Model prediction feedback correction method and device based on Internet of Things operating system platform
The IoT operating system platform automatically performs model parameter correction and feedback, which solves the problem in the existing technology that the correction results caused by manual intervention cannot be known in time, realizes real-time correction of model parameters and business chain adjustment, and improves the correction efficiency and accuracy. .
Patent Information
- Application Number
- CN202211739268.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-12-28
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2042-12-28
AI Technical Summary
Existing model parameter correction methods require manual intervention, resulting in the inability to obtain correction results in a timely manner, inability to achieve real-time evaluation and adjustment, and low efficiency.
Receive model parameter correction requests through the IoT operating system platform, automatically perform parameter corrections, record the output results, provide real-time feedback and adjustments, and use formulas to compare the output results to determine the normality of corrections and optimize parameters.
It improves the timeliness and accuracy of model parameter correction, reduces correction losses, facilitates users to perform real-time optimization, and saves time.
Smart Images

Figure CN116822117B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of Internet of Things, and in particular relates to a model prediction feedback correction method and device based on an Internet of Things operating system platform. Background Art
[0002] In the business flow model, model parameter correction is an important means to improve the accuracy of the model. In the prior art, it is necessary to correct the model parameters separately and then manually update the model. Obviously, the existing model parameter correction method is inconvenient to implement. After each correction, it is not possible to know the correction result in time, and it is impossible to achieve real-time evaluation and correction adjustment of the correction result, which wastes time and has low correction efficiency. Summary of the invention
[0003] In view of this, the embodiment of the present invention provides a model prediction feedback correction method and device based on the Internet of Things operating system platform, which is used to solve the problems that the existing model parameter correction method needs to rely on manual work, is inconvenient to implement, cannot timely know the quality of the correction result after each correction, and cannot achieve real-time evaluation and timely correction and adjustment of the correction result. The present invention can provide real-time feedback on the correction results of the model parameters, and can correct and adjust the parameters in real time, and can also reasonably adjust the business chain.
[0004] On the one hand, an embodiment of the present invention provides a model prediction feedback correction method based on an Internet of Things operating system platform, the method comprising:
[0005] Receiving a modification request for modifying parameters of a target business flow model through the Internet of Things operating system platform;
[0006] In response to the modification request, modifying the parameters of the target service flow model according to a preset model parameter modification method;
[0007] Record the output results of the target business flow model after each parameter modification;
[0008] According to the output result of the target business flow model after each parameter correction, the parameters of the target business flow model are feedback-corrected.
[0009] In some optional embodiments, the method further comprises:
[0010] Receiving a business chain modification request of a target business flow model through an IoT operating system platform;
[0011] Provide a target business flow model business chain editing window;
[0012] The target business flow model business chain editing window receives the user's modification of the target business chain, updates the target business flow model, and then executes the step of modifying the parameters of the target business flow model according to the preset model parameter modification method.
[0013] In some optional embodiments, the step of performing feedback correction on the parameters of the target business flow model again according to the output result of the target business flow model after each parameter correction includes:
[0014] Compare the output results of the target business flow model before and after each parameter modification;
[0015] Based on the comparison results of the output results of the target business flow model before and after the recent multiple parameter corrections, determine whether the current parameter correction is normal;
[0016] If the current parameter correction is normal, continue to execute the step of correcting the parameters of the target business flow model until the output result of the target business flow model meets the requirements of the correction request.
[0017] In some optional embodiments, after determining whether the current parameter modification is normal, the method further includes:
[0018] If the current parameter correction is abnormal, the parameters of the target business flow model will be adjusted to the optimal parameters in the most recent parameter corrections based on the comparison results of the output results of the target business flow model before and after the most recent parameter corrections, so as to reduce the loss of this correction; wherein, the optimal parameters are the parameters that minimize the deviation between the output results of the target business flow model and the preset expected results in the most recent parameter corrections.
