A method for storing municipal rainwater and sewage pipe network information based on BIM

Through BIM technology, a three-dimensional model of rain and sewage pipeline network is generated and combined with blockchain consensus algorithm, the security and timeliness of traditional municipal rain and sewage pipeline network information storage is solved, and the secure storage and real-time update of information is realized, reducing errors and Improved collection efficiency.

CN116412858BActive Publication Date: 2024-11-26BRIDGE & TUNNEL ENG SUBSIDIARY OF CCCC THIRD HIGHWAY ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310360184.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-04-06
Publication Date
2024-11-26
Estimated Expiration
2043-04-06

AI Technical Summary

Technical Problem

The information storage of traditional municipal rainwater and sewage pipelines has problems such as insecure information, large data analysis errors, and poor collection timeliness, and it relies on manual operations to consume time and effort.

Method used

BIM technology is used to generate a three-dimensional model of the rain and sewage pipeline network, and the blockchain consensus algorithm is used to ensure the accuracy and security of the model, update the data in real time, transmit it to the public chain for storage and analysis, and use sensors to collect data in real time for early warning and maintenance. notify.

Benefits of technology

It realizes the security and consistency of information storage, reduces errors, saves manpower and time, and improves timeliness.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116412858B_ABST
    Figure CN116412858B_ABST
Patent Text Reader

Abstract

The present invention proposes a method for storing municipal rainwater and sewage pipe network information based on BIM, the method comprising: first, installing sensors at appropriate locations of the municipal rainwater and sewage pipe network, and collecting data information of relevant locations through the sensors; generating a three-dimensional model of the rainwater and sewage pipe network through BIM technology based on the collected information; and obtaining an accurate three-dimensional model of the rainwater and sewage pipe network through a blockchain consensus algorithm, and saving it on a public chain; continuously collecting data information of relevant locations of the rainwater and sewage pipe network through sensors, updating the three-dimensional model on each computer in real time, and completing full-time monitoring of the rainwater and sewage pipe network; the method will solve the problem of insecurity of information stored in computers, reduce errors, eliminate misjudgments, save manpower and time, and has strong timeliness.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to BIM technology, blockchain technology and information storage technology, and in particular to a BIM-based municipal rainwater and sewage pipe network information storage method. Background Art

[0002] Disadvantages of traditional municipal rainwater and sewage pipe network information storage: the information is stored on a fixed computer or several computers, which is easy to be damaged and stolen; when analyzing the data, repeated analysis through a computer is easy to cause errors, and at the same time, problems with the computer itself cannot be ruled out; traditional rainwater and sewage pipe information collection requires manual work, which is time-consuming and labor-intensive, and has poor timeliness.

[0003] BIM technology uses the relevant information data of the construction project as the basis of the model to establish the building model, and simulates the real information of the building through digital information simulation; it has the advantages of visualization, coordination, simulation, optimizability and plotting; applying BIM technology to the municipal rainwater and sewage pipe network will enable real-time updating of the three-dimensional model of the municipal rainwater and sewage pipe network.

[0004] Blockchain technology is a new type of computer technology that integrates distributed ledgers, consensus algorithms, P2P networks and cryptographic algorithms. It is currently in the primary stage of blockchain technology development. The blockchain consensus algorithm is: when the number of secure computers in the entire network exceeds 2 / 3 of the number of computers in the entire network, the blockchain system is considered to be safe. The present invention deforms the consensus algorithm: when the number of computers that determine the consistent result of transaction information exceeds 2 / 3 of the number of computers in the entire network, the consistent result is considered to be a consensus result. At the same time, the deformed consensus algorithm is combined with the F function to further improve the blockchain consensus algorithm. Summary of the invention

[0005] The purpose of the present invention is to overcome the above problems existing in the prior art and greatly improve its technical effect on the basis of the original technology; to this end, the present invention provides a method for storing municipal rainwater and sewage pipe network information based on BIM, the method comprising:

[0006] First, during the construction of the municipal rainwater and sewage pipe network, sensors are installed at appropriate locations of the municipal rainwater and sewage pipe network to collect data information of relevant locations of the rainwater and sewage pipe network;

[0007] Combine the data information of relevant parts collected for the first time with the information during the construction of the municipal rainwater and sewage pipe network, and generate a three-dimensional model of the rainwater and sewage pipe network through BIM technology;

