Active power control method and system for terminal distribution network
By constructing the objective function of the load response reliability index in the terminal distribution network, the problem of control accuracy under the influence of user power consumption habits and equipment failures is solved, and the stability and execution efficiency of the power system are improved.
Patent Information
- Application Number
- CN202410023614.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-05
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2044-01-05
AI Technical Summary
The existing technology in the terminal distribution network is affected by factors such as user power consumption habits and occasional equipment failures, resulting in control accuracy problems, load response reliability is difficult to effectively achieve, and affects the stability of power grid peak regulation and frequency modulation control.
By obtaining the load response reliability index, construct an objective function that maximizes the load response reliability index, and add it to power balance control and peak shaving control to form multi-objective control, correct regulation instructions, and improve response accuracy.
It effectively improves the execution accuracy of control instructions, improves the frequency stability of the power system, avoids repeated dispatching, and improves the execution efficiency of the power automation system.
Smart Images

Figure CN117748626B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of power system control, and in particular to an active power control method and system for a terminal distribution network. Background Art
[0002] With the continuous increase in the installed capacity of wind power and photovoltaic clean energy, the penetration rate and adjustable load of distributed wind power and distributed photovoltaic on the demand side have increased rapidly, and the participation of the demand side in the control process of power grid power balance, peak load regulation, and frequency regulation has become a hot topic in current research and demonstration. With the application of advanced measurement systems and intelligent control, the demand response (DR) technology of terminal distribution networks has been enhanced. In addition to adding energy storage devices to assist in grid control, load aggregators (LA) can also use direct load control to reduce demand-side electricity consumption in real time, responding to power system power balance, peak load regulation, and frequency regulation control.
[0003] The terminal distribution network has abundant adjustable resources, among which air-conditioning load has fast response speed, great adjustment potential and little impact on users' lives. Industrial load has complete infrastructure, large load capacity and strong willingness to participate in DR, which is an ideal direct-controlled load for participating in power grid peak regulation. The current related research and application mainly focus on the regulation strategy of air-conditioning load and industrial load. Considering the operating characteristics of air-conditioning load and its cluster and user comfort, the active power regulation model of air-conditioning load is established, and a centralized optimization and autonomous response variable frequency air-conditioning cluster regulation strategy is proposed; the regulation potential of industrial load is explored, and the influence of factory production process on load power is combined to propose a power grid DR regulation strategy taking into account the characteristics of industrial load.
[0004] However, in the actual response process, affected by the user's own behavior and equipment failure status, some DR equipment often cannot respond effectively, and the actual load reduction is difficult to achieve the expected amount. With the gradual increase in the reliance of new power systems on DR, the impact of DR reliability on system safety and stability cannot be ignored; at the same time, with the increasing number of load types participating in DR, a response reliability model that considers different load characteristics is also urgently needed.
[0005] The ability of the load to stably reduce a given power value within a specified time after receiving a DR instruction is called the load response reliability. At present, the research and application of related issues of load response reliability mainly include: using probability distribution functions to simulate exogenous and endogenous uncertainties on the demand side, and establishing a DR capability reliability evaluation method; considering the uncertainty of statistical laws themselves, optimizing LA scheduling by establishing a fuzzy random programming model, and proposing a response capacity credibility to measure the load response potential; referring to traditional generators, building a multi-state model of demand-side reliability, and analyzing the impact of cyber-physical system coupling, user response uncertainty, and distribution network reliability constraints on LA on demand-side response reliability.
[0006] Current research and applications all use deterministic models to describe the DR control effect of loads and generate control strategies, ignoring the fact that the actual response capability of the terminal distribution network load will be affected by factors such as user electricity usage habits and occasional equipment failures. Therefore, the problem of control accuracy is prominent, and it is necessary to include consideration of load response reliability in the optimization control objective of DR. Summary of the invention
[0007] In view of the defects of the prior art and the need for improvement, the purpose of the present invention is to provide a refined active power control technology for terminal distribution networks, aiming to solve the problem of regulation accuracy caused by factors such as user power consumption habits and occasional equipment failures in the existing control technology of terminal distribution networks.
