A method for regulating water and sediment in small watersheds in loess plateau areas
Through the analysis and simulation of the plateau-SWMM hydrodynamic model and the WEP-L water-sand coupling model, the problem of water-sand regulation in small basins in the loess plateau area under extreme rainfall was solved, and the ability to prevent floods and respond to extreme weather was improved.
Patent Information
- Application Number
- CN202311766805.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-20
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2043-12-20
Smart Images

Figure CN117744525B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of water and sediment control, and in particular to a water and sediment control system method for a small watershed in a loess plateau area. Background Art
[0002] Heavy rainfall is an important cause of soil erosion on the Loess Plateau. Extreme rainfall is the main factor affecting soil erosion in the region, and its erosion and destructiveness to the soil is far greater than that of normal rainfall. Traditional soil and water conservation measures generally use a combination of engineering measures such as vegetation, horizontal ditches, fish scale pits, silt dams, and non-engineering measures to increase infiltration, reduce surface runoff, and reduce water flow energy. However, with the frequent occurrence of extreme rainfall, the traditional on-site governance model is increasingly facing challenges in dealing with extreme rainfall events. Summary of the invention
[0003] In view of the above-mentioned deficiencies in the prior art, the present invention provides a water and sediment control system method for a small watershed in the Loess Plateau area, which solves the problems of disordered "collection-convergence-drainage" water process on the plateau surface, chaotic drainage direction, and unsystematic various control engineering measures, resulting in low ability to resist extreme climate and inability to effectively cope with extreme rainfall weather.
[0004] In order to achieve the above-mentioned object of the invention, the technical solution adopted by the present invention is:
[0005] A method for regulating water and sediment in a small watershed in a loess plateau region is provided, which comprises the following steps:
[0006] S1. Select the plateaus that meet the screening criteria and their basic information, and collect the basic information of the surrounding small watersheds;
[0007] S2. Conduct temporal and spatial process analysis of extreme rainfall in the basin, set extreme rainfall scenarios, and obtain the maximum possible rainfall on the plateau surface;
[0008] S3. According to the basic information of the plateau surface, a plateau surface-SWMM hydrodynamic model is constructed and calibrated to obtain a calibrated plateau surface-SWMM hydrodynamic model;
[0009] S4. Use the calibrated plateau-SWMM hydrodynamic model to simulate and obtain the plateau multi-mode drainage process lines under different extreme rainfall conditions;
[0010] S5. Process the basic information of the small watershed, and construct a WEP-L water-sediment coupling model based on the processed basic information of the small watershed; calibrate the WEP-L water-sediment coupling model to obtain the calibrated WEP-L water-sediment coupling model;
[0011] S6. Use the calibrated WEP-L water-sediment coupling model to simulate and obtain the water-sediment process of each small watershed under different extreme rainfall conditions;
[0012] S7, according to the plateau multi-mode drainage process line obtained in step S4, the water and sediment process of each small watershed obtained in step S6 is analyzed to obtain each small watershed after screening, and the location, intensity and influence of soil and water loss risks corresponding to each small watershed after screening are determined;
[0013] S8. According to the location, intensity and influence of the soil erosion risk of each small watershed after screening, determine whether there is a reservoir in each small watershed after screening; if there is no reservoir, adjust the plateau control plan so that the transit water level of the small watershed does not exceed the flood control water level of each small watershed; otherwise, enter step S9;
[0014] S9. Conduct risk assessment on the reservoirs corresponding to the screened small watersheds to obtain risk evaluation of the reservoirs; regulate the small watersheds in the Loess Plateau area according to the risk evaluation of the reservoirs.
[0015] Furthermore, the selection criteria of the plateau in step S1 are: selecting an area with a slight degree of erosion, water system connectivity and a plateau area accounting for more than 10% of the area of the small watershed.
