The real-time heart rate information is processed based on the target model to obtain the target user's operation state at the operation moment corresponding to at least one heart rate collection moment. The predicted instantaneous efficiency of the target user at the operation moment corresponding to each heart rate collection moment can be determined based on the target model. When the predicted instantaneous efficiency is 1, it indicates that the target user's operation state is a climbing state, and when the predicted instantaneous efficiency is 0, it indicates that the target user's operation state is a resting state. According to the energy consumption information corresponding to the target user in the climbing state and the corresponding climbing heart rate information, the risk level of the target user in the operation process is determined, and an early warning is issued. In the actual operation process of the target user, the corresponding risk level is determined through the energy consumption information and the climbing heart rate information in the climbing state, and an early warning is issued. The problem that when the target user is working at high altitude, it is impossible to timely and effectively judge whether the target user has the risk of falling based on work experience is solved. By analyzing the real-time heart rate information of the target user and combining the energy consumption information of the target user in the climbing state, it is achieved to timely and effectively assess the risks in the target user's operation process and timely issue risk warnings to the target user.
[0102] Optionally, the high-altitude operation risk warning device further includes: a sample information acquisition module, used to obtain sample heart rate information of at least one sample user during the high-altitude operation process; wherein the high-altitude operation process includes a climbing state and a resting state, and the sample heart rate information includes a first sample heart rate in the climbing state and a second sample heart rate in the resting state;
[0103] A climbing speed determination module is used to determine the climbing speed of the current sample user for each sample user according to the current heart rate information and historical heart rate information of the current sample user in the climbing state; wherein the current heart rate information is the heart rate information at the current heart rate collection moment, and the historical heart rate information is the historical heart rate information adjacent to the current heart rate collection moment;
[0104] An instantaneous climbing efficiency determination module is used to obtain the instantaneous climbing efficiency at the corresponding heart rate collection moment according to the climbing height and climbing speed of the current sample user;
[0105] The module for determining the model to be used is used to construct a current model to be used corresponding to the current sample heart rate information based on at least one instantaneous climbing efficiency during the high-altitude operation, so as to determine the working status of the current sample user at the corresponding working moment based on the current model to be used.
[0106] Optionally, the target model determination module includes: a real-time heart rate information collection unit, which is used to collect the real-time heart rate of the target user based on the heart rate collection device during the high-altitude operation to obtain real-time heart rate information;
[0107] a target sample information determining unit, configured to determine target sample heart rate information corresponding to the real-time heart rate information from at least one sample heart rate information based on a similarity algorithm;
[0108] The target model determination unit is used to determine the to-be-used model corresponding to the target sample heart rate information as the target model corresponding to the target user.
[0109] Optionally, the operation state determination module includes: a predicted instantaneous efficiency determination unit, which is used to input the real-time heart rate information into the target model, and determine the predicted instantaneous efficiency of the operation moment corresponding to at least one heart rate collection moment during the high-altitude operation of the target user based on the target model;
[0110] The operation status determination unit is used to determine the operation status of the target user at the corresponding operation moment based on each predicted instantaneous efficiency.
[0111] Optionally, the risk warning module includes: a basic parameter information acquisition unit, used to acquire basic parameter information of the target user; wherein the basic parameter information includes height, weight and initial physical energy;
[0112] an energy consumption information determining unit, configured to process at least one basic parameter information based on a preset energy consumption function to obtain energy consumption information of a target user;
[0113] The risk level determination unit is used to determine the risk level corresponding to the target user according to the energy consumption information and corresponding climbing heart rate information of the target user in the climbing state.
[0114] Optionally, the risk level determination unit includes: a first unit, configured to determine that the risk level of the target user is a first-level risk when the climbing heart rate information is greater than the preset heart rate information;
[0115] The second unit is used to determine that the risk level of the target user is a level 2 risk when the climbing heart rate information is greater than the preset heart rate information and the energy consumption information is less than the energy lower limit threshold.
[0116] Optionally, the risk level determination unit is also used to determine the actual operating speed of the target user during the high-altitude operation; if the actual operating speed is less than a preset speed threshold, a speed warning prompt is generated and a warning is issued.
[0117] The high-altitude operation risk warning device provided in the embodiment of the present invention can execute the high-altitude operation risk warning method provided in any embodiment of the present invention, and has the corresponding functional modules and beneficial effects of the execution method.
[0118] Embodiment 4
[0119] Figure 7 A schematic diagram of the structure of an electronic device 10 of an embodiment of the present invention is shown. The electronic device is intended to represent various forms of digital computers, such as laptop computers, desktop computers, workstations, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The electronic device may also represent various forms of mobile devices, such as personal digital processing, cellular phones, smart phones, wearable devices (such as helmets, glasses, watches, etc.) and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the present invention described and / or required herein.
