A method for extracting brine and creating a cavity during gas injection in a connected well salt cavern gas storage reservoir

By combining the gas injection and halogen extraction processes in the salt cavity gas storage in the connected well, the salt cavity is screened using sonar cavity measurement technology, and the intermediate well is used to discharge halogen. The cavity is formed by fresh water or light brine, which is solved by the small-sized salt cavity that cannot meet the storage capacity. The problem of gas demand has improved the utilization rate of salt rock resources and gas storage capacity, and shortened the construction period.

CN117868757BActive Publication Date: 2024-11-05JIANGSU GUONENG PETROLEUM & NATURAL GAS CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311711675.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-13
Publication Date
2024-11-05
Estimated Expiration
2043-12-13

AI Technical Summary

Technical Problem

The small salt cavity in the salt hole gas storage in the Tongxiejing salt hole cannot meet the gas storage needs, resulting in waste of salt rock resources and extending the gas storage storage construction cycle.

Method used

The larger salt cavity is screened as the gas injection well by sonar chamber measurement technology, and the smaller salt cavity is used as the cavity formation well. Combined with the gas injection and halogen extraction process, the intermediate well is used to discharge the halogen and manufacture it through fresh water or brine water The capacity of the salt cavity is gradually expanded.

Benefits of technology

The utilization rate of salt ore resources has been improved, the capacity of gas storage storage has been expanded, the construction period of gas storage has been shortened, and the full development of salt rock resources and the early production of gas storage has been achieved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117868757B_ABST
    Figure CN117868757B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for extracting brine and forming a cavity during the gas injection process of a connected well salt cavern gas storage, comprising: in the connected well salt cavern, preferably a large salt cavern is used as a gas injection well, and a small salt cavern is used as a cavity forming well, and an intermediate well is drilled on the connecting passage of the two connected wells or a well is drilled on the salt cavern of the cavity forming well as a brine drainage well; natural gas is injected into the larger salt cavern through the gas injection well, and while this process is in progress, fresh water or fresh brine is injected into the smaller salt cavern through the cavity forming well to extract brine and form a cavity, and the brine displaced by the natural gas and the brine formed by the brine extraction and cavity forming are discharged through the brine drainage well. The method utilizes the connectivity of the salt cavern, combines gas injection and brine extraction and cavity forming, realizes brine extraction and cavity forming during the gas injection process, improves the utilization rate of salt mine resources, expands the storage capacity of the gas storage, shortens the gas storage construction period, and realizes the maximization of economic benefits.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a method for extracting brine and creating a cavity during the gas injection process of a connected well salt cavern gas storage reservoir, and specifically belongs to the field of natural gas storage and salt rock water solution mining. Background Art

[0002] The connected well salt cavern gas storage is a gas storage built using underground salt caverns, which has the advantages of large gas storage capacity and long-term gas storage. However, when salt mining enterprises use connected wells for salt rock water solution mining, they often adopt asymmetric mining technology, mainly using one well to inject water to create a cavity, and the other well is mainly used to drain brine, so two salt cavities, one large and one small, are formed.

[0003] Large salt cavities meet the needs of gas storage capacity design, and the utilization rate of salt mine resources is relatively high. However, small salt cavities not only cannot meet the gas storage needs, but also cause a waste of salt rock resources. If brine mining and cavity building continue to expand the storage capacity of smaller salt cavities, the construction cycle of the gas storage will be increased.

[0004] Therefore, when a connected well salt cavern gas storage uses a salt cavity that has reached the standard volume for gas injection, it is an important issue how to expand the volume of the other cavity that has not reached the standard, increase the storage capacity of the gas storage, fully develop and utilize the remaining salt mine resources, and at the same time ensure the safe operation of the connected well salt cavern gas storage. Summary of the invention

[0005] The present invention provides a method for extracting brine and forming a cavity during the gas injection process of a connected well salt cavern gas storage reservoir, which utilizes the connectivity of the salt caverns to combine gas injection and extracting brine and forming a cavity, thereby realizing the work of extracting brine and forming a cavity in another salt cavern with a smaller volume during the gas injection process of the gas storage reservoir, thereby improving the utilization rate of salt mine resources, expanding the storage capacity of the gas storage reservoir, and shortening the construction period of the gas storage reservoir. The method comprises the following steps:

[0006] (1) In the connected well salt cavern gas storage, the salt well with a larger salt cavern volume is selected as the gas injection well through sonar cavity detection technology, and another salt well with a smaller salt cavern volume (not reaching the capacity, if gas is stored at the current stage, it will cause a waste of resources) is used as the cavern formation well;

