A system for preparing synthesis gas based on coal chemical industry coupled with coking and renewable energy

By coupling a coal chemical system with a coking system, and combining water electrolysis for hydrogen production with renewable energy for syngas production, the problems of inefficient utilization of coke oven gas and high CO2 capture costs have been solved. This has enabled large-scale and stable coupling of green hydrogen and zero CO2 emissions, improving energy efficiency and economics.

CN116477572BActive Publication Date: 2024-11-19SHAANXI BLOWER GROUP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310323134.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-03-30
Publication Date
2024-11-19
Estimated Expiration
2043-03-30

AI Technical Summary

Technical Problem

Existing technologies suffer from inefficient utilization of coke oven gas and high CO2 capture costs, especially in the process of producing syngas from renewable energy sources, where large-scale coupling and stability are difficult to achieve.

Method used

By coupling a coal chemical system with a coking system, and combining a system for producing hydrogen through water electrolysis and syngas from renewable energy sources, including a coke oven, purification and separation unit, syngas compression unit, water electrolysis hydrogen production unit, and gasification unit, the system achieves efficient coupling of coke oven gas and renewable energy. It adopts oxygen-enriched/pure oxygen combustion and CO replacement of coke oven gas for self-use, thereby increasing CO2 concentration and reducing capture costs. It also utilizes waste heat from coking and off-peak electricity from the power grid to regulate energy supply and ensure system stability.

Benefits of technology

It has achieved large-scale stable coupling of green hydrogen, reduced CO2 capture costs, improved energy utilization and system economy, realized steady-state coupling of coal chemical industry and renewable energy and zero CO2 emissions, and ensured low-cost, green and environmentally friendly, and long-term operation of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116477572B_ABST
    Figure CN116477572B_ABST
Patent Text Reader

Abstract

The present invention provides a system for preparing synthesis gas based on coal chemical industry coupled with coking and renewable energy, including a coal coking system, a water electrolysis hydrogen production system and a gasification device, wherein the coal coking system includes a coke oven, a purification and separation device and a synthesis gas compression device, the carbonization chamber of the coke oven is connected to the first air inlet of the purification and separation device through a pipeline, the first air outlet of the purification and separation device is connected to the combustion chamber of the coke oven, and the second air outlet of the purification and separation device is connected to the synthesis gas compression device, and the water electrolysis hydrogen production system includes a water electrolysis hydrogen production device, the water electrolysis hydrogen production device has an oxygen exhaust port and a hydrogen exhaust port, the oxygen exhaust port is connected to the air inlet of the combustion chamber, the hydrogen exhaust port is connected to the synthesis gas compression device, and the exhaust port of the gasification device is connected to the second air inlet of the purification and separation device. It can overcome the defects of external carbon supplementation, fluctuation regulation of large-scale utilization of green hydrogen, inefficient utilization of hydrogen-rich gas and high cost of CO2 capture in the prior art.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of coal chemical industry, and in particular to a system for preparing synthesis gas based on coal chemical industry coupled with coking and renewable energy. Background Art

[0002] Based on the characteristics of resource endowment, my country is the world's largest coal chemical producer. The high carbon property and processing characteristics of coal determine the high energy consumption and large CO2 emissions of coal chemical industry. How to achieve energy conservation and carbon reduction in coal chemical industry has become an important constraint for the survival and implementation of the project.

[0003] At present, in the field of new coal chemical industry, the industry couples green hydrogen production from renewable energy with coal-to-syngas production. On the one hand, it adjusts the carbon-hydrogen ratio of the process, eliminates the conversion device, and reduces CO2 emissions. On the other hand, it reduces CO2 emissions from fuel combustion in supporting thermal power stations through CO2 capture and utilization.

[0004] In the field of coal coking, the industry has changed the use of coke oven gas for power generation to producing chemicals based on the hydrogen-rich characteristics of coke oven gas.

[0005] In the actual application of new coal chemical industry, due to the intermittent and instability of renewable energy, it is difficult to achieve large-scale coupling application of green hydrogen and coal-based synthesis gas. In addition, when the CO2 concentration of thermal power station fuel combustion is low (10%-12%), it causes the problem of high CO2 capture cost.

