Single-phase grounding fault handling method for distribution network with high penetration distributed generation
By adopting the single-phase grounding treatment method based on the adaptive power direction and the three-level time difference grounding protection in the high-penetration distributed power distribution network, the difficulty in fault location caused by the two-way flow of power is solved and the normal power supply is realized. The adaptive processing of single-phase ground faults in the power supply state improves the accuracy and operability of fault location.
Patent Information
- Application Number
- CN202310508430.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-08
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2043-05-08
AI Technical Summary
In distribution networks with high penetration of distributed power sources, traditional single-phase ground fault detection methods and protection devices are difficult to effectively handle the situation of two-way flow of power, resulting in fault location and protection configuration facing challenges, especially during normal power supply and transfer. Under power supply status.
Using a single-phase grounding processing method based on the adaptive direction of incoming calls, by configuring three-level time-differential grounding protection, combined with local feeder automation logic, the power supply status is determined and the fault location is determined to achieve single-phase grounding in the 10kV distribution network. Fault location.
It realizes the adaptive processing of single-phase ground faults in normal power supply and transfer power supply states in distribution networks containing high-penetration distributed power supplies, simplifies the processing logic, improves the accuracy and operability of fault location, and is suitable for Distribution network with high penetration rate of DG.
Smart Images

Figure CN117175509B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power distribution automation, and in particular to a method for processing a single-phase grounding fault in a distribution network containing a high-penetration distributed power source. Background Art
[0002] More and more distributed generation sources are connected to the distribution network. However, when there are many distributed generation sources (DG) in the power grid, it will have a great impact on the system voltage shape, voltage drop, harmonics, short-circuit current, transient stability, dynamic stability, voltage stability, frequency control and other characteristics. Among them, the impact on the relay protection of the distribution network is particularly prominent. The traditional distribution network is characterized by radial topology wiring and is powered by a single-side power supply. Its relay protection is also designed based on this architecture. For distribution networks with a large number of DG connections, their operating characteristics will change significantly, which brings challenges to the protection configuration of the distribution network.
[0003] Distribution network feeders containing high penetration DGs will have bidirectional current flow, even on the trunk line. High penetration DGs make it possible for current to flow in both directions, both in normal operation and in fault conditions.
[0004] For the distribution network of small current grounding system (ungrounded and resonant grounding) without DG, the current detection method of single-phase grounding fault based on the steady-state and transient characteristics of the fault has been relatively mature, and a series of grounding fault line selection and location methods have been proposed. Among them, the line selection and location devices using transient signals have been widely used in the field in recent years. Among them, the most commonly used transient algorithm is the algorithm based on the transient power direction of the zero-sequence model. With the wider application scope and higher penetration rate of DG in distribution networks, it is urgent to clarify a series of issues such as how the transient characteristics of small current grounding faults in active distribution networks change, whether the existing line selection and location methods continue to be applicable, and whether the performance of existing detection devices can continue to meet the requirements.