[0008] In order to achieve the above technical objectives, the present application provides a method for controlling active power of a terminal distribution network, comprising the following steps:
[0009] Based on the load operation characteristics of the terminal distribution network, a load response reliability index for reflecting the impact on load response accuracy is obtained;
[0010] Based on the load response reliability index, a first objective function that maximizes the load response reliability index is constructed and added to the second objective function of power balance control, peak load control or frequency regulation control of the terminal distribution network to form a multi-objective control, thereby correcting the control power deviation caused by user power usage habits and equipment sporadic factors and improving the execution accuracy of control instructions.
[0011] Preferably, in the process of obtaining the load response reliability index, based on the load operation characteristics, the factors affecting the load response accuracy are analyzed from two aspects: user behavior and equipment failure, and a load response reliability index that comprehensively reflects the factors affecting the load response accuracy is obtained.
[0012] Preferably, in the process of analyzing factors affecting load response accuracy, for air conditioning load, factors that reduce response reliability due to user behavior include:
[0013] 1.1) The air conditioner switch state changes within the response cycle;
[0014] 1.2) The air conditioning set temperature is adjusted within the response period;
[0015] 1.3) Frequent responses lead to a decline in user experience and response fatigue;
[0016] For industrial users, factors that reduce their response reliability include:
[0017] 2.1) The marginal cost of industrial users participating in DR increases with the increase of response capacity, resulting in a decrease in their willingness to respond;
[0018] 2.2) When EBE participates in DR, the risk reserve of factory production is reduced, the economic loss when encountering risks is increased, and the user's DR willingness decreases;
[0019] 2.3) Frequent responses interfere with normal factory production and industrial users become response fatigued.
[0020] Preferably, in the process of obtaining the load response reliability index, the load response reliability index is expressed as:
[0021]
[0022]
[0023]
[0024]
[0025] Among them, λ AC,RR , MT,RR , AF,RR and λ EBE,RR Respectively represent the response reliability index of air conditioning load, machine tool load, arc furnace load and EBE load; λ AC,EUP , AC,CF , AC,RF , AC,EF The power consumption period index, comfort index, response fatigue index, and equipment failure index, which are the factors affecting the reliability of air-conditioning load response, are represented respectively; MLS,RC , MLS,RF , MLS,EF They represent the response capacity index, response fatigue index, and equipment failure index of the factors affecting the reliability of industrial load response; EBE,BR , EBE,EF They represent the response reserve index and equipment failure index of the factors affecting EBE response reliability respectively.
[0026] Preferably, in the process of constructing the first objective function, the first objective function is expressed as:
[0027]
[0028] Among them, u AC,i 、u MT,i 、u AF,i and u EBE,i is the DR state variable of air conditioning load, machine tool load, arc furnace load and EBE load; AC,RR,i , MT,RR,i , AF,RR,i and λ EBE,RR,irepresents the response reliability index of the i-th air conditioner load, machine tool load, arc furnace load or EBE load; N AC 、N MT 、N AF 、N EBE They respectively represent the number of air conditioning loads, machine tool loads, arc furnace loads or EBE loads that can be controlled in LA.
[0029] Preferably, in the process of forming the multi-objective control, the multi-objective control is achieved by setting the power balance constraint and the load constraint based on the first objective function and the second objective function.
[0030] Preferably, in the process of setting the power balance constraint, the power balance constraint is expressed as:
[0031]
[0032] Among them, P sys,t is the expected DR capacity received by LA at time t; P loss,t is the capacity deviation of the actual response of LA; ΔP A,Ci,t 、AP EBE,t They represent the load of the i-th air conditioner or the capacity of the EBE load reduction at time t; ΔP MT,t , ΔP AF,t They respectively represent the total capacity of machine tool load and arc furnace load reduction at time t.
