A structural connection node between new and old subway stations and a construction method thereof

By using plate connectors and ultra-high performance concrete protective layers in the new and old subway station structures, combined with multi-level supporting structures, the problems of insufficient load-bearing capacity and low torsional stiffness are solved, the safety and durability of the structure are improved, and the simplicity the construction process.

CN116770887BActive Publication Date: 2024-10-22CHINA RAILWAY DESIGN GRP CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202311002375.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-08-10
Publication Date
2024-10-22
Estimated Expiration
2043-08-10

AI Technical Summary

Technical Problem

The existing technology has problems such as insufficient load-bearing capacity, low torsional stiffness, high corrosion risk and cumbersome construction procedures in the structural connection of old and new subway stations. It is especially difficult to apply to long box-shaped subway station structures and cannot meet the durability of underground environments. Require.

Method used

Plate connectors are installed on the tops of existing stations and new stations, and ultra-high performance concrete is used to form a concrete protective layer. Vertical and transverse beams are set up in the supporting structure, and embedded steel bars are used to connect to the supporting structure to form a multi-level Connect structures to increase contact surface and shear capacity.

Benefits of technology

It achieves high force transfer between the old and new concrete structures, enhances the shear bearing capacity, reduces the secondary distribution of internal forces, improves the safety and durability of the structure, reduces the risk of corrosion, and simplifies the construction process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116770887B_ABST
    Figure CN116770887B_ABST
Patent Text Reader

Abstract

The present invention discloses a structural connection node of an old and new subway station and a construction method thereof, wherein the connection node includes an existing station, a new station is arranged on one side of the existing station, a supporting structure is arranged at the connection of the new station, the supporting structure vertically supports the demolished position of the existing station, and a multi-level horizontal connection structure is arranged between the supporting structure and the existing station; the construction method thereof comprises the following steps: surface treatment is performed on the outer wall of the existing station, and steel bars are arranged and implanted on the outer wall; vertical beams of the new station and the supporting structure are constructed; concrete at the top connection position of the existing station and the new station is demolished; plate-type connectors are installed in the existing steel mesh and the new steel mesh; ultra-high performance concrete is poured; the side wall of the existing station is demolished, and horizontal beams of the supporting structure are constructed. The present invention improves the problems of the prior art, such as great influence on the structure of the existing station, insufficient bearing capacity, low torsional rigidity, great corrosion risk, and complicated construction procedures.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of underground station engineering, and in particular relates to a structural connection node of a new and old subway station and a construction method thereof. Background Art

[0002] The rapid advancement of urbanization and the rapid increase in urban population have stimulated economic vitality while also bringing huge traffic pressure to cities. As ground transportation capacity approaches saturation, vigorously developing underground rail transit has become a powerful means to alleviate urban traffic congestion and improve urban operation efficiency. In order to further improve the quality of cities and meet the people's growing needs for a better life, we must continue to promote the construction of urban rail transit and accelerate the construction of an integrated urban transportation network.

[0003] Due to the limitations of project costs and development ideas, most early subway stations were built as single-line stations, and basically no conditions were reserved for connecting with the newly built subway network, which brought many engineering difficulties to the interconnection of subway networks. Among them, how to meet the transfer needs between new subway stations and existing subway stations and realize the reliable connection and connection of new and old subway station structures are key technical problems that need to be solved urgently.

[0004] The existing subway station structures are mostly single-column double-span or double-column three-span box-type reinforced concrete frame structures. To achieve connection with the new station structure, the side walls of the existing station structure need to be demolished, and the top and floor slabs of the existing and new station structures need to be connected accordingly. The process involves complex load support conversion, boundary condition changes, and secondary distribution of internal forces in the existing station structure. Therefore, it is particularly important to select a reasonable, safe, reliable, and durable connection node between the old and new station structures during the reconstruction of the new and old subway stations.

[0005] However, since the through-construction and reconstruction of existing old and new subway station structures is an emerging construction demand in the field of underground engineering technology in recent years, many key technical solutions are still in the exploratory stage. At present, the structural connection between the old and new subway stations in the through-construction project is mostly directly borrowed from the rebar solution used for the connection between the old and new structures on the ground. However, there are significant differences between the above-ground buildings and subway stations in terms of structural form, load conditions and service environment. In actual application, there are problems such as great impact on the existing station structure, insufficient bearing capacity, low torsional stiffness, high corrosion risk and cumbersome construction procedures, and the applicable scenarios are limited.