[0005] The present invention analyzes the flow direction characteristics and single-phase grounding fault characteristics of a 10kV distribution network containing high-penetration distributed power sources under normal power supply and transfer power supply conditions, and combines the current local feeder automation logic to propose a single-phase grounding processing method based on incoming call direction adaptation. The grounding protection delay only needs to be configured with three levels of time difference, so that the single-phase grounding fault positioning of a 10kV distribution network containing high-penetration distributed power sources under normal power supply and transfer power supply conditions can be achieved. Summary of the invention
[0006] The object of the present invention is to
[0007] In order to achieve the purpose of the present invention, the technical solution adopted by the present invention is:
[0008] The single-phase grounding fault handling method of the distribution network containing high-penetration distributed power sources is that the outgoing line switches of the substation are all connected to the head-end sectionalizing switches, the switches along the line on one side are all non-head-end sectionalizing switches, and the boundary switch is connected between the head-end sectionalizing switches and the non-head-end sectionalizing switches on the other side. All switches are equipped with delayed quick-break protection and one-time reclosing function. The handling method is as follows:
[0009] Determine the power supply status;
[0010] 1) Normal power supply, determine the fault location: the fault is located in the main line, the head-end sectionalizing switch is delayed to open, the non-head-end sectionalizing switch is opened due to loss of pressure, the head-end sectionalizing switch starts the first-stage delayed closing, after the head-end sectionalizing switch is closed, the non-head-end sectionalizing switches start the second-stage delayed closing in sequence, if the grounding feature is detected within the closing confirmation time after the switch is closed, the head-end sectionalizing switch or the non-head-end sectionalizing switch closed in the current time period is opened, and the forward lockout is set, and the head-end sectionalizing switch or the non-head-end sectionalizing switch adjacent to the positive direction of the current detects the instantaneous voltage and sets the reverse lockout to determine the fault location and complete the protection;
[0011] When the fault is located on the branch line, the boundary switch opens before the head-end section switch, and the boundary switch starts the first-stage delay closing. If the grounding feature is detected within the closing confirmation time after the switch is closed, the boundary switch opens and sets the lock to complete the protection;
[0012] 2) Transfer power supply and determine the fault location: the fault is inside the substation, the head-end sectional switch loses voltage and opens, the combined switch and the non-head-end sectional switch lose voltage and opens, the combined switch opens the third-level delayed closing, the combined switch marks the voltage direction as negative, the non-head-end sectional switches close in sequence, the head-end voltage reverses and the switch does not close, and the protection is completed;
[0013] The fault is located in the main line. The head-end switch detects the grounding fault feature. Since the voltage direction of the combined switch is marked as negative before closing, the combined switch opens before the head-end sectional switch after the fault delay confirmation. The non-head-end sectional switch opens due to voltage loss. The combined switch starts the first-stage delay closing, and the non-head-end sectional switches start the second-stage delay closing in sequence. If the grounding feature is detected within the closing confirmation time after the switch is closed, the head-end sectional switch or the non-head-end sectional switch closed in the current time period will be opened, and the forward lockout will be set. After the head-end sectional switch or the non-head-end sectional switch adjacent to the positive direction of the current detects the instantaneous voltage, the reverse lockout will be set to determine the fault location and complete the protection.
[0014] The fault is located on the branch line, and the fault handling process is the same as that in the normal power supply state;
[0015] Among them: the judgment basis for the fault location being located in the main line or is whether the grounding fault characteristics are detected on the load side of the boundary switch; the judgment basis for the fault location being located inside the substation during power transfer is whether the head-end section switch is in the voltage-loss tripping state.
[0016] Furthermore, the closing confirmation time is shorter than the first-level delayed closing time and the second-level delayed closing time.
[0017] Furthermore, the substation outgoing line switch includes a first substation outgoing line switch CB1 and a second substation outgoing line switch CB2, the first substation outgoing line switch CB1 and the second substation outgoing line switch CB2 are electrically connected to the substation, and the first head-end segment switch FB1, the first non-head-end segment switch FB2, the second non-head-end segment switch FB3, and the second head-end segment switch FB6 are connected in series in sequence between the first substation outgoing line switch CB1 and the second substation outgoing line switch CB2, and a contact switch is electrically connected between the second non-head-end segment switch FB3 and the second head-end segment switch FB6. Switch LS, a third non-first-end segment switch FB4 is electrically connected between the first first-end segment switch FB1 and the first non-first-end segment switch FB2, the third non-first-end segment switch FB4 is electrically connected to the fourth non-first-end segment switch FB5, the fourth non-first-end segment switch FB5 is electrically connected to the first boundary switch WY1, the first boundary switch WY1 is electrically connected to the first distributed power source DG1, the second boundary switch WY2 is electrically connected between the first non-first-end boundary switch FB2 and the second non-first-end boundary switch FB3, and the second boundary switch WY2 is electrically connected to the second distributed power source DG2.
