A dust removal device and method for water conservancy and hydropower tunnel engineering after excavation and blasting

By designing a water circulation mechanism and a dust removal device for the collection tank in the water conservancy and hydropower tunnel project, the problem of water depletion in the water tank in the prior art is solved, and the recycling of water and the improvement of dust removal efficiency is achieved.

CN116733521BActive Publication Date: 2024-11-26CHINA THREE GORGES CORPORATION
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310649729.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-06-02
Publication Date
2024-11-26
Estimated Expiration
2043-06-02

AI Technical Summary

Technical Problem

The existing water conservancy, hydropower tunnel blasting and dust removal device needs to consume water in the water tank when cleaning dust, resulting in returning to the replenishing water tank when the water is exhausted, which extends the dust removal time.

Method used

A dust removal device for excavation and blasting of water conservancy and hydropower tunnel engineering is designed, and a water circulation mechanism and a collection tank are used to drive water circulation through the first outlet hole and the second outlet hole to reduce water consumption, and through the exhaust parts and exhaust parts Drive the settlement of dust in the air and achieve effective dust cleaning.

Benefits of technology

The water recycling reduces the time required for dust removal, reduces the frequency of returning water change, and improves dust removal efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116733521B_ABST
    Figure CN116733521B_ABST
Patent Text Reader

Abstract

The present invention provides a dust removal device and method for use after excavation and blasting of a water conservancy and hydropower tunnel project, including a mounting frame and an open end of the tunnel to form a dust removal chamber, and a mounting frame and a sealed end of the tunnel to form a dust removal chamber. The air outlet is used to receive air in the dust removal chamber and to discharge air into the dust removal chamber. The exhaust member is installed on the air inlet. The exhaust member is used to drive the air in the dust removal chamber to move toward the air inlet. The water circulation mechanism has a water suction end and a water outlet end, the water outlet end is arranged around the circumference of the air outlet, and is provided with a first water outlet hole distributed along the extension direction of the water outlet end. The first water outlet hole is used to discharge water into the air outlet to drive dust sedimentation. The collecting trough is installed in the air outlet and is used to receive water discharged from the first water outlet. The water suction end is installed in the collecting trough and is used to inhale water in the collecting trough.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of dust removal in water conservancy and hydropower tunnel excavation, and in particular to a dust removal device and method used after excavation and blasting of a water conservancy and hydropower tunnel project. Background Art

[0002] A water conservancy and hydropower tunnel refers to a closed water channel that is often excavated through a mountain for water delivery or flood discharge in a water conservancy project. It is also called a hydraulic tunnel. According to the different tasks they undertake, it can be divided into a discharge tunnel and a discharge tunnel. The discharge tunnel is used to release the water required for irrigation, power generation and water supply from the reservoir; the discharge tunnel can be used to cooperate with the spillway to discharge part of the flood, discharge the tail water of the hydropower station, empty the reservoir for the maintenance of hub buildings or for war preparations, and discharge sand. In the construction of water conservancy and hydropower tunnels, the amount of earth and stone excavation is very huge, so it is often necessary to blast the inside of the tunnel to speed up the construction progress. However, a large amount of dust will be generated after the blasting. Since the space in the tunnel is relatively small, the wind circulation is not conducive to the rapid sedimentation of dust, which can easily cause health hazards to the on-site workers. Therefore, a blasting dust removal device is needed to reduce the dust generated during the blasting process.

[0003] After searching by the applicant, it was found that a mobile tunnel blasting dust removal device was mentioned in the public document with announcement number CN107916952A and the name of the mobile tunnel blasting dust removal device, including a supporting chassis, a wheel hub is installed on the supporting chassis, a water tank is fixed on the upper surface of the supporting chassis, a rotating device is fixed on the upper surface of the water tank, a U-shaped support frame is welded and fixed on the rotating device, and a bearing seat is welded and fixed on the two ends of the U-shaped support frame, a blower is installed on the bearing seat through a first rotating shaft, a water spray device is welded and fixed at the air outlet of the blower, a submersible water pump is arranged in the water tank, and the water outlet of the submersible water pump is connected to the water spray device through a water pipe, a fixed ear seat is welded on the outer wall of the blower, a connecting rope is fixed on the fixed ear seat, and the other end of the connecting rope is connected to a fixing device. The invention is easy to move and use, has a good dust reduction effect and is easy to adjust and control.

[0004] However, this technology has the above problem, that is, it needs to consume the water in the water tank when cleaning the dust. Therefore, when the water in the water tank is exhausted, it is necessary to return to the outlet to replenish the water in the water tank, which prolongs the dust removal time. Summary of the invention

[0005] In order to solve the above technical problems, the present invention provides a dust removal device and method for use after excavation and blasting of water conservancy and hydropower tunnel projects, which can recycle water to reduce water consumption, thereby reducing the time required to return for water replacement and cutting the time required for dust removal.