[0016] Furthermore, the basic information of the water area in step S1 includes DEM data, river network data, meteorological and hydrological data, land use data, water conservancy and soil and water conservation data, water system and water network data, rainfall data, vegetation index data, vegetation coverage, leaf area index, soil data and hydrogeological data; among them, land use data, water conservancy and soil and water conservation data, water system and water network data, and rainfall data are used to construct the plateau-SWMM hydrodynamic model; all data are used to construct the WEP-L water-sediment coupling model; river network data include water systems and divisions, river sections; meteorological and hydrological data include daily precipitation, hourly precipitation, wind speed, temperature, sunshine, humidity, measured runoff, and restored runoff.
[0017] Furthermore, step S2 further comprises:
[0018] S2-1. According to the meteorological and hydrological data and rainfall data, the rainfall frequency distribution curve is analyzed to obtain the rainfall events under different rainfall frequencies;
[0019] S2-2, set extreme rainfall scenarios according to rainfall events at different rainfall frequencies, and use the formula:
[0020]
[0021]
[0022] The design rainstorm intensity q of the screened plateau under the extreme rainfall scenario is obtained, that is, the maximum possible rainfall on the plateau surface; wherein, i represents the rainfall intensity of the screened plateau under the extreme rainfall scenario, A1, C, b, and n all represent constants, T represents the rainfall duration of the screened plateau under the extreme rainfall scenario, P represents the design recurrence period of the screened plateau under the extreme rainfall scenario, and lg represents a logarithmic function with base 10.
[0023] Furthermore, step S3 uses dynamic wave simulation hydrodynamic calculation to construct a plateau-SWMM hydrodynamic model, whose formula includes momentum equation and continuity equation, which are:
[0024]
[0025]
[0026] Among them, g represents the acceleration of gravity, A represents the cross-sectional area of the plateau after screening, h represents the water depth of the cross-sectional area A of the plateau after screening, x represents the distance from a fixed section along the flow path of the waterway, Q represents the cross-sectional flow rate of the plateau after screening, t represents time, Sf represents the energy drop caused by friction loss, represents the pressure and gravity terms, represents the acceleration of convection, Indicates the flow change item in and out of the control unit body, express, Represents the change in water volume in the control unit.
[0027] Furthermore, the processing process of the basic water area information in step S5 is as follows:
[0028] The river network codes, sub-basins and contour zones were divided, and the DEM data were processed and converted using ArcGIS to obtain the converted DEM data, flow direction, cumulative confluence number, confluence length, and grid slope data;
[0029] Process rainfall data and meteorological and hydrological data to obtain hourly rainfall;
[0030] The land use data, water conservancy and soil and water conservation data, vegetation index data, vegetation coverage, leaf area index, soil data and hydrogeological data are processed to obtain the processed land use data, water conservancy and soil and water conservation data, vegetation index data, vegetation coverage, leaf area index, soil data and hydrogeological data.
[0031] Furthermore, the processing process of rainfall data and meteorological and hydrological data is as follows:
[0032] The correlation coefficient between the station rainfall is obtained according to the rainfall data and meteorological and hydrological data, and the station daily rainfall is selected according to the correlation coefficient; based on the rainfall intensity duration formula, the rainfall-rainfall force relationship model and the rainfall-rainfall force-duration relationship model, the station daily rainfall is downscaled by the Thiessen polygon method to obtain the hourly rainfall; among which, the station daily rainfall is not less than 10mm.
[0033] Furthermore, step S9 further includes:
[0034] S9-1. Analyze and verify the water levels of the small watersheds on both sides of the plateau, simulate the calibrated plateau-SWMM hydrodynamic model, and obtain the corresponding plateau multi-mode drainage process line; obtain the flood peak flow of the small watershed based on the plateau multi-mode drainage process line of the small watershed;
[0035] S9-2, calculate according to the river network data to obtain the river gradient;
[0036] S9-3. According to the peak flow of the small watershed, combined with the cross-sectional shape of the small watershed and the river gradient, the peak water level of the small watershed is obtained;
[0037] S9-4. Analyze and verify the water storage capacity of the reservoir to obtain the flood control capacity of the reservoir;
[0038] S9-5. Conduct risk assessment on reservoirs based on the peak water level of small watersheds and the flood control capacity of reservoirs to obtain corresponding risk evaluation;
[0039] S9-6. Based on the risk assessment of the reservoir, formulate a regulation plan for the small watershed in the Loess Plateau area and regulate the small watershed in the Loess Plateau area according to the plan.