[0033] Preferably, in the process of setting load constraints, load constraints are generated by setting air conditioning load comfort constraints, light industrial machine tool power reduction constraints, steelmaking arc furnace power reduction constraints and in-plant energy backup equipment constraints, wherein the air conditioning load comfort constraints are used to constrain the air conditioning set temperature to be within the general human comfort temperature range, the light industrial machine tool power reduction constraints are used to respond to power grid peak load instructions, and the steelmaking arc furnace power reduction constraints are used to adjust the arc furnace power to achieve load reduction while ensuring that the total melting energy of the arc furnace remains unchanged; the in-plant energy backup equipment constraints are used to ensure that sensitive equipment can still maintain normal operation in unexpected situations.
[0034] Preferably, among industrial users, when considering EBE to participate in DR, it is assumed that EBE is only used when the total capacity of other adjustable loads cannot meet P sys,t Participate in the response at any time, and limit the number of responses per day.
[0035] The present invention discloses an active power control system for a terminal distribution network, comprising:
[0036] A reliability evaluation module, used to obtain a load response reliability index reflecting the impact on load response accuracy based on load operation characteristics of the terminal distribution network;
[0037] The multi-objective control module is used to construct a first objective function that maximizes the load response reliability index based on the load response reliability index, and add it to the second objective function of the power balance control, peak load control or frequency regulation control of the terminal distribution network to form a multi-objective control, thereby correcting the control power deviation caused by the user's power consumption habits and the occasional factors of the equipment, and improving the execution accuracy of the control instructions.
[0038] The present invention discloses the following technical effects:
[0039] The present invention takes into account the impact of user behavior on the execution effect of direct-controlled loads, quantifies the impact as a load response reliability index, and adds the goal of maximizing the load response reliability index in the control processes such as power balance control, peak-shaving control, and frequency regulation control. This can effectively solve the main problem of the impact of user behavior on the execution effect of direct-controlled loads, greatly improve the control execution accuracy, and indirectly improve the frequency stability of the power system.
[0040] The present invention improves the execution accuracy of peak-shaving control, frequency-modulation control and other controls, can achieve one-step control, effectively avoids the dispatcher from repeatedly sending peak-shaving control and frequency-modulation control instructions, and improves the execution efficiency of the power automation system. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0042] Figure 1 It is a flow chart of the terminal distribution network response peak load control described in the present invention;
[0043] Figure 2 It is a schematic diagram of the principle of EBE participating in DR according to the present invention. DETAILED DESCRIPTION
[0044] To make the purpose, technical scheme and advantages of the embodiments of the present application clearer, the technical scheme in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments. The components of the embodiments of the present application generally described and shown in the drawings here can be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present application provided in the drawings is not intended to limit the scope of the application claimed for protection, but merely represents the selected embodiments of the present application. Based on the embodiments of the present application, all other embodiments obtained by those skilled in the art without making creative work belong to the scope of protection of the present application.
[0045] like Figure 1-2 As shown, the present invention provides a terminal distribution network refined active power control technology, including the following contents:
[0046] Step 1: Based on the load operation characteristics, analyze the factors affecting the load response accuracy from the two aspects of user behavior and equipment failure;
[0047] Step 2, define a load response reliability index that comprehensively reflects the factors affecting load response accuracy;
[0048] Step 3: Establish a load response reliability model, add a load response reliability index objective function to the existing power balance control, peak load control or frequency regulation control objective function, and construct a multi-objective control to correct the control power deviation caused by factors such as user power usage habits and equipment sporadicity, thereby improving the execution accuracy of control instructions.
[0049] Factors affecting load response accuracy. For air conditioning loads, factors that reduce response reliability due to user behavior can be summarized into three categories:
[0050] 1) The air conditioner switch status changes within the response cycle (for example, the user turns off the air conditioner before going out for a long time);
[0051] 2) The air conditioner set temperature is adjusted within the response period (some users who are more sensitive to temperature changes and have higher comfort requirements adjust the set temperature during DR);
[0052] 3) Frequent responses result in a decline in user experience and response fatigue.
[0053] Factors affecting load response accuracy. For industrial users, there are three types of factors that reduce the reliability of their response:
[0054] 1) The marginal cost of industrial users participating in DR increases with the increase of response capacity, resulting in a decrease in their willingness to respond;
[0055] 2) When EBE participates in DR, the risk reserve of factory production decreases, the economic loss when encountering risks increases, and the user's DR willingness decreases.