[0019] In some optional embodiments, comparing the output results of the target service flow model before and after each parameter modification includes:
[0020] The comparison results of the output results of the target business flow model before and after each parameter modification are calculated according to the following first formula:
[0021]
[0022] Among them, B k represents the comparison result value of the output results of the target business flow model before and after the kth parameter modification; J k (a) represents the a-th model result value in the output result of the target business flow model after the k-th parameter modification; J k-1 (a) represents the a-th model result value in the output result of the target business flow model before the k-th parameter modification. If k≤1, then J k-1(a)=J0(a); J0(a) represents the preset expected result value corresponding to the a-th model result in the output result of the target business flow model; a=1, 2, …, m; m represents the number of model results included in the output result of the target business flow model; || represents obtaining the absolute value;
[0023] The step of comparing the output results of the target service flow model before and after the most recent parameter corrections to determine whether the current parameter correction is normal includes:
[0024] Calculate the judgment value of whether the current parameter correction is normal or not according to the second formula;
[0025] Whether the judgment value of whether the current parameter correction is normal is equal to 1; if so, it is judged that the current parameter correction is normal; otherwise, it is judged that the current parameter correction is abnormal;
[0026] Wherein, the second formula is:
[0027]
[0028] In the second formula, Z represents the judgment value of whether the current parameter correction is normal or not; n-i represents the comparison result value of the output results of the target business flow model before and after the ni-th parameter modification; J n-i (a) represents the ath model result value in the output result of the target business flow model after the nith parameter correction; n represents the total number of parameter corrections performed on the target business flow model in response to the correction request as of the current moment; i = 0, 1,…, n-1.
[0029] In some optional embodiments, adjusting the parameters of the target service flow model to the optimal parameters in the most recent multiple parameter modifications according to the comparison results of the output results of the target service flow model before and after the most recent multiple parameter modifications includes:
[0030] Determine the number of corrections N corresponding to the optimal parameter among the most recent multiple parameter corrections according to the third formula;
[0031] Adjust the parameters of the target business flow model to the state of the parameter values after the Nth parameter modification;
[0032] Wherein, the third formula is:
[0033]
[0034] In the third formula, N represents the number of corrections corresponding to the optimal parameter in the most recent multiple parameter corrections; It means substituting the value of i from 0 to n-1 into the brackets to obtain the value of i when the maximum value is obtained in the brackets.
[0035] On the other hand, an embodiment of the present invention provides a model prediction feedback correction device based on an Internet of Things operating system platform, the device comprising:
[0036] A receiving module, used for receiving a modification request for modifying parameters of a target business flow model through an Internet of Things operating system platform;
[0037] A response correction module, used to respond to the correction request and perform parameter correction on the parameters of the target business flow model according to a preset model parameter correction method;
[0038] A result recording module is used to record the output results of the target business flow model after each parameter modification;
[0039] The feedback correction module is used to perform feedback correction on the parameters of the target business flow model according to the output results of the target business flow model after each parameter correction.
[0040] In some optional embodiments, the feedback correction module includes:
[0041] A comparison unit, used to compare the output results of the target business flow model before and after each parameter modification;
[0042] A judgment unit, used to judge whether the current parameter modification is normal based on the comparison results of the output results of the target business flow model before and after the most recent multiple parameter modifications;
[0043] a triggering unit, configured to trigger the response modification module to continue to modify the parameters of the target business flow model when the judgment result of the judgment unit is yes, until the output result of the target business flow model meets the requirements of the modification request;
[0044] An adjustment unit is used to adjust the parameters of the target business flow model to the optimal parameters in the most recent parameter corrections when the judgment result of the judgment unit is no, based on the comparison results of the output results of the target business flow model before and after the most recent parameter corrections, so as to reduce the loss of this correction; wherein the optimal parameters are the parameters that minimize the deviation between the output results of the target business flow model and the preset expected results in the most recent parameter corrections.