[0006] In order to realize the above technical features, the object of the present invention is achieved as follows: a dust removal device for water conservancy and hydropower tunnel engineering after excavation and blasting, comprising:

[0007] A mounting frame is used to be installed in a tunnel, the tunnel has an open end and a sealed end, the mounting frame has an air inlet and an air outlet which are both connected to the sealed end and the open end, the mounting frame and the open end are surrounded to form a dust exhaust chamber, and the mounting frame and the sealed end are surrounded to form a dust removal chamber; the air outlet is used to receive air in the dust removal chamber and to discharge air into the dust exhaust chamber;

[0008] An exhaust member is installed on the air inlet duct, the exhaust member is used to drive the air in the dust removal chamber to move towards the air inlet duct, the air inlet duct is used to receive the air exhausted by the exhaust member and to discharge the air into the dust removal chamber;

[0009] A water circulation mechanism, comprising a water suction end and a water discharge end, wherein the water discharge end is arranged around the circumference of the air outlet passage and is provided with first water discharge holes distributed along the extension direction of the water discharge end, wherein the first water discharge holes are used to discharge water into the air outlet passage to drive dust in the air to settle;

[0010] The collecting tank is installed in the air outlet and is used to receive the water discharged from the first water outlet. The water suction end is installed in the collecting tank and is used to suck the water in the collecting tank.

[0011] The mounting frame comprises:

[0012] The outer tube has a side wall with an installation cavity around the circumference of the outer tube, and the water outlet is installed in the installation cavity along the circumference of the outer tube;

[0013] A first nozzle, corresponding to the first water outlet hole one by one, one end of the first nozzle is connected to the water circulation mechanism through the first water outlet hole, and the other end of the first nozzle passes through the inner wall of the installation cavity and is located in the air outlet channel;

[0014] The inner tube is inserted in the outer tube, the air inlet is located in the inner tube, and the inner tube and the outer tube are surrounded to form an air outlet.

[0015] The collecting tank comprises:

[0016] a first sub-groove, arranged around the inner tube, the first sub-groove being used to receive water discharged from the first water outlet;

[0017] The second sub-trough is installed at the bottom of the outer tube and is connected with the first sub-trough. The second sub-trough is used to receive water discharged from the first sub-trough. The outer tube is provided with an opening connecting the installation cavity and the second sub-trough. The installation cavity is used to receive water discharged from the second sub-trough. The water suction end is inserted into the installation cavity through the opening.

[0018] The water circulation mechanism comprises:

[0019] A water pump is mounted on the outer pipe and has a water suction end located in the mounting cavity;

[0020] A first filter plate is installed in the outer tube and is located between the second sub-groove and the opening;

[0021] The drain pipe has one end mounted on the water pump and the other end mounted in the mounting cavity along the circumference of the outer pipe. The drain pipe is provided with a first water outlet hole connected with the interior of the drain pipe.

[0022] Also includes:

[0023] A second filter plate, one side of which is attached to the inner tube, and the other side of which extends in a direction away from the inner tube and abuts against the outer tube, and the second filter plate is located on a side of the first water outlet away from the sealing end;

[0024] The exhaust member is installed on the second filter plate and is located between the outer tube and the inner tube. The exhaust member and the first water outlet are respectively located on opposite sides of the second filter plate. The exhaust member is used to drive the air in the outlet duct to pass through the second filter plate and move toward the dust exhaust chamber.

[0025] Also includes:

[0026] A second nozzle, the drain pipe is provided with a second water outlet hole distributed along the axial direction of the drain pipe, the second water outlet hole and the first water outlet hole are respectively located on the opposite sides of the drain pipe, the second nozzle corresponds to the second water outlet hole one by one, one end of the second nozzle is connected to the drain pipe through the second water outlet hole, and the other end of the second nozzle passes through the inner wall of the installation cavity and is located outside the outer tube.

[0027] Also includes:

[0028] A first guide groove is rotatably mounted on the outside of the outer tube and is located below the second nozzle;

[0029] A second guide groove is slidably mounted in the first guide groove, the first guide groove and the second guide groove are arranged to form a guide space, and the second guide groove slides relative to the first guide groove in the axial direction of the first guide groove to adjust the guide space;

[0030] A connecting pipe, one end of which is connected to the first guide groove, and the other end of which is connected to the second sub-groove.

