Anti-buoyancy segment system, fabrication and design methods for shield tunnel construction in hard strata

By installing anti-buoyancy water bags and grouting structures in shield tunnels, the problem of segment floating in hard strata was solved, thereby improving the stability and safety of the tunnel and simplifying the construction process.

CN116537821BActive Publication Date: 2026-11-17SHANDONG UNIV
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202310426015.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-04-17
Publication Date
2026-11-17
Estimated Expiration
2043-04-17

AI Technical Summary

Technical Problem

In hard strata, the floating phenomenon of tunnel segments during shield tunnel construction is severe, leading to deformation, leakage and shearing of connecting bolts, which affects the quality and safety of the tunnel structure. Existing treatment measures are not effective and are complicated to construct.

Method used

An anti-buoyancy segment system is adopted, including anti-buoyancy water bags and grouting structures. Anti-buoyancy water bags are set between the segments and the inner wall of the tunnel surrounding rock, and grout is injected into the water bags using grouting pipes and grouting valves to resist the buoyancy of the segments and ensure the stability of the tunnel.

Benefits of technology

It effectively resists segment uplift, improves tunnel safety, reduces accident losses, ensures project quality, and simplifies the construction process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116537821B_ABST
    Figure CN116537821B_ABST
Patent Text Reader

Abstract

This invention discloses an anti-buoyancy tunnel segment system, its fabrication, and design method for shield tunnel construction in hard strata. The system includes anti-buoyancy tunnel segments, each composed of a segment and an anti-buoyancy water-filled bag, used at the tunnel arch; the anti-buoyancy water-filled bag is positioned between the segment and the inner wall of the tunnel surrounding rock; and grouting pipes, grouting holes, and grouting valves, with the grouting valves connected to the inner side of the grouting holes. The method includes: calculating the anti-buoyancy pressure within the anti-buoyancy water-filled bag; calculating the design arc length of the anti-buoyancy water-filled bag at the arch position based on the bearing pressure of the segment; injecting grout into the anti-buoyancy water-filled bag outside the segment after the anti-buoyancy tunnel segment has exited the shield tail; and repeating the above steps until the desired effect is achieved after the grout inside the anti-buoyancy water-filled bag has solidified. This invention addresses the difficulties and key challenges of constructing anti-buoyancy shield tunnel segments in special geological conditions, especially hard strata, improving tunnel safety, reducing accident losses, and ensuring project quality.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to an anti-buoyancy segment system for shield tunnel construction in hard strata, and its manufacturing and design methods. Background Technology

[0002] With the acceleration of urbanization in my country, the utilization and development of underground space is receiving increasing attention, leading to a surge in the construction of large-diameter cross-river shield tunnels. During shield tunnel construction, after the assembled tunnel segments exit the shield tail, a gap forms between the outer surface of the segment and the surrounding rock. This gap is typically filled using synchronous grouting. Synchronous grouting is a crucial step in shield tunneling; as the shield advances, grout is pumped into the resulting gap to prevent ground subsidence and to stop the flow of slurry from the shield face into the assembled tunnel segments, ensuring tunnel structural stability. However, the segments exiting the shield tail can float in the uncured grout, especially in hard strata where this floating phenomenon is common. Because adjacent segments are connected using semi-rigid methods such as bolts and shear pins, deformation, leakage, and even bolt shearing caused by this floating can negatively impact the quality, safety, and lifespan of the shield structure.

[0003] Currently, the impact and application of anti-buoyancy shield tunnel segment construction in hard strata have not received sufficient attention in China. During shield tunnel construction, when segments float, methods such as selecting appropriate grout, increasing synchronous grouting pressure, and using secondary grouting are generally employed. These measures increase the construction intensity, place higher demands on construction machinery and personnel, and do not significantly control segment floatation. Summary of the Invention

[0004] The purpose of this invention is to provide a technical solution for the construction of anti-buoyancy shield tunnel segments in hard strata, including a system for their fabrication and design, to address the shortcomings of existing technologies. This solution can address the difficulties and key points of constructing anti-buoyancy shield tunnel segments in special geological conditions, especially hard strata, thereby improving tunnel safety, reducing accident losses, and ensuring project quality.