[0045] In some optional embodiments, the comparison unit is specifically used to calculate the comparison result of the output result of the target service flow model before and after each parameter modification according to the following first formula:
[0046]
[0047] Among them, B k represents the comparison result value of the output results of the target business flow model before and after the kth parameter modification; J k(a) represents the a-th model result value in the output result of the target business flow model after the k-th parameter modification; J k-1 (a) represents the a-th model result value in the output result of the target business flow model before the k-th parameter modification. If k≤1, then J k-1 (a)=J0(a); J0(a) represents the preset expected result value corresponding to the a-th model result in the output result of the target business flow model; a=1, 2, …, m; m represents the number of model results included in the output result of the target business flow model; || represents obtaining the absolute value;
[0048] The judgment unit is specifically used to calculate the judgment value of whether the current parameter correction is normal or not according to the second formula, and judge whether the judgment value of whether the current parameter correction is normal or not is equal to 1; if so, it is judged that the current parameter correction is normal, otherwise, it is judged that the current parameter correction is abnormal;
[0049] Wherein, the second formula is:
[0050]
[0051] In the second formula, Z represents the judgment value of whether the current parameter correction is normal or not; n-i represents the comparison result value of the output results of the target business flow model before and after the ni-th parameter modification; J n-i (a) represents the ath model result value in the output result of the target business flow model after the nith parameter modification; n represents the total number of parameter modifications of the target business flow model for the modification request as of the current moment; i=0, 1, ..., n-1;
[0052] The adjustment unit is specifically used to determine the number of corrections N corresponding to the optimal parameter in the most recent multiple parameter corrections according to the third formula, and adjust the parameter of the target business flow model to the state of the parameter value after the Nth parameter correction;
[0053] Wherein, the third formula is:
[0054]
[0055] In the third formula, N represents the number of corrections corresponding to the optimal parameter in the most recent multiple parameter corrections; It means substituting the value of i from 0 to n-1 into the brackets to obtain the value of i when the maximum value is obtained in the brackets.
[0056] The present invention provides a model prediction feedback correction method and device based on an Internet of Things operating system platform. The correction request for parameter correction of a target business flow model is received through the Internet of Things operating system platform. Then, the parameters of the target business flow model are corrected according to a preset model parameter correction method, and the output result of the target business flow model after each parameter correction is recorded. According to the output result of the target business flow model after each parameter correction, the parameters of the target business flow model are corrected. When problems occur during the model parameter correction process, they can be detected in time, and the parameters of the target business flow model can be corrected by feedback in time, which can improve the timeliness and correction accuracy of the model parameter correction, reduce the correction loss, and can also change the business chain in real time, which is convenient for users to optimize the model in real time and saves user time. BRIEF DESCRIPTION OF THE DRAWINGS
[0057] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0058] Figure 1 A flow chart of a model prediction feedback correction method based on an Internet of Things operating system platform provided by an embodiment of the present invention;
[0059] Figure 2 A schematic diagram of the structure of a model prediction feedback correction device based on an Internet of Things operating system platform provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0060] The embodiments of the present invention are described in detail below with reference to the accompanying drawings.
[0061] It should be clear that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0062] Figure 1 A flow chart of a model prediction feedback correction method based on an Internet of Things operating system platform provided by an embodiment of the present invention. Figure 1 , the method comprises the following steps:
[0063] S1: receiving a modification request for modifying parameters of a target business flow model through the IoT operating system platform;
[0064] S2: In response to the modification request, modify the parameters of the target service flow model according to a preset model parameter modification method;
[0065] S3: Record the output results of the target business flow model after each parameter modification;
[0066] S4: According to the output result of the target business flow model after each parameter correction, the parameters of the target business flow model are feedback-corrected.
[0067] The beneficial effect of the above technical solution is: receiving a correction request for parameter correction of the target business flow model through the Internet of Things operating system platform, then correcting the parameters of the target business flow model according to the preset model parameter correction method, and recording the output result of the target business flow model after each parameter correction, and according to the output result of the target business flow model after each parameter correction, feedback correction is performed on the parameters of the target business flow model. When problems occur during the model parameter correction process, they can be detected in time, and the parameters of the target business flow model can be feedback corrected in time, which can improve the timeliness and correction accuracy of the model parameter correction, reduce the correction loss, facilitate users to optimize the model in real time, and save users' time.
[0068] In some embodiments, the method provided by the present invention further comprises the following steps A11-A13:
[0069] Step A11: receiving a service chain modification request of a target service flow model through the IoT operating system platform;
[0070] Step A12: providing a target business flow model business chain editing window;
[0071] Step A13: Receive the user's modification of the target business chain through the target business flow model business chain editing window, and update the target business flow model, and then execute the step of correcting the parameters of the target business flow model according to the preset model parameter correction method described in step S2.