[0006] In the actual application of coal coking, due to the hydrogen-rich characteristics of coke oven gas, carbon supplementation is often required in the production of chemicals. In addition, 40% of the coke oven gas is burned in the coke oven for self-use. At the same time, the CO2 concentration is low after combustion in the coke oven, resulting in inefficient utilization of hydrogen-rich gas and high CO2 capture costs. Summary of the invention

[0007] Therefore, the present invention provides a system for preparing synthesis gas based on coal chemical industry coupled with coking and renewable energy, which can overcome the inefficient utilization of coke oven gas and CO 2 The defect of high capture cost.

[0008] In order to solve the above problems, the present invention provides a system for preparing synthesis gas based on coal chemical industry coupled with coking and renewable energy, comprising a coal coking system, a water electrolysis hydrogen production system and a gasification device, the coal coking system comprising a coke oven, a purification and separation device and a synthesis gas compression device, the carbonization chamber of the coke oven is connected to the first air inlet of the purification and separation device through a pipeline, the first air outlet of the purification and separation device is connected to the combustion chamber of the coke oven, and the second air outlet of the purification and separation device is connected to the synthesis gas compression device, the water electrolysis hydrogen production system comprises a water electrolysis hydrogen production device, the water electrolysis hydrogen production device has an oxygen exhaust port and a hydrogen exhaust port, the oxygen exhaust port is connected to the air inlet of the combustion chamber, the hydrogen exhaust port is connected to the synthesis gas compression device, and the exhaust port of the gasification device is connected to the second air inlet of the purification and separation device.

[0009] In some embodiments, the system for preparing synthesis gas based on coal chemical industry coupled with coking and renewable energy also includes a conversion device, the exhaust port of the gasification device is connected to the air inlet of the conversion device, and the exhaust port of the conversion device is connected to the second air inlet of the purification and separation device.

[0010] In some embodiments, the oxygen exhaust port of the water electrolysis hydrogen production device is also connected to the gasification device.

[0011] In some embodiments, the wastewater outlet of the purification and separation device is connected to the gasification device so that the wastewater generated by the purification and separation device can be sent to the gasification device.

[0012] In some embodiments, the system for preparing synthesis gas based on coal chemical industry coupled with coking and renewable energy further includes an air separation device, which is respectively connected to the gasification device and the combustion chamber to provide oxygen therefor.

[0013] In some embodiments, the water electrolysis hydrogen production system further includes a power storage unit, one end of which is connected to a power grid, and the other end of which is connected to the water electrolysis hydrogen production device to provide electrical energy for the water electrolysis hydrogen production device.

[0014] In some embodiments, the water electrolysis hydrogen production system further includes a renewable energy power generation unit, which provides electrical energy for the water electrolysis hydrogen production device.

[0015] In some embodiments, the renewable energy generation unit is further connected to the power storage unit.

[0016] In some embodiments, the system for preparing synthesis gas based on coal chemical industry coupled with coking and renewable energy also includes a methane conversion unit, the air inlet end of the methane conversion unit is connected to the methane exhaust port of the purification and separation unit, and the exhaust end of the methane conversion unit is connected to the second air inlet of the purification and separation unit.

[0017] In some embodiments, a system for preparing synthesis gas based on coal chemical industry coupled with coking and renewable energy further includes a coke dry quenching device, a first waste heat boiler and a second waste heat boiler, wherein the carbonization chamber of the coke oven is connected to the coke dry quenching device, the exhaust port of the coke dry quenching device is connected to the air inlet of the second waste heat boiler, the air inlet of the coke dry quenching device is connected to the exhaust port of the second waste heat boiler, the exhaust port of the combustion chamber of the coke oven is connected to the air inlet of the first waste heat boiler, and the heat generated by heat exchange between the first waste heat boiler and the second waste heat boiler supplies energy to the system.