[0008] According to the method in the previous step, several computers generate a three-dimensional model of the rainwater and sewage pipe network, and then obtain an accurate three-dimensional model of the rainwater and sewage pipe network through the blockchain consensus algorithm, save the accurate three-dimensional model of the rainwater and sewage pipe network on the computer, and transmit the three-dimensional model of the rainwater and sewage pipe network and the collected data to the public chain for the first time;

[0009] The sensors continuously collect data information about relevant parts of the rainwater and sewage pipe network, transmit the data information to the computer, and update the three-dimensional model on each computer in real time;

[0010] The computer compares the newly updated 3D model with the 3D model first transmitted to the public chain to see if the data of the relevant parts exceeds the safety threshold, and transmits the judgment result to other computers;

[0011] Through the blockchain consensus algorithm, determine whether the data information of the relevant parts is within the safety threshold; if it is not within the safety threshold, an early warning will be issued to notify technical personnel to carry out repairs and reinforcements; the three-dimensional model corresponding to the consensus result will be saved on the computer; at the same time, the three-dimensional model corresponding to the consensus result and the collected data information of the relevant parts will be transmitted to the public chain.

[0012] Furthermore, the installation of sensors at appropriate locations of the municipal rainwater and sewage pipe network includes: installing sensors at various interfaces, vulnerable locations and key space observation points of the municipal rainwater and sewage pipe network. The key space observation points refer to the key space observation points at which the overall structural data information of the rainwater and sewage pipe network in the key space can be well collected after the sensors are installed.

[0013] Furthermore, the three-dimensional model of the rainwater and sewage pipe network generated by BIM technology includes: the establishment of the three-dimensional model of the municipal rainwater and sewage pipe network includes: two-dimensional CAD drawings, BIM water supply and drainage modeling and BIM model consistency check, and finally, the reviewed BIM model is obtained.

[0014] Furthermore, the method of obtaining an accurate three-dimensional model of the rainwater and sewage pipe network through the blockchain consensus algorithm includes: the blockchain consensus algorithm is that each computer transmits the generated three-dimensional model of the rainwater and sewage pipe network to other computers, and then all computers split the three-dimensional model of the rainwater and sewage pipe network according to the structure of the rainwater and sewage pipe network to generate a location function F(x1, x2, x3, ...x n ), where F is the position function, x1, x2, x3, …x nThe data information of relevant parts of the rainwater and sewage pipe network is collected; each computer compares whether the value of the part function of each computer is the same, if they are exactly the same, it proves that the three-dimensional models generated by all computers are consistent; if there are different values ​​of the part function F, the part information x that causes the different F values ​​is found; the computer counts the values ​​of different part information x, if there is an x ​​value that appears more than 2 / 3 of the number of all computers, then the value that appears more than 2 / 3 of the number of all computers is used as the consensus x value of all computers, and the three-dimensional models of all computers are updated by the consensus x value until the part function F values ​​transmitted by all computers are completely consistent, that is, an accurate three-dimensional model of the rainwater and sewage pipe network is obtained.

[0015] Furthermore, the real-time updating of the three-dimensional model on each computer includes: before the computer updates the data, it needs to send a request to the public chain to obtain the three-dimensional model information stored in the public chain; compare the three-dimensional model stored by itself with the extracted three-dimensional model stored in the public chain, and modify the three-dimensional model stored by itself so that the three-dimensional model stored by itself is consistent with the three-dimensional model stored in the public chain.

[0016] Furthermore, the comparing of the relevant part data information to determine whether it exceeds the safety threshold comprises: extracting the three-dimensional model transmitted to the public chain for the first time from the public chain by the computer, and updating the relevant part data information of the three-dimensional model just updated by the computer. i Compare the security threshold of the relevant part data information corresponding to the 3D model first transmitted to the public chain to observe the relevant part data information x i Whether the corresponding relevant part data information is within the safety threshold; if not, it proves that the safety threshold has been exceeded and there is a security risk.

[0017] Furthermore, the blockchain consensus algorithm includes: computer statistics of relevant part data information x i The judgment result is whether the number of computers within the safety threshold exceeds 2 / 3 of the total number of computers. If it exceeds 2 / 3, it proves that the corresponding relevant parts are within the safety threshold; if it does not exceed 2 / 3, it proves that there are safety risks in the relevant parts, and the technical personnel are notified to carry out repairs and reinforcement; after the technical personnel carry out repairs and reinforcement, they will use the collected data information of the relevant parts of the rainwater and sewage pipe network to timely update the three-dimensional model saved in the computer.