[0007] (2) Based on the gas storage construction standards, an intermediate well is drilled above the connecting channel between the two connecting wells to enter the connecting channel as a brine drainage well, or a well is drilled into the cavity on the salt cavern of the cavity well to serve as a brine drainage well;

[0008] (3) Natural gas is injected into the larger salt cavity through the preferred gas injection well, displacing the brine from top to bottom. The brine enters the brine drainage well through the connecting channel and is discharged;

[0009] (4) At the same time as the gas injection starts in step (3), a high-pressure pump is used to pump fresh water or brine from the cavity-making well into the salt cavity with a smaller volume to extract brine and make a cavity. The brine formed in the cavity is discharged through the brine discharge well;

[0010] (5) At the end of gas injection, stop pumping fresh water or brine and close the valve of the cavity well. Continue to inject gas to a certain extent and then close the valve of the brine well. After injecting gas to the planned gas volume, stop injecting gas, maintain pressure and close the well. The entire gas injection cycle ends.

[0011] Since the brine mining and cavity making process cannot be completed overnight and requires a long period of time, the above steps are repeated after the next gas injection cycle begins, and the cycle continues until the volume of the salt cavity in the cavity making well reaches the required gas storage capacity.

[0012] Furthermore, in step (1), the connected well salt cavern gas storage refers to the salt cavern that has been transformed from an old well, meets the gas storage gas injection and production standards, and has passed the verification of sealing and stability; the volume of the selected gas injection well salt cavern is 200,000-400,000 m 3 , preferably 250,000-350,000 m 3 The volume of the cavern is generally less than 200,000 m 3 .

[0013] Furthermore, in step (2), when the brine drainage well is drilled above the connecting channel between two connecting wells, it is not advisable to directly enter the connecting channel. Instead, water injection and fracturing should be performed 10-50 m, preferably 20-40 m, and more preferably 25-35 m above the connecting channel; after fracturing into the connecting channel, fresh water is continuously injected for a period of time.

[0014] Furthermore, in step (2), when the brine drainage well is drilled on the salt cavern of the cavity-forming well, the wellhead position of the brine drainage well into the cavity should be lower than the wellhead position of the cavity-forming well into the cavity. Preferably, the wellhead position of the brine drainage well into the cavity is in the sediment area in the cavity, and more preferably, the wellhead position of the brine drainage well into the cavity is lower than 1 / 3 of the horizontal height of the connecting channel.

[0015] Furthermore, in steps (3) and (4), while injecting gas through the gas injection well using a compressor, a high-pressure pump is used to pump fresh water or brine into the cavity formation well, ensuring that the pressure in the gas storage salt cavity is slightly greater than the pressure of the pumped brine, about 0.1-1Mpa, preferably 0.15-0.6Mpa, and more preferably 0.2-0.4Mpa.

[0016] Furthermore, in step (5), as the gas injection process proceeds, the interface between natural gas and brine gradually moves downward. When the gas-liquid interface in the gas storage well is located 10-20 m, preferably 12-18 m or 14-16 m above the sediment channel, pumping of fresh water or brine is stopped and the cavity well valve is closed.

[0017] Furthermore, in step (5), as the gas injection progresses to the end, the interface between natural gas and brine moves further downward, and when the gas-liquid interface in the gas storage well is 0-10m, preferably 2-8m, 3-6m or 4-5m above the sediment channel, the brine discharge well valve is closed to stop the brine discharge.

[0018] During the entire process of gas injection, brine extraction and cavity creation, the water injection pressure of the cavity creation well changes dynamically with the change of the operating pressure of the gas storage well, and the water injection pressure is lower than the operating pressure of the gas storage well during the entire time period. The injected fresh water or brine can only dissolve the salt rock in the salt cavern of the cavity creation well and will not affect the stability of the gas storage well and the connecting channel.

[0019] The advantages of the present invention are:

[0020] 1. The present invention enables the connected well gas storage to store gas in salt cavities that have reached capacity in advance during the construction process, while continuing to extract brine and build cavities in salt cavities that have not reached capacity, thereby shortening the construction period of the gas storage and enabling the gas storage to be put into production as soon as possible.

[0021] 2. The present invention improves the utilization rate of salt mine resources, expands the storage capacity of gas storage, and maximizes economic benefits. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] The present invention is further explained and illustrated by referring to the accompanying drawings and specific embodiments below.