[0018] The present invention provides a system for preparing synthesis gas based on coal chemical industry coupling coking and renewable energy. Through the perfect coupling of coal-based synthesis gas with renewable energy hydrogen production and coal coking, the large-scale stable coupling of green hydrogen and the flexible adjustment of the carbon-hydrogen ratio of the product synthesis gas can be achieved. By replacing the self-used coke oven gas of the coke oven with CO and burning with oxygen-enriched / pure oxygen, the CO2 concentration of the coke oven system is guaranteed to be increased from about 10% to more than 98%, the cost of carbon capture is reduced, and the scale of the supporting thermal power station of the new coal chemical industry is replaced or reduced by the coking waste heat, so as to reduce the CO2 emission of fuel combustion from the source. The by-product oxygen of the electrolytic water hydrogen production device is used to reduce or cancel the air separation device. Under the policy that raw coal is not included in the total energy consumption, the energy consumption index and project energy consumption of the project are reduced. By replacing the self-used coke oven gas of the coke oven with CO, the coal gasification and conversion device, the grid valley electricity supplement, the electrolytic water hydrogen production and the matching adjustment of the coke output capacity of the coke oven are used to smooth the fluctuation of renewable energy, improve the utilization rate of renewable energy and improve the economic efficiency of the device. Coking waste liquid, powdered coke, solid waste, etc. are synergistically treated to improve energy utilization efficiency and project economic benefits. Ultimately, the large-scale steady-state coupling of coal chemical industry and renewable energy and zero CO2 emissions will be achieved, the energy consumption of the equipment will be reduced, and the system will be guaranteed to be low-cost, green and environmentally friendly, and operate over a long period of time. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a schematic diagram of the structure of a system for preparing synthesis gas based on coal chemical industry coupled with coking and renewable energy according to an embodiment of the present invention.

[0020] The reference numerals are:

[0021] 1. Coke oven; 2. Gasification device; 3. Coke dry quenching device; 4. Purification and separation device; 5. Conversion device; 6. Methane conversion device; 7. Synthesis gas compression device; 8. First waste heat boiler; 9. Second waste heat boiler; 10. Water electrolysis hydrogen production device; 11. Power storage unit; 12. Renewable energy power generation unit; 13. Air separation unit. DETAILED DESCRIPTION

[0022] See also Figure 1As shown, according to an embodiment of the present invention, a system for preparing synthesis gas based on coal chemical industry coupled with coking and renewable energy is provided, including a coal coking system, a water electrolysis hydrogen production system and a gasification device 2, the coal coking system includes a coke oven 1, a purification and separation device 4 and a synthesis gas compression device 7, the carbonization chamber of the coke oven 1 is connected to the first air inlet of the purification and separation device 4 through a pipeline, the first air outlet of the purification and separation device 4 is connected to the combustion chamber of the coke oven 1, and the second air outlet of the purification and separation device 4 is connected to the synthesis gas compression device 7, the water electrolysis hydrogen production system includes a water electrolysis hydrogen production device 10, the water electrolysis hydrogen production device 10 has an oxygen exhaust port and a hydrogen exhaust port, the oxygen exhaust port is connected to the air inlet of the combustion chamber, the hydrogen exhaust port is connected to the synthesis gas compression device 7, and the exhaust port of the gasification device 2 is connected to the second air inlet of the purification and separation device 4.

[0023] The coke oven gas produced in the carbonization chamber is sent to the purification and separation device 4 together with the raw coal gas produced by the gasification device 2. After separation and purification, raw synthesis gas and CO fuel gas are generated. The CO fuel gas is sent to the combustion chamber through the first gas outlet and mixed with the oxygen from the oxygen exhaust port and then burned to provide energy for the coal coking system. The raw synthesis gas is sent to the synthesis gas compression device 7 through the second gas outlet and mixed with the hydrogen from the hydrogen exhaust port and then compressed to form synthesis gas. The use of fuel replacement and oxygen-enriched / pure oxygen combustion in the coke oven combustion chamber, the high-solubility CO2 obtained after combustion is directly recovered and reused, which can effectively reduce the high cost problem caused by low-concentration CO2 capture.