[0056] 3) Frequent responses interfere with normal factory production, and industrial users become fatigued;
[0057] Load response reliability index λ RR It can be defined as: a normalized measure of the degree of influence of load response reliability-related influencing factors on response reliability. RR The size of λ represents the probability that the load effectively responds to the LA command. RR The closer it is to 1, the smaller the impact of the influencing factor on the load and the greater the response reliability. The calculation formula is:
[0058]
[0059] Where: AC,RR , MT,RR , AF,RR and λ EBE,RR Respectively represent the response reliability index of air conditioning load, machine tool load, arc furnace load and EBE load; λ AC,EUP , AC,CF , AC,RF , AC,EF The power consumption period index, comfort index, response fatigue index, and equipment failure index, which are the factors affecting the reliability of air-conditioning load response, are represented respectively; MLS,RC , MLS,RF , MLS,EF They represent the response capacity index, response fatigue index, and equipment failure index of the factors affecting the reliability of industrial load response; EBE,BR , EBE,EF They represent the response reserve index and equipment failure index of the factors affecting EBE response reliability respectively.
[0060] Electricity consumption period index λ AC,EUP It reflects the probability of the air conditioner switch state changing during DR. AC,EUP The smaller the value is, the lower the fit between the DR period and the user's habitual electricity consumption period is. Therefore, the greater the probability of the air conditioner switching state changing during the DR period, the greater the weakening of the response reliability. Based on the user's historical electricity consumption data, the K-means algorithm is used to obtain the user's typical daily electricity consumption curve. Based on this, similar typical daily electricity consumption curves are clustered again to summarize the electricity consumption period preference curve clusters. According to the electricity consumption period curve clusters, by analyzing the peak electricity consumption period [t start ,t end ] and the response time t, λ can be calculated AC,EUP, the relevant formula is shown in formula (2). When the cluster center curve has multiple peak periods in a day, the period closer to the response time is preferred for calculation.
[0061]
[0062] Where: t start ,t mid and t end Respectively represent the starting time, middle time and end time of the peak power consumption period; P λ is the judgment power during peak hours, preferably 0.95 times of the average power; T is 24h.
[0063] Comfort index λ AC,CF Reflects the probability that the air conditioning set temperature will be adjusted during the DR period. AC,CF The smaller the value, the lower the fit between the set temperature and the user's expected temperature. The user is more likely to adjust the set temperature, which reduces the reliability of the air conditioner's response. The range of LA set temperature is determined by a questionnaire survey in advance, but different users have different sensitivities to temperature. Therefore, the influence of LA set temperature on their comfort is different. AC,CF It can be calculated by formula (3).
[0064]
[0065] Where: T AC Set the temperature for the air conditioner; T set,max and T set,min LA respectively represents the upper and lower limits of the air conditioning temperature; T e,max and T e,min They respectively represent the upper and lower limits of the temperature expected by the user.
[0066] Response capacity index λ MLS,RC It reflects the impact of the response capacity of the manufacturing line scheduling (MLS) on the willingness of industrial users to participate in DR. MLS,RC The smaller it is, the more the capacity of light industrial machine tools will be interrupted or the power of steelmaking arc furnaces will be reduced in a single response. The greater the impact of assembly line stagnation and scrap steel accumulation on the production efficiency of light industrial enterprises and steel enterprises, the lower the DR willingness of industrial users. MLS,RC The calculation is shown in formula (4).
[0067]
[0068] Where: S MLS,i It can represent the number of intermediate products accumulated in the assembly line of the i-th light industrial enterprise or the stock of scrap steel to be melted in the i-th electric arc furnace; S MLS,i,maxIndicates the maximum value of the product accumulation of the production line or the maximum scrap steel inventory to be melted in the electric arc furnace; ΔP MLS,i It can represent the power reduction value of the i-th light industrial enterprise or the i-th electric arc furnace; ΔP MLS,i,max is the maximum value of the corresponding equipment power reduction; β MLS,i It can represent the number of machine tools interrupted by the i-th light industrial enterprise β MT,i Or the regulation level β of the i-th electric arc furnace AF,i β MLS,i,max The corresponding β MT,i,max or β AF,i,max .