[0006] Chinese patent CN113653359A discloses a conversion connection structure of annular steel plate hoops at the nodes of a newly added beam and an existing column, including an existing column, vertical steel plates are arranged around the existing column, the vertical steel plates are fixedly connected to the existing column by mechanical anchor bolts, and adjacent vertical steel plates are connected by single-sided groove partial penetration butt welds; two annular steel plate hoops perpendicular to the vertical steel plates are arranged on the outer side of the vertical steel plates, the two annular steel plate hoops respectively correspond to the positions of the upper and lower longitudinal steel bars of the newly added beam, the annular steel plate hoops and the vertical steel plates are welded by fillet welds, the upper and lower longitudinal steel bars of the newly added beam are respectively welded to the upper and lower annular steel plate hoops, and a number of studs are welded to the vertical steel plates within the cross-section of the newly added beam.

[0007] This invention is applicable to the field of building renovation and reinforcement technology. The reasonable node connection method effectively improves the force transmission and force-bearing performance at the beam-column nodes, significantly increases the safety performance and seismic resistance of the nodes, and at the same time makes the construction simple and saves costs, solving various drawbacks and risks existing in previous conventional connection practices.

[0008] However, the annular steel plate hoops used in this technical solution to connect the stress-bearing steel bars of the newly built beams and the existing columns are only applicable to independent components with smaller cross-sections. They cannot be applied in continuous and extremely long box-type subway station structures because it is difficult to construct closed annular steel plate hoops. At the same time, this technical solution does not have a special anti-corrosion design and is difficult to meet the durability requirements in underground environments with higher corrosion risks.

[0009] Chinese patent CN216690476 U discloses a new-old concrete connection structure, including an original concrete structure, a new concrete structure, a sealing layer, a concrete structure surface layer and a connecting wire mesh. A plurality of wedge-shaped grooves are arranged at intervals from top to bottom at the interface where the original concrete structure contacts the new concrete structure. The wedge-shaped grooves are arranged parallel to the top surface of the original concrete structure. A connecting seam for placing the connecting wire mesh is opened in the wedge-shaped groove. One end of the connecting wire mesh is inserted into the connecting seam, and the other end is cast and fixed in the new concrete structure. The sealing layer covers the concrete structure surface at the junction of the original concrete structure and the new concrete structure, and the concrete structure surface layer covers the original concrete structure and the new concrete structure and wraps the sealing layer.

[0010] The invention increases the contact area and connection strength of the bonding interface between the new and old concrete by setting a wire mesh and a wedge-shaped groove, and prevents moisture from penetrating through cracks and causing steel bar corrosion by setting a sealing layer, thereby extending the life of the new and old concrete connection structure. However, in this technical solution, the new and old concrete structures only transfer loads through implanted steel bars, and in order to meet the requirements of the specifications, the location of the implanted steel bars often deviates from the load-bearing steel bars on the top surface of the structure, which reduces the load-bearing efficiency of the implanted steel bar solution; in addition, since the loads borne by the side walls of the subway station structure are huge and complex, in order to achieve equal replacement of implanted steel bars with existing structural reinforcement, the number of implanted steel bars is often far greater than that of existing structural steel bars, which greatly increases the construction period and cost; more importantly, this technical solution cannot provide sufficient vertical stiffness and torsional stiffness for the existing structural top plate or floor deck boundary after the side wall is broken, which will further aggravate the secondary distribution of internal forces of the existing station structure caused by the renovation and use, which is not conducive to the safe operation of the existing station structure. Summary of the invention

[0011] The present invention is proposed to solve the problems existing in the prior art, and its purpose is to provide a new and old subway station structure connection node and a construction method thereof.

[0012] The technical solution of the present invention is: a structural connection node between an old and a new subway station, including an existing station, a new station is arranged on one side of the existing station, a supporting structure is arranged at the connection of the new station, the supporting structure vertically supports the demolished position of the existing station, and a multi-level horizontal connection structure is arranged between the supporting structure and the existing station.