[0040] Furthermore, the formula for analyzing and verifying the reservoir water storage capacity in step S9-3 is:
[0041]
[0042] Among them, Q 初 represents the inflow of the reservoir at the beginning of the period, Q 末 represents the inflow of the reservoir at the end of the period, Δt represents the difference between the beginning and the end of the period, q 末 represents the outflow of the reservoir at the end of the period, q 初 represents the outflow of the reservoir at the beginning of the period, V 末 represents the reservoir water storage at the end of the period, V 初 It indicates the water storage capacity of the reservoir at the beginning of the time period.
[0043] Furthermore, the specific process of step S9-6 is as follows:
[0044] Based on the risk assessment of the reservoir and combined with the maximum possible rainfall on the plateau, a control plan is formulated, and it is determined whether there is a risk in the small watershed during heavy rain. If there is a risk, the control plan is modified and the drainage outlets of the small watershed without risk are opened; otherwise, the original control plan is followed.
[0045] The beneficial effects of the present invention are as follows: the method quantitatively analyzes and regulates the drainage conditions of each outlet of the tableland according to the real-time situation of the small watershed through the tableland-SWMM hydrodynamic model and the WEP-L water-sediment coupling model, effectively regulates the water flow in the small watershed, and improves the flood control and extreme weather resistance capabilities of the small watershed. In extreme rainstorm weather, the small watershed can be effectively managed and the problem of water loss control in the small watershed can be prevented, thereby improving the response capabilities of the small watershed in extreme weather. BRIEF DESCRIPTION OF THE DRAWINGS
[0046] Figure 1 It is a specific flow chart of the present invention;
[0047] Figure 2 It is a result simulation diagram of the present invention;
[0048] Figure 3 It is a line diagram of the plateau multi-mode drainage process of the present invention;
[0049] Figure 4 It is the runoff process line diagram of the small watershed 1 of the present invention;
[0050] Figure 5 It is the runoff process line diagram of small watershed 3 of the present invention. DETAILED DESCRIPTION
[0051] The specific implementation modes of the present invention are described below to facilitate those skilled in the art to understand the present invention. However, it should be clear that the present invention is not limited to the scope of the specific implementation modes. For those of ordinary skill in the art, as long as various changes are within the spirit and scope of the present invention as defined and determined by the attached claims, these changes are obvious, and all inventions and creations utilizing the concept of the present invention are protected.
[0052] like Figure 1 , Figure 2 , Figure 3 , Figure 4 and Figure 5 As shown, a water and sediment control system method for a small watershed in a loess plateau area includes the following steps:
[0053] S1, selecting a plateau that meets the screening criteria and basic information of its plateau surface, and collecting basic information of its surrounding small watersheds; in the present invention, the surrounding small watersheds include small watershed 1, small watershed 2, and small watershed 3, and the objects of subsequent processing related to the small watersheds are all these three small watersheds;
[0054] S2. Conduct temporal and spatial process analysis of extreme rainfall in the basin, set extreme rainfall scenarios, and obtain the maximum possible rainfall on the plateau surface;
[0055] S3. According to the basic information of the plateau surface, a plateau surface-SWMM hydrodynamic model is constructed and calibrated to obtain a calibrated plateau surface-SWMM hydrodynamic model;
[0056] S4. Use the calibrated plateau-SWMM hydrodynamic model to simulate and obtain the plateau multi-mode drainage process lines under different extreme rainfall conditions;
[0057] S5. Process the basic information of the small watershed, and construct a WEP-L water-sediment coupling model based on the processed basic information of the small watershed; calibrate the WEP-L water-sediment coupling model to obtain the calibrated WEP-L water-sediment coupling model;
[0058] S6. Use the calibrated WEP-L water-sediment coupling model to simulate and obtain the water-sediment process of each small watershed under different extreme rainfall conditions;
[0059] S7, according to the plateau multi-mode drainage process line obtained in step S4, the water and sediment process of each small watershed obtained in step S6 is analyzed to obtain each small watershed after screening, and the location, intensity and influence of soil and water loss risks corresponding to each small watershed after screening are determined;
[0060] S8. According to the location, intensity and influence of the soil erosion risk of each small watershed after screening, determine whether there is a reservoir in each small watershed after screening; if there is no reservoir, adjust the plateau control plan so that the transit water level of the small watershed does not exceed the flood control water level of each small watershed; otherwise, enter step S9;
[0061] S9. Conduct risk assessment on the reservoirs corresponding to the screened small watersheds to obtain risk evaluation of the reservoirs; regulate the small watersheds in the Loess Plateau area according to the risk evaluation of the reservoirs.