[0120] like Figure 7 As shown, the electronic device 10 includes at least one processor 11, and a memory connected to the at least one processor 11, such as a read-only memory (ROM) 12, a random access memory (RAM) 13, etc., wherein the memory stores a computer program that can be executed by at least one processor, and the processor 11 can perform various appropriate actions and processes according to the computer program stored in the read-only memory (ROM) 12 or the computer program loaded from the storage unit 18 to the random access memory (RAM) 13. In the RAM 13, various programs and data required for the operation of the electronic device 10 can also be stored. The processor 11, the ROM 12, and the RAM 13 are connected to each other through a bus 14. An input / output (I / O) interface 15 is also connected to the bus 14.
[0121] A number of components in the electronic device 10 are connected to the I / O interface 15, including: an input unit 16, such as a keyboard, a mouse, etc.; an output unit 17, such as various types of displays, speakers, etc.; a storage unit 18, such as a disk, an optical disk, etc.; and a communication unit 19, such as a network card, a modem, a wireless communication transceiver, etc. The communication unit 19 allows the electronic device 10 to exchange information / data with other devices through a computer network such as the Internet and / or various telecommunication networks.
[0122] The processor 11 may be a variety of general and / or special processing components with processing and computing capabilities. Some examples of the processor 11 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various special artificial intelligence (AI) computing chips, various processors running machine learning model algorithms, a digital signal processor (DSP), and any appropriate processor, controller, microcontroller, etc. The processor 11 executes the various methods and processes described above, such as the high-altitude operation risk warning method.
[0123] In some embodiments, the high-altitude operation risk warning method can be implemented as a computer program, which is tangibly contained in a computer-readable storage medium, such as a storage unit 18. In some embodiments, part or all of the computer program can be loaded and / or installed on the electronic device 10 via the ROM 12 and / or the communication unit 19. When the computer program is loaded into the RAM 13 and executed by the processor 11, one or more steps of the high-altitude operation risk warning method described above can be performed. Alternatively, in other embodiments, the processor 11 can be configured to execute the high-altitude operation risk warning method in any other appropriate manner (for example, by means of firmware).
[0124] Various implementations of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), load programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various implementations can include: being implemented in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which can be a special purpose or general purpose programmable processor that can receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.
[0125] The computer program for implementing the high-altitude operation risk warning method of the present invention can be written in any combination of one or more programming languages. These computer programs can be provided to a processor of a general-purpose computer, a special-purpose computer or other programmable data processing device, so that when the computer program is executed by the processor, the functions / operations specified in the flow chart and / or block diagram are implemented. The computer program can be executed entirely on the machine, partially on the machine, as a stand-alone software package, partially on the machine and partially on a remote machine, or entirely on a remote machine or server.
[0126] In the context of the present invention, a computer-readable storage medium may be a tangible medium that may contain or store a computer program for use by or in combination with an instruction execution system, device or equipment. A computer-readable storage medium may include, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices or equipment, or any suitable combination of the foregoing. Alternatively, a computer-readable storage medium may be a machine-readable signal medium. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.
[0127] To provide interaction with a user, the systems and techniques described herein may be implemented on an electronic device having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and a pointing device (e.g., a mouse or trackball) through which the user can provide input to the electronic device. Other types of devices may also be used to provide interaction with the user; for example, the feedback provided to the user may be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user may be received in any form (including acoustic input, voice input, or tactile input).
[0128] The systems and techniques described herein may be implemented in a computing system that includes backend components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes frontend components (e.g., a user computer with a graphical user interface or a web browser through which a user can interact with implementations of the systems and techniques described herein), or a computing system that includes any combination of such backend components, middleware components, or frontend components. The components of the system may be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), a blockchain network, and the Internet.
[0129] A computing system may include a client and a server. The client and the server are generally remote from each other and usually interact through a communication network. The client and server relationship is generated by computer programs running on the corresponding computers and having a client-server relationship with each other. The server may be a cloud server, also known as a cloud computing server or cloud host, which is a host product in the cloud computing service system to solve the defects of difficult management and weak business scalability in traditional physical hosts and VPS services.
[0130] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps described in the present invention can be executed in parallel, sequentially or in different orders, as long as the desired results of the technical solution of the present invention can be achieved, and this document does not limit this.