[0031] A method for removing dust after tunnel engineering excavation and blasting using the dust removal device after excavation and blasting of a water conservancy and hydropower tunnel engineering comprises the following steps:

[0032] Step 1: After the blasting is completed, the outer tube is adjusted so that the end of the outer tube close to the first nozzle faces the sealing end of the tunnel, the first guide groove is rotated in a direction away from the outer tube so that the first guide groove is parallel to the bottom surface, and then the second guide groove is slid along the axis of the first guide groove in a direction away from the first guide groove so that the second guide groove abuts against the wall of the tunnel;

[0033] Step 2, opening the exhaust member to drive the air from the dust exhaust chamber into the inner tube, and at the same time starting the suction member to drive the air in the air outlet passage to pass through the second filter plate and move toward the dust exhaust chamber, thereby forming a negative pressure at one end of the air outlet passage close to the sealing end, so as to drive the air in the dust removal end into the air outlet passage;

[0034] Step 3, start the water pump to drive the water in the installation cavity to enter the water suction end, and enter the air outlet duct through the drain pipe and the first nozzle in turn to drive the dust in the air to settle, then the water is collected by the first sub-groove, and passes through the first sub-groove, the second sub-groove, the first filter plate and the opening in turn to enter the installation cavity, at the same time, the water enters the water suction end, and passes through the drain pipe and the second nozzle in turn to enter between the outer pipe and the tunnel wall to drive the dust in the air to settle, then the water is collected by the first guide groove and the second guide groove, and passes through the connecting pipe, the second sub-groove, the first filter plate and the opening in turn to enter the installation cavity.

[0035] The present invention has beneficial effects:

[0036] The present invention adopts the above-mentioned dust removal device, by enclosing the mounting frame and the open end of the tunnel to form a dust removal chamber, and the mounting frame and the sealed end of the tunnel to form a dust removal chamber; the air outlet is used to receive the air in the dust removal chamber and to discharge the air into the dust removal chamber, the exhaust member is installed on the air inlet, and the exhaust member is used to drive the air in the dust removal chamber to move toward the air inlet. The water circulation mechanism has a water suction end and a water outlet end, the water outlet end is arranged around the circumference of the air outlet, and is provided with a first water outlet hole distributed along the extension direction of the water outlet end. The first water outlet hole is used to discharge water into the air outlet to drive dust sedimentation. The collecting trough is installed in the air outlet and is used to receive the water discharged from the first water outlet hole. The water suction end is installed in the collecting trough and is used to suck the water in the collecting trough. This dust removal device can recycle water to reduce water consumption, thereby reducing the time required to return to change water and reducing the time required for dust removal. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0038] Figure 1 A schematic structural diagram of a dust removal device used after excavation and blasting in a water conservancy and hydropower tunnel project provided by an embodiment of the present invention.

[0039] Figure 2 for Figure 1A schematic diagram of the structure of a dust removal device used after excavation and blasting in a water conservancy and hydropower tunnel project in the A direction.

[0040] Figure 3 For along Figure 2 The cross-sectional view obtained after cutting along the CC path.

[0041] Figure 4 Based Figure 3 Enlarged view of point E in the middle.

[0042] Figure 5 for Figure 1 A schematic diagram of the structure of a dust removal device used after excavation and blasting in a water conservancy and hydropower tunnel project in the B direction.

[0043] Figure 6 For along Figure 5 The cross-sectional view obtained after cutting along the DD path.

[0044] Figure 7 A schematic structural diagram of a dust removal device used in a water conservancy and hydropower tunnel engineering excavation and blasting after the embodiment of the present invention when the device is in the second working position.

[0045] Figure 8 A cross-sectional view of a dust removal device used after excavation and blasting in a water conservancy and hydropower tunnel project provided by an embodiment of the present invention when the device is in the second working position.

[0046] Fig. 9 An exploded view of a mounting frame for a dust removal device used after excavation and blasting in a water conservancy and hydropower tunnel project provided by an embodiment of the present invention.

[0047] Fig.10 A schematic diagram of the assembly of a dust removal device in a tunnel after excavation and blasting in a water conservancy and hydropower tunnel project provided by an embodiment of the present invention.

[0048] In the figure: 1-mounting frame; 101-air inlet; 102-air outlet; 103-first mounting port; 104-second mounting port;

[0049] 11-inner tube; 111-mounting plate; 112-through hole;

[0050] 12-outer tube; 121-installation cavity;

[0051] 13-first nozzle; 14-connecting plate;

[0052] 2- Exhaust parts;

[0053] 3-water circulation mechanism; 301-water suction end; 302-water discharge end; 31-water pump; 32-first filter plate; 33-drain pipe;

[0054] 4-collecting tank; 41-first sub-slot; 42-second sub-slot; 43-opening;

[0055] 5-second filter plate; 51-air extraction member;

[0056] 6- second nozzle;

[0057] 7-first guide groove; 701-right guide groove; 702-left guide groove;

[0058] 71-second guide groove; 711-right second guide groove; 712-left second guide groove; 72-connecting pipe; 73-guide space;

[0059] 8-tunnel; 801-dust removal chamber; 802-dust exhaust chamber; 81-sealed end; 82-open end. DETAILED DESCRIPTION

[0060] The embodiments of the present invention are further described below in conjunction with the accompanying drawings.