[0005] To solve the above-mentioned technical problems, the present invention adopts the following technical solution:

[0006] A segment anti-buoyancy system for shield tunnel construction in hard strata, characterized by: including

[0007] Anti-buoyancy segments, which consist of segments and anti-buoyancy water bladders, are used in tunnel arches;

[0008] Anti-buoyancy water bladders are placed between the tunnel segments and the inner wall of the surrounding rock of the tunnel.

[0009] Grouting pipe, the grouting pipe is located at the bottom of the anti-buoyancy water bladder bag;

[0010] Grouting holes are located on the segments, and grouting pipes are fixed and connected to the outside of the grouting holes;

[0011] And the grouting valve, which is connected to the inside of the grouting hole.

[0012] The above-mentioned structural design addresses the challenges and key aspects of constructing anti-buoyancy shield tunnel segments in special geological conditions, especially hard strata, thereby improving tunnel safety, reducing accident losses, and ensuring project quality.

[0013] Furthermore, the anti-buoyancy water bladder is made of thin-walled, high-strength PVC-coated fabric.

[0014] Furthermore, the grouting pipe is a resin grouting pipe.

[0015] Furthermore, the anti-buoyancy water bladder is initially in a vacuum-flattened state, and its length and width are the same as the outer arc surface of the anti-buoyancy tube.

[0016] The method for fabricating and installing anti-buoyancy segments in the anti-buoyancy segment system for shield tunnel construction in hard strata, as described above, is characterized by the following steps: before assembling the anti-buoyancy segments, the anti-buoyancy water bladder is tightly adhered to the outside of the segment using an adhesive material, and the grouting pipe of the anti-buoyancy water bladder is fixed and connected to the outer end of the grouting hole of the segment. Then, the anti-buoyancy segments are assembled at the designed tunnel arch position, and the shield tail is pushed out after the entire ring is assembled.

[0017] The above-mentioned method for designing and implementing anti-buoyancy pressure in the anti-buoyancy segment system for shield tunnel construction in hard strata is characterized by the following steps:

[0018] S1. First, the buoyancy force Fu of the tunnel lining is obtained according to the formula of buoyancy force of tunnel segment lining in grout and the weight of the segment itself. By assuming the design width B and arc length L of the anti-buoyancy segment, the anti-buoyancy pressure Pu in the design anti-buoyancy water bag is calculated.

[0019] S2. Then, based on the bearing pressure P of the tunnel segment, the design arc length L of the anti-buoyancy water bladder at the arch crown is calculated using P=Pu, thus determining the range of the anti-buoyancy tunnel segment at the arch crown. Grout is injected into the anti-buoyancy water bladder at the arch crown to achieve the corresponding design pressure Pu to resist the buoyancy force.

[0020] S3. Once the anti-buoyancy segment has detached from the shield tail, screw one end of the grouting valve into the grouting hole. Use a high-pressure grouting machine to inject grout into the anti-buoyancy water bladder on the outside of the anti-buoyancy segment through the grouting valve and grouting hole, so that the pressure reaches the corresponding design anti-buoyancy pressure Pu to resist the buoyancy force. During the grouting process, adjust the grouting pressure according to the misalignment with the adjacent ring, change the pressure inside the anti-buoyancy water bladder, and make the anti-buoyancy segment move up and down to be flush with the adjacent ring.

[0021] S4. Finally, after the grout inside the anti-buoyancy water bag has solidified and the pressure has stabilized, close the grouting valve, remove the grouting pipe, and unplug the grouting valve. Repeat the above steps to implement the next anti-buoyancy measure until the tunnel buoyancy control achieves the expected effect.