[0062] The selection criteria of the plateau in step S1 are: selecting areas with a slight degree of erosion, water system connectivity and a plateau area that accounts for more than 10% of the area of the small watershed.
[0063] The basic information of the water area in step S1 includes DEM data, river network data, meteorological and hydrological data, land use data, water conservancy and soil and water conservation data, water system and water network data, rainfall data, vegetation index data, vegetation coverage, leaf area index, soil data and hydrogeological data; among them, land use data, water conservancy and soil and water conservation data, water system and water network data, and rainfall data are used to construct the plateau-SWMM hydrodynamic model; all data are used to construct the WEP-L water-sediment coupling model; river network data include water systems and divisions, river sections; meteorological and hydrological data include daily precipitation, hourly precipitation, wind speed, temperature, sunshine, humidity, measured runoff, and restored runoff.
[0064] Step S2 further comprises:
[0065] S2-1. According to the meteorological and hydrological data and rainfall data, the rainfall frequency distribution curve is analyzed to obtain the rainfall events under different rainfall frequencies;
[0066] S2-2, set extreme rainfall scenarios according to rainfall events at different rainfall frequencies, and use the formula:
[0067]
[0068]
[0069] The design rainstorm intensity q of the screened plateau under the extreme rainfall scenario is obtained, that is, the maximum possible rainfall on the plateau surface; wherein, i represents the rainfall intensity of the screened plateau under the extreme rainfall scenario, A1, C, b, and n all represent constants, T represents the rainfall duration of the screened plateau under the extreme rainfall scenario, P represents the design recurrence period of the screened plateau under the extreme rainfall scenario, and lg represents a logarithmic function with base 10.
[0070] Step S3 uses dynamic wave simulation hydrodynamic calculation to construct the plateau-SWMM hydrodynamic model, whose formula includes momentum equation and continuity equation, which are:
[0071]
[0072]
[0073] Among them, g represents the acceleration of gravity, A represents the cross-sectional area of the plateau after screening, h represents the water depth of the cross-sectional area A of the plateau after screening, x represents the distance from a fixed section along the flow path of the waterway, Q represents the cross-sectional flow rate of the plateau after screening, t represents time, Sf represents the energy drop caused by friction loss, represents the pressure and gravity terms, represents the acceleration of convection, Indicates the flow change item in and out of the control unit body, express, Represents the change in water volume in the control unit.
[0074] The processing process of the basic water area information in step S5 is as follows:
[0075] The river network codes, sub-basins and contour zones were divided, and the DEM data were processed and converted using ArcGIS to obtain the converted DEM data, flow direction, cumulative confluence number, confluence length, and grid slope data;
[0076] Process rainfall data and meteorological and hydrological data to obtain hourly rainfall;
[0077] The land use data, water conservancy and soil and water conservation data, vegetation index data, vegetation coverage, leaf area index, soil data and hydrogeological data are processed to obtain the processed land use data, water conservancy and soil and water conservation data, vegetation index data, vegetation coverage, leaf area index, soil data and hydrogeological data.