[0061] Embodiment 1:

[0062] In order to solve the problem existing in the existing CN107916952A named as a mobile tunnel blasting dust removal device: that is, it needs to consume the water in the water tank when cleaning the dust, so when the water in the water tank is exhausted, it needs to return to the outlet to replenish the water in the water tank, thereby prolonging the dust removal time.

[0063] In order to solve the above technical problems, this embodiment provides a dust removal device and a dust removal method for use in water conservancy and hydropower tunnel 8 engineering after excavation and blasting. Figure 1 and Figure 6 The dust removal device shown is used after excavation and blasting in a water conservancy and hydropower tunnel 8 project, and includes a mounting frame 1, an exhaust member 2, a water circulation mechanism 3 and a collection tank 4.

[0064] The exhaust member 2 is an exhaust fan that meets GB / T 23174-2008, which is a prior art and will not be described in detail here.

[0065] A dust removal device for use in water conservancy and hydropower tunnel 8 engineering after excavation blasting, the dust removal device after blasting comprises a mounting frame 1, an exhaust member 2, a water circulation mechanism 3 and a collection tank 4. Fig.10 The mounting frame 1 shown is used to be installed in the tunnel 8 to separate the opening 43 end and the sealing end 81 of the tunnel 8. The mounting frame 1 has an air inlet 101 and an air outlet 102 for communicating with the sealing end 81 and the opening 43 end. The mounting frame 1 and the opening 43 end are surrounded to form a dust exhaust chamber 802, and the mounting frame 1 and the sealing end 81 are surrounded to form a dust removal chamber 801. Figure 3The air outlet 102 is used to receive the air in the dust removal chamber 801 and to discharge the air into the dust exhaust chamber 802 along the direction W2. Figure 2 The exhaust member 2 is shown installed on the air inlet 101. Figure 3 The exhaust member 2 shown is used to drive the air in the dust removal chamber 802 to move along the direction W1 toward the air inlet 101 . The air inlet 101 is used to receive the air exhausted by the exhaust member 2 and to discharge the air into the dust removal chamber 801 .

[0066] like Figure 6 The water circulation mechanism 3 shown in the figure has a water suction end 301 and a water outlet end 302. The water outlet end 302 is arranged around the circumference of the air outlet 102 and is provided with first water outlet holes (not shown in the figure) evenly distributed along the extension direction of the water outlet end 302. The first water outlet holes (not shown in the figure) are used to discharge water into the air outlet 102 along the direction H1 to drive the dust in the air to settle. The collecting tank 4 is installed in the air outlet 102, and the water suction end 301 is installed in the collecting tank 4. Figure 6 The collecting tank 4 shown is used to receive water discharged from the first water outlet (not shown in the figure). Under the action of gravity, the water in the collecting tank 4 moves along the direction H2 toward the water suction end 301 and is absorbed by the water suction end 301 .

[0067] Through the above structure, the dust removal device provided in this embodiment for use after excavation and blasting of a water conservancy and hydropower tunnel 8 project can recycle water to reduce water consumption, thereby reducing the time required to return for water replacement and cutting the time required for dust removal.

[0068] Specifically, after the sealing bag of the tunnel 8 is blasted, the mounting frame 1 is adjusted so that the mounting frame 1 separates the sealing end 81 and the opening 43 of the tunnel 8. The two ends of the air inlet 101 are respectively connected to the sealing end 81 and the opening 43 of the tunnel 8, and the two ends of the air outlet 102 are respectively connected to the sealing end 81 and the opening 43 of the tunnel 8.

[0069] like Figure 3 As shown, the exhaust piece 2 is then started to drive the air in the dust exhaust chamber 802 to pass through the exhaust piece 2 and the air inlet duct 101 in sequence along the W1 direction and enter the dust removal chamber 801, thereby forming a positive pressure in the air inlet duct 101, and at the same time making the air pressure in the dust removal chamber 801 greater than the air pressure in the dust exhaust chamber 802, so that the air in the dust removal chamber 801 enters the dust exhaust chamber 802 through the air outlet duct 102 along the W2 direction, thereby driving the dust to enter the air outlet duct 102 along the W2 direction.

[0070] like Figure 6As shown, during this period, the water circulation mechanism 3 is started to drive the water in the collection tank 4 to pass through the water suction end 301 and the water outlet end 302 in sequence along the H3 direction, and enter the air outlet 102 along the H1 direction through the first water outlet hole (not shown in the figure), so as to absorb the dust in the air in the air outlet 102 and enter the collection tank 4. Then, the water moves in the collection tank 4 along the H2 direction toward the water suction end 301 to be recycled by the water circulation mechanism 3.