[0018] Compared with the prior art, the advantages of the present invention are:
[0019] The present invention can realize the self-adaptation of single-phase ground fault processing in the distribution network containing high-permeability DG when switching between normal power supply and transfer power supply;
[0020] The processing method proposed by the present invention does not require major changes to the original algorithm, and only requires simple preprocessing operations on the zero-sequence current sampling data. The processing logic is simple and practical.
[0021] The processing method proposed in the present invention is based on the mature local feeder automation technology of the distribution network. It only needs to configure the three-level grounding protection delay, has simple parameter configuration, strong operability, and accurate fault location. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1a This is a schematic diagram of normal power supply when there is no distributed power supply;
[0023] Figure 1b This is a schematic diagram of power supply when there is no distributed power source;
[0024] Figure 2aThis is a schematic diagram of normal power supply with high penetration rate distributed power sources;
[0025] Figure 2b This is a schematic diagram of power supply when high penetration rate distributed power sources are involved;
[0026] Figure 3a It is the zero-sequence equivalent network when a single-phase grounding fault occurs during normal power supply;
[0027] Figure 3b It is the zero-sequence equivalent network when a single-phase grounding fault occurs during power transfer;
[0028] Figure 4 It is a typical example diagram of the present invention;
[0029] Figure 5a This is a schematic diagram of a normal power supply trunk line failure;
[0030] Figure 5b FB1 protection trip, FB2-FB5 pressure loss trip;
[0031] Figure 5c It is FB1 reclosing and FB2 delayed closing;
[0032] Figure 5d Open and lock the FB2 protection, and lock the FB3 protection;
[0033] Figure 6a This is a schematic diagram of a branch line fault during normal power supply;
[0034] Figure 6b Reclosing for normal power supply and opening for fault protection;
[0035] Figure 7a This is a schematic diagram of voltage loss on a faulty line in a substation during power transfer;
[0036] Figure 7b This is a schematic diagram of power transfer processing;
[0037] Figure 8a This is a schematic diagram of a main line fault during power transfer;
[0038] Figure 8b LS protection trip, FB2-FB5 pressure loss trip;
[0039] Figure 8c It is LS reclosing and FB3 delayed closing;
[0040] Figure 8d Open and lock the FB3 protection, and lock FB2;
[0041] Figure 9a This is a schematic diagram of a branch line fault during power transfer;
[0042] Figure 9b To reclose the circuit breaker during power transfer and open the circuit breaker for fault protection. DETAILED DESCRIPTION
[0043] In order to further explain the technical means and effects adopted by the present invention to achieve the predetermined purpose, the single-phase grounding fault processing method of the distribution network containing high-penetration distributed power sources proposed by the present invention is described in detail as follows in combination with the accompanying drawings and preferred examples:
[0044] Definition of active power direction: Under normal power supply conditions, the direction of active power flowing from the 10kV busbar of the power supply substation to the feeder is the positive direction, and the direction of active power flowing from the feeder to the 10kV busbar is the negative direction.
[0045] 1) As shown in Figure 1, under normal power supply conditions, the active power on the trunk line is positive; under transfer power supply conditions, the active power on the trunk line is negative; the active power on the branch line is positive in both cases. The active power direction on the trunk line can be used to determine whether it is a normal power supply state or a transfer power supply state; when the active power direction is positive, it is a normal power supply state, and when the active power direction is negative, it is a transfer power supply state.
[0046] 2) As shown in Figure 2, if the DG capacity is very small and is not enough to change the active power direction on the trunk line, the active power direction on the trunk line is the same as Figure 1, and the power supply status can also be judged by the active power direction.
[0047] If the capacity of the distributed generation is very large (including high penetration), then whether in normal power supply or transfer power supply, as the DG power generation and line load change, the power direction of S1 and S2 may not be fixed, but change in both directions. When transferring power, in some extreme cases, the active power direction of the contact switch may also change in both directions. Therefore, in a distribution network with high penetration DG, it will be invalid to use the active power direction to determine whether it is in normal power supply or transfer power supply.