[0078] The processing process of rainfall data and meteorological and hydrological data is as follows:
[0079] The correlation coefficient between the station rainfall is obtained according to the rainfall data and meteorological and hydrological data, and the station daily rainfall is selected according to the correlation coefficient; based on the rainfall intensity duration formula, the rainfall-rainfall force relationship model and the rainfall-rainfall force-duration relationship model, the station daily rainfall is downscaled by the Thiessen polygon method to obtain the hourly rainfall; among which, the station daily rainfall is not less than 10mm.
[0080] Step S9 further comprises:
[0081] S9-1. Analyze and verify the water levels of the small watersheds on both sides of the plateau, simulate the calibrated plateau-SWMM hydrodynamic model, and obtain the corresponding plateau multi-mode drainage process line; obtain the flood peak flow of the small watershed based on the plateau multi-mode drainage process line of the small watershed;
[0082] S9-2, calculate according to the river network data to obtain the river gradient;
[0083] S9-3. According to the peak flow of the small watershed, combined with the cross-sectional shape of the small watershed and the river gradient, the peak water level of the small watershed is obtained;
[0084] S9-4. Analyze and verify the water storage capacity of the reservoir to obtain the flood control capacity of the reservoir;
[0085] S9-5. Conduct risk assessment on reservoirs based on the peak water level of small watersheds and the flood control capacity of reservoirs to obtain corresponding risk evaluation;
[0086] S9-6. Based on the risk assessment of the reservoir, formulate a regulation plan for the small watershed in the Loess Plateau area and regulate the small watershed in the Loess Plateau area according to the plan.
[0087] The formula for analyzing and verifying the reservoir water storage capacity in step S9-3 is:
[0088]
[0089] Among them, Q 初 represents the inflow of the reservoir at the beginning of the period, Q 末 represents the inflow of the reservoir at the end of the period, Δt represents the difference between the beginning and the end of the period, q 末 represents the outflow of the reservoir at the end of the period, q 初 represents the outflow of the reservoir at the beginning of the period, V 末 represents the reservoir water storage at the end of the period, V 初 It indicates the water storage capacity of the reservoir at the beginning of the time period.
[0090] The specific process of step S9-6 is:
[0091] Based on the risk assessment of the reservoir and combined with the maximum possible rainfall on the plateau, a control plan is formulated, and it is determined whether there is a risk in the small watershed during heavy rain. If there is a risk, the control plan is modified and the drainage outlets of the small watershed without risk are opened; otherwise, the original control plan is followed.
[0092] In one embodiment of the present invention, when screening the plateau, when the edge of the plateau is about 5°, that is, in the range of 4.9 to 5.1°, the screening condition is also met.
[0093] The formulas for rainfall intensity duration formula, rainfall amount-rainfall force relationship model and rainfall amount-rainfall force-duration relationship model are:
[0094]
[0095] S=a i H+b i +ε i
[0096]
[0097] Where i represents the rainfall intensity, S represents the rain force, n represents the rainfall attenuation coefficient, and T n represents the rainfall duration when the rainfall attenuation coefficient is n, T n-1 represents the rainfall duration when the rainfall attenuation coefficient is n-1, a i , b i represents the parameter, H represents the daily rainfall, b i It means that ε i Represents the residual.
[0098] The calculation formula for river gradient is:
[0099]
[0100] Among them, J represents the river gradient, H1 represents the source elevation, H0 represents the estuary elevation, and L represents the length of the river.
[0101] When the flood peak water level of a small watershed exceeds the flood control water level of the small watershed, overflow will occur at this node, and it will be a risk section. When the water storage capacity of a reservoir exceeds the flood control storage capacity of the reservoir, the reservoir is prone to dam breach, and it will be a risk section.
[0102] In summary, the present invention uses the tableland-SWMM hydrodynamic model and the WEP-L water-sediment coupling model to quantitatively analyze and regulate the drainage conditions of each tableland outlet according to the real-time situation of the small watershed, effectively regulate the water flow in the small watershed, and improve the flood control and extreme weather resistance capabilities of the small watershed. In extreme rainstorm weather, the small watershed can be effectively managed and the problem of water loss control in the small watershed can be prevented, thereby improving the response capabilities of the small watershed in extreme weather.