[0069] Response Alternative Indicator λ EBE,BR This reflects the risk of insufficient production reserves for users caused by EBE's participation in DR during factory production. EBE,BR The smaller the SOC, the less the reserve resources in the plant. The shorter the time that sensitive equipment can be kept running in the event of an unexpected power outage, that is, the greater the economic risk borne by the user. The reserve resources in the plant can be calculated by the equivalent charge capacity SOC EBE If λ EBE,BR The specific calculation is:
[0070]
[0071] Where: SOC EBE,min It is the minimum equivalent charge capacity, which is determined based on the minimum capacity limit of the risk reserve within the plant.
[0072] Response fatigue index λ RF This reflects the response fatigue problem caused by the frequent participation of MLS in DR in air conditioning load and industrial load. RF The smaller it is, the shorter the recovery interval between two load responses is, and the deeper the response fatigue is. The specific formula is:
[0073]
[0074] Where: t and t last are the time of this and last DR respectively; t set,RF Represents the expected recovery time of the load. The air conditioning load, machine tool load and arc furnace load can be 1h, 1h and 3h respectively. By setting the recovery time reasonably, it can not only alleviate the user's response fatigue, but also ensure the fairness of different users participating in DR to a certain extent, and also improve the diversity of load states in DR control, and to a certain extent suppress the user's load recovery effect, which has multiple meanings.
[0075] Equipment failure index λ EF Used to evaluate the isolation status after a response device failure. EFThe smaller the value, the longer it takes to isolate and repair the failed response device, and it is not suitable as an adjustable resource for this DR. EF Calculation method:
[0076]
[0077] Where: t set,EF Represents the isolation time of the faulty equipment, which can be 6h; S EF Indicates the execution status of the device for the last DR instruction. It takes 1 if the response is successful, otherwise it takes 0.
[0078] The objective function of maximizing the load response reliability index is:
[0079]
[0080] In the formula, u AC,i 、u MT,i 、u AF,i and u EBE,i is the DR state variable of air conditioning load, machine tool load, arc furnace load, and EBE load; AC,RR,i , MT,RR,i , AF,RR,i and λ EBE,RR,i Respectively represent the response reliability index of the i-th air conditioner load, machine tool load, arc furnace load, and EBE load; N AC 、N MT 、N AF 、N EBE They respectively represent the number of controllable air-conditioning loads, machine tool loads, arc furnace loads, and EBE loads in the distribution network.
[0081] Embodiment 1: Taking the terminal distribution network responding to the peak load control instruction as an example, the flow chart of the terminal distribution network responding to the peak load control is as follows: Figure 1 shown.
[0082] A common objective function for conventional terminal distribution networks to respond to peak load control instructions is to minimize the DR cost. Air conditioning load and some industrial loads are selected as peak load resources. The DR cost minimization objective function is shown in formula (9):
[0083]
[0084] Where: C AC,t , C IL,t and C loss,t They represent the DR cost of air conditioning load and industrial load at time t and the penalty cost corresponding to the actual response capacity deviation; N AC and N EBE are the number of air-conditioning equipment and EBE participating in DR respectively; ρ AC,i and ρEBE,i are the DR response cost coefficients of air conditioning load and EBE respectively; ρ MT , AF and ρ loss are the DR response cost coefficients for reducing the power of machine tools and arc furnaces and the penalty cost coefficients for the actual response capacity deviation, in which the life loss cost of the transformer is taken into account; Δ PAC,i,t , ΔP EBE,i,t They represent the capacity of the i-th air conditioner load and EBE load reduction at time t; ΔP MT,t , ΔP AF,t They represent the total capacity of machine tool load and arc furnace load reduction at time t; P loss,t Represents the actual response capacity deviation at time t.
[0085] The present invention provides a method for fine active power control of a terminal distribution network. On the basis of objective function (9), an objective function for maximizing load response reliability is added to construct a dual-objective control, thereby correcting the control power deviation caused by factors such as user power usage habits and equipment sporadicity, and improving the execution accuracy of control instructions.