[0072] The beneficial effect of the above technical solution is that the business chain of the business flow model can be set and modified through the Internet of Things operating system platform, and the parameters of the business flow model can be automatically corrected according to the modification results, which facilitates the user's real-time optimization of the model and saves the user's time.
[0073] In some embodiments, step S3 may include the following steps S31-S33:
[0074] S31: Compare the output results of the target business flow model before and after each parameter modification;
[0075] S32: judging whether the current parameter modification is normal according to the comparison results of the output results of the target business flow model before and after the most recent parameter modification; if so, continuing to perform the step of modifying the parameters of the target business flow model until the output results of the target business flow model meet the requirements of the modification request; otherwise, executing S33;
[0076] S33: According to the comparison result of the output results of the target business flow model before and after the most recent multiple parameter corrections, the parameters of the target business flow model are adjusted to the optimal parameters in the most recent multiple parameter corrections to reduce the loss of this correction;
[0077] The optimal parameters are the parameters that minimize the deviation between the output results of the target business flow model and the preset expected results in the most recent multiple parameter corrections.
[0078] The beneficial effect of the above technical solution is: by comparing the output results of the target business flow model before and after each parameter correction, it is possible to promptly know whether the current parameter correction is normal, and when the current parameter correction is abnormal, adjust the parameters of the target business flow model to the optimal parameters in the most recent multiple parameter corrections to reduce the correction loss, thereby improving the timeliness and accuracy of model parameter correction, reducing correction losses, and improving correction efficiency.
[0079] In some embodiments, the step of comparing the output results of the target service flow model before and after each parameter modification in step S31 includes: calculating the comparison result of the output results of the target service flow model before and after each parameter modification according to the following first formula (1):
[0080]
[0081] Among them, B k represents the comparison result value of the output results of the target business flow model before and after the kth parameter modification; J k (a) represents the a-th model result value in the output result of the target business flow model after the k-th parameter modification; J k-1 (a) represents the a-th model result value in the output result of the target business flow model before the k-th parameter modification. If k≤1, then J k-1 (a)=J0(a); J0(a) represents the preset expected result value corresponding to the a-th model result in the output result of the target business flow model; a=1, 2, …, m; m represents the number of model results included in the output result of the target business flow model; || represents obtaining the absolute value;
[0082] In this embodiment, S32 specifically includes the following steps S321-S322:
[0083] S321: Calculate the judgment value of whether the current parameter correction is normal or not according to the second formula (2);
[0084] S322: Determine whether the determination value of whether the current parameter correction is normal is equal to 1; if so, determine that the current parameter correction is normal; otherwise, determine that the current parameter correction is abnormal;
[0085] Wherein, the second formula is:
[0086]
[0087] In the second formula (2), Z represents the judgment value of whether the current parameter correction is normal or not; n-i represents the comparison result value of the output results of the target business flow model before and after the ni-th parameter modification; J n-i (a) represents the ath model result value in the output result of the target business flow model after the nith parameter correction; n represents the total number of parameter corrections performed on the target business flow model in response to the correction request as of the current moment; i = 0, 1,…, n-1.
[0088] The beneficial effect of the above technical solution is: using the first formula (1) to compare the output results of the business flow model before and after parameter correction to obtain a comparison result, laying the foundation for subsequent control; then using the second formula (2) to obtain the comparison result based on the output results of the business flow model before and after the most recent parameter corrections, it is judged whether the current parameter correction is normal, thereby knowing whether the current parameter correction is disordered, and timely detecting it when disorder occurs, which can improve the correction accuracy of the model parameters.
[0089] In some embodiments, S33 specifically includes the following steps S331-S332:
[0090] S331: Determine the number of corrections N corresponding to the optimal parameter in the most recent multiple parameter corrections according to the third formula;
[0091] S332: adjusting the parameters of the target service flow model to the state of the parameter values after the Nth parameter modification;
[0092] Wherein, the third formula is:
[0093]
[0094] In the third formula, N represents the number of corrections corresponding to the optimal parameter in the most recent multiple parameter corrections; It means substituting the value of i from 0 to n-1 into the brackets to obtain the value of i when the maximum value is obtained in the brackets.