Claims
1. A method for regulating water and sediment in a small watershed in a loess plateau region, characterized in that: The following steps are involved: S1. Select the plateaus that meet the screening criteria and their basic information, and collect the basic information of the surrounding small watersheds; S2. Conduct temporal and spatial process analysis of extreme rainfall in the basin, set extreme rainfall scenarios, and obtain the maximum possible rainfall on the plateau surface; S3. According to the basic information of the plateau surface, a plateau surface-SWMM hydrodynamic model is constructed and calibrated to obtain a calibrated plateau surface-SWMM hydrodynamic model; S4. Use the calibrated plateau-SWMM hydrodynamic model to simulate and obtain the plateau multi-mode drainage process lines under different extreme rainfall conditions; S5. Process the basic information of the small watershed, and construct a WEP-L water-sediment coupling model based on the processed basic information of the small watershed; calibrate the WEP-L water-sediment coupling model to obtain the calibrated WEP-L water-sediment coupling model; S6. Use the calibrated WEP-L water-sediment coupling model to simulate and obtain the water-sediment process of each small watershed under different extreme rainfall conditions; S7, according to the plateau multi-mode drainage process line obtained in step S4, the water and sediment process of each small watershed obtained in step S6 is analyzed to obtain each small watershed after screening, and the location, intensity and influence of soil and water loss risks corresponding to each small watershed after screening are determined; S8. Determine whether there is a reservoir in each of the screened small watersheds based on the location, intensity and influence of soil erosion risk in each of the screened small watersheds; If there is no reservoir, the plateau control scheme is adjusted so that the transit water level of the small watershed does not exceed the flood control water level of each small watershed; otherwise, the process goes to step S9; S9, conducting risk assessment on the reservoirs corresponding to each small watershed after screening to obtain a risk assessment of the reservoirs; According to the risk assessment of the reservoir, the small watershed in the loess plateau area is regulated; The step S2 further comprises: S2-1. According to the meteorological and hydrological data and rainfall data, the rainfall frequency distribution curve is analyzed to obtain the rainfall events under different rainfall frequencies; S2-2, set extreme rainfall scenarios according to rainfall events at different rainfall frequencies, and use the formula: The design rainstorm intensity q of the selected plateau under the extreme rainfall scenario is obtained, that is, the maximum possible rainfall on the plateau surface; wherein, i represents the rainfall intensity of the selected plateau under the extreme rainfall scenario, A1, C, b, n all represent constants, T represents the rainfall duration of the selected plateau under the extreme rainfall scenario, P represents the design recurrence period of the selected plateau under the extreme rainfall scenario, and lg represents a logarithmic function with a base of 10; The step S3 uses dynamic wave simulation hydrodynamic calculation to construct a plateau-SWMM hydrodynamic model, and its formula includes momentum equation and continuity equation, which are respectively: Among them, g represents the acceleration of gravity, A represents the cross-sectional area of the plateau after screening, h represents the water depth of the cross-sectional area A of the plateau after screening, x represents the distance from a fixed section along the flow path of the waterway, Q represents the cross-sectional flow rate of the plateau after screening, t represents time, Sf represents the energy drop caused by friction loss, represents the pressure and gravity terms, represents the acceleration of convection, Indicates the flow change item in and out of the control unit body, represents the variation of flow along the length of the river, Represents the change in water volume in the control unit.
2. The method for regulating water and sediment in a small watershed in a loess plateau according to claim 1, characterized in that: The selection criteria of the plateau in step S1 are: selecting an area with a slight degree of erosion, a connected water system and a plateau area accounting for more than 10% of the area of the small watershed.