[0022] Furthermore, the tunnel buoyancy in step S1 is the buoyancy formula for the tunnel segments minus the weight of the tunnel segments themselves, i.e.

[0023] Furthermore, the equation for the pressure inside the buoyancy-resistant water bladder is: Where R is the radius of the central axis of the tunnel lining, B is the width of the tunnel segment, t is the thickness of the tunnel segment, and γ c For concrete segment weight, γ w Where A is the density of the slurry or water, and A is the contact area between the anti-buoyancy segment and the anti-buoyancy water bladder.

[0024] Furthermore, A = B * L, where L is the arc length of the contact surface between the anti-buoyancy water bladder and the tunnel segment. Based on the maximum allowable bearing pressure P of the tunnel segment, the design arc length L of the anti-buoyancy water bladder at the arch can be calculated using P = Pu, thus determining the range of the anti-buoyancy tunnel segment at the arch. By injecting grout into the anti-buoyancy water bladder at the arch to achieve the corresponding pressure Pu, the buoyancy force can be resisted.

[0025] The present invention, by adopting the above-described technical solution, has the following beneficial effects:

[0026] This invention addresses the challenges and key aspects of constructing anti-buoyancy shield tunnel segments in special geological conditions, especially hard strata, thereby improving tunnel safety, reducing accident losses, and ensuring project quality. Attached Figure Description

[0027] The present invention will be further described below with reference to the accompanying drawings:

[0028] Figure 1 This is a schematic diagram of the anti-buoyancy segment system in the anti-buoyancy segment system, fabrication and design method for shield tunnel construction in hard strata of the present invention;

[0029] Figure 2 This is a schematic diagram of the cylindrical tube segment in this invention;

[0030] Figure 3 This is a schematic diagram of the pressure-resistant water-buoyancy bag in this invention;

[0031] Figure 4 This is a flowchart of the design and implementation method in this invention.

[0032] In the diagram: 1-Anti-buoyancy segment; 2-Anti-buoyancy water bladder; 3-Synchronous grouting slurry. Detailed Implementation

[0033] It should be noted that, unless otherwise specified, the embodiments and features described in this application can be combined with each other. The present invention will now be described in detail with reference to the accompanying drawings and embodiments.

[0034] To enable those skilled in the art to better understand the present invention, the technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort should fall within the scope of protection of the present invention.

[0035] It should be noted that the terms "first," "second," etc., in the specification, claims, and accompanying drawings of this invention are used to distinguish similar objects and are not necessarily used to describe a specific order or sequence. Furthermore, the terms "comprising" and "having," and any variations thereof, are intended to cover non-exclusive inclusion.

[0036] like Figures 1 to 3 The diagram illustrates the anti-buoyancy segment system for shield tunnel construction in hard strata according to the present invention. It includes an anti-buoyancy segment 1, which is composed of a segment and an anti-buoyancy water-filled bag 2, used for the tunnel arch; the anti-buoyancy water-filled bag 2, located between the segment and the inner wall of the tunnel surrounding rock, made of thin-walled high-strength PVC-coated fabric, initially in a vacuum-flattened state, with its length and width equal to the outer arc surface of the anti-buoyancy segment 1; a grouting pipe, located at the bottom of the anti-buoyancy water-filled bag 2, which is a resin grouting pipe; synchronous grouting slurry 3 injected between the segment and the inner wall of the tunnel surrounding rock, distributed around the outer perimeter of the segment; grouting holes, located on the segment, with the grouting pipe fixed and connected to the outside of the grouting holes; and a grouting valve, connected to the inside of the grouting holes, preferably a high-pressure grouting ball valve.

[0037] The above-mentioned structural design addresses the challenges and key aspects of constructing anti-buoyancy shield tunnel segments in special geological conditions, especially hard strata, thereby improving tunnel safety, reducing accident losses, and ensuring project quality.