[0023] Figure 1 This is a structural diagram of the brine extraction and cavity making process during the gas injection process of the connected well salt cavern gas storage, when the brine discharge well is located above the connected channel;

[0024] Figure 2 This is a structural diagram of the brine extraction and cavity making process during the gas injection process of the connected well salt cavern gas storage. The brine drainage well is located on the side of the cavity making well, which is also a lateral well.

[0025] Among them, 1 is a cavity making well, 2 is a brine drainage well, 3 is a steam injection well, 4 is a cavity making wellhead valve, 5 is a brine drainage wellhead valve, 6 is a gas injection wellhead valve, 7 is a connecting channel, 8 is a sediment area, 9 is brine, 10 is natural gas, and 11 is a gas-liquid interface. DETAILED DESCRIPTION

[0026] The present invention will be further described in specific embodiments. The embodiments of the present invention provide a specific method and step, but it should be understood that the embodiments of the present invention are not limited to the described steps and materials. On the contrary, the scope of the present invention should be interpreted as including various modifications and variations, which fall within the spirit and scope of the present invention.

[0027] Examples (such as Figure 1 )

[0028] Screening and drilling: A pair of wells in a salt mine that had been renovated were selected to build a gas storage reservoir. The volume of the salt cavity in Well 1 was measured to be 90,000 cubic meters and that in Well 3 was 300,000 cubic meters by sonar cavity measurement technology. Well 1 was used as a cavity well and Well 3 as a gas injection well. In addition, a new well (Well 2) was built above the connecting channel between Wells 1 and 3 according to the well construction standards for gas storage reservoirs to enter the connecting channel as a brine drainage well. During the construction of Well 2, drilling was stopped 50 meters above the connecting channel, and after casing cementing, water injection fracturing was used to enter the connecting channel. After fracturing into the connecting channel, fresh water or fresh brine was continuously injected for 10 days to prevent the open hole section of the brine drainage well from shrinking and collapsing, thereby blocking the brine drainage channel.

[0029] Gas injection, brine extraction and cavity creation: Use a compressor to pressurize natural gas to the design pressure, open the gas injection wellhead valve 6, and inject natural gas into the salt cavity of well 3 through the steam injection well 3; while the compressor starts gas injection, use a high-pressure pump to pressurize fresh water or brine to the design pressure, open the cavity creation wellhead valve 4, and inject fresh water or brine into the salt cavity of well 1 through the cavity creation well 1. At this time, natural gas displaces the brine in the salt cavity of well 1 from top to bottom, and the brine is discharged through the brine drainage well 2; fresh water or brine is pumped into the salt cavity of well 1 to dissolve the salt rock and perform cavity creation. The brine formed by cavity creation is discharged through the brine drainage well 2. In this process, it is necessary to ensure that the natural gas pressure is slightly greater than the fresh water or brine pressure by about 0.3Mpa. The purpose of this is to prevent brine from flowing back into the gas injection salt cavity and ensure the smooth gas injection and brine removal.

[0030] Stop well and close valve: During the gas injection process, pay attention to the monitoring and detection of the gas-liquid interface in the salt cavity of gas injection well 3. As the gas injection process proceeds, the interface between natural gas and brine gradually moves downward. When the gas-liquid interface in the salt cavity of steam injection well 3 is 15m above the sediment channel, stop pumping fresh water and close the cavity well valve 4. As the gas injection reaches the end, the interface between natural gas and brine moves further downward. When the gas-liquid interface in the salt cavity of steam injection well 3 is 5m above the sediment channel, close the brine discharge well valve 5 to stop brine discharge.

[0031] Figure 2 It is a lateral well, and its working mode is similar to Figure 1 similar.

[0032] The method for extracting brine and creating a cavity during the gas injection process of the connected well salt cavern gas storage provided in the above embodiment can be adjusted according to actual needs during implementation. For example, the location and depth of the well can be adjusted according to the specific conditions of the gas storage, and the type and depth of the channel between the connected wells should also be considered. For example, the purpose of storing gas and creating a cavity to a greater extent in the gas storage can be achieved by injecting gas and fresh water at different pressures and flow rates.