[0018] The beneficial effects of the present invention are:

[0019] Beneficial effects: The collected data information and the generated three-dimensional model are stored on the public blockchain. According to the data on the blockchain, the data stored on the computer is updated in real time to make the stored data consistent, solving the problem of insecure information stored on the computer. The collected data is analyzed through a consensus algorithm to see if it is within the security threshold, which reduces errors and eliminates misjudgments. Information is collected in real time through sensors, and the three-dimensional model is updated in real time, saving manpower and time, and having strong timeliness. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 :A flow chart of a method for storing municipal rainwater and sewage pipe network information based on BIM of the present invention.

[0021] Figure 2 :Flowchart of BIM generating a three-dimensional model of the municipal rainwater and sewage pipe network. DETAILED DESCRIPTION

[0022] The specific embodiments of the present invention are described in detail below in conjunction with the accompanying drawings. It should be understood that the specific embodiments given here are only used to illustrate and explain the present invention, and cannot be used to limit the present invention.

[0023] It should be noted that many specific details are set forth in the following description to facilitate a full understanding of the present invention. However, the present invention may also have other implementations and variations thereof. Therefore, the protection scope of the present invention is not limited to the specific embodiments disclosed below.

[0024] like Figure 1As shown, according to an embodiment of the present invention, a method for storing municipal rainwater and sewage pipe network information based on BIM is provided, the method comprising: step S100, first, during the construction of the municipal rainwater and sewage pipe network, sensors are installed at appropriate locations of the municipal rainwater and sewage pipe network to collect data information of relevant locations of the rainwater and sewage pipe network; step S101, the data information of relevant locations collected for the first time is combined with the information during the construction of the municipal rainwater and sewage pipe network, and a three-dimensional model of the rainwater and sewage pipe network is generated through BIM technology; step S102, according to the method of step S101, several computers generate a three-dimensional model of the rainwater and sewage pipe network, and then an accurate three-dimensional model of the rainwater and sewage pipe network is obtained through a blockchain consensus algorithm, the accurate three-dimensional model of the rainwater and sewage pipe network is saved on a computer, and the three-dimensional model of the rainwater and sewage pipe network and the collected data are combined for the first time. In step S103, data information of relevant parts of the rainwater and sewage pipe network is continuously collected through sensors, and the data information is transmitted to the computer, and the three-dimensional model on each computer is updated in real time; in step S104, the computer compares the three-dimensional model just updated with the three-dimensional model transmitted to the public chain for the first time, compares whether the data information of the relevant parts exceeds the safety threshold, and transmits the judgment result to other computers; in step S105, through the blockchain consensus algorithm, it is determined whether the data information of the relevant parts is within the safety threshold; if it is not within the safety threshold, an early warning is issued to notify the technical staff to carry out maintenance and reinforcement; the three-dimensional model corresponding to the consensus result is saved on the computer; at the same time, the three-dimensional model corresponding to the consensus result and the collected data information of the relevant parts are transmitted to the public chain.

[0025] Specifically, the present invention first installs sensors at appropriate locations of the municipal rainwater and sewage pipe network during the construction of the municipal rainwater and sewage pipe network, and collects data information of relevant locations through the sensors; the data information of relevant locations collected for the first time is combined with the information during the construction of the municipal rainwater and sewage pipe network, and a three-dimensional model of the rainwater and sewage pipe network is generated through BIM technology; an accurate three-dimensional model of the rainwater and sewage pipe network is obtained through a blockchain consensus algorithm, and the accurate three-dimensional model of the rainwater and sewage pipe network is saved on a computer and a public chain; subsequently, data information of relevant locations of the rainwater and sewage pipe network is continuously collected through sensors, and the three-dimensional model on each computer is updated in real time; the three-dimensional model is compared with the three-dimensional model transmitted to the public chain by the computer for the first time to compare whether the data information of the relevant locations exceeds a safety threshold; finally, the blockchain consensus algorithm is used to determine whether the data information of the relevant locations is within the safety threshold; if not within the safety threshold, an early warning is issued to notify technical personnel to perform maintenance and reinforcement; this method ensures the security of information storage and information analysis.

[0026] Step S100, first, during the construction of the municipal rainwater and sewage pipe network, sensors are installed at appropriate locations of the municipal rainwater and sewage pipe network to collect data information of relevant locations of the rainwater and sewage pipe network.

