An intelligent switch device with remote approval and management functions and an intelligent switch system thereof

By designing intelligent switch equipment and systems with remote approval and management functions, the existing switch box management problems are solved and the problems of cumbersome and safety hazards are realized, remote intelligent management and accurate recording of power consumption are achieved, and factory power management efficiency and safety are improved.

CN116826966BActive Publication Date: 2025-08-08GUANGXI MENGCHUANG INTELLIGENT TECH CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202310735244.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-06-20
Publication Date
2025-08-08
Estimated Expiration
2043-06-20

AI Technical Summary

Technical Problem

The management methods of switch boxes in existing factories or workshops are cumbersome, rely on manual verification, low efficiency, and the remote control switch boxes lack intelligent systems and cannot be managed in a standardized manner, which poses safety hazards and inaccurate power consumption.

Method used

Design an intelligent switch device with remote approval and management functions, combined with an intelligent switch system, through QR code application, intelligent switch equipment and meter integration, filter filter signals, and four-G module transmission data, to realize remote approval, management and status monitoring, and integrate feedback circuits to ensure safety.

Benefits of technology

Remote approval and management of smart switch equipment is realized, the efficiency and safety of power consumption applications are improved, the accurate recording and management of power consumption is ensured, manual intervention is reduced, and it is suitable for complex factory environments.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116826966B_ABST
    Figure CN116826966B_ABST
Patent Text Reader

Abstract

An intelligent switching device and its intelligent switching system with remote approval and management functions. Compared with ordinary switching devices, the intelligent switching device has the function of remote control of opening or closing. In conjunction with the intelligent switching system, it can realize remote approval of application / return of intelligent switching devices, remote intelligent switching device management, remote maintenance, opening and closing status viewing, data statistics and other functions, which can facilitate users and managers to apply for the use of intelligent switching devices and manage intelligent switching devices.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power equipment, and in particular to an intelligent switch device with remote approval and management functions and an intelligent switch system thereof. Background Art

[0002] During actual production in factories or workshops, on-site operators often violate regulations by using electricity or illegally pulling wires. This behavior can not only damage factory or workshop equipment but also cause personal accidents. Currently, most factories or workshops require that when electricity is needed, an application be submitted. The equipment management unit then dispatches personnel to verify the application and opens the power box door for the construction unit to use. After the use is complete, the user notifies the management unit and shuts down the power. This solution is cumbersome, difficult to manage, inefficient, and labor-intensive. Therefore, to address these issues, it is necessary to design an intelligent switch device and its associated intelligent switch system with remote approval and management capabilities.

[0003] The following are the relevant documents found on intelligent switchgear and intelligent switchgear systems with remote approval and management functions:

[0004] Patent 1: Distribution box and distribution box system; Application number: 201922225936.5; Application date: 2019-12-11; Applicant: Xining East Depot of China Railway Qinghai-Tibet Group Co., Ltd., Shenzhen Jiangong Intelligent Technology Co., Ltd.; Abstract: The utility model discloses a distribution box and a distribution box system. The distribution box includes a dual power conversion switch, an electric meter and a circuit breaker module arranged in the box body; the dual power conversion switch is connected to the mains and the electric meter respectively; the circuit breaker module includes a power supply unit, a circuit breaker and a network unit; the circuit breaker is connected to the power supply unit, the network unit and the electric meter respectively, and the network unit is connected to the server to realize remote control of the circuit breaker by the server. Among them, by replacing the ordinary circuit breaker with a circuit breaker with a power supply unit and a network unit, communication between the circuit breaker and the server is realized, so that maintenance personnel can timely understand the status of the circuit breaker through the server and remotely control the circuit breaker, thereby improving the safety of the distribution box.

[0005] Patent 2: A control system for a fast-response intelligent switch box; Application number: 201711195164.4; Application date: 2017-11-24; Applicant: Anhui Water Conservancy, Municipal and Garden Construction Co., Ltd.; Abstract: The present invention discloses a control system for a fast-response intelligent switch box, comprising a switch box body and a remote control terminal connected to the switch box body via a 4G router; the switch box body comprises a box body, and a main circuit and a control circuit disposed within the box body; the main circuit comprises an AC contactor and a leakage protector, wherein the main contacts of the AC contactor and the leakage protector are connected in series in the main circuit for controlling the power load; the control circuit comprises a WiFi control module, a power module, a fuse and a control coil of the AC contactor; the WiFi control module comprises a single-chip microcomputer, a WiFi communication module connected to the single-chip microcomputer, and a contact S for controlling the on-off of an output relay KA; the single-chip microcomputer is connected to the 4G router via the WiFi communication module, and then connected to the intelligent control terminal via the Internet, and remote off-site monitoring and control of the on-site distribution box is achieved through corresponding APP software on the intelligent control terminal.

[0006] Patent 3: Construction Site Intelligent Power Distribution System; Application Number: 201710494020.2; Application Date: June 26, 2017; Applicant: Hebei Second Construction Engineering Co., Ltd.; Abstract: This invention discloses an intelligent power distribution system for construction sites, used for temporary power distribution control at construction sites. It includes a construction information management platform, as well as a main distribution cabinet, distribution boxes, and switch boxes, each containing an intelligent control box, inductors, and contactors. By leveraging automatic control and information technology, it addresses challenges such as the difficulty of managing and controlling temporary power distribution at construction sites, providing power safety alarms, maintaining equipment power consumption statistics, and shutting down equipment during idle periods. By combining the intelligent control box, main distribution cabinet, power control server, and construction information management platform, it enables real-time and accurate monitoring of the power consumption and status of each power distribution line, including the users, remote control of the power supply of each power-consuming device, and enabling card-based power access, device identification, real-time alarms and power outages for equipment overcurrent, overload, and overvoltage, as well as full Wi-Fi coverage at the construction site.

[0007] It can be seen from the above literature that most of the switch boxes currently used in factories or enterprises are manual switch boxes. When electricity is needed on site, the equipment management department needs to arrange personnel to go to the site for verification, open the box door and supply electricity for on-site use. After use, the user department will notify the management department to shut down the power and close the door. The use procedures are cumbersome, the management is difficult, the efficiency is low, and a lot of manpower is consumed. Although some factories or enterprises have configured remote-controlled switch boxes, the existing remote-controlled switch boxes still have shortcomings in actual use. Since the existing remote-controlled switch boxes lack a supporting intelligent switch system, the so-called remote control is highly dependent on having the control right of the remote-controlled switch box. If the on-site department wants to use the remote control switch box, it needs to call or send a message to the management department. After the management department agrees to the application, it will control the remote control switch box to power on. Compared with the switch box with pure manual power-on, it only saves the time for the management department to arrive at the site. In addition, this remote application process is not standardized, and the management department cannot obtain the identity of the applicant and cannot know the applicant's true intention of electricity use, which can easily cause safety accidents. At the same time, the existing remote control switch box has poor anti-interference ability when sending and receiving control signals, which can easily cause incorrect power-on or power-off, and does not have the function of uploading electricity consumption, resulting in the management department being unable to accurately understand the actual electricity consumption situation on site. Summary of the Invention

[0008] The purpose of the present invention is to solve the above problems and provide an intelligent switch device and an intelligent switch system with remote approval and management functions.

[0009] The intelligent switch device with remote approval and management functions includes: a box body, a box cover, a plastic connecting strip, a QR code nameplate, a stop indicator light, a run indicator light, a socket, an electric meter, a No. 1 circuit breaker, a control module, a contactor, a manual switch, a No. 2 circuit breaker, an antenna, a filter, a 4G module and a fuse. The box body and the box cover have the same side surface inside which several plastic connecting strips are fixed together by screws, and the outer edges of the box body and the box cover are provided with several threaded holes and connected by bolts. The QR code nameplate, the stop indicator light, the run indicator light and the socket are embedded in the box body. On the front of the cover, the electric meter, No. 1 circuit breaker, control module, contactor, No. 2 circuit breaker, antenna, filter and 4G module are installed inside the box, and the manual switch is embedded in the side of the box. The three-phase five-wire power supply runs through the box and is connected to the meter input terminal. The input terminal of No. 1 circuit breaker is respectively connected to the meter output terminal A, B, C three-phase and N line. The output terminal of No. 1 circuit breaker is connected in series with a fuse. The control module is provided with No. 1 terminal, No. 2 terminal, No. 3 terminal, No. 4 terminal, No. 5 terminal and No. 6 terminal. The contactor contains a coil, a normally open linkage contact, a normally open contact and a normally closed contact. The N line of the three-phase five-wire power supply is connected to the No. 1 circuit breaker outlet terminal with the No. 1 terminal and the No. 2 terminal of the control module respectively, and the normally open contact and normally closed contact of the contactor are connected in parallel between the N line of the three-phase five-wire power supply and the No. 1 circuit breaker outlet terminal. The normally open contact and normally closed contact are connected in series with the run indicator light and the stop indicator light respectively. The No. 3 terminal and the No. 4 terminal of the control module are connected, and the coil of the contactor is connected in series between the No. 3 and No. 4 terminals. The No. 5 terminal and the No. 6 terminal of the control module are connected, and the first contact of the normally open linkage contact of the contactor is connected in series between the No. 5 and No. 6 terminals. Manual The two ends of the switch are respectively connected to the No. 2 terminal and the No. 4 terminal of the control module. The incoming end of the second contact of the normally open linkage contact of the contactor is connected to the outgoing end of the No. 1 circuit breaker. The incoming end of the No. 2 circuit breaker is respectively connected to the outgoing end of the second contact of the normally open linkage contact of the contactor and the N line of the three-phase five-wire power supply. The incoming end of the socket is respectively connected to the outgoing end of the No. 2 circuit breaker, the remaining two phase lines of the meter outgoing end and the PE line. The antenna is electrically connected to the filter, the filter is electrically connected to the 4G module, the 4G module is electrically connected to the control module, and the meter is electrically connected to the input end of the control module.

[0010] Furthermore, the socket is an industrial socket.

[0011] Furthermore, the electric meter and the control module are connected via an RS-485 bus.

[0012] Furthermore, the control module is a single chip microcomputer.

[0013] Furthermore, the manual switch is a normally open manual switch with a mechanical lock structure.

[0014] In order to realize an intelligent switch device with remote approval and management functions, the intelligent switch system of the present invention includes: an embedded program, a host computer and a server. The host computer installed with the embedded program receives and displays the electricity application form sent by the intelligent switch device with remote approval and management functions, and sends a control signal to the intelligent switch device with remote approval and management functions. The server stores the electricity application form and electricity approval form of the host computer, and transmits the electricity application form and electricity approval form to the host computer.

[0015] Furthermore, the smart switch system is divided into three types of management permissions, namely system administrator, smart switch device administrator and ordinary users. The system administrator can manage the smart switch device and assign smart switch device administrator permissions. The smart switch device administrator can review the application for smart switch device and view the real-time status and usage records of the smart switch device under his charge. Ordinary users can initiate the use / return application of smart switch device and report faults of smart switch device without authorization.

[0016] Furthermore, the smart switch system has the function of online application submission and mobile application approval. After ordinary users scan the QR code on the on-site electrical box, they can open the WeChat applet, fill in the relevant information unit, name, telephone number, usage and termination time on the smart switch equipment information page, submit the use / return application, and choose to take photos and upload pictures, or online videos, etc. as attachments / basis for the application. When a fault is found in the smart switch equipment, a fault report can also be filled in. After the smart switch equipment fault report is reviewed and approved, the system automatically trips the faulty switch. After receiving the application reminder, the smart switch equipment administrator can verify the application, approve or reject the application operation. The administrator agrees to use it and clicks online to remotely operate the power supply and authorize use. If the smart switch equipment is used for more than a certain period of time, the system automatically pushes a message to the user and the smart switch equipment administrator, prompting the user to apply for an extension of the use time or perform a tripping operation, and prompting the smart switch equipment administrator to track the use of the smart switch equipment to prevent power loss or even accidents.

[0017] Furthermore, the smart switch system has a message reminder push function. Within the allowed number of messages, the associated public account pushes WeChat messages in real time. When the smart switch device administrator fails to process the message within the specified time, the system automatically triggers SMS and email push.

[0018] Working principle:

[0019] First, install the intelligent switch box, fix the box in a suitable position, then adjust the No. 1 and No. 2 circuit breakers to the circuit-breaking state, and then connect the lines. After completing the line connection, use plastic connecting strips and screws to connect the box body and the box cover into a whole, and then screw the bolts into each threaded hole, and then adjust the No. 1 and No. 2 circuit breakers to the circuit-passing state to complete the installation.

[0020] Then, build the intelligent switch system at a suitable location in the factory or enterprise, install the host computer and server, and debug the program. After the system is stable, enter the information of all the intelligent switch boxes on site into the intelligent switch system, and set up system administrators, intelligent switch equipment administrators and ordinary users.

[0021] When electricity is needed on site, ordinary users can scan the QR code on the on-site electrical box to open the WeChat applet, fill in the relevant information unit, name, phone number, use and termination time on the smart switch equipment information page, submit the use / return application, and choose to take a photo and upload a picture, or online video, etc. as an attachment / basis for the application. When a fault is found in the smart switch equipment, a fault report can also be filled in. After the fault report of the smart switch equipment is reviewed and approved, the system will automatically disconnect the faulty switch.

[0022] After ordinary users submit their applications, the associated official account will push WeChat information in real time. If the smart switch device administrator fails to process the message within the specified time, the system will automatically trigger SMS and email push. After receiving the application reminder, the smart switch device administrator can verify the application and approve or reject the application. If the administrator agrees to use it and clicks "Approve" online, power can be remotely supplied and authorized for use. If the smart switch device is used for more than a certain period of time, the system will automatically push messages to the user and the smart switch device administrator, prompting the user to apply for an extension of the use time or to perform a tripping operation, and prompting the smart switch device administrator to track the use of the smart switch device to prevent power loss or even accidents.

[0023] When the approval is passed, the terminal manager sends a power-on signal to the smart switch box. The power-on signal is picked up by the antenna with a filter. After filtering out irrelevant signals, the signal is transmitted to the control module through the 4G module. The control module controls the contactor to operate. At this time, the socket is turned on, and the on-site production personnel start each electrical equipment. During the power consumption process, the operation indicator light is turned on and is always on, and the electric meter and control module record the power consumption and power consumption duration respectively. The control module sends the collected power consumption and time information through the 4G module via the filter and antenna to the terminal. The terminal sends a signal in time according to the power consumption and time information to control the smart switch box to power off. After the power is off, the stop indicator light is turned on and is always on, while the operation indicator light is disconnected and extinguished.

[0024] In addition, when the control module controls the contactor to operate, it will verify whether the contactor operates normally through the normally open linkage contact and send relevant information to the terminal. If the contactor does not work normally, the terminal manager will be informed. At this time, the manager will come to the site and manually power on the device by controlling the manual switch with the key.

[0025] The significant beneficial effects of the present invention are:

[0026] (1) The present invention uses intelligent switching devices in conjunction with intelligent switching systems to realize functions such as remote approval of application / return of intelligent switching devices, remote management of intelligent switching devices, remote maintenance, viewing of opening and closing status, and data statistics, which can facilitate users and managers to apply for the use of intelligent switching devices and manage intelligent switching devices.

[0027] (2) The present invention adopts the method of scanning a QR code and filling in information to apply for electricity, which solves the low efficiency caused by the existing remote switch box requiring the applicant to notify the manager by phone or message to remotely power on. At the same time, the application method through the QR code is simple and standardized, which helps terminal management personnel to systematically understand the electricity usage situation on site.

[0028] (3) The present invention integrates an electric meter and connects the electric meter to the control module, so that the control module can obtain the specific power usage of the intelligent switch box in real time, and then send the power usage to the terminal through the 4G module, filter and antenna, so that the terminal can obtain the detailed power usage of the workshop or factory and facilitate the enterprise to make production adjustments.

[0029] (4) The present invention integrates a feedback circuit in the intelligent switch box, so that the terminal can obtain whether the intelligent switch box is powered on normally. When the control module fails, it can also be manually powered on through a manual switch, avoiding the impact of the intelligent switch equipment failure on the production plan and improving the fault tolerance of the intelligent switch equipment.

[0030] (5) The present invention uses a filter to enable the intelligent switch box to better filter irrelevant control signals, making the control of the intelligent switch box more precise, avoiding the intelligent switch box from being powered on incorrectly due to receiving control signals from other devices, avoiding safety hazards, and making the present application more suitable for the complex environment of factories or workshops. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 This is a flowchart of the approved intelligent switch system of the present invention;

[0032] Figure 2 This is a flowchart of the rejection of the review of the intelligent switch system of the present invention;

[0033] Figure 3 This is a front view of the intelligent switch device of the present invention;

[0034] Figure 4 It is a side view of the intelligent switching device of the present invention;

[0035] Figure 5 This is a schematic diagram of the internal structure of the intelligent switch device of the present invention;

[0036] Figure 6 This is a circuit diagram between the control module, contactor and supporting components of the intelligent switching device of the present invention;

[0037] The meanings of the symbols in the figure are as follows:

[0038] 1-Box body; 2-Box cover; 3-Plastic connecting strip; 4-QR code nameplate; 5-Stop indicator light; 6-Run indicator light; 7-Socket; 8-Electricity meter; 9-Circuit breaker No. 1; 10-Control module; 1001-Terminal No. 1; 1002-Terminal No. 2; 1003-Terminal No. 3; 1004-Terminal No. 4; 1005-Terminal No. 5; 1006-Terminal No. 6; 11-Contactor; 1101-Coil; 1102-Normally open linkage contact; 1103-Normally open contact; 1104-Normally closed contact; 12-Manual switch; 13-Circuit breaker No. 2; 14-Antenna; 15-Filter; 16-4G module; 17-Fuse

[0039] Specific implementation examples

[0040] The intelligent switch device with remote approval and management functions includes: a box body 1, a box cover 2, a plastic connecting strip 3, a QR code nameplate 4, a stop indicator light 5, a run indicator light 6, a socket 7, an electric meter 8, a No. 1 circuit breaker 9, a control module 10, a contactor 11, a manual switch 12, a No. 2 circuit breaker 13, an antenna 14, a filter 15, a 4G module 16 and a fuse 17. The same side of the box body 1 and the box cover 2 are fixed with several plastic connecting strips 3 by screws, and the outer edges of the box body 1 and the box cover 2 are provided with several threaded holes and connected by bolts. The QR code nameplate 4, the stop indicator light 5, the run indicator light 6 and the socket 7 are embedded in the front of the box cover 2. The electric meter 8, the No. 1 circuit breaker 9, the control module 10, the connecting strip 3 are fixed with several threaded holes and the outer edges of the box body 1 and the box cover 2 are connected with bolts. The contactor 11, the No. 2 circuit breaker 13, the antenna 14, the filter 15 and the 4G module 16 are installed inside the box 1, and the manual switch 12 is embedded in the side of the box 1. The three-phase five-wire power supply runs through the box 1 and is connected to the incoming line of the meter 8. The incoming line of the No. 1 circuit breaker 9 is respectively connected to the three-phase A, B, C and N line of the meter 8. The outgoing line of the No. 1 circuit breaker 9 is connected in series with a fuse 17. The control module 10 is provided with a No. 1 terminal 1001, a No. 2 terminal 1002, a No. 3 terminal 1003, a No. 4 terminal 1004, a No. 5 terminal 1005 and a No. 6 terminal 1006. The contactor 11 contains a coil 1101, a normally open linkage contact 1102, a normally open contact 1103 and a normally closed contact 1104. The N line of the three-phase five-wire power supply is connected to the No. 1 terminal. The output terminals of the circuit breaker 9 are respectively connected to the No. 1 terminal 1001 and the No. 2 terminal 1002 of the control module 10, and the normally open contact 1103 and the normally closed contact 1104 of the contactor 11 are connected in parallel between the N line of the three-phase five-wire power supply and the No. 1 circuit breaker 9 output terminal. The normally open contact 1103 and the normally closed contact 1104 are respectively connected in series with the run indicator light 6 and the stop indicator light 5. The No. 3 terminal 1003 and the No. 4 terminal 1004 of the control module 10 are connected, and the coil 1101 of the contactor 11 is connected in series between the No. 3 terminal 1003 and the No. 4 terminal 1004. The No. 5 terminal 1005 and the No. 6 terminal 1006 of the control module 10 are connected, and the normally open linkage contact of the contactor 11 is connected in series between the No. 5 terminal 1005 and the No. 6 terminal 1006. 1102 first contact, the two ends of the manual switch 12 are respectively connected to the No. 2 terminal 1002 and the No. 4 terminal 1004 of the control module 10, the incoming end of the second contact of the normally open linkage contact 1102 of the contactor 11 is connected to the outgoing end of the No. 1 circuit breaker 9, the incoming end of the No. 2 circuit breaker 13 is respectively connected to the outgoing end of the second contact of the normally open linkage contact 1102 of the contactor 11 and the N line of the three-phase five-wire power supply, the incoming end of the socket 7 is respectively connected to the outgoing end of the No. 2 circuit breaker 13, the remaining two phase lines of the outgoing end of the electric meter 8 and the PE line, the antenna 14 is electrically connected to the filter 15, the filter 15 is electrically connected to the 4G module 16, the 4G module 16 is electrically connected to the control module 10, and the electric meter 8 is electrically connected to the input end of the control module 10.

[0041] Preferably, the socket 7 is an industrial socket.

[0042] Preferably, the electric meter 8 and the control module 10 are connected via an RS-485 bus.

[0043] Preferably, the control module 10 is a single chip microcomputer.

[0044] Preferably, the manual switch 14 is a normally open manual switch with a mechanical lock structure.

[0045] In order to realize an intelligent switch device with remote approval and management functions, the intelligent switch system of the present invention includes: an embedded program, a host computer and a server. The host computer installed with the embedded program receives and displays the electricity application form sent by the intelligent switch device with remote approval and management functions, and sends a control signal to the intelligent switch device with remote approval and management functions. The server stores the electricity application form and electricity approval form of the host computer, and transmits the electricity application form and electricity approval form to the host computer.

[0046] Preferably, the smart switch system is divided into three types of management permissions, namely system administrator, smart switch device administrator and ordinary user. The system administrator can manage the smart switch device and assign smart switch device administrator permissions. The smart switch device administrator can review the application for smart switch device and view the real-time status and usage records of the smart switch device under his charge. Ordinary users can initiate the use / return application of smart switch device and report faults of smart switch device without authorization.

[0047] Preferably, the smart switch system has the function of online application submission and mobile application approval via mobile phone. After ordinary users scan the QR code on the on-site electrical box, they can open the WeChat applet, fill in the relevant information unit, name, telephone number, usage and termination time on the smart switch equipment information page, submit the use / return application, and choose to take a photo and upload a picture, or use an online video as an attachment / basis for the application. When a fault is found in the smart switch equipment, a fault report can also be filled in. After the fault report of the smart switch equipment is reviewed and approved, the system automatically trips the faulty switch. After receiving the application reminder, the smart switch equipment administrator can verify the application and approve or reject the application operation. The administrator agrees to use it and clicks "approval" online to remotely operate power supply and authorize use. If the use time of the smart switch equipment exceeds a certain period of time, the system automatically pushes a message to the user and the smart switch equipment administrator, prompting the user to apply for an extension of the use time or perform a tripping operation, and prompting the smart switch equipment administrator to track the use of the smart switch equipment to prevent power loss or even accidents.

[0048] Preferably, the smart switch system has a message reminder push function. Within the allowed number of messages, the associated official account pushes WeChat messages in real time. When the smart switch device administrator fails to process the message within the specified time, the system automatically triggers SMS and email push.

[0049] The comparison of the factory before and after the installation of the intelligent switch system and the matching intelligent switch box is shown in Table 1.

[0050] Table 1

[0051] Comparison Project Before installation After installation Power-on method On-site manual power-on Remote power on Other information feedback none Power and equipment status feedback Number of switch boxes managed by the administrator 1 to 10 sets More than 20 sets

[0052] As can be seen from Table 1, after the factory installed the intelligent switch system and the supporting intelligent switch box, it has achieved significant improvements in many aspects. On the one hand, the use of remote power-on approval has increased the speed of power-on approval, reduced the workload of administrators, and increased the number of devices managed by administrators. On the other hand, the administrator's understanding of on-site conditions has been improved. Through the intelligent switch system, the administrator can keep abreast of on-site power usage and equipment working status at any time.

Claims

1. An intelligent switch device with remote approval and management functions, characterized in that: include: A box body (1), a box cover (2), a plastic connecting strip (3), a QR code nameplate (4), a stop indicator light (5), a run indicator light (6), a socket (7), an electric meter (8), a No. 1 circuit breaker (9), a control module (10), a contactor (11), a manual switch (12), a No. 2 circuit breaker (13), an antenna (14), a filter (15), a 4G module (16) and a fuse (17); the box body (1) and the box cover (2) are fixed with a plurality of plastic connecting strips (3) on the same side thereof by screws, and the outer edges of the box body (1) and the box cover (2) are provided with a plurality of threaded holes and connected by bolts; the QR code nameplate (4), the stop indicator light (5), the run indicator light (6) and the socket (7) are fixed with a plurality of threaded holes. The electric meter (8), the No. 1 circuit breaker (9), the control module (10), the contactor (11), the No. 2 circuit breaker (13), the antenna (14), the filter (15) and the 4G module (16) are installed inside the box (1). The manual switch (12) is embedded in the side of the box (1). The three-phase five-wire power supply runs through the box (1) and is connected to the incoming line of the electric meter (8). The incoming line of the No. 1 circuit breaker (9) is respectively connected to the three-phase A, B, C and N line of the outgoing line of the electric meter (8). The outgoing line of the No. 1 circuit breaker (9) is connected in series with a fuse (17). The control module (10) is provided with a No. 1 terminal (1001), a No. 2 terminal (1002), a No. 3 terminal (1003), a No. 4 terminal (100 4), terminal No. 5 (1005) and terminal No. 6 (1006), the contactor (11) includes a coil (1101), a normally open linkage contact (1102), a normally open contact (1103) and a normally closed contact (1104), the three-phase five-wire power supply N line and the output terminal of the No. 1 circuit breaker (9) are respectively connected to the No. 1 terminal (1001) and the No. 2 terminal (1002) of the control module (10), and the three-phase five-wire power supply N line and the output terminal of the No. 1 circuit breaker (9) are connected in parallel with the normally open contact (1103) and the normally closed contact (1104) of the contactor (11), the normally open contact (1103) and the normally closed contact (1104) are respectively connected in series with the running indicator light (6) and the stop indicator light (5), the control module (1 0) are connected, and the coil (1101) of the contactor (11) is connected in series between the third terminal (1003) and the fourth terminal (1004), the fifth terminal (1005) and the sixth terminal (1006) of the control module (10) are connected, and the first contact of the normally open linkage contact (1102) of the contactor (11) is connected in series between the fifth terminal (1005) and the sixth terminal (1006), the two ends of the manual switch (12) are respectively connected to the second terminal (1002) and the fourth terminal (1004) of the control module (10), and the incoming end of the second contact of the normally open linkage contact (1102) of the contactor (11) is connected to the outgoing end of the first circuit breaker (9),The incoming end of the No. 2 circuit breaker (13) is respectively connected to the outgoing end of the second contact of the normally open linkage contact (1102) of the contactor (11) and the N line of the three-phase five-wire power supply. The incoming end of the socket (7) is respectively connected to the outgoing end of the No. 2 circuit breaker (13), the remaining two phase lines of the outgoing end of the electric meter (8) and the PE line. The antenna (14) is electrically connected to the filter (15), the filter (15) is electrically connected to the 4G module (16), the 4G module (16) is electrically connected to the control module (10), and the electric meter (8) is electrically connected to the input end of the control module (10).

2. The intelligent switch device with remote approval and management functions according to claim 1 is characterized in that: The socket (7) is an industrial socket.

3. The intelligent switch device with remote approval and management functions according to claim 1 is characterized in that: The electric meter (8) and the control module (10) are connected via an RS-485 bus.

4. The intelligent switch device with remote approval and management functions according to claim 1 is characterized in that: The control module (10) is a single chip microcomputer.

5. The intelligent switch device with remote approval and management functions according to claim 1 is characterized in that: The manual switch (12) is a normally open manual switch with a mechanical lock structure.

6. An intelligent switch system for realizing the intelligent switch device with remote approval and management functions as claimed in claim 1, characterized in that: The intelligent switch system includes: an embedded program, a host computer and a server. The host computer installed with the embedded program receives and displays the electricity application form sent by the intelligent switch device with remote approval and management functions, and sends a control signal to the intelligent switch device with remote approval and management functions. The server stores the electricity application form and electricity approval form of the host computer, and transmits the electricity application form and electricity approval form to the host computer.

7. The intelligent switch system according to claim 6, characterized in that: The smart switch system is divided into three types of management permissions, namely system administrator, smart switch device administrator and ordinary users. The system administrator can manage the smart switch device and assign smart switch device administrator permissions. The smart switch device administrator can review the application for smart switch device and view the real-time status and usage records of the smart switch device under his charge. Ordinary users can initiate the use / return application of smart switch device and report faults of smart switch device without authorization.

8. The intelligent switch system according to claim 6, characterized in that: The smart switch system has the function of online application submission and mobile application approval. After ordinary users scan the QR code on the on-site electrical box, they can open the WeChat applet and fill in relevant information on the smart switch device information page, including unit, name, phone number, usage and expiration time, and submit a use / return application. They can also choose to take photos and upload pictures, or online videos, as attachments / basis for the application. When a fault is found in the smart switch device, a fault report can also be filled in. After the smart switch device fault report is reviewed and approved, the system automatically trips the faulty switch. After receiving the application reminder, the smart switch device administrator can verify the application and approve or reject the application operation. The administrator agrees to use it and clicks "approval" online to remotely operate power supply and authorize use. If the smart switch device is used for more than a certain period of time, the system automatically pushes a message to the user and the smart switch device administrator, prompting the user to apply for an extension of the use time or perform a tripping operation, and prompting the smart switch device administrator to track the use of the smart switch device to prevent power loss or even accidents.

9. The intelligent switch system according to claim 6, characterized in that: The smart switch system has a message reminder push function. Within the allowed number of messages, the associated public account pushes WeChat messages in real time. If the smart switch device administrator fails to process the message within the specified time, the system automatically triggers SMS and email push.

Citation Information

Patent Citations

  • Intelligent power distribution system at construction site

    CN107257162B

  • Control system for fast response type intelligent switch box

    CN107834704A

  • Distribution box and distribution box system

    CN211428693U

  • CYFZD intelligent low voltage switch cabinet

    CN102403657A

  • Implementation method of key monitoring technology of unattended intelligent power distribution cabinet

    CN115864650A