[0048] 3) For distribution networks with DG access, since DG can be regarded as a "power generation load", the signal of the zero-sequence model is not greatly changed, so the line selection and positioning method using the zero-sequence model transient power direction signal can still be applied. However, in the case of power transfer, the main line is powered by the connecting switch, and the zero-sequence current direction in the normal power supply state and the power transfer state is different. That is, for the switches on the main line, when using the zero-sequence model transient power direction method to determine the grounding fault, it is necessary to distinguish whether it is a normal power supply state or a power transfer state. The zero-sequence current direction on the branch line is the same under normal power supply and power transfer conditions and remains unchanged.
[0049] As shown in Figure 3, a single-phase grounding fault occurs. Assuming that a single-phase grounding fault occurs in line 1 and the grounding fault point remains unchanged, the zero-sequence current direction under normal power supply and transfer power supply is compared. As shown in Figures 2 and 3, the zero-sequence current direction on the fault line is opposite. At this time, it is not possible to judge whether it is a normal power supply state or a transfer power supply state based on the positive and negative directions of the active power. Using the active power direction to judge whether the feeder is in a transfer power supply state is not suitable for distributed power generation with high penetration distribution network lines, because under normal power supply conditions, the individual switches of the trunk line may also change the flow direction, resulting in misjudgment of the transfer power supply state, and further misjudgment of the grounding fault.
[0050] Considering that the active power direction cannot be used to determine whether the distribution network with high penetration rate of distributed generation can be used to determine whether it is in the power transfer state, the characteristics of local FA can be combined to handle faults. A single-phase grounding fault handling logic for the distribution network with high penetration rate of distributed generation based on local FA is proposed.
[0051] The single-phase grounding fault processing logic of the distribution network with high penetration rate of distributed generation based on local FA is as follows:
[0052] 1) It includes sectionalizing, demarcation and interconnecting switches, which can be equipped with circuit breakers or load switches. Sectionalizing switches and interconnecting switches are equipped with double-side voltage detection (PT or electronic voltage sensor), one (set) is installed on the power supply side and one (set) on the load side, providing Udy (power supply side) and Ufh (load side) voltage measurement; the demarcation switch is equipped with at least one voltage detection (PT or electronic voltage sensor) on the power supply side for voltage measurement. Sectionalizing switches, interconnecting switches and demarcation switches must have the measurement functions of three-phase current, zero-sequence current and double-side zero-sequence voltage.
[0053] 2) In order to simplify the configuration, only the head-end sectionalizing switch, tie switch and boundary switch of the feeder are equipped with small current ground fault protection function and reclosing function. For these three types of switches, the ground protection delay is coordinated according to the three-level delay difference, with the difference of ΔT, the boundary switch delay is T0, the tie switch delay is T0+ΔT, and the head-end sectionalizing switch delay is T0+2*ΔT.
[0054] 3) All switches are equipped with a post-acceleration protection function. At present, most of the switches used in the actual field have only one zero-voltage transformer (sensor), which is installed on the power supply side or the load side. Considering the case of power transfer, if there is zero voltage in the incoming direction, but the zero-voltage transformer (sensor) is installed on the opposite side of the incoming direction, it will cause a zero-voltage mutation after closing the switch, thereby causing the switch to malfunction. Therefore, in order to avoid malfunction of the switch, the present invention requires that both sides of the switch have a zero-voltage transformer (sensor). After closing the switch, if the change value of the zero voltage on both sides is greater than the set value, it is considered that the switch is closed at the grounding fault point.
[0055] The zero voltage before closing is: U0dy1 (power supply side), U0fh1 (load side); the zero voltage after closing is: U0dy2 (power supply side), U0fh2 (load side); the sudden change setting value is U0set. It is considered a ground fault only if the two conditions of U0dy2-U0dy1>U0set and U0fh2-U0fh1>U0set are met. If one of them is not met, it is not a ground fault.