[0086] The objective function of maximizing load response reliability can be expressed as:
[0087]
[0088] Where: u AC,i 、u MT,i 、u AF,i and u EBE,i is the DR state variable of air conditioning load, machine tool load, arc furnace load and EBE load; it takes 1 when it participates in DR, otherwise it takes 0. AC,RR , MT,RR , AF,RR and λ EBE,RR They represent the response reliability indexes of air conditioning load, machine tool load, arc furnace load, and EBE load respectively.
[0089] The constraints for solving the above dual-objective control include:
[0090] (1) Power balance constraints
[0091] In the actual DR process, each load has a minimum adjustment step of the response capacity. The total DR capacity cannot be continuously adjusted, and the deviation can only be reduced by diversifying the load combination. In addition, when the demand response adjustable capacity is less than the upper command capacity, the actual response capacity deviation will also occur. Therefore, there is a response power deviation P loss,t , satisfying the power balance constraint:
[0092]
[0093] Where: P sys,t is the expected DR capacity received by LA at time t; P loss,t is the capacity deviation of the actual LA response.
[0094] (2) Load constraints
[0095] 1) Air conditioning load comfort constraint. Considering the air conditioning operating power range limit, and the air conditioning set temperature should be within the general human comfort temperature range, there is a constraint as shown in formula (12).
[0096]
[0097] Where: T AC,i (t) is the set temperature of the i-th air conditioner at time t; T set,max and T set,min Respectively represent the upper and lower limits of the air conditioning set temperature; P AC,i (t) is the operating power of the i-th air conditioner at time t; P AC,max and P AC,min Respectively represent the upper and lower limits of the air conditioner operating power.
[0098] 2) Power reduction constraints for light industrial machine tools
[0099] Light industrial enterprises can respond to the grid peak load regulation instruction by reasonably interrupting some machine tool equipment in the discrete production process, and then resume production after the response is completed. Assume that the operating power of each machine tool in the i-th light industrial enterprise at time t is P MT,i (t), the total power reduced by interrupting the machine tool is ΔP MT (t) is as shown in formula (13).
[0100]
[0101] Where: β MT,i is the number of machine tools interrupted by the i-th light industrial enterprise; β MT,i,max N is the maximum number of machine tools that can be interrupted by the i-th light industrial enterprise; MT The number of light industrial enterprises.
[0102] 3) Steelmaking electric arc furnace power reduction constraints
[0103] The electric arc furnace is a high energy consumption process in steel mills and has a large DR value. By adjusting the load regulating transformer, the power of the electric arc furnace can be adjusted to achieve load reduction while ensuring that the total melting energy of the electric arc furnace remains unchanged. The electric arc furnace response model is established as shown in formula (14).
[0104]
[0105] Where: β AF,iis the adjustment level of the i-th electric arc furnace, corresponding to different melting power levels; β AF,i,max is the maximum adjustment level of the i-th electric arc furnace; N AF Indicates the number of arc furnaces; ΔP AF (t) the power cut for regulating the electric arc furnace; P AF,i (t) is the regulating power of the i-th electric arc furnace per unit gear.
[0106] 4) Constraints on Energy Backup Equipment (EBE) within the plant
[0107] There are usually certain backup resources inside the factory to ensure that sensitive equipment can still operate normally in unexpected situations. The backup resources inside the factory include: 1) intermediate product reserves, 2) backup energy storage inside the factory, and 3) backup diesel engines inside the factory.
[0108] The principle of EBE's participation in DR is as follows Figure 2 Assume that a production line has two adjacent processes A and B. When DR is used, there are two ways to reduce the power consumption of process A:
[0109] Use the factory's backup energy storage and diesel engine to temporarily supply power to process A;
[0110] Reduce the operating load of process A and maintain the operation of process B by investing in intermediate product reserves.
[0111] To simplify the model, the remaining reserve of intermediate products and the remaining fuel of diesel engine can be equivalent to the energy storage charge state SOC SR , a universal equivalent energy storage model of EBE is established, as shown in formula (15).