[0013] Furthermore, the supporting structure is a vertical L-shaped structure, and the supporting structure includes a vertical supporting structure vertical beam and a horizontal supporting structure horizontal beam, and the supporting structure horizontal beam is inserted into the existing station for support.

[0014] Furthermore, the transverse connecting structure includes an end transverse connecting structure and a middle transverse connecting structure, the end transverse connecting structure connects the ends of the existing station and the newly built station, and the middle transverse connecting structure connects the side walls of the existing station and the newly built station.

[0015] Furthermore, the end transverse connection structure includes a plate-type connection member, and the plate-type connection member is connected to the existing steel mesh in the existing station and the newly built steel mesh in the newly built station.

[0016] Furthermore, ultra-high performance concrete is poured at the plate-type connecting piece to form a concrete protective layer.

[0017] Furthermore, the middle transverse connection structure includes implanted steel bars arranged at the side walls of the existing station, and the protruding sections of the implanted steel bars are anchored in the vertical beams of the supporting structure, so as to connect the middle parts of the existing station and the newly built station.

[0018] Furthermore, connecting steel bars are provided between the transverse beams of the supporting structure and the vertical beams of the supporting structure.

[0019] A new and old subway station structure connection node and a construction method thereof, comprising the following steps:

[0020] A. Carry out surface treatment on the outer wall of the existing station and lay out and embed steel bars on the outer wall;

[0021] B. Break the concrete at the top connection of the existing station and the new station;

[0022] C. Install the plate connector in the existing steel mesh and the newly built steel mesh;

[0023] D. Construction of new stations and vertical beams of supporting structures;

[0024] E. Pour ultra-high performance concrete at the plate connector to form a concrete protective layer;

[0025] F. Remove the structural side walls of the existing station and construct supporting structural transverse beams.

[0026] Furthermore, in step B, the concrete at the top connection position of the existing station and the newly built station is broken. In the process of breaking the concrete, the existing steel mesh in the existing station and the newly built steel mesh in the newly built station are partially exposed.

[0027] Furthermore, in step F, the structural side wall of the existing station is demolished, and the horizontal beam of the supporting structure is constructed. The horizontal beam of the supporting structure reserves the stirrup connection conditions for the vertical beam of the supporting structure to form a horizontal closed stirrup.

[0028] The beneficial effects of the present invention are as follows:

[0029] The present invention adopts a solution of setting plate-type connectors connected to the steel meshes of the existing station and the newly built station on the top of the two stations, thereby realizing the reliable transmission of tension / bending moment between the old and new concrete structures. Compared with the traditional rebar embedding solution, the plate-type connector proposed in the present invention is set closer to the original structural steel bars, and the force transmission effect is more efficient; the traditional rebar embedding solution transmits axial tension through organic rebar embedding glue, which has a certain risk of long-term performance degradation. The technical solution proposed in the present invention transmits axial tension / negative bending moment between the old and new concrete structures through the shear interaction between the shear connector in the plate-type connector and the concrete and steel mesh, which can partially or completely replace the tensile function provided by the implanted steel bars, avoiding the use of organic materials and the long-term performance degradation problems that may be caused thereby.

[0030] The present invention makes full use of the excellent mechanical and durability properties of ultra-high performance concrete materials, and considers the strong bonding effect between the ultra-high performance concrete and the existing concrete connection interface, and uses it as a protective layer and reinforcement layer for the connection nodes of existing stations and newly built stations. The ultra-high performance concrete protective layer not only ensures the reliable force transmission of the plate-type connector, but also avoids the adverse effects of high water pressure, strong seepage and corrosive environment in the underground environment on the long-term service performance of the connection node.