[0056] 4) The head-end sectionalizing switch and boundary switch are put into use with the transient ground fault protection function based on the zero-sequence model, and the processing logic does not need to judge the direction of the incoming call.
[0057] The contact switch can automatically or manually transfer power. The ground fault protection function based on the zero-sequence model transient power direction method is put into use, and the processing logic needs to determine the direction of the incoming power. The zero-sequence current sampling data is adaptively processed according to the power-on situation before closing. Before closing, Udy has pressure and Ufh has no pressure, and the power-on direction is recorded as positive; before closing, Udy has no pressure and Ufh has pressure, and the power-on direction is recorded as negative. According to the voltage direction before closing, the ground fault processing under normal power supply and transferred power supply is adaptive: a) When it is in the positive direction, the collected zero-sequence current remains unchanged, and the zero-sequence model transient power direction method processing steps are directly used; b) When it is in the reverse direction, the collected zero-sequence current direction must first be reversed. The specific operation can be to negative the sampling value of the zero-sequence current, and then use the zero-sequence model transient power direction method processing steps.
[0058] 5) Boundary switch: only protects single-phase ground faults on the distributed power supply side, and does not detect ground faults on the grid side. The boundary switch does not need to determine the power supply direction. The national standard "GB / T33593-2017 Distributed Power Supply Grid Connection Technology" requires: Distributed power sources should have the ability to quickly detect islands and immediately disconnect from the grid, and the anti-islanding protection action time is no more than 2s. The reclosing delay of the boundary switch needs to be considered in coordination with the DG islanding protection time to meet the fault handling requirements.
[0059] The following example explains the logic of automatic fault handling of feeder line after adaptive acceleration protection in detail. Figure 4 .
[0060] CB1-CB2: Substation outgoing line switch, For the combination, The secondary reclosing function is enabled, and the reclosing charging time is 20s; it has overcurrent protection function, but does not have small current grounding protection function.
[0061] FB1 and FB6: Head end sectionalizing switch, ● is closed, ○ is open. Low current ground fault protection function is activated (no need to identify the voltage direction before closing), delay is 2s; once reclosing function is activated, reclosing delay is 7s; after zero voltage acceleration protection function is activated, delay is 0.1s. X time is 21s; Y time is 5s; Z time is 0.5s. Reverse power is blocked to prevent power from being supplied to the substation during power transfer.
[0062] FB2 and FB5: non-head-end sectionalizing switch, ● is closed, ○ is open. After zero pressure is put into use, the acceleration protection function is activated, and the delay is 0.1s. Y time is 5s; Z time is 0.5s. The X time of FB2 is 7s, the X time of FB3 is 7s, the X time of FB4 is 21s, and the X time of FB5 is 7s.
[0063] LS: contact switch, automatic power transfer, For the combination, The low current ground fault protection function is activated (it is necessary to identify the voltage direction before closing, and the zero sequence model transient algorithm is adaptively processed according to the voltage direction before closing), with a delay of 1.5s; the one-time reclosing function is activated, and the reclosing delay is 7s; the zero voltage acceleration protection function is activated, and the delay is 0.1s. The XL time (delayed closing time after the contact switch loses pressure on one side) is 60s.
[0064] WY1-WY2: Boundary switch, ● is closed, ○ is open. The low current ground fault protection function is activated (no need to identify the voltage direction before closing), the delay is 1s; the one-time reclosing function is activated, the reclosing delay is 7s (greater than the maximum delay time of island protection); the reclosing detects pressure on one side, and the reclosing charging time is 20s. The acceleration protection function after zero pressure is activated, and the delay is 0.1s.
[0065] (I) Handling of permanent single-phase grounding fault in normal power supply
[0066] (1) Single-phase grounding fault on the main line
[0067] 1) A single-phase ground fault occurs between FB2 and FB3, and FB1 detects the ground fault characteristics.