[0095] The beneficial effect of the above technical solution is: using the third formula (3) to adjust the parameters to the optimal correction parameters in the most recent multiple parameter corrections according to the output results of the model before and after the most recent multiple parameter corrections, thereby reducing the current correction loss and timely recovering the losses caused by part of the model.
[0096] Corresponding to the method provided in the embodiment of the present invention, the embodiment of the present invention also provides a model prediction feedback correction device based on the Internet of Things operating system platform, such as Figure 2 As shown, the device comprises:
[0097] A receiving module 1 is used to receive a modification request for modifying parameters of a target business flow model through an Internet of Things operating system platform;
[0098] A response correction module 2, used for responding to the correction request and correcting the parameters of the target business flow model according to a preset model parameter correction method;
[0099] Result recording module 3, used to record the output result of the target business flow model after each parameter modification;
[0100] The feedback correction module 4 is used to perform feedback correction on the parameters of the target business flow model according to the output result of the target business flow model after each parameter correction.
[0101] The beneficial effects of the above technical solution are: the receiving module 1 receives a correction request for parameter correction of the target business flow model through the Internet of Things operating system platform, the response correction module 2 corrects the parameters of the target business flow model according to the preset model parameter correction method, the result recording module 3 records the output results of the target business flow model after each parameter correction, and the feedback correction module 4 performs feedback correction on the parameters of the target business flow model according to the output results of the target business flow model after each parameter correction. It can detect problems in time when they occur during the model parameter correction process, and timely feedback and correct the parameters of the target business flow model, which can improve the timeliness and correction accuracy of the model parameter correction, reduce the correction loss, facilitate users to optimize the model in real time, and save users' time.
[0102] In some optional embodiments, the feedback correction module 4 includes:
[0103] The comparison unit 41 is used to compare the output results of the target business flow model before and after each parameter modification; preferably, the comparison unit is specifically used to calculate the comparison results of the output results of the target business flow model before and after each parameter modification according to the above first formula (1).
[0104] The judgment unit 42 is used to judge whether the current parameter correction is normal according to the comparison results of the output results of the target business flow model before and after the most recent multiple parameter corrections. Preferably, the judgment unit 42 is specifically used to calculate the judgment value of whether the current parameter correction is normal according to the second formula (2) above, and judge whether the judgment value of whether the current parameter correction is normal is equal to 1; if so, the current parameter correction is judged to be normal, otherwise, the current parameter correction is judged to be abnormal.
[0105] The trigger unit 43 is used to trigger the response modification module 2 to continue to modify the parameters of the target business flow model when the judgment result of the judgment unit 42 is yes, until the output result of the target business flow model meets the requirements of the modification request.
[0106] The adjustment unit 44 is used to adjust the parameters of the target business flow model to the optimal parameters in the most recent multiple parameter corrections based on the comparison results of the output results of the target business flow model before and after the most recent multiple parameter corrections when the judgment result of the judgment unit 42 is no, so as to reduce the loss of this correction; wherein the optimal parameters are the parameters that minimize the deviation between the output results of the target business flow model and the preset expected results in the most recent multiple parameter corrections. Preferably, the adjustment unit 44 is specifically used to determine the number of corrections N corresponding to the optimal parameters in the most recent multiple parameter corrections according to the third formula (3) above, and adjust the parameters of the target business flow model to the state of the parameter values after the Nth parameter correction.
[0107] The beneficial effect of the above technical solution is: by comparing the output results of the target business flow model before and after each parameter correction by the comparison unit 41 and making a judgment by the judgment unit 42, it is possible to promptly know whether the current parameter correction is normal, and when the current parameter correction is abnormal, adjust the parameters of the target business flow model to the optimal parameters in the most recent multiple parameter corrections to reduce the correction loss, thereby improving the timeliness and accuracy of model parameter correction, reducing correction losses, and improving correction efficiency.
[0108] In summary, the model prediction feedback correction method and device based on the Internet of Things operating system platform provided by the embodiment of the present invention receives a correction request for parameter correction of the target business flow model through the Internet of Things operating system platform, then corrects the parameters of the target business flow model according to the preset model parameter correction method, and records the output result of the target business flow model after each parameter correction, and according to the output result of the target business flow model after each parameter correction, the parameters of the target business flow model are feedback-corrected. In the feedback correction process, the output result of the model before and after the parameter correction is compared by the first formula (1) to obtain a comparison result, which lays the foundation for subsequent control; then the second formula (2) is used to determine whether the current parameter correction is normal according to the comparison result obtained by the output result of the model before and after the most recent multiple parameter corrections, so as to know whether the current parameter correction is disordered, and detect it in time when disorder occurs; finally, the third formula (3) is used to adjust the parameters to the optimal correction parameters in the most recent multiple parameter corrections according to the output results of the model before and after the most recent multiple parameter corrections, thereby reducing the current correction loss, timely recovering the loss caused by part of the model, and improving the timeliness and correction accuracy of the model parameter correction, reducing the correction loss, facilitating the user to optimize the model in real time, and saving the user's time.
[0109] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 An apparatus for the method specified in one or more blocks.
[0110] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 The method specified in one or more boxes.
[0111] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process in the computer or other programmable device. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps of a method specified in one or more boxes.
[0112] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these changes and variations. The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily thought of by those skilled in the art within the technical scope disclosed by the present invention should be covered within the protection scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.
Claims
1. A model prediction feedback correction method based on an Internet of Things operating system platform, characterized in that: The method comprises: Receiving a modification request for modifying parameters of a target business flow model through the Internet of Things operating system platform; In response to the modification request, modifying the parameters of the target service flow model according to a preset model parameter modification method; Record the output results of the target business flow model after each parameter modification; According to the output result of the target business flow model after each parameter correction, the parameters of the target business flow model are fed back and corrected; The step of performing feedback correction on the parameters of the target business flow model again according to the output result of the target business flow model after each parameter correction includes: Compare the output results of the target business flow model before and after each parameter modification; Based on the comparison results of the output results of the target business flow model before and after the recent multiple parameter corrections, determine whether the current parameter correction is normal; If the current parameter correction is normal, continue to perform the step of correcting the parameters of the target business flow model until the output result of the target business flow model meets the requirements of the correction request; The comparison of the output results of the target service flow model before and after each parameter modification includes: The comparison results of the output results of the target business flow model before and after each parameter modification are calculated according to the following first formula: in, Indicates the Comparison result value of the output results of the target business flow model before and after the secondary parameter correction; Indicates the The output result of the target business flow model after the second parameter correction Model result value; Indicates the The output result of the target business flow model before the second parameter correction If the model result value but ; Indicates the output result of the target business flow model. The preset expected result value corresponding to each model result; ; Indicates the number of model results included in the output results of the target business flow model; It means to find the absolute value; The step of comparing the output results of the target service flow model before and after the most recent parameter corrections to determine whether the current parameter correction is normal includes: Calculate the judgment value of whether the current parameter correction is normal or not according to the second formula; Whether the judgment value of whether the current parameter correction is normal is equal to 1; if so, it is judged that the current parameter correction is normal; otherwise, it is judged that the current parameter correction is abnormal; Wherein, the second formula is: In the second formula, Indicates the judgment value of whether the current parameter correction is normal or not; Indicates the Comparison result value of the output results of the target business flow model before and after the secondary parameter correction; Indicates the The output result of the target business flow model after the second parameter correction Model result value; Indicates the total number of times the parameters of the target service flow model have been modified in response to the modification request as of the current moment; .
2. The model prediction feedback correction method based on the Internet of Things operating system platform according to claim 1 is characterized in that: The method further comprises: Receiving a business chain modification request of a target business flow model through an IoT operating system platform; Provide a target business flow model business chain editing window; The target business flow model business chain editing window receives the user's modification of the target business chain, updates the target business flow model, and then executes the step of modifying the parameters of the target business flow model according to the preset model parameter modification method.
3. The model prediction feedback correction method based on the Internet of Things operating system platform according to claim 1 is characterized in that: After determining whether the current parameter correction is normal, the method further includes: If the current parameter correction is abnormal, the parameters of the target business flow model will be adjusted to the optimal parameters in the most recent parameter corrections based on the comparison results of the output results of the target business flow model before and after the most recent parameter corrections, so as to reduce the loss of this correction; wherein, the optimal parameters are the parameters that minimize the deviation between the output results of the target business flow model and the preset expected results in the most recent parameter corrections.
4. The model prediction feedback correction method based on the Internet of Things operating system platform as claimed in claim 3 is characterized in that: The step of adjusting the parameters of the target business flow model to the optimal parameters in the most recent multiple parameter modifications according to the comparison results of the output results of the target business flow model before and after the most recent multiple parameter modifications includes: According to the third formula, the number of corrections corresponding to the optimal parameter in the most recent multiple parameter corrections is determined ; Adjust the parameters of the target business flow model to The state of the parameter value after the secondary parameter is corrected; Wherein, the third formula is: In the third formula, Indicates the number of corrections corresponding to the optimal parameter among the most recent multiple parameter corrections; Indicates that The value ranges from 0 to Substitute into the brackets to get the maximum value in the brackets value.
5. A model prediction feedback correction device based on the Internet of Things operating system platform, characterized in that: The device comprises: A receiving module, used for receiving a modification request for modifying parameters of a target business flow model through an Internet of Things operating system platform; A response correction module, used to respond to the correction request and perform parameter correction on the parameters of the target business flow model according to a preset model parameter correction method; A result recording module is used to record the output results of the target business flow model after each parameter modification; A feedback correction module, used to perform feedback correction on the parameters of the target business flow model according to the output result of the target business flow model after each parameter correction; Wherein, the feedback correction module includes: A comparison unit, used to compare the output results of the target business flow model before and after each parameter modification; A judgment unit, used to judge whether the current parameter modification is normal based on the comparison results of the output results of the target business flow model before and after the most recent multiple parameter modifications; a triggering unit, configured to trigger the response modification module to continue to modify the parameters of the target business flow model when the judgment result of the judgment unit is yes, until the output result of the target business flow model meets the requirements of the modification request; Wherein, the feedback correction module further includes: An adjustment unit, for adjusting the parameters of the target business flow model to the optimal parameters in the most recent multiple parameter corrections when the judgment result of the judgment unit is no, based on the comparison results of the output results of the target business flow model before and after the most recent multiple parameter corrections, so as to reduce the loss of this correction; wherein the optimal parameters are the parameters that minimize the deviation between the output results of the target business flow model and the preset expected results in the most recent multiple parameter corrections; The comparison unit is specifically used to calculate the comparison result of the output result of the target service flow model before and after each parameter modification according to the following first formula: in, Indicates the Comparison result value of the output results of the target business flow model before and after the secondary parameter correction; Indicates the The output result of the target business flow model after the second parameter correction Model result value; Indicates the The output result of the target business flow model before the second parameter correction If the model result value but ; Indicates the output result of the target business flow model. The preset expected result value corresponding to each model result; ; Indicates the number of model results included in the output results of the target business flow model; It means to find the absolute value; The judgment unit is specifically used to calculate the judgment value of whether the current parameter correction is normal or not according to the second formula, and judge whether the judgment value of whether the current parameter correction is normal or not is equal to 1; if so, it is judged that the current parameter correction is normal, otherwise, it is judged that the current parameter correction is abnormal; Wherein, the second formula is: In the second formula, Indicates the judgment value of whether the current parameter correction is normal or not; Indicates the Comparison result value of the output results of the target business flow model before and after the secondary parameter correction; Indicates the The output result of the target business flow model after the second parameter correction Model result value; Indicates the total number of times the parameters of the target service flow model have been modified in response to the modification request as of the current moment; ; The adjustment unit is specifically used to determine the number of corrections corresponding to the optimal parameter in the most recent multiple parameter corrections according to the third formula , and adjust the parameters of the target business flow model to the The state of the parameter value after the secondary parameter is corrected; Wherein, the third formula is: In the third formula, Indicates the number of corrections corresponding to the optimal parameter among the most recent multiple parameter corrections; Indicates that The value ranges from 0 to Substitute into the brackets to get the maximum value in the brackets value.
Citation Information
Patent Citations
Method and system for implementing service flow modification
CN101404610A
Method for realizing model language capable of describing IOT (internet of things) service
CN102508658A
Internet of Things data acquisition and transmission performance optimization method and device, and computer equipment
CN113055424A
Business function updating method, device and system, computer equipment and storage medium
CN115238793A
Method and system for analyzing internet of things (IOT) data in real-time and providing predictions
IN201841035359A