[0031] The supporting structure in the present invention increases the contact surface between the existing station and the newly built station; the transverse beams of the supporting structure provide additional shear force transmission paths, greatly improving the shear bearing capacity of the nodes; the supporting structure and the remaining existing station side walls form a whole, providing a stronger bending and torsional constraint boundary for the existing subway station structure boundary after the original side walls are removed, which can effectively reduce the secondary distribution of internal forces caused by the removal of the side walls of the existing station, thereby weakening the impact of the through-reconstruction of the old and new subway stations on the structural safety of the existing subway stations. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0033] Figure 2 It is a partial stereogram of the present invention;

[0034] Figure 3 It is a partial assembly schematic diagram of the present invention;

[0035] Figure 4 It is a partial schematic diagram of an existing station in the present invention;

[0036] Figure 5 It is a partial schematic diagram of the newly built station in the present invention;

[0037] Figure 6 It is a structural schematic diagram of the concrete protective layer in the present invention;

[0038] Figure 7 It is a schematic diagram of the connection between the concrete protective layer and the existing station in the present invention;

[0039] Figure 8 It is a structural schematic diagram of a plate type connector in the present invention;

[0040] Fig. 9 is another structural schematic diagram of the plate type connector in the present invention;

[0041] Fig.10 It is a construction schematic diagram of construction step A in the present invention;

[0042] Fig.11 It is a construction schematic diagram of construction step B in the present invention;

[0043] Fig.12 It is a construction schematic diagram of construction step C and step D in the present invention;

[0044] Fig.13 It is a construction schematic diagram of construction step E in the present invention;

[0045] Fig.14 It is a construction schematic diagram of construction step F in the present invention;

[0046] in:

[0047] 1 Existing station 2 New station

[0048] 3 Existing station structural columns 4 New station structural columns

[0049] 5 Supporting structure 6 Supporting structure column

[0050] 7 Concrete cover 8 New steel mesh

[0051] 9 Existing steel mesh 10 Plate connector

[0052] 11 Implanted steel bars 12 Through steel bars

[0053] 13 Steel bar connection embedded parts 14 Shear connector

[0054] 15 Vent 16 Existing station side wall

[0055] 17 Chiseling end

[0056] 51 Supporting structure vertical beam 52 Supporting structure horizontal beam. DETAILED DESCRIPTION

[0057] Hereinafter, the present invention will be described in detail with reference to the accompanying drawings and embodiments:

[0058] like Figures 1 to 14 As shown, a structural connection node between an old and new subway station includes an existing station 1, a newly built station 2 is arranged on one side of the existing station 1, a supporting structure 5 is arranged at the connection between the newly built station 2, and the supporting structure 5 vertically supports the demolished position of the existing station 1, and a multi-level horizontal connection structure is arranged between the supporting structure 5 and the existing station 1.

[0059] The supporting structure 5 is a vertical L-shaped structure, and includes a vertical supporting structure vertical beam 51 and a horizontal supporting structure transverse beam 52. The supporting structure transverse beam 52 is inserted into the existing station 1 for support.

[0060] The transverse connecting structure includes an end transverse connecting structure and a middle transverse connecting structure. The end transverse connecting structure connects the ends of the existing station 1 and the newly built station 2, and the middle transverse connecting structure connects the side walls of the existing station 1 and the newly built station 2.

[0061] The end transverse connection structure includes a plate-type connection member 10 , and the plate-type connection member 10 is connected to the existing steel mesh 9 in the existing station 1 and the newly built steel mesh 8 in the newly built station 2 .

[0062] Ultra-high performance concrete is poured at the plate-type connector 10 to form a concrete protective layer 7 .

[0063] The middle transverse connection structure includes an implanted steel bar 11 arranged at the side wall of the existing station 1, and the protruding section of the implanted steel bar 11 is anchored in the vertical beam 51 of the supporting structure to achieve the connection between the middle of the existing station 1 and the newly built station 2.

[0064] Connecting steel bars are provided between the supporting structure transverse beam 52 and the supporting structure vertical beam 51 .

[0065] Specifically, the existing station 1 includes a top plate, a bottom plate and a middle plate, and existing station structural columns 3 are arranged between the top plate and the middle plate and between the bottom plate and the middle plate, and the top plate, the bottom plate and the middle plate are all connecting points.

[0066] Correspondingly, the newly built station 2 is also provided with newly built station structural columns 4 for vertical support.

[0067] Specifically, the supporting structure 5 is provided with a supporting structure column 6 for support.