[0112]
[0113] Where: SOC EBE is the equivalent charge capacity of EBE, representing the inventory of intermediate products or the amount of diesel engine oil; SOC EBE,max and SOC EBE,min is the upper and lower limits of the equivalent charge capacity, representing the inventory limit of intermediate products and the limit of diesel engine oil; ΔP EBE,dis is the discharge power of equivalent energy storage, representing the intermediate product supply rate or diesel engine power generation; ΔP EBE,dis,max and ΔP EBE,dis,min is the upper and lower limits of the discharge power of the equivalent energy storage; η EBE,dis is the equivalent energy storage discharge efficiency, represents the intermediate product conversion efficiency or diesel engine power generation efficiency, and Δt represents the program operation step.
[0114] Considering the particularity of EBE, it requires sufficient recovery time after each response to complete the replenishment of risk reserve resources within the plant. Therefore, it is stipulated that EBE is only used when the total capacity of other adjustable loads cannot meet P sys,t Participate in the response at any time, and set a daily response limit, as shown in formula (16).
[0115]
[0116] Where: u EBE It is a Boolean variable. When it is 1, EBE participates in DR; otherwise, it does not participate.
[0117] By solving the dual-objective control (9) and (10), the terminal distribution network can be finely controlled in terms of active power, and the control power deviation caused by factors such as user power consumption habits and equipment sporadicity can be corrected, thereby improving the execution accuracy of control instructions.
[0118] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0119] In the description of the present invention, it should be understood that the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0120] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. A method for controlling active power of a terminal distribution network, characterized in that: The following steps are involved: Based on the load operation characteristics of the terminal distribution network, a load response reliability index for reflecting the impact on load response accuracy is obtained; Based on the load response reliability index, a first objective function for maximizing the load response reliability index is constructed, and added to a second objective function of power balance control, peak load regulation control or frequency regulation control of the terminal distribution network to form a multi-objective control, thereby correcting the control power deviation caused by factors such as user power consumption habits and equipment sporadic factors, and improving the execution accuracy of control instructions; In the process of obtaining the load response reliability index, the load response reliability index is expressed as: Among them, λ AC,RR , MT,RR , AF,RR and λ EBE,RR They represent the response reliability index of air conditioning load, machine tool load, arc furnace load and EBE load respectively; λ AC,EUP , AC,CF , AC,RF、 λ AC,EF The power consumption period index, comfort index, response fatigue index, and equipment failure index, which are the factors affecting the reliability of air-conditioning load response, are respectively represented; λ MLS,RC , MLS,RF , MLS,EF The response capacity index, response fatigue index, and equipment failure index represent the factors affecting the reliability of industrial load response respectively; λ EBE,BR , EBE,EF The response reserve index and equipment failure index represent the factors affecting the reliability of EBE response respectively; In the process of constructing the first objective function, the first objective function is expressed as: Among them, u AC,i 、u MT,i 、u AF,i and u EBE,i is the DR state variable of the i-th air conditioner load, machine tool load, arc furnace load, and EBE load; λ AC,RR ,i、λ MT,RR ,i、λ AF,RR,i and λ EBE,RR,i They represent the response reliability index of the i-th air conditioner load, machine tool load, arc furnace load, and EBE load respectively; N AC 、N MT 、N AF 、N EBE They respectively represent the amount of air conditioning load, machine tool load, arc furnace load and EBE load that can be controlled in LA.
2. The active power control method of a terminal distribution network according to claim 1, characterized in that: In the process of obtaining the load response reliability index, based on the load operation characteristics, the factors affecting the load response accuracy are analyzed from two aspects: user behavior and equipment failure, and the load response reliability index that comprehensively reflects the factors affecting the load response accuracy is obtained.