[0071] Based on the above foundation. Figure 2 The mounting frame 1 shown includes an outer tube 12, a first nozzle 13 and an inner tube 11. The inner side wall of the outer tube 12 has an installation cavity 121 around the outer tube 12, and the water outlet 302 is installed in the installation cavity 121 along the circumference of the outer tube 12. Figure 2 As shown, the inner tube 11 is inserted into the outer tube 12, the air inlet 101 is located in the inner tube 11, and the inner tube 11 and the outer tube 12 are surrounded to form the air outlet 102. Figure 3 The figure also includes a mounting plate 111, which is covered on the end of the inner tube 11 away from the sealing end 81 and fixed to the inner tube 11 by welding. A through hole 112 is opened on the mounting plate 111, and the exhaust member 2 is installed on the mounting plate 111 by screw connection, and is connected to the interior of the inner tube 11 through the through hole 112.

[0072] The first nozzle 13 corresponds to the first water outlet hole (not shown in the figure). One end of the first nozzle 13 is connected to the water circulation mechanism 3 through the first water outlet hole (not shown in the figure), and the other end of the first nozzle 13 passes through the inner wall of the installation cavity 121 and is located in the outlet channel 102. Figure 6 As shown, water enters the air outlet duct along the direction H1 through the first nozzle 13. It should be noted that H1 is Figure 6 The direction of water in the nozzle indicated in when entering the air outlet 102 , the initial direction of water when entering the air outlet 102 from any first nozzle 13 is collinear with the axis of the first nozzle 13 .

[0073] Based on the above foundation. Figure 6The collecting tank 4 shown includes a first sub-trough 41 and a second sub-trough 42. The first sub-trough 41 is welded around the opposite sides of the inner tube 11 and the top of the inner tube 11, and the first sub-trough 41 is used to receive water discharged from the first water outlet (not shown in the figure). The second sub-trough 42 is welded to the bottom of the outer tube 12 and is connected to the first sub-trough 41. The second sub-trough 42 is used to receive water discharged from the first sub-trough 41. The outer tube 12 is provided with an opening 43 connecting the installation cavity 121 and the second sub-trough 42. The installation cavity 121 is used to receive water discharged from the second sub-trough 42, and the water suction end 301 is inserted into the installation cavity 121 through the opening 43. Specifically, the water received in the first sub-trough 41 passes through the first sub-trough 41, the second sub-trough 42 and the opening 43 in sequence along the H2 direction and enters the installation cavity 121.

[0074] Based on the above foundation. Figure 8 The water circulation mechanism 3 shown includes a water pump 31, a first filter plate 32 and a drain pipe 33. The water pump 31 is a submersible water pump 31 that meets the GB / T2816-1991 standard, and the filter material of the first filter plate 32 is a filter cloth that meets the GB / T 38019-2019 standard, which are all prior arts and are not described in detail here.

[0075] like Figure 8 The water pump 31 is installed in the installation cavity 121 through a threaded connection and has a water suction end 301 located in the installation cavity 121. The first filter plate 32 is installed in the outer tube 12 and is located between the second sub-groove 42 and the opening 43. One end of the drain pipe 33 is installed on the water pump 31, and the other end is installed in the installation cavity 121 along the circumference of the outer tube 12. The drain pipe 33 is provided with a first water outlet hole (not shown in the figure) that is connected to the inside of the drain pipe 33. Figure 6 It should be noted that there are two second sub-grooves 42, which are respectively located on both sides of the opening 43 and are respectively connected to the two ends of the first sub-grooves 41. There are two first filter plates 32, which are respectively located between the two second sub-grooves 42 and the opening 43.

[0076] Preferably, Fig. 9 The inner tube 11 is provided with a first installation opening 103 corresponding to the opening 43, and the water pump 31 is inserted into the installation cavity 121 through the first installation opening 103 and the opening 43. The inner tube 11 is also provided with a second installation opening 104 connecting the inner tube 11 and the second sub-groove 42, and the first filter plate 32 is inserted into the second sub-groove 42 through the second installation opening 104 and is located between the second sub-groove 42 and the opening 43. Preferably, as Figure 3 As shown, the first nozzle 13 , the first sub-trough 41 , the second sub-trough 42 , the first filter plate 32 and the drain pipe 33 are two groups distributed along the axis of the inner tube 11 .

[0077] Specifically, water passes through the first filter plate 32 so that dust carried in the water is filtered by the first filter plate 32 .

[0078] Based on the basis of appeal. Figure 5 The dust removal device shown in the figure used after excavation and blasting of a water conservancy and hydropower tunnel 8 project also includes a second filter plate 5 and an exhaust member 51 .