[0024] Preferably, the hydrogen exhaust port of the water electrolysis hydrogen production device 10 is connected to the purification and separation device 4. In the purification and separation device 4, the coke oven gas undergoes primary cooling, tar recovery, naphthalene removal, ammonia removal, and benzene removal, and then passes through a low-temperature methanol washing device together with the converted coal gas from the methane conversion device 6 and the raw coal gas from the gasification device 2, and enters a deep cold separation device after further desulfurization and decarbonization to produce synthesis gas (CO+H 2 ), and enters the synthesis gas compression device 7 together with the hydrogen from the water electrolysis hydrogen production device 10.

[0025] In a specific embodiment, the system for preparing synthesis gas based on coal chemical industry coupled with coking and renewable energy also includes a conversion device 5, the exhaust port of the gasification device 2 is connected to the air inlet of the conversion device 5, and the exhaust port of the conversion device 5 is connected to the second air inlet of the purification and separation device 4.

[0026] In a specific embodiment, the oxygen exhaust port of the water electrolysis hydrogen production device 10 is also connected to the gasification device 2 .

[0027] In a specific embodiment, the wastewater outlet of the purification and separation device 4 is connected to the gasification device 2 so that the wastewater generated by the purification and separation device 4 can be sent to the gasification device 2 .

[0028] In a specific embodiment, the system for preparing synthesis gas based on coal chemical industry coupled with coking and renewable energy further includes an air separation device 13, which is respectively connected to the gasification device 2 and the combustion chamber to provide oxygen therefor. The air separation and the electrolytic water oxygen production balance are adjusted to ensure oxygen-rich combustion in the combustion chamber and the gasification device, thereby improving the combustion efficiency and the generated gas concentration.

[0029] In a specific embodiment, the water electrolysis hydrogen production system further includes a power storage unit 11 , one end of which is connected to a power grid, and the other end of which is connected to the water electrolysis hydrogen production device 10 to provide electrical energy for the water electrolysis hydrogen production device 10 .

[0030] In a specific embodiment, the water electrolysis hydrogen production system further includes a renewable energy power generation unit 12 , and the renewable energy power generation unit 12 provides electrical energy for the water electrolysis hydrogen production device 10 .

[0031] Specifically, the renewable energy power generation unit 12 is a wind power generation unit or a solar power generation unit.

[0032] In a specific embodiment, the renewable energy power generation unit 12 is also connected to the power storage unit 11 .

[0033] In a specific embodiment, the system for preparing synthesis gas based on coal chemical industry coupled with coking and renewable energy further includes a methane conversion device 6, the air inlet end of the methane conversion device 6 is connected to the methane exhaust port of the purification and separation device 4, and the exhaust end of the methane conversion device 6 is connected to the second air inlet of the purification and separation device 4. The three balance adjustment methods of coke oven gas, coal gasification, and water electrolysis hydrogen production can effectively adjust the carbon-hydrogen ratio of the synthesis gas to ensure that the carbon-hydrogen ratio of the synthesis gas is stable within the required range.

[0034] In a specific embodiment, a system for preparing synthesis gas based on coal chemical industry coupled with coking and renewable energy also includes a dry quenching device 3, a first waste heat boiler 8 and a second waste heat boiler 9, the carbonization chamber of the coke oven 1 is connected to the dry quenching device 3, the exhaust port of the dry quenching device 3 is connected to the air inlet of the second waste heat boiler 9, the air inlet of the dry quenching device 3 is connected to the exhaust port of the second waste heat boiler 9, the exhaust port of the combustion chamber of the coke oven 1 is connected to the air inlet of the first waste heat boiler 8, and the heat generated by the heat exchange between the first waste heat boiler 8 and the second waste heat boiler 9 supplies energy to the system.