[0027] Specifically, the method of installing sensors at appropriate locations of the municipal rainwater and sewage pipe network: installing sensors at various interfaces, vulnerable locations and key space observation points of the municipal rainwater and sewage pipe network. The key space observation points refer to the key space observation points at which the overall structural data information of the rainwater and sewage pipe network in the key space can be well collected after the sensors are installed.

[0028] In the above embodiment, specifically, according to the scale of the municipal rainwater and sewage pipe network and the actual construction situation, sensors are installed at all locations where sensors need to be installed to ensure that the sensors can obtain the overall situation of the entire underground rainwater and sewage pipe network.

[0029] Step S101, combining the relevant part data information collected for the first time with the information during the construction of the municipal rainwater and sewage pipe network, and generating a three-dimensional model of the rainwater and sewage pipe network through BIM technology.

[0030] Specifically, after the construction is completed, the sensors are activated to collect data information on relevant parts of the municipal rainwater and sewage pipe network for the first time; the collected actual construction data information is combined with the prescribed information during the construction of the municipal rainwater and sewage pipe network, and a three-dimensional model of the municipal rainwater and sewage pipe network is generated through BIM technology.

[0031] In the above embodiment, specifically, Figure 2 The figure shows a flow chart for generating a BIM three-dimensional model of a municipal rainwater and sewage pipe network. It can be seen from the flow chart that the establishment of a BIM three-dimensional model of a municipal rainwater and sewage pipe network mainly includes: two-dimensional CAD drawings, BIM water supply and drainage modeling, and BIM model consistency check. Among them, the BIM model consistency check includes the check of BAD drawings and the check of BIM water supply and drainage modeling. If the check of CAD drawings fails, the process returns to the process of establishing CAD drawings. If the check of BIM water supply and drainage modeling fails, the process returns to the process of BIM water supply and drainage modeling. This process continues until the BIM three-dimensional model of the municipal rainwater and sewage pipe network is successfully audited.

[0032] Step S102: According to the method of step S101, several computers generate a three-dimensional model of the rainwater and sewage pipe network, and then obtain an accurate three-dimensional model of the rainwater and sewage pipe network through the blockchain consensus algorithm. The accurate three-dimensional model of the rainwater and sewage pipe network is saved on the computer, and the three-dimensional model of the rainwater and sewage pipe network and the collected data are transmitted to the public chain for the first time.

[0033] Specifically, several computers generate a three-dimensional model of the rainwater and sewage pipe network through the method of step S101, and transmit the generated three-dimensional model to other computers, and obtain an accurate three-dimensional model of the rainwater and sewage pipe network through the blockchain consensus algorithm; then, the accurate three-dimensional model of the rainwater and sewage pipe network is saved on the computer, and the three-dimensional model of the rainwater and sewage pipe network and the collected data are transmitted to the public chain for the first time; the public chain is a public blockchain, and the blockchain can be divided into private chain, alliance chain and public chain according to the scale and security level.

[0034] In the above embodiment, specifically, the method of obtaining an accurate three-dimensional model of the rainwater and sewage pipe network through the blockchain consensus algorithm is as follows: after each computer transmits the generated three-dimensional model of the rainwater and sewage pipe network to other computers, all computers split the three-dimensional model of the rainwater and sewage pipe network according to the structure of the rainwater and sewage pipe network, and generate a location function F (x1, x2, x3, ... x n ), where F is the position function, x1, x2, x3, …x n The data information of all relevant parts of the rainwater and sewage pipe network is collected; each computer compares whether the value of the part function of each computer is the same. If they are exactly the same, it proves that the three-dimensional models generated by all computers are consistent, and it can be determined that the three-dimensional model is an accurate three-dimensional model of the rainwater and sewage pipe network; if there are different values ​​of the part function F, the part information x that causes the different F values ​​is found; the computer counts the values ​​of different part information x, if there is an x ​​value that appears more than 2 / 3 of the number of all computers, the value that appears more than 2 / 3 of the number of all computers is used as the consensus x value of all computers, and the three-dimensional models of all computers are updated by the consensus x value until the part function F values ​​transmitted by all computers are completely consistent, that is, an accurate three-dimensional model of the rainwater and sewage pipe network is obtained.

[0035] Step S103, continuously collecting data information of relevant parts of the rainwater and sewage pipe network through sensors, transmitting the data information to computers, and updating the three-dimensional model on each computer in real time.