3. The method for regulating water and sediment in a small watershed in a loess plateau region according to claim 1, characterized in that: The basic information of the water area in step S1 includes DEM data, river network data, meteorological and hydrological data, land use data, water conservancy and soil and water conservation data, water system and water network data, rainfall data, vegetation index data, vegetation coverage, leaf area index, soil data and hydrogeological data; among them, land use data, water conservancy and soil and water conservation data, water system and water network data, and rainfall data are used to construct the plateau-SWMM hydrodynamic model; all data are used to construct the WEP-L water-sediment coupling model; the river network data include water systems and divisions, river sections; the meteorological and hydrological data include daily precipitation, hourly precipitation, wind speed, temperature, sunshine, humidity, measured runoff, and restored runoff.
4. The method for regulating water and sediment in a small watershed in a loess plateau according to claim 1, characterized in that: The processing process of the basic water area information in step S5 is as follows: The river network codes, sub-basins and contour zones were divided, and the DEM data were processed and converted using ArcGIS to obtain the converted DEM data, flow direction, cumulative confluence number, confluence length, and grid slope data; Process rainfall data and meteorological and hydrological data to obtain hourly rainfall; The land use data, water conservancy and soil and water conservation data, vegetation index data, vegetation coverage, leaf area index, soil data and hydrogeological data are processed to obtain the processed land use data, water conservancy and soil and water conservation data, vegetation index data, vegetation coverage, leaf area index, soil data and hydrogeological data.
5. The method for regulating water and sediment in a small watershed in a loess plateau region according to claim 4 is characterized by: The processing process of the rainfall data and meteorological and hydrological data is as follows: The correlation coefficient between the station rainfall is obtained according to the rainfall data and meteorological and hydrological data, and the station daily rainfall is selected according to the correlation coefficient; based on the rainfall intensity duration formula, the rainfall-rainfall force relationship model and the rainfall-rainfall force-duration relationship model, the station daily rainfall is downscaled by the Thiessen polygon method to obtain the hourly rainfall; among which, the station daily rainfall is not less than 10mm.
6. The method for regulating water and sediment in a small watershed in a loess plateau region according to claim 4, characterized in that: The step S9 further comprises: S9-1. Analyze and verify the water levels of the small watersheds on both sides of the plateau, simulate the calibrated plateau-SWMM hydrodynamic model, and obtain the corresponding plateau multi-mode drainage process line; obtain the flood peak flow of the small watershed based on the plateau multi-mode drainage process line of the small watershed; S9-2, calculate according to the river network data to obtain the river gradient; S9-3. According to the peak flow of the small watershed, combined with the cross-sectional shape of the small watershed and the river gradient, the peak water level of the small watershed is obtained; S9-4. Analyze and verify the water storage capacity of the reservoir to obtain the flood control capacity of the reservoir; S9-5. Conduct risk assessment on reservoirs based on the peak water level of small watersheds and the flood control capacity of reservoirs to obtain corresponding risk evaluation; S9-6. Based on the risk assessment of the reservoir, formulate a regulation plan for the small watershed in the Loess Plateau area and regulate the small watershed in the Loess Plateau area according to the plan.
7. The method for regulating water and sediment in a small watershed in a loess plateau region according to claim 6 is characterized by: The formula for analyzing and verifying the reservoir water storage capacity in step S9-3 is: Among them, Q 初 represents the inflow of the reservoir at the beginning of the period, Q 末 represents the inflow of the reservoir at the end of the period, Δt represents the difference between the beginning and the end of the period, q 末 represents the outflow of the reservoir at the end of the period, q 初 represents the outflow of the reservoir at the beginning of the period, V 末 represents the reservoir water storage at the end of the period, V 初 It represents the water storage capacity of the reservoir at the beginning of the time period.
8. The method for regulating water and sediment in a small watershed in a loess plateau region according to claim 6, characterized in that: The specific process of step S9-6 is as follows: According to the risk assessment of the reservoir and the maximum possible rainfall on the plateau, a control plan is formulated, and whether there is a risk in the small watershed during heavy rain weather is determined; if there is a risk, the control plan is modified and the drainage outlets of the small watershed without risk are arranged to be opened; Otherwise, it will operate according to the original control plan.