Claims

1. A method for extracting brine and creating a cavity during the gas injection process of a connected well salt cavern gas storage reservoir, characterized in that: The following steps are involved: (1) In the connected well salt cavern gas storage, the sonar cavity measurement technology is used to select the salt well with a larger salt cavity volume as the gas injection well, and the other salt well with a smaller salt cavity volume as the cavity formation well. The larger volume refers to the salt well that has reached the volume standard, and the smaller volume refers to the salt well that has not reached the volume standard. (2) Based on the gas storage construction standards, an intermediate well is drilled above the connecting channel between the two connecting wells to enter the connecting channel as a brine drainage well, or a well is drilled into the cavity on the salt cavern of the cavity well to serve as a brine drainage well; (3) Natural gas is injected into the larger salt cavity through the gas injection well, displacing the brine from top to bottom. The brine enters the brine drainage well through the connecting channel and is discharged; (4) At the same time as the gas injection starts in step (3), a high-pressure pump is used to pump fresh water or brine from the cavity-making well into the salt cavity with a smaller volume to extract brine and make a cavity. The brine formed in the cavity is discharged through the brine discharge well; (5) At the end of gas injection, stop pumping fresh water or brine and close the valve of the cavity well. Continue to inject gas to a certain extent and then close the valve of the brine well. After injecting gas to the planned gas volume, stop injecting gas, maintain pressure and close the well. The entire gas injection cycle ends. (6) After the next gas injection cycle begins, repeat the above steps until the salt cavity volume of the cavity well reaches the required gas storage capacity.

2. The method for extracting brine and creating a cavity during the gas injection process of a connected well salt cavern gas storage according to claim 1, characterized in that: In step (1), the connected well salt cavern gas storage refers to the salt caverns that have been transformed from old wells, meet the gas storage gas injection and production standards, and have passed the verification of sealing and stability; the volume of the selected injection well salt cavern is 200,000-400,000 m 3 The volume of the cavern is less than 200,000 m 3 .

3. The method for extracting brine and creating a cavity during the gas injection process of a connected well salt cavern gas storage according to claim 1, characterized in that: In step (2), when the brine drainage well is drilled above the connecting channel between two connecting wells, it is not advisable to directly enter the connecting channel. Water injection and fracturing should be carried out 10-50m above the connecting channel; after fracturing into the connecting channel, fresh water should continue to be injected for a period of time to ensure that the wellbore is unobstructed.

4. The method for extracting brine and creating a cavity during the gas injection process of a connected well salt cavern gas storage according to claim 1, characterized in that: In step (2), when the brine drainage well is drilled on the salt cavern of the cavity-forming well, the wellhead position of the brine drainage well entering the cavity should be lower than the wellhead position of the cavity-forming well entering the cavity.

5. The method for extracting brine and creating a cavity during the gas injection process of a connected well salt cavern gas storage according to claim 4, characterized in that: The wellhead of the brine drainage well into the cavity is located in the sediment area in the cavity.

6. The method for extracting brine and creating a cavity during the gas injection process of a connected well salt cavern gas storage according to claim 1, characterized in that: In step (4), while using a compressor to inject gas through the gas injection well, a high-pressure pump is used to pump fresh water or brine into the cavity well. It is necessary to ensure that the pressure in the gas storage salt cavity is slightly greater than or equal to the pressure of the pumped brine to prevent brine backflow.

7. The method for extracting brine and creating a cavity during gas injection in a connected well salt cavern gas storage according to claim 1, characterized in that: In step (5), as the gas injection process proceeds, the interface between natural gas and brine gradually moves downward. When the gas-liquid interface in the gas storage well is 10-20 m above the sediment channel, pumping of fresh water or brine is stopped and the cavity well valve is closed.

8. The method for extracting brine and creating a cavity during the gas injection process of a connected well salt cavern gas storage according to claim 1, characterized in that: In step (5), as the gas injection progresses to the end, the interface between natural gas and brine moves further downward. When the gas-liquid interface in the gas storage well is 0-10 m above the sediment channel, the brine discharge well valve is closed to stop the brine discharge.

9. The method for extracting brine and creating a cavity during the gas injection process of a connected well salt cavern gas storage according to any one of claims 1 to 8, characterized in that: During the process of gas injection and brine extraction, the water injection pressure of the cavity well changes dynamically with the operating pressure of the gas storage well.

10. The method for extracting brine and creating a cavity during the gas injection process of a connected well salt cavern gas storage according to any one of claims 1 to 8, characterized in that: By utilizing the connectivity of salt caverns, gas injection and brine extraction and cavity creation are combined, so that while one well in a connected salt cavern gas storage is injecting gas, another well is simultaneously extracting brine and creating a cavity, thereby improving the utilization rate of salt mine resources and expanding the storage capacity of the gas storage.