[0079] The exhaust member 51 is an exhaust fan that meets GB / T 23174-2008, and the filter material of the second filter plate 5 is a filter cloth that meets GB / T 38019-2019. Both are existing technologies and will not be described in detail here.

[0080] like Figure 2 One side of the second filter plate 5 is attached to the inner tube 11, and the other side extends in a direction away from the inner tube 11 and abuts against the inner wall of the outer tube 12. The second filter plate 5 is located on the side of the first water outlet (not shown in the figure) away from the sealing end 81. The exhaust member 51 is installed on the second filter plate 5 and is located between the outer tube 12 and the inner tube 11. The exhaust member 51 and the first water outlet (not shown in the figure) are respectively located on opposite sides of the second filter plate 5. The exhaust member 51 is used to drive the air in the outlet duct 102 to pass through the second filter plate 5 and move toward the dust exhaust chamber 802. Specifically, as shown in FIG. Figure 3 The air suction member 51 is started to drive the air in the dust removal chamber 801 of the tunnel 8 to pass through the air outlet 102 in sequence along the direction W2, and the air suction member 51 enters the dust exhaust chamber 802.

[0081] Based on the above foundation. Figure 1 and Figure 5 The dust removal device shown in the figure for use after excavation and blasting of a water conservancy and hydropower tunnel 8 project also includes a second nozzle 6 , a first guide groove 7 , a second guide groove 71 and a connecting pipe 72 .

[0082] The drain pipe 33 is provided with second water outlet holes (not shown in the figure) distributed along the axial direction of the drain pipe 33. The second water outlet holes (not shown in the figure) and the first water outlet holes (not shown in the figure) are respectively located on opposite sides of the drain pipe 33. The second nozzles 6 correspond to the second water outlet holes (not shown in the figure) one by one. Figure 5 One end of the second nozzle 6 is connected to the drain pipe 33 through a second water outlet hole (not shown in the figure), and the other end of the second nozzle 6 passes through the inner wall of the installation cavity 121 and is located outside the outer tube 12.

[0083] like Figure 7The first guide grooves 7 shown are two, and the two first guide grooves 7 are rotatably installed on opposite sides of the outer tube 12. The second guide grooves 71 are two, and the two second guide grooves 71 are slidably installed in the two first guide grooves 7 in a one-to-one correspondence, and are respectively surrounded by the two first guide grooves 7 to form a guide space 73. In the axial direction of the first guide groove 7, the second guide groove 71 slides relative to the first guide groove 7 to adjust the guide space 73. One end of the connecting pipe 72 is connected to the first guide groove 7, and the other end of the connecting pipe 72 is connected to the second sub-groove 42.

[0084] In order to conveniently distinguish and describe the two first guide grooves 7 and the two second guide grooves 71, as shown in FIG. Figure 7 As shown, the two first guide grooves 7 are named as the left first guide groove 702 and the right first guide groove 701 , and the two second guide grooves 71 are named as the left second guide groove 712 and the right second guide groove 711 .

[0085] Specifically, Figure 2 As shown, the right guide groove 701 rotates along the R2 direction to be attached to the outer tube 12, and the left guide groove 702 rotates along the R1 direction to be attached to the outer tube 12 to reduce the space occupied by the device. Figure 7 As shown, when the second nozzle 6 is working, the right guide groove 701 is rotated along the R3 direction, and the left guide groove 702 is rotated along the R4 direction, so that the two guide spaces 73 are respectively located below the second nozzle 6 outside the opposite sides of the outer tube 12. Figure 7 As shown, the left second guide groove 712 is slid along the N1 direction, and the right second guide groove 711 is slid along the N2 direction to increase the projection area of ​​the guide space 73 on both sides of the outer tube 12 on the ground. Figure 8 As shown, the left two guide grooves 712 are slid along the N3 direction, and the right two guide grooves 711 are slid along the N4 direction to reduce the projection area of ​​the guide space 73 on both sides of the outer tube 12 on the ground.

[0086] like Figure 6 The water pump 31 shown is started to drive the water in the installation cavity 121 to pass through the water pump 31, the drainage pipe 33 and the second water outlet (not shown in the figure) in sequence along the direction H3 to enter the second nozzle 6. Figure 7 As shown, the liquid flows into the gap between the outer tube 12 and the tunnel 8 along the direction H4 and is collected by the flow guide spaces 73 located on both sides of the outer tube 12. Figure 8 As shown, the water in the right second guide groove 711 then passes through the right second guide groove 711 and the right first guide groove 701 connecting pipe 72 in the direction H5 and enters the second sub-groove 42. The water in the left second guide groove 712 passes through the left second guide groove 712 and the left first guide groove 702 connecting pipe 72 in the direction H3 and enters the second sub-groove 42.