[0131] The above specific implementations do not constitute a limitation on the protection scope of the present invention. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modification, equivalent substitution and improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A high-altitude operation risk warning method, characterized in that: include: Determine a target model corresponding to the target user according to the real-time heart rate information of the target user during the aerial work; wherein the working state during the aerial work includes a climbing state and a resting state, and the real-time heart rate information includes climbing heart rate information in the climbing state and resting heart rate information in the resting state; Processing the real-time heart rate information based on the target model to obtain a work status of the target user at a work moment corresponding to at least one heart rate collection moment; Determine the risk level of the target user during the operation according to the energy consumption information and the corresponding climbing heart rate information corresponding to the target user in the climbing state, and issue an early warning; Wherein, before determining the target model corresponding to the target user according to the real-time heart rate information of the target user during the high-altitude operation, the method further includes: Obtaining sample heart rate information of at least one sample user during an aerial work process; wherein the aerial work process includes a climbing state and a resting state, and the sample heart rate information includes a first sample heart rate in the climbing state and a second sample heart rate in the resting state; For each sample user, determine the climbing speed of the current sample user according to the current heart rate information and historical heart rate information of the current sample user in the climbing state; wherein the current heart rate information is the heart rate information at the current heart rate collection moment, and the historical heart rate information is the historical heart rate information adjacent to the current heart rate collection moment; Obtaining the instantaneous climbing efficiency at the corresponding heart rate collection moment according to the climbing height and the climbing speed of the current sample user; Based on at least one instantaneous climbing efficiency during the aerial work process, a current model to be used corresponding to the current sample heart rate information is constructed to determine the working state of the current sample user at the corresponding working moment based on the current model to be used.
2. The method according to claim 1, characterized in that The step of determining a target model corresponding to the target user according to the real-time heart rate information of the target user during the aerial work comprises: During the high-altitude operation, the heart rate of the target user is collected in real time based on the heart rate collection device to obtain real-time heart rate information; Based on a similarity algorithm, determining target sample heart rate information corresponding to the real-time heart rate information from at least one sample heart rate information; The model to be used corresponding to the target sample heart rate information is determined as the target model corresponding to the target user.
3. The method according to claim 1, characterized in that: The processing of the real-time heart rate information based on the target model to obtain the operation status of the target user at an operation moment corresponding to at least one heart rate collection moment includes: Inputting the real-time heart rate information into the target model, and determining the predicted instantaneous efficiency of the target user at a working moment corresponding to at least one heart rate collection moment during the high-altitude working process based on the target model; Based on each predicted instantaneous efficiency, the operating status of the target user at the corresponding operating moment is determined.
4. The method according to claim 1, characterized in that: The step of determining the risk level of the target user during operation according to the energy consumption information and the corresponding climbing heart rate information corresponding to the target user in the climbing state includes: Obtaining basic parameter information of the target user; wherein the basic parameter information includes height, weight and initial physical energy; Based on a preset energy consumption function, the at least one basic parameter information is processed to obtain energy consumption information of the target user; The risk level corresponding to the target user is determined according to the energy consumption information and the corresponding climbing heart rate information of the target user in the climbing state.
5. The method according to claim 4, characterized in that The determining the risk level corresponding to the target user includes: When the climbing heart rate information is greater than the preset heart rate information, determining that the risk level of the target user is level one risk; When the climbing heart rate information is greater than the preset heart rate information, and the energy consumption information is less than the energy lower limit threshold, it is determined that the risk level of the target user is a level 2 risk.
6. The method according to claim 5, characterized in that Also includes: Determine the actual operating speed of the target user during the aerial operation; If the actual operating speed is less than the preset speed threshold, a speed warning prompt is generated and an early warning is issued.
7. A high-altitude operation risk warning device, characterized in that: include: A target model determination module is used to determine a target model corresponding to the target user according to the real-time heart rate information of the target user during the aerial work process; wherein the working state during the aerial work process includes a climbing state and a resting state, and the real-time heart rate information includes climbing heart rate information in the climbing state and resting heart rate information in the resting state; A work status determination module, used for processing the real-time heart rate information based on the target model to obtain the work status of the target user at a work moment corresponding to at least one heart rate collection moment; A risk warning module, used to determine the risk level of the target user during the operation according to the energy consumption information and the corresponding climbing heart rate information corresponding to the target user in the climbing state, and issue a warning; Wherein, the high-altitude operation risk warning device also includes: A sample information acquisition module, used to acquire sample heart rate information of at least one sample user during an aerial work process; wherein the aerial work process includes a climbing state and a resting state, and the sample heart rate information includes a first sample heart rate in the climbing state and a second sample heart rate in the resting state; A climbing speed determination module, for each sample user, according to the current heart rate information and historical heart rate information of the current sample user in the climbing state, to determine the climbing speed of the current sample user; wherein the current heart rate information is the heart rate information at the current heart rate collection moment, and the historical heart rate information is the historical heart rate information adjacent to the current heart rate collection moment; An instantaneous climbing efficiency determination module, used to obtain the instantaneous climbing efficiency at the corresponding heart rate collection moment according to the climbing height and the climbing speed of the current sample user; The module for determining the model to be used is used to construct a current model to be used corresponding to the current sample heart rate information based on at least one instantaneous climbing efficiency during the high-altitude operation, so as to determine the working status of the current sample user at the corresponding working moment based on the current model to be used.
8. An electronic device, characterized in that: The electronic device comprises: at least one processor; and a memory communicatively connected to the at least one processor; wherein, The memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the high-altitude work risk warning method described in any one of claims 1-6.
9. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the high-altitude work risk warning method described in any one of claims 1-6 when executed.