[0035] During use, the mixed coal from the coal preparation system is loaded into the carbonization chamber of the coke oven 1 for coking. The heat required for coking is supplied by the CO fuel gas (mainly CO) from the purification and separation device 4 and the oxygen from the water electrolysis hydrogen production device 10 in the combustion chamber of the coke oven 1 through oxygen-enriched / pure oxygen combustion. The coke oven gas produced in the carbonization chamber of the coke oven 1 is all sent to the purification and separation device 4. The combustion chamber of the coke oven 1 produces high-temperature CO after oxygen-enriched combustion. 2 The gas enters the first waste heat boiler 8 to produce steam as a byproduct, and the red coke is sent to the dry coke quenching device 3 to be cooled by the inert gas. The high-temperature inert gas generated enters the second waste heat boiler 9 to produce steam as a byproduct. The inert gas cooled by the second waste heat boiler 9 returns to the dry coke quenching device 3 for continued use. The cooled CO 2 The gas can be directly recycled and used, or partially used in the methane conversion unit 6. The coke is cooled to 180°C and enters the subsequent coke screening and storage system. The waste heat from the boiler is used to power the system, reducing the configuration scale of the original self-provided thermal power station.

[0036] The powdered coke from the coke screen storage system, the organic wastewater and tar from the purification and separation device 4, the oxygen from the water electrolysis hydrogen production device 10, and the raw coal from the coal preparation system enter the gasification device 2 together, and the raw coal gas produced enters the conversion device 5 for CO conversion. The conversion depth is adjusted according to the hydrogen output of the water electrolysis hydrogen production device 10, the hydrogen component output of the coke oven gas of the coke oven 1, and the carbon-hydrogen ratio requirements of the product synthesis gas. The converted gas is sent to the purification and separation device 4.

[0037] In the purification and separation device 4, the coke oven gas undergoes primary cooling, tar recovery, naphthalene removal, ammonia removal, and benzene removal, and together with the converted coal gas from the methane conversion device 6 and the converted gas from the conversion device 5, passes through the low-temperature methanol washing device, and after further desulfurization and decarbonization, enters the deep cold separation device to produce synthesis gas (CO+H 2 ), and enters the synthesis gas compression device 7 together with the hydrogen from the water electrolysis hydrogen production device 10.

[0038] In order to ensure that the synthesis gas with a suitable carbon-hydrogen ratio (CO+H 2 ), firstly, the energy supply of the water electrolysis hydrogen production device 10 is ensured through the power storage unit 11, and the hydrogen output rate of the water electrolysis hydrogen production device 10 is ensured; secondly, the bottom-up adjustment is performed through the conversion device 5, that is, when the crude synthesis gas produced by the purification and separation device cannot meet the carbon-hydrogen ratio of the production synthesis gas, it is supplemented by the conversion gas produced by the conversion device 5, so as to ensure the normal operation of the purification and separation device and the synthesis gas compression device, the qualified components and pressure indicators of the product gas, the full utilization of renewable energy and the stability of the operation of the whole system.

[0039] CH produced by purification and separation device 4 4The gas is sent to the methane conversion device 6, and the other gas separated by the purification and separation device 4 (ie, CO fuel gas) is sent to the coke oven combustion chamber and is burned with oxygen sent by the water electrolysis hydrogen production device 10 for oxygen-enriched / pure oxygen.

[0040] The by-product steam of the first waste heat boiler 8 and the second waste heat boiler 9 is used in the synthesis gas process such as the air separation unit 13, the synthesis gas compression unit 7, and the methane conversion unit 6, replacing or reducing the scale of the new coal chemical supporting thermal power station. 2 The gas can be directly recovered and used, or partially used in the methane conversion unit 6.

[0041] The electric energy of the water electrolysis hydrogen production device 10 is provided by the renewable energy unit 12 or the power storage unit 11. The produced hydrogen is sent to the synthesis gas compression device, and the produced oxygen is sent to the gasification device 2 and the coke oven combustion chamber. When the oxygen is insufficient, it is provided by the air separation device 13.

[0042] Ultimately, the large-scale steady-state coupling of coal chemical industry and renewable energy and CO 2 Zero emission, reducing energy consumption of the device, ensuring low cost, green and environmental protection of the system and long-term operation.