[0087] It should be noted that if Figure 4There are two drain pipes 33 shown, and the two drain pipes 33 are respectively provided with a first water outlet hole (not shown in the figure) and a second water outlet hole (not shown in the figure). The operator can isolate the drain pipe 33 provided with the second water outlet hole (not shown in the figure) according to actual usage to prevent water from flowing out of the second nozzle 6.

[0088] Embodiment 2:

[0089] The method of using the dust removal device after excavation and blasting of a water conservancy and hydropower tunnel 8 project is as follows:

[0090] Step 1: After the blasting is completed, the outer tube 12 is adjusted so that the end of the outer tube 12 close to the first nozzle 13 faces the sealing end 81 of the tunnel 8. The first guide groove 7 is rotated in a direction away from the outer tube 12 so that the first guide groove 7 is parallel to the bottom surface, and then the second guide groove 71 is slid along the axis of the first guide groove 7 in a direction away from the first guide groove 7 so that the second guide groove 71 abuts against the wall of the tunnel 8;

[0091] Step 2: Open the exhaust member 2 to drive the air from the dust exhaust chamber 802 into the inner tube 11. At the same time, start the suction member 51 to drive the air in the air outlet 102 to pass through the second filter plate 5 and move toward the dust exhaust chamber 802, thereby forming a negative pressure at one end of the air outlet 102 close to the sealing end 81, so as to drive the air in the dust removal chamber 801 into the air outlet;

[0092] Step three, start the water pump 31 to drive the water in the installation cavity 121 into the water suction end 301, and enter the air outlet duct through the drain pipe 33 and the first nozzle 13 in turn to drive the dust in the air to settle. The water is then collected by the first sub-groove 41, and passes through the first sub-groove 41, the second sub-groove 42, the first filter plate 32 and the opening 43 in turn to enter the installation cavity 121. At the same time, the water enters the water suction end 301, and passes through the drain pipe 33 and the second nozzle 6 in turn to enter between the outer tube 12 and the wall of the tunnel 8 to drive the dust in the air to settle. The water is then collected by the first guide groove 7 and the second guide groove 71, and passes through the connecting pipe 72, the second sub-groove 42, the first filter plate 32 and the opening 43 in turn to enter the installation cavity 121.

Claims

1. A dust removal device for use after excavation and blasting of a water conservancy and hydropower tunnel project, characterized in that: include: The mounting frame (1) is used for being installed in a tunnel (8), the tunnel (8) having an open end (82) and a sealed end (81), the mounting frame (1) having an air inlet (101) and an air outlet (102) which are both in communication with the sealed end and the open end, the mounting frame (1) and the open end are arranged to form a dust exhaust chamber (802), and the mounting frame (1) and the sealed end are arranged to form a dust removal chamber (801); the air outlet (102) is used for receiving air in the dust removal chamber and for exhausting air into the dust exhaust chamber; An exhaust member (2) is mounted on the air inlet duct (101), the exhaust member (2) being used to drive the air in the dust removal chamber to move in a direction close to the air inlet duct (101), the air inlet duct (101) being used to receive the air exhausted by the exhaust member (2) and to discharge the air into the dust removal chamber; A water circulation mechanism (3) having a water suction end (301) and a water outlet end (302), wherein the water outlet end (302) is arranged around the circumference of the air outlet duct (102) and is provided with first water outlet holes distributed along the extension direction of the water outlet end (302), wherein the first water outlet holes are used to discharge water into the air outlet duct (102) to drive dust in the air to settle; The collecting tank (4) is installed in the air outlet (102) and is used to receive water discharged from the first water outlet hole; the water suction end (301) is installed in the collecting tank (4) and is used to suck water in the collecting tank (4); The mounting frame (1) comprises: The outer tube (12) has a mounting cavity (121) inside the side wall which is circumferentially around the outer tube (12), and the water outlet end (302) is mounted in the mounting cavity (121) along the circumference of the outer tube (12); A first nozzle (13) corresponds one-to-one with the first water outlet hole, one end of the first nozzle (13) is connected to the water circulation mechanism (3) through the first water outlet hole, and the other end of the first nozzle (13) passes through the inner wall of the installation cavity (121) and is located in the air outlet channel (102); The inner tube (11) is inserted into the outer tube (12), the air inlet (101) is located in the inner tube (11), and the inner tube (11) and the outer tube (12) are arranged to form an air outlet (102); The collecting tank (4) comprises: A first sub-groove (41) is arranged around the outside of the inner tube (11), wherein the first sub-groove (41) is used to receive water discharged from the first water outlet; The second sub-groove (42) is installed at the bottom of the outer tube (12) and is connected to the first sub-groove (41). The second sub-groove (42) is used to receive water discharged from the first sub-groove (41). The outer tube (12) is provided with an opening connecting the installation cavity (121) and the second sub-groove (42). The installation cavity (121) is used to receive water discharged from the second sub-groove (42). The water suction end (301) is inserted into the installation cavity (121) through the opening.