[0036] Specifically, the method for updating the three-dimensional model on each computer in real time is as follows: before the computer updates the data, the computer needs to send a request to the public chain to obtain the three-dimensional model information stored in the public chain; compare the three-dimensional model stored by itself with the extracted three-dimensional model stored in the public chain, and modify the three-dimensional model stored by itself to make the three-dimensional model stored by itself consistent with the three-dimensional model stored in the public chain.

[0037] In the above embodiment, preferably, the sensor collects data information of relevant parts of the rainwater and sewage pipe network at regular intervals, and can be set to collect data information of relevant parts of the rainwater and sewage pipe network every 5 minutes; that is, the computer updates the data every 5 minutes.

[0038] In step S104, the computer compares the newly updated three-dimensional model with the three-dimensional model first transmitted to the public chain to see whether the data information of the relevant parts exceeds the safety threshold, and transmits the judgment result to other computers.

[0039] Specifically, while the computer updates the three-dimensional model of the rainwater and sewage pipe network, it extracts and obtains the three-dimensional model of the rainwater and sewage pipe network that was first saved on the public chain; the computer compares the newly updated three-dimensional model with the extracted three-dimensional model of the rainwater and sewage pipe network that was first saved on the public chain.

[0040] In the above embodiment, specifically, the computer extracts the three-dimensional model that is first transmitted to the public chain in the public chain, and sends the data information x of the relevant parts of the three-dimensional model that has just been updated to the public chain. i Compare the security threshold of the relevant part data information corresponding to the 3D model first transmitted to the public chain to observe the relevant part data information x i Whether the data information of the corresponding relevant parts is within the safety threshold; if it is not within the safety threshold, it proves that the safety threshold has been exceeded and there is a safety risk; if it is within the safety threshold, it proves that there is no safety risk in the corresponding part.

[0041] Step S105, through the blockchain consensus algorithm, determine whether the data information of the relevant parts is within the safety threshold; if it is not within the safety threshold, issue an early warning and notify the technical staff to carry out maintenance and reinforcement; save the three-dimensional model corresponding to the consensus result on the computer; at the same time, transmit the three-dimensional model corresponding to the consensus result and the collected data information of the relevant parts to the public chain.

[0042] Specifically, each computer obtains the judgment results of all other computers on whether the data information of relevant parts of the rainwater and sewage pipe network is within the safety threshold; through the blockchain consensus algorithm, it is finally determined whether the data information of relevant parts of the rainwater and sewage pipe network is within the safety threshold of the corresponding parts.

[0043] In the above embodiment, specifically, the method for the computer to determine whether the relevant part data information is safe is: the computer statistically checks the relevant part data information x i The judgment result is whether the number of computers within the safety threshold exceeds 2 / 3 of the total number of computers. If it exceeds 2 / 3, it proves that the corresponding relevant parts are within the safety threshold; if it does not exceed 2 / 3, it proves that there are safety risks in the relevant parts, and the technical personnel are notified to carry out repairs and reinforcement; after the technical personnel carry out repairs and reinforcement, they will use the collected data information of the relevant parts of the rainwater and sewage pipe network to timely update the three-dimensional model saved in the computer.

[0044] In the above embodiment, the present invention realizes all-round and full-time monitoring of the rainwater and sewage pipe network through steps S100 to S105, and saves the acquired data information to different computers and public chains, thereby ensuring the security of the saved information and, at the same time, ensuring a safe working environment for the rainwater and sewage pipe network.

[0045] It should be understood that the above-mentioned embodiments are one or more embodiments of the present invention, and there are many other embodiments and variations thereof based on the present invention; the variations and modifications made by ordinary technicians in this industry through the present invention without making pioneering innovations all fall within the scope of protection of the present invention.

Claims

1. A method for storing municipal rainwater and sewage pipe network information based on BIM, characterized in that: The method comprises the following steps: 1) First, during the construction of the municipal rainwater and sewage pipe network, sensors are installed at appropriate locations of the municipal rainwater and sewage pipe network to collect data information of relevant locations of the rainwater and sewage pipe network; 2) Combine the data information of relevant parts collected for the first time with the information during the construction of the municipal rainwater and sewage pipe network, and generate a three-dimensional model of the rainwater and sewage pipe network through BIM technology; 3) According to the method of step 2), several computers generate a three-dimensional model of the rainwater and sewage pipe network, and then obtain an accurate three-dimensional model of the rainwater and sewage pipe network through the blockchain consensus algorithm, save the accurate three-dimensional model of the rainwater and sewage pipe network on the computer, and transmit the three-dimensional model of the rainwater and sewage pipe network and the collected data to the public chain for the first time; The method of obtaining an accurate three-dimensional model of the rainwater and sewage pipe network by using the blockchain consensus algorithm includes: the blockchain consensus algorithm is that each computer transmits the generated three-dimensional model of the rainwater and sewage pipe network to other computers, and then all computers split the three-dimensional model of the rainwater and sewage pipe network according to the structure of the rainwater and sewage pipe network to generate a location function F(x1, x2, x3, ...x n ), where F is the position function, x1, x2, x3, ...x n The relevant part data information of the rainwater and sewage pipe network is collected; each computer compares whether the value of the part function of each computer is the same, if they are exactly the same, it proves that the three-dimensional models generated by all computers are consistent; if there are different values ​​of the part function F, then find the part information x that causes the different F values; the computer counts the values ​​of different part information x, if there is an x ​​value that appears more than 2 / 3 of the number of all computers, then the value that appears more than 2 / 3 of the number of all computers is used as the consensus x value of all computers, and the three-dimensional models of all computers are updated by the consensus x value until the part function F values ​​transmitted by all computers are completely consistent, that is, an accurate three-dimensional model of the rainwater and sewage pipe network is obtained; The three-dimensional model of the rainwater and sewage pipe network generated by BIM technology includes: the establishment of the three-dimensional model of the municipal rainwater and sewage pipe network includes: two-dimensional CAD drawings, BIM water supply and drainage modeling and BIM model consistency check, and finally, the reviewed BIM model is obtained; 4) Continuously collect data information of relevant parts of the rainwater and sewage pipe network through sensors, transmit the data information to computers, and update the three-dimensional model on each computer in real time; specifically, the real-time updating of the three-dimensional model on each computer includes: before the computer updates the data, it needs to send a request to the public chain to obtain the three-dimensional model information stored in the public chain; compare the three-dimensional model stored by itself with the three-dimensional model stored in the public chain extracted, and modify the three-dimensional model stored by itself so that the three-dimensional model stored by itself is consistent with the three-dimensional model stored in the public chain; 5) The computer compares the newly updated 3D model with the 3D model that was first transmitted to the public chain to see whether the data information of the relevant parts exceeds the safety threshold, and transmits the judgment result to other computers; specifically, the comparison of whether the data information of the relevant parts exceeds the safety threshold includes: the computer extracts the 3D model that was first transmitted to the public chain from the public chain, compares the data information of the relevant parts of the newly updated 3D model with the 3D model that was first transmitted to the public chain, and transmits the judgment result to other computers; i Compare the security threshold of the relevant part data information corresponding to the 3D model first transmitted to the public chain to observe the relevant part data information x i Whether the data information of the corresponding relevant parts is within the safety threshold; if not, it means that the safety threshold has been exceeded and there is a safety risk; 6) Through the blockchain consensus algorithm, determine whether the data information of the relevant parts is within the safety threshold; if not, issue an early warning and notify the technical staff to carry out repairs and reinforcements; save the three-dimensional model corresponding to the consensus result on the computer; at the same time, transmit the three-dimensional model corresponding to the consensus result and the collected data information of the relevant parts to the public chain.

2. A method for storing municipal rainwater and sewage pipe network information based on BIM according to claim 1, characterized in that: The installation of sensors at appropriate locations of the municipal rainwater and sewage pipe network includes: installing sensors at various interfaces, vulnerable locations and key space observation points of the municipal rainwater and sewage pipe network. The key space observation points refer to the key space observation points where, after the sensors are installed, the overall structural data information of the rainwater and sewage pipe network in the key space can be well collected.

3. A method for storing municipal rainwater and sewage pipe network information based on BIM according to claim 1, characterized in that: The blockchain consensus algorithm includes: computer statistics of relevant part data information x i The judgment result is whether the number of computers within the safety threshold exceeds 2 / 3 of the total number of computers. If it exceeds 2 / 3, it proves that the corresponding relevant parts are within the safety threshold; if it does not exceed 2 / 3, it proves that there are safety risks in the relevant parts, and the technical personnel are notified to carry out repairs and reinforcement; after the technical personnel carry out repairs and reinforcement, they will use the collected data information of the relevant parts of the rainwater and sewage pipe network to timely update the three-dimensional model saved in the computer.