[0038] The fabrication and installation method of the anti-buoyancy segment in the anti-buoyancy segment system for shield tunnel construction in hard strata, as described above, includes the following steps: Before assembling the anti-buoyancy segment 1, the anti-buoyancy water bladder 2 is tightly adhered to the outside of the segment using adhesive material, and the grouting pipe of the anti-buoyancy water bladder 2 is fixed and connected to the outer end of the grouting hole of the segment. Then, the anti-buoyancy segment 1 is assembled at the designed tunnel arch position, and the shield tail is pushed out after the entire ring is assembled.

[0039] The above-mentioned design and implementation method for anti-buoyancy pressure in the anti-buoyancy segment system for shield tunnel construction in hard strata includes the following steps:

[0040] S1. First, the buoyancy force Fu of the tunnel lining is calculated based on the buoyancy formula of the tunnel lining segments in the grout and the weight of the segments themselves. Then, assuming the design width B and arc length L of the anti-buoyancy segment 1, the anti-buoyancy pressure Pu inside the designed anti-buoyancy water bag 2 is calculated. The tunnel buoyancy force is the buoyancy formula of the tunnel lining segments minus the weight of the segments themselves.

[0041] The equation for the internal pressure of the anti-buoyancy water bladder 2 is: Where R is the radius of the central axis of the tunnel lining, B is the width of the tunnel segment, t is the thickness of the tunnel segment, and γ c For concrete segment weight, γ w The density of the slurry or water is A, and the contact area between the anti-buoyancy segment 1 and the anti-buoyancy water bladder 2 is A.

[0042] A = B * L, where L is the arc length of the contact surface between the anti-buoyancy water bladder 2 and the tunnel segment. Based on the maximum allowable bearing pressure P of the tunnel segment, the design arc length L of the anti-buoyancy water bladder 2 at the arch can be calculated using P = Pu, thus determining the range of the anti-buoyancy tunnel segment 1 at the arch. By injecting grout into the anti-buoyancy water bladder 2 at the arch to achieve the corresponding pressure Pu, the upward buoyancy force can be resisted.

[0043] Density γ of reinforced concrete segment 1 c =25kN / m 3 The aspect ratio t / 2R > 4%, if density γ is considered... w =18kN / m 3 The buoyancy force after grout injection, Fu < 16πR 2 B = 450B kN, required pressure Pu = Fu / A = 450 / L (kPa); if groundwater buoyancy (density γ) is considered... w =10kN / m 3 Fu = 6πR 2 B = 170B kN, water bladder pressure Pu = Fu / A = 170 / L (kPa).

[0044] S2. Then, based on the bearing pressure P of the tunnel segment, the design arc length L of the anti-buoyancy water bladder 2 at the arch crown is calculated by P=Pu, thus determining the range of the anti-buoyancy tunnel segment 1 at the arch crown; grout is injected into the anti-buoyancy water bladder 2 at the arch crown to reach the corresponding design pressure Pu to resist the buoyancy force.

[0045] S3. When the anti-buoyancy segment 1 is removed from the shield tail, screw one end of the grouting valve into the grouting hole. Use a high-pressure grouting machine to inject grout into the anti-buoyancy water bladder 2 on the outside of the anti-buoyancy segment 1 through the grouting valve and grouting hole, so that the pressure reaches the corresponding design anti-buoyancy pressure Pu to resist the buoyancy force. During the grouting process, according to the misalignment with the adjacent ring, adjust the grouting pressure to change the pressure inside the anti-buoyancy water bladder 2, so that the anti-buoyancy segment 1 moves up and down to be flush with the adjacent ring.

[0046] S4. Finally, after the grout inside the anti-buoyancy water bag 2 has solidified and the pressure has stabilized, close the grouting valve, remove the grouting pipe, and unplug the grouting valve. Repeat the above steps to implement the next anti-buoyancy measure until the tunnel buoyancy control achieves the expected effect.