2. A dust removal device for use after excavation and blasting of a water conservancy and hydropower tunnel project according to claim 1, characterized in that: The water circulation mechanism (3) comprises: A water pump (31) is mounted on the outer tube (12) and has a water suction end (301) located in the mounting cavity (121); A first filter plate (32) is installed in the outer tube (12) and is located between the second sub-groove (42) and the opening (43); A drainage pipe (33) has one end mounted on the water pump (31) and the other end mounted in the mounting cavity (121) along the circumference of the outer pipe (12). The drainage pipe (33) is provided with a first water outlet hole connected to the interior of the drainage pipe (33).

3. A dust removal device for use after excavation and blasting of a water conservancy and hydropower tunnel project according to claim 2, characterized in that: Also includes: A second filter plate (5), one side of which is attached to the inner tube (11), and the other side of which extends in a direction away from the inner tube (11) and abuts against the outer tube (12), wherein the second filter plate (5) is located on a side of the first water outlet away from the sealing end; An air suction member (51) is mounted on the second filter plate (5) and is located between the outer tube (12) and the inner tube (11); the air suction member (51) and the first water outlet are respectively located on opposite sides of the second filter plate (5); the air suction member (51) is used to drive the air in the air outlet passage to pass through the second filter plate (5) and move toward the dust exhaust chamber.

4. A dust removal device for use after excavation and blasting of a water conservancy and hydropower tunnel project according to claim 3, characterized in that: Also includes: A second nozzle (6), wherein the drain pipe (33) is provided with a second water outlet hole distributed along the axial direction of the drain pipe (33), the second water outlet hole and the first water outlet hole are respectively located on opposite sides of the drain pipe (33), the second nozzle (6) and the second water outlet hole correspond one to one, one end of the second nozzle (6) is connected to the drain pipe (33) through the second water outlet hole, and the other end of the second nozzle (6) passes through the inner wall of the installation cavity (121) and is located outside the outer tube (12).

5. A dust removal device for use after excavation and blasting of a water conservancy and hydropower tunnel project according to claim 4, characterized in that: Also includes: A first guide groove (7) is rotatably mounted on the outside of the outer tube (12) and is located below the second nozzle (6); a second guide groove (71) slidably mounted in the first guide groove (7); the first guide groove (7) and the second guide groove (71) are arranged to form a guide space (73); in the axial direction of the first guide groove (7), the second guide groove (71) slides relative to the first guide groove (7) to adjust the guide space (73); A connecting pipe (72), one end of which is connected to the first guide groove (7), and the other end of which is connected to the second sub-groove (42).

6. A method for removing dust after tunnel excavation and blasting using the dust removal device for tunnel excavation and blasting of water conservancy and hydropower engineering as claimed in claim 5, characterized in that: The method comprises the following steps: Step 1, after blasting is completed, the outer tube (12) is adjusted so that the end of the outer tube (12) close to the first nozzle (13) faces the sealing end of the tunnel, the first guide groove (7) is rotated in a direction away from the outer tube (12) so that the first guide groove (7) is parallel to the bottom surface, and then the second guide groove (71) is slid along the axis of the first guide groove (7) in a direction away from the first guide groove (7) so that the second guide groove (71) abuts against the wall of the tunnel; Step 2, opening the exhaust member (2) to drive air from the dust exhaust chamber into the inner tube (11), and simultaneously starting the suction member (51) to drive the air in the air outlet duct (102) to pass through the second filter plate (5) and move toward the dust exhaust chamber, thereby forming a negative pressure at one end of the air outlet duct (102) close to the sealing end, so as to drive the air in the dust removal end into the air outlet duct; Step 3, starting the water pump (31) to drive the water in the installation cavity (121) to enter the water suction end (301), and then enter the air outlet duct through the drainage pipe (33) and the first nozzle (13) in sequence to drive the dust in the air to settle. The water is then collected by the first sub-groove (41), and then passes through the first sub-groove (41), the second sub-groove (42), the first filter plate (32) and the opening (43) in sequence to enter the installation cavity (121). At the same time, the water enters the water suction end (301), and then passes through the drainage pipe (33) and the second nozzle (6) in sequence to enter between the outer tube (12) and the tunnel wall, so as to drive the dust in the air to settle. The water is then collected by the first guide groove (7) and the second guide groove (71), and then passes through the connecting pipe (72), the second sub-groove (42), the first filter plate (32) and the opening (43) in sequence to enter the installation cavity (121).