[0068] Specifically, a top notch groove is formed on the top of the existing station 1, and the existing steel mesh 9 in the existing station 1 is exposed at the position of the top notch groove. Correspondingly, a new notch groove is also formed on the top of the new station 2, and the new steel mesh 8 is exposed at the position of the new notch groove. The top notch groove and the new notch groove are assembled to form a groove.

[0069] Specifically, the groove can accommodate the plate-type connector 10, and the plate-type connector 10 connects the exposed existing steel mesh 9 and the exposed newly built steel mesh 8 to connect the two into one.

[0070] Specifically, after the plate-type connector 10 is connected, ultra-high performance concrete is poured into the groove to form a concrete protective layer 7 .

[0071] Specifically, the supporting structure vertical beam 51 is fitted with the existing station side wall 16 of the existing station 1, and the supporting structure vertical beam 51 is provided with a steel bar connection embedded part 13. The supporting structure vertical beam 51 and the supporting structure transverse beam 52 are cast and constructed successively.

[0072] Specifically, in step F, the structural side wall of the existing station is removed, and the supporting structure transverse beam 52 is constructed to reserve the stirrup connection conditions for the supporting structure vertical beam 51 to form a horizontal closed stirrup.

[0073] Specifically, a through steel bar 12 is provided at the demolished position of the existing station 1. The through steel bar 12 is vertical. The lower end of the through steel bar 12 protrudes out of the existing station 1 and enters into the supporting structure transverse beam 52, and is cast as a whole when the supporting structure transverse beam 52 is constructed.

[0074] Specifically, the plate connector 10 includes a metal plate, and a shear connector 14 is provided on one side of the metal plate. The shear connector 14 is arranged on the metal plate as needed, and part of the shear connector 14 is inserted into the newly built steel mesh 8, and part of the shear connector 14 is inserted into the existing steel mesh 9, thereby forming a fixation.

[0075] As a structural form, the metal plate is in a strip shape, a single row of shear connectors 14 are arranged on one side of the metal plate, and a plurality of plate connectors 10 are arranged between the newly built steel mesh 8 and the existing steel mesh 9.

[0076] As another structural form, the metal plate is rectangular, and a plurality of rows of shear connectors 14 are arranged on one side of the metal plate. Air outlet holes 15 are also arranged in the metal plate.

[0077] Specifically, the ultra-high performance concrete in the concrete protective layer 7 completely covers the connection area between the newly built station 2 and the existing station 1 .

[0078] Specifically, the supporting structure transverse beam 52 and the bottom contact surface of the existing station 1 are provided with through steel bars 12 .

[0079] Specifically, the mating surface between the supporting structure 5 and the existing station side wall 16 of the existing station 1 is a roughened end 17 .

[0080] Specifically, the shear-resistant connector 14 used in the plate-type connector 10 is a bolt, and may also be a metal member such as a channel steel, a steel block, etc. that can play a shear-resistant role.

[0081] Specifically, the metal plate fixedly connected to the shear connector 14 in the plate connector 10 is a steel plate. The shear connector in the plate connector 10 and the metal plate are fixedly connected by welding.

[0082] Specifically, the depth of the shear connector 14 of the plate connector 10 inserted into the newly built steel mesh 8 and the existing steel mesh 9 should be greater than the buried depth of the steel mesh to ensure reliable force transmission between the steel mesh and the shear connector 14 .

[0083] Specifically, the ultra-high performance concrete is steel fiber reinforced ultra-high performance concrete, and the steel fiber can also be replaced by organic fibers such as polyethylene and inorganic fibers such as basalt fibers. Fiber-reinforced ultra-high performance concrete has excellent tensile strength, crack resistance, impermeability and durability, and its interface connection with existing concrete is dense, and it can serve safely and reliably in underground environments for a long time.

[0084] Specifically, the steel bars used for the implanted steel bars 11 are ribbed steel bars.

[0085] A new and old subway station structure connection node and a construction method thereof, comprising the following steps:

[0086] A. Carry out surface treatment on the outer wall of the existing station and lay out and embed steel bars on the outer wall;

[0087] B. Break the concrete at the top connection of the existing station and the new station;

[0088] C. Install the plate connector in the existing steel mesh and the newly built steel mesh;

[0089] D. Construction of new stations and vertical beams of supporting structures;

[0090] E. Pour ultra-high performance concrete at the plate connector to form a concrete protective layer;

[0091] F. Remove the structural side walls of the existing station and construct supporting structural transverse beams.