[0068] 2) FB1 opens after the fault delay confirmation, and then FB2-FB5 opens due to pressure loss. LS starts XL timing.
[0069] 3) FB1 recloses after 21s, and FB2 closes after another 7s. Since it is closed due to a fault, the grounding feature is detected within the Y time (the zero voltage values on both sides suddenly increase), and then the protection is accelerated to open and the forward lock is set. FB3 detects the instantaneous voltage and sets the reverse lock.
[0070] 4) FB4 and FB5 are closed step by step successfully.
[0071] 5) After FB1 is opened for the first time, LS delays closing after 60s, and FB3 does not close due to reverse blocking.
[0072] The entire troubleshooting process is shown in Figure 5a-5d .
[0073] (2) Branch line single-phase grounding fault
[0074] A ground fault occurs on the load side of the boundary switch WY2, and both FB1 and WY2 detect a single-phase ground fault.
[0075] WY2 trips before FB1, and 7 seconds later WY2 recloses to the fault, and then accelerates the protection to open. The entire fault handling process is shown in Figure 5.
[0076] The entire troubleshooting process is shown in Figure 6a-6b .
[0077] (II) Handling of permanent single-phase grounding fault under power transfer
[0078] (1) Power transfer process
[0079] Assume that the feeder outage is caused by an internal fault in substation 1.
[0080] 1) FB1-FB5 will open due to pressure loss.
[0081] 2) LS starts XL timing.
[0082] 3) After 60s, LS delays closing. Before closing, there is voltage on the Udy side and no voltage on the Ufh side, and the voltage direction is recorded as negative.
[0083] 4) FB3, FB2, FB4, and FB5 are closed step by step successfully. Since FB1 is the head-end sectionalizing switch, it will not be closed in the reverse direction.
[0084] The entire failure process is shown in Figure 7a-Figure 7b .
[0085] (2) Single-phase grounding fault on the main line
[0086] 1) A single-phase grounding fault occurs between FB2 and FB3, and FB6 detects the grounding fault characteristics; since the voltage direction of LS is recorded as negative before closing, the grounding fault characteristics can also be detected after the zero-sequence current sampling value is reversed.
[0087] 2) After the fault delay is confirmed, LS opens before FB6, and then FB2-FB5 open due to pressure loss. LS starts the reclosing timing.
[0088] 3) LS recloses after 21s, and FB3 closes after another 7s. Since it is closed due to a fault, the grounding feature is detected within the Y time (the zero voltage values on both sides suddenly increase), and then the circuit breaker is opened at an accelerated speed and the forward lock is set. FB2 detects the instantaneous voltage and sets the reverse lock.
[0089] The entire troubleshooting process is shown in Figure 8a-8d .
[0090] (3) Branch line single-phase grounding fault
[0091] A ground fault occurs on the load side of the boundary switch WY2, and FB6 detects the ground fault characteristics; since the voltage direction of LS is recorded as negative before closing, the ground fault characteristics can also be detected after the zero-sequence current sampling value is reversed; WY2 detects the ground fault characteristics.
[0092] WY2 trips before FB6 and LS, and WY2 recloses 7s later, closing the circuit breaker to the fault, and then accelerating the protection to open the circuit breaker. The entire fault handling process is shown in Figure 9a-9b .
[0093] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Any technician familiar with the profession, without departing from the scope of the technical solution of the present invention, makes any simple modifications, equivalent changes and modifications to the above embodiments based on the technical essence of the present invention, which still fall within the scope of the technical solution of the present invention.