Claims

1. A method for designing and implementing anti-buoyancy pressure in an anti-buoyancy segment system for shield tunnel construction in hard strata, characterized by: Anti-buoyancy segment system includes Anti-buoyancy segment, which is composed of segments and anti-buoyancy water bladders, is used for tunnel arches; An anti-buoyancy water bladder is provided between the tunnel segment and the inner wall of the surrounding rock of the tunnel; Grouting pipe, wherein the grouting pipe is located at the bottom of the anti-buoyancy water bladder bag; Grouting holes are provided on the segments, and grouting pipes are fixed and connected to the outside of the grouting holes; and a grouting valve, wherein the grouting valve is connected to the inside of the grouting hole; The anti-buoyancy water bladder is made of thin-walled high-strength PVC coated fabric; The grouting pipe is a resin grouting pipe; the anti-buoyancy water bladder is initially in a vacuum flattened state, and its length and width are the same as the outer arc surface in contact with the anti-buoyancy tube sheet; Synchronous grouting fluid is injected between the tunnel segments and the inner wall of the surrounding rock, and is distributed around the outside of the tunnel segments. The grouting valve is a high-pressure grouting ball valve; Before assembling the anti-buoyancy segment, the anti-buoyancy water bladder is tightly glued to the outside of the segment using adhesive material, and the grouting pipe of the anti-buoyancy water bladder is fixed and connected to the outside end of the grouting hole of the segment. Then the anti-buoyancy segment is assembled at the designed tunnel arch position, and the shield tail is pushed out after the entire ring is assembled. The following are the steps for designing and implementing anti-buoyancy pressure in anti-buoyancy segment systems: S1. First, the tunnel buoyancy force Fu is calculated based on the buoyancy formula of the tunnel lining segments in the grout and the weight of the segments themselves. Then, assuming the design width B of the anti-buoyancy segments and the arc length L of the contact surface between the anti-buoyancy water bag and the segments, the anti-buoyancy pressure Pu inside the designed anti-buoyancy water bag is calculated. The tunnel buoyancy force is the sum of the buoyancy formula for the tunnel lining segments and the weight of the segments themselves. A=B L and A are the designed contact areas between the anti-buoyancy tube segments and the anti-buoyancy water bladder bags; S2. Then, based on the bearing pressure P of the tunnel segment, the design arc length L' of the anti-buoyancy water bladder at the arch crown is calculated using P=Pu, thus determining the range of the anti-buoyancy tunnel segment at the arch crown. Grout is injected into the anti-buoyancy water bladder at the arch crown to achieve the corresponding design anti-buoyancy pressure Pu to resist the buoyancy force. S3. After the anti-buoyancy segment has exited the shield tail, screw one end of the grouting valve into the grouting hole. Use a high-pressure grouting machine to inject grout into the anti-buoyancy water bladder on the outside of the anti-buoyancy segment through the grouting valve and grouting hole, so that the pressure reaches the corresponding design anti-buoyancy pressure Pu to resist the buoyancy force. During the grouting process, according to the misalignment with the adjacent ring, adjust the grouting pressure to change the pressure inside the anti-buoyancy water bladder, so that the anti-buoyancy segment moves up and down to be level with the adjacent ring. The equation for the pressure inside the anti-buoyancy water bladder is: Where R is the radius of the central axis of the tunnel lining, B is the width of the tunnel segment, and t is the thickness of the tunnel segment. For concrete segment weight, The density of the slurry or water is A, and the contact area between the anti-buoyancy segment and the anti-buoyancy water bladder is A. S4. Finally, after the grout inside the anti-buoyancy water bag has solidified and the pressure has stabilized, close the grouting valve, remove the grouting pipe, and unplug the grouting valve. Repeat the above steps to implement the next anti-buoyancy measure until the tunnel buoyancy control achieves the expected effect.

Citation Information

Patent Citations

  • Method for determining minimum burial depth of complex stratum shield tunnel

    CN106761783A

  • Shield tunnel position precise adjustment device and method based on adjustable grouting container

    CN110344843A

  • Double compensation method for controlling stratum and stress loss of shield tunnel

    CN114776323A