[0092] Step B is to break the concrete at the top connection position of the existing station and the newly built station. In the process of breaking the concrete, the existing steel mesh 9 in the existing station 1 and the newly built steel mesh 8 in the newly built station 2 are partially exposed.

[0093] Step F: demolish the structural side wall of the existing station, construct the supporting structure transverse beam, and connect the steel mesh in the supporting structure transverse beam 52 with the steel mesh in the supporting structure vertical beam 51.

[0094] Specifically, in step A, the outer wall of the existing station is surface treated, and steel bars are placed and implanted on the outer wall. The specific process is as follows:

[0095] First, the connection interface between the existing station 1 and the newly built station 2 is roughened to form a roughened end 17 .

[0096] Then, the embedded steel bars 11 required by the design are implanted into the roughened connection surface between the existing station 1 and the newly built station 2.

[0097] Specifically, step D constructs the new station and the vertical beams of the supporting structure. The specific process is as follows:

[0098] First, the reinforcement cage of the newly built station 2 and the reinforcement cage of the vertical beams 51 of the supporting structure 5 are manufactured and installed.

[0099] Then, the steel bar connection embedded parts 13 for connecting with the horizontal steel bar cage in the transverse beam 52 of the supporting structure are installed on the vertical beam steel bar cage.

[0100] Finally, the newly built station 2 and the vertical beams 51 of the supporting structure are cast.

[0101] Specifically, step B is to break the concrete at the top connection position of the existing station and the new station. The specific process is as follows:

[0102] The concrete at the position where the plate connector 10 needs to be installed on the top of the newly built station 2 and the existing station 1 is broken, and the breaking depth should be greater than the burial depth of the newly built steel mesh 8 and the existing steel mesh 9.

[0103] As a variation, for a newly constructed station 2, measures can be taken during pouring to directly reserve a location for installing the plate-type connector 10 to avoid additional demolition work, and the reserved depth should also be greater than the buried depth of the structural steel mesh.

[0104] During the demolition process, if the top of the existing station 1 is not equipped with steel bars arranged along the direction of the connection interface between the newly built station 2 and the existing station 1, steel bars in this direction shall be additionally arranged at the corresponding position to form a steel mesh. The additionally arranged steel bars shall be tightly connected with the steel bars exposed after the concrete is removed from the top of the existing station 1 to ensure reliable force transmission between the two.

[0105] Specifically, step C installs the plate connector in the existing steel mesh and the newly built steel mesh. The specific process is as follows:

[0106] The plate connector 10 is installed in the grid of the exposed new steel mesh 8 and the existing steel mesh 9. The axis of the plate connector 10 should be perpendicular to the connection interface between the new station 2 and the existing station 1. The insertion depth of the shear connector 14 on the plate connector 10 should exceed the buried depth of the steel mesh.

[0107] Specifically, in step E, ultra-high performance concrete is poured at the plate-type connector to form a concrete protective layer. The specific process is as follows:

[0108] First, formwork is provided as required in the areas where the ultra-high performance concrete cover layer needs to be poured.

[0109] Then, when pouring the ultra-high performance concrete protective layer, it should be poured slowly before the ultra-high performance concrete covers the plate connector 10 to ensure that all the air under the plate connector is discharged. For the plate connector with vents, it should be ensured that the ultra-high performance concrete slurry overflows from the vents.

[0110] Finally, the remaining ultra-high performance concrete protective layer is poured.

[0111] Specifically, step F involves removing the structural side walls of the existing station and constructing the supporting structural transverse beams. The specific process is as follows:

[0112] First, the existing station side wall 16 of the existing station 1 is demolished, and during the demolition process, care should be taken to protect the through steel bars 12 that need to be inserted into the transverse beams 52 of the supporting structure.

[0113] Correspondingly, the demolition work of the existing station side wall 16 should be carried out in sections and relevant verification calculations should be performed.

[0114] Then, a steel cage for the supporting structure transverse beam 52 is manufactured and installed. The newly manufactured steel cage should be connected to the steel bars of the supporting structure vertical beam 51 manufactured in step D through the steel bar connection embedded parts 13 provided in step D.

[0115] Finally, the casting of the supporting structure transverse beam 52 is completed.

[0116] The present invention adopts a solution of setting plate-type connectors connected to the steel meshes of the existing station and the newly built station on the top of the two stations, thereby realizing the reliable transmission of tension / bending moment between the old and new concrete structures. Compared with the traditional rebar embedding solution, the plate-type connector proposed in the present invention is set closer to the original structural steel bars, and the force transmission effect is more efficient; the traditional rebar embedding solution transmits axial tension through organic rebar embedding glue, which has a certain risk of long-term performance degradation. The technical solution proposed in the present invention transmits axial tension / negative bending moment between the old and new concrete structures through the shear interaction between the shear connector in the plate-type connector and the concrete and steel mesh, which can partially or completely replace the tensile function provided by the implanted steel bars, avoiding the use of organic materials and the long-term performance degradation problems that may be caused thereby.

[0117] The present invention makes full use of the excellent mechanical and durability properties of ultra-high performance concrete materials, and considers the strong bonding effect between the ultra-high performance concrete and the existing concrete connection interface, and uses it as a protective layer and reinforcement layer for the connection nodes of existing stations and newly built stations. The ultra-high performance concrete protective layer not only ensures the reliable force transmission of the plate-type connector, but also avoids the adverse effects of high water pressure, strong seepage and corrosive environment in the underground environment on the long-term service performance of the connection node.

[0118] The supporting structure in the present invention increases the contact surface between the existing station and the newly built station; the transverse beams of the supporting structure provide additional shear force transmission paths, greatly improving the shear bearing capacity of the nodes; the supporting structure and the remaining existing station side walls form a whole, providing a stronger bending and torsional constraint boundary for the existing subway station structure boundary after the original side walls are removed, which can effectively reduce the secondary distribution of internal forces caused by the removal of the side walls of the existing station, thereby weakening the impact of the through-reconstruction of the old and new subway stations on the structural safety of the existing subway stations.

Claims

1. A structural connection node between a new and an old subway station, comprising an existing station (1), Features: A newly built station (2) is arranged on one side of the existing station (1), a supporting structure (5) is arranged at the connection of the newly built station (2), the supporting structure (5) vertically supports the demolished position of the existing station (1), and a multi-level horizontal connection structure is arranged between the supporting structure (5) and the existing station (1); The supporting structure (5) is a vertical L-shaped structure, and the supporting structure (5) comprises a vertical supporting structure vertical beam (51) and a horizontal supporting structure transverse beam (52), and the supporting structure transverse beam (52) is inserted into the existing station (1) for support; The transverse connection structure comprises an end transverse connection structure and a middle transverse connection structure, the end transverse connection structure connects the ends of the existing station (1) and the newly built station (2), and the middle transverse connection structure connects the side walls of the existing station (1) and the newly built station (2); The end transverse connection structure comprises a plate-type connection member (10), and the plate-type connection member (10) is connected to an existing steel mesh (9) in an existing station (1) and a newly built steel mesh (8) in a newly built station (2); The supporting structure vertical beam (51) is fitted with an existing station side wall (16) of the existing station (1), a steel bar connection embedded part (13) is provided in the supporting structure vertical beam (51), and the supporting structure vertical beam (51) and the supporting structure transverse beam (52) are cast in sequence; The supporting structure transverse beam (52) reserves the stirrup connection conditions of the supporting structure vertical beam (51) to form a horizontal closed stirrup; A through steel bar (12) is provided at the demolished position of the existing station (1), the through steel bar (12) being vertical, the lower end of the through steel bar (12) protruding out of the existing station (1) and entering into the supporting structure transverse beam (52), and integrally cast during the construction of the supporting structure transverse beam (52); The top of the existing station (1) forms a top notch groove, and the existing steel mesh (9) in the existing station (1) is exposed at the position of the top notch groove. Correspondingly, the top of the newly built station (2) also forms a newly built notch groove, and the newly built steel mesh (8) is exposed at the position of the newly built notch groove. The top notch groove and the newly built notch groove are joined together to form a groove. The groove is capable of accommodating a plate-type connecting member (10), and the plate-type connecting member (10) connects the exposed existing steel mesh (9) and the exposed newly built steel mesh (8), thereby connecting the two into one.