3. The active power control method of a terminal distribution network according to claim 2, characterized in that: In the process of analyzing the factors that affect the load response accuracy, for air conditioning loads, the factors that reduce the response reliability due to user behavior include: 1.1) The air conditioner switch state changes within the response cycle; 1.2) The air conditioning set temperature is adjusted within the response period; 1.3) Frequent responses lead to a decline in user experience and response fatigue; For industrial users, factors that reduce their response reliability include: 2.1) The marginal cost of industrial users participating in DR increases with the increase of response capacity, resulting in a decrease in their willingness to respond; 2.2) When EBE participates in DR, the risk reserve of factory production is reduced, the economic loss when encountering risks is increased, and the user's DR willingness decreases; 2.3) Frequent responses interfere with normal factory production and industrial users become response fatigued.
4. The active power control method of a terminal distribution network according to claim 1, characterized in that: In the process of forming multi-objective control, multi-objective control is achieved by setting power balance constraints and load constraints based on the first objective function and the second objective function.
5. The active power control method of the terminal distribution network according to claim 4, characterized in that: In the process of setting the power balance constraint, the power balance constraint is expressed as: Among them, P sys,t is the expected DR capacity received by LA at time t; P loss,t is the capacity deviation of the actual response of LA; ΔP AC,i,t , ΔP EBE,i,t They represent the capacity of the i-th air conditioner load and EBE load reduction at time t; ΔP MT,t , ΔP AF,t They respectively represent the total capacity of machine tool load and arc furnace load reduction at time t.
6. The active power control method of a terminal distribution network according to claim 5, characterized in that: In the process of setting load constraints, the load constraints are generated by setting air conditioning load comfort constraints, light industrial machine tool power reduction constraints, steelmaking arc furnace power reduction constraints and in-plant energy backup equipment constraints, wherein the air conditioning load comfort constraints are used to constrain the air conditioning set temperature to be within the general human comfort temperature range, the light industrial machine tool power reduction constraints are used to respond to power grid peak load instructions, and the steelmaking arc furnace power reduction constraints are used to adjust the arc furnace power to achieve load reduction while ensuring that the total melting energy of the arc furnace remains unchanged; the in-plant energy backup equipment constraints are used to ensure that sensitive equipment can still maintain normal operation in unexpected situations.
7. The active power control method of a terminal distribution network according to claim 6, characterized in that: Among industrial users, when considering EBE to participate in DR, it is assumed that EBE is only used when the total capacity of other adjustable loads cannot meet P sys,t Participate in the response at any time, and limit the number of responses per day.
8. An active power control system for a terminal distribution network, characterized in that: include: A reliability evaluation module, used to obtain a load response reliability index reflecting the impact on load response accuracy based on load operation characteristics of the terminal distribution network; A multi-objective control module is used to construct a first objective function that maximizes the load response reliability index based on the load response reliability index, and add it to a second objective function of power balance control, peak load control or frequency regulation control of the terminal distribution network to form a multi-objective control, thereby correcting the control power offset caused by the user's power consumption habits and the occasional factors of the equipment, and improving the execution accuracy of the control instruction; In the process of obtaining the load response reliability index, the load response reliability index is expressed as: Among them, λ AC,RR , MT,RR , AF,RR and λ EBE,RR They represent the response reliability index of air conditioning load, machine tool load, arc furnace load and EBE load respectively; λ AC,EUP , AC,CF , AC,RF、 λ AC,EF The power consumption period index, comfort index, response fatigue index, and equipment failure index, which are the factors affecting the reliability of air-conditioning load response, are respectively represented; λ MLS,RC , MLS,RF , MLS,EF The response capacity index, response fatigue index, and equipment failure index represent the factors affecting the reliability of industrial load response respectively; λ EBE,BR , EBE,EF The response reserve index and equipment failure index represent the factors affecting the reliability of EBE response respectively; In the process of constructing the first objective function, the first objective function is expressed as: Among them, u AC,i 、u MT,i 、u AF,i and u EBE,i is the DR state variable of the i-th air conditioner load, machine tool load, arc furnace load, and EBE load; λ AC,RR ,i、λ MT,RR ,i、λ AF,RR,i and λ EBE,RR,i They represent the response reliability index of the i-th air conditioner load, machine tool load, arc furnace load, and EBE load respectively; N AC 、N MT 、N AF 、N EBE They respectively represent the amount of air conditioning load, machine tool load, arc furnace load and EBE load that can be controlled in LA.