[0043] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principle of the present invention shall be included in the protection scope of the present invention. The above description is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and variations can be made without departing from the technical principles of the present invention. These improvements and variations should also be regarded as the protection scope of the present invention.

Claims

1. A system for preparing synthesis gas based on coal chemical industry coupled with coking and renewable energy, characterized in that: The invention comprises a coal coking system, a water electrolysis hydrogen production system and a gasification device (2), wherein the coal coking system comprises a coke oven (1), a purification and separation device (4) and a synthesis gas compression device (7), wherein the carbonization chamber of the coke oven (1) is connected to a first air inlet of the purification and separation device (4) via a pipeline, the first air outlet of the purification and separation device (4) is connected to a combustion chamber of the coke oven (1), and the second air outlet of the purification and separation device (4) is connected to the synthesis gas compression device (7), the water electrolysis hydrogen production system comprises a water electrolysis hydrogen production device (10), and the water electrolysis hydrogen production device (10) The invention has an oxygen exhaust port and a hydrogen exhaust port, wherein the oxygen exhaust port is connected to the air inlet of the combustion chamber, the hydrogen exhaust port is connected to the synthesis gas compression device (7), the exhaust port of the gasification device (2) is connected to the second air inlet of the purification and separation device (4), and also includes a conversion device (5), the exhaust port of the gasification device (2) is connected to the air inlet of the conversion device (5), the exhaust port of the conversion device (5) is connected to the second air inlet of the purification and separation device (4), and the oxygen exhaust port of the water electrolysis hydrogen production device (10) is also connected to the gasification device (2).

2. The system for preparing synthesis gas based on coal chemical industry coupled with coking and renewable energy according to claim 1 is characterized in that: The wastewater outlet of the purification and separation device (4) is connected to the gasification device (2) so that the wastewater generated by the purification and separation device (4) can be sent to the gasification device (2).

3. The system for preparing synthesis gas based on coal chemical industry coupled with coking and renewable energy according to claim 1, characterized in that: It also includes an air separation device (13), which is connected to the gasification device (2) and the combustion chamber respectively so as to provide oxygen therefor.

4. The system for preparing synthesis gas based on coal chemical industry coupled with coking and renewable energy according to claim 1, characterized in that: The water electrolysis hydrogen production system further comprises a power storage unit (11), one end of the power storage unit (11) being connected to a power grid, and the other end of the power storage unit (11) being connected to the water electrolysis hydrogen production device (10) so as to be able to provide electric energy for the water electrolysis hydrogen production device (10).

5. The system for preparing synthesis gas based on coal chemical industry coupled with coking and renewable energy according to claim 4 is characterized in that: The water electrolysis hydrogen production system further comprises a renewable energy power generation unit (12), wherein the renewable energy power generation unit (12) provides electric energy for the water electrolysis hydrogen production device (10).

6. The system for preparing synthesis gas based on coal chemical industry coupled with coking and renewable energy according to claim 5, characterized in that: The renewable energy power generation unit (12) is also connected to the power storage unit (11).

7. The system for preparing synthesis gas based on coal chemical industry coupled with coking and renewable energy according to claim 1, characterized in that: It also comprises a methane conversion device (6), wherein the air inlet end of the methane conversion device (6) is connected to the methane exhaust port of the purification and separation device (4), and the exhaust end of the methane conversion device (6) is connected to the second air inlet of the purification and separation device (4).

8. The system for preparing synthesis gas based on coal chemical industry coupled with coking and renewable energy according to claim 1, characterized in that: The system further comprises a dry coke quenching device (3), a first waste heat boiler (8) and a second waste heat boiler (9); the carbonization chamber of the coke oven (1) is also connected to the dry coke quenching device (3); the exhaust port of the dry coke quenching device (3) is connected to the air inlet of the second waste heat boiler (9); the air inlet of the dry coke quenching device (3) is connected to the exhaust port of the second waste heat boiler (9); the exhaust port of the combustion chamber of the coke oven (1) is connected to the air inlet of the first waste heat boiler (8); and the heat generated by the heat exchange between the first waste heat boiler (8) and the second waste heat boiler (9) supplies energy to the system.