2. A structural connection node for a new and old subway station according to claim 1, Features: Ultra-high performance concrete is poured at the plate-type connecting member (10) to form a concrete protective layer (7).

3. A new and old subway station structure connection node according to claim 1, Features: The middle transverse connection structure comprises an implanted steel bar (11) arranged at the side wall of the existing station (1), and the protruding section of the implanted steel bar (11) is anchored in the vertical beam (51) of the supporting structure, so as to realize the connection between the middle of the existing station (1) and the newly built station (2).

4. A structural connection node for new and old subway stations according to claim 1, Features: Connecting steel bars are provided between the supporting structure transverse beam (52) and the supporting structure vertical beam (51).

5. A construction method for connecting the structure of new and old subway stations. Features: The following steps are involved: A. Carry out surface treatment on the outer wall of the existing station and lay out and implant steel bars on the outer wall; B. Break the concrete at the top connection of the existing station and the new station; C. Install the plate connector in the existing steel mesh and the newly built steel mesh; D. Construction of new stations and vertical beams of supporting structures; E. Pour ultra-high performance concrete at the plate connector to form a concrete protective layer; F. Remove the existing station's structural side walls and construct supporting structural transverse beams; Step D is to construct the new station and supporting structure vertical beams. The specific process is as follows: First, a steel cage of the newly built station (2) and a steel cage of a vertical beam of a supporting structure (5) of a vertical beam (51) are manufactured and installed; Then, a steel bar connection embedded part (13) for connecting with the horizontal steel bar cage in the transverse beam (52) of the supporting structure is installed on the vertical beam steel bar cage; Finally, the new station (2) and the supporting structure vertical beams (51) are cast; Step B: breaking the concrete at the top connection position of the existing station and the newly built station. In the process of breaking the concrete, the existing steel mesh (9) in the existing station (1) and the newly built steel mesh (8) in the newly built station (2) are partially exposed; Breaking the concrete at the location where the plate-type connector (10) needs to be installed on the top of the new station (2) and the existing station (1), and the breaking depth should be greater than the burial depth of the new steel mesh (8) and the existing steel mesh (9); During the demolition process, if the top of the existing station (1) is not provided with steel bars arranged in the direction of the connection interface between the newly built station (2) and the existing station (1), additional steel bars in that direction shall be arranged at the corresponding position to form a steel mesh. The additionally arranged steel bars shall be tightly connected with the steel bars exposed after the concrete is demolished on the top of the existing station (1) to ensure reliable force transmission between the two. Step C: Install the plate connector in the existing steel mesh and the newly built steel mesh. The specific process is as follows: The plate connector (10) is installed in the mesh of the exposed new steel mesh (8) and the existing steel mesh (9), the axis of the plate connector (10) should be perpendicular to the connection interface between the new station (2) and the existing station (1), and the insertion depth of the shear connector (14) on the plate connector (10) should exceed the embedding depth of the steel mesh; Specifically, in step E, ultra-high performance concrete is poured at the plate-type connector to form a concrete protective layer. The specific process is as follows: First, formwork is provided as needed in the areas where the ultra-high performance concrete cover needs to be poured; Then, when pouring the ultra-high performance concrete protective layer, it should be poured slowly before the ultra-high performance concrete covers the plate-type connector (10) to ensure that all air under the plate-type connector is exhausted. For the plate-type connector with air vents, it should be ensured that ultra-high performance concrete slurry overflows from the air vents. Finally, the remaining ultra-high performance concrete protective layer is poured; Step F: demolish the structural side wall of the existing station, construct the supporting structure transverse beam, and reserve the stirrup connection conditions of the supporting structure vertical beam (51) in the supporting structure transverse beam (52) to form a horizontal closed stirrup.

Citation Information

Cited By

  • New and old subway channel interface structure

    CN223739432U