Claims
1. A method for handling single-phase grounding faults in a distribution network containing high-penetration distributed power sources, characterized in that: The outgoing line switches of the substation are all connected to the head-end sectionalizing switches. The switches along the line on one side are all non-head-end sectionalizing switches. The boundary switch is connected between the head-end sectionalizing switches and the non-head-end sectionalizing switches on the other side. All switches are equipped with delayed quick-break protection and one-time reclosing function. The processing method is as follows: Determine the power supply status; 1) Normal power supply, determine the fault location: the fault is located in the main line, the head-end sectionalizing switch is delayed to open, the non-head-end sectionalizing switch is opened due to loss of pressure, the head-end sectionalizing switch starts the first-stage delayed closing, after the head-end sectionalizing switch is closed, the non-head-end sectionalizing switches start the second-stage delayed closing in sequence, if the grounding feature is detected within the closing confirmation time after the switch is closed, the head-end sectionalizing switch or the non-head-end sectionalizing switch closed in the current time period is opened, and the forward lockout is set, and the head-end sectionalizing switch or the non-head-end sectionalizing switch adjacent to the positive direction of the current detects the instantaneous voltage and sets the reverse lockout to determine the fault location and complete the protection; When the fault is located on the branch line, the boundary switch opens before the head-end section switch, and the boundary switch starts the first-stage delay closing. If the grounding feature is detected within the closing confirmation time after the switch is closed, the boundary switch opens and sets the lock to complete the protection; 2) Transfer power supply and determine the fault location: the fault is inside the substation, the head-end sectional switch loses voltage and opens, the combined switch and the non-head-end sectional switch lose voltage and opens, the combined switch opens the third-level delayed closing, the combined switch marks the voltage direction as negative, the non-head-end sectional switches close in sequence, the head-end voltage reverses and the switch does not close, and the protection is completed; The fault is located in the main line. The head-end switch detects the grounding fault feature. Since the voltage direction of the combined switch is marked as negative before closing, the combined switch opens before the head-end sectional switch after the fault delay confirmation. The non-head-end sectional switch opens due to voltage loss. The combined switch starts the first-stage delay closing, and the non-head-end sectional switches start the second-stage delay closing in sequence. If the grounding feature is detected within the closing confirmation time after the switch is closed, the head-end sectional switch or the non-head-end sectional switch closed in the current time period will be opened, and the forward lockout will be set. After the head-end sectional switch or the non-head-end sectional switch adjacent to the positive direction of the current detects the instantaneous voltage, the reverse lockout will be set to determine the fault location and complete the protection. The fault is located on the branch line, and the fault handling process is the same as that in the normal power supply state; Wherein: the judgment basis for the fault location being located in the main line is whether the ground fault characteristics are detected on the load side of the boundary switch; When power is transferred, the basis for judging whether the fault location is inside the substation is whether the head-end sectionalizing switch is in the state of undervoltage tripping.
2. The method for handling single-phase grounding faults in a distribution network containing high-penetration distributed power sources according to claim 1, characterized in that: The closing confirmation time is shorter than the first-stage delayed closing time and the second-stage delayed closing time.
3. The method for handling single-phase grounding faults in a distribution network containing high-penetration distributed power sources according to claim 1, characterized in that: The substation outgoing line switch comprises a first substation outgoing line switch CB1 and a second substation outgoing line switch CB2, the first substation outgoing line switch CB1 and the second substation outgoing line switch CB2 are electrically connected to the substation, the first head-end section switch FB1, the first non-head-end section switch FB2, the second non-head-end section switch FB3, and the second head-end section switch FB6 are connected in series in sequence between the first substation outgoing line switch CB1 and the second substation outgoing line switch CB2, and a tie switch L is electrically connected between the second non-head-end section switch FB3 and the second head-end section switch FB6. S, a third non-first-end segment switch FB4 is electrically connected between the first first-end segment switch FB1 and the first non-first-end segment switch FB2, the third non-first-end segment switch FB4 is electrically connected to the fourth non-first-end segment switch FB5, the fourth non-first-end segment switch FB5 is electrically connected to the first boundary switch WY1, the first boundary switch WY1 is electrically connected to the first distributed power source DG1, the second boundary switch WY2 is electrically connected between the first non-first-end boundary switch FB2 and the second non-first-end boundary switch FB3, and the second boundary switch WY2 is electrically connected to the